Attachment_VI_-_Q&As_Eglin_AFB.pdf

PDF 256 KB Posted

Attached to
Bulk Storage Services Federal contract opportunity
Solicitation number
SPE603-18-R-0502
Issued by
Defense Logistics Agency Energy

About this file

Attachment VI - Q&As Eglin AFB

View the file

Other files for this federal contract opportunity

Other files attached to Bulk Storage Services, newest first.
File Type Posted
Attachment_XIII_-_Moody_AFB_Appendix_AF.pdf PDF
SF30_SPE60318R0502_0008.pdf PDF
Attachment_VIII_-_Q&As_Robins_AFB.pdf PDF
Attachment_X_-_LittleRock_AFB_Appendix_AF.pdf PDF
Attachment_VII_-_Q&As_Moody_AFB.pdf PDF
Attachment_I_-_Contracting_Q&As.pdf PDF
Attachment_XIV_-_Robins_AFB_Appendix_AF.pdf PDF
Attachment_V_-_Q&As_Barksdale_AFB.pdf PDF
Attachment_II_-General_Technical_Q&As.pdf PDF
Attachment_IX_-_Hurlburt_AFB_Appendix_AF.pdf PDF
Attachment_XI_-Barksdale_AFB_Appendix_AF.pdf PDF
Attachment_XII_-_Eglin_AFB_Appendix_AF.pdf PDF
Attachment_III_-_Q&As_Hurlburt_AFB.pdf PDF
Attachment_IV_-_Q&As_LittleRock_AFB.pdf PDF
Amendment_0007.pdf PDF
Amendment_0006.pdf PDF
Final_Conformed_Solicitation_SPE603-18-R-0502_02-12-18.pdf PDF
Amendment_0005_2-8-18.pdf PDF
Amendment_0004.pdf PDF
ATTACHMENT_II_-__OFFEROR_SUBMISSION_PACKAGE_AF_GOCOs_SE.pdf PDF
Final_Conformed_Solicitation_SPE603-18-R-0502_01-18-18.pdf PDF
Amendment_0003.pdf PDF
Final_Conformed_Solicitation_SPE603-18-R-0502.pdf PDF
Amendment_0002.pdf PDF
Preproposal_Conf._-_Site_Visit_Sign_in_sheet.pdf PDF
Amendment_0001.pdf PDF
Final_AF_Consolidated_PWS.pdf PDF
Revised_RB_Appendix_AF.pdf PDF
Preproposal_Powerpoint_Presentation_Final.pptx PPTX presentation
ATTACHMENT_IV_JOINT_VENTURE_CONSENT_FORM.pdf PDF
RB_Appendix_AF.pdf PDF
WD_-_2015-5117.pdf PDF
AF_GOCO_PWS.pdf PDF
WD_2015-4493.pdf PDF
BD_Appendix_AF.pdf PDF
WD_2015-4531.pdf PDF
WD_-_2015-5191.pdf PDF
MD_Appendix_AF.pdf PDF
HB_Appendix_AF.pdf PDF
ATTACHMENT_III_-_PAST_PERFORMANCE_QUESTIONAIRE_-_AF_GOCOs_SE.doc.pdf PDF
ATTACHMENT_II_-__OFFEROR_SUBMISSION_PACKAGE_AF_GOCOs_SE.docx.pdf PDF
EG_Appendix_AF.pdf PDF
LR_Appendix_AF.pdf PDF
WD_2015-4495.pdf PDF
Final_Solicitation_SPE603-18-R-0502_12-06-17.docx.pdf PDF
WD_2015-4531.pdf PDF
Show all 46

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation SPE603-18-R-0502

Southeast Region

Eglin AFB Questions & Answers

1. Reference PWS Appendix AF – Eglin: The hours of operation state that the

Contractor must be capable of going to 24X7 operations in support of exercise or real world requirements. How many hours have been required for extension of operations for real world and exercise requirements in the last 12-month period?

Answer: Refer to Appendix AF section 2 and 3 and PWS Section C-5.1

2. Reference PWS Appendix AF – Eglin: The workload information states that there have been 1 time that the Contractor has been called in outside normal duty hours.

Please confirm the Contractor has also not had to have personnel stay after normal duty hours to complete receipts/transfers/issues.

Answer: Please refer to PWS Paragraph C-5.1

3. Reference PWS Appendix AF – Eglin: The workload information states that there have been 1 time that the Contractor has been called in outside normal duty hours.

Would the Contractor be reimbursed if personnel have to stay after normal duty hours to complete receipts/transfers/issues?

Answer: Please refer to PWS Paragraph C-5.1

4. Reference PWS Appendix AF – Eglin: The workload information states that there has been 1 time that the Contractor has been called in outside normal duty hours.

How many hours did the Contractor stay beyond NDH as they do not appear reimbursable in the resulting contract?

Answer: Refer to PWS Section C-5.1

5. Reference PWS Appendix AF – Eglin: The base specific requirements provide a listing of Government-furnished facilities to be used by the Contractor. Are spill kits to be provided by the Government?

Answer: Please refer to PWS Paragraph C-5.8.2

6. Reference PWS Appendix AF – Eglin: Does the Government pump out low points/pits in the AOR of the Contractor?

Answer: According to Appendix AF there are no low points/pits at this location

7. Reference PWS Appendix AF – Eglin: The base equipment list includes a boat, boat motor, and boom system. Does the Government pay directly for the maintenance costs as paragraph states that LRS funds repairs?

Answer: Refer to Appendix AF section 8

8. Reference PWS Appendix AF – Eglin: The base equipment list includes a boat, boat motor, and boom system. Does the Government provide the fuel for the boat?

9. Reference PWS Appendix AF – Eglin: The workload information does not include information on when the Contractor can receive trucks or barge receipt. What is the normal window that receipts occur, by conveyance, to the Installation?

Answer: Please refer to Appendix AF (2) Hours of Operation

10. Reference Appendix AF (3) Workload Information, the table shows that 4 JAA tank trucks, 2 DS2 tank trucks and 1 GUR tank truck can be on-loaded for bulk deliveries i.e. DFSP to DFSP. Please confirm the Contractor is responsible for loading tank trucks with JAA, DS2 and GUR products. Additionally, please include the frequency that tank truck loading operations occur, if applicable.

Answer: Refer to Appendix AF section 3

11. Please confirm how jet fuel is transferred to the Government operated hydrant system. During the site visit, it was mentioned that the Contractor fills commercial trucks with Jet A, which is then transported to the tanks on the Government side.

Please include the frequency that tank truck loading operations occur, if applicable.

Alternatively, does the Contractor transfer Jet A to the Government system using installed transfer pumps? The table shows that the Contractor is responsible for transferring weekly to Facility 92 and Facility 1422; we just need to confirm whether this is via filling commercial tank trucks or transferring using installed transfer pumps.

Answer: Refer to Appendix AF section 3; it states how fuel is transferred to each location

12. Please confirm if the Contractor performs return to bulk operations (i.e. R-11 or bowsers).

Answer: Refer to PWS Section C-5.2.2.1

13. Please confirm who is responsible for repairing the Government provided containment boom should it become damaged or worn for usage?

Answer: See Appendix AF (8) Equipment (EAID):

14. It was discussed at the site visit that WFSM is responsible for performing all corrosion control/painting for pipeline, tanks and petroleum system components.

Please confirm painting and corrosion control is part of the Government’s preventive maintenance responsibility.

Answer: Refer to Appendix AF table 2, page 1

15. Please confirm that the Government provides maintenance, gas, personal flotation devices and registration costs for the boat used to deploy the boom and that the

Contractor is responsible for towing the boat with a Contractor provided truck to and from the boat ramp and to and from an off-site location for maintenance when required.

Answer: Refer to Appendix AF section 14

16. Please describe the process for purchasing “non-ethanol” gas for the boat. Is the fuel provided on base or does the Contractor purchase off-site and is reimbursed by the Government for the cost?

17. Appendix AF (3) Workload Information states that there are no emergency generators for POL facilities within the Contractor’s AOR. Please confirm if there are procedures in place for the Contractor to request mobile/portable generator equipment during power outages.

Answer: There are no in-place emergency generators. There is a Memorandum of

Agreement with base civil engineering to provide portable generators in case of emergency.

18. Please confirm if there is a mandatory boating safety training course required for operating the boat and if training is provided by the Government or Contractor.

Answer: Refer to PWS Section C-4.1 and Appendix C

19. Please confirm whether or not the Contractor is required to provide spill response kits at the pier, tank truck receipt loading areas and fillstands.

20. Please confirm all fill-stands are equipped with operational dead-man control and overfill protection device (Scully System).

Answer: Yes

21. Please confirm responsibility for purchasing spill kits?