This document contains responses to contractor questions regarding Solicitation Number 36C24921R0010 for renovations to Building 34 at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. Key details include the scope of work involving renovations to correct facility condition assessment deficiencies, a base bid quantity of 550 linear feet for thermal system insulation removal, clarification that steam and condensate lines not part of the renovation do not require tie-ins, and the requirement for polypropylene piping as specified. Contractors are directed to secure construction areas with fencing and provided guidance on acceptable temporary fencing options and durations. The response also addresses questions on asbestos abatement procedures, exposed mastic removal, and the need for the contractor to submit wage conformance at time of contract award.

View the file

Other files

File Type Posted
36C24921R0010 0005.pdf PDF
Bldg 34 Spec Section 281300.pdf PDF
423-926.1171.Arch-Mtn_Home updated 2-10.pdf PDF
RFI 005 - 210205_Responded.pdf PDF
RFI 004 - 210129_Responded_02092021.pdf PDF
RFI 002 - 210120 (GLMV Comments) (002).pdf PDF
RFIs response clarifications.pdf PDF
RFI 001 - 210118_Responded.pdf PDF
Site visit 2 28 Jan 2020.pdf PDF
36C24921R0010 0004.pdf PDF
Site Visit 13 Jan 2021.PDF PDF
brick vault at slab infill4.jpg JPG image
B34 new ACM Survey.pdf PDF
brick vault at slab infill1.jpg JPG image
Protect in place equipment.pdf PDF
01-29-21 Reno Bldg. 34 - RFI 88-91_Responded.pdf PDF
LBP DOC-Word.pdf PDF
brick vault at slab infill2.jpg JPG image
01-20-21 Reno Bldg. 34 - RFI 44-51 Valiant_Responsed.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 1-16 Valiant_Responsed.pdf PDF
RFI 003 - 210129_Responded.pdf PDF
Advon RFIs response.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 26-34 Valiant_Responsed.pdf PDF
Building 34 ACM Report.pdf PDF
36C24921R0010 0003.pdf PDF
brick vault at slab infill3.jpg JPG image
brick vault at slab infill5.jpg JPG image
423-926.1171.Arch-Mtn_Home 2.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 52-60 Valiant_Responsed.pdf PDF
brick vault at slab infill.jpg JPG image
TN20200111 01012021RFI BIC 4 1-20-21_Responded.pdf PDF
TN20200111 01012021RFI BIC 6 Responded.pdf PDF
TN20200111 01012021RFI BIC 2 1-20-21_Responded.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 17-25 Valiant_Responsed.pdf PDF
REQUEST FOR INFORMATION (RFI) 1 1-13-21 BIC_Responsed.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 71-75 Valiant_Responsed.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 61-70 Valiant_Responsed.pdf PDF
TN20200111 01012021RFI BIC 3 1-20-21_Responded.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 35-43 Valiant_Responsed.pdf PDF
36C24921R0010 0002.pdf PDF
36C24921R0010 0001.pdf PDF
36C24921R0010 0001.docx DOCX document
Calculation of Self Performed Work.pdf PDF
Past Performance Questionnaire.pdf PDF
Copy of General Conditions Breakout.xlsx XLSX spreadsheet
36C24921R0010_1.docx DOCX document
Contractor EMR Certification Form.pdf PDF
B-34 Architectural.pdf PDF
B-34 Plumbing.pdf PDF
WD - TN20200111 01012021.pdf PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION (RFI)

36C24921R0010

PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.

When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.

PROJECT TITLE: Renovate Bldg. 34 to Correct FCA

Deficiencies

PROJECT LOCATION: James H. Quillen VA Medical

Center

P.O. Box 4000

Mt. Home, TN 37684

SUBMITTED BY: City/State:

PHONE NO.:

TO: Dewayne L. Knowles

Dewayne.Knowles@va.gov

Diana K. Grube

Diana.Grube@va.gov

RFI NO.: 79-87 DATE:01-29-21 SPEC/DWG. REFERENCE:

REPLY NEEDED BY:

INFORMATION NEEDED:

79. Are the General Contractors required to place a Temporary Construction Fence around the perimeter of the building? If so, can the VA provide how far back from the Building this should occur?

80. Instead of a Chain Link Temporary Construction Fence, would it be acceptable to use Snow Fence around the perimeter, excluding where dumpsters would be located?

81. Drawing 34-AR-1 shows Keynote 6 labeled where the walls are to remain. Does the Government expect the

Asbestos Contractor to remove the Block filler from these walls that are to remain by grinding it off?

82. Drawing 34-AD-101 in Room E085 Freezer, once the existing Freezer units get removed, it will expose a black mastic on the existing Ceiling that is shown to be “Hot,” per the previous testing reports. Does the VA want this removed?

83. The Asbestos report, nor the Drawings indicate a basis for the amount of TPI that is to be removed. The total LF could not be field verified. Typically, we’re providing with a LF to account for in the contract and add an additional 10% to that total. Can the VA provide us with the total LF that should be accounted for in the Base

Bid?

84. Existing underground steam condensate has several lines coming into the building that are not shown on the drawings. Do these lines need to be tied back to the new system piping and pump? Please advise.

85. Can the specifications for the heating hot water piping in the lower mechanical room be changed to the normal steel piping used in the VA Building.

This will allow for a much better installation and then change to the polypropylene as it leaves the mechanical room. Please advise.

86. Section 04 01 00 of the specs call for Maintenance of Masonry, the scope calls for repointing existing, damaged masonry joints & replacing existing, damaged masonry units. The exterior elevation plans do not have any notes or details specifying areas to be repaired. Can you please provide updated elevations indicating the specific areas which will require masonry repairs/replacement?

87. Wages TN20210111 01/01/2021 do not indicate the wages for Asbestos or Lead Abatement worker. Please provide those missing wages?

REPLY:

79. Contractors will need to secure any construction laydown areas with chain link fence. The contractor will also need to fence in any area were work is occurring on the exterior of the building so as to prevent public access to work areas.

80. Snow fence is not permitted for any long-term fencing. Snow fencing will be allowed for temporary fence needs not to exceed 2 weeks.

81. Block walls schedule to remain for this project will not require abatement. Only block walls scheduled for disturbance will require abatement.

82. Asbestos-containing black mastic associated with freezers are to be removed from substrates in all locations.

83. Please use 550 linear feet for thermal system insulation (TSI) as a base bid.

84. Steam and condensate pipes that are not utilized for the renovation of this building do not require tie in into the building.

85. Polypropylene was specifically requested by the VA. We have no objection to what is proposed subject to approval by the VA

86. Brick tuckpointing is only intended for areas of building penetration being repaired.

87. The contractor will submit a wage conformance to the CO at the time of contract award.