These are plumbing drawings for the Elevator Replacement project at the Hines VA Hospital in Hines, Illinois. The documents include four sheets (P000-PP100.1) detailing plumbing demolition and existing conditions for the basement and machine room floor plans. The drawings specify technical requirements for storm, sanitary, and vent piping, including insulation specifications, penetration sealing, and fire rating maintenance. Key technical notes mandate compliance with multiple building codes including the 2024 International Building, Mechanical, Plumbing, and Fire Codes, as well as various NFPA standards. The drawings emphasize contractor responsibilities such as field verification of existing conditions, maintaining fire ratings, submitting shop drawings, and providing operation and maintenance manuals.

The plumbing documents are part of a comprehensive elevator replacement project, focusing on precise technical specifications for existing plumbing systems in the basement areas. Specific requirements include maintaining existing floor drains per elevator code (ASME A17.1), installing plenum-rated pipe insulation, and ensuring proper drainage slopes for various piping systems. The contractor must coordinate with other trades, submit detailed documentation, and guarantee all work for one year from final owner acceptance. The project is fully sprinklered and follows VA construction and facilities management guidelines.

View the file

Other files

File Type Posted
36C25225R0036 0007.docx DOCX document
S06 36C25225R0036 006_Att02 25-0725 Supplemental Sketches.pdf PDF
BLDG200F13R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att07 26 22 00 Low-Voltage Transformers.pdf PDF
BLDG200F3R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att05 Physical Access Control Clarifications.pdf PDF
S06 36C25225R0036 006_Att12 Sole Source Listing__full.e.pdf PDF
S06 36C25225R0036 006_Att06 26 43 13 Surge Protection Devices - Addendum 1.pdf PDF
BLDG200F7R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att11 Photos_Existing Conditions.pdf PDF
BLDG200F6R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att01 Finish and Lighting Changes.pdf PDF
BLDG200 F10R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att09 Hines State Tax Exempt 2025.pdf PDF
BLDG200F4R2010.xls XLS spreadsheet
BLDG200F11R2010.xls XLS spreadsheet
BLDG200F9R2010.xls XLS spreadsheet
BLDG200BSMTR2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att10 OFFER SCHEDULE.R1 578-25-003 B200 Elevators.pdf PDF
BLDG200F2R2010.xls XLS spreadsheet
BLDG200F1R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att08 GKT15-30W-10_Specification.pdf PDF
BLDG200F8R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att04 _ Wage Rates IL20250009.R3 2025.08.01.pdf PDF
BLDG200F14R2010.xls XLS spreadsheet
BLDG200F5R2010.xls XLS spreadsheet
36C25225R0036 0006.docx DOCX document
S06 36C25225R0036 0005.docx DOCX document
S06 36C25225R0036 0005.pdf PDF
S06 36C25225R0036 004 578-25-003_Att Finish Schedule.pdf PDF
36C25225R0036 0004.docx DOCX document
S06 36C25225R0036 003 Att2 Sign-in Site Visit_02_rev.pdf PDF
36C25225R0036 0003.docx DOCX document
S06 36C25225R0036 003 Att1 Sign-in Site Visit_01.pdf PDF
S06 36C25225R0036 002 Att2 Sign-in Site Visit_02.pdf PDF
S06 36C25225R0036 002 Att1 Sign-in Site Visit_01.pdf PDF
S06 36C25225R0036 002 578-25-003.docx DOCX document
S06 001 Att1 Sign-in Site Visit_01 for 578-25-003 Elevators 2025.06.18.pdf PDF
36C25225R0036 0001.docx DOCX document
36C25225R0036_3.docx DOCX document
S02 Sol R0036 AttA VAAR 852.219-75 Certification 578-25-003.docx DOCX document
S02 Sol R0036 AttC Contractor EMR Safety Info 578-25-003.docx DOCX document
S02 Sol R0036 AttE SOW.Att00_Descriptive Project Scope of Work 578-25-003_r.pdf PDF
S02 Sol R0036 AttE SOW.Att15d_578-25-003 100 perc DWGS Part 4of5_2025.01.24.pdf PDF
S02 Sol R0036 AttE SOW.Att12_Cutting Welding and Other Hot Work.pdf PDF
S02 Sol R0036 AttE SOW.Att18b_Building 220 Colored Space Drawings.pdf PDF
S02 Sol R0036 AttB Contractor Info 578-25-003.docx DOCX document
36C25225R0036_3.docx DOCX document
S02 Sol R0036 AttE SOW.Att09_Infection Control Risk Assessment_ICRA-1.3.pdf PDF
S02 Sol R0036 AttE SOW.Att14a _578-25-003_Replace Elevators B200_SPECS VOL 1of 2_updated.pdf PDF
Show 40 more

Latest 50 of 73 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STORM, SANITARY WASTE AND VENT PIPING:

1. STORM PIPING SHALL BE INSULATED WITH 1" FLEXIBLE ELASTOMERIC

SELF-SEAL INSULATION, ARMAFLEX AP, OR EQUAL.

2. PROVIDE PLENUM RETURN PIPE WRAP, FOIL FACED INSULATING BLANKET

WITH 1/2" INSULATION LAYER, OVER ALL PLASTIC VENT, SANITARY, AND

STORM PIPING LOCATED WITHIN A RETURN AIR PLENUM.

MISCELLANEOUS:

1. ALL HORIZONTAL PIPING PENETRATIONS SHALL BE PROVIDED WITH

ESCUTCHEONS TO PROVIDE A CLEAN INSTALLATION.

2. PIPING PENETRATIONS THROUGH BUILDINGS STRUCTURE SHALL BE UL

RATED AND FIRESTOPPED, WHERE REQUIRED.

3. MAINTAIN INDICATED FIRE RATINGS OF WALLS, PARTITIONS, CEILINGS

AND FLOORS AT PENETRATIONS. SEAL WITH FIRESTOPPING TO MAINTAIN

FIRE RATING.

4. RESTORE DAMAGED FINISHES. CLEAN AND PROTECT WORK FROM

DAMAGE.

1. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND INDICATIVE OF

WORK TO BE PROVIDED (FURNISHED AND INSTALLED) UNDER THIS

CONTRACT. DRAWINGS SHOULD NOT BE SCALED.

2. THE CONTRACTOR IS RESPONSIBLE TO EXAMINE THE EXISTING

CONDITIONS UNDER WHICH THEY SHALL OPERATE AND VERIFY THE

EXTENT OF WORK REQUIRED TO COMPLETE THE WORK UNDER THIS

CONTRACT.

3. PRIOR TO ORDERING AND FABRICATING ANY EQUIPMENT, IT IS THE

RESPONSIBILITY OF THE CONTRACTOR TO EXAMINE THE PHYSICAL

CONDITIONS AT THE PROJECT SITE AND VERIFY SPACE AND SUFFICIENT

CLEARANCES ARE AVAILABLE FOR INSTALLING EQUIPMENT, DUCTWORK,

PIPING, AND APPURTENANCES, AND TO DETERMINE ANY NECESSARY

MODIFICATIONS.

4. PERFORM ALL WORK IN COMPLIANCE WITH ALL APPLICABLE FEDERAL,

STATE, AND LOCAL CODES, REGULATIONS, AND STANDARDS ADOPTED BY

THE AUTHORITY HAVING JURISDICTION. IF CONFLICTS EXIST BETWEEN

THESE ENGINEERING DOCUMENTS AND CODES, THE MOST STRINGENT

REQUIREMENTS SHALL GOVERN.

5. ALL CONSTRUCTION WORK SHALL ALSO MEET THE FOLLOWING CODE

REQUIREMENTS:

· VA TECHNICAL INFORMATION LIBRARY (TIL)

· INTERNATIONAL BUILDING CODE (IBC) 2024

· INTERNATIONAL EXISTING BUILDING CODE 2024

· INTERNATIONAL MECHANICAL CODE 2024

· INTERNATIONAL PLUMBING CODE 2024

· INTERNATIONAL ENERGY CONSERVATION CODE 2024

· INTERNATIONAL FIRE CODE 2024

· NFPA 1-2024, THE UNIFORM FIRE CODE

· NFPA 101-2024, THE LIFE SAFETY CODE

· NFPA 51B-2024, STANDARD FOR FIRE PREVENTION DURING WELDING,

CUTTING AND OTHER HOT WORK

· NFPA 13-2022, STANDARD FOR THE INSTALLATION OF SPRINKLER

SYSTEMS

· NFPA 70-2023, NATIONAL ELECTRICAL CODE

· NFPA 90A-2024, STANDARD FOR THE INSTALLATION OF AIR

CONDITIONING AND VENTING SYSTEMS.

· NFPA 99-2024, STANDARD FOR HEALTH CARE FACILITIES

· NFPA 241-2022, STANDARD FOR SAFEGUARDING CONSTRUCTION,

ALTERATION AND DEMOLITION OPERATIONS.

6. CONTRACTOR SHALL COORDINATE AND SEQUENCE DEMOLITION,

CLEANING, AND CONSTRUCTION WORK.

7. CONTRACTOR SHALL NOTE ANY SPECIAL REQUIREMENTS FOR

INSTALLATION OF WORK UNDER THIS CONTRACT. DISMANTLE AND

REASSEMBLE EQUIPMENT AS NECESSARY FOR ENTRY INTO THE BUILDING

AND THE LOCATION OF INSTALLATION.

8. THE CONTRACTOR SHALL MAINTAIN A COMPLETE PROJECT SCHEDULE AND

SHALL UPDATE THIS SCHEDULE WEEKLY. ANY CHANGES SHALL BE NOTED

AND AN UPDATED SCHEDULE SHALL BE PROVIDED TO THE OWNER.

9. ALL PERMITS, FEES, TAXES, ETC SHALL BE PAID BY CONTRACTOR AS PART

OF THE TOTAL PROJECT COST.

10. MAINTAIN THE INTEGRITY OF ALL FIRE AND SMOKE RATED WALLS,

PARTITIONS, CEILINGS, AND FLOORS. SEAL ALL PENETRATIONS THROUGH

RATED ASSEMBLIES WITH FIRESTOP MATERIAL IN ACCORDANCE WITH U.L.

REQUIREMENTS TO MAINTAIN THE ASSEMBLY RATING.

11. CONTRACTOR SHALL FURNISH U.L. APPROVED DRAWINGS FOR EACH TYPE

OF FIRE AND SMOKE RATED ASSEMBLY PENETRATION BY DUCTS, PIPES, OR

CONDUITS, AND SHALL DISPLAY THESE DRAWINGS ON THE JOB SITE AT ALL

TIMES DURING CONSTRUCTION.

12. CONTRACTOR SHALL REFER TO ALL DETAILS FOR PROPER GUIDANCE.

13. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND EQUIPMENT

SUBMITTALS FOR ALL PRODUCTS USED ON PROJECT.

14. THE ENGINEER'S APPROVAL OF SUBMITTAL DATA SHALL NOT RELIEVE THE

CONTRACTOR OF RESPONSIBILITY FOR DEVIATIONS FROM THE

REQUIREMENTS OF CONTRACT DOCUMENTS UNLESS THE CONTRACTOR

HAS RECEIVED WRITTEN APPROVAL FROM THE ENGINEER TO THE SPECIFIC

DEVIATION. THE ENGINEER'S APPROVAL OF SUBMITTAL DATA SHALL NOT

RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR ERRORS OR

OMISSIONS IN HIS OR HER SUBMITTAL DATA.

15. THE CONTRACTOR IS REQUIRED TO SUBMIT THREE COMPLETE O&M

MANUALS IN THREE RING BINDERS AT SUBSTANTIAL COMPLETION.

MANUALS SHALL INCLUDE INSTALLATION AND MAINTENANCE DATA ON ALL

NEW EQUIPMENT AND MATERIALS, CERTIFIED TECHNICAL PRODUCT DATA,

EQUIPMENT SHOP DRAWINGS, SPARE PARTS DATA, ETC. PROVIDE AN

INDEX AND ASSOCIATED DIVIDERS.

16. CLOSE OUT DOCUMENTS: THE CONTRACTOR IS TO MAINTAIN ONE SET OF

CONSTRUCTION DRAWINGS ON SITE AND KEEP CURRENT WITH MARK UP

AS-BUILT CONDITIONS DURING CONSTRUCTION OF THE PROJECT. THIS SET

IS TO INCLUDE ALL CONTRACT CHANGES, MODIFICATIONS, AND

CLARIFICATIONS. THIS SET ALONG WITH ALL SHOP DRAWINGS SHALL BE

TURNED OVER TO THE ARCHITECT/ENGINEER AFTER CONSTRUCTION

COMPLETION.

17. IT IS THE RESPONSIBILITY OF ALL BIDDERS TO THOROUGHLY REVIEW AND

UNDERSTAND ALL CONSTRUCTION DOCUMENTS. THIS INCLUDES BUT IS

NOT LIMITED TO ALL DRAWINGS, SPECIFICATION SECTIONS, ETC. THE

DRAWINGS ARE SCHEMATIC IN NATURE. THEREFORE BEFORE STARTING

ANY WORK, THE CONTRACTOR SHALL REVIEW ALL OTHER CONSTRUCTION

DOCUMENTS, VERIFY FIELD CONDITIONS AND SHALL MAKE ANY REQUIRED

MINOR ADJUSTMENTS WITHOUT EXTRA COST TO THE OWNER. ANY MAJOR

DISCREPANCIES FOUND SHALL BE BROUGHT TO THE ATTENTION OF THE

ARCHITECT/ENGINEER. THE BASE BID SHALL REFLECT THE TOTAL COST OF

NEW EQUIPMENT INSTALLATION. THIS INCLUDES LABOR, EQUIPMENT AND

MATERIALS. NO CHANGE ORDERS SHALL BE ISSUED WITHOUT WRITTEN

CONSENT AND APPROVAL FROM ENGINEER AND ARCHITECT.

1. ALL WORK SHALL COMPLY WITH APPLICABLE NATIONAL, STATE, AND

LOCAL CODES. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO, THE 2024

INTERNATIONAL PLUMBING CODE. WHERE CONFLICTS OCCUR BETWEEN

CODES, OR BETWEEN CONSTRUCTION DOCUMENTS AND CODES, THE

MOST RESTRICTIVE REQUIREMENTS SHALL GOVERN.

2. REVIEW PLANS OF ALL TRADES PRIOR TO BIDDING AND BEGINNING WORK.

INSTALLATIONS ARE TO INCLUDE ALL PLUMBING FOR COMPLETE SYSTEMS

SHOWN ON THE PLANS AND AS REQUIRED.

3. COORDINATE WITH OTHER TRADES TO PREVENT INTERFERENCE WITH

HVAC DUCTS, STRUCTURE, ELECTRICAL, LIGHTING, AND OTHER PIPING IN

THE CEILING SPACE. VENT PIPING AND WATER PIPING SHALL BE HELD

EITHER ABOVE OR BELOW HVAC DUCTWORK, AS COORDINATED WITH THE

HVAC CONTRACTOR.

4. ALL CHANGES SHALL BE REVIEWED BY THE ARCHITECT.

5. THE PLUMBING SUBCONTRACTOR SHALL FURNISH AND INSTALL ALL

PLUMBING FIXTURES, UNLESS NOTED OTHERWISE.

6. VERIFY LOCATION OF EXISTING WATER SERVICE AND THE

LOCATION/INVERTS OF SANITARY PIPING PRIOR TO INSTALLATION.

7. CUT AND PATCH CONCRETE AS REQUIRED.

8. IT IS NOT THE INTENT OF THESE DRAWINGS TO COVER ALL WORK AND

MATERIAL. ANY EQUIPMENT, PLUMBING FIXTURE, TRIM HARDWARE

AND/OR DEVICES USUALLY UTILIZED IN THE CLASS OF WORK, THOUGH NOT

SPECIFICALLY MENTIONED OR SHOWN ON THESE DRAWINGS, BUT WHICH

MAY BE NECESSARY FOR THE SATISFACTORY COMPLETION OF THE WORK

(AS DETERMINED BY THE ARCHITECT) SHALL BE FURNISHED AND

INSTALLED BY THE CONTRACTOR AS PART OF HIS TOTAL WORK.

9. THE EQUIPMENT ROUGH-IN ITEMS AND THEIR DIMENSIONED LOCATIONS

FOR ALL CONNECTIONS ARE ACCURATE TO THE BEST OF OUR

KNOWLEDGE. IN SOME INSTANCES THE OWNER OR SUPPLIER MAY MAKE

SUBSTITUTIONS OR EQUIPMENT ITEMS MAY VARY FROM WHAT IS SHOWN.

THEREFORE, THESE ITEMS AND DIMENSIONS SHALL BE VERIFIED WITH THE

EQUIPMENT SUPPLIER, OWNER AND/OR EQUIPMENT ROUGH-IN DRAWING.

FAILURE OF THE APPROPRIATE CONTRACTOR TO VERIFY ROUGH-INS OR

THEIR LOCATIONS SHALL PLACE THE RESPONSIBILITY FOR ANY

SUBSEQUENT RELOCATION AND/OR ADDITIONAL ROUGH-INS DIRECTLY

UPON THAT CONTRACTOR.

10. CONTRACTOR SHALL SUPPLY TO THE ARCHITECT/ENGINEER THE

REQUIRED COPIES OF SHOP DRAWINGS FOR APPROVAL SO THE QUALITY

OF INTENDED MATERIALS OR EQUIPMENT CAN BE REVIEWED BEFORE

INSTALLATION. THERE WILL BE NO INSTALLATION UNTIL SHOP DRAWINGS

HAVE BEEN SUBMITTED AND REVIEWED BY THE ARCHITECT/ENGINEER.

11. DO NOT SCALE THIS DRAWING. REFER TO ARCHITECTURAL FLOOR PLAN

FOR BUILDING DIMENSIONS.

12. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DO NOT

NECESSARILY SHOW ALL ELBOWS, OFFSETS, UNIONS, VALVES, FITTINGS,

ETC. REQUIRED TO COMPLETE THE INSTALLATION OF THE WORK. THE

SUBMISSION OF A PROPOSAL SHALL BE CONSTRUED AS EVIDENCE THAT

THE CONTRACTOR HAS FAMILIARIZED HIMSELF WITH THE PLANS AND

BUILDING SITE. CLAIMS MADE SUBSEQUENT TO THE PROPOSAL FOR

MATERIALS AND LABOR BECAUSE OF DIFFICULTIES ENCOUNTERED WILL

NOT BE RECOGNIZED IF THEY COULD HAVE BEEN FORESEEN HAD PROPER

EXAMINATION BEEN MADE.

13. THE CONTRACTOR SHALL COOPERATE FULLY AMONG ALL TRADES.

14. INSTALL 1" INSULATION WITH ALL-SERVICE JACKET ON ALL ROOF LEADERS

ABOVE CEILING.

15. INSTALL PLENUM RATED INSULATION WRAP ON ALL PLASTIC VENT,

SANITARY AND STORM PIPING LOCATED WITHIN A RETURN AIR PLENUM.

16. ALL PIPES HANGING FROM SINGLE VERTICAL RODS / HANGERS SHALL NOT

MOVE OR SWAY DURING OPERATION. SUITABLE LATERAL SUPPORTS OR

BRACING SHALL BE USED TO PREVENT SWAY OR MOVEMENT.

17. INSTALL STORM AND CONDENSATE PIPING WITH MINIMUM SLOPE OF 1/8"

PER FOOT. INSTALL SANITARY PIPING LESS THAN 3" AT 1/4" PER FOOT, 3"

TO 6" AT 1/8" PER FOOT, AND 8" AND GREATER AT 1/16" PER FOOT.

CONTRACTOR IS RESPONSIBLE FOR PROPER DRAINAGE OF ALL SYSTEMS.

18. MATERIALS, EQUIPMENT, ASSEMBLIES AND SYSTEMS SHALL MEET ALL

PERTINENT REQUIREMENTS OF NATIONALLY RECOGNIZED TESTING

ORGANIZATIONS SUCH AS UL, ASTM, ASSE, AWWE, AGA AND NFPA AS WELL

AS THE MOST CURRENT ADOPTED VERSION OF THE STATE AND LOCAL

CODES.

19. WHERE JOB CONDITIONS REQUIRE CHANGES FROM THE CONTRACT

DOCUMENTS THAT DO NOT CHANGE THE SCOPE OR NATURE OF WORK

REQUIRED, THE CONTRACTOR SHALL MAKE SUCH CHANGES WITHOUT

ADDITIONAL COST TO THE OWNER. NO OTHER CHANGES MAY BE MADE

WITHOUT WRITTEN PERMISSION FROM THE ENGINEER.

20. CONTRACTOR SHALL GUARANTEE ALL WORK FOR WHICH MATERIALS ARE

FURNISHED, FABRICATED, FIELD ERECTED, ALL FACTORY ASSEMBLED

EQUIPMENT FOR WHICH NO SPECIFIC MANUFACTURER'S GUARANTEE IS

FURNISHED, AND ALL WORK IN CONNECTION WITH INSTALLATION OF

MANUFACTURER'S GUARANTEED EQUIPMENT. THE CONTRACTOR'S

GUARANTEE SHALL LAST ONE YEAR FROM THE FINAL OWNER

ACCEPTANCE OF THE WORK AND SHALL APPLY TO ALL DEFECTS IN

MATERIALS AND WORKMANSHIP OF ANY KIND.

4000 SF

6" SD-1

4" FD-1FLOOR DRAIN 4" AD-6 AREA DRAIN

4" FS-4FLOOR SINK

4" SD-29 DECK DRAIN4" FD-3PFLOOR DRAIN

6 DFU

4" FD-13

HUB DRAIN

FLOW

CONTROL

DRAIN

4" SD-12

COMBINATION

DRAINS

STORM DRAIN4" SD-15

Room

KEYNOTE

CONTINUATION SYMBOL

ROOM NAME AND NUMBER

EXISTING PIPE TAG

ITEM TO BE DEMOLISHED

AREA NOT IN CONTRACT

PIPING BEING DEMOLISHED

ABOVE GROUND PIPING

PIPE SIZE TAG (DIAMETER)

DRAIN SIZE

PIPE RISE

PIPE DROP

PIPE TEE REDUCING 45

DEGREE TEE

45 DEGREE TEE

BELOW GROUND PIPING

PIPE INVERT ELEVATION TAG

PIPE SLOPE TAG

* NOTE *

ALL OF GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL OTHER

DRAWINGS IN THIS SET. THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS

SHEET MAY OR MAY NOT BE USED IN THIS SET OF DRAWINGS

TYPE

(SEE SCHEDULE)

ABV ABOVE

AD AREA DRAIN

ADD ADDENDUM

AFF ABOVE FINISHED FLOOR

AFUE ANNUAL FUEL UTIL. EFFICIENCY

ALT ALTERNATE

AP ACCESS PANEL

ARCH ARCHITECT/ARCHITECTURAL

BFF BELOW FINISHED FLOOR

BLW BELOW

CAP CAPACITY

CB CATCH BASIN

CTE CONNECT TO EXISTING

CW COLD WATER

DIA DIAMETER

DN DOWN

DOM. DOMESTIC

EA EACH

ELEC ELECTRICAL

EQUIP EQUIPMENT

EWH ELECTRIC WATER HEATER

EWT ENTERING WATER TEMP

(E) EXISTING

F DEGREES FAHRENHEIT

FCO FLOOR CLEAN OUT

FD FLOOR DRAIN

FL FLOOR

FO FUEL OIL

FOV FUEL OIL VENT

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FS FLOOR SINK

FT FOOT/FEET

GAL GALLON

GF GAS-FIRED

GC GENERAL CONTRACTOR

GPM GALLONS PER MINUTE

GW GREASE WASTE

HB HOSE BIB

HP HORSE POWER

HTG HEATING

HTR HEATER

HW HOT WATER

ID INDIRECT

IN INCH

INV INVERT

LB POUND

LB/HR POUNDS PER HOUR

LP LOW PRESSURE

LPG LIQUEFIED PETROLEUM GAS

LWT LEAVING WATER TEMP

MAX MAXIMUM

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MTR MOTOR

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NTS NOT TO SCALE

O OXYGEN

ORD OVERFLOW ROOF DRAIN

PSD PRIMARY STORM WATER DRAIN

PIV POST INDICATOR VALVE

PLBG PLUMBING

PRESS PRESSURE

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIG POUNDS PER SQUARE INCH

GAUGE

PWR POWER

RD ROOF DRAIN

REC RECESSED

RED REDUCER

RM ROOM

RW RAIN WATER

SD STORM DRAINAGE

SAN SANITARY

TDR TRENCH DRAIN

TEMP TEMPERATURE

TYP TYPICAL

UG UNDERGROUND

VAC VACUUM

V VENT

VTR VENT THROUGH ROOF

W WASTE

WCO WALL CLEAN OUT

ABBREVIATIONS

DBP DOM WATER BOOSTER PUMP

DCP DOM WATER CIRCULATING PUMP

GI GREASE INTERCEPTOR

SP SUMP PUMP

WH WALL HYDRANT

"P" - INDICATES

PRIMER CONNECTION

FIXTURE UNITS

ROOF AREA

SERVED BY DRAIN

GATE VALVE

3-WAY AIRMOTOR

CONTROLLER

ANGLE GLOBE VALVE

ANGLE HOSE VALVE

DIAPHRAGM VALVE

GLOBE VALVE

HOSE GLOBE VALVE

LOCK SHIELD VALVE

NEEDLE VALVE

PLUG VALVE

QUICK OPENING VALVE

SPRING CHECK VALVE

SWING GATE CHECK VALVE

TEMP PRESSURE RELIEF VALVE

CLG CEILING

CO CLEAN OUT

CP CIRCULATOR PUMP

D DEMOLISH OR DEMOLITION

DFU DRAINAGE FIXTURE UNITS

ETR EXISTING TO REMAIN

EWC ELECTRIC WATER COOLER

G GAS

GCO GRADE CLEAN OUT

GWH GAS WATER HEATER

GR GREASE

WSF WATER SUPPLY FIXTURES

WC WATER CLOSET

UR URINAL

TWH TANKLESS WATER HEATER

SF SQUARE FOOT

S SINK

IB ICE MAKER OUTLET BOX

LAV LAVATORY

MS MOP SINK

HD HUB DRAIN

HWR HOT WATER RETURN

NG NATURAL GAS

OSD OVERFLOW (SECONDARY)

STORM WATER DRAIN

GENERAL PLUMBING SYMBOLS PLUMBING AND PIPING SYMBOLS

PIPE ACCESSORY TAGS

DRAIN TAGS

NUMBER OF SHEET WHERE DETAIL APPEARS

NUMBER OF DETAIL ON SHEET

REVISION NUMBER - SHOWN ON PLANS

NEW CONNECTION TO EXISTING

LIMIT OF DEMOLITION

PLUMBING MATERIALS

GENERAL NOTESPLUMBING NOTES

(E)

2"

2"

4"

4"

INVERT: -105' - 1"

1/8" / 12" SLOPE

2" DOM. WM

DOMESTIC WATER METER

BALANCING VALVE

1/4 TURN BALL VALVE

CHECK VALVE

3-WAY MIXING VALVE

MOTORIZED CONTROL VALVE

3 WAY MOTORIZED CONTROL

VALVE

PRESSURE REDUCING VALVE

BUTTERFLY VALVE

2" BALANCING

2" SHUTOFF

2" CHECK

2" TMV

2" M-CNTRL

2" 3-WAY CNTRL

2" PRV

2" BUTTERFLY

CAP

PLUG

CWV

CA

CD

CDR

DCW

S-CW

DHW

DHW-140°

HWR

HWR-140°

GV

GW

NG

PD

V

SS

STM

SD

OSD

COMBINATION WASTE & VENT

COMPRESSED AIR

CONDENSATE DRAINAGE

CONDENSATE RETURN

DOMESTIC COLD WATER

SOFT COLD WATER

DOMESTIC HOT WATER

DOMESTIC HOT WATER 140°

DOM. HOT WATER RECIRCULATION

DOM. HOT WATER RECIRC. 140°

GREASE VENT

GREASE WASTE

NATURAL GAS

PUMP DISCHARGE

SANITARY VENT

SANITARY SEWER

STEAM

STORM DRAINAGE

OVERFLOW STORM DRAINAGE

PG PROPANE GAS

RO REVERSE OSMOSIS WATER

IW INDIRECT WASTE

MA MEDICAL AIR

MO MEDICAL OXYGEN

MV MEDICAL VACUUM

WM

M

M

P

S

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

Architect:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEP Engineer: Elevator Consultant:

MES GROUP LERCH BATES

550 N. REO STREET SUITE 203

TAMPA, FL 33609

813.289.4700

216 S. JEFFERSON STREET

SUITE LL2

CHICAGO, IL 60661

312.256.1010

30% SCHEMATIC DESIGN 06/20/2024

60% DESIGN DEVELOPMENT 08/12/2024

90% QAQC REVIEW 09/23/2024

90% CONSTRUCTION DOCUMENTS 10/02/2024

100% QAQC REVIEW 10/25/2024

100% BID DOCUMENTS 01/20/2025

100% BID DOCUMENTS - REVISED BASE BID 01/24/2025

A u to d e s k D o c s /1

.6

.1

V A

H in e s E le v a to r

R e p la c e m e n t/

.6

.1

H in e s E le v a to rs M

E P

R

.r v t

/2

/2

:2

:5

A

M

P000

PLUMBING TITLE SHEET

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

ELEVATOR REPLACEMENT

5000 5TH AVE, HINES, IL 60141

578-25-003

01/24/2025 NPS PBJ

100% BID DOCUMENTS

FULLY SPRINKLERED

PLUMBING SHEET INDEX

P000 PLUMBING TITLE SHEET

PD116 MACHINE ROOM FLOOR PLAN - PLUMBING DEMOLITION

PP100 BASEMENT FLOOR PLAN - PLUMBING - OVERALL

PP100.1 ENLARGED BASEMENT FLOOR PLAN - PLUMBING

FIRE RATING LEGEND

1 HOUR FIRE WALL

2 HOUR FIRE WALL

Revisions: Date:

Date Signed: 01/24/2025 License Expires: 02/28/2027

(E) 2" SD DN FROM

ROOF DRAIN

(E) 2" SD DN FROM

ROOF DRAIN

(E)FS

ENGINEERING

MECHANICAL

ROOM

(E) 2" SD DN TO

FLR BELOW

OPEN TO BELOW

OPEN TO BELOW

(E) 2" SD

H I J

A. EXISTING PIPE ROUTING AND ASSOCIATED COMPONENTS SHOWN ON

DRAWINGS ARE APPROXIMATE LOCATIONS AND ARE PROVIDED FOR

REFERENCE USE ONLY. FIELD VERIFY AND COORDINATE WITH EXACT

LOCATIONS, ELEVATIONS, SIZES, AND CONDITIONS OF EXISTING

COMPONENTS.

PLUMBING GENERAL NOTES

1. EXISTING FLOOR SINK SHALL BE DEMOLISHED COMPLETELY. REMOVE

EXISTING SANITARY DRAINAGE PIPING BACK TO NEAREST MAIN. CAP AND

SEAL EXISTING SANITARY PIPING. FLOOR SHALL BE PATCHED TO MATCH

EXISTING CONSTRUCTION.

PLUMBING DEMOLITION KEYNOTES -

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

Architect:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEP Engineer: Elevator Consultant:

MES GROUP LERCH BATES

550 N. REO STREET SUITE 203

TAMPA, FL 33609

813.289.4700

216 S. JEFFERSON STREET

SUITE LL2

CHICAGO, IL 60661

312.256.1010

30% SCHEMATIC DESIGN 06/20/2024

60% DESIGN DEVELOPMENT 08/12/2024

KEY PLAN

NO SCALE

N

90% QAQC REVIEW 09/23/2024

90% CONSTRUCTION DOCUMENTS 10/02/2024

100% QAQC REVIEW 10/25/2024

100% BID DOCUMENTS 01/20/2025

100% BID DOCUMENTS - REVISED BASE BID 01/24/2025

A u to d e s k D o c s /1

.6

.1

V A

H in e s E le v a to r

R e p la c e m e n t/

.6

.1

H in e s E le v a to rs M

E P

R

.r v t

/2

/2

:2

:5

A

M

PD116

MACHINE ROOM FLOOR PLAN -

PLUMBING DEMOLITIONGUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

ELEVATOR REPLACEMENT

5000 5TH AVE, HINES, IL 60141

578-25-003

01/24/2025 NPS PBJ

100% BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"PD116

1 MACHINE ROOM FLOOR PLAN - PLUMBING DEMOLITION

N

Revisions: Date:

PP100.1

A

B C D E F G H I J K L M N O P Q

A. EXISTING PIPE ROUTING AND ASSOCIATED COMPONENTS SHOWN ON

DRAWINGS ARE APPROXIMATE LOCATIONS AND ARE PROVIDED FOR

REFERENCE USE ONLY. FIELD VERIFY AND COORDINATE WITH EXACT

LOCATIONS, ELEVATIONS, SIZES, AND CONDITIONS OF EXISTING

COMPONENTS.

PLUMBING GENERAL NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

Architect:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEP Engineer: Elevator Consultant:

MES GROUP LERCH BATES

550 N. REO STREET SUITE 203

TAMPA, FL 33609

813.289.4700

216 S. JEFFERSON STREET

SUITE LL2

CHICAGO, IL 60661

312.256.1010

30% SCHEMATIC DESIGN 06/20/2024

60% DESIGN DEVELOPMENT 08/12/2024

KEY PLAN

NO SCALE

N

90% QAQC REVIEW 09/23/2024

90% CONSTRUCTION DOCUMENTS 10/02/2024

100% QAQC REVIEW 10/25/2024

100% BID DOCUMENTS 01/20/2025

100% BID DOCUMENTS - REVISED BASE BID 01/24/2025

A u to d e s k D o c s /1

.6

.1

V A

H in e s E le v a to r

R e p la c e m e n t/

.6

.1

H in e s E le v a to rs M

E P

R

.r v t

/2

/2

:2

:0

A

M

PP100

BASEMENT FLOOR PLAN -

PLUMBING - OVERALLGUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

ELEVATOR REPLACEMENT

5000 5TH AVE, HINES, IL 60141

578-25-003

01/24/2025 NPS PBJ

100% BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/16" = 1'-0"PP100

1 BASEMENT FLOOR PLAN - PLUMBING - OVERALL

N

Revisions: Date:

H I

J K

(E)FD

(E)FD

(E)FD

ELEVATOR P3 ELEVATOR P2 ELEVATOR P1

ELEVATOR P4 ELEVATOR P5

ELEVATOR S6

ELEVATOR S7

ELEVATOR S8

BASEMENT ELEVATOR

LOBBY

VERTICAL SPACE CHASE

C099

ENGINEERING ELECTRICAL

CLOSET

C003A

NUTRITION/FOOD DISH

ROOM

C032A

VERTICAL SPACE CHASE

RCCB44C

VERTICAL SPACE CHASE

C004A

ENGINEERING STORAGE

C004

SPD SERVICE OXYGEN TANK

STORAGE

C003

COMMON SPACE CORRIDOR

RCCB15R

SURGICAL OFFICE

B019B

SURGICAL OFFICE

B019C

SURGICAL OFFICE

B019

SURGICAL

RCCB28R

SURGICAL RECOVERY

A001

EMS TOILET

D001

NUTRITION/FOOD PATIENT

DINING

D009A

EDUCATION ENTRY

RCCB35R

EDUCATION TRAINING ROOM

D009

V E

R T

IC

A

L S

P A

C E

C H

A S

E

R C

C B

C

COMMON SPACE CORRIDOR

RCCB14R

H I J K

A. EXISTING PIPE ROUTING AND ASSOCIATED COMPONENTS SHOWN ON

DRAWINGS ARE APPROXIMATE LOCATIONS AND ARE PROVIDED FOR

REFERENCE USE ONLY. FIELD VERIFY AND COORDINATE WITH EXACT

LOCATIONS, ELEVATIONS, SIZES, AND CONDITIONS OF EXISTING

COMPONENTS.

PLUMBING GENERAL NOTES

1. EXISTING FLOOR DRAIN SHALL REMAIN. PER 2022 ASME A17.1 SECTION

2.2.2.5, "IN ELEVATORS PROVIDED WITH FIREFIGHTER'S EMERGENCY

OPERATION, A DRAIN OR SUMP PUMP SHALL BE PROVIDED." THE EXISTING

FLOOR DRAIN SHALL REMAIN TO MEET ELEVATOR CODE REQUIREMENTS.

PLUMBING DEMOLITION KEYNOTES -

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

Architect:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEP Engineer: Elevator Consultant:

MES GROUP LERCH BATES

550 N. REO STREET SUITE 203

TAMPA, FL 33609

813.289.4700

216 S. JEFFERSON STREET

SUITE LL2

CHICAGO, IL 60661

312.256.1010

30% SCHEMATIC DESIGN 06/20/2024

60% DESIGN DEVELOPMENT 08/12/2024

KEY PLAN

NO SCALE

N

90% QAQC REVIEW 09/23/2024

90% CONSTRUCTION DOCUMENTS 10/02/2024

100% QAQC REVIEW 10/25/2024

100% BID DOCUMENTS 01/20/2025

100% BID DOCUMENTS - REVISED BASE BID 01/24/2025

A u to d e s k D o c s /1

.6

.1

V A

H in e s E le v a to r

R e p la c e m e n t/

.6

.1

H in e s E le v a to rs M

E P

R

.r v t

/2

/2

:2

:0

A

M

PP100.1

ENLARGED BASEMENT FLOOR

PLAN - PLUMBINGGUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

ELEVATOR REPLACEMENT

5000 5TH AVE, HINES, IL 60141

578-25-003

01/24/2025 NPS PBJ

100% BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"PP100.1

1 ENLARGED BASEMENT FLOOR PLAN - PLUMBING

N

Revisions: Date:

Sheets
P000 - PLUMBING TITLE SHEET
PD116 - MACHINE ROOM FLOOR PLAN - PLUMBING DEMOLITION
PP100 - BASEMENT FLOOR PLAN - PLUMBING - OVERALL
PP100.1 - ENLARGED BASEMENT FLOOR PLAN - PLUMBING

File details come from the government source that posted it. Updated .