Attachment_VII_-_Q&As_Moody_AFB.pdf

PDF 254 KB Posted

Attached to
Bulk Storage Services Federal contract opportunity
Solicitation number
SPE603-18-R-0502
Issued by
Defense Logistics Agency Energy

About this file

Attachment VII - Q&As Moody AFB

View the file

Other files for this federal contract opportunity

Other files attached to Bulk Storage Services, newest first.
File Type Posted
Attachment_XIII_-_Moody_AFB_Appendix_AF.pdf PDF
SF30_SPE60318R0502_0008.pdf PDF
Attachment_VIII_-_Q&As_Robins_AFB.pdf PDF
Attachment_VI_-_Q&As_Eglin_AFB.pdf PDF
Attachment_X_-_LittleRock_AFB_Appendix_AF.pdf PDF
Attachment_I_-_Contracting_Q&As.pdf PDF
Attachment_XIV_-_Robins_AFB_Appendix_AF.pdf PDF
Attachment_V_-_Q&As_Barksdale_AFB.pdf PDF
Attachment_II_-General_Technical_Q&As.pdf PDF
Attachment_IX_-_Hurlburt_AFB_Appendix_AF.pdf PDF
Attachment_XI_-Barksdale_AFB_Appendix_AF.pdf PDF
Attachment_XII_-_Eglin_AFB_Appendix_AF.pdf PDF
Attachment_III_-_Q&As_Hurlburt_AFB.pdf PDF
Attachment_IV_-_Q&As_LittleRock_AFB.pdf PDF
Amendment_0007.pdf PDF
Amendment_0006.pdf PDF
Final_Conformed_Solicitation_SPE603-18-R-0502_02-12-18.pdf PDF
Amendment_0005_2-8-18.pdf PDF
Amendment_0004.pdf PDF
ATTACHMENT_II_-__OFFEROR_SUBMISSION_PACKAGE_AF_GOCOs_SE.pdf PDF
Final_Conformed_Solicitation_SPE603-18-R-0502_01-18-18.pdf PDF
Amendment_0003.pdf PDF
Final_Conformed_Solicitation_SPE603-18-R-0502.pdf PDF
Amendment_0002.pdf PDF
Preproposal_Conf._-_Site_Visit_Sign_in_sheet.pdf PDF
Amendment_0001.pdf PDF
Final_AF_Consolidated_PWS.pdf PDF
Revised_RB_Appendix_AF.pdf PDF
Preproposal_Powerpoint_Presentation_Final.pptx PPTX presentation
ATTACHMENT_IV_JOINT_VENTURE_CONSENT_FORM.pdf PDF
RB_Appendix_AF.pdf PDF
WD_-_2015-5117.pdf PDF
AF_GOCO_PWS.pdf PDF
WD_2015-4493.pdf PDF
BD_Appendix_AF.pdf PDF
WD_2015-4531.pdf PDF
WD_-_2015-5191.pdf PDF
MD_Appendix_AF.pdf PDF
HB_Appendix_AF.pdf PDF
ATTACHMENT_III_-_PAST_PERFORMANCE_QUESTIONAIRE_-_AF_GOCOs_SE.doc.pdf PDF
ATTACHMENT_II_-__OFFEROR_SUBMISSION_PACKAGE_AF_GOCOs_SE.docx.pdf PDF
EG_Appendix_AF.pdf PDF
LR_Appendix_AF.pdf PDF
WD_2015-4495.pdf PDF
Final_Solicitation_SPE603-18-R-0502_12-06-17.docx.pdf PDF
WD_2015-4531.pdf PDF
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation SPE603-18-R-0502

Southeast Region

Moody AFB Questions & Answers

1. The Moody Wage Determination states that employees get 11 holidays per year while the Appendix AF for Moody lists 10 holidays. Which one are we to follow?

Answer: The contractor must comply with the terms of the Wage Determination and meet requirements as directed in the PWS.

2. The hours of operations on the Moody Appendix AF call for work between 0700-

1500 on reserve weekends. How many reserve weekends per year should we plan for? What kind of support is required from the contractor on reserve weekends? Is the full staff required or is one contractor employee sufficient?

Answer: Please refer to revised Appendix AF Moody AFB under (2) Hours of

Operation

3. Reference PWS Appendix AF – Moody: The hours of operation indicates the requirement for UTA support. How many UTA (Unit Training Activity) weekends are supported each month?

Answer: Please refer to revised Appendix AF Moody AFB under (2) Hours of

Operation

4. Reference PWS Appendix AF – Moody: The workload information states that there have been many times that the Contractor has been called in outside normal duty hours. Please confirm the Contractor has also not had to have personnel stay after normal duty hours to complete receipts/transfers/issues.

Answer: Please refer to PWS Paragraph C-5.1

5. Reference PWS Appendix AF – Moody: The workload information states that there have been many times that the Contractor has been called in outside normal duty hours. Would the Contractor be reimbursed if personnel have to stay after normal duty hours to complete receipts/transfers/issues?

Answer: Please refer to PWS Paragraph C-5.1

6. Reference PWS Appendix AF – Moody: The workload information states that there have been many times that the Contractor has been called in outside normal duty hours. Please provide an annual estimate on the hours of overtime required in the last 12 months if these are now covered in the FFP.

Answer: Please refer to Appendix AF Section (3) Workload Information.

7. Reference PWS Appendix AF – Moody: The workload information references an emergency generator being in the Contractor’s AOR. Please confirm that a

Government entity is responsible for conducting the periodic generator testing and maintenance.

Answer: Base Civil Engineering conducts periodic testing and maintenance of the generator.

8. Reference PWS Appendix AF – Moody: The workload information references an emergency generator being in the Contractor’s AOR. Please confirm that the

Government provides the fuel for this generator in the event that the Contractor is responsible for testing.

Answer: Government provides fuel for this generator.

9. Reference PWS Appendix AF – Moody: The workload information references states that DLA-E is providing quarterly and above maintenance on GFP. Please confirm the Contractor is only responsible for operator level inspection.

Answer: Refer to PWS Section C-5.3.1

10. Reference PWS Appendix AF – Moody: The workload information references states that DLA-E is providing quarterly and above maintenance on GFP. Please confirm the Contractor is only responsible for coordination with CE for maintenance of GFP.

Answer: Refer to PWS Section C-5.3.3

11. Reference PWS Appendix AF – Moody: The base specific requirements provide a listing of Government-furnished facilities to be used by the Contractor. Are spill kits to be provided by the Government?

Answer: Please refer to PWS Paragraph C-5.8.2

12. Reference PWS Appendix AF – Moody: Does the Government pump out low points/pits in the AOR of the Contractor?

Answer: According to Appendix AF, there are no low point drains

13. Reference PWS Appendix AF – Moody: The workload information does not include any ground product information. Please confirm the services provided are limited to management of JAA.

Answer: Refer to Appendix AF section 6

14. Reference PWS Appendix AF – Moody: The workload information does not include information on when the Contractor can receive trucks. What is the normal window that tank trucks deliver product to the Installation?

Answer: Refer to Appendix AF section 3

15. Reference Appendix AF (2) Hours of Operation, please provide how often Reserve weekends occur at Moody AFB.

Answer: Refer to Appendix AF section 3

16. Please confirm if the Contractor performs return to bulk operations (i.e. R-11 or bowsers).

Answer: Refer to PWS Section C-5.2.2.1

17. Please confirm all fillstands are equipped with operational deadman control and overfill protection device (Scully System).

Answer: Yes

18. Please clarify the responsibilities for operating (training etc.) and maintaining (fuel, oil, mx.) the emergency generator (Fac.# 5057).

Answer: If the emergency generator is provided to the contractor for use, Base Civil

Engineering provides training for use of the generator and will provide maintenance of the generator. The Contractor Officer will provide guidance as applicable.

19. Reference Appendix AF (3) Workload Information, the table shows an average of

(1) C-300 truck fill per month, approximately 935 gallons however the table does not specify if this jet fuel or ground fuel. Please clarify if the Contractor fills the C-300 or is it Government personnel. The Appendix AF does not show any ground fuel tanks assigned to the Contractor.

Answer: Please refer to revised Appendix AF Moody AFB under (3) Workload

Information.

20. Please confirm if the Contractor has any responsibility for the (2) catch tanks

(under oil/water separators) listed in Appendix AF.

Answer: Base Civil Engineering maintains responsibility of these

21. Please confirm whether or not the Contractor is required to provide spill response kits at the tank truck off-loading areas and fillstands.

Answer: Refer to PWS Section C-5.8.2

22. It was mentioned during the site visit that the Contractor has the following additional duties: Facility Manager, Satellite Accumulation Point Manager and

Controlled Area Manager. Please confirm.

Answer: Please refer to revised Appendix AF Moody AFB under (3) Workload

Information.

File details come from the government source that posted it.