01-20-21 Reno Bldg. 34 - RFI 61-70 Valiant_Responsed.pdf

PDF 43 KB Posted

Attached to
Renovate Building #34 to Correct FCA Deficiencies
Solicitation number
36C24921R0010
Issued by

About this file

This document contains a request for information (RFI) regarding a solicitation to renovate Building 34 at the James H. Quillen VA Medical Center in Mountain Home, Tennessee to correct facility condition assessment deficiencies. The RFI provides responses to 70 questions from contractors seeking clarification on specifications, drawings, and other requirements. Key areas addressed in the RFI responses include confirmation that paneling and wall finishes are to be removed in several rooms, clarification that repair work will be included in scope but quantified through field surveys, identification of floor and wall finishes to be removed and referred for asbestos testing, and notes regarding furniture and equipment removal and treatment of existing plaster, flooring, and sprinkler systems. The RFI aims to ensure contractors have the information needed to fully understand renovation requirements prior to submitting proposals.

View the file

Other files

File Type Posted
36C24921R0010 0005.pdf PDF
Bldg 34 Spec Section 281300.pdf PDF
423-926.1171.Arch-Mtn_Home updated 2-10.pdf PDF
RFI 005 - 210205_Responded.pdf PDF
RFI 004 - 210129_Responded_02092021.pdf PDF
RFI 002 - 210120 (GLMV Comments) (002).pdf PDF
RFIs response clarifications.pdf PDF
RFI 001 - 210118_Responded.pdf PDF
Site visit 2 28 Jan 2020.pdf PDF
36C24921R0010 0004.pdf PDF
Site Visit 13 Jan 2021.PDF PDF
brick vault at slab infill4.jpg JPG image
B34 new ACM Survey.pdf PDF
brick vault at slab infill1.jpg JPG image
Protect in place equipment.pdf PDF
01-29-21 Reno Bldg. 34 - RFI 88-91_Responded.pdf PDF
LBP DOC-Word.pdf PDF
brick vault at slab infill2.jpg JPG image
01-20-21 Reno Bldg. 34 - RFI 44-51 Valiant_Responsed.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 1-16 Valiant_Responsed.pdf PDF
RFI 003 - 210129_Responded.pdf PDF
Advon RFIs response.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 26-34 Valiant_Responsed.pdf PDF
Building 34 ACM Report.pdf PDF
36C24921R0010 0003.pdf PDF
brick vault at slab infill3.jpg JPG image
brick vault at slab infill5.jpg JPG image
01-29-21 Reno Bldg. 34 - RFI 79-87_Responded.pdf PDF
423-926.1171.Arch-Mtn_Home 2.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 52-60 Valiant_Responsed.pdf PDF
brick vault at slab infill.jpg JPG image
TN20200111 01012021RFI BIC 4 1-20-21_Responded.pdf PDF
TN20200111 01012021RFI BIC 6 Responded.pdf PDF
TN20200111 01012021RFI BIC 2 1-20-21_Responded.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 17-25 Valiant_Responsed.pdf PDF
REQUEST FOR INFORMATION (RFI) 1 1-13-21 BIC_Responsed.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 71-75 Valiant_Responsed.pdf PDF
TN20200111 01012021RFI BIC 3 1-20-21_Responded.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 35-43 Valiant_Responsed.pdf PDF
36C24921R0010 0002.pdf PDF
36C24921R0010 0001.pdf PDF
36C24921R0010 0001.docx DOCX document
Calculation of Self Performed Work.pdf PDF
Past Performance Questionnaire.pdf PDF
Copy of General Conditions Breakout.xlsx XLSX spreadsheet
36C24921R0010_1.docx DOCX document
Contractor EMR Certification Form.pdf PDF
B-34 Architectural.pdf PDF
B-34 Plumbing.pdf PDF
WD - TN20200111 01012021.pdf PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION (RFI)

36C24921R0010

PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.

When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.

PROJECT TITLE: Renovate Bldg. 34 to Correct FCA

Deficiencies

PROJECT LOCATION: James H. Quillen VA Medical

Center

P.O. Box 4000

Mt. Home, TN 37684

SUBMITTED BY: City/State:

PHONE NO.:

TO: Dewayne L. Knowles

Dewayne.Knowles@va.gov

Diana K. Grube

Diana.Grube@va.gov

RFI NO.: 61-70 DATE:01-20-21 SPEC/DWG. REFERENCE:

REPLY NEEDED BY:

INFORMATION NEEDED:

61. Sheet 34-AD-105, Room E110 Carpenter Shop. Does the VA inl Contractor to remove the paneling on the exterior wall and columns that are to remain in place?

62. Sheet 34-AD-105, Rooms E106 through E113, E118-119 have existing ceilings to be removed. Once removed, this opens up to the existing Plaster Ceilings above. The Drawings doesn't indicate Repairing the existing plaster ceilings as shown in Room E104. It was not easily visible during the site visit to see existing conditions. Does the VA intend for the General Contractor to add these rooms in the total repair SQFT as note 9 indicates?

63. Sheet 34-AD-105, Rooms E116 Kitchen and E117 Men's Bathroom, has an existing tile floor that doesn't show to be removed. Can the VA confirm if this floor shall be removed and if it's been tested for Asbestos?

64. Sheet 34-AD-105, Rooms E116 Kitchen and E117 Men's Bathroom, has existing wall tile not shown to be removed on the exterior walls. Does the VA intend for the General Contractor to have this removed and has this been tested for

Asbestos?

65. Sheet 34-AD-103, Rooms E028 and E029 Men's and Women's Bathroom show existing Floor and Wall tile that remain in place. Does the VA intend for the General Contractor to have this removed and has this been tested for

Asbestos?

66. In Room E021 Maintenance Unit B. Will the existing shelving units be removed prior to building turnover?

67. Sheet 34-A-111 Detail A, Lower Level Improvement Ceiling Plan - Overall, shows a new ceiling being installed for Area B of the Building. Existing conditions would not allow for a system to be installed in these areas. Can the VA confirm that there is no new ceiling being installed in this area?

68. Area B, Lower Level has existing red tile flooring that does not show to be removed In Demolition nor, Abatement.

Can the VA confirm this flooring is to remain in place? Has this flooring been tested for Asbestos?

69. Has Sprinkler System been tested for LEAD Based Paint?

70. Sheet 34-AD-106, Room 188, Maintenance Unit C does not have a Sheet Keynote 9 for repairing the existing plaster ceiling. There is a couple significant damaged areas in the existing ceiling directly above room E189, Office.

Does the VA want to include this area in the Repair SQFT for Plaster Ceilings?

mailto:Dewayne.Knowles@va.gov mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov mailto:diana.grube@va.gov

REPLY:

61. Yes, paneling on exterior walls are to be removed in E110. (GLMV)

62. Yes, the work is to be included in the scope but due to the requirement for deconstructive demolition the work required will be included on the existing condition survey. (GLMV)

63. Yes. Demolition floor plan to be updated to show where floor is to be removed. Reference Asbestos Abatement Plans for materials containing asbestos. (GLMV)

64. Yes, wall finishes in this area are to be removed and will be noted on the demolition plan. Reference

Asbestos Abatement Plans for materials containing asbestos. (GLMV)

65. Yes. Demolition floor plan to be updated to show where floor and wall finish is to be removed. Reference

Asbestos Abatement Plans for materials containing asbestos. (GLMV)

66. All furniture and equipment to be removed by VA, unless otherwise noted. (GLMV)

67. No new ceilings are being installed. (GLMV)

68. Yes. Demolition floor plan to be updated to show where floor is to be removed. Reference Asbestos Abatement Plans for materials containing asbestos. (GLMV)

69. Reference specification section 028333.13. (GLMV)

70. Yes GC should account for repair and replacement as required. Reference specification section 028333.13 for lead based paint. (GLMV)

REPLY COMPILED BY: DATE: 1/27/2021

ATTACHMENTS: COPY TO: