S06 36C25225R0036 006_Att01 Finish and Lighting Changes.pdf

PDF 127 KB Posted

Attached to
Z1DA--578-25-003 Renovate Elevators B200 (Construction) at the Hines VA Hospital in Hines, IL
Solicitation number
36C25225R0036_3
Issued by

About this file

This document is an amendment to a solicitation for renovating elevators in Building 200, specifically detailing elevator cab finishes and lighting changes for passenger and service elevators. The amendment covers detailed specifications for elevator interiors, including changes to center panel materials (from EP-4 stainless steel to EP-3 fused nickel silver for passenger elevators), handrail specifications (HR-10 1.5" round stainless steel for passenger elevators and BR-10 3" x ¼" flat stainless steel for service elevators), and ceiling configurations. For passenger elevators (P-1 through P-5) and most service elevators (S-6, S-7), the specification mandates Forms & Surfaces 6-Panel stainless steel ceiling with satin finish, six downlights, and perimeter accent lighting. Service elevator S-8 will maintain its existing top of elevator car configuration with wall-mounted lights, which will be refurbished with new translucent panels and re-lamped to LED.

View the file

Other files

File Type Posted
36C25225R0036 0007.docx DOCX document
S06 36C25225R0036 006_Att02 25-0725 Supplemental Sketches.pdf PDF
BLDG200F13R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att07 26 22 00 Low-Voltage Transformers.pdf PDF
BLDG200F3R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att05 Physical Access Control Clarifications.pdf PDF
S06 36C25225R0036 006_Att12 Sole Source Listing__full.e.pdf PDF
S06 36C25225R0036 006_Att06 26 43 13 Surge Protection Devices - Addendum 1.pdf PDF
BLDG200F7R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att11 Photos_Existing Conditions.pdf PDF
BLDG200F6R2010.xls XLS spreadsheet
BLDG200 F10R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att09 Hines State Tax Exempt 2025.pdf PDF
BLDG200F4R2010.xls XLS spreadsheet
BLDG200F11R2010.xls XLS spreadsheet
BLDG200F9R2010.xls XLS spreadsheet
BLDG200BSMTR2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att10 OFFER SCHEDULE.R1 578-25-003 B200 Elevators.pdf PDF
BLDG200F2R2010.xls XLS spreadsheet
BLDG200F1R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att08 GKT15-30W-10_Specification.pdf PDF
BLDG200F8R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att04 _ Wage Rates IL20250009.R3 2025.08.01.pdf PDF
BLDG200F14R2010.xls XLS spreadsheet
BLDG200F5R2010.xls XLS spreadsheet
36C25225R0036 0006.docx DOCX document
S06 36C25225R0036 0005.docx DOCX document
S06 36C25225R0036 0005.pdf PDF
S06 36C25225R0036 004 578-25-003_Att Finish Schedule.pdf PDF
36C25225R0036 0004.docx DOCX document
S06 36C25225R0036 003 Att2 Sign-in Site Visit_02_rev.pdf PDF
36C25225R0036 0003.docx DOCX document
S06 36C25225R0036 003 Att1 Sign-in Site Visit_01.pdf PDF
S06 36C25225R0036 002 Att2 Sign-in Site Visit_02.pdf PDF
S06 36C25225R0036 002 Att1 Sign-in Site Visit_01.pdf PDF
S06 36C25225R0036 002 578-25-003.docx DOCX document
S06 001 Att1 Sign-in Site Visit_01 for 578-25-003 Elevators 2025.06.18.pdf PDF
36C25225R0036 0001.docx DOCX document
36C25225R0036_3.docx DOCX document
S02 Sol R0036 AttA VAAR 852.219-75 Certification 578-25-003.docx DOCX document
S02 Sol R0036 AttC Contractor EMR Safety Info 578-25-003.docx DOCX document
S02 Sol R0036 AttE SOW.Att00_Descriptive Project Scope of Work 578-25-003_r.pdf PDF
S02 Sol R0036 AttE SOW.Att15d_578-25-003 100 perc DWGS Part 4of5_2025.01.24.pdf PDF
S02 Sol R0036 AttE SOW.Att12_Cutting Welding and Other Hot Work.pdf PDF
S02 Sol R0036 AttE SOW.Att18b_Building 220 Colored Space Drawings.pdf PDF
S02 Sol R0036 AttB Contractor Info 578-25-003.docx DOCX document
36C25225R0036_3.docx DOCX document
S02 Sol R0036 AttE SOW.Att09_Infection Control Risk Assessment_ICRA-1.3.pdf PDF
S02 Sol R0036 AttE SOW.Att14a _578-25-003_Replace Elevators B200_SPECS VOL 1of 2_updated.pdf PDF
S02 Sol R0036 AttE SOW.Att07_Pre-Construction Risk Assessment_PCRA 1.1.pdf PDF
Show 40 more

Latest 50 of 73 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Elevator cab finishes and lighting changes:

Sheet AI201

a. Detail 1/AI201: Cab Interiors – Passenger

i. ELEVATIONS - Center panel directly behind the handrails on both side elevations and the back elevation shall be “EP-3 FUSED NICKEL SILVER” ilo

“EP-4 STAINLESS STEEL”.

ii. CEILING PLAN – All ceilings in passenger elevators (P-1, P-2, P-3, P-4, P-5) shall be Forms & Surfaces 6-Panel stainless steel ceiling, satin finish with six

(6) downlights and perimeter accent lighting.

b. Detail 2/AI202: Cab Interiors – Service

i. ELEVATIONS – All handrails in service elevators (S-6, S-7, S-8) on both side elevations and the back elevation shall be “BR-10 BUMPRAIL” ilo “HR-10

HANDRAIL”.

i. CEILING PLAN – Ceilings in service elevators (S-6, S-7) shall be Forms & Surfaces 6-Panel stainless steel ceiling, satin finish with six (6) downlights and perimeter accent lighting.

ii. CEILING PLAN – No ceiling to be provided in service elevator (S-8). The existing top of elevator car configuration with extended doghouse and wall mounted lights on the side elevations to be maintained. The top of wall light fixtures shall be refurbished with new translucent panel and shall be re-lamped to LED.

Sheet AI202

a. Finish Schedule

i. All passenger elevator handrails shall be “HR-10”, 1.5” round stainless steel with radiused end returns.

ii. All service elevator handrails shall be “BR-10”, 3” x ¼” flat stainless steel with radiused end returns.

Specification Section 14 21 10:

a. Paragraph 2.44 – Car Enclosure: Alternate #4, New Passenger/Service Elevators:

i. Replace Paragraph J.1 for the following:

1. For all passenger elevators (P-1, P-2, P-3, P-4, P-5) and service elevators (S-6, S-7) the ceiling system & lighting shall be “Forms & Surfaces” 6-Panel stainless steel ceiling, satin finish with six (6) downlights and perimeter accent lighting.

ii. Delete the following from Paragraph J.2:

Solicitation 36C25225R0036 Project 578-25-003 Renovate Elevators in Bldg 200 Amendment P0006 - Attachment 01 Page 1 of 2

1. Provide LED illuminated car light fixtures above the ceiling panels.

b. Paragraph 2.44.K Optional lighting for service elevators – Clarification:

i. This section shall apply to service elevator S-8 only.

Solicitation 36C25225R0036 Project 578-25-003 Renovate Elevators in Bldg 200 Amendment P0006 - Attachment 12a

File details come from the government source that posted it. Updated .