REQUEST FOR INFORMATION (RFI) 1 1-13-21 BIC_Responsed.pdf
PDF 97 KB Posted
- Solicitation number
- 36C24921R0010
About this file
This document contains responses to a Request for Information (RFI) regarding a federal contract opportunity to renovate Building 34 at the James H. Quillen VA Medical Center in Mountain Home, Tennessee to correct facility condition assessment deficiencies. The base contract scope of work includes conduit rough-in only for physical access control systems, with all devices, wiring, and installation to be provided and performed by the Department of Veterans Affairs. Contractors shall coordinate device locations and conduit requirements with the owner prior to rough-in. Responses to RFI questions are due by January 27, 2021.
View the file
Other files
Show 40 more
Latest 50 of 58 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION (RFI)
36C24921R0010
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical Center P.O. Box 4000 Mt. Home, TN 37684
SUBMITTED BY: City/State:
PHONE NO.:
TO: Dewayne L. Knowles Dewayne.Knowles@va.gov
Diana K. Grube Diana.Grube@va.gov
RFI NO.: #1 DATE:
1-13-21
SPEC/DWG. REFERENCE:
28 13 00
REPLY NEEDED BY:
INFORMATION NEEDED:
Looking through this job, our sub noticed that Card readers and electronic locks are referenced, but the division 28 13 00 for physical access control wasn't in the project manual.
Is that part of this project, or is it held out?
REPLY: Please refer to the notes on the ES sheets, specifically Note F. Base contract is for conduit rough-in only.
Contractor shall coordinate requirements for the specific system provided by the owner.
ALL VOICE/DATA/CATV/SECURITY DEVICES AND WIRING PROVIDED AND INSTALLED
BY OWNER. E.C. TO PROVIDE BACK BOXES AND CONDUITS. FOR EACH CAMERA
LOCATION, ROUTE A MINIMUM 1" CONDUIT BACK. COORDINATE ALL DEVICE LOCATIONS
AND CONDUIT ROUGH-IN REQUIREMENTS WITH OWNER PRIOR TO
ROUGH-IN. (AME)
REPLY COMPILED BY : HOPE PITTMAN, ATRIAX DATE: 1/27/2021