This document contains an asbestos survey report for Building 34 at the James H. Quillen VA Medical Center. The report identifies asbestos-containing materials found in the building including vinyl floor tile in the basement measuring approximately 13,300 square feet. Trace amounts of asbestos were also found in baseboard mastic located in the museum storage area totaling around 160 linear feet. The related federal contract opportunity is solicitation number 36C24921R0010 to renovate Building 34 to correct deficiencies identified in the Facility Condition Assessment. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9.
View the file
Other files
Show 40 more
Latest 50 of 58 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E. ROBERTS ALLEY & ASSOCIATES, INC.
101 Fountain Place Building
Suite 3A 207 East Main Street
Johnson City, Tennessee 37604
GS 10F 0165R
FOR
JAMES H. QUILLEN VA MEDICAL CENTER
PROJECT 621-05-115
LBP / Asbestos Risk Assessment/Abatement Plan
ASBESTOS REPORT
27 JANUARY 2006
Contractor is registered with the Central Contractor Registration Database.
Data Universal Numbering System (DUNS) Number: 09-982-4278
Contractor's Taxpayer Identification Number (TIN): 58-1387802
VA Medical Center Asbestos Survey Sample Results Page 1 of 3
4.7 Building 34
E. Roberts Alley & Associates, Inc. U.S. Dept of Veterans Affairs December 2005 Project No. 2005-0731 VA Contract GS-10F-0165R VA Project No. 621-05-115
Building Description:
Building 34 is a three-story building with a total size of approximately 65,000 square feet. It has a basement floor which is predominantly underground and a first floor of the same size. The second floor is smaller and encompasses only the north end of the building. The building faces south and is constructed in the shape of an inverted “T”. In the center of the south entrance is a bell / clock tower which extends above the height of the roof. The south wing of the building extends in an east / west direction and is only two floors. This section of the building does not have a second floor, but it does have an attic with a wooden floor which extends the full length of the wing. The north wing of the building extends from north to south and has three floors.
The building is constructed of brick, with wooden eaves or soffitts. The south wing of the building has metal framed windows while the north wing of the building has wooden windows with window glazing. The interior of the building is predominantly plaster walls and ceilings. A few internal walls on the ground and first floors have been added in recent years and they are constructed of gypsum wallboard. There are also suspended, fibrous tile ceilings in many of the rooms. The floors throughout the basement are predominantly concrete covered with vinyl tile. The first floor is predominantly terrazzo tile on concrete. The second floor has a single layer of vinyl tile and / or carpeting over wooden sub-flooring.
There is a considerable amount of pipe insulation throughout the building, but all of the piping observed is insulated with fiberglass material having a paper or plastic outer wrap.
Some smaller refrigerant lines were noted to have foam insulation. It is understood that asbestos containing thermal system insulation was abated from this facility several years earlier. It is possible that asbestos containing pipe insulation may be present in enclosed pipe chases, wall cavities, or inaccessible ceiling plenums within the facility, but no suspect pipe insulation was observed during the survey.
Fiberglass batting insulation was observed on the roof decking in the south attic area and loose fibrous insulation was observed in the attic area above the second floor in the north wing. The south attic area also contained fiberglass insulated piping. The clock / bell tower is constructed of brick and wood.
Sampling Strategy:
The building was surveyed for materials suspected of containing asbestos. Samples of suspect surfacing, thermal insulation, and miscellaneous materials were observed.
Roofing materials were excluded from the survey, as per the scope of work. Some rooms on the first floor and the bookstore in the basement were not inspected due to their being occupied by ETSU personnel.
VA Medical Center Asbestos Survey Sample Results Page 2 of 3
VA Project No. 621-05-115
Sixty-nine (69) samples of building materials were collected for asbestos analysis:
♦ Twenty (20) samples of floor tile, seventeen (17) samples being from the basement floor, and three samples from the second floor, ♦ Thirteen (13) samples of thermal system insulation of pipe insulation and tank insulation on the basement floor, first floor and south attic. Samples included wrap mastic, elbow mud, and fibrous insulation, ♦ Eleven (11) samples of baseboard mastic from all three floors, ♦ Nine (9) samples of ceiling material, eight samples of ceiling tile and one sample of ceiling texture, ♦ Five (5) samples of gypsum wallboard and joint compound composites from the basement and first floors, ♦ Four (4) samples of the building plaster, collected from the basement, and first floors, ♦ Two (2) samples of attic insulation, ♦ Two (2) samples of exterior window glazing, ♦ One (1) sample of stair riser mastic, ♦ One (1) sample of fibrous wall tiles, and ♦ One (1) sample of HVAC insulation / wrap.
Discussion of Results:
Vinyl floor tile in the basement was found to be asbestos containing. The vinyl tile that was identified as ACM is located in the canteen, the food storage room adjacent to the kitchen, the south end of the north / south corridor, the HVAC storage office, the HVAC shop, HVAC shop office, and the former bowling alley / storage area that adjoins the HVAC shop area.
Baseboard mastic or adhesive on vinyl baseboards in the museum storage area was found to contain trace (less than 1%) amounts of asbestos. The laboratory determined the asbestos to actually be contained in a white joint compound type material adhering to the baseboard mastic, rather than the mastic itself. Approximately 160 linear feet of this baseboard mastic is located in the museum storage area. A sample of wallboard material with joint compound sampled in the museum storage area did not recover any asbestos.
Materials containing less than 1% asbestos are not regulated by EPA. While these materials do not meet the definition of an asbestos containing material and are not regulated under EPA, disturbance of these materials could create potential exposure to asbestos fibers. Exposure to airborne asbestos fibers is regulated by OSHA as well as the state of Tennessee’s TOSHA.
The ACM floor tile in the canteen, food storage, HVAC shop and office areas, and south end of the north / south corridor are in good condition, with the tiles intact. The total
VA Medical Center Asbestos Survey Sample Results Page 3 of 3
VA Project No. 621-05-115 amount of ACM flooring in the basement is approximately 13,300 square feet. Refer to Table B: Summary of Asbestos Containing Materials, for a detailed list of the ACMs for this building.
TABLE A: ASBESTOS SAMPLING RESULTS VA MEDICAL CENTER
BUILDING 34
SAMPLE
NO. LOCATION MATERIAL DESCRIPTION ASBESTOS CONTENT
34A-01 Mason Shop Pipe Wrap Tan Fibers No Asbestors Detected Page 1 of 3 34A-02 Boiler Pipe Wrap Tan Adhesive No Asbestos Detected 34A-03 Boiler Pipe Wrap Gray Adhesive No Asbestos Detected 34A-04 Boiler Insulation Gray Power No Asbestos Detected 34A-05 Boiler Pipe Wrap Tan Adhesive No Asbestos Detected 34A-06 Boiler Pipe Wrap Tan Adhesive No Asbestos Detected 34A-07 Boiler Pipe Wrap Gray Adhesive No Asbestos Detected 34A-08 Boiler Pipe Wrap Yellow Fibers No Asbestos Detected 34A-09 Repair Office Pipe Wrap Tan Fibers/Black Tar Like No Asbestos Detected 34A-010 Plumbing Storage Pipe Wrap Gray Power No Asbestos Detected 34A-011 Plumbing Storage Pipe Wrap Brown Fibers No Asbestos Detected 34A-012 HVAC HVAC Insulation Tan Adhesive No Asbestos Detected 34A-013 HVAC Pike Mastic Tan Adhesive No Asbestos Detected 34A-014a Plumbing Storage Flooring Tan Vinyl No Asbestos Detected 34A-014b Plumbing Storage Flooring Gray/Brown Adhesive No Asbestos Detected 34A-015a E-Corridor Flooring Tan Adhesive No Asbestos Detected 34A-015b E-Corridor Flooring Brown Vinyl No Asbestos Detected 34A-016a Hallway Flooring Brown Vinyl No Asbestos Detected 34A-016b Hallway Flooring Brown Adhesive No Asbestos Detected 34A-017a S-Corridor Flooring Brown Vinyl Tile 2% Chrysotile 34A-017b S-Corridor Flooring Black Mastic No Asbestos Detected 34A-018a HVAC Storage Flooring Brown Vinyl Tile 2% Chrysotile 34A-018b HVAC Storage Flooring Black Mastic No Asbestos Detected 34A-019a HVAC Storage Flooring Red Vinyl Tile 3% Chrysotile 34A-019b HVAC Storage Flooring Black Mastic No Asbestos Detected 34A-020a HVAC Storage Flooring Red Vinyl Tile 3% Chrysotile 34A-020b HVAC Storage Flooring Black Mastic No Asbestos Detected 34A-021a HVAC/TIN Shop Flooring Red Vinyl Tile 3% Chrysotile 34A-021b HVAC/TIN Shop Flooring Black Mastic No Asbestos Detected 34A-022a HVAC Shop Office Flooring Gray Vinyl 2% Chrysotile 34A-022b HVAC Shop Office Flooring Black Mastic No Asbestos Detected 34A-023a SW Corridor Flooring Tan Vinyl No Asbestos Detected 34A-023b SW Corridor Flooring Brown Mastic No Asbestos Detected 34A-024a Closet/outside bathr Flooring Tan Vinyl No Asbestos Detected 34A-024b Closet/outside bathr Flooring Black Mastic No Asbestos Detected 34A-025a Canteen Flooring Tan Vinyl No Asbestos Detected 34A-025b Canteen Flooring Black Mastic No Asbestos Detected 34A-026a Canteen Flooring Tan Vinyl 2% Chrysotile 34A-026b Canteen Flooring Brown Mastic No Asbestos Detected 34A-027 Corridor Ceiling Tile Gray Fibers No Asbestos Detected 34A-028 HVAC Storage Ceiling Tile Brown Fibers No Asbestos Detected 34A-029 HVAC/TIN Storage Ceiling Tile Brown Fibers No Asbestos Detected 34A-030 HVAC/TIN Storage Wall Tiles Brown Fibers No Asbestos Detected 34A-031 Canteen Ceiling Tile Brown Fibers No Asbestos Detected 34A-032 Corridor Ceiling Tile Brown Fibers No Asbestos Detected 34A-033 Corridor Wallboard Composite White Powder No Asbestos Detected 34A-034 Corridor Wallboard Composite White Powder No Asbestos Detected 34A-035a Corridor Baseboard Mastic Black Vinyl No Asbestos Detected 34A-035b Corridor Baseboard Mastic Tan Adhesive No Asbestos Detected
Basement
E. Roberts Alley Associates, Inc.
Project No. 2005-0731
Dept. of Veterans Affairs VA Contract GF-10F-0165R VA Project No. 621-05-115 November 2005
SAMPLE
NO. LOCATION MATERIAL DESCRIPTION ASBESTOS CONTENT
34A-036a Corridor Baseboard Mastic Black Vinyl No Asbestos Detected Page 2 of 3 34A-036b Corridor Baseboard Mastic Brown Adhesive No Asbestos Detected 34A-037a Corridor Baseboard Mastic Brown Vinyl No Asbestos Detected 34A-037b Corridor Baseboard Mastic Brown Adhesive No Asbestos Detected 34A-038a Corridor Baseboard Mastic Brown Vinyl No Asbestos Detected 34A-038b Corridor Baseboard Mastic Brown Adhesive No Asbestos Detected 34A-039a Plumbing Storage Baseboard Mastic Brown Vinyl No Asbestos Detected 34A-039b Plumbing Storage Baseboard Mastic Brown Adhesive No Asbestos Detected 34A-063a Food Storage Flooring Tan Vinyl 2% Chrysotile 34A-063b Food Storage Flooring Tan Adhesive No Asbestos Detected 34A-064 Food Storage Baseboard Mastic Brown Adhesive No Asbestos Detected 34A-067a Canteen Flooring Beige Vinyl 2% Chrysotile 34A-067b Canteen Flooring Yellow Adhesive No Asbestos Detected 34A-068a Canteen Flooring Beige Vinyl 2% Chrysotile 34A-068b Canteen Flooring Yellow Adhesive No Asbestos Detected 34A-069a Canteen Flooring Beige Vinyl 2% Chrysotile 34A-069b Canteen Flooring Yellow Adhesive No Asbestos Detected
34A-040 Museum Attic Insulation Brown Fibers No Asbestos Detected 34A-041 101 Closet Plaster Brown/White Cementitious No Asbestos Detected 34A-042 Museum Pipe Wrap Tan Fibers No Asbestos Detected 34A-043 Museum Plaster White/Gray Cementitious No Asbestos Detected 34A-044 Museum Plaster White Powder No Asbestos Detected 34A-045 Museum Ceiling Tile Brown Fibers No Asbestos Detected 34A-046 Museum Plaster Brown/Gray Cementitious No Asbestos Detected 34A-047a Museum Baseboard Mastic Brown Vinyl No Asbestos Detected 34A-047b Museum Baseboard Mastic Brown Adhesive <1% Chrysotile 34A-048a Museum Baseboard Mastic Gray Vinyl No Asbestos Detected 34A-048b Museum Baseboard Mastic Brown Adhesive <1% Chrysotile 34A-049 Museum Wallboard Copsosite Tan Powder No Asbestos Detected 34A-050a Corridor Baseboard Mastic Gray Vinyl No Asbestos Detected 34A-050b Corridor Baseboard Mastic Brown Adhesive No Asbestos Detected 34A-051 Corridor Wallboard Composite Gray Powder No Asbestos Detected 34A-052 Paint Shop Ceiling Texture White Powder No Asbestos Detected 34A-060 Carperters Shop Ceiling Tile Gray Fibers No Asbestos Detected 34A-061 Carperters Shop Wallboard Composite White Powder No Asbestos Detected 34A-062 Carperters Shop Baseboard Mastic Brown Adhesive No Asbestos Detected
34A-053 Attic Attic Insulation Brown Fibers No Asbestos Detected 34A-054a Storage Flooring Tan Vinyl No Asbestos Detected 34A-054b Storage Flooring Tan Adhesive No Asbestos Detected 34A-055a Storage Closet Flooring Tan Vinyl No Asbestos Detected 34A-055b Storage Closet Flooring Tan Adhesive No Asbestos Detected 34A-056a Lab Flooring Tan Vinyl No Asbestos Detected 34A-056b Lab Flooring Tan Adhesive No Asbestos Detected 34A-057 Corridor Ceiling Texture Brown Fibers No Asbestos Detected 34A-058a Closet Baseboard Mastic Brown Vinyl No Asbestos Detected 34A-058b Closet Baseboard Mastic Brown Adhesive No Asbestos Detected
First Floor
Second Floor
E. Roberts Alley Associates, Inc.
Project No. 2005-0731
Dept. of Veterans Affairs
SAMPLE
NO. LOCATION MATERIAL DESCRIPTION ASBESTOS CONTENT
34A-059 Corridor Stair Riser Mastic Brown/Black Adhesive No Asbestos Detected Page 3 of 3
34A-065 N-end E-side 1st floor Window Glazing White Powder No Asbestos Detected 34A-066 Ground W-side Window Glazing Tan Brittle No Asbestos Detected
Exterior
E. Roberts Alley Associates, Inc.
Project No. 2005-0731
Dept. of Veterans Affairs
TABLE B: SUMMARY OF ASBESTOS CONTAINING MATERIALS VA MEDICAL CENTER
SAMPLE
NO. LOCATION DESCRIPTION ASBESTOS CONTENT APPROXIMATE QUANTITY
34A-017a Brown Vinyl Tile 2% Chrysotile
34A-018a Brown Vinyl Tile 2% Chrysotile
34A-019a Red Vinyl Tile 3% Chrysotile
34A-020a Red Vinyl Tile 3% Chrysotile
34A-021a Red Vinyl Tile 3% Chrysotile
34A-022a HVAC Shop Office Gray Vinyl 2% Chrysotile 195 sf
34A-026a Beige Vinyl 2% Chrysotile
34A-067a Beige Vinyl 2% Chrysotile
34A-068a Beige Vinyl 2% Chrysotile
34A-069a Beige Vinyl 2% Chrysotile
34A-063a Food Storage Beige Vinyl 2% Chrysotile 200 sf
34A-047b Museum Brown Adhesive <1% Chrysotile
34A-048b Museum Brown Adhesive <1% Chrysotile
*Materials containing asbestos in amounts less than 1% are not regulated by EPA.
Basement Flooring
1,104 sfHVAC Storage
9,056 sfHVAC Shop
Baseboard Mastic
160 lf*
Canteen 2,730 sf
E. Roberts Alley Associates, Inc.
Project No. 2005-0731
U.S. Dept. of Veterans Affairs VA Contract GS-10F-0165R VA Project No. 621-05-115 December 2005
VA MEDICAL CENTER ASBESTOS SAMPLING LOCATIONS BUILDING 34
34A-040
First Floor
Attic above Room 101
Grey Loose Insulation
34A-041
First Floor
Museum Area
Room 101A Closet
Plaster
34A-042
First Floor
Attic above Museum
White Pipe Insulation
E. Roberts Alley Associates, Inc.
Project No. 2005-0731
U.S. Dept. of Veterans Affairs
34A-043
First Floor
Museum, NW Wall
Below Clock Tower
Surface Plaster
34A-044
First Floor
Museum
Foyer Ceiling
Surface Plaster
34A-045
First Floor
Musuem Storage Room
White Ceiling Tile
E. Roberts Alley Associates, Inc.
Project No. 2005-0731
U.S. Dept. of Veterans Affairs
34A-046
First Floor
Museum Storage Room
Exterior South Wall
Plaster
34A-047
First Floor
Museum Storage Room
NE Corner Room
Baseboard Mastic
Trace Amounts of Asbestos
34A-048
First Floor
Museum Storage Room
Baseboard Mastic
Trace Amounts of Asbestos
E. Roberts Alley Associates, Inc.
Project No. 2005-0731
U.S. Dept. of Veterans Affairs
34A-049
First Floor
Museum Storage Room
NW Corner Restroom
Gypsum Wallboard with Joint Compound, Composite
34A-050
First Floor
Corridor, North of Museum
Baseboard Mastic
34A-051
First Floor
Corridor, North of Museum
Gypsum Wallboard with Joint Compound, Composite
E. Roberts Alley Associates, Inc.
Project No. 2005-0731
U.S. Dept. of Veterans Affairs
34A-052
First Floor
Paint Shop
North End of Floor
White Ceiling Texture
34A-053
Second Floor
Attic above Offices
Grey Loose Insulation
34A-054
Second Floor
SW Storage Room
Begie Floor Tile and Gold Mastic
E. Roberts Alley Associates, Inc.
Project No. 2005-0731
U.S. Dept. of Veterans Affairs
34A-055
Second Floor
Storage Closet, South End
Beige Floor Tile and Gold Mastic
34A-056
Second Floor
SE Lab Room
Beige Floor Tile and Gold Mastic
34A-057
Second Floor
Corridor
Ceiling Tile
E. Roberts Alley Associates, Inc.
Project No. 2005-0731
U.S. Dept. of Veterans Affairs
34A-058
Second Floor
Closet, South End
Gold Baseboard Mastic
34A-059
Basement
Stair Riser Mastic
34A-060
First Floor
Carpenter's Shop
Ceiling Tile
E. Roberts Alley Associates, Inc.
Project No. 2005-0731
U.S. Dept. of Veterans Affairs
34A-061
First Floor
Carpenter's Shop
Gypsum Wallboard and Joint Compound Composite
34A-062
First Floor
Carpenter's Shop
Baseboard Mastic
34A-063
Basement
Food Storage
Beige Floor Tile and Black Mastic
ACM: Floor Tile
E. Roberts Alley Associates, Inc.
Project No. 2005-0731
U.S. Dept. of Veterans Affairs
34A-064
Basement
Food Storage
Brown Baseboard Mastic
34A-065
Exterior, NE
Window Glazing
34A-066
Exterior, West
Window Glazing
E. Roberts Alley Associates, Inc.
Project No. 2005-0731
U.S. Dept. of Veterans Affairs
34A-067
Basement
Canteen, NW
Beige Floor Tile and Black Mastic
ACM: Floor Tile
34A-068
Basement
Canteen, NW
Beige Floor Tile and Black Mastic
ACM: Floor Tile
34A-069
Basement
Canteen, NW
Beige Floor Tile and Black Mastic
ACM: Floor Tile
E. Roberts Alley Associates, Inc.
Project No. 2005-0731
U.S. Dept. of Veterans Affairs
34A-01
Basement
Mason Shop
West Wall
Pipe Insulation & End Cap Mastic
34-02
Basement
Boiler Room
Pit
Pipe End Cap Mastic
34-03
Basement
Boiler Room
North Wall
Pipe Insulation & Wrap
E. Roberts Alley Associates, Inc.
Project No. 2005-0731
U.S. Dept. of Veterans Affairs
34A-04
Basement
Boiler Room
Overhead Pipe
Elbow Insulation
34A-05
Basement
Boiler Room
West Wall
Pipe Insulation & Wrap
34A-06
Basement
Boiler Room
Pipe Insulation & Wrap
E. Roberts Alley Associates, Inc.
Project No. 2005-0731
U.S. Dept. of Veterans Affairs
34A-07
Basement
Boiler Room
North Side
Pipe End Cap Mastic
34A-08
Basement
Boiler Room
North Wall
Pipe Insulation & Wrap
34A-09
Basement
Equipment/Repair Office
Overhead Pipe
Pipe Insulation & Wrap
E. Roberts Alley Associates, Inc.
Project No. 2005-0731
U.S. Dept. of Veterans Affairs
34A-010
Basement
Plumbing Storage Room
Overhead Pipe, North End
Pipe Insulation & Mud
34A-011
Basement
Plumbing Storage Room
Overhead E/W Pipe
Pipe Wrap & Black Mastic
34A-012
Basement
HVAC Room
Adjacent to HVAC Shop
Duct Wrap & Mastic
E. Roberts Alley Associates, Inc.
Project No. 2005-0731
U.S. Dept. of Veterans Affairs
34A-013
Basement
HVAC Room
Pipe End Cap Mastic
34A-014
Basement
Plumbing Storage Room
Tan Floor Tile & Gold Mastic
34A-015
Basement
Corridor East
Tan Floor Tile & Gold Mastic
E. Roberts Alley Associates, Inc.
Project No. 2005-0731
U.S. Dept. of Veterans Affairs
34A-016
Basement
Corridor
Center of Floor
Tan Floor Tile & Gold Mastic
34A-017
Basement
South Corridor
Brown Floor Tile & Black Mastic
ACM: Floor Tile
34A-018
Basement
HVAC Storage Room
Southeast Area of Floor
Brown Floor Tile & Black Mastic
ACM: Floor Tile
E. Roberts Alley Associates, Inc.
Project No. 2005-0731
U.S. Dept. of Veterans Affairs
34A-019
Basement
HVAC Shop
Southeast Area of Floor
Red Floor Tile & Black Mastic
ACM: Floor Tile
34A-020
Basement
Corridor
South End of Bldg.
Red Floor Tile & Black Mastic
ACM: Floor Tile
34A-021
Basement
HVAC / TIN Shop
Former Bowling Alley
Red Floor Tile & Black Mastic
ACM: Floor Tile
E. Roberts Alley Associates, Inc.
Project No. 2005-0731
U.S. Dept. of Veterans Affairs
34A-022
Basement
HVAC Shop Office
Southeast Area of Bldg.
White Floor Tile & Black Mastic
ACM: Floor Tile
34A-023
Basement
Southwest Corridor
Near Canteen
Beige Floor Tile & Gold Mastic
34A-024
Basement
Restroom Foyer
Adjacent to Dishwashing
Beige Floor Tile & Gold Mastic
E. Roberts Alley Associates, Inc.
Project No. 2005-0731
U.S. Dept. of Veterans Affairs
34A-025
Basement
Canteen
Under Serving Line
Beige Floor Tile & Gold Mastic
ACM: Floor Tile
(Reference resamples #067 - 69)
34A-026
Basement
Canteen
Southeast Section
Beige Floor Tile & Gold Mastic
ACM: Floor Tile
34A-027
Basement
West Corridor
Ceiling Tile
E. Roberts Alley Associates, Inc.
Project No. 2005-0731
U.S. Dept. of Veterans Affairs
34A-028
Basement
HVAC Storage Room
Ceiling Tile
34A-029
Basement
HVAC/TIN Storage Room
Former Bowling Alley
Ceiling Tile
34A-030
Basement
HVAC/TIN Storage Room
Former Bowling Alley
Fibrous Wall Tiles
E. Roberts Alley Associates, Inc.
Project No. 2005-0731
U.S. Dept. of Veterans Affairs
34A-031
Basement
Canteen
Ceiling Tile
34A-032
Basement
Corridor
Outside Canteen
Ceiling Tile
34A-033
Basement
West Corridor
Gypsum wallboard & Joint Compound Composite
E. Roberts Alley Associates, Inc.
Project No. 2005-0731
U.S. Dept. of Veterans Affairs
34A-034
Basement
West Corridor
Near Canteen
Gypsum wallboard & Joint Compound Composite
34A-035
Basement
West Corridor
South Side
Baseboard Mastic
34A-036
Basement
N/S Corridor
South End
Baseboard Mastic
E. Roberts Alley Associates, Inc.
Project No. 2005-0731
U.S. Dept. of Veterans Affairs
34A-037
Basement
N/S Corridor
Central Area of Bldg.
Baseboard Mastic
34A-038
Basement
Men's Rest Room
Central Area of Bldg.
Baseboard Mastic
34A-039
Basement
Plumbing Storage Room
Baseboard Mastic
E. Roberts Alley Associates, Inc.
Project No. 2005-0731
U.S. Dept. of Veterans Affairs
34A-059
Basement
North Sairwell
Stair Riser Mastic
34A-063
Basement
Food Storage
Adjacent to Kitchen
Beige Floor Tile and Black Mastic
ACM: Floor Tile
34A-064
Basement
Food Storage
Adjacent to Kitchen
Baseboard Mastic
E. Roberts Alley Associates, Inc.
Project No. 2005-0731
U.S. Dept. of Veterans Affairs
34A-066
Exterior
West Side, Basement Level
Window Glazing
34A-067
Basement
Canteen, NW
Beige Floor Tile and Black Mastic
ACM: Floor Tile
34A-068
Basement
Canteen, SW
Beige Floor Tile and Black Mastic
ACM: Floor Tile
E. Roberts Alley Associates, Inc.
Project No. 2005-0731
U.S. Dept. of Veterans Affairs
34A-069
Basement
Canteen, Center
Beige Floor Tile and Black Mastic
ACM: Floor Tile
E. Roberts Alley Associates, Inc.
Project No. 2005-0731
U.S. Dept. of Veterans Affairs
File details come from the government source that posted it. Updated .