This technical specification section (26 43 13) details requirements for Surge Protective Devices (SPD) for the Elevator Replacement project at Edward Hines VAMC in Illinois. The document specifies comprehensive technical requirements for panelboard-mounted surge protective devices, including compliance with UL 1449 and IEEE standards. Key product specifications include a modular design with field-replaceable modules, minimum 120kA surge current per phase, redundant suppression circuits, LED indicator lights, an audible alarm, and Form-C contacts for remote monitoring of protection status.

The specification outlines detailed installation, testing, and acceptance requirements, mandating that installation must conform to the National Electrical Code (NEC) and manufacturer instructions. The contractor must provide visual inspections, verify electrical connections, clean enclosures, and demonstrate proper device operation. Additionally, the specification requires a factory-trained technician to provide a 2-hour training session on SPD maintenance and operation. The document is part of Solicitation 36C25225R0036 for Project 578-25-003 to Renovate Elevators in Building 200 at the Hines, Illinois VA Medical Center.

View the file

Other files

File Type Posted
36C25225R0036 0007.docx DOCX document
S06 36C25225R0036 006_Att02 25-0725 Supplemental Sketches.pdf PDF
BLDG200F13R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att07 26 22 00 Low-Voltage Transformers.pdf PDF
BLDG200F3R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att05 Physical Access Control Clarifications.pdf PDF
S06 36C25225R0036 006_Att12 Sole Source Listing__full.e.pdf PDF
BLDG200F7R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att11 Photos_Existing Conditions.pdf PDF
BLDG200F6R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att01 Finish and Lighting Changes.pdf PDF
BLDG200 F10R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att09 Hines State Tax Exempt 2025.pdf PDF
BLDG200F4R2010.xls XLS spreadsheet
BLDG200F11R2010.xls XLS spreadsheet
BLDG200F9R2010.xls XLS spreadsheet
BLDG200BSMTR2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att10 OFFER SCHEDULE.R1 578-25-003 B200 Elevators.pdf PDF
BLDG200F2R2010.xls XLS spreadsheet
BLDG200F1R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att08 GKT15-30W-10_Specification.pdf PDF
BLDG200F8R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att04 _ Wage Rates IL20250009.R3 2025.08.01.pdf PDF
BLDG200F14R2010.xls XLS spreadsheet
BLDG200F5R2010.xls XLS spreadsheet
36C25225R0036 0006.docx DOCX document
S06 36C25225R0036 0005.docx DOCX document
S06 36C25225R0036 0005.pdf PDF
S06 36C25225R0036 004 578-25-003_Att Finish Schedule.pdf PDF
36C25225R0036 0004.docx DOCX document
S06 36C25225R0036 003 Att2 Sign-in Site Visit_02_rev.pdf PDF
36C25225R0036 0003.docx DOCX document
S06 36C25225R0036 003 Att1 Sign-in Site Visit_01.pdf PDF
S06 36C25225R0036 002 Att2 Sign-in Site Visit_02.pdf PDF
S06 36C25225R0036 002 Att1 Sign-in Site Visit_01.pdf PDF
S06 36C25225R0036 002 578-25-003.docx DOCX document
S06 001 Att1 Sign-in Site Visit_01 for 578-25-003 Elevators 2025.06.18.pdf PDF
36C25225R0036 0001.docx DOCX document
36C25225R0036_3.docx DOCX document
S02 Sol R0036 AttA VAAR 852.219-75 Certification 578-25-003.docx DOCX document
S02 Sol R0036 AttC Contractor EMR Safety Info 578-25-003.docx DOCX document
S02 Sol R0036 AttE SOW.Att00_Descriptive Project Scope of Work 578-25-003_r.pdf PDF
S02 Sol R0036 AttE SOW.Att15d_578-25-003 100 perc DWGS Part 4of5_2025.01.24.pdf PDF
S02 Sol R0036 AttE SOW.Att12_Cutting Welding and Other Hot Work.pdf PDF
S02 Sol R0036 AttE SOW.Att18b_Building 220 Colored Space Drawings.pdf PDF
S02 Sol R0036 AttB Contractor Info 578-25-003.docx DOCX document
36C25225R0036_3.docx DOCX document
S02 Sol R0036 AttE SOW.Att09_Infection Control Risk Assessment_ICRA-1.3.pdf PDF
S02 Sol R0036 AttE SOW.Att14a _578-25-003_Replace Elevators B200_SPECS VOL 1of 2_updated.pdf PDF
S02 Sol R0036 AttE SOW.Att07_Pre-Construction Risk Assessment_PCRA 1.1.pdf PDF
Show 40 more

Latest 50 of 73 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

26 43 13 - 1

SECTION 26 43 13

SURGE PROTECTIVE DEVICES

PART 1 - GENERAL

1.1 DESCRIPTION

A. This section specifies the furnishing, installation, and connection of Type 2 Surge Protective

Devices, as defined in NFPA 70, and indicated as SPD in this section.

1.2 RELATED WORK

A. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS: Requirements that apply to all sections of Division 26.

B. Section 26 24 16, PANELBOARDS: For factory-installed or external SPD.

1.3 QUALITY ASSURANCE

A. Quality Assurance shall be in accordance with Paragraph, QUALIFICATIONS (PRODUCTS AND

SERVICES) in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS.

1.4 SUBMITTALS

A. Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 11, REQUIREMENTS

FOR ELECTRICAL INSTALLATIONS, and the following requirements:

1. Shop Drawings:

a. Submit sufficient information to demonstrate compliance with drawings and specifications.

b. Include electrical ratings and device nameplate data.

2. Manuals:

a. Submit, simultaneously with the shop drawings, companion copies of complete maintenance and operating manuals including technical data sheets, wiring diagrams, and information for ordering replacement parts.

b. If changes have been made to the maintenance and operating manuals originally submitted, submit updated maintenance and operating manuals two weeks prior to the final inspection.

3. Certifications: Two weeks prior to final inspection, submit the following.

a. Certification by the manufacturer that the SPD conforms to the requirements of the drawings and specifications.

b. Certification by the Contractor that the SPD has been properly installed.

1.5 APPLICABLE PUBLICATIONS

A. Publications listed below (including amendments, addenda, revisions, supplement and errata) form a part of this specification to the extent referenced. Publications are referenced in the text by the basic designation only.

B. Institute of Engineering and Electronic Engineers (IEEE):

Elevator Replacement Edward Hines VAMC Hines, Illinois 578-25-003

Addendum 1 07-30-25 11-01-22

Solicitation 36C25225R0036 Project 578-25-003 Renovate Elevators in Bldg 200 Amendment P0006 - Attachment 6

26 43 13 - 2

IEEE C62.41.2-02 ...................... Characterization of Surges in Low-Voltage (1000 V and Less)

AC Power Circuits

IEEE C62.45-08 ......................... Surge Testing for Equipment Connected to Low-Voltage (1000 V and Less) AC Power Circuits

C. National Fire Protection Association (NFPA):

70-23 .......................................... National Electrical Code (NEC)

D. Underwriters Laboratories, Inc. (UL):

UL 1283-17 ................................ Electromagnetic Interference Filters

UL 1449-21 ................................ Surge Protective Devices

PART 2 - PRODUCTS

2.1 PANELBOARD SPD

A. General Requirements:

1. Comply with UL 1449 and IEEE C62.41.2.

2. Modular design with field-replaceable modules, or non-modular design.

3. Fuses, rated at 200 kA interrupting capacity.

4. Bolted compression lugs for internal wiring.

5. Integral disconnect switch.

6. Redundant suppression circuits.

7. LED indicator lights for power and protection status.

8. Audible alarm, with silencing switch, to indicate when protection has failed.

9. Form-C contacts rated at 5 A and 250-V ac, one normally open and one normally closed, for remote monitoring of protection status. Contacts shall reverse on failure of any surge diversion module or on opening of any current-limiting device.

10. Four-digit transient-event counter.

B. Surge Current per Phase: Minimum 120kA per phase.

2.2 ENCLOSURES

A. Enclosures: NEMA 1.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Installation shall be in accordance with the NEC, as shown on the drawings, and manufacturer’s instructions.

B. Factory-installed SPD: Switchgear, switchboard, or panelboard manufacturer shall install SPD at the factory.

C. Field-installed SPD: Contractor shall install SPD with conductors or buses between SPD and points of attachment as short and straight as possible. Do not exceed manufacturer's recommended lead length. Do not bond neutral and ground.

Elevator Replacement Edward Hines VAMC Hines, Illinois 578-25-003

Addendum 1 07-30-25 11-01-22

Solicitation 36C25225R0036 Project 578-25-003 Renovate Elevators in Bldg 200

26 43 13 - 3

1. Provide a circuit breaker as a dedicated disconnecting means for TVSS as shown on drawings.

D. Do not perform insulation resistance tests on switchgear, switchboards, panelboards, or feeders with the SPD connected. Disconnect SPD before conducting insulation resistance tests, and reconnect SPD immediately after insulation resistance tests are complete.

3.2 ACCEPTANCE CHECKS AND TESTS

A. Perform in accordance with the manufacturer's recommendations. In addition, include the following:

1. Visual Inspection and Tests:

a. Compare equipment nameplate data with specifications and approved shop drawings.

b. Inspect physical, electrical, and mechanical condition.

c. Verify that disconnecting means and feeder size and maximum length to SPD corresponds to approved shop drawings.

d. Verifying tightness of accessible bolted electrical connections by calibrated torque-wrench method.

e. Vacuum-clean enclosure interior. Clean enclosure exterior.

f. Verify the correct operation of all sensing devices, alarms, and indicating devices.

3.3 FOLLOW-UP VERIFICATION

A. After completion of acceptance checks and tests, the Contractor shall show by demonstration in service that SPD are in good operating condition and properly performing the intended function.

3.4 INSTRUCTION

A. Provide the services of a factory-trained technician for one 2-hour training period for instructing personnel in the maintenance and operation of the SPD, on the date requested by the //Resident

Engineer// //COR//.

---END---

Elevator Replacement Edward Hines VAMC Hines, Illinois 578-25-003

Addendum 1 07-30-25 11-01-22

Solicitation 36C25225R0036 Project 578-25-003 Renovate Elevators in Bldg 200