01-20-21 Reno Bldg. 34 - RFI 26-34 Valiant_Responsed.pdf

PDF 105 KB Posted

Attached to
Renovate Building #34 to Correct FCA Deficiencies
Solicitation number
36C24921R0010
Issued by

About this file

This document contains responses to questions from contractors regarding a solicitation for renovations to Building 34 at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. The solicitation seeks bids to correct facility condition deficiencies and involves the removal of doors, walls, and flooring. Contractors must submit questions by specification or drawing number and the government will reply with relevant details such as: the VA will transport salvaged doors if contractors palletize and store them; heaters will remain or be removed depending on whether an alternate proposal is accepted; an additional site visit was provided; lead and asbestos reports will be issued as amendments; trench infilling is included; wall base removal depends on demolition plans; decking will be deconstructed before bidding; and the building is slab on grade. The response compiled by the VA aims to clarify contractor questions in order to facilitate accurate bids for the solicitation closing on January 27, 2021.

View the file

Other files

File Type Posted
36C24921R0010 0005.pdf PDF
Bldg 34 Spec Section 281300.pdf PDF
423-926.1171.Arch-Mtn_Home updated 2-10.pdf PDF
RFI 005 - 210205_Responded.pdf PDF
RFI 004 - 210129_Responded_02092021.pdf PDF
RFI 002 - 210120 (GLMV Comments) (002).pdf PDF
RFIs response clarifications.pdf PDF
RFI 001 - 210118_Responded.pdf PDF
Site visit 2 28 Jan 2020.pdf PDF
36C24921R0010 0004.pdf PDF
Site Visit 13 Jan 2021.PDF PDF
brick vault at slab infill4.jpg JPG image
B34 new ACM Survey.pdf PDF
brick vault at slab infill1.jpg JPG image
Protect in place equipment.pdf PDF
01-29-21 Reno Bldg. 34 - RFI 88-91_Responded.pdf PDF
LBP DOC-Word.pdf PDF
brick vault at slab infill2.jpg JPG image
01-20-21 Reno Bldg. 34 - RFI 44-51 Valiant_Responsed.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 1-16 Valiant_Responsed.pdf PDF
RFI 003 - 210129_Responded.pdf PDF
Advon RFIs response.pdf PDF
Building 34 ACM Report.pdf PDF
36C24921R0010 0003.pdf PDF
brick vault at slab infill3.jpg JPG image
brick vault at slab infill5.jpg JPG image
01-29-21 Reno Bldg. 34 - RFI 79-87_Responded.pdf PDF
423-926.1171.Arch-Mtn_Home 2.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 52-60 Valiant_Responsed.pdf PDF
brick vault at slab infill.jpg JPG image
TN20200111 01012021RFI BIC 4 1-20-21_Responded.pdf PDF
TN20200111 01012021RFI BIC 6 Responded.pdf PDF
TN20200111 01012021RFI BIC 2 1-20-21_Responded.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 17-25 Valiant_Responsed.pdf PDF
REQUEST FOR INFORMATION (RFI) 1 1-13-21 BIC_Responsed.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 71-75 Valiant_Responsed.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 61-70 Valiant_Responsed.pdf PDF
TN20200111 01012021RFI BIC 3 1-20-21_Responded.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 35-43 Valiant_Responsed.pdf PDF
36C24921R0010 0002.pdf PDF
36C24921R0010 0001.pdf PDF
36C24921R0010 0001.docx DOCX document
Calculation of Self Performed Work.pdf PDF
Past Performance Questionnaire.pdf PDF
Copy of General Conditions Breakout.xlsx XLSX spreadsheet
36C24921R0010_1.docx DOCX document
Contractor EMR Certification Form.pdf PDF
B-34 Architectural.pdf PDF
B-34 Plumbing.pdf PDF
WD - TN20200111 01012021.pdf PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION (RFI)

36C24921R0010

PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.

When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.

PROJECT TITLE: Renovate Bldg. 34 to Correct FCA

Deficiencies

PROJECT LOCATION: James H. Quillen VA Medical

Center

P.O. Box 4000

Mt. Home, TN 37684

SUBMITTED BY: City/State:

PHONE NO.:

TO: Dewayne L. Knowles

Dewayne.Knowles@va.gov

Diana K. Grube

Diana.Grube@va.gov

RFI NO.: 26-34 DATE:01-20-21 SPEC/DWG. REFERENCE:

REPLY NEEDED BY:

INFORMATION NEEDED:

26. The drawings state that most doors are to be removed, salvages and handed over to the VA. Does the VA intent to pick up and transport the doors to their desired location? If the VA wants the contractor to transport the doors, please provide the location where they are to be moved and how far away it is from Bldg. 34? Is it the contractor’s responsibility to load, transport and unload? Does the contractor need to make provisions for storage on the jobsite?

27. "Alternate for attic air handlers (alt 1 on specification, alt 4 on RFP) indicates to provide hydronic heaters in lieu of air handlers shown. Prints show 2 air handlers and 9 heaters in that area. Please clarify:

If alternate is not taken, will the 8 heaters remain in the base?

If alternate is taken, are more heaters than the 8 shown required?"

28. Will the VA consider allowing another site visit? The bidding documents don’t specify the existing wall types that are to be removed on the demo plans. Assuming all wall types are the same as Masonry/Concrete would drive the cost higher. Allowing another site visit could be cost effective and schedule effective for the Owner in the end.

29. Do you have a current lead report? If so, can you please provide it via Amendment?

30. Do you have a current asbestos report available? If so, can you please provide it via Amendment?

31. After taking down block/concrete walls indicated on the drawings, there will be trenches to infill. Is trench infill part of this project's scope of work?

32. On existing walls that are to remain, is the contractor responsible for removing the wall base on those walls?

33. On 34-A-102 there is a note that states "GC and applicable subcontractors shall inspect decking conditions underneath roof during walkthrough." However, during the walkthrough it was observed that the majority of the deck was covered and not visible. 34-A-102 also states that the "GC is to provide and review a survey with the COR before construction begins." Since a survey is required, are we to assume that only the areas indicated on the drawings shall be priced?

34. Is there crawlspace under any of the building or is it considered to be slab on grade? If so, what is the depth of the crawl space?

mailto:Dewayne.Knowles@va.gov mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov mailto:diana.grube@va.gov

REPLY:

26. The doors shall be palletized and protected from damage (i.e. palletized, stacked, stickered, strapped and plastic wrapped). The Contractor shall make provisions to store the doors in the paint booth and adjacent area during construction. If the VA desires to store the doors elsewhere, we will pallet jack them to the loading docks.

27. If alternate is not taken, heaters are to be removed in base bid. If alternate is taken the 8-unit heaters shown will remain. (GLMV) The unit heaters on the first floor will not be required if the air handlers are provided. If air handlers are not provided the heaters on the first floor are required. The heaters on the second floor are to be provided in either case and are not affected by the alternate. (AME)

28. 2nd site visit was Thursday, January 28, 2021 at 7AM CT (8AM ET).

29. Yes. We will provide as an amendment document.

30. Yes. We will provide as an amendment document.

31. Trench infill as a result from the removal of CMU walls will be included in the scope of work. Infill with sandfill under 4” concrete slab tied into existing concrete slab with #3 rebar at 12” O.C. (GLMV)

32. Reference demo plan for removal of floor and wall base. (GLMV)

33. This service was requested by the VA. VA to inform GC that deconstruction will occur by VA before final bids are required. Alternately, the survey can be provided by the selected GC after bidding and deconstructive demolition by the GC for review by the COR. (GLMV)

34. Building does not have crawlspace and is slab on grade. (GLMV)

REPLY COMPILED BY: DATE: 1/27/2021

ATTACHMENTS: COPY TO: