The provided file contains mechanical design drawings for an elevator replacement project at the Edward Hines Jr. VA Hospital in Hines, Illinois. The documents include six mechanical drawings (M000, MD116, MH116, M501, M601) detailing HVAC system modifications for the elevator machine room. Key components include six existing air handling units (AHU-AS1 through AHU-AS3 and AHU-A1F through AHU-A3F) located in the elevator machine room, which will either be raised or replaced to meet ASME A17.1 Section 2.7.4.1 headroom requirements. The drawings specify mechanical demolition of existing exhaust fans, steam piping, and chilled water piping, with provisions for new connections and integration with the existing building automation system. The project includes two bid options: a base bid to raise existing equipment and an alternate deduct bid to install new Daikin BCHD030 horizontal fan coil units with specific performance characteristics.
View the file
Other files
Show 40 more
Latest 50 of 73 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CO2
CO
H
HS
NO2
S
TH
TS
T
MS
(E)
2"
KEYNOTE
CONTINUATION SYMBOL
NUMBER OF SHEET WHERE DETAIL APPEARS
NUMBER OF DETAIL ON SHEET
REVISION NUMBER - SHOWN ON PLANS
ROOM NAME AND NUMBER
NEW CONNECTION TO EXISTING
EXISTING PIPE TAG
ITEM TO BE DEMOLISHED
AREA NOT IN CONTRACT
PIPING BEING DEMOLISHED
ABOVE GROUND PIPING
PIPE SIZE TAG (DIAMETER)
BELOW GROUND PIPING
PIPE INVERT ELEVATION TAG
PIPE SLOPE TAG
Room
INVERT: -105' - 1"
1/8" / 12" SLOPE
18"x12"
18"/12"
(E)
18"Ø
EXHAUST AIR
OUTSIDE AIR
RELIEF AIR
RETURN AIR
SUPPLY AIR
TRANSFER AIR
TYPE (REFER TO SCHEDULES)
CFM
EXISTING DUCT TAG
OVAL DUCT SIZE TAG (WIDTH / HEIGHT)
SQUARE DUCT SIZE TAG (WIDTH x HEIGHT)
RECTANGULAR SUPPLY/OUTSIDE AIR DUCT RISE
RECTANGULAR RETURN/TRANSFER AIR DUCT RISE
ROUND DUCT SIZE TAG (DIAMETER)
DUCT BEING DEMOLISHED
ROUND SUPPLY/OUTSIDE AIR DUCT RISE
ROUND RETURN/TRANSFER AIR DUCT RISE
RECTANGULAR EXHAUST/RELIEF AIR DUCT RISE
ROUND EXHAUST/RELIEF AIR DUCT RISE
DROP
DROP
DROP
DROP
DROP
DROP
GREASE EXHAUST AIR
SMOKE EXHAUST AIR
EXISTING EQUIPMENT
TO REMAIN
EXHAUST GAS FLUE
COMBUSTION AIR
CONDITIONED OUTSIDE AIR
VAV-XX
(E)VAV-XX
ABV ABOVE
AC AIR CONDITIONING
ADD ADDENDUM
AFF ABOVE FINISHED FLOOR
ALT ALTERNATE
AP ACCESS PANEL
ARCH ARCHITECT/ARCHITECTURAL
BFF BELOW FINISHED FLOOR
BTU BRITISH THERMAL UNITS
BTUH BTU PER HOUR
CAP CAPACITY
CFM CUBIC FEET PER MINUTE
CLG CEILING
D DEGREE
DB DRY BULB
DIA DIAMETER
DN DOWN
EAT ENTERING AIR TEMP
ELEC ELECTRICAL
EQUIP EQUIPMENT
EWT ENTERING WATER TEMP
EA EXHAUST AIR
EXIST EXISTING
F DEGREES FAHRENHEIT
FL FLOOR
FPM FEET PER MINUTE
FT FOOT/FEET
FTR FIN TUBE RADIATION
GAL GALLON
GF GAS-FIRED
GC GENERAL CONTRACTOR
GPM GALLONS PER MINUTE
HP HORSEPOWER
HTG HEATING
HTR HEATER
ID INDIRECT
IN INCH
INV INVERT
LB POUND
LB/HR POUNDS PER HOUR
LAT LEAVING AIR TEMP
LP LOW PRESSURE
LVR LOUVER
LWT LEAVING WATER TEMP
MA MIXED AIR
MAX MAXIMUM
MBH ONE THOUSAND BTUH
MCF ONE THOUSAND CUBIC FEET
MD MOTORIZED DAMPER
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTR MOTOR
MUA MAKE-UP AIR
NC NOISE CRITERIA
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
NUM NUMBER
O
OXYGEN
OA OUTSIDE AIR
PD PRESSURE DROP
PLBG PLUMBING
PRESS PRESSURE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH
GAUGE
PWR POWER
R
DUCT RISER
RA RETURN AIR
RCP RADIANT CEILING PANEL
REC RECESSED
RED REDUCER
RH RELATIVE HUMIDITY
RLA RELIEF AIR
RM ROOM
RPM REVOLUTIONS PER MINUTE
SF SQUARE FOOT
SA SUPPLY AIR
SF SQUARE FOOT
SD SMOKE DAMPER
SM SURFACE MOUNT
SP STATIC PRESSURE
STM STEAM
T
THERMOSTAT
TD TEMPERATURE DROP
TEMP TEMPERATURE
TYP TYPICAL
UG UNDERGROUND
VAC VACUUM
VAV VARIABLE AIR VOLUME
VENT VENTILATION
WB WET BULB
SUPPLY
DIFFUSER
RTU-XX
VAV BOX
ROOFTOP UNIT
VAV-XX
RTU-XX
EQUIPMENT ID
SYMBOL
SENSOR
MANUAL SWITCH
THERMOSTAT
TEMPERATURE SENSOR
TEMP & HUMIDITY SENSOR
HUMIDITY SENSOR
NITROGEN DIOXIDE SENSOR
CARBON MONOXIDE SENSOR
CARBON DIOXIDE SENSOR
HUMIDISTAT
AC AIR CONDITIONING UNIT
ACCU AIR COOLING CONDENSING UNIT
AHU AIR HANDLING UNIT
AS AIR SEPARATOR
B BOILER
CH CHILLER
CT COOLING TOWER
CUH CABINET UNIT HEATER
CHWP CHILLED WATER PUMP
CWP CONDENSER WATER PUMP
DC DUCT MOUNTED COIL
EF EXHAUST FAN
EDC ELECTRIC DUCT COIL
ET EXPANSION TANK
EWH ELECTRIC WATER HEATER
FCU FAN COIL UNIT
FP FIRE PUMP
GRV GRAVITY ROOF VENTILATOR
HWP HEATING WATER PUMP
HRU HEAT RECOVERY UNIT
PV POWER ROOF VENTILATOR
RF RETURN FAN
RTU ROOFTOP UNIT
SP SUMP PUMP
UH UNIT HEATER
WH WATER HEATER
EQUIPMENT ABBREVIATIONS
F S FS M D
MOTORIZED DAMPER
BACKDRAFT DAMPERFIRE DAMPER
SMOKE DAMPER
COMB. FIRE/SMOKE DAMPER
HVAC-
CP-X
BMS CONTROL PANEL
MANUAL BALANCING DAMPER
12"x12" SA
PANEL NAME
CONDENSATE EXHAUST AIR
18"x18" SA
18"x18" OA
18"x18" OA
18"x18" RA
18"x18" TA
18"x18" EA
18"x18" LA
18"x18" GEA
18"x18" CEA
18"x18" SEA
6"Ø FLUE
6"Ø CA
1. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND INDICATIVE OF
WORK TO BE PROVIDED (FURNISHED AND INSTALLED) UNDER THIS
CONTRACT. DRAWINGS SHOULD NOT BE SCALED.
2. THE CONTRACTOR IS RESPONSIBLE TO EXAMINE THE EXISTING
CONDITIONS UNDER WHICH THEY SHALL OPERATE AND VERIFY THE
EXTENT OF WORK REQUIRED TO COMPLETE THE WORK UNDER THIS
CONTRACT.
3. PRIOR TO ORDERING AND FABRICATING ANY EQUIPMENT, IT IS THE
RESPONSIBILITY OF THE CONTRACTOR TO EXAMINE THE PHYSICAL
CONDITIONS AT THE PROJECT SITE AND VERIFY SPACE AND SUFFICIENT
CLEARANCES ARE AVAILABLE FOR INSTALLING EQUIPMENT, DUCTWORK,
PIPING, AND APPURTENANCES, AND TO DETERMINE ANY NECESSARY
MODIFICATIONS.
4. PERFORM ALL WORK IN COMPLIANCE WITH ALL APPLICABLE FEDERAL,
STATE, AND LOCAL CODES, REGULATIONS, AND STANDARDS ADOPTED BY
THE AUTHORITY HAVING JURISDICTION. IF CONFLICTS EXIST BETWEEN
THESE ENGINEERING DOCUMENTS AND CODES, THE MOST STRINGENT
REQUIREMENTS SHALL GOVERN.
5. ALL CONSTRUCTION WORK SHALL ALSO MEET THE FOLLOWING CODE
REQUIREMENTS:
· VA TECHNICAL INFORMATION LIBRARY (TIL)
· INTERNATIONAL BUILDING CODE (IBC) 2024
· INTERNATIONAL EXISTING BUILDING CODE 2024
· INTERNATIONAL MECHANICAL CODE 2024
· INTERNATIONAL PLUMBING CODE 2024
· INTERNATIONAL ENERGY CONSERVATION CODE 2024
· INTERNATIONAL FIRE CODE 2024
· NFPA 1-2024, THE UNIFORM FIRE CODE
· NFPA 101-2024, THE LIFE SAFETY CODE
· NFPA 51B-2024, STANDARD FOR FIRE PREVENTION DURING WELDING,
CUTTING AND OTHER HOT WORK
· NFPA 13-2022, STANDARD FOR THE INSTALLATION OF SPRINKLER
SYSTEMS
· NFPA 70-2023, NATIONAL ELECTRICAL CODE
· NFPA 90A-2024, STANDARD FOR THE INSTALLATION OF AIR
CONDITIONING AND VENTING SYSTEMS.
· NFPA 99-2024, STANDARD FOR HEALTH CARE FACILITIES
· NFPA 241-2022, STANDARD FOR SAFEGUARDING CONSTRUCTION,
ALTERATION AND DEMOLITION OPERATIONS.
6. CONTRACTOR SHALL COORDINATE AND SEQUENCE DEMOLITION,
CLEANING, AND CONSTRUCTION WORK.
7. CONTRACTOR SHALL NOTE ANY SPECIAL REQUIREMENTS FOR
INSTALLATION OF WORK UNDER THIS CONTRACT. DISMANTLE AND
REASSEMBLE EQUIPMENT AS NECESSARY FOR ENTRY INTO THE BUILDING
AND THE LOCATION OF INSTALLATION.
8. THE CONTRACTOR SHALL MAINTAIN A COMPLETE PROJECT SCHEDULE AND
SHALL UPDATE THIS SCHEDULE WEEKLY. ANY CHANGES SHALL BE NOTED
AND AN UPDATED SCHEDULE SHALL BE PROVIDED TO THE OWNER.
9. ALL PERMITS, FEES, TAXES, ETC SHALL BE PAID BY CONTRACTOR AS PART
OF THE TOTAL PROJECT COST.
10. MAINTAIN THE INTEGRITY OF ALL FIRE AND SMOKE RATED WALLS,
PARTITIONS, CEILINGS, AND FLOORS. SEAL ALL PENETRATIONS THROUGH
RATED ASSEMBLIES WITH FIRESTOP MATERIAL IN ACCORDANCE WITH U.L.
REQUIREMENTS TO MAINTAIN THE ASSEMBLY RATING.
11. CONTRACTOR SHALL FURNISH U.L. APPROVED DRAWINGS FOR EACH TYPE
OF FIRE AND SMOKE RATED ASSEMBLY PENETRATION BY DUCTS, PIPES, OR
CONDUITS, AND SHALL DISPLAY THESE DRAWINGS ON THE JOB SITE AT ALL
TIMES DURING CONSTRUCTION.
12. CONTRACTOR SHALL REFER TO ALL DETAILS FOR PROPER GUIDANCE.
13. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND EQUIPMENT
SUBMITTALS FOR ALL PRODUCTS USED ON PROJECT.
14. THE ENGINEER'S APPROVAL OF SUBMITTAL DATA SHALL NOT RELIEVE THE
CONTRACTOR OF RESPONSIBILITY FOR DEVIATIONS FROM THE
REQUIREMENTS OF CONTRACT DOCUMENTS UNLESS THE CONTRACTOR
HAS RECEIVED WRITTEN APPROVAL FROM THE ENGINEER TO THE SPECIFIC
DEVIATION. THE ENGINEER'S APPROVAL OF SUBMITTAL DATA SHALL NOT
RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR ERRORS OR
OMISSIONS IN HIS OR HER SUBMITTAL DATA.
15. THE CONTRACTOR IS REQUIRED TO SUBMIT THREE COMPLETE O&M
MANUALS IN THREE RING BINDERS AT SUBSTANTIAL COMPLETION.
MANUALS SHALL INCLUDE INSTALLATION AND MAINTENANCE DATA ON ALL
NEW EQUIPMENT AND MATERIALS, CERTIFIED TECHNICAL PRODUCT DATA,
EQUIPMENT SHOP DRAWINGS, SPARE PARTS DATA, ETC. PROVIDE AN
INDEX AND ASSOCIATED DIVIDERS.
16. CLOSE OUT DOCUMENTS: THE CONTRACTOR IS TO MAINTAIN ONE SET OF
CONSTRUCTION DRAWINGS ON SITE AND KEEP CURRENT WITH MARK UP
AS-BUILT CONDITIONS DURING CONSTRUCTION OF THE PROJECT. THIS SET
IS TO INCLUDE ALL CONTRACT CHANGES, MODIFICATIONS, AND
CLARIFICATIONS. THIS SET ALONG WITH ALL SHOP DRAWINGS SHALL BE
TURNED OVER TO THE ARCHITECT/ENGINEER AFTER CONSTRUCTION
COMPLETION.
17. IT IS THE RESPONSIBILITY OF ALL BIDDERS TO THOROUGHLY REVIEW AND
UNDERSTAND ALL CONSTRUCTION DOCUMENTS. THIS INCLUDES BUT IS
NOT LIMITED TO ALL DRAWINGS, SPECIFICATION SECTIONS, ETC. THE
DRAWINGS ARE SCHEMATIC IN NATURE. THEREFORE BEFORE STARTING
ANY WORK, THE CONTRACTOR SHALL REVIEW ALL OTHER CONSTRUCTION
DOCUMENTS, VERIFY FIELD CONDITIONS AND SHALL MAKE ANY REQUIRED
MINOR ADJUSTMENTS WITHOUT EXTRA COST TO THE OWNER. ANY MAJOR
DISCREPANCIES FOUND SHALL BE BROUGHT TO THE ATTENTION OF THE
ARCHITECT/ENGINEER. THE BASE BID SHALL REFLECT THE TOTAL COST OF
NEW EQUIPMENT INSTALLATION. THIS INCLUDES LABOR, EQUIPMENT AND
MATERIALS. NO CHANGE ORDERS SHALL BE ISSUED WITHOUT WRITTEN
CONSENT AND APPROVAL FROM ENGINEER AND ARCHITECT.
1. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF FIELD CONDITIONS
PRIOR TO BEGINNING WORK AND ORDERING EQUIPMENT, AND FOR
COORDINATING NEW EQUIPMENT DIMENSIONS AND MEANS AND
METHODS FOR INSTALLATION WITH FIELD CONDITIONS.
2. CONTRACTOR IS RESPONSIBLE TO COORDINATE WITH SUBMITTED
EQUIPMENT TO ENSURE ALL INLET/OUTLET CONNECTIONS COORDINATE
WITH FIELD INSTALLED DUCTWORK AND MAKE ANY NECESSARY DUCT
MODIFICATIONS TO ENSURE PROPER OPERATION OF MECHANICAL
EQUIPMENT.
3. SUBMITTALS SHALL MEET SCHEDULED DESIGN CHARACTERISTICS,
INCLUDING BUT NOT LIMITED TO CFMS, EAT(DB/WB), ESP, CAPACITIES,
VOLTAGES/PHASES, MCA/MOCP, SONES, ETC.
4. ALL DUCT CONSTRUCTION, INSTALLATION, AND SUPPORTS ARE TO
COMPLY WITH LATEST EDITION OF SMACNA'S HVAC DUCT
CONSTRUCTION STANDARDS METAL AND FLEXIBLE DUCT. ALL
DUCTWORK SHALL BE 2" PRESSURE CLASS UNLESS OTHERWISE NOTED.
5. ROUND DUCTS AND FITTINGS SHALL BE SPIRAL SEAM CONSTRUCTION,
MANUFACTURED FROM G60 GALVANIZED STEEL ACCORDING TO ASTM
A653/A924 AND AS SPECIFIED. RECTANGULAR DUCTWORK SHALL BE
MANUFACTURED FROM G60 GALVANIZED SHEET METAL STEEL
ACCORDING TO ASTM A653/A653M AND AS SPECIFIED.
6. INSULATE ALL CONCEALED, SINGLE WALL SUPPLY, RETURN, AND
OUTSIDE AIR DUCTS WITH 2.0" THICK EXTERNAL MINERAL-FIBER FOIL
BACK BLANKET INSULATION, INSTALLED R-VALUE = 6 MINIMUM, K=0.25
BTU-IN./SF-HR-°F, 1.5 LB/CF NOMINAL DENSITY, COMPLYING WITH ASTM
C553 TYPE II AND ASTM C1290 TYPE III, JOHNS MANVILLE MICROLITE OR
EQUAL. JOINTS TO BE STAPLED AND TAPED WITH PRESSURE SENSITIVE
TAPE AS MANUFACTURED BY COMPAC INDUSTRIES MODEL #120 (FLAME
SPREAD = 5, SMOKE DEVELOPED = 10) OTHER ACCEPTABLE
MANUFACTURERS ARE OWENS CORNING AND KNAUF.
7. ALL WALL-MOUNTED THERMOSTATS AND/OR TEMPERATURE SENSORS
SHALL BE INSTALLED AT AN ELEVATION OF 48" ABOVE FINISHED FLOOR
TO THE TOP UNLESS OTHERWISE NOTED ON DRAWINGS. LOCATION OF
WALL-MOUNTED THERMOSTATS SHALL BE COORDINATED WITH OTHER
TRADES FOR A NEAT APPEARANCE. FINAL LOCATION OF THERMOSTATS
SHALL BE SUBJECT TO THE APPROVAL OF THE ENGINEER OR
REPRESENTATIVE IN THE FIELD.
8. CONTRACTOR SHALL PROVIDE A COPY OF THE TEST AND BALANCE
REPORT BY AN AABC OR NEBB CERTIFIED AGENCY. THIS REPORT MUST
BE REVIEWED AND APPROVED BY THE ENGINEER PRIOR TO THE FINAL
INSPECTION. THE CONTRACTOR MUST ALSO PROVIDE ALL REPORTS
REQUIRED BY THE SPECIFICATION. OUTDOOR TEMPERATURE (DB);
OUTSIDE AIR (DB/WB & CFM); SUPPLY AIR AT UNIT DISCHARGE (DB/WB &
CFM); RETURN AIR {MIXED} (DB/WB & CFM); LEAVING COIL (DB/WB);
DIFFUSER/GRILLE (DB/WB); EQUIPMENT (EWT/LWT); EQUIPMENT
(EAT/LAT); EQUIPMENT (GPM); EQUIPMENT (PRESSURES). OUTSIDE AIR
CFM SHALL BE MEASURED DIRECTLY AND NOT CALCULATED FROM THE
DIFFERENCE BETWEEN SUPPLY AIR CFM AND RETURN AIR CFM.
9. CONTRACTOR SHALL MAKE NECESSARY ADJUSTMENTS DURING TEST
AND BALANCE AS REQUIRED TO ENSURE EQUIPMENT IS OPERATING
WITHIN 10% OF THE SPECIFIED CRITERIA. THIS INCLUDES, BUT IS NOT
LIMITED TO, ADJUSTING BELTS, SHEAVES, PULLEYS, AND IMPELLERS.
10. ALL DUCTWORK MUST BE INSTALLED 6" AWAY FROM ANY FIRE RATED
WALL TO FACILITATE INSPECTION.
11. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL TRADES
INSTALLATION SCHEDULES.
12. PROVIDE A FIRE DAMPER AT EVERY DUCT PENETRATION OF A
FIRE-RATED WALL OR CEILING, WHETHER SHOWN ON DRAWINGS OR NOT.
ALL FIRE DAMPERS SHALL BE DYNAMIC TYPE WITH BLADES OUTSIDE
AIRSTREAM, UNLESS NOTED OTHERWISE.
13. PROVIDE FIRE, SMOKE, AND COMBINATION FIRE/SMOKE DAMPERS AT
EVERY LOCATION WHERE REQUIRED BY SECTION 607.5 OF THE
FBC-MECHANICAL, WHETHER SHOWN ON DRAWINGS OR NOT. PROVIDE
PROPER DAMPER ACTUATION IN ACCORDANCE WITH SECTION 607.3.3 OF
THE FBC-MECHANICAL. PROVIDE ACCESS AND IDENTIFICATION IN
ACCORDANCE WITH SECTION 607.4 OF THE FBC-MECHANICAL.
14. WHERE SMOKE OR COMBINATION FIRE/SMOKE DAMPERS ARE REQUIRED,
THE ELECTRICAL OR FIRE ALARM CONTRACTOR (MECHANICAL
CONTRACTOR TO COORDINATE) SHALL PROVIDE 120V POWER AND
ENSURE PROPER OPERATION UPON ACTIVATION. PROVIDE PROPER
DAMPER ACTUATION IN ACCORDANCE WITH SECTION 607.3.3.2 OF THE
FBC-MECHANICAL.
14.1. *HOSPITALS AND NURSING HOMES IN FLORIDA* - OTHER THAN IN
MECHANICAL SMOKE CONTROL SYSTEMS, DURING AN AUTOMATIC
FIRE ALARM ACTIVATION, FANS OPERATING IN THE ZONE IN ALARM
SHALL SHUT DOWN AND SMOKE AND FIRE/SMOKE DAMPERS SHALL
CLOSE.
14.2. *NURSING HOMES IN FLORIDA* - OTHER THAN IN MECHANICAL
SMOKE CONTROL SYSTEMS, ALL SMOKE AND FIRE/SMOKE DAMPERS
SHALL CLOSE UPON MANUAL SHUTDOWN OF THE ASSOCIATED
SUPPLY, RETURN, OR EXHAUST FAN.
15. PROVIDE SMOKE DAMPERS FOR ALL SYSTEMS WITH DESIGN CAPACITY
GREATER THAN 15,000 CFM TO ISOLATE AIR HANDLING UNIT FROM THE
REMAINDER OF THE SYSTEM ON BOTH THE SUPPLY AND RETURN SIDE,
UNLESS THE AIR HANDLING UNIT IS LOCATED ON THE FLOOR IT SERVES
AND SERVES ONLY THAT FLOOR, OR UNLESS THE AIR HANDLING UNIT IS
LOCATED ON THE ROOF AND SERVES ONLY THE FLOOR IMMEDIATELY
BELOW THE ROOF.
16. PROVIDE A DUCT SMOKE DETECTOR IN THE SUPPLY AIR DUCT,
DOWNSTREAM OF THE AIR FILTERS AND AHEAD OF ANY BRANCH
CONNECTIONS, FOR ALL SYSTEMS HAVING A DESIGN CAPACITY GREATER
THAN 2,000 CFM.
SMD DUCT SMOKE DETECTOR
FD FIRE DAMPER
FSD FIRE/SMOKE DAMPER
MFD MECHANICAL FLOOR DRAIN
ABBREVIATIONS
GENERAL MECHANICAL SYMBOLS
LIMIT OF DEMOLITION
HVAC SYMBOLS
CD-XX
XXX CFM
RETURN
GRILLE
TYPE (REFER TO SCHEDULES)
CFM
RG-XX
XXX CFM
EXHAUST
GRILLE
TYPE (REFER TO SCHEDULES)
CFM
EG-XX
XXX CFM
SIDEWALL
SUPPLY GRILLE
TYPE (REFER TO SCHEDULES)
CFM
SG-XX
XXX CFM
LINEAR SLOT
DIFFUSER
TYPE (REFER TO SCHEDULES)
CFM
LSD-XX
XXX CFM
GRILLES, REGISTERS & DIFFUSERS TAG
MECHANICAL EQUIPMENT TAGS
EXISTING EQUIPMENT
TO BE DEMOLISHED (E)VAV-XX
DATA DEVICE TAGS
DAMPERS
PIPING SYMBOLS
WM
M
S
M
CHWS
CD
CDR
CWR
CWS
HWR
HWS
NG
STM
CHWR CHILLED WATER RETURN
CHILLED WATER SUPPLY
CONDENSATE DRAINAGE
CONDENSATE RETURN
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
HEATING WATER RETURN
HEATING WATER SUPPLY
NATURAL GAS
STEAM
RL REFRIGERANT LINE
2"
4"
4"
PIPE RISE
PIPE DROP
PIPE TEE REDUCING 45
DEGREE TEE
45 DEGREE TEE
PG PROPANE GAS
2" DOM. WM
PIPE ACCESSORY TAGS
DOMESTIC WATER METER
BALANCING VALVE
1/4 TURN BALL VALVE
CHECK VALVE
3-WAY MIXING VALVE
MOTORIZED CONTROL VALVE
3 WAY MOTORIZED CONTROL
VALVE
PRESSURE REDUCING VALVE
REFRIGERANT SOLENOID VALVE
BUTTERFLY VALVE
2" BALANCING
2" SHUTOFF
2" CHECK
2" TMV
2" M-CNTRL
2" 3-WAY CNTRL
2" PRV
3/8" SOLENOID
2" BUTTERFLY
CAP
PLUG
GWR
GWS
GEOTHERMAL WATER RETURN
GEOTHERMAL WATER SUPPLY
* NOTE *
ALL OF GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL OTHER
DRAWINGS IN THIS SET. THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS
SHEET MAY OR MAY NOT BE USED IN THIS SET OF DRAWINGS.
GENERAL NOTESMECHANICAL PIPING NOTES
CHILLED WATER PIPING:
ALL CHILLED WATER PIPING SHALL BE SCH. 40 BLACK STEEL FOR PIPE SIZED
10"Ø AND SMALLER AND STANDARD WEIGHT BLACK STEEL FOR PIPE SIZES
12"Ø AND LARGER. PIPING SHALL BE ASTM A53 SEAMLESS OR ERW PIPE WITH
BUTT WELDED FITTINGS FOR PIPING OVER 2"Ø AND THREADED WITH
THREADED FITTINGS FOR PIPE 2"Ø AND UNDER. ELBOWS 2-1/2" AND LARGER
SHALL BE LONG RADIUS. WELD-O-LETS MAY BE USED ON PIPES 3" AND
SMALLER IN LIEU OF TEES. FURNISH AND INSTALL FOAMGLASS INSULATION ON
CHILLED WATER PIPING VIA THE FOLLOWING SCHEDULE: 1/2" TO 1-1/4" = 1-1/2"
THICK, 1-1/2" AND ABOVE = 2" THICK. SEAL ALL JOINTS WITH PITTSEAL 727 AND
PROVIDE AN ALL SERVICE STAINLESS STEEL JACKET WITH SELF-SCALING LAPS
OVER THE FOAMGLASS INSULATION. ALL WORK SHALL BE PER
MANUFACTURERS RECOMMENDATIONS. PRIME AND PAINT (1 RUST INHIBITING
PRIMER COAT AND 2 FINISH COATS) WITH INDUSTRIAL GRADE ENAMEL.
PROVIDE FULL BAND OR STRIP-TYPE PIPE IDENTIFICATION TAG WITH FLOW
DIRECTION AND SYSTEM NOMENCLATURE. PROVIDE REMOVABLE INSULATION
FOR ALL WATER PORTS & VALVES.
MISCELLANEOUS:
PROVIDE PIPE HANGERS AT ALL FITTINGS, AT EACH DROP AND EVERY 10 FEET
OF STRAIGHT PIPE RUN. REFER TO SPECIFICATIONS. ALL HANGERS SHALL BE
HOT-DIP GALVANIZED AND SUPPORTS SHALL BE PAINTED PER
SPECIFICATIONS. INSTRUMENTS AND CONTROL PIPING SHALL BE SAME AS
SPECIFIED FOR MAIN SERVICE. CONDENSATE DRAIN PIPING SHALL ASTM B88,
TYPE L COPPER WITH SOLDER WROUGHT FITTINGS AND UNIONS. ALL PIPES
HANGING FROM SINGLE VERTICAL RODS / HANGERS SHALL NOT MOVE OR
SWAY DURING OPERATION. SUITABLE LATERAL SUPPORTS OR BRACING SHALL
BE USED TO PREVENT SWAY OR MOVEMENT.
DIELECTRIC FITTINGS:
PROVIDE THREADED DIELECTRIC UNIONS FOR PIPE SIZES 2" AND UNDER. FOR
PIPE SIZES 2-1/2" AND ABOVE, PROVIDE COPPER AND STEEL FLANGES
ELECTRICALLY ISOLATED AT GASKET AND BOLT SLEEVES. FITTINGS AND
UNIONS SHALL BE RATED FOR THE MAXIMUM PRESSURE AND TEMPERATURE
CONDITIONS OF THE SERVICE.
STEEL FLANGES AND FITTINGS:
ASME B16.9, INCLUDING BOLTS, NUTS, AND GASKETS OF MATERIAL GROUP 1.1,
BUTT WELDED END CONNECTIONS, AND RAISED FACE FACING.
VALVES:
SELECT VALVES WITH THE FOLLOWING ENDS OR TYPES OF PIPE
CONNECTIONS:
COPPER TUBE, 2" AND SMALLER: SOLDER ENDS.
STEEL PIPE, 2" AND SMALLER: THREADED OR GROOVED ENDS
STEEL PIPE, OVER 2": GROOVED END OR FLANGED
NOTE: PROVIDE ONLY VALVES MADE IN THE UNITED STATES. IMPORTED
VALVES ARE UNACCEPTABLE.
BALL VALVES: TWO PIECE, FULL PORT, BRONZE BALL VALVE WITH STAINLESS
STEEL BALL AND STEM, PTFE OR TFE SEATS, THREADED ENDS, MSS SP-110, AT
WORKING PRESSURE RATING. PROVIDE EXTENDED STEM WHERE INSULATION
IS SPECIFIED OR INDICATED.
BUTTERFLY VALVES: LUG STYLE, SINGLE-FLANGE BUTTERFLY VALVE WITH
ASTM A 536 DUCTILE IRON OR ASTM A 126 CAST IRON BODY, EPDM SEAT,
ALUMINUM-BRONZE DISC, STAINLESS STEEL STEM WITH COPPER BUSHINGS,
BUBBLE-TIGHT SHUTOFF, MSS SP-67. FOR SIZES 2"-6" PROVIDE LEVER
OPERATOR. FOR SIZES 8" AND LARGER PROVIDE GEAR OPERATOR WITH
POSITION INDICATORS. GEAR OPERATED VALVES 7'-0" AFF AND GREATER
SHALL BE PROVIDED WITH CHAIN OPERATORS. PROVIDE EXTENDED STEMS
WHERE INSULATION IS SPECIFIED OR INDICATED.
GENERAL NOTE:
CONTRACTOR SHALL ISOLATE AND FLUSH ALL NEW PIPING AND
ASSOCIATED FITTINGS/ACCESSORIES PRIOR TO CONNECTION TO ANY NEW
OR EXISTING MECHANICAL EQUIPMENT FOR A PERIOD OF NOT LESS THAN 12
HOURS. AFTER INITIAL FLUSHING IS COMPLETE, CONTRACTOR SHALL ADD
APPROPRIATE NON-FOAMING RUST INHIBITORS TO SYSTEM AND CONTINUE
FLUSHING FOR 12 HOURS. AFTER FLUSHING IS COMPLETE, SYSTEM SHALL
BE DRAINED AND FILLED WITH CLEAN WATER.
UNDER NO CIRCUMSTANCE SHALL ANY OF THE FLUSHING LIQUID BE
INTRODUCED IN THE EXISTING SYSTEM.
ONCE SYSTEM IS COMPLETELY FLUSHED, CONTRACTOR SHALL
COORDINATE WITH CHEMICAL FEED CONTRACTOR/COMPANY FOR PROPER
CHEMICAL FEED ADDITION.
MECHANICAL NOTES
17. PENETRATIONS FOR PIPES, CONDUITS OR OTHER PURPOSES THROUGH
ASSEMBLIES (FLOORS, ROOF, WALLS, PARTITIONS, ETC.) WITH A
REQUIRED FIRE RESISTANCE RATING SHALL BE SEALED TO THE
PENETRATING MEMBER IN AN APPROVED MANNER WHICH MAINTAINS
THE REQUIRED FIRE RESISTANCE RATING OF THE ASSEMBLY.
17.1. WHERE HOLES FOR PENETRATIONS ARE FORMED CIRCULAR OR
CORE-BORED, THE PENETRATION SHALL BE PROTECTED WITH
FIRE-SEAL BRAND SMOKE AND FIRE STOP FITTINGS BY O-Z GEDNEY,
LINK-SEAL BRAND BY THUNDER LINE, OR EQUAL APPROVED BY
ENGINEER.
17.2. WHERE HOLES FOR PENETRATIONS ARE IRREGULAR
(NON-CIRCULAR) IN SHAPE, THE PENETRATION SHALL BE
PROTECTED WITH DOW CORNING 3-6548, SILICONE RTV FOAM, 3M
FIRE BARRIER PENETRATION SEAL SYSTEM, OR EQUAL APPROVED
BY THE ENGINEER.
18. INTENT OF MECHANICAL NOTES ON DRAWINGS IS TO CLARIFY THE
SCOPE OF WORK AND ALERT CONTRACTOR OF EXISTING CONDITIONS.
CONTRACTOR IS TO VISIT THE SITE AND VERIFY ALL CLEARANCES
BEFORE FABRICATION OF DUCTWORK, AND PROVIDE ADDITIONAL
OFFSET AND/OR CHANGES IN DUCT SIZES TO MEET FIELD CONDITIONS,
AND TO COORDINATE WITH ELECTRICAL, PLUMBING, AND FIRE
PROTECTION SUBCONTRACTORS, BEFORE ANY CONSTRUCTION WORK.
19. CONTRACTOR SHALL PROVIDE ALL SUPPLEMENTARY STEEL,
STRUCTURES, INSERTS, SLEEVES, AND HANGING DEVICES REQUIRED TO
INSTALL AND ADEQUATELY SUPPORT MECHANICAL EQUIPMENT AND
COMPONENTS IN A MANNER WHICH WILL NOT OVERLOAD BUILDING
STRUCTURE. CONTRACTOR SHALL COORDINATE WITH GENERAL
CONTRACTOR AND ALL BUILDING TRADES TO AVOID CONFLICTS AND TO
MAINTAIN EQUIPMENT ACCESS AND SERVICEABILITY.
20. PROVIDE A TRAP IN ALL CONDENSATE PIPING LOCATED AT THE AIR
HANDLING EQUIPMENT. INSULATE ALL CONDENSATE LINES WITH 1/2"
CLOSED CELL FOAM INSULATION. ALL PIPING EXPOSED TO EXTERNAL
ELEMENTS SHALL BE JACKETED WITH UV STABILIZED PVC OR ALUMINUM
SHEETING.
21. AIR HANDLING EQUIPMENT SHALL BE PROVIDED WITH WARRANTIES AS
STATED IN SPECIFICATIONS.
22. PROVIDE ADDITIONAL DUCTWORK AND PIPING SUPPORTS ON BOTH
SIDES AND WITHIN 18" OF EACH FIRE RATED WALL. DUCTWORK OR
PIPING SHALL NOT BE SUPPORTED FROM ANY FIRE RATED WALL.
23. PROVIDE SINGLE WALL TURNING VANES IN ALL RECTANGULAR DUCT
ELBOWS WITH ANGLES FROM 45 DEGREES TO 90 DEGREES, EXCEPT FOR
TRANSFER AIR ELBOWS. TURNING VANES SHALL BE PROVIDED
ACCORDING TO SMACNA HVAC DUCT CONSTRUCTION STANDARDS
METAL AND FLEXIBLE.
24. DUCT DIMENSIONS SHOWN ON DRAWINGS ARE CLEAR INSIDE
DIMENSIONS (FREE AREA).
25. ALL HVAC EQUIPMENT SHALL BE INSTALLED PER MANUFACTURER'S
RECOMMENDATIONS UNLESS INDICATED OTHERWISE.
26. CONTRACTOR SHALL THOROUGHLY CLEAN AND ENSURE PROPER
OPERATION OF ANY EXISTING HVAC EQUIPMENT. ANY CHANGE TO THE
SYSTEM SHALL RESULT IN EQUIPMENT MODIFICATIONS (AS REQUIRED)
INCLUDING BUT NOT LIMITED TO REPLACING MOTORS, VFDS, PULLEYS,
SHEAVES, BELTS, ETC.
27. A/C MAINTENANCE SHOP PERSONNEL TO PROVIDE LABELING
STANDARDS.
28. ALL CONTROL WIRING SHALL BE INCLUDED AS PART OF MECHANICAL
WORK; REFER TO ELECTRICAL SPECIFICATIONS FOR CONDUIT AND
WIRING REQUIREMENTS. COORDINATE WITH ELECTRICAL CONTRACTOR
TO ENSURE THAT REQUIRED INTERFACE DEVICES ARE PROVIDED WITH
ELECTRICAL COMPONENTS (I.E. FAN SPEED RHEOSTATS, AUXILIARY
CONTACTS, INTERLOCKS, ETC.).
29. ALL EQUIPMENT DISCONNECTS, WHETHER INTERNALLY MOUNTED OR
EXTERNALLY MOUNTED, SHALL BE FURNISHED AND INSTALLED BY
MECHANICAL CONTRACTOR, WIRED BY ELECTRICAL CONTRACTOR. IF
EXTERNALLY MOUNTED, PROVIDE DISCONNECTING MEANS AT SAME
ELEVATION AS EQUIPMENT. REFER TO ELECTRICAL SPECIFICATIONS FOR
REQUIREMENTS.
30. MECHANICAL CONTRACTOR SHALL COORDINATE ELECTRICAL
CHARACTERISTICS AND REQUIREMENTS OF ALL MECHANICAL
EQUIPMENT WITH ELECTRICAL CONTRACTOR BEFORE
BIDDING/ORDERING AND INSTALLATION.
MECHANICAL NOTES
ALTERNATE DEDUCT BID ITEM
(REFER TO DRAWING GC101 ON ARCHITECTURAL
FOR STATEMENT OF BID ITEMS)
HVAC SHEET INDEX
M000 HVAC TITLE SHEET
MD116 MACHINE ROOM FLOOR PLAN - MECHANICAL DEMOLITION
MH116 MACHINE ROOM FLOOR PLAN - MECHANICAL
M501 MECHANICAL DETAILS & CONTROLS
M601 MECHANICAL SCHEDULES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
Architect:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEP Engineer: Elevator Consultant:
MES GROUP LERCH BATES
550 N. REO STREET SUITE 203
TAMPA, FL 33609
813.289.4700
216 S. JEFFERSON STREET
SUITE LL2
CHICAGO, IL 60661
312.256.1010
30% SCHEMATIC DESIGN 06/20/2024
60% DESIGN DEVELOPMENT 08/12/2024
90% QAQC REVIEW 09/23/2024
90% CONSTRUCTION DOCUMENTS 10/02/2024
100% QAQC REVIEW 10/25/2024
100% BID DOCUMENTS 01/20/2025
100% BID DOCUMENTS - REVISED BASE BID 01/24/2025
A u to d e s k D o c s /1
.6
.1
V A
H in e s E le v a to r
R e p la c e m e n t/
.6
.1
H in e s E le v a to rs M
E P
R
.r v t
/2
/2
:1
:4
A
M
M000
HVAC TITLE SHEET
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
ELEVATOR REPLACEMENT
5000 5TH AVE, HINES, IL 60141
578-25-003
01/24/2025 NPS PBJ
100% BID DOCUMENTS
FULLY SPRINKLERED
FIRE RATING LEGEND
1 HOUR FIRE WALL
2 HOUR FIRE WALL
Revisions: Date:
Date Signed: 01/24/2025 License Expires: 02/28/2027
T
T1
TT2
T
T3
(E)AHU-AS2
(E)AHU-AS1
(E)AHU-AS3
(E)AHU-A1F(E)AHU-A2F
(E)AHU-A3F
OPEN TO BELOW
OPEN TO BELOW
(E) 2 1/2" CHWR
(E) 2 1/2" CHWS
(E) 1 1/2" CHWR (ABOVE)
(E) 1 1/2" CHWS (BELOW)
(E) 1 1/2" CHWR (ABOVE)
(E) 1 1/2" CHWS (BELