This document is a VA Hospital Policy Memorandum detailing safety procedures for cutting, welding, and other hot work operations. The policy establishes strict guidelines for performing hot work in non-designated areas at the Hines VA Hospital, requiring a permit from the Safety Section for all such activities outside of six specifically designated shop areas. Key requirements include obtaining authorization 1-2 days prior to work, ensuring fire safety precautions are taken, maintaining fire extinguishers nearby, and conducting a thorough inspection 30 minutes after work completion.

The memorandum outlines comprehensive responsibilities for various personnel, including the Safety Section, Facilities Management Service Chief, contractors, and project engineers. Specific safety protocols include clearing work areas of combustibles within a 35-foot radius, protecting floors, covering wall and floor openings, and ensuring equipment is clean and free of flammable materials. The policy references NFPA 51B standards and OSHA regulations, and was issued on March 27, 2013, with a recertification date of March 27, 2016, indicating it was part of the ongoing safety management processes for the VA Hospital's maintenance and renovation activities.

View the file

Other files

File Type Posted
36C25225R0036 0007.docx DOCX document
S06 36C25225R0036 006_Att02 25-0725 Supplemental Sketches.pdf PDF
BLDG200F13R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att07 26 22 00 Low-Voltage Transformers.pdf PDF
BLDG200F3R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att05 Physical Access Control Clarifications.pdf PDF
S06 36C25225R0036 006_Att12 Sole Source Listing__full.e.pdf PDF
S06 36C25225R0036 006_Att06 26 43 13 Surge Protection Devices - Addendum 1.pdf PDF
BLDG200F7R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att11 Photos_Existing Conditions.pdf PDF
BLDG200F6R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att01 Finish and Lighting Changes.pdf PDF
BLDG200 F10R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att09 Hines State Tax Exempt 2025.pdf PDF
BLDG200F4R2010.xls XLS spreadsheet
BLDG200F11R2010.xls XLS spreadsheet
BLDG200F9R2010.xls XLS spreadsheet
BLDG200BSMTR2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att10 OFFER SCHEDULE.R1 578-25-003 B200 Elevators.pdf PDF
BLDG200F2R2010.xls XLS spreadsheet
BLDG200F1R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att08 GKT15-30W-10_Specification.pdf PDF
BLDG200F8R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att04 _ Wage Rates IL20250009.R3 2025.08.01.pdf PDF
BLDG200F14R2010.xls XLS spreadsheet
BLDG200F5R2010.xls XLS spreadsheet
36C25225R0036 0006.docx DOCX document
S06 36C25225R0036 0005.docx DOCX document
S06 36C25225R0036 0005.pdf PDF
S06 36C25225R0036 004 578-25-003_Att Finish Schedule.pdf PDF
36C25225R0036 0004.docx DOCX document
S06 36C25225R0036 003 Att2 Sign-in Site Visit_02_rev.pdf PDF
36C25225R0036 0003.docx DOCX document
S06 36C25225R0036 003 Att1 Sign-in Site Visit_01.pdf PDF
S06 36C25225R0036 002 Att2 Sign-in Site Visit_02.pdf PDF
S06 36C25225R0036 002 Att1 Sign-in Site Visit_01.pdf PDF
S06 36C25225R0036 002 578-25-003.docx DOCX document
S06 001 Att1 Sign-in Site Visit_01 for 578-25-003 Elevators 2025.06.18.pdf PDF
36C25225R0036 0001.docx DOCX document
36C25225R0036_3.docx DOCX document
S02 Sol R0036 AttA VAAR 852.219-75 Certification 578-25-003.docx DOCX document
S02 Sol R0036 AttC Contractor EMR Safety Info 578-25-003.docx DOCX document
S02 Sol R0036 AttE SOW.Att00_Descriptive Project Scope of Work 578-25-003_r.pdf PDF
S02 Sol R0036 AttE SOW.Att15d_578-25-003 100 perc DWGS Part 4of5_2025.01.24.pdf PDF
S02 Sol R0036 AttE SOW.Att18b_Building 220 Colored Space Drawings.pdf PDF
S02 Sol R0036 AttB Contractor Info 578-25-003.docx DOCX document
36C25225R0036_3.docx DOCX document
S02 Sol R0036 AttE SOW.Att09_Infection Control Risk Assessment_ICRA-1.3.pdf PDF
S02 Sol R0036 AttE SOW.Att14a _578-25-003_Replace Elevators B200_SPECS VOL 1of 2_updated.pdf PDF
S02 Sol R0036 AttE SOW.Att07_Pre-Construction Risk Assessment_PCRA 1.1.pdf PDF
Show 40 more

Latest 50 of 73 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA Hospital Policy Memorandum 578-03-001-089 (R-2) Hines, IL March 27, 2013

Cutting, Welding and Other Hot Work

Changes:

• Removed paragraph 2a (7) “Construction areas, small projects, and or emergency repair locations.

Education / Training:

• The Safety Officer will ensure review of changes by FMS staff and contractors affected.

Related Forms: None

KEYWORDS: welding, hot work, burn permits

VA Hospital Policy Memorandum 578-03-001-089 (R-2) Hines IL 60141 March 27, 2013

Cutting, Welding and Other Hot Work

1. PURPOSE: To establish policy and procedures for cutting, welding and other hot work operations in non-designated areas and to assure that all supervisors, employees, and contractors take proper precautions when any cutting, welding, or other hot work is to be accomplished.

2. POLICY:

a. Designated welding areas include the following Facilities Management Service shops/areas:

(1) Machine Repair Shop,

(2) Pipefitting Shop,

(3) Air Conditioning and Refrigeration Shop,

(4) Motor Transportation Shop,

(5) Biomedical Section Repair Area, and

(6) Boiler Plant.

b. In order to minimize the risk of fires during construction, alteration, demolition operations, or making repairs while performing hot work such as cutting, welding, thermit welding, brazing, soldering, grinding, thermal spraying, thawing pipe, or any other similar work, procedures and controls are hereby established to control all cutting and welding operations conducted in areas not specifically designated for this type of operation.

c. Cutting, welding, and other hot work shall NOT be permitted in the following areas:

(1) In the presence of explosive atmosphere (mixtures of flammable gases, vapors, liquids, or dust with air);

(2) In areas not authorized by the Safety Section; and

(3) In buildings equipped with a sprinkler system while the sprinkler system is impaired.

d. A cutting, welding, and other hot work permit shall be obtained from the Safety Section, located in Building 2, within 1-2 days prior to any and all cutting and welding (see Attachment A) in non-designated areas. The original, or a copy, must be immediately available while work is being done in those non-designated areas. A copy of the permit shall be retained in the files of the Safety Section.

2.

e. The Safety Officer, other designated fire safety personnel in the Safety section and FMS employees at/or above the section chief level shall have the authority to stop cutting, welding, and other hot work operations that are being accomplished without a permit and such operations that do not meet standards set forth in NFPA 51B.

f. Cutting, welding, and other hot work operations performed by outside contractors, i.e.

non-Hines VA employees, in non-designated areas on off tours (nights, weekends and holidays) MUST be directly supervised/observed by the project engineer even if a fire watch is not required.

3. RESPONSIBILITES:

a. The Safety Section is responsible for:

(1) providing oversight of the overall hazardous operations involving cutting and welding operations within the hospital complex, and

(2) authorizing cutting, welding, and other hot work operations in areas not specifically designed or approved for such processes

b. The Chief, Facilities Management Service is responsible for:

(1) ensuring that maintenance personnel are trained in proper welding, cutting and other hot work procedures and comply with the requirements of this policy, and

(2) ensuring that an individual from the requesting shop or department shall supply an individual for safety operations who is knowledgeable and capable of operating the fire extinguisher in their possession .in the event that a fire watch is required during operations in both designated and non-designated areas.

d. The contracting officer’s representative (COR)/project engineer is responsible for:

(1) assuring that all contractors follow the procedures in this policy, and

(2) requesting authorization, i.e. burn permit is secured for cutting, welding, and other hot work operations, prior to the initiation of work in non-designated areas, to assure conditions are safe;

(3) supervising/observing cutting, welding and other hot work operations done in non-designated areas during off tours (nights, weekends and holidays); and

(4) participating in any fire watches required for work being done by non-VA employees or ensuring that coverage can be provided by appropriate personnel in the Safety Section.

3.

e. Contractors are responsible for:

(1) Instructing their employees on this policy prior to the initiation of any cutting, welding or hot work, and

(2) Requesting authorization, i.e. burn permit for cutting, welding, and other hot work prior to the initiation of work;

(3) Ensuring that individuals involved in hot work operations shall be trained in the safe operation of their equipment and in the safe use of the process;

(4) Ensuring that individuals involved in hot work operations have an awareness of the inherent risks involved and understand the emergency procedures in the event of a fire;

(5) Ensuring the original/copy of the burn permit is available at the work site; and

(6) Ensuring that the original/copy of the burn permit is returned to the Safety Office upon for record keeping.

4. ACTIONS:

a. Upon issuance of cutting and welding permit, the name of the individual receiving the permit and the date and time of issuance shall be entered in the Safety Section Hot Work Permit Log. A copy of the permit shall be retained in the files of the Safety Section.

b. For all cutting, welding, and other hot work operations not in approved designated areas, the Safety Section will be notified at extension 24301 or extension 25614 at least 30 minutes prior to any operation. NOTE: If this work has been scheduled in advance for the off tours, the project engineer must be present during the work.

c. When work cannot be moved practically, the work area will be made fire safe by removing or covering combustibles within a range of possible sparks.

d. The area around any operation will be cleared of dust or lint to exceed the possible range of sparks by three (3) feet.

e. Wherever there are floor openings or cracks in the flooring that cannot be closed, precautions shall be taken so that no readily combustible materials on the floor below will be exposed to sparks which might drop through the floor. The same precautions shall be observed with regard to cracks or holes in walls, open doorways and open or broken windows.

f. Where combustible materials such as paper clippings, wood shavings, or textile fibers are on the floor, the floor shall be swept clean for a radius of 35 feet (10.7 m). Combustible floors shall be kept wet, covered with damp sand, or protected by fire-resistant shields. Where floors have been wet down, personnel operating arc welding or cutting equipment shall be protected from possible shock.

4.

g. When required based on the assessment of the Safety Section personnel (see Attachment A), the fire watch will be designed to have appropriate personnel present, as detailed above, with an approved fire extinguisher for the duration of the operation and for thirty (30) minutes after the operation is complete.

h. When cutting or welding overhead, an approved fire blanket will be placed below to cover the area affected. Note: The blanket will either be provided by the contractor or the VA employees doing the work.

i. Upon the completion of operation, an inspection will be made for any hot materials and areas by the fire watch individual before securing the area.

5. REFERENCES:

a. NFPA 51B, Standard for Fire Prevention During Welding, Cutting, and Other Hot Work, 2009 Edition

b. 29 CFR OSHA 1910.252(a)(2)(i) General Requirements: Welding, Cutting & Brazing

6. RESCISSION: Policy Memorandum 578-03-001-089 (R-1) Cutting, Welding, and Other Hot Work, dated March 13, 2010.

7. RECERTIFICATION: This Policy Memorandum will be re-certified on or before March 27,

8. FOLLOW-UP RESPONSIBILITY: Safety Section (001S)

Joan M. Ricard, FACHE Hospital Director

Attachments

Distribution: Hines Intranet Website and Service Chiefs/Service Line Managers via E-mail

5.

Policy Memorandum 578-03-001-089(R-2) March 27, 2013 Attachment A

PERMIT FOR CUTTING AND WELDING

WITH PORTABLE GAS OR ARC EQUIPMENT

Date

Building

Department Floor

Work to be done

Special precautions

The location where this work is to be done has been examined, necessary precautions taken, and permission is granted for this work. (See other side.)

Permit expires

Signed (Individual responsible for authorizing welding and cutting)

Time started Completed

FINAL CHECK-UP

Work areas and all adjacent areas to which sparks and heat might have spread (including floors above and below and on opposite sides of walls) were inspected 30 minutes after the work was completed and were found fire safe.

Signed (Individual Responsible for Permit)

6.

ATTENTION

Before approving any cutting and welding permit, the fire safety officer/ appointee shall inspect the work area and confirm that precautions have been taken to prevent fire in accordance with

NFPA 51B.

PRECAUTIONS

Sprinklers in service Cutting and welding equipment in good repair

WITHIN 35 FT. OF WORK

Floors swept clean of combustibles Combustible floors wet down, covered with damp sand, metal or other shields No combustible material or flammable liquids Combustibles and flammable liquids protected with covers or guards All wall and floor openings covered Covers suspended beneath work to collect sparks

WORK ON WALLS OR CEILINGS

Construction non-combustible and without combustible covering Combustibles moved away from opposite side of wall

WORK ON ENCLOSED EQUIPMENT

(Tanks, containers, ducts, dust collectors, etc.)

Equipment cleaned of all combustibles Containers purged of flammable vapors

FINAL CHECK-UP

To be made 30 minutes after completion of any operation unless fire watch is provided.