This document package includes construction documents for renovations to Building 34 at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. The project scope involves correcting facility condition assessment deficiencies. Drawings cover demolition plans, improvement plans, structural details, mechanical, electrical and plumbing plans, as well as specifications for roofing, windows, doors and other architectural elements. Construction is to adhere to historic preservation standards for the property which is listed on the National Register of Historic Places. The solicitation seeks general contracting services to complete renovations in accordance with the provided design package.

View the file

Other files

File Type Posted
36C24921R0010 0005.pdf PDF
Bldg 34 Spec Section 281300.pdf PDF
423-926.1171.Arch-Mtn_Home updated 2-10.pdf PDF
RFI 005 - 210205_Responded.pdf PDF
RFI 004 - 210129_Responded_02092021.pdf PDF
RFI 002 - 210120 (GLMV Comments) (002).pdf PDF
RFIs response clarifications.pdf PDF
RFI 001 - 210118_Responded.pdf PDF
Site visit 2 28 Jan 2020.pdf PDF
36C24921R0010 0004.pdf PDF
Site Visit 13 Jan 2021.PDF PDF
brick vault at slab infill4.jpg JPG image
B34 new ACM Survey.pdf PDF
brick vault at slab infill1.jpg JPG image
Protect in place equipment.pdf PDF
01-29-21 Reno Bldg. 34 - RFI 88-91_Responded.pdf PDF
LBP DOC-Word.pdf PDF
brick vault at slab infill2.jpg JPG image
01-20-21 Reno Bldg. 34 - RFI 44-51 Valiant_Responsed.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 1-16 Valiant_Responsed.pdf PDF
RFI 003 - 210129_Responded.pdf PDF
Advon RFIs response.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 26-34 Valiant_Responsed.pdf PDF
Building 34 ACM Report.pdf PDF
36C24921R0010 0003.pdf PDF
brick vault at slab infill3.jpg JPG image
brick vault at slab infill5.jpg JPG image
01-29-21 Reno Bldg. 34 - RFI 79-87_Responded.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 52-60 Valiant_Responsed.pdf PDF
brick vault at slab infill.jpg JPG image
TN20200111 01012021RFI BIC 4 1-20-21_Responded.pdf PDF
TN20200111 01012021RFI BIC 6 Responded.pdf PDF
TN20200111 01012021RFI BIC 2 1-20-21_Responded.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 17-25 Valiant_Responsed.pdf PDF
REQUEST FOR INFORMATION (RFI) 1 1-13-21 BIC_Responsed.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 71-75 Valiant_Responsed.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 61-70 Valiant_Responsed.pdf PDF
TN20200111 01012021RFI BIC 3 1-20-21_Responded.pdf PDF
01-20-21 Reno Bldg. 34 - RFI 35-43 Valiant_Responsed.pdf PDF
36C24921R0010 0002.pdf PDF
36C24921R0010 0001.pdf PDF
36C24921R0010 0001.docx DOCX document
Calculation of Self Performed Work.pdf PDF
Past Performance Questionnaire.pdf PDF
Copy of General Conditions Breakout.xlsx XLSX spreadsheet
36C24921R0010_1.docx DOCX document
Contractor EMR Certification Form.pdf PDF
B-34 Architectural.pdf PDF
B-34 Plumbing.pdf PDF
WD - TN20200111 01012021.pdf PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACTOR WILL VERIFY AND FAMILIARIZE HIMSELF WITH ALL EXISTING CONDITIONS PRIOR TO PLACING BID.

2. CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN FIELD AND NOTIFY PROJECT ENGINEER OF ALL

DISCREPANCIES IF ANY, FOUND PRIOR TO PLACEMENT OF ANY COMPONENTS.

3. THE CONTRACTOR WILL TAKE ALL NECESSARY PRECAUTIONS INCLUDING THE BUILDING AND MAINTENANCE OF

DUST TIGHT PARTITIONS, DAILY VACUUMING, SWEEPING, AND PROVISION OF CLEAN FLOOR MATS AT THE PROJECT ENTRANCES, TO PREVENT THE INFILTRATION OF DIRT AND DUST FROM THE CONSTRUCTION AREAS

INTO THE OWNER OCCUPIED AREAS.

4. IF THE PROJECT AREA INCLUDES EXISTING EQUIPMENT, SURFACES, FINISHES, MATERIALS, ETC., NOT TO BE REMOVED, THE CONTRACTOR MUST PROTECT THIS EQUIPMENT FROM DUST, DEBRIS, DAMAGE, ETC. THE CONTRACTOR MUST ALSO CLEAN THESE ITEMS/SURFACES TO THE ORIGINAL CONDITION FOUND AT THE START

OF THE PROJECT PRIOR TO FINAL INSPECTION.

5. PATCH ALL FINISHES WHERE DISTURBED BY THE WORK AND WHERE UNFINISHED SURFACES HAVE BEEN EXPOSED BY DEMOLITION. PATCHING MUST MATCH ADJACENT MATERIALS, COLORS, AND FINISHES. WALL SURFACES THAT ARE PATCHED SHALL HAVE THE FINISHES (PAINT, VINYL WALL COVERING, ETC.) REPLACED

FROM CORNER TO CORNER AND FLOOR TO CEILING.

6. UNLESS OTHERWISE INDICATED, FINISH ALL NEW FRAMES AND PARTITIONS TO MATCH SURROUNDING. NEW HOLLOW METAL DOORS SHALL BE PAINTED SAME COLOR AS FRAMES. EXISTING PARTITIONS RECEIVING NEW DOOR FRAMES THAT HAVE VINYL WALL COVERING (VWC) SHALL HAVE THE VWC COMPLETELY REMOVED AND

REPLACED WITH NEW VWC OF MATCHING TEXTURE AND COLOR.

7. PAINT ALL EXPOSED NEW AND EXISTING PIPING, CONDUIT, WIRE MOLD, ELECTRICAL PANELS, ACCESS PANELS, ETC., TO MATCH WALL FINISH UNLESS OTHERWISE NOTED.

8. WHENEVER EXISTING EQUIPMENT, PIPING, DUCTS, ETC., ARE REQUIRED TO BE REMOVED, SUCH REMOVAL SHALL INCLUDE ALL ANCHORS, HANGERS, FOUNDATIONS, ETC., UNLESS NOTED OTHERWISE. AFTER REMOVAL;

FLOORS, WALLS, AND CEILINGS SHALL BE FINISHED TO MATCH ADJOINING SURFACES.

9. UTILITY WORK THAT WILL REQUIRE A SHUTDOWN OF EXISTING SERVICE WILL BE DONE AT TIMES OTHER THAN NORMAL WORKING HOURS AT NO ADDITIONAL COST TO THE GOVERNMENT. WORK MUST BE SCHEDULED WITH

THE VA PROJECT ENGINEER.

10. COORDINATE ALL WORK WITH OTHER TRADES AND EXISTING CONDITIONS TO ELIMINATE CONFLICTS AND/OR INTERFERENCES. THE CONTRACTOR SHALL PROVIDE ALL OFFSETS, FITTINGS, TRANSITIONS, EXTENSIONS, ETC., REQUIRED FOR A COMPLETE AND FUNCTIONAL SYSTEM.

11. DRAWINGS ARE DIAGRAMMATIC AND SHOW ONLY THE GENERAL ARRANGEMENT OF EACH SYSTEM. BECAUSE OF SMALL SCALE OF DRAWINGS IT IS NOT POSSIBLE TO SHOW OR INDICATE ALL BRANCHES, OFFSETS, FITTINGS, BOXES, AND ACCESSORIES WHICH MAY BE REQUIRED. CONTRACTOR MUST CAREFULLY INVESTIGATE STRUCTURAL AND FINISH CONDITIONS AFFECTING ALL WORK, FURNISHING SUCH FITTINGS, TRAPS, VALVES, BOXES, ACCESSORIES, ETC., AS MAY BE REQUIRED.

12. LOCATIONS OF NEW EQUIPMENT, PIPING, AND ASSOCIATED ITEMS SHOWN ON THE DRAWINGS ARE SCHEMATIC ONLY. THE CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION AND ELEVATION FOR ALL WORK, INCLUDING CONNECTIONS TO EXISTING WORK. ALL OFFSETS, FITTINGS, TRANSITIONS, EXTENSIONS, ETC., REQUIRED FOR

A COMPLETE AND FUNCTIONAL SYSTEM SHALL BE PROVIDED AT NO ADDITIONAL COST.

13. ALL EXISTING DUCTWORK, ELECTRICAL OR MECHANICAL PIPING, CABLE TRAYS, ETC., IS NOT NECESSARILY SHOWN ON THE DRAWINGS. BEFORE CONTRACTOR PLACES A BID IT IS IMPERATIVE THEY VISIT THE JOBSITE AND FIELD VERIFY THE EXACT LOCATION OF ALL EXISTING EQUIPMENT, DUCTWORK, PIPING, ETC. IT WILL BE PART OF THE CONTRACTOR'S RESPONSIBILITY AND THE CONTRACTOR WILL BEAR THE COST TO ENGINEER AND RELOCATE ANY EXISTING OBSTACLES WHICH WILL INTERFERE WITH THE CONTRACTOR'S ABILITY TO

INSTALL ALL NEW OR RELOCATED WORK IN THIS PROJECT.

14. CONTRACTOR SHALL NOT INSTALL CONDUIT, PIPING, LIGHTING, OR OTHER OBSTRUCTIONS UNDER OR ADJACENT TO HVAC EQUIPMENT THAT WILL ELIMINATE OR OBSTRUCT ACCESS TO COILS, MOTORS, VALVES, SWITCHES, PANELS, ETC.

15. BEFORE THE CONTRACTOR BEGINS WORK HE SHALL RECORD ANY EXISTING SYSTEM INFORMATION SUCH AS TEMPERATURE, FLOW RATE, PRESSURE, CURRENT, VOLTAGE, OR ANY OTHER INFORMATION NECESSARY FOR HIM TO RETURN THE AFFECTED SYSTEM TO ORIGINAL OPERATING CONDITION. UNLESS NOTED OTHERWISE IT IS ASSUMED THAT ALL SYSTEMS (HVAC, ELECTRICAL, PLUMBING, ETC.) ARE WORKING PROPERLY IN EVERY

MANNER AT THE BEGINNING OF THE PROJECT.

