Amendment_0006.pdf
PDF 87 KB Posted
- Attached to
- Bulk Storage Services Federal contract opportunity
- Solicitation number
- SPE603-18-R-0502
- Issued by
- Defense Logistics Agency Energy
About this file
Amendment 0006
View the file
Other files for this federal contract opportunity
Show all 46
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO.
4. REQUISITION/PURCHASE REQ. NO.
See Block 14
5. PROJECT NO. (If applicable)
6. ISSUED BY CODE SPE603 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
SPE60318R0502
X
2017 DEC 07
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, is not extended.
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
12. ACCOUNTING AND APPROPRIATION DATA (If required)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A NAME AND TITLE OF SIGNER (Type or print)
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(a) By completing Items 8 and 15, and returning
DLA ENERGY
BULK PETROLEUM SERVICES
8725 JOHN J. KINGMAN ROAD
FORT BELVOIR VA 22060
15C. DATE SIGNED 16C. DATE SIGNED
D. OTHER (Specify type of modification and authority)
3. EFFECTIVE DATE
Opening/Closing Date Changed to:
2017 DEC 07 / 2018 FEB 22
TIME 1:00 PM
See Attached Continuation Sheet(s).
(X)
CHECK ONE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 2 OF 4 PAGES
SPE60318R0502 - 0006
CONTINUED ON NEXT PAGE
The purpose of Amendment 0006 is for the following:
1.) Extend Solicitation SPE603-18-R-0502 closing date from February 16, 2018 to February 22, 2018 at 1:00 PM Fort Belvoir, VA time.
2.) Final Solicitation SPE603-18-R-0502 with highlighted changes attached. The final version supersedes all previous versions.
a.) In Solicitation SPE603-18-R-0502 FAR Clause ADDENDUM TO 52.212-1 – INSTRUCTIONS TO OFFERS – COMMERCIAL ITEMS (OCT 2015) under Volume I, Technical Proposal - was updated to state:
Technical/Management Evaluation Sub-factor 1: Staffing - Technical, managerial, and operational details of manpower related issues to meet mission requirements. The proposal must provide a staffing approach which demonstrates understanding of the personnel requirements to successfully accomplish all PWS tasks. The proposal must provide a staffing matrix identifying manning by positions and shifts to perform all required tasks and cover required hours of operation for normal daily operations. The proposal must identify all required personnel positions and qualifications.
The proposal must address requirements to respond to surge or contingency operations to ensure no mission delay or failure. The proposal must address any manpower issues such as compliance with Service specific requirements, impact of any applicable Status of Forces Agreements, and any applicable recognition of security clearance requirements.
Technical/Management Evaluation Sub-factor 2: Operations - Technical, managerial, and operational details of supporting normal and contingency operations to meet mission requirements. The proposal must provide a concept of operations that demonstrates knowledge of product receipt, storage, issue, and transfer functions and should ensure requirements for normal daily operations are met. The proposal must address response to contingency and extended operations. The proposal must address procedures to maintain accountability and quality of DWCF product which will ensure compliance with DLA Energy Policies.
Technical/Management Evaluation Sub-factor 3: Maintenance - Technical, managerial, and operational details of maintaining operational capability of facilities, vehicles, and equipment to meet mission requirements. The proposal must demonstrate understanding of planning, conducting, monitoring, and documenting operator, preventive, and other maintenance of systems, equipment, buildings, and grounds as required and in accordance with regulations and best commercial practices.
Technical/Management Evaluation Sub-factor 4: Safety - Technical, managerial, and operational details incorporating federal, state, and local laws and regulations to ensure safe working environment. The proposal must provide procedures to be implemented to ensure all operations are conducted in accordance with federal, state, local, and international safety laws, regulations, and best commercial practices. The proposal must demonstrate knowledge and understanding of safety issues and specifically address hazards of products, lockout/tagout procedures, and confined space work rules.
Technical/Management Evaluation Sub-factor 5: Security - Technical, managerial, and operational details of meeting physical, information, and personnel security requirements. The proposal must provide procedures to be implemented to ensure all aspects of security are maintained. The proposal must indicate a good knowledge of security performance requirements and must specifically address key control, visitor access control, Force Protection condition requirements, contractor personnel security/background checks, and protection of government computer systems and information.
Technical/Management Evaluation Sub-factor 6: Environmental - Technical, managerial, and operational details of planning and conducting operations in compliance with environmental laws and regulations. The proposal must provide environmental performance requirements details and must specifically address spill prevention and response pertaining to fuel receipt, storage, and issue operations to be to ensure strict compliance with all applicable base, local, state, federal, and international environmental laws, regulations, and plans.
Technical/Management Evaluation Sub-factor 7: Training - Technical, managerial, and operational details to ensure contractor personnel have requisite skills and associated training to accomplish all government requirements. The proposal must provide procedures to be implemented to ensure all contractor personnel are qualified and certified to accomplish all required tasks. The proposal must identify required courses and frequencies for maintaining personnel competence and method of documentation and certification. The proposal must also address the requirements for providing training to government personnel.
Technical/Management Evaluation Sub-factor 8: Furnished Items - Technical, managerial, and operational details of providing and maintaining Contractor furnished items; maintaining and handling government-owned items to support normal and contingency operations to meet mission requirements. The proposal identify any Contractor furnished vehicles, equipment, and supplies for use in performing operations. The proposal must also identify any Contractor furnished safety items such as Personal Protective Equipment (PPE) or confined space equipment. The proposal should address quantity, condition, age, capabilities, maintenance, and/or replacement of contractor- furnished items to ensure sufficient support is continually provided. The proposal should address appropriate documentation and handling requirements for government-owned items being operated and maintained by the contractor.
b.) In Solicitation SPE603-18-R-0502 FAR Clause 52.212-2 EVALUATION - COMMERCIAL ITEMS (OCT 2014) under Factor 3:
Price was updated to state:
Option (Extension Provision) price: In accordance with FAR 52.217-8, OPTION TO EXTEND SERVICES (NOV 1999), the Government has the unilateral right to extend any resulting contract under the same terms and conditions for a total of not more than six months. To account for the option period(s) possible under 52.217-8 (maximum of six months), the Government will evaluate the option to extend by adding six months of Offeror’s performance period to the Offeror’s total price. The method for evaluating the extension is to multiply an additional six months of requirements by the offered monthly price of CLIN 0002 (OPTION PERIOD). The sum of CLINs 0001 and 0002 and the 52.217-8 Option to Extend Service price will be the offeror’s total evaluated price.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 3 OF 4 PAGES
CONTINUED ON NEXT PAGE
3.) All Questions and Answers will be provided through FBO at a later date.
4.) All other terms and conditions of the solicitation remain unchanged.
CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 4 OF 4 PAGES
Attachments
List of Attachments
File Name Description ATTACH.Final Conformed Solicitation SPE603-18-
R-0502
Section A- Planning a
STANDARD FORM 30 (REV. 10-83)
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED:
PAGE OF PAGES
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED:
PAGE OF PAGES
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED:
PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
6. ISSUED BY
CODE
7. ADMINISTERED BY (If other than Item 6)
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
10A. MODIFICATION OF CONTRACT/ORDER NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A NAME AND TITLE OF SIGNER (Type or print)
NSN 7540-01-152-8070
Previous edition unusable STANDARD FORM 30 (REV. 10-83) Prescribed by GSA FAR (48 CFR) 53.243
16B. UNITED STATES OF AMERICA
15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer) (Signature of person authorized to sign) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
(a) By completing Items 8 and 15, and returning
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
PAGE OF
1.5 Amendment of Solicitation/Modification Contract skim Standard Form - Amend Acrobat Distiller 4.0 for Windows D:20001018094515Z D:20090422155830-04'00'
| REFNUMBER: |
| TEXTFIELD1: |
| SECTIONHEADER: |
| CURRENTPAGE_1: |
| PAGECOUNT_1: |
| SECTION_TITLE: |
| Z_DEFAULTCURRENTPAGE_2: |
| Z_DEFAULTPAGECOUNT_2: |
| Z_DEFAULTCURRENTPAGE_3: |
| Z_DEFAULTPAGECOUNT_3: |
| ZSF30_CONTRT_ID_CODE: |
| ZSF30_AMEND_MOD_NO: 0006 |
| ZSF30_PR_REQ_NO: See Block 14 |
| PROJECT_NO: |
| ISSUE_CODE: |
| ADMIN_CODE: |
| CON_NAME1: |
| CON_DUNS: |
| CON_CAGE: |
| SOL_NO: |
| A: |
| ISSUE_DATE: |
| CON_NO: |
| ORDER_NO: |
| EFF_DATE: |
| X: |
| Y: |
| COPIES: |
| ACCOUNTING: |
| AA: |
| BB: |
| SUPP_AUTH: |
| DD: |
| EE: |
| FF: |
| GG_COP: |
| SIGNER_NAME: |
| SIGNER_TITLE: |
| AGENCY_NAME1: |
| ADMIN_NAME1: |
| MOD_KTR_SIGNDATE: |
| CO_NAME: |
| CO_TITLE: |
| MOD_CO_DATESIGN: |
| M: |
| CC: |
| CO_AUTH: |
| ZSF30_AGENCY_USR: |
| OTHER_MOD: |
| ZS_FORM_SIGNATURE: |
| ZSF30_EFF_DATE1: |
| ZSF30_BLOCK14: Opening/Closing Date Changed to: |
2017 DEC 07 / 2018 FEB 22
TIME 1:00 PM
See Attached Continuation Sheet(s).
| TextField1: |
| TextField2: |
| CurrentPage: |
| PageCount: |
| LTC_ATTACHMENT2: |
| STANDARD_TXT: |
| RICH_TEXT: |
| SECTIONTITLE: |
| BOLD_TEXT: |
| HDR_CELL_1: |
| HDR_CELL_2: |
| ROW_CELL_1: |
| ROW_CELL_2: |
File details come from the government source that posted it.