Attachment_IV_-_Q&As_LittleRock_AFB.pdf

PDF 112 KB Posted

Attached to
Bulk Storage Services Federal contract opportunity
Solicitation number
SPE603-18-R-0502
Issued by
Defense Logistics Agency Energy

About this file

Attachment IV - Q&As LittleRock AFB

View the file

Other files for this federal contract opportunity

Other files attached to Bulk Storage Services, newest first.
File Type Posted
Attachment_XIII_-_Moody_AFB_Appendix_AF.pdf PDF
SF30_SPE60318R0502_0008.pdf PDF
Attachment_VIII_-_Q&As_Robins_AFB.pdf PDF
Attachment_VI_-_Q&As_Eglin_AFB.pdf PDF
Attachment_X_-_LittleRock_AFB_Appendix_AF.pdf PDF
Attachment_XII_-_Eglin_AFB_Appendix_AF.pdf PDF
Attachment_III_-_Q&As_Hurlburt_AFB.pdf PDF
Attachment_VII_-_Q&As_Moody_AFB.pdf PDF
Attachment_I_-_Contracting_Q&As.pdf PDF
Attachment_XIV_-_Robins_AFB_Appendix_AF.pdf PDF
Attachment_V_-_Q&As_Barksdale_AFB.pdf PDF
Attachment_II_-General_Technical_Q&As.pdf PDF
Attachment_IX_-_Hurlburt_AFB_Appendix_AF.pdf PDF
Attachment_XI_-Barksdale_AFB_Appendix_AF.pdf PDF
Amendment_0007.pdf PDF
Amendment_0006.pdf PDF
Final_Conformed_Solicitation_SPE603-18-R-0502_02-12-18.pdf PDF
Amendment_0005_2-8-18.pdf PDF
Amendment_0004.pdf PDF
ATTACHMENT_II_-__OFFEROR_SUBMISSION_PACKAGE_AF_GOCOs_SE.pdf PDF
Final_Conformed_Solicitation_SPE603-18-R-0502_01-18-18.pdf PDF
Amendment_0003.pdf PDF
Final_Conformed_Solicitation_SPE603-18-R-0502.pdf PDF
Amendment_0002.pdf PDF
Preproposal_Conf._-_Site_Visit_Sign_in_sheet.pdf PDF
Amendment_0001.pdf PDF
Final_AF_Consolidated_PWS.pdf PDF
Revised_RB_Appendix_AF.pdf PDF
Preproposal_Powerpoint_Presentation_Final.pptx PPTX presentation
ATTACHMENT_IV_JOINT_VENTURE_CONSENT_FORM.pdf PDF
RB_Appendix_AF.pdf PDF
WD_-_2015-5117.pdf PDF
AF_GOCO_PWS.pdf PDF
WD_2015-4493.pdf PDF
BD_Appendix_AF.pdf PDF
WD_2015-4531.pdf PDF
Final_Solicitation_SPE603-18-R-0502_12-06-17.docx.pdf PDF
WD_2015-4531.pdf PDF
WD_-_2015-5191.pdf PDF
MD_Appendix_AF.pdf PDF
HB_Appendix_AF.pdf PDF
ATTACHMENT_III_-_PAST_PERFORMANCE_QUESTIONAIRE_-_AF_GOCOs_SE.doc.pdf PDF
ATTACHMENT_II_-__OFFEROR_SUBMISSION_PACKAGE_AF_GOCOs_SE.docx.pdf PDF
EG_Appendix_AF.pdf PDF
LR_Appendix_AF.pdf PDF
WD_2015-4495.pdf PDF
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation SPE603-18-R-0502

Southeast Region

LittleRock AFB Questions & Answers

1. Appendix AF states that 3 trucks can be offloaded at one time. If offloading three trucks, does the contractor have to have three employees present to meet the two-man policy or is there a local waiver allowing one contractor employee to monitor two or more trucks?

Answer: Refer to PWS Appendix D, General, fourth paragraph.

2. What is the average duration of the daily 40,000-70,000 gallon transfer, or what is the average flowrate?

Answer: Refer to PWS Appendix AF, Section 3, Workload Information.

3. Reference PWS Appendix AF – Little Rock: The workload information references an emergency generator being in the Contractor’s AOR. Please confirm that a Government entity is responsible for conducting the periodic generator testing and maintenance.

4. Reference PWS Appendix AF – Little Rock: The workload information references an emergency generator being in the Contractor’s AOR. Please confirm that the Government provides the fuel for this generator in the event that the Contractor is responsible for testing.

5. Reference PWS Appendix AF – Little Rock: The workload information references states that DLA-E is providing quarterly and above maintenance on

GFP. Please confirm the Contractor is only responsible for operator level inspection.

Answer: Refer to PWS Section 5 Performance Requirements, Sub-Paragraph C-

5.3.1and C-5.3.2.1.

6. Reference PWS Appendix AF – Little Rock: The workload information references states that DLA-E is providing quarterly and above maintenance on

GFP. Please confirm the Contractor is only responsible for coordination with

CE for maintenance of GFP.

5.3.2.1.

7. Reference PWS Appendix AF – Little Rock: The base specific requirements provide a listing of Government-furnished facilities to be used by the

Contractor. Are spill kits to be provided by the Contractor or the Government?

5.8.2.

8. Reference PWS Appendix AF – Little Rock: Does the Government pump out low points/pits in the AOR of the Contractor?

Answer: Refer to PWS Appendix AF, Section 4, Base Specific Requirements.

9. Reference PWS Appendix AF – Little Rock: The workload information does not include any ground product information. Please confirm the services provided are limited to management of JAA.

10. Reference PWS Appendix AF – Little Rock: The workload information does not include information on when the Contractor can receive trucks. What is the normal window that tank trucks deliver product to the Installation?

11. Please identify what level of maintenance is provided under the USACE RM contract (the Appendix AF indicates contract was to have been awarded

February 2017)

12. During the site visit we were shown a waste water treatment system and certain contractor requirements were described; however, there is no mention of this system in Appendix AF. Please provide details as to the full extent of the contractor’s responsibility for operating and/or maintaining this system.

Answer: Refer to section (3) Workload Information in the Appendix AF

13. Reference Appendix AF (8) Equipment, the table shows two bowsers that are provided to the Contractor. The comments state that maintenance of all equipment on the list is the responsibility of the Contractor. Please confirm whether or not the Contractor is required to provide maintenance services for the two bowsers.

Answer: Refer to PWS Appendix AF, Section 8, Equipment (EAID).

14. Please include any radios provided by the Government in Appendix AF (13)

Land Mobile Radios (LMR).

Answer: Refer to PWS Appendix AF, Section 13 Land Mobile Radios (LMR).

File details come from the government source that posted it.