16. THE CONTRACTOR'S RECORDED MEASUREMENTS MUST BE SUBMITTED TO THE PROJECT ENGINEER FOR REVIEW AND ACCEPTANCE BEFORE ANY DEMOLITION OR OTHER RELATED WORK CAN PROCEED.THE CONTRACTOR WILL BE RESPONSIBLE FOR MAINTAINING ALL EXISTING ACCESS DOORS TO CONSTRUCTION AREAS, EXISTING MECHANICAL AND ELECTRICAL AREAS, ASSIGNED STORAGE AREAS, EQUIPMENT ACCESS AREAS, ETC. DOORS MUST BE RESTORED TO THE CONDITION ENCOUNTERED AT BEGINNING OF PROJECT.

THIS INCLUDES DOOR REPLACEMENT, HARDWARE REPLACEMENT, HARDWARE REPAIR, DOOR REPAIR, ETC.

17. NOTE: IF THERE IS ANY WORK TO BE DONE ON EXISTING ROOFS, SUCH AS ROOF PENETRATIONS OR STANDS, OR ANYTHING THAT DAMAGES THE INTEGRITY OF THE ROOF, THIS WORK MUST BE DONE BY A CONTRACTOR LICENSED BY THE ROOFING MEMBRANE MANUFACTURER. HE MUST BE APPROVED BY THE MEMBRANE MANUFACTURER SO AS TO NOT VOID OR INTERRUPT EXISTING SINGLE PLY MEMBRANE ROOF WARRANTIES.

18. CONTRACTOR MUST PROVIDE HIS OWN EQUIPMENT FOR MOVING OF MATERIALS, EQUIPMENT AND TRASH.

THIS INCLUDES CARTS FOR REMOVAL OF DEMOLITION MATERIALS, PALLET JACKS FOR EQUIPMENT MOVING, TWO OR FOUR WHEEL CARTS FOR EQUIPMENT TRANSFER, ETC. CONTRACTOR MAY NOT BORROW VA OWNED

EQUIPMENT FOR THIS PURPOSE.

19. IF ASBESTOS INSULATION IS REMOVED ON THIS PROJECT ALL PIPING AND OTHER MECHANICAL ITEMS THAT HAD THE ASBESTOS INSULATION REMOVED MUST BE REINSULATED WITH MATERIALS ACCORDING TO THE

SPECIFICATIONS.

20. SEVERE NOISE PRODUCING WORK WILL NOT BE ALLOWED DURING NORMAL WORKING HOURS AND MUST BE SCHEDULED WITH THE VA PROJECT ENGINEER FOR OTHER TIMES. THIS INCLUDES JACKHAMMERING

CONCRETE, SAWCUTTING CONCRETE, REPETITIVE HAMMER DRILLING OF CONCRETE, ETC.

21. THE VA DOES NOT PROVIDE TELEPHONE SERVICE OR A TELEPHONE FOR THE CONTRACTORS USE. IT IS THE CONTRACTOR’S RESPONSIBILITY TO COVER THE COSTS OF THE INSTALLATION OF A TEMPORARY LAND LINE PHONE. THE CONTRACTOR SHALL CONTACT THE TELEPHONE COMPANY TO HAVE THIS PHONE INSTALLED.

22. ALL CONTRACTOR’S PERSONNEL WHO PLAN TO WORK ON SITE MUST RECEIVE AN ID BADGE THROUGH THE VA’S PIV (PERSONAL IDENTITY VERIFICATION) PROGRAM. THIS REQUIRES HAVING FINGERPRINTS TAKEN AND A

BACKGROUND CHECK DONE BEFORE THE BADGE CAN BE ISSUED.

23. WATER OR LIQUIDS MUST NOT BE ALLOWED TO COME INTO CONTACT WITH NEW OR EXISTING DRYWALL FROM CONSTRUCTION RELATED ACTIVITIES. REMOVE AND REPLACE ANY DRYWALL THAT HAS COME INTO CONTACT

WITH WATER OR OTHER LIQUIDS.

24. LIVE ELECTRICAL CIRCUITS ARE BURIED WITHIN THE CONCRETE FLOOR SLABS AND THERE IS NO RECORD OF THE EXACT LOCATIONS. THE CONTRACTOR SHALL X-RAY THE FLOOR WHEREVER THE CONTRACTOR PLANS ON DRILLING THROUGH THE CONCRETE FLOOR SLABS. IT WILL BE THE CONTRACTOR’S RESPONSIBILITY TO

IMMEDIATELY REPAIR ANY CIRCUIT THAT HAS BEEN CUT OR DAMAGED.

25. WHEN AN EXIT IS CLOSED BECAUSE OF THIS PROJECT THE CONTRACTOR MUST INSTALL BARRICADES AND SIGNAGE AT THE EXIT DOOR. THE CONTRACTOR MUST ALSO COVER OR REMOVE THE LIGHTED EXIT SIGN.

26. WHEN THE CONSTRUCTION REQUIRES THAT EXISTING EXITS FROM THE BUILDING BE BLOCKED OR CLOSED THE CONTRACTOR MUST INSTALL BARRIERS IN FRONT OF THE EXIT TO BLOCK PASSAGE, INSTALL SIGNAGE ON THE BARRIERS OR DOOR STATING THAT THE EXIT IS CLOSED AND COVER THE LIGHTED EXIT SIGN FOR THIS EXIT.

THESE MUST ALL BE REMOVED WHEN THE EXIT IS REOPENED.

27. CONTRACTOR SHALL PROVIDE BOXES, CONDUIT, WIRE, AND RECONNECTIONS AS REQUIRED TO RECONNECT ANY AND ALL EXISTING LIGHT FIXTURES, RECEPTACLES, OR DEVICES REMAINING IN USE. REMOVAL OF ANY ELECTRICAL EQUIPMENT SHALL NOT AFFECT THE OPERATION OF EQUIPMENT REMAINING IN USE.

28. A GREEN GROUND SHALL BE RUN WITH ALL FEEDERS AND WITH ALL CIRCUITS TO RECEPTACLES, MOTORS, FIXED EQUIPMENT, AND APPLIANCES.

29. PANELBOARDS AND CIRCUIT BREAKERS SHALL HAVE THE FOLLOWING MINIMUM INTERRUPTING RATINGS:120/208 - 22,000 AMPERES SYMMETRICAL, 277/480 - 14,000 AMPERES SYMMETRICAL

30. CONTINUITY OF ALL SERVICES TO AND FROM THE FACILITIES IN THE EXISTING BUILDING SHALL BE MAINTAINED WITHOUT INTERRUPTION, EXCEPT FOR SUCH PERIODS OF TIME WHICH THE V.A. MAY DESIGNATE. IF TEMPORARY CONNECTIONS, ETC. ARE NECESSARY TO ASSURE THE CONTINUITY OF SERVICE, THEY SHALL BE FURNISHED WITHOUT ADDITIONAL CHARGE TO THE V.A. AND SHALL BE REMOVED WHEN NO LONGER

NECESSARY.

31. ALL INSTALLATIONS AND EQUIPMENT SHALL FOLLOW THE GUIDELINES ESTABLISHED BY THE CURRENT

NATIONAL ELECTRIC CODE

32. ALL EXISTING CONDUIT AND WIRING MADE ABANDONED BY THIS PROJECT OR FOUND TO BE ABANDONED

DURING DEMOLITION SHALL BE REMOVED.

33. COORDINATE THE PROVISION AND INSTALLATION OF ALL CONTROL WIRING FOR MECHANICAL EQUIPMENT WITH

THE GENERAL CONTRACTOR AND MECHANICAL CONTRACTOR.

34. FOR SAFETY PURPOSES THE CONTRACTOR WILL NOT WORK ON ANY ELECTRICAL EQUIPMENT HOT. ALL

SHUTDOWNS WILL BE SCHEDULED IN ADVANCE WITH THE VA

35. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL OPENINGS REQUIRED IN WALLS. ALL OPENINGS SHALL BE REPAIRED TO MATCH EXISTING BY A QUALIFIED CONTRACTOR AT THE EXPENSE OF THIS CONTRACTOR. ALL

CONDUITS IN WALLS SHALL BE GROUTED OR SEALED INTO OPENINGS

36. FOR DOORS BEING REPLACED AND WALLS WITHIN A CONSTRUCTION AREA: CAREFULLY REMOVE SIGNAGE, ROOM NUMBERS, ARTWORK, ETC., AND STORE IN A PROTECTIVE BOX FOR REINSTALLATION AT COMPLETION OF AREA. ANY DAMAGED SIGNAGE, ARTWORK, ETC., SHALL BE REPLACED WITH NEW. VA INTERIOR DESIGNER

AND COR SHALL IDENTIFY LOCATIONS FOR REINSTALLATION.

37. THE PROPERTY IS LISTED AS A NATIONAL HISTORIC LANDMARK AND LISTED IN THE NATIONAL REGISTER OF HISTORIC PLACES THROUGH THE MOUNTAIN HOME BRANCH CAMPUS. ALL REHABILITATION WORK SHALL MEET THE SECRETARY OF INTERIORS STANDARDS FOR THE TREATMENT OF HISTORIC PROPERTIES FOR

REHABILITATION. HTTPS://WWW.NPS.GOV/TPS/STANDARDS/REHABILITATION.HTM

38. THE WORK IS TO UTILIZE THE PRESERVATION PRINCIPALS FOUND WITHIN THE NATIONAL PARK SERVICE'S

TECHNICAL PRESERVATION BRIEFS FOR REHABILITATION WHICH CAN BE FOUND AT:

HTTPS://WWW.NPS.GOV/TPS/HOW-TO-PRESERVE/BRIEFS.HTM

PROJECT SITE

NAME

ELEVATION

101A

PLAN NORTH

ID

ID

NAME

NO

IDID

0 8' 16'4'C4

DRAWING BLOCK TITLE

1/8" = 1'-0"

NO

SHT

SIM

NO

SHT

SIM

NO

SHT

SIM

BUILDING SECTION IDENTIFICATION

SECTION NUMBER

SHEET NUMBER

WALL SECTION IDENTIFICATION

SECTION NUMBER

SHEET NUMBER

SHEET

ELEV_NO

Ref

R ef

Ref

R ef

EXTERIOR ELEVATION IDENTIFICATION

SHEET

RefEL

R ef

EL

RefEL

R ef

EL

INTERIOR ELEVATION IDENTIFICATION

ELEVATION NUMBER

SHEET NUMBER

ELEVATION NUMBER

SHEET NUMBER

SHT

NO

SIM

DETAIL/CALLOUT IDENTIFICATION

DETAIL NUMBER

SHEET NUMBER

DRAWING BLOCK TITLE

VIEW NUMBER

VIEW SCALE

VIEW NAME

GRAPHIC SCALE

EXTERIOR ELEVATION IDENTIFICATION

ELEVATION NAME

ELEVATION

NORTH INDICATOR

PROJECT NORTH LINE

TRUE NORTH LINE

COLUMN LINE GRID INDICATOR

ID

GRID IDENTIFICATION

FLOOR PLAN REFERENCE INDICATORS

ROOM TAG

WINDOW TAG

DOOR TAG

PARTITION TAG

REVISION TAG

KEYNOTE TAG

SPOT ELEVATION

TAG

100'-0"

CL CENTER LINE

Abbreviation Term

1WAY one-way 2WAY two-way 3PLY three-ply 3WAY three-way 4WAY four-way

A A LABEL Class A door A/C air condition A/C UNIT air conditioning unit A/E architect/engineer AAP alarm annunciator panel AB anchor bolt ABBRV abbreviation ACC accessible ACOUS INSUL acoustical insulation ACOUS PNL acoustical panel ACS DR access door ACS FLR access floor ACS PNL access panel ACT acoustical ceiling tile ADA Americans with Disabilities Act AFF above finished floor AGGR aggregate AHJ authority having jurisdiction AHU air handling unit AIA American Institute of Architects ALM alarm ALNMT alignment ALT alternate ALT NO alternate number ALUM aluminum ANN annunciator ANOD anodize APC acoustical panel ceiling APPD approved APPROX approximate ARCH Architect ASKLR automatic sprinkler ASPH asphalt ATS automatic transfer switch AV audio visual

B B LABEL Class B door B PL base plate BAS building automation system BB baseboard BC bookcase BD board BDRY boundary BFF below finish floor BHMA Builder's Hardware

Manufacturer's Association BITUM bituminous BLKHD bulkhead BLT IN built-in BLW CLG below ceiling BN bullnose BRCG bracing BRDG bridging BRDG JST bridging joist BRG bearing BRG PL bearing plate BRZ bronze BTWN between BUR built-up roofing

C cont.

CER ceramic CF contractor furnished CF/CI contractor furnished/ contractor installed CF/OI contractor furnished/ owner installed CFE contractor furnished equipment CFLG counterflashing CFMF cold-formed metal framing CG corner guard CHFR chamfer CI cast iron CIP cast-in-place CIR circle CJ control joint CL center line CLDG cladding CLG ceiling CLG DIFF ceiling diffuser CLG GRL ceiling grille CLG HT ceiling height CLG REG ceiling register CLKJ calked joint CLR color CMPST composite CMPTR computer CMU concrete masonry unit CNR corner CNTOR contactor CNTR counter CO cleanout COL column COMM communication CONC concrete CONC FLR concrete floor CONC OPNG concrete opening CONSTR construction CONSULT consultant CONT continue COORD coordinate CORR corridor COV PL cover plate CP control panel CPT carpet CRCMF circumference CRT YD courtyard CS cast stone CSG casing CSI Construction Specifications

Institute CSK counter sunk CSMT casement CSTL cast steel CSWK casework CT ceramic tile CT STN cut stone CTB ceramic tile base CTF ceramic tile floor CTG coating CTR center CTRL control CU FT cubic feet CU IN cubic inch CU YD cubic yard CURT curtain

E E LABEL Class E door EA each EFS exterior finish system EGB exterior gypsum board EGSB exterior gypsum sheathing board EIFS exterior insulation and finish system EJ expansion joint EL elevation ELEC electric ELEV elevator ENTR entrance EOS edge of slab EPS expanded polystyrene board

(insulation) EQ equal EQUIP equipment ESCAL escalator EXST existing EXT exterior EXT GR exterior grade EXT LT exit light

F F BRK fire brick FAAP fire alarm annunciator panel FABL fire alarm bell FABX fire alarm box FACP fire alarm control panel FAR floor area ratio FAS BD fascia board FC BRK face brick FD floor drain FDC fire department connection FDCC fire department connection cabinet FDMPR fire damper FDR fire door FDTN foundation FDV fire department valve FE fire extinguisher FEC fire extinguisher cabinet FF finish face FF BATT foil backed batt insulation FF EL finish floor elevation FF&E furniture, fixture, and equipment FFA from floor above FFB from floor below FH fire hydrant FHC fire hose cabinet FHP full height partition

I IBC International Building Code ID identification ID NO identification number INFO information INSUL insulation INSUL PNL insulated metal panel INT interior

J JAN janitor JAN CLO janitor closet J-BOX junction box JS janitor's sink

K KIT kitchen KPL kickplate KWY keyway

L cont.

LNDSCP landscape LT light LT FLUOR fluorescent lighting LT GA light gage LTG lighting LVR louver LW PLAS lightweight plaster LWC lightweight concrete

M MACH RM machine room MATL material MAX maximum MC moisture content MD metal deck MECH mechanical MECH RM mechanical room MEMB membrane MEP mechanical, electrical, plumbing MEZZ mezzanine MFR manufacturer MIN minimum MIRR mirror MISC miscellaneous MLDG molding (moulding) MLWK millwork MOD modify MOD BIT modified bitumen MR moisture resistant MS mop sink MTL metal MVBL movable MWP membrane waterproofing

N N north NA not applicable NFC National Fire Code NFPA National Fire Protection

Association NIC not in contract NO number NOM nominal NP no paint NRC noise reduction coefficient NTS not to scale

O OA overall OC on center OCC occupy OD outside diameter OF/CI owner furnished/ contractor installed OFD overflow drain OF/OI owner furnished/owner installed OFS outside face of studs OH DR overhead (coiling) door OPNG opening ORD overflow roof drain OVFL overflow

P cont.

PLG piling PLYWD plywood PNL panel PRCST precast PREFIN prefinish PRKG parking PT paint PTN partition PVC polyvinyl chloride (plastic) PVF polyvinyl fluoride (plastic) PVG paving PWR power

S SAT suspended acoustical tile SATC suspended acoustical tile ceiling SB splash block SBS styrene butadien styrene SBSTR substrate SCHED schedule SCMU solid concrete masonry unit SCRN screen SDG siding SDMPR smoke damper SECT section SF square foot (feet) SHT MTL FLASH sheet metal (flashing) SHTHG sheathing SHV shelving SIM similar SJ slab construction joint SLNT sealant SMK smoke SND sanitary napkin dispenser SND INS sound insulation SP EL spot elevation SPEC specification SPKLR sprinkler SQ square SQ IN square inch SQ YD square yard

Q QT quarry tile QTB quarry tile base QTF quarry tile floor QTY quantity

R RB resilient base RB HK robe hook RBM reinforced brick masonry RC reinforced concrete RCP reflected ceiling plan RCPTN reception RD roof drain RDG INS rigid insulation, solid REBAR reinforcing steel bars REF reference REINF reinforce REQ require REQD required RESIL resilient REV revision RHR right hand reverse RL roof leader RLG railing RM room RO rough opening RSD rolling steel door RT right RTF rubber tile floor RTG rating RTU roof top unit RV roof vent RVL reveal

S cont.

SST stainless steel STC sound transmission class STD standard STL JST steel joist STL LNTL steel lintel STL PL steel plate STL RF DK steel roof deck STL TB steel tube STL TR steel truss STOR storage STRUCT structural STRUCT STL structural steel SUSP suspend SUSP CLG suspended ceiling SV sheet vinyl SYM symbol SYS system

T TD trench drain TE top elevation TEMP temporary TFF top of finish floor THK thickness THRU through TMPD tempered TRTD treated TS tube steel TYP typical

U UGND underground UL Underwriters Laboratories UNFIN unfinish UNO unless noted otherwise

V VAN vanity VAP PRF vapor proof VB vinyl base VCT vinyl composition tile VEST vestibule VFAT vinyl faced acoustical tile VNR veneer VR vapor retarder VRFY verify VTR vent through roof

W W CAB wall cabinets W/O without WB wood base WBL wood blocking WC water closet WC WL HNG water closet, wall hung WCLR water cooler WD wood WD LOUV wood louvers WDF wood door and frame WDP wood panelling WF wide flange WF BM beam, wide flange WFAB wall fabric WFR wood frame WFS wood furring strips WGL wired glass WPM waterproof membrane WSCT wainscot

X, Y, Z X BRACE cross brace X SECT cross section XBRA crossbracing XPS extruded polystyrene board

(insulation)

YD yard

Z modulus of section

D cont.

DIM dimension DIST distance DIV division DOC document DPTN demountable partition DR door DR CL door closer DR FR door frame DR OPNG door opening DRH door holder DRLV door louver DRST door stop DRSW door switch DW dishwasher DWG drawing

F cont.

FN fence FR fire rating FRMG framing FRP fiberglass reinforced plastic FRST GL frosted glass FRTW fire retardant treated wood FT feet FTG footing FW fire wall FWRK formwork

G GALV galvanized GC general contractor GFRC glass-fiber-reinforced concrete GFRG glass-fiber-reinforced gypsum GFRP glass-fiber-reinforced plaster GFRP glass-fiber-reinforced plastic GL glass GL BLK glass block GLU LAM glued laminated wood GLZ glazing GLZ CMU glazed concrete masonry unit GPC gypsum plaster ceiling GR BM grade beam GR FL ground floor GR LN grade line GSB gypsum sheathing board GUT gutter GWT glazed wall tile GYM gymnasium GYP gypsum GYP BD gypsum board GYP PLAS gypsum plaster

H HB hose bibb HCP handicapped HCWD hollow core wood door HM hollow metal HMD hollow metal door HMDF hollow metal door and frame HMF hollow metal frame HNDRL handrail HORIZ horizontal HS hand sink HT height HVY heavy HYD hydrant

C C CONC cast concrete C LABEL Class C door CAB cabinet CAC ceiling attenuation class CATW catwalk CBB cementitious (backer) board CEM cement CEM FIN cement finish CEM PLAS cement plaster CEM PLAS CLGcement plaster ceiling

D D LABEL Class D door DBL double DBL ACT DR double acting door DBL GLZ double glaze DEMO demolition DEPT department DET detail DF drinking fountain DF WL MTDdrinking fountain, wall mounted DIA diameter

F FIN finish FIXT fixture FLG flooring FLR floor FLR FIN floor finish FLR PL floor plate FLR SK floor sink

L LAM laminate LAV lavatory LBS pounds LED light emitting diode LF linear feet (foot) LF INS loose fill insulation LKR RM locker room LL low level

P PAR parapet PAT pattern PB pull box PBD particleboard PCC precast concrete PCP portland cement plaster PERF perforated PERIM perimeter PGBD pegboard PIL pilaster PL property line PL GL plate glass PLAM plastic laminate PLAS plaster PLBG plumbing

CONCRETE,

CAST-IN-PLACE

GROUT

BRICK,

COMMON/FACE

CONCRETE

MASONRY UNIT

STONE,

CAST

ALUMINUM

ORNAMENTAL

METAL

STEEL AND

OTHER METALS

INSULATION,

LOOSE FILL OR

BLANKET

INSULATION,

RIGID BOARD

SHEET METAL

PLASTER,

GYPSUM OR

PORTLAND CEMENT

EARTH,

CRUSHED ROCK

GRAVEL

EARTHWORK,

COMPACTED

FILL

SAND

CMU

BOND BEAM

LINTEL

CMU, END

PLYWOOD

WOOD BLOCKING

OR SHIM

WOOD FRAMING,

CONTINUOUS

GLASS, ELEVATION

OWNER:

James H. Quillen VA Medical Center 53 Memorial Ave Bldg 34 Johnson City, Tennessee (Mountain Home) P: (423)926-1171 C: Aaron Prosak, Engineering Technician E: aaron.prosak@va.gov

ARCHITECT:

GLMV Architecture, Inc.

1525 E. Douglas Wichita, KS 67211 P: (316) 265-9367 F: (316) 265-5646 C: Fred Britain, AIA, Project Manager E: fred.britain@glmv.com

HISTORIC PRESERVATION ARCHITECT:

STRATA Architecture, Inc.

1701 Oak Street, Suite 100 Kansas City, MO 64108 P: (816) 474-0900 C: Trudy Faulkner E: trudy@strata-arch.com

MECHANICAL / ELECTRICAL / PLUMBING:

AME Consulting Engineers 705 E. Morehead St.

Charlotte, NC 28202

FIRE PROTECTION ENGINEER:

GHD Cons Services, Inc.

222 S. Church St. #400 Charlotte, NC 28202 P: (704) 342-4910 C: Charles Hahl E: eric.okurowski@ghd.com

INDUSTRIAL HYGIENIST

Terracon 72 Pointe Circle Greenville, SC 29615 P: (864) 292-2901 C: Jeffrey Gurrie, CIH E: jeff.gurrie@terracon.com

ARCHITECT / ENGINEEROWNER

CONSULTANTS

ARCHITECT OF RECORD:

Atriax, pllc 102 3rd Avenue NE Hickory, NC 28601 (PO Box 1629 Hickory, NC 28603) P: (828) 315-9962 C: Bob Sinclair E: bob.sinclair@atriaxgroup.com

P: (704) 295-4263 C: James Dinkler, PE E: jdinkler@ame-pc.com

Drawing Title

Approved: Associate Director

Project Title

Date

Location

Checked

Building Number

Project Number:

Drawing Number

Drawn

CONSULTANTS: ARCHITECT/ENGINEERS:

Dwg. of o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Veterans

Health

Administration

Medical Center Director: Date:

Associate Medical Center Director: Date:

Engineering M&O Foreman: Date:

Chief Engineering Service: Date:

Boiler Plant Foreman: Date:

Safety Manager: Date:

Industrial Hygenist: Date:

Infection Control Nurse: Date:

Energy Manager: Date:

Approved: Date:

Approved: Chief of Staff

Approved: Infection Control

Approved: Chief Engineer

Approved: Safety Officer

Approved: Chief, Police & Security

GHD Cons Services, Inc.

Fire Protection Engineer 222 S. Church St. #400, Charlotte, NC 28202

Phone: 704-342-4910 www.ghd.com

GLMV Architecture Architect 1525 E. Douglas, Wichita, KS 67211

Phone: 316-265-9367 www.glmv.com

AME Consulting Engineers MEP Engineers 705 E. Morehead St., Charlotte, NC 28202

Phone: 704-295-4263 www.ame-pc.com

STRATA Architecture, Inc.

Historic Preservation Architect 1701 Oak Street, Suite 100, Kansas City, MO 64108

Phone: 816-474-0900 www.strata-arch.com

Atriax, pllc 102 3rd Avenue NE, Hickory, NC 28601 PO Box 1629, Hickory, NC 28603

Phone: 828-315-9962 www.atriaxgroup.com

/1

/2

:2

:5

P M

B

IM

/1

.1

M tn

H o m e V

A

B ld g

R e n o v

-9

.1

.A rc h

-M tn

H o m e .r v t

34-G-001

COVER SHEET Renovate Building 34 to Correct FCA Deficiencies

James H. Quillen VAMC Mountain Home, TN

621-18-102

07/24/2020 FAB JSR 1 149

SHEET NUMBER SHEET NAME REV. NO.

34-PD-111 PLUMBING - FIRST FLOOR DEMOLITION PLAN - AREA A

34-PD-112 PLUMBING - FIRST FLOOR DEMOLITION PLAN - AREA B

34-PD-121 PLUMBING - SECOND FLOOR - ATTIC DEMOLITION PLAN - AREA A

34-PD-122 PLUMBING - SECOND FLOOR - ATTIC DEMOLITIONPLAN - AREA B

34-PL-101 PLUMBING - LOWER LEVEL WASTE & VENT PLAN - AREA A

34-PL-102 PLUMBING - LOWER LEVEL WASTE & VENT PLAN - AREA B

34-PL-111 PLUMBING - FIRST FLOOR WASTE & VENT PLAN - AREA A

34-PL-112 PLUMBING - FIRST FLOOR WASTE & VENT PLAN - AREA B

34-PL-121 PLUMBING - SECOND FLOOR - ATTIC WASTE & VENT PLAN - AREA A

34-PL-122 PLUMBING - SECOND FLOOR - ATTIC WASTE & VENT PLAN - AREA B

34-PL-131 PLUMBING - LOWER LEVEL WATER PLAN - AREA A

34-PL-132 PLUMBING - LOWER LEVEL WATER PLAN - AREA B

34-PL-141 PLUMBING - FIRST FLOOR WATER PLAN - AREA A

34-PL-142 PLUMBING - FIRST FLOOR WATER PLAN - AREA B

34-PL-151 PLUMBING - SECOND FLOOR - ATTIC WATER PLAN - AREA A

34-PL-152 PLUMBING - SECOND FLOOR - ATTIC WATER PLAN - AREA B

34-P-501 PLUMBING - RISERS

34-P-701 PLUMBING - DETAILS

MECHANICAL

34-M-001 MECHANICAL - GENERAL NOTES AND LEGENDS

34-MD-101 MECHANICAL - LOWER LEVEL - AREA A DUCTWORK PLAN - DEMOLITION

34-MD-111 MECHANICAL - FIRST FLOOR - AREA A DUCTWORK PLAN - DEMOLITION

34-MD-112 MECHANICAL - FIRST FLOOR - AREA B DUCTWORK PLAN - DEMOLITION

34-MD-121 MECHANICAL - ATTIC-SECOND FLOOR DUCTWORK PLANS - DEMOLITION

34-MD-201 MECHANICAL - LOWER LEVEL - AREA A PIPING PLAN - DEMOLITION

34-MD-202 MECHANICAL - LOWER LEVEL - AREA B PIPING PLAN - DEMOLITION

34-MD-211 MECHANICAL - FIRST FLOOR - AREA A PIPING PLAN - DEMOLITION

34-MD-212 MECHANICAL - FIRST FLOOR - AREA B PIPING PLAN - DEMOLITION

34-MD-221 MECHANICAL - ATTIC-SECOND FLOOR PIPING PLANS - DEMOLITION

34-MH-111 MECHANICAL - FIRST FLOOR - AREA A DUCTWORK PLAN

34-MH-121 MECHANICAL - ATTIC DUCTWORK PLAN

34-MP-101 MECHANICAL - LOWER LEVEL - AREA A PIPING PLAN

34-MP-102 MECHANICAL - LOWER LEVEL - AREA B PIPING PLAN

34-MP-111 MECHANICAL - FIRST FLOOR - AREA A PIPING PLAN

34-MP-112 MECHANICAL - FIRST FLOOR - AREA B PIPING PLAN

34-MP-121 MECHANICAL - ATTIC-SECOND FLOOR PIPING PLANS

34-MP-401 MECHANICAL - ENLARGED PIPING PLANS

34-M-601 MECHANICAL- SCHEDULES

34-M-602 MECHANICAL - PIPING DIAGRAM

34-M-603 MECHANICAL - PIPING DIAGRAM

34-M-701 MECHANICAL - DETAILS

34-M-702 MECHANICAL - DETAILS

34-M-703 MECHANICAL - CONTROLS

34-M-704 MECHANICAL - CONTROLS

34-M-705 MECHANICAL - CONTROLS

ELECTRICAL

34-E-001 ELECTRICAL - GENERAL NOTES AND LEGENDS

34-ED-101 ELECTRICAL - LOWER LEVEL DEMOLITION PLAN - AREA A

34-ED-102 ELECTRICAL - LOWER LEVEL DEMOLITION PLAN - AREA B

34-ED-111 ELECTRICAL - FIRST FLOOR DEMOLITION PLAN - AREA A

34-ED-112 ELECTRICAL - FIRST FLOOR DEMOLITION PLAN - AREA B

34-ED-121 ELECTRICAL - SECOND FLOOR - ATTIC DEMOLITION PLAN - AREA A

34-ED-122 ELECTRICAL - SECOND FLOOR - ATTIC DEMOLITION PLAN - AREA B

34-EL-101 ELECTRICAL - LOWER LEVEL LIGHTING PLAN - AREA A

34-EL-102 ELECTRICAL - LOWER LEVEL LIGHTING PLAN - AREA B

34-EL-111 ELECTRICAL - FIRST FLOOR LIGHTING PLAN - AREA A

34-EL-112 ELECTRICAL - FIRST FLOOR LIGHTING PLAN - AREA B

34-EL-121 ELECTRICAL - SECOND FLOOR - ATTIC LIGHTING PLAN - AREA A

34-EL-122 ELECTRICAL - SECOND FLOOR - ATTIC LIGHTING PLAN - AREA B

34-EP-101 ELECTRICAL - LOWER LEVEL POWER PLAN - AREA A

34-EP-102 ELECTRICAL - LOWER LEVEL POWER PLAN - AREA B

34-EP-111 ELECTRICAL - FIRST FLOOR POWER PLAN - AREA

34-EP-112 ELECTRICAL - FIRST FLOOR POWER PLAN - AREA B

34-EP-121 ELECTRICAL - SECOND FLOOR - ATTIC POWER PLAN - AREA A

34-EP-122 ELECTRICAL - SECOND FLOOR - ATTIC POWER PLAN - AREA B

34-ES-101 ELECTRICAL - LOWER LEVEL SECURITY PLAN - AREA A

34-ES-102 ELECTRICAL - LOWER LEVEL SECURITY PLAN - AREA B

34-ES-111 ELECTRICAL- SECURITY PLAN- AREA A

34-ES-112 ELECTRICAL- SECURITY PLAN- AREA B

34-ES-122 ELECTRICAL- SECURITY PLAN / ATTIC SECURITY PLAN - AREA B

34-E-501 ELECTRICAL - EXISTING POWER RISER DIAGRAM

34-E-502 ELECTRICAL - NEW POWER RISER DIAGRAM

34-E-601 ELECTRICAL- SCHEDULES

34-E-602 ELECTRICAL- PANEL SCHEDULES

34-E-603 ELECTRICAL- PANEL SCHEDULES

34-E-604 ELECTRICAL- PANEL SCHEDULES

34-E-605 ELECTRICAL- PANEL SCHEDULES

34-E-606 ELECTRICAL- PANEL SCHEDULES

34-E-701 ELECTRICAL - DETAILS

SHEET NUMBER SHEET NAME REV. NO.

GENERAL

34-G-001 COVER SHEET

34-G-002 CONCEPT LAYOUT

34-GI-001 CODE SUMMARY

34-GI-002 CODE FLOOR PLAN

34-GI-003 CODE FLOOR PLAN

34-GI-004 CODE FLOOR PLAN

STRUCTURAL

34-S-101 SLAB INFILL - LOWER LEVEL FLOOR AREA B

ARCHITECTURAL

34-AD-101 DEMOLITION PLANS - LOWER LEVEL & 1ST FLOOR PLANS OVERALL

34-AD-102 DEMOLITION PLANS - 2ND FLOOR & ROOF OVERALL 1

34-AD-103 DEMOLITION FLOOR PLAN - LOWER LEVEL FLOOR AREA A 1

34-AD-104 DEMOLITION FLOOR PLAN - LOWER LEVEL FLOOR AREA B 1

34-AD-105 DEMOLITION FLOOR PLAN - 1ST FLOOR AREA A 1

34-AD-106 DEMOLITION FLOOR PLAN - 1ST FLOOR AREA B 1

34-A-101 IMPROVEMENT PLANS - LOWER LEVEL & 1ST FLOOR OVERALL

34-A-102 IMPROVEMENT PLANS - 2ND FLOOR & ROOF PLAN OVERALL 1

34-A-103 IMPROVEMENT PLAN - LOWER LEVEL FLOOR AREA A

34-A-104 IMPROVEMENT PLAN - LOWER LEVEL FLOOR AREA B

34-A-105 IMPROVEMENT PLAN - 1ST FLOOR AREA A 1

34-A-106 IMPROVEMENT PLAN - 1ST FLOOR AREA B

34-A-111 RCP IMPROVEMENT LOWER LEVEL & 1ST FLOOR OVERALL

34-A-112 RCP IMPROVEMENT 1ST & 2ND LEVEL

34-A-201 EXTERIOR ELEVATIONS - IMPROVEMENT

34-A-202 EXTERIOR ELEVATIONS - IMPROVEMENT

34-A-301 BUILDING SECTIONS

34-A-302 BUILDING SECTIONS

34-A-601 DOOR DETAILS & SCHEDULE

34-A-602 ROOF DETAILS

ABATEMENT

34-AR-1 ABESTOS ABATEMENT PLAN

34-AR-2 ABESTOS ABATEMENT PLAN

34-AR-3 ABESTOS ABATEMENT PLAN

FIRE PROTECTION

34-FA-001 FIRE ALARM- REFERENCE SHEET

34-FA-101 FIRE ALARM - BASEMENT & 1ST FLOOR NEW PLAN OVERALL

34-FA-102 FIRE ALARM - 2ND FLOOR & BELL TOWER NEW PLAN OVERALL

34-FA-103 FIRE ALARM - BASEMENT FLOOR NEW WORK- AREA A

34-FA-104 FIRE ALARM- BASEMENT FLOOR NEW WORK- AREA B

34-FA-105 FIRE ALARM- 1ST FLOOR NEW WORK- AREA A

34-FA-106 FIRE ALARM- 1ST FLOOR NEW WORK- AREA B

34-FA-107 FIRE ALARM- 2ND FLOOR NEW WORK- AREA A

34-FA-108 FIRE ALARM- 2ND FLOOR NEW WORK- AREA B

34-FA-501 FIRE ALARM - DETAIL SHEET

34-FA-601 FIRE ALARM- RISER DIAGRAM & MATRIX

34-FJ-101 FIRE ALARM- BASEMENT & 1ST FLOOR OVERALL DEMOLITION PANS

34-FJ-102 FIRE ALARM- 2ND FLOOR OVERALL PLANS

34-FJ-103 FIRE ALARM- BASEMENT FLOOR DEMOLITION- AREA A

34-FJ-104 FIRE ALARM- BASEMENT FLOOR DEMOLITION- AREA B

34-FJ-105 FIRE ALARM- 1ST FLOOR DEMOLITION- AREA A

34-FJ-106 FIRE ALARM- 1ST FLOOR DEMOLITION- AREA B

34-FJ-107 FIRE ALARM- 2ND FLOOR DEMOLITION- AREA A

34-FJ-108 FIRE ALARM- 2ND FLOOR DEMOLITION- AREA B

34-FK-101 SPRINKLER - BASEMENT & 1ST FLOOR DEMOLITION PLANS OVERALL

34-FK-102 SPRINKLER - 2ND FLOOR MECH. MEZZANINE, AND BELL TOWER DEMO PLAN- OVERALL

34-FK-103 SPRINKLER- BASEMENT FLOOR DEMOLITION- AREA A

34-FK-104 SPRINKLER- BASEMENT FLOOR DEMOLITION- AREA B

34-FK-105 SPRINKLER- 1ST FLOOR DEMOLITION- AREA A

34-FK-106 SPRINKLER- 1ST FLOOR DEMOLITION- AREA B

34-FK-107 SPRINKLER- 2ND FLOOR DEMOLITION- AREA A

34-FK-108 SPRINKLER- 2ND FLOOR AND BELL TOWER DEMOLITION- AREA B

34-FX-001 SPRINKLER- REFERENCE SHEET

34-FX-101 SPRINKLER- BASEMENT & 1ST FLOOR NEW PLAN OVERALL

34-FX-102 SPRINKLER- 2ND FLOOR & BELL TOWER NEW PLAN OVERALL

34-FX-103 SPRINKLER- LOWER LEVEL FLOOR NEW WORK- AREA A

34-FX-104 SPRINKLER- LOWER LEVEL FLOOR NEW WORK- AREA B

34-FX-105 SPRINKLER- 1ST FLOOR NEW WORK- AREA A

34-FX-106 SPRINKLER- 1ST FLOOR NEW WORK- AREA B

34-FX-107 SPRINKLER- 2ND FLOOR NEW WORK- AREA A

34-FX-108 SPRINKLER- 2ND FLOOR NEW WORK- AREA B

34-FX-501 SPRINKLER - DETAIL SHEET

34-FX-502 SPRINKLER - DETAIL SHEET

34-FX-601 SPRINKLER - RISER DIAGRAM & SCHEDULES

PLUMBING

34-P-001 PLUMBING - GENERAL NOTES, SCHEDULES AND LEGENDS

34-PD-101 PLUMBING - LOWER LEVEL DEMOLITION PLAN - AREA A

34-PD-102 PLUMBING - LOWER LEVEL DEMOLITION PLAN - AREA B

ARCHITECTURAL LEGEND MISC. ARCHITECTURAL SYMBOLS SHEET INDEX

SITE LOCATION

DEPARTMENT OF VETERANS AFFAIRS

GENERAL NOTES

ARCHITECTURAL ABBREVIATIONS

JAMES H. QUILLEN VA MEDICAL CENTER - JOHNSON CITY, TENNESSEE (MOUNTAIN HOME)

PROJECT NO. 621-18-102

RENOVATE BLDG. 34 TO CORRECT FCA DEFICIENCIES

DIRECTORY

Revisions: Date:

DN

UP

DN

LOWER ROOF

REF. ROOF PLAN

LOWER ROOF

REF. ROOF PLAN

LOWER ROOF

REF. ROOF PLAN

LOWER ROOF

REF. ROOF PLAN

LOWER ROOF

REF. ROOF PLAN

LOWER ROOF

REF. ROOF PLAN

LOWER ROOF

REF. ROOF PLAN

OPEN TO BELOW

OPEN TO BELOW

6 7

DEDUCT

DEDUCT

DEDUCT13 DEDUCT

DEDUCT

DEDUCT

17 17

HATCH LEGEND

REFERENCE ASSOCIATED KEYNOTE 8 FOR MORE INFORMATION

EXISTING WALL / PARTITION TO REMAIN

EXISTING LOAD-BEARING WALL / PARTITION TO REMAIN

AREA NOT INCLUDED IN SCOPE OF WORK

NEW WALL / PARTITION CONSTRUCTION

LINETYPE LEGEND

LIGHT THIN LINE INDICATES EXISTING ELEMENT TO REMAIN

HEAVY DASHED LINE INDICATES EXISTING ELEMENT TO BE

REMOVED IN ITS ENTIRETY

SHEET KEYNOTES

CLASSROOM

LOUNGE

STORAGECLOS

CORRIDOR

RESTROOM

STORAGE RM

CLASSROOM

STORAGE RM

CLASSROOM

STORAGE RM

STAIRS

ROOF TYPE LEGEND

SLATE TILE

NEW ASPHALT SHINGLE

LOW PROFILE STANDING SEAM METAL ROOF

NEW TPO

GENERAL NOTES

1. REMOVE ENTIRE MECHANICAL, ELECTRICAL, PLUMBING, TELECOMMUNICATIONS (MEP/T)

SYSTEMS AS NOTED.

2. REMOVE ALL INTERIOR PARTITIONS AND ASSOCIATED DOORS IN THEIR ENTIRETY AS NOTED.

3. REMOVE ALL INTERIOR CEILINGS AND ASSOCIATED LIGHT FIXTURES AND CEILING DIFFUSERS

IN THEIR ENTIRETY AS NOTED.

4. ANY DEMOLITION OR DISTURBANCE TO BLOCK WALLS CONTAINING ASBESTOS ARE

REQUIRED TO BE REMOVED BY THE ABATEMENT CONTRACTOR.

5. REMOVE AND DISPOSE OF ALL ASBESTOS-CONTAINING INSULATION IN WALLS AND ABOVE

CEILINGS.

6. REMOVE AND DISPOSE OF ALL ASBESTOS-CONTAINING MASTIC ON CORK INSULATION AND

ORIGINAL COOLER WALLS/CEILINGS.

7. SALVAGE DOOR, TRIM AND FRAME FOR POTENTIAL REINSTALLATION OR OTHER WOOD

FRAME REPAIRS WHEREVER INDICATED ON AREA DEMOLITION DRAWINGS.

ROOF GENERAL NOTES

• FLY OVER VIDEO SHOWING ROOFING CONDITIONS IS AVAILABLE FOR REVIEW. THIS VIDEO

IS INCLUDED AND CONSIDERED A CONSTRUCTION DOCUMENT. GENERAL CONTRACTOR

AND APPLICABLE SUB-CONTRACTORS SHALL REVIEW VIDEO.

• GENERAL CONTRACTOR AND APPLICABLE SUB-CONTRACTORS SHALL INSPECT DECKING

CONDITIONS UNDERNEATH ROOF DURING WALK THROUGH

• GENERAL CONTRACTOR SHALL PROVIDE AND REVIEW SURVEY REPORT OF EXPECTED

ROOF REPAIRS WITH COR BEFORE CONSTRUCTION BEGINS.

Drawing Title

Approved: Associate Director

Project Title

Date

Location

Checked

Building Number

Project Number:

Drawing Number

Drawn

CONSULTANTS: ARCHITECT/ENGINEERS:

Dwg. of o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Veterans

Health

Administration Approved: Chief of Staff

Approved: Infection Control

Approved: Chief Engineer

Approved: Safety Officer

Approved: Chief, Police & Security

GHD Cons Services, Inc.

Fire Protection Engineer 222 S. Church St. #400, Charlotte, NC 28202

Phone: 704-342-4910 www.ghd.com

GLMV Architecture Architect 1525 E. Douglas, Wichita, KS 67211

Phone: 316-265-9367 www.glmv.com

AME Consulting Engineers MEP Engineers 705 E. Morehead St., Charlotte, NC 28202

Phone: 704-295-4263 www.ame-pc.com

STRATA Architecture, Inc.

Historic Preservation Architect 1701 Oak Street, Suite 100, Kansas City, MO 64108

Phone: 816-474-0900 www.strata-arch.com

Atriax, pllc 102 3rd Avenue NE, Hickory, NC 28601 PO Box 1629, Hickory, NC 28603

Phone: 828-315-9962 www.atriaxgroup.com

B

A

KEYPLAN

TRUE NORTH

/1

/2

:2

:4

P M

B

IM

/1

.1

M tn

H o m e V

A

B ld g

R e n o v

-9

.1

.A rc h

-M tn

H o m e .r v t

34-AD-102

DEMOLITION PLANS - 2ND FLOOR &

ROOF OVERALL

Renovate Building 34 to Correct FCA Deficiencies

James H. Quillen VAMC Mountain Home, TN

621-18-102

07/24/2020 FAB JSR 9 149

0 16' 32'8'1/16" = 1'-0"A

SECOND FLOOR / ATTIC DEMOLITION PLAN

0 16' 32'8'1/16" = 1'-0"B

ROOF DEMOLITION PLAN

1 EXISTING GUTTER TO REMAIN. REPAIR/REPLACE TO ALLOW PROPER DRAINAGE WITHOUT LEAKS.

MATCH HISTORIC SIZE, PROFILE, AND MATERIALS IN CASE NEEDED TO REPLACE.

2 REMOVE EXISTING HVAC UNIT AND ASSOCIATED DUCTWORK & CONNECTIONS IN THEIR ENTIRETY

3 REMOVE EXISTING HVAC UNIT STRUCTURAL SUPPORT IN THEIR ENTIRETY. PATCH & REPAIR ROOF

AS REQUIRED.

4 REPAIR/REPLACE THROUGH WALL SCUPPER AND DOWNSPOUT TO PREVENT WATER INFILTRATION

5 REPAIR/REPLACE FLASHING/SEALANT AT CLERESTORY.

6 EXISTING SKYLIGHT TO BE REMOVED.

7 EXISTING ROOF ACCESS HATCH TO REMAIN. REPAIR/REPLACE FLASHING/SEALANTS

8 EXISTING ROOFTOP EXHAUST FANS. REF. MECHANICAL FOR MORE INFORMATION.

9 EXISTING AHU FAN REF. MECHANICAL FOR MORE INFORMATION.

10 REPAIR/REPLACE EXISTING METAL COPING PARAPET CAP.

11 REPAIR/REPLACE EXISTING TRANSITION FLASHING AROUND TPO PERIMETER

12 REPAIR/REPLACE EXISTING LIGHTNING ROD CONNECTIONS.

13 REPAIR/REPLACE FLASHING/SEALANTS AT CRICKET.

14 REPAIR/ REPLACE THROUGH WALL SCUPPER AND DOWNSPOUT TO PREVENT WATER INFILTRATION

15 DEMOLISH EXISTING ROOF SYSTEM DOWN TO DECKING AND PREP FOR NEW ROOF SYSTEM AS

NOTED ON ROOF PLAN

16 SALVAGE DOOR, TRIM AND FRAME FOR POTENTIAL REINSTALLATION OR OTHER WOOD FRAME

REPAIRS.

17 REMOVE AREA OF SLATE TILE ROOF SYSTEM DOWN TO ROOF DECK.

18 REMOVE ALL INSULATED STUD WALL WITH GYP. BOARD FINISH PARTITIONS IN ITS ENTIRETY

19 DEMO PORTION OF WALL AND PREP OPENING FOR NEW DOOR AND FRAME. REF. IMPROVEMENT

PLANS.

20 REMOVE CARPET AND RUBBER WALL BASE IN ITS ENTIRETY

21 REMOVE VCT AND RUBBER WALL BASE IN ITS ENTIRETY

22 REMOVE ACT ASSEMBLY IN ITS ENTIRETY

PLAN NORTH PLAN NORTH

Revisions: Date:

Revision 1 1/27/2021

UP

UP

/A 34-AD-104/A 34-AD-104

26 17

40 4040

40 40

40 39

40 39

38 39

CWT CO-ORDR

E007

OFFICE

E008

PRINT SHOP CO-ORDR

E006

MEN'S TOILET

E004

WOMEN'S TOILET

E003

HVAC

E002

OFFICE

E014 OFFICE

E015

OFFICE

E016

TOILET

E017

OFFICE

E013

SHOP

E001

OFFICE

E009

CWT SHOP OFFICES

E005

PRINT SHOP

E010

DARK RM

E018

STORAGE

E019

MAINTENANCE UNIT B

STORAGE

E021

HVAC STORAGE

E023

ELECTRICAL ROOM

E026

MAINTENANCE UNIT B

E022

HVAC

E027

MEN'S

E028

WOMEN'S

E029

OFFICE

E030

PRINT SHOP

E010b

CORRIDOR

E025

BREAK ROOM

E024

MEN'S TOILET

E045

STORAGE

E042

STORAGE

E043

TRANS VAULT

E044

CORRIDOR

E041

CORRIDOR

E040

ELEV

E011

ELEV EQUIP.

E012

CORRIDOR

E020

UNEXCAVATED

UNEXCAVATED

OFFICE

E031

OFFICE

E032

UNEXCAVATED

E035

HATCH LEGEND

REFERENCE ASSOCIATED KEYNOTE 8 FOR MORE INFORMATION

EXISTING WALL / PARTITION TO REMAIN

EXISTING LOAD-BEARING WALL / PARTITION TO REMAIN

AREA NOT INCLUDED IN SCOPE OF WORK

NEW WALL / PARTITION CONSTRUCTION

LINETYPE LEGEND

LIGHT THIN LINE INDICATES EXISTING ELEMENT TO REMAIN

HEAVY DASHED LINE INDICATES EXISTING ELEMENT TO BE

REMOVED IN ITS ENTIRETY

SHEET KEYNOTES

GENERAL NOTES

1. REMOVE ENTIRE MECHANICAL, ELECTRICAL, PLUMBING, TELECOMMUNICATIONS (MEP/T)

SYSTEMS AS NOTED.

2. REMOVE ALL INTERIOR PARTITIONS AND ASSOCIATED DOORS IN THEIR ENTIRETY AS NOTED.

3. REMOVE ALL INTERIOR CEILINGS AND ASSOCIATED LIGHT FIXTURES AND CEILING DIFFUSERS

IN THEIR ENTIRETY AS NOTED.

4. ANY DEMOLITION OR DISTURBANCE TO BLOCK WALLS CONTAINING ASBESTOS ARE

REQUIRED TO BE REMOVED BY THE ABATEMENT CONTRACTOR.

5. REMOVE AND DISPOSE OF ALL ASBESTOS-CONTAINING INSULATION IN WALLS AND ABOVE

CEILINGS.

6. REMOVE AND DISPOSE OF ALL ASBESTOS-CONTAINING MASTIC ON CORK INSULATION AND

ORIGINAL COOLER WALLS/CEILINGS.

7. SALVAGE DOOR, TRIM AND FRAME FOR POTENTIAL REINSTALLATION OR OTHER WOOD

FRAME REPAIRS WHEREVER INDICATED ON AREA DEMOLITION DRAWINGS.

Drawing Title

Approved: Associate Director

Project Title

Date

Location

Checked

Building Number

Project Number:

Drawing Number

Drawn

CONSULTANTS: ARCHITECT/ENGINEERS:

Dwg. of o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Veterans

Health

Administration Approved: Chief of Staff

Approved: Infection Control

Approved: Chief Engineer

Approved: Safety Officer

Approved: Chief, Police & Security

GHD Cons Services, Inc.

Fire Protection Engineer 222 S. Church St. #400, Charlotte, NC 28202

Phone: 704-342-4910 www.ghd.com

GLMV Architecture Architect 1525 E. Douglas, Wichita, KS 67211

Phone: 316-265-9367 www.glmv.com

AME Consulting Engineers MEP Engineers 705 E. Morehead St., Charlotte, NC 28202

Phone: 704-295-4263 www.ame-pc.com

STRATA Architecture, Inc.

Historic Preservation Architect 1701 Oak Street, Suite 100, Kansas City, MO 64108

Phone: 816-474-0900 www.strata-arch.com

Atriax, pllc 102 3rd Avenue NE, Hickory, NC 28601 PO Box 1629, Hickory, NC 28603

Phone: 828-315-9962 www.atriaxgroup.com

A

KEYPLAN

TRUE NORTH

/1

/2

:2

:4

P M

B

IM

/1

.1

M tn

H o m e V

A

B ld g

R e n o v

-9

.1

.A rc h

-M tn

H o m e .r v t

34-AD-103

DEMOLITION FLOOR PLAN - LOWER

LEVEL FLOOR AREA A

Renovate Building 34 to Correct FCA Deficiencies

James H. Quillen VAMC Mountain Home, TN

621-18-102

07/24/2020 FAB JSR 10 149

0 8' 16'4'1/8" = 1'-0"A

LOWER LEVEL DEMOLITION PLAN AREA A

PLAN NORTH

1 EXISTING ELEVATOR EQUIPMENT ROOM AND ELEVATOR TO REMAIN

2 EXISTING ELECTRICAL ROOM TO REMAIN OPERATIONAL. REF. ELECTRICAL DRAWINGS FOR EXITING

ELECTRICAL EQUIPMENT TO REMAIN.

3 EXISTING HVAC ROOM TO REMAIN OPERATIONAL. REF. MECHANICAL DRAWINGS FOR EXISTING

EQUIPMENT TO REMAIN

4 EXISTING TRANS VAULT TO REMAIN OPERATIONAL. REF. ELECTRICAL DRAWINGS FOR EXISTING

EQUIPMENT TO REMAIN.

5 EXISTING LOAD BEARING WALL TO REMAIN

6 EXISTING MECHANICAL ROOM TO REMAIN OPERATIONAL. NO DEMO WORK TO BE DONE.

8 DEMO EXISTING FLOOR SLAB AND STRUCTURAL SUPPORT IN THEIR ENTIRETY, AS SHOWN WITHIN

HATCHED AREA. PREP FLOOR OPENING FOR NEW CONCRETE INFILL

9 EXISTING PLASTER CEILING TO REMAIN. PATCH/REPAIR AS REQUIRED.

10 EXISTING SPIRAL STAIR TO REMAIN. PATCH/REPAIR AS REQUIRED.

11 REMOVE EXISTING LOCKERS IN THEIR ENTIRETY. VA TO REMOVE ALL FURNITURE AND EQUIPMENT

UNLESS OTHERWISE NOTED.

12 EXISTING EXTERIOR DOOR TO REMAIN. REPAIR/REPLACE WEATHER SEALS AND THRESHOLD AS

NEEDED.

13 REMOVE ALL EXISTING REFRIGERATOR AND ASSOCIATED COMPONENTS IN THEIR ENTIRETY.

14 EXISTING INTERIOR DOOR TO REMAIN

15 EXISTING STAIR TO REMAIN

16 EXISTING PAINT BOOTH TO REMAIN

17 REMOVE DOOR AND FRAME IN THEIR ENTIRETY. SALVAGE DOOR AND FRAME TO BE RETURNED TO

VA.

18 REMOVE EXTERIOR DOOR AND FRAME IN THEIR ENTIRETY. SALVAGE DOOR AND FRAME TO BE

RETURNED TO VA. SEE IMPROVEMENT PLANS AND DOOR SCHEDULE FOR NEW DOOR.

19 REMOVE EXTERIOR STOREFRONT AND FRAME IN THEIR ENTIRETY. SALVAGE STOREFRONT AND

FRAME TO BE RETURNED TO VA. SEE IMPROVEMENT PLANS AND DOOR SCHEDULE FOR NEW

STOREFRONT.

20 REMOVE 100'-0" LONG X 12'-0" WIDE RAMP AND 8'-0" WIDE SIDEWALKS ON THE NORTH AND SOUTH SIDES OF THE RAMP IN THEIR ENTIRETY. SAWCUT SLAB AT CURB TO ALLOW FOR CLEAN JOINT FOR

NEW SIDEWALK.

21 SALVAGE DOOR, TRIM AND FRAME FOR POTENTIAL REINSTALLATION OR OTHER WOOD FRAME

REPAIRS.

22 REMOVE AND SALVAGE DOOR FOR FUTURE REINSTALLATION. KEEP WOOD FRAMES IN PLACE.

23 REMOVE ALL PREFAB OFFICE PARTITIONS IN ITS ENTIRETY.

24 REMOVE ALL CMU WALL WITH GYP. BOARD FINISH PARTITIONS IN ITS ENTIRETY

25 REMOVE ALL INSULATED STUD WALL WITH GYP. BOARD FINISH PARTITIONS IN ITS ENTIRETY.

26 REMOVE ALL CMU WALL PARTITIONS IN ITS ENTIRETY.

27 REMOVE ALL CHAIN LINK PARTITIONS IN ITS ENTIRETY.

28 REMOVE ALL INSULATED METAL PANEL WITH TILE WAINSCOATING PARTITIONS IN ITS ENTIRETY.

29 REMOVE ALL BRICK WALL IN ITS ENTIRETY.

30 REMOVE ALL INSULATED METAL PANEL PARTITIONS IN ITS ENTIRETY.

31 REMOVE ALL STUD WITH PLASTIC & WIRE PARTITIONS IN ITS ENTIRETY.

32 REMOVE ALL BRICK WALL WITH PLASTER FINISH PARTITIONS IN ITS ENTIRETY.

33 REMOVE ALL RESTROOM PARTITIONS IN ITS ENTIRETY.

34 REMOVE ALL INSULATED STUD WALL WITH GYP. BOARD & METAL PANEL FINISH PARTITIONS IN ITS

ENTIRETY.

35 REMOVE MEZZANINE FRAMING AND FINISH IN ITS ENTIRETY.

36 REMOVE WALL FINISH TO MASONRY SUBSTRATE.

37 REMOVE CARPET AND RUBBER WALL BASE IN ITS ENTIRETY.

38 REMOVE TERRACOTTA AND COVE BASE IN ITS ENTIRETY.

39 REMOVE VCT AND RUBBER WALL BASE IN ITS ENTIRETY.

40 REMOVE ACT ASSEMBLY IN ITS ENTIRETY.

41 REMOVE CERAMIC TILE AND COVE BASE IN ITS ENTIRETY.

42 REMOVE RUBBER WALL BASE IN ITS ENTIRETY.

Revisions: Date:

Revision 1 1/27/2021

UP

/A 34-AD-103/A 34-AD-103

PLUMBING STORAGE

E051

ELEV EQUIP

E056

OFFICE

E078

FREEZER

E075

WAITING RM

E076

STORAGE

E077

REFR

E073

FREEZER

E079

FREEZER

E082

REFR

E081

FREEZER

E083

REFR

E084

FREEZER

E085

MASON SHOP

E080

CORRIDOR

E071

OFFICE

E055

EQUIP REPAIR

E054

MECH REF

E074

REFR

E072

UNEXCAVATED

E033

REFR

E191

UNEXCAVATED

E034

HATCH LEGEND

REFERENCE ASSOCIATED KEYNOTE 8 FOR MORE INFORMATION

EXISTING WALL / PARTITION TO REMAIN

EXISTING LOAD-BEARING WALL / PARTITION TO REMAIN

AREA NOT INCLUDED IN SCOPE OF WORK

NEW WALL / PARTITION CONSTRUCTION

LINETYPE LEGEND

LIGHT THIN LINE INDICATES EXISTING ELEMENT TO REMAIN

HEAVY DASHED LINE INDICATES EXISTING ELEMENT TO BE

REMOVED IN ITS ENTIRETY

SHEET KEYNOTES

GENERAL NOTES

1. REMOVE ENTIRE MECHANICAL, ELECTRICAL, PLUMBING, TELECOMMUNICATIONS (MEP/T)

SYSTEMS AS NOTED.

2. REMOVE ALL INTERIOR PARTITIONS AND ASSOCIATED DOORS IN THEIR ENTIRETY AS NOTED.

3. REMOVE ALL INTERIOR CEILINGS AND ASSOCIATED LIGHT FIXTURES AND CEILING DIFFUSERS

IN THEIR ENTIRETY AS NOTED.

4. ANY DEMOLITION OR DISTURBANCE TO BLOCK WALLS CONTAINING ASBESTOS ARE

REQUIRED TO BE REMOVED BY THE ABATEMENT CONTRACTOR.

5. REMOVE AND DISPOSE OF ALL ASBESTOS-CONTAINING INSULATION IN WALLS AND ABOVE

CEILINGS.

6. REMOVE AND DISPOSE OF ALL ASBESTOS-CONTAINING MASTIC ON CORK INSULATION AND

ORIGINAL COOLER WALLS/CEILINGS.

7. SALVAGE DOOR, TRIM AND FRAME FOR POTENTIAL REINSTALLATION OR OTHER WOOD

FRAME REPAIRS WHEREVER INDICATED ON AREA DEMOLITION DRAWINGS.

Drawing Title

Approved: Associate Director

Project Title

Date

Location

Checked

Building Number

Project Number:

Drawing Number

Drawn

CONSULTANTS: ARCHITECT/ENGINEERS:

Dwg. of o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Veterans

Health

Administration Approved: Chief of Staff

Approved: Infection Control

Approved: Chief Engineer

Approved: Safety Officer

Approved: Chief, Police & Security

GHD Cons Services, Inc.

Fire Protection Engineer 222 S. Church St. #400, Charlotte, NC 28202

Phone: 704-342-4910 www.ghd.com

GLMV Architecture Architect 1525 E. Douglas, Wichita, KS 67211

Phone: 316-265-9367 www.glmv.com

AME Consulting Engineers MEP Engineers 705 E. Morehead St., Charlotte, NC 28202

Phone: 704-295-4263 www.ame-pc.com

STRATA Architecture, Inc.

Historic Preservation Architect 1701 Oak Street, Suite 100, Kansas City, MO 64108

Phone: 816-474-0900 www.strata-arch.com

Atriax, pllc 102 3rd Avenue NE, Hickory, NC 28601 PO Box 1629, Hickory, NC 28603

Phone: 828-315-9962 www.atriaxgroup.com

B

KEYPLAN

TRUE NORTH

/1

/2

:2

:4

P M

B

IM

/1

.1

M tn

H o m e V

A

B ld g

R e n o v

-9

.1

.A rc h

-M tn

H o m e .r v t

34-AD-104

DEMOLITION FLOOR PLAN - LOWER

LEVEL FLOOR AREA B

Renovate Building 34 to Correct FCA Deficiencies

James H. Quillen VAMC Mountain Home, TN

621-18-102

07/24/2020 FAB JSR 11 149

0 8' 16'4'1/8" = 1'-0"A

LOWER LEVEL DEMOLITION PLAN AREA B

PLAN NORTH

1 EXISTING ELEVATOR EQUIPMENT ROOM AND ELEVATOR TO REMAIN

2 EXISTING ELECTRICAL ROOM TO REMAIN OPERATIONAL. REF. ELECTRICAL DRAWINGS FOR EXITING

ELECTRICAL EQUIPMENT TO REMAIN.

3 EXISTING HVAC ROOM TO REMAIN OPERATIONAL. REF. MECHANICAL DRAWINGS FOR EXISTING

EQUIPMENT TO REMAIN

4 EXISTING TRANS VAULT TO REMAIN OPERATIONAL. REF. ELECTRICAL DRAWINGS FOR EXISTING

EQUIPMENT TO REMAIN.

5 EXISTING LOAD BEARING WALL TO REMAIN

6 EXISTING MECHANICAL ROOM TO REMAIN OPERATIONAL. NO DEMO WORK TO BE DONE.

8 DEMO EXISTING FLOOR SLAB AND STRUCTURAL SUPPORT IN THEIR ENTIRETY, AS SHOWN WITHIN

HATCHED AREA. PREP FLOOR OPENING FOR NEW CONCRETE INFILL

9 EXISTING PLASTER CEILING TO REMAIN. PATCH/REPAIR AS REQUIRED.

10 EXISTING SPIRAL STAIR TO REMAIN. PATCH/REPAIR AS REQUIRED.

11 REMOVE EXISTING LOCKERS IN THEIR ENTIRETY. VA TO REMOVE ALL FURNITURE AND EQUIPMENT

UNLESS OTHERWISE NOTED.

12 EXISTING EXTERIOR DOOR TO REMAIN. REPAIR/REPLACE WEATHER SEALS AND THRESHOLD AS

NEEDED.

13 REMOVE ALL EXISTING REFRIGERATOR AND ASSOCIATED COMPONENTS IN THEIR ENTIRETY.

14 EXISTING INTERIOR DOOR TO REMAIN

15 EXISTING STAIR TO REMAIN

16 EXISTING PAINT BOOTH TO REMAIN

17 REMOVE DOOR AND FRAME IN THEIR ENTIRETY. SALVAGE DOOR AND FRAME TO BE RETURNED TO

VA.

18 REMOVE EXTERIOR DOOR AND FRAME IN THEIR ENTIRETY. SALVAGE DOOR AND FRAME TO BE

RETURNED TO VA. SEE IMPROVEMENT PLANS AND DOOR SCHEDULE FOR NEW DOOR.

19 REMOVE EXTERIOR STOREFRONT AND FRAME IN THEIR ENTIRETY. SALVAGE STOREFRONT AND

FRAME TO BE RETURNED TO VA. SEE IMPROVEMENT PLANS AND DOOR SCHEDULE FOR NEW

STOREFRONT.

20 REMOVE 100'-0" LONG X 12'-0" WIDE RAMP AND 8'-0" WIDE SIDEWALKS ON THE NORTH AND SOUTH SIDES OF THE RAMP IN THEIR ENTIRETY. SAWCUT SLAB AT CURB TO ALLOW FOR CLEAN JOINT FOR

NEW SIDEWALK.

21 SALVAGE DOOR, TRIM AND FRAME FOR POTENTIAL REINSTALLATION OR OTHER WOOD FRAME

REPAIRS.

22 REMOVE AND SALVAGE DOOR FOR FUTURE REINSTALLATION. KEEP WOOD FRAMES IN PLACE.

23 REMOVE ALL PREFAB OFFICE PARTITIONS IN ITS ENTIRETY.

24 REMOVE ALL CMU WALL WITH GYP. BOARD FINISH PARTITIONS IN ITS ENTIRETY

25 REMOVE ALL INSULATED STUD WALL WITH GYP. BOARD FINISH PARTITIONS IN ITS ENTIRETY.

26 REMOVE ALL CMU WALL PARTITIONS IN ITS ENTIRETY.

27 REMOVE ALL CHAIN LINK PARTITIONS IN ITS ENTIRETY.

28 REMOVE ALL INSULATED METAL PANEL WITH TILE WAINSCOATING PARTITIONS IN ITS ENTIRETY.

29 REMOVE ALL BRICK WALL IN ITS ENTIRETY.

30 REMOVE ALL INSULATED METAL PANEL PARTITIONS IN ITS ENTIRETY.

31 REMOVE ALL STUD WITH PLASTIC & WIRE PARTITIONS IN ITS ENTIRETY.

32 REMOVE ALL BRICK WALL WITH PLASTER FINISH PARTITIONS IN ITS ENTIRETY.

33 REMOVE ALL RESTROOM PARTITIONS IN ITS ENTIRETY.

34 REMOVE ALL INSULATED STUD WALL WITH GYP. BOARD & METAL PANEL FINISH PARTITIONS IN ITS

ENTIRETY.

35 REMOVE MEZZANINE FRAMING AND FINISH IN ITS ENTIRETY.

36 REMOVE WALL FINISH TO MASONRY SUBSTRATE.

37 REMOVE CARPET AND RUBBER WALL BASE IN ITS ENTIRETY.

38 REMOVE TERRACOTTA AND COVE BASE IN ITS ENTIRETY.

39 REMOVE VCT AND RUBBER WALL BASE IN ITS ENTIRETY.

40 REMOVE ACT ASSEMBLY IN ITS ENTIRETY.

41 REMOVE CERAMIC TILE AND COVE BASE IN ITS ENTIRETY.

42 REMOVE RUBBER WALL BASE IN ITS ENTIRETY.

Revisions: Date:

Revision 1 1/27/2021

DN

DN

DN

DN

F E

FE

F E

DN

UP

/A 34-AD-106/A 34-AD-106

18 18 18

22 22

17 17

40 40

34-AD-105

Sim

404040

41 41

HATCH LEGEND

REFERENCE ASSOCIATED KEYNOTE 8 FOR MORE INFORMATION

EXISTING WALL / PARTITION TO REMAIN

EXISTING LOAD-BEARING WALL / PARTITION TO REMAIN

AREA NOT INCLUDED IN SCOPE OF WORK

NEW WALL / PARTITION CONSTRUCTION

LINETYPE LEGEND

LIGHT THIN LINE INDICATES EXISTING ELEMENT TO REMAIN

HEAVY DASHED LINE INDICATES EXISTING ELEMENT TO BE

REMOVED IN ITS ENTIRETY

STORAGE

E145

HAC CLOSET

E146

STORAGE

E106

STOR

E118

STOR

E119

CARP STOR

E113

OFFICE

E115

LOUNGE

E114

SHEET METAL SHOP

E111

CARPENTER SHOP

E110

STORAGE

E112

HAC

E107

ENTRANCE STORE

E109

CLOSET

E120

MUSEUM

E104

ENTRANCE

E105

CORRIDOR

E140

COMM CLOSET

E147

RESTROOM

E102b

INTAKE

E103

CLOSET

E103b

KITCHEN

E116

FOYER

E101

INTAKE

E102

STORAGE

E108

MEN'S

E117

HALL

E141

WOMEN'S

E142

MEN'S

E143

STORAGE

E144

STORAGE

E145

SHEET KEYNOTES

GENERA…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .