These are plumbing drawings for the Elevator Replacement project at the Hines VA Hospital in Hines, Illinois. The documents include four sheets (P000-PP100.1) detailing plumbing demolition and existing conditions for the basement and machine room floor plans. The drawings specify technical requirements for storm, sanitary, and vent piping, including insulation specifications, penetration sealing, and fire rating maintenance. Key technical notes mandate compliance with multiple building codes including the 2024 International Building, Mechanical, Plumbing, and Fire Codes, as well as various NFPA standards. The drawings emphasize contractor responsibilities such as field verification of existing conditions, maintaining fire ratings, submitting shop drawings, and providing operation and maintenance manuals.
The plumbing documents are part of a comprehensive elevator replacement project, focusing on precise technical specifications for existing plumbing systems in the basement areas. Specific requirements include maintaining existing floor drains per elevator code (ASME A17.1), installing plenum-rated pipe insulation, and ensuring proper drainage slopes for various piping systems. The contractor must coordinate with other trades, submit detailed documentation, and guarantee all work for one year from final owner acceptance. The project is fully sprinklered and follows VA construction and facilities management guidelines.
View the file
Other files
Show 40 more
Latest 50 of 73 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STORM, SANITARY WASTE AND VENT PIPING:
1. STORM PIPING SHALL BE INSULATED WITH 1" FLEXIBLE ELASTOMERIC
SELF-SEAL INSULATION, ARMAFLEX AP, OR EQUAL.
2. PROVIDE PLENUM RETURN PIPE WRAP, FOIL FACED INSULATING BLANKET
WITH 1/2" INSULATION LAYER, OVER ALL PLASTIC VENT, SANITARY, AND
STORM PIPING LOCATED WITHIN A RETURN AIR PLENUM.
MISCELLANEOUS:
1. ALL HORIZONTAL PIPING PENETRATIONS SHALL BE PROVIDED WITH
ESCUTCHEONS TO PROVIDE A CLEAN INSTALLATION.
2. PIPING PENETRATIONS THROUGH BUILDINGS STRUCTURE SHALL BE UL
RATED AND FIRESTOPPED, WHERE REQUIRED.
3. MAINTAIN INDICATED FIRE RATINGS OF WALLS, PARTITIONS, CEILINGS
AND FLOORS AT PENETRATIONS. SEAL WITH FIRESTOPPING TO MAINTAIN
FIRE RATING.
4. RESTORE DAMAGED FINISHES. CLEAN AND PROTECT WORK FROM
DAMAGE.
1. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND INDICATIVE OF
WORK TO BE PROVIDED (FURNISHED AND INSTALLED) UNDER THIS
CONTRACT. DRAWINGS SHOULD NOT BE SCALED.
2. THE CONTRACTOR IS RESPONSIBLE TO EXAMINE THE EXISTING
CONDITIONS UNDER WHICH THEY SHALL OPERATE AND VERIFY THE
EXTENT OF WORK REQUIRED TO COMPLETE THE WORK UNDER THIS
CONTRACT.
3. PRIOR TO ORDERING AND FABRICATING ANY EQUIPMENT, IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO EXAMINE THE PHYSICAL
CONDITIONS AT THE PROJECT SITE AND VERIFY SPACE AND SUFFICIENT
CLEARANCES ARE AVAILABLE FOR INSTALLING EQUIPMENT, DUCTWORK,
PIPING, AND APPURTENANCES, AND TO DETERMINE ANY NECESSARY
MODIFICATIONS.
4. PERFORM ALL WORK IN COMPLIANCE WITH ALL APPLICABLE FEDERAL,
STATE, AND LOCAL CODES, REGULATIONS, AND STANDARDS ADOPTED BY
THE AUTHORITY HAVING JURISDICTION. IF CONFLICTS EXIST BETWEEN
THESE ENGINEERING DOCUMENTS AND CODES, THE MOST STRINGENT
REQUIREMENTS SHALL GOVERN.
5. ALL CONSTRUCTION WORK SHALL ALSO MEET THE FOLLOWING CODE
REQUIREMENTS:
· VA TECHNICAL INFORMATION LIBRARY (TIL)
· INTERNATIONAL BUILDING CODE (IBC) 2024
· INTERNATIONAL EXISTING BUILDING CODE 2024
· INTERNATIONAL MECHANICAL CODE 2024
· INTERNATIONAL PLUMBING CODE 2024
· INTERNATIONAL ENERGY CONSERVATION CODE 2024
· INTERNATIONAL FIRE CODE 2024
· NFPA 1-2024, THE UNIFORM FIRE CODE
· NFPA 101-2024, THE LIFE SAFETY CODE
· NFPA 51B-2024, STANDARD FOR FIRE PREVENTION DURING WELDING,
CUTTING AND OTHER HOT WORK
· NFPA 13-2022, STANDARD FOR THE INSTALLATION OF SPRINKLER
SYSTEMS
· NFPA 70-2023, NATIONAL ELECTRICAL CODE
· NFPA 90A-2024, STANDARD FOR THE INSTALLATION OF AIR
CONDITIONING AND VENTING SYSTEMS.
· NFPA 99-2024, STANDARD FOR HEALTH CARE FACILITIES
· NFPA 241-2022, STANDARD FOR SAFEGUARDING CONSTRUCTION,
ALTERATION AND DEMOLITION OPERATIONS.
6. CONTRACTOR SHALL COORDINATE AND SEQUENCE DEMOLITION,
CLEANING, AND CONSTRUCTION WORK.
7. CONTRACTOR SHALL NOTE ANY SPECIAL REQUIREMENTS FOR
INSTALLATION OF WORK UNDER THIS CONTRACT. DISMANTLE AND
REASSEMBLE EQUIPMENT AS NECESSARY FOR ENTRY INTO THE BUILDING
AND THE LOCATION OF INSTALLATION.
8. THE CONTRACTOR SHALL MAINTAIN A COMPLETE PROJECT SCHEDULE AND
SHALL UPDATE THIS SCHEDULE WEEKLY. ANY CHANGES SHALL BE NOTED
AND AN UPDATED SCHEDULE SHALL BE PROVIDED TO THE OWNER.
9. ALL PERMITS, FEES, TAXES, ETC SHALL BE PAID BY CONTRACTOR AS PART
OF THE TOTAL PROJECT COST.
10. MAINTAIN THE INTEGRITY OF ALL FIRE AND SMOKE RATED WALLS,
PARTITIONS, CEILINGS, AND FLOORS. SEAL ALL PENETRATIONS THROUGH
RATED ASSEMBLIES WITH FIRESTOP MATERIAL IN ACCORDANCE WITH U.L.
REQUIREMENTS TO MAINTAIN THE ASSEMBLY RATING.
11. CONTRACTOR SHALL FURNISH U.L. APPROVED DRAWINGS FOR EACH TYPE
OF FIRE AND SMOKE RATED ASSEMBLY PENETRATION BY DUCTS, PIPES, OR
CONDUITS, AND SHALL DISPLAY THESE DRAWINGS ON THE JOB SITE AT ALL
TIMES DURING CONSTRUCTION.
12. CONTRACTOR SHALL REFER TO ALL DETAILS FOR PROPER GUIDANCE.
13. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND EQUIPMENT
SUBMITTALS FOR ALL PRODUCTS USED ON PROJECT.
14. THE ENGINEER'S APPROVAL OF SUBMITTAL DATA SHALL NOT RELIEVE THE
CONTRACTOR OF RESPONSIBILITY FOR DEVIATIONS FROM THE
REQUIREMENTS OF CONTRACT DOCUMENTS UNLESS THE CONTRACTOR
HAS RECEIVED WRITTEN APPROVAL FROM THE ENGINEER TO THE SPECIFIC
DEVIATION. THE ENGINEER'S APPROVAL OF SUBMITTAL DATA SHALL NOT
RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR ERRORS OR
OMISSIONS IN HIS OR HER SUBMITTAL DATA.
15. THE CONTRACTOR IS REQUIRED TO SUBMIT THREE COMPLETE O&M
MANUALS IN THREE RING BINDERS AT SUBSTANTIAL COMPLETION.
MANUALS SHALL INCLUDE INSTALLATION AND MAINTENANCE DATA ON ALL
NEW EQUIPMENT AND MATERIALS, CERTIFIED TECHNICAL PRODUCT DATA,
EQUIPMENT SHOP DRAWINGS, SPARE PARTS DATA, ETC. PROVIDE AN
INDEX AND ASSOCIATED DIVIDERS.
16. CLOSE OUT DOCUMENTS: THE CONTRACTOR IS TO MAINTAIN ONE SET OF
CONSTRUCTION DRAWINGS ON SITE AND KEEP CURRENT WITH MARK UP
AS-BUILT CONDITIONS DURING CONSTRUCTION OF THE PROJECT. THIS SET
IS TO INCLUDE ALL CONTRACT CHANGES, MODIFICATIONS, AND
CLARIFICATIONS. THIS SET ALONG WITH ALL SHOP DRAWINGS SHALL BE
TURNED OVER TO THE ARCHITECT/ENGINEER AFTER CONSTRUCTION
COMPLETION.
17. IT IS THE RESPONSIBILITY OF ALL BIDDERS TO THOROUGHLY REVIEW AND
UNDERSTAND ALL CONSTRUCTION DOCUMENTS. THIS INCLUDES BUT IS
NOT LIMITED TO ALL DRAWINGS, SPECIFICATION SECTIONS, ETC. THE
DRAWINGS ARE SCHEMATIC IN NATURE. THEREFORE BEFORE STARTING
ANY WORK, THE CONTRACTOR SHALL REVIEW ALL OTHER CONSTRUCTION
DOCUMENTS, VERIFY FIELD CONDITIONS AND SHALL MAKE ANY REQUIRED
MINOR ADJUSTMENTS WITHOUT EXTRA COST TO THE OWNER. ANY MAJOR
DISCREPANCIES FOUND SHALL BE BROUGHT TO THE ATTENTION OF THE
ARCHITECT/ENGINEER. THE BASE BID SHALL REFLECT THE TOTAL COST OF
NEW EQUIPMENT INSTALLATION. THIS INCLUDES LABOR, EQUIPMENT AND
MATERIALS. NO CHANGE ORDERS SHALL BE ISSUED WITHOUT WRITTEN
CONSENT AND APPROVAL FROM ENGINEER AND ARCHITECT.
1. ALL WORK SHALL COMPLY WITH APPLICABLE NATIONAL, STATE, AND
LOCAL CODES. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO, THE 2024
INTERNATIONAL PLUMBING CODE. WHERE CONFLICTS OCCUR BETWEEN
CODES, OR BETWEEN CONSTRUCTION DOCUMENTS AND CODES, THE
MOST RESTRICTIVE REQUIREMENTS SHALL GOVERN.
2. REVIEW PLANS OF ALL TRADES PRIOR TO BIDDING AND BEGINNING WORK.
INSTALLATIONS ARE TO INCLUDE ALL PLUMBING FOR COMPLETE SYSTEMS
SHOWN ON THE PLANS AND AS REQUIRED.
3. COORDINATE WITH OTHER TRADES TO PREVENT INTERFERENCE WITH
HVAC DUCTS, STRUCTURE, ELECTRICAL, LIGHTING, AND OTHER PIPING IN
THE CEILING SPACE. VENT PIPING AND WATER PIPING SHALL BE HELD
EITHER ABOVE OR BELOW HVAC DUCTWORK, AS COORDINATED WITH THE
HVAC CONTRACTOR.
4. ALL CHANGES SHALL BE REVIEWED BY THE ARCHITECT.
5. THE PLUMBING SUBCONTRACTOR SHALL FURNISH AND INSTALL ALL
PLUMBING FIXTURES, UNLESS NOTED OTHERWISE.
6. VERIFY LOCATION OF EXISTING WATER SERVICE AND THE
LOCATION/INVERTS OF SANITARY PIPING PRIOR TO INSTALLATION.
7. CUT AND PATCH CONCRETE AS REQUIRED.
8. IT IS NOT THE INTENT OF THESE DRAWINGS TO COVER ALL WORK AND
MATERIAL. ANY EQUIPMENT, PLUMBING FIXTURE, TRIM HARDWARE
AND/OR DEVICES USUALLY UTILIZED IN THE CLASS OF WORK, THOUGH NOT
SPECIFICALLY MENTIONED OR SHOWN ON THESE DRAWINGS, BUT WHICH
MAY BE NECESSARY FOR THE SATISFACTORY COMPLETION OF THE WORK
(AS DETERMINED BY THE ARCHITECT) SHALL BE FURNISHED AND
INSTALLED BY THE CONTRACTOR AS PART OF HIS TOTAL WORK.
9. THE EQUIPMENT ROUGH-IN ITEMS AND THEIR DIMENSIONED LOCATIONS
FOR ALL CONNECTIONS ARE ACCURATE TO THE BEST OF OUR
KNOWLEDGE. IN SOME INSTANCES THE OWNER OR SUPPLIER MAY MAKE
SUBSTITUTIONS OR EQUIPMENT ITEMS MAY VARY FROM WHAT IS SHOWN.
THEREFORE, THESE ITEMS AND DIMENSIONS SHALL BE VERIFIED WITH THE
EQUIPMENT SUPPLIER, OWNER AND/OR EQUIPMENT ROUGH-IN DRAWING.
FAILURE OF THE APPROPRIATE CONTRACTOR TO VERIFY ROUGH-INS OR
THEIR LOCATIONS SHALL PLACE THE RESPONSIBILITY FOR ANY
SUBSEQUENT RELOCATION AND/OR ADDITIONAL ROUGH-INS DIRECTLY
UPON THAT CONTRACTOR.
10. CONTRACTOR SHALL SUPPLY TO THE ARCHITECT/ENGINEER THE
REQUIRED COPIES OF SHOP DRAWINGS FOR APPROVAL SO THE QUALITY
OF INTENDED MATERIALS OR EQUIPMENT CAN BE REVIEWED BEFORE
INSTALLATION. THERE WILL BE NO INSTALLATION UNTIL SHOP DRAWINGS
HAVE BEEN SUBMITTED AND REVIEWED BY THE ARCHITECT/ENGINEER.
11. DO NOT SCALE THIS DRAWING. REFER TO ARCHITECTURAL FLOOR PLAN
FOR BUILDING DIMENSIONS.
12. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DO NOT
NECESSARILY SHOW ALL ELBOWS, OFFSETS, UNIONS, VALVES, FITTINGS,
ETC. REQUIRED TO COMPLETE THE INSTALLATION OF THE WORK. THE
SUBMISSION OF A PROPOSAL SHALL BE CONSTRUED AS EVIDENCE THAT
THE CONTRACTOR HAS FAMILIARIZED HIMSELF WITH THE PLANS AND
BUILDING SITE. CLAIMS MADE SUBSEQUENT TO THE PROPOSAL FOR
MATERIALS AND LABOR BECAUSE OF DIFFICULTIES ENCOUNTERED WILL
NOT BE RECOGNIZED IF THEY COULD HAVE BEEN FORESEEN HAD PROPER
EXAMINATION BEEN MADE.
13. THE CONTRACTOR SHALL COOPERATE FULLY AMONG ALL TRADES.
14. INSTALL 1" INSULATION WITH ALL-SERVICE JACKET ON ALL ROOF LEADERS
ABOVE CEILING.
15. INSTALL PLENUM RATED INSULATION WRAP ON ALL PLASTIC VENT,
SANITARY AND STORM PIPING LOCATED WITHIN A RETURN AIR PLENUM.
16. ALL PIPES HANGING FROM SINGLE VERTICAL RODS / HANGERS SHALL NOT
MOVE OR SWAY DURING OPERATION. SUITABLE LATERAL SUPPORTS OR
BRACING SHALL BE USED TO PREVENT SWAY OR MOVEMENT.
17. INSTALL STORM AND CONDENSATE PIPING WITH MINIMUM SLOPE OF 1/8"
PER FOOT. INSTALL SANITARY PIPING LESS THAN 3" AT 1/4" PER FOOT, 3"
TO 6" AT 1/8" PER FOOT, AND 8" AND GREATER AT 1/16" PER FOOT.
CONTRACTOR IS RESPONSIBLE FOR PROPER DRAINAGE OF ALL SYSTEMS.
18. MATERIALS, EQUIPMENT, ASSEMBLIES AND SYSTEMS SHALL MEET ALL
PERTINENT REQUIREMENTS OF NATIONALLY RECOGNIZED TESTING
ORGANIZATIONS SUCH AS UL, ASTM, ASSE, AWWE, AGA AND NFPA AS WELL
AS THE MOST CURRENT ADOPTED VERSION OF THE STATE AND LOCAL
CODES.
19. WHERE JOB CONDITIONS REQUIRE CHANGES FROM THE CONTRACT
DOCUMENTS THAT DO NOT CHANGE THE SCOPE OR NATURE OF WORK
REQUIRED, THE CONTRACTOR SHALL MAKE SUCH CHANGES WITHOUT
ADDITIONAL COST TO THE OWNER. NO OTHER CHANGES MAY BE MADE
WITHOUT WRITTEN PERMISSION FROM THE ENGINEER.
20. CONTRACTOR SHALL GUARANTEE ALL WORK FOR WHICH MATERIALS ARE
FURNISHED, FABRICATED, FIELD ERECTED, ALL FACTORY ASSEMBLED
EQUIPMENT FOR WHICH NO SPECIFIC MANUFACTURER'S GUARANTEE IS
FURNISHED, AND ALL WORK IN CONNECTION WITH INSTALLATION OF
MANUFACTURER'S GUARANTEED EQUIPMENT. THE CONTRACTOR'S
GUARANTEE SHALL LAST ONE YEAR FROM THE FINAL OWNER
ACCEPTANCE OF THE WORK AND SHALL APPLY TO ALL DEFECTS IN
MATERIALS AND WORKMANSHIP OF ANY KIND.
4000 SF
6" SD-1
4" FD-1FLOOR DRAIN 4" AD-6 AREA DRAIN
4" FS-4FLOOR SINK
4" SD-29 DECK DRAIN4" FD-3PFLOOR DRAIN
6 DFU
4" FD-13
HUB DRAIN
FLOW
CONTROL
DRAIN
4" SD-12
COMBINATION
DRAINS
STORM DRAIN4" SD-15
Room
KEYNOTE
CONTINUATION SYMBOL
ROOM NAME AND NUMBER
EXISTING PIPE TAG
ITEM TO BE DEMOLISHED
AREA NOT IN CONTRACT
PIPING BEING DEMOLISHED
ABOVE GROUND PIPING
PIPE SIZE TAG (DIAMETER)
DRAIN SIZE
PIPE RISE
PIPE DROP
PIPE TEE REDUCING 45
DEGREE TEE
45 DEGREE TEE
BELOW GROUND PIPING
PIPE INVERT ELEVATION TAG
PIPE SLOPE TAG
* NOTE *
ALL OF GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL OTHER
DRAWINGS IN THIS SET. THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS
SHEET MAY OR MAY NOT BE USED IN THIS SET OF DRAWINGS
TYPE
(SEE SCHEDULE)
ABV ABOVE
AD AREA DRAIN
ADD ADDENDUM
AFF ABOVE FINISHED FLOOR
AFUE ANNUAL FUEL UTIL. EFFICIENCY
ALT ALTERNATE
AP ACCESS PANEL
ARCH ARCHITECT/ARCHITECTURAL
BFF BELOW FINISHED FLOOR
BLW BELOW
CAP CAPACITY
CB CATCH BASIN
CTE CONNECT TO EXISTING
CW COLD WATER
DIA DIAMETER
DN DOWN
DOM. DOMESTIC
EA EACH
ELEC ELECTRICAL
EQUIP EQUIPMENT
EWH ELECTRIC WATER HEATER
EWT ENTERING WATER TEMP
(E) EXISTING
F DEGREES FAHRENHEIT
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FL FLOOR
FO FUEL OIL
FOV FUEL OIL VENT
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FS FLOOR SINK
FT FOOT/FEET
GAL GALLON
GF GAS-FIRED
GC GENERAL CONTRACTOR
GPM GALLONS PER MINUTE
GW GREASE WASTE
HB HOSE BIB
HP HORSE POWER
HTG HEATING
HTR HEATER
HW HOT WATER
ID INDIRECT
IN INCH
INV INVERT
LB POUND
LB/HR POUNDS PER HOUR
LP LOW PRESSURE
LPG LIQUEFIED PETROLEUM GAS
LWT LEAVING WATER TEMP
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTR MOTOR
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
O OXYGEN
ORD OVERFLOW ROOF DRAIN
PSD PRIMARY STORM WATER DRAIN
PIV POST INDICATOR VALVE
PLBG PLUMBING
PRESS PRESSURE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH
GAUGE
PWR POWER
RD ROOF DRAIN
REC RECESSED
RED REDUCER
RM ROOM
RW RAIN WATER
SD STORM DRAINAGE
SAN SANITARY
TDR TRENCH DRAIN
TEMP TEMPERATURE
TYP TYPICAL
UG UNDERGROUND
VAC VACUUM
V VENT
VTR VENT THROUGH ROOF
W WASTE
WCO WALL CLEAN OUT
ABBREVIATIONS
DBP DOM WATER BOOSTER PUMP
DCP DOM WATER CIRCULATING PUMP
GI GREASE INTERCEPTOR
SP SUMP PUMP
WH WALL HYDRANT
"P" - INDICATES
PRIMER CONNECTION
FIXTURE UNITS
ROOF AREA
SERVED BY DRAIN
GATE VALVE
3-WAY AIRMOTOR
CONTROLLER
ANGLE GLOBE VALVE
ANGLE HOSE VALVE
DIAPHRAGM VALVE
GLOBE VALVE
HOSE GLOBE VALVE
LOCK SHIELD VALVE
NEEDLE VALVE
PLUG VALVE
QUICK OPENING VALVE
SPRING CHECK VALVE
SWING GATE CHECK VALVE
TEMP PRESSURE RELIEF VALVE
CLG CEILING
CO CLEAN OUT
CP CIRCULATOR PUMP
D DEMOLISH OR DEMOLITION
DFU DRAINAGE FIXTURE UNITS
ETR EXISTING TO REMAIN
EWC ELECTRIC WATER COOLER
G GAS
GCO GRADE CLEAN OUT
GWH GAS WATER HEATER
GR GREASE
WSF WATER SUPPLY FIXTURES
WC WATER CLOSET
UR URINAL
TWH TANKLESS WATER HEATER
SF SQUARE FOOT
S SINK
IB ICE MAKER OUTLET BOX
LAV LAVATORY
MS MOP SINK
HD HUB DRAIN
HWR HOT WATER RETURN
NG NATURAL GAS
OSD OVERFLOW (SECONDARY)
STORM WATER DRAIN
GENERAL PLUMBING SYMBOLS PLUMBING AND PIPING SYMBOLS
PIPE ACCESSORY TAGS
DRAIN TAGS
NUMBER OF SHEET WHERE DETAIL APPEARS
NUMBER OF DETAIL ON SHEET
REVISION NUMBER - SHOWN ON PLANS
NEW CONNECTION TO EXISTING
LIMIT OF DEMOLITION
PLUMBING MATERIALS
GENERAL NOTESPLUMBING NOTES
(E)
2"
2"
4"
4"
INVERT: -105' - 1"
1/8" / 12" SLOPE
2" DOM. WM
DOMESTIC WATER METER
BALANCING VALVE
1/4 TURN BALL VALVE
CHECK VALVE
3-WAY MIXING VALVE
MOTORIZED CONTROL VALVE
3 WAY MOTORIZED CONTROL
VALVE
PRESSURE REDUCING VALVE
BUTTERFLY VALVE
2" BALANCING
2" SHUTOFF
2" CHECK
2" TMV
2" M-CNTRL
2" 3-WAY CNTRL
2" PRV
2" BUTTERFLY
CAP
PLUG
CWV
CA
CD
CDR
DCW
S-CW
DHW
DHW-140°
HWR
HWR-140°
GV
GW
NG
PD
V
SS
STM
SD
OSD
COMBINATION WASTE & VENT
COMPRESSED AIR
CONDENSATE DRAINAGE
CONDENSATE RETURN
DOMESTIC COLD WATER
SOFT COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER 140°
DOM. HOT WATER RECIRCULATION
DOM. HOT WATER RECIRC. 140°
GREASE VENT
GREASE WASTE
NATURAL GAS
PUMP DISCHARGE
SANITARY VENT
SANITARY SEWER
STEAM
STORM DRAINAGE
OVERFLOW STORM DRAINAGE
PG PROPANE GAS
RO REVERSE OSMOSIS WATER
IW INDIRECT WASTE
MA MEDICAL AIR
MO MEDICAL OXYGEN
MV MEDICAL VACUUM
WM
M
M
P
S
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
Architect:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEP Engineer: Elevator Consultant:
MES GROUP LERCH BATES
550 N. REO STREET SUITE 203
TAMPA, FL 33609
813.289.4700
216 S. JEFFERSON STREET
SUITE LL2
CHICAGO, IL 60661
312.256.1010
30% SCHEMATIC DESIGN 06/20/2024
60% DESIGN DEVELOPMENT 08/12/2024
90% QAQC REVIEW 09/23/2024
90% CONSTRUCTION DOCUMENTS 10/02/2024
100% QAQC REVIEW 10/25/2024
100% BID DOCUMENTS 01/20/2025
100% BID DOCUMENTS - REVISED BASE BID 01/24/2025
A u to d e s k D o c s /1
.6
.1
V A
H in e s E le v a to r
R e p la c e m e n t/
.6
.1
H in e s E le v a to rs M
E P
R
.r v t
/2
/2
:2
:5
A
M
P000
PLUMBING TITLE SHEET
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
ELEVATOR REPLACEMENT
5000 5TH AVE, HINES, IL 60141
578-25-003
01/24/2025 NPS PBJ
100% BID DOCUMENTS
FULLY SPRINKLERED
PLUMBING SHEET INDEX
P000 PLUMBING TITLE SHEET
PD116 MACHINE ROOM FLOOR PLAN - PLUMBING DEMOLITION
PP100 BASEMENT FLOOR PLAN - PLUMBING - OVERALL
PP100.1 ENLARGED BASEMENT FLOOR PLAN - PLUMBING
FIRE RATING LEGEND
1 HOUR FIRE WALL
2 HOUR FIRE WALL
Revisions: Date:
Date Signed: 01/24/2025 License Expires: 02/28/2027
(E) 2" SD DN FROM
ROOF DRAIN
(E) 2" SD DN FROM
ROOF DRAIN
(E)FS
ENGINEERING
MECHANICAL
ROOM
(E) 2" SD DN TO
FLR BELOW
OPEN TO BELOW
OPEN TO BELOW
(E) 2" SD
H I J
A. EXISTING PIPE ROUTING AND ASSOCIATED COMPONENTS SHOWN ON
DRAWINGS ARE APPROXIMATE LOCATIONS AND ARE PROVIDED FOR
REFERENCE USE ONLY. FIELD VERIFY AND COORDINATE WITH EXACT
LOCATIONS, ELEVATIONS, SIZES, AND CONDITIONS OF EXISTING
COMPONENTS.
PLUMBING GENERAL NOTES
1. EXISTING FLOOR SINK SHALL BE DEMOLISHED COMPLETELY. REMOVE
EXISTING SANITARY DRAINAGE PIPING BACK TO NEAREST MAIN. CAP AND
SEAL EXISTING SANITARY PIPING. FLOOR SHALL BE PATCHED TO MATCH
EXISTING CONSTRUCTION.
PLUMBING DEMOLITION KEYNOTES -
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
Architect:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEP Engineer: Elevator Consultant:
MES GROUP LERCH BATES
550 N. REO STREET SUITE 203
TAMPA, FL 33609
813.289.4700
216 S. JEFFERSON STREET
SUITE LL2
CHICAGO, IL 60661
312.256.1010
30% SCHEMATIC DESIGN 06/20/2024
60% DESIGN DEVELOPMENT 08/12/2024
KEY PLAN
NO SCALE
N
90% QAQC REVIEW 09/23/2024
90% CONSTRUCTION DOCUMENTS 10/02/2024
100% QAQC REVIEW 10/25/2024
100% BID DOCUMENTS 01/20/2025
100% BID DOCUMENTS - REVISED BASE BID 01/24/2025
A u to d e s k D o c s /1
.6
.1
V A
H in e s E le v a to r
R e p la c e m e n t/
.6
.1
H in e s E le v a to rs M
E P
R
.r v t
/2
/2
:2
:5
A
M
PD116
MACHINE ROOM FLOOR PLAN -
PLUMBING DEMOLITIONGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
ELEVATOR REPLACEMENT
5000 5TH AVE, HINES, IL 60141
578-25-003
01/24/2025 NPS PBJ
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"PD116
1 MACHINE ROOM FLOOR PLAN - PLUMBING DEMOLITION
N
Revisions: Date:
PP100.1
A
B C D E F G H I J K L M N O P Q
A. EXISTING PIPE ROUTING AND ASSOCIATED COMPONENTS SHOWN ON
DRAWINGS ARE APPROXIMATE LOCATIONS AND ARE PROVIDED FOR
REFERENCE USE ONLY. FIELD VERIFY AND COORDINATE WITH EXACT
LOCATIONS, ELEVATIONS, SIZES, AND CONDITIONS OF EXISTING
COMPONENTS.
PLUMBING GENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
Architect:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEP Engineer: Elevator Consultant:
MES GROUP LERCH BATES
550 N. REO STREET SUITE 203
TAMPA, FL 33609
813.289.4700
216 S. JEFFERSON STREET
SUITE LL2
CHICAGO, IL 60661
312.256.1010
30% SCHEMATIC DESIGN 06/20/2024
60% DESIGN DEVELOPMENT 08/12/2024
KEY PLAN
NO SCALE
N
90% QAQC REVIEW 09/23/2024
90% CONSTRUCTION DOCUMENTS 10/02/2024
100% QAQC REVIEW 10/25/2024
100% BID DOCUMENTS 01/20/2025
100% BID DOCUMENTS - REVISED BASE BID 01/24/2025
A u to d e s k D o c s /1
.6
.1
V A
H in e s E le v a to r
R e p la c e m e n t/
.6
.1
H in e s E le v a to rs M
E P
R
.r v t
/2
/2
:2
:0
A
M
PP100
BASEMENT FLOOR PLAN -
PLUMBING - OVERALLGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
ELEVATOR REPLACEMENT
5000 5TH AVE, HINES, IL 60141
578-25-003
01/24/2025 NPS PBJ
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/16" = 1'-0"PP100
1 BASEMENT FLOOR PLAN - PLUMBING - OVERALL
N
Revisions: Date:
H I
J K
(E)FD
(E)FD
(E)FD
ELEVATOR P3 ELEVATOR P2 ELEVATOR P1
ELEVATOR P4 ELEVATOR P5
ELEVATOR S6
ELEVATOR S7
ELEVATOR S8
BASEMENT ELEVATOR
LOBBY
VERTICAL SPACE CHASE
C099
ENGINEERING ELECTRICAL
CLOSET
C003A
NUTRITION/FOOD DISH
ROOM
C032A
VERTICAL SPACE CHASE
RCCB44C
VERTICAL SPACE CHASE
C004A
ENGINEERING STORAGE
C004
SPD SERVICE OXYGEN TANK
STORAGE
C003
COMMON SPACE CORRIDOR
RCCB15R
SURGICAL OFFICE
B019B
SURGICAL OFFICE
B019C
SURGICAL OFFICE
B019
SURGICAL
RCCB28R
SURGICAL RECOVERY
A001
EMS TOILET
D001
NUTRITION/FOOD PATIENT
DINING
D009A
EDUCATION ENTRY
RCCB35R
EDUCATION TRAINING ROOM
D009
V E
R T
IC
A
L S
P A
C E
C H
A S
E
R C
C B
C
COMMON SPACE CORRIDOR
RCCB14R
H I J K
A. EXISTING PIPE ROUTING AND ASSOCIATED COMPONENTS SHOWN ON
DRAWINGS ARE APPROXIMATE LOCATIONS AND ARE PROVIDED FOR
REFERENCE USE ONLY. FIELD VERIFY AND COORDINATE WITH EXACT
LOCATIONS, ELEVATIONS, SIZES, AND CONDITIONS OF EXISTING
COMPONENTS.
PLUMBING GENERAL NOTES
1. EXISTING FLOOR DRAIN SHALL REMAIN. PER 2022 ASME A17.1 SECTION
2.2.2.5, "IN ELEVATORS PROVIDED WITH FIREFIGHTER'S EMERGENCY
OPERATION, A DRAIN OR SUMP PUMP SHALL BE PROVIDED." THE EXISTING
FLOOR DRAIN SHALL REMAIN TO MEET ELEVATOR CODE REQUIREMENTS.
PLUMBING DEMOLITION KEYNOTES -
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
Architect:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEP Engineer: Elevator Consultant:
MES GROUP LERCH BATES
550 N. REO STREET SUITE 203
TAMPA, FL 33609
813.289.4700
216 S. JEFFERSON STREET
SUITE LL2
CHICAGO, IL 60661
312.256.1010
30% SCHEMATIC DESIGN 06/20/2024
60% DESIGN DEVELOPMENT 08/12/2024
KEY PLAN
NO SCALE
N
90% QAQC REVIEW 09/23/2024
90% CONSTRUCTION DOCUMENTS 10/02/2024
100% QAQC REVIEW 10/25/2024
100% BID DOCUMENTS 01/20/2025
100% BID DOCUMENTS - REVISED BASE BID 01/24/2025
A u to d e s k D o c s /1
.6
.1
V A
H in e s E le v a to r
R e p la c e m e n t/
.6
.1
H in e s E le v a to rs M
E P
R
.r v t
/2
/2
:2
:0
A
M
PP100.1
ENLARGED BASEMENT FLOOR
PLAN - PLUMBINGGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
ELEVATOR REPLACEMENT
5000 5TH AVE, HINES, IL 60141
578-25-003
01/24/2025 NPS PBJ
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"PP100.1
1 ENLARGED BASEMENT FLOOR PLAN - PLUMBING
N
Revisions: Date:
| Sheets |
| P000 - PLUMBING TITLE SHEET |
| PD116 - MACHINE ROOM FLOOR PLAN - PLUMBING DEMOLITION |
| PP100 - BASEMENT FLOOR PLAN - PLUMBING - OVERALL |
| PP100.1 - ENLARGED BASEMENT FLOOR PLAN - PLUMBING |