Advon RFIs response.pdf

PDF 83 KB Posted

Attached to
Renovate Building #34 to Correct FCA Deficiencies
Solicitation number
36C24921R0010
Issued by

About this file

This document contains responses to questions regarding a solicitation for renovations to Building 34 at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. The solicitation requires renovations to correct facility condition assessment deficiencies. Security guards will not be needed for the project as the facility will be vacated prior to notice to proceed. Furnishings will need to be removed and palletized for storage in the paint booth area or loading docks. The single superintendent may serve as the site safety and health officer. LEED and BIM requirements are not specified. Thermography testing is not required. Simplex Grinnell services the fire alarm, PlugSmart the HVAC controls, and the VA police services maintain access controls and the CCTV system. A room finish schedule can be found in specification section 09 06 00. Key note 11 on plan sheet 34-A-102 shall be the same as key note 5.

View the file

Other files

File Type Posted
36C24921R0010 0005.pdf PDF
Bldg 34 Spec Section 281300.pdf PDF
423-926.1171.Arch-Mtn_Home updated 2-10.pdf PDF
RFI 005 - 210205_Responded.pdf PDF
RFI 004 - 210129_Responded_02092021.pdf PDF
RFI 002 - 210120 (GLMV Comments) (002).pdf PDF
RFIs response clarifications.pdf PDF
RFI 001 - 210118_Responded.pdf PDF
Site visit 2 28 Jan 2020.pdf PDF
36C24921R0010 0004.pdf PDF
Site Visit 13 Jan 2021.PDF PDF
brick vault at slab infill4.jpg JPG image
B34 new ACM Survey.pdf PDF
brick vault at slab infill1.jpg JPG image
Protect in place equipment.pdf PDF
01-29-21 Reno Bldg. 34 - RFI 88-91_Responded.pdf PDF
LBP DOC-Word.pdf PDF
brick vault at slab infill2.jpg JPG image
01-20-21 Reno Bldg. 34 - RFI 44-51 Valiant_Responsed.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 1-16 Valiant_Responsed.pdf PDF
RFI 003 - 210129_Responded.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 26-34 Valiant_Responsed.pdf PDF
Building 34 ACM Report.pdf PDF
36C24921R0010 0003.pdf PDF
brick vault at slab infill3.jpg JPG image
brick vault at slab infill5.jpg JPG image
01-29-21 Reno Bldg. 34 - RFI 79-87_Responded.pdf PDF
423-926.1171.Arch-Mtn_Home 2.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 52-60 Valiant_Responsed.pdf PDF
brick vault at slab infill.jpg JPG image
TN20200111 01012021RFI BIC 4 1-20-21_Responded.pdf PDF
TN20200111 01012021RFI BIC 6 Responded.pdf PDF
TN20200111 01012021RFI BIC 2 1-20-21_Responded.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 17-25 Valiant_Responsed.pdf PDF
REQUEST FOR INFORMATION (RFI) 1 1-13-21 BIC_Responsed.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 71-75 Valiant_Responsed.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 61-70 Valiant_Responsed.pdf PDF
TN20200111 01012021RFI BIC 3 1-20-21_Responded.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 35-43 Valiant_Responsed.pdf PDF
36C24921R0010 0002.pdf PDF
36C24921R0010 0001.pdf PDF
36C24921R0010 0001.docx DOCX document
Calculation of Self Performed Work.pdf PDF
Past Performance Questionnaire.pdf PDF
Copy of General Conditions Breakout.xlsx XLSX spreadsheet
36C24921R0010_1.docx DOCX document
Contractor EMR Certification Form.pdf PDF
B-34 Architectural.pdf PDF
B-34 Plumbing.pdf PDF
WD - TN20200111 01012021.pdf PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION (RFI)

36C24921R0010

PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.

When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.

PROJECT TITLE: Renovate Bldg. 34 to Correct FCA

Deficiencies

PROJECT LOCATION: James H. Quillen VA Medical Center P.O. Box 4000 Mt. Home, TN 37684

SUBMITTED BY: City/State:

PHONE NO.:

TO: Dewayne L. Knowles Dewayne.Knowles@va.gov

Diana K. Grube Diana.Grube@va.gov

RFI NO.: #1 - #12 DATE: 1/20/2021 SPEC/DWG. REFERENCE: See details below

REPLY NEEDED BY:

INFORMATION NEEDED:

1. Per spec section 01 00 00, para 1.5 (c), will the contractor be required to provide security guards for this project?

2. Per spec section 01 00 00, para 1.5 (g), states that phasing will be required, and the personnel will be within the facility, but para (h) states that the facility will be vacated after NTP is provided to the contractor. Please confirm that the facility will be vacant during the construction phase of this project.

3. Per spec section 01 00 00, para 1.7(d), what furnishings will the contractor be required to remove? If any, will these need to be stored in a conditioned space and will the contractor be required to re-install them? Please provide a list of furnishings that the contractor is to remove.

4. Per spec section 01 35 26, para 1.7, can the SSHO also be the superintendent or will this be a separate position?

5. Per spec section 01 45 29, para 3.4 (C), what LEED requirements are to be provided by the contractor for this project?

6. Per spec section 01 45 29, para. 3.4 (C), will the contractor be required to provide all the additional QC management personnel for the matrix provided, or can our onsite QC manager or our specialized subcontractors provide QC management for the additional disciplines stated in this matrix? This is a very expensive option if we have to provide individual QC managers for the different the disciplines.

7. Per spec section 01 91 00, para 1.1 (F), is BIM modeling a requirement for the contractor to provide for this project?

8. Per spec section 01 91 00, para 1.1 (LLL), is Thermography testing required for the contractor to provide for this project?

9. Who is the company that services the fire alarm system within the facility?

10. Who is the company that maintains the HVAC controls for this facility?

11. Who is the company that maintains the access control or cctv system for this facility?

12. Please provide a room finish schedule.

13. Plan Sheet 34-A-102 Key Note 11 is missing. Please advise what is required?

REPLY:

1. Security Guards will not be required for this project. The project will still need to be made secure (locked, restricted access to public, etc.)

2. The facility will be vacated prior to NTP. This project is a single phase project.

3. The doors shall be palletized and protected from damage (i.e. palletized, stacked, stickered, strapped and plastic wrapped). The Contractor shall make provisions to store the doors in the paint booth and adjacent area during construction. If the VA desires to store the doors elsewhere, we will pallet jack them to the loading docks. (GLMV)

4. The SSHO may be a collateral duty of the site superintendent

5. 01 45 00 3.4 (C) remove LEED specialist. (GLMV)

6. This section is pulled from TIL. (GLMV)

7. Section 01 91 00 para 1.1 (F) does not contain a BIM requirement. Please clarify question and VA will have to wave any requirements in the specification. (GLMV)

8. Section 01 91 00 para 1.1 (LLL) does not contain a thermography testing requirement. Please clarify question and VA will have to wave any requirements in the specification. (GLMV)

9. Simplex Grinnell

10. PlugSmart

11. VA police Svcs. Maintains the Access controls system. CCTV is maintained by Avigilon.

12. Room finish schedule see specification section 09 06 00 para 3.3 (B). (GLMV)

13. Key note 11 to read the same as Key Not 5.

REPLY COMPILED BY: HOPE PITTMAN DATE: 1/29/2021

ATTACHMENTS: COPY TO: