This document contains responses to a contractor's questions regarding a federal solicitation to renovate Building 34 at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. The solicitation seeks to correct facility condition assessment deficiencies. Questions covered topics such as asbestos testing of plaster, fire alarm and security wiring requirements, plumbing and mechanical piping demolition and installation, steel fabrication certifications, and the presence of asbestos-containing materials in concrete masonry unit walls. Responses addressed specific specification and drawing references, clarified the scope of demolition and new construction work, and provided guidance on equivalent certifications to American Institute of Steel Construction qualifications. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration VISN 9 for project number 621-18-102.
View the file
Other files
Show 40 more
Latest 50 of 58 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION (RFI)
36C24921R0010
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY COMPILED BY: Hope Pittman, Atriax DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text joee Typewritten Text 1/29/21 joee Typewritten Text Has the existing plaster in the walls and ceilings been tested for ACM? If so, is all or some of the existing plaster ACM?
Zoe Typewritten Text Plaster has been tested in the past by the VA and additional confirmatory sampling for this project. Samples collected did not contain asbestos. (JG, Terracon)
Zoe Typewritten Text 2/1/2021
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY COMPILED BY: Hope Pittman, Atriax DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
1/1/2021 mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text joee Typewritten Text 1/29/21 joee Typewritten Text Is fire alarm wire to be in conduit 100%?
Zoe Typewritten Text All fire alarm wiring to be in conduit per Specification 283100 Section 2.2.D.1.
Zoe
(EO, GHD)
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY COMPILED BY: Hope Pittman, Atriax DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
Yes. All security wiring will be 100% in conduit. (FR, AME)
2/1/2021 mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text joee Typewritten Text 1/29/21 joee
Is access control cabling to be in conduit 100%?
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY COMPILED BY: Hope Pittman, Atriax DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
2/1/21 mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text joee Typewritten Text 1/29/21 joee Typewritten Text Sheet FK-104 appears to show the existing fire suppression system to be removed back to the 6” existing incoming service. Does the existing 6” incoming service remain and get tied into the new service at this location?
Zoe Typewritten Text Existing fire sprinkler piping to be demolished to the incoming fire service line. Existing incoming fire service to be reused for this phase. During construction, the condition of the existing underground piping will be inspected and replaced during the next phase if required.
(EO, GHD)
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY COMPILED BY: Hope Pittman, Atriax DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text joee Typewritten Text 1/29/21 joee Typewritten Text Regarding all plumbing and mechanical piping demo above and behind the plaster ceilings and walls; do the plaster ceilings/walls get demoed to remove all piping or is the piping to be capped and abandoned in place?
kyle.wilkerson Text Box Reference architectural demo plans for walls and ceilings to be removed. Walls and ceilings that remain are to have piping capped and abandoned in place. (GLMV)
Zoe
2/1/21
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY COMPILED BY: Hope Pittman, Atriac DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
2/1/21 mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text joee Typewritten Text 1/29/21 joee Typewritten Text If piping is to be fully removed and plaster ceiling and walls are to be demoed, what assembly shall be used to patch the existing plaster?
kyle.wilkerson Text Box Reference architectural demo plans for walls and ceilings to be removed. Walls and ceilings that remain are to have piping capped and abandoned in place. (GLMV)
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY COMPILED BY Hope Pittman, Atriax DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
2/1/21
Reference architectural demo plans for walls and ceilings to be removed. Walls and ceilings that remain are to have piping capped and abandoned in place. (GLMV) mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text joee Typewritten Text 1/29/21 joee
Will new plumbing and mechanical piping be installed behind the existing plaster ceilings/walls or in front?
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY COMPILED BY: Hope Pittman, Atriax DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
Reference architectural demo plans for walls and ceilings to be removed. Walls and ceilings that remain are to have piping capped and abandoned in place. (GLMV)
2/1/21 mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text joee Typewritten Text 1/29/21 joee
If piping is to be installed behind existing plaster, what assembly shall be used to patch the existing plaster?
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY COMPILED BY: Hope Pittman, Atriax DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
AISC Certification can be waived provided the steel fabricators and installers submit an equivalent certification.
2/1/21 mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text joee Typewritten Text 1/29/21 joee Typewritten Text The steel specs 05 12 00 and 05 21 00 there is a requirement for all fabricators and installers to have an AISC certification. We have contacted all of the AISC contractors, per the AISC registered website, and none of the fabricators or erectors are able to bid this project.
There are other companies available, but they have not paid to receive the AISC certifications. Since AISC certification does not guarantee a quality project, and the issues surrounding finding an AISC certified company, and due to the fact that this project is quite small, we request that an exemption be given for this certification.
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY COMPILED BY : Hope Pittman, Atriax DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
2/1/21 mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text joee Typewritten Text 1/29/21 joee Typewritten Text The AR-1 thru 3 sheets call out several of the existing exposed CMU walls as having asbestos block filler. There are other exposed cmu walls which are not identified as having ACM block filler. Should these unidentified exposed cmu walls also be assumed as containing ACM block filler?
Zoe
Concerning Block Wall Filler. This material was tested in several areas of the building. Section 1.2 of the Asbestos Removal Specifications notes block wall filler contains <1% asbestos and is present on the surface of block walls. If this material is to be removed or new finishes attached to the walls, the contractor shall treat this as an ACM. (JG, Terracon)
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY COMPILED BY: Hope Pittman, Atriax DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
No, existing openings in interior walls are not required to be infilled. (GLMV)
2/1/21 mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text joee Typewritten Text 1/29/21 joee Typewritten Text The majority of the existing walls are either cmu, terra cotta block, or some other masonry construction. These walls have dozens, maybe as many as 50 existing penetrations that will need to patched once the existing ductwork and other MEP system components are removed. Can these penetrations in existing masonry walls be infilled using a fire rated metal framing and gypsum assembly, or will a masonry assembly be required?
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY COMPILED BY: Hope Pittman, Atriax DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
New MEP system includes mostly small piping. New ductwork in mechanical mezzanine in area A will be supported by mezzanine floor. The intent is to reuse existing wall openings for new MEP systems and ductwork..
(GLMV)
2/1/21 mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text joee Typewritten Text 1/29/21 joee Typewritten Text The majority of the existing walls are either cmu, terra cotta block, or some other masonry construction. These walls will require dozens or new penetrations or expanding of existing penetrations to accommodate the new ductwork and other MEP systems. Please provide some typical details for lintels at the various sized openings.
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY COMPILED BY: Hope Pittman, Atriax DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
Please refer to drawings MD221 and MD121 for work in the referenced are. See also architectural demolition drawings and notes.(FR, AME)
2/1/21 mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text joee Typewritten Text 1/29/21 joee Typewritten Text It appears that the second floor attic space above the Area “B” is not included in the drawings. This attic is several thousand feet sprinkler mains and branches as well as several exhaust fans, ductwork and other MEP systems which will require demolition. Please identify these areas on the plans. The access for this attic space is located halfway up the ladder which is used to access the Area “B” roof hatch from inside the storage at the end of the Area “B second floor corridor.
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY COMPILED BY: Hope Pittman, Atrix DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
The intent is to remove the steel structure on the ground floor including the brick catacomb style barrel vaulted ceiling. Revise keynote 8 on 34-AD-106 to read as, remove the steel structure on the ground floor and brick barrel vaulted ceiling first. Provide report to structural engineer noting the structural integrity of the integral concrete slab that remains. Provide in the base bid removal of the integral concrete slab and installation of new floor deck show on 34-S-101. (GLMV)
2/1/21 mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text joee Typewritten Text 1/29/21 joee
The Slab Infill sheet 34-S-101 shows a section of 1st Floor in Area “B” to be demoed. This structure of this area is not identified on the plans. However, after closer examination through the ceiling hatch in the walk in cooler below this area, there appears to be much more to this work than the plan identify. The floor structure appears to consist of a 3-6” thick concrete slab poured integrally with 10”x8” concrete beams spaced approximately 9’ oc. In addition, the is a steel structure on the ground floor under this area denoted for demolition which supports a sort of brick “catacomb” style barrel vaulted ceiling and walls. The steel structure is extremely rusted and in very bad shape and the brick vault is beginning to crumble. A structural assessment may be needed for this area. See the attached photos. Please advice how to handle this area for bidding purposes.
PROJECT NUMBER: 621-18-102 Please ensure that before submitting questions or requests for clarification that you thoroughly read the solicitation, specifications, drawings and other pertinent documents.
When submitting questions on this project the Government requires contractors to specifically identify the specification and/or solicitation section(s) or drawing number(s) in reference to the question or request for clarification submitted. No question or request for clarification will be answered by the Government unless the above requirements are met. Failure to comply may prevent the Government from responding in a timely manner.
PROJECT TITLE: Renovate Bldg. 34 to Correct FCA
Deficiencies
PROJECT LOCATION: James H. Quillen VA Medical
Center
P.O. Box 4000
Mt. Home, TN 37684
TO: Dewayne L. Knowles
Dewayne.Knowles@va.gov
Diana K. Grube
Diana.Grube@va.gov
RFI NO.: DATE:
REPLY NEEDED BY:
REPLY:
REPLY COMPILED BY: Hope Pittman, Atriax DATE:
ATTACHMENTS: COPY TO:
SUBMITTED BY: City/State:
PHONE NO.:
Semper Tek, Inc. Lexington, KY
ASAP
859-252-8339
Spec/DWG Reference:
Information Needed:
Reference details 1 and 2 on 34-A-105 for the extent on ramp construction. The intent is to keep a portion of the existing walking surface in front of the door. (GLMV)
2/1/21 mailto:Dewayne.Knowles@va.gov mailto:diana.grube@va.gov joee Typewritten Text joee Typewritten Text 1/29/21 joee Typewritten Text After closer inspection of the ramp denoted for demo on sheet 34-A-105, there does not appear to be a landing in front of the doors at the Porch 105. The ramp slopes all the way to the threshold. Therefore, to demo the ramp will demo the entire structure up to the building including the stairs on each side of the ramp. It appears there may need to be an entirely new landing and double stair constructed at this location to achieve the design intent. Please advice how to handle this area for bidding purposes.
File details come from the government source that posted it. Updated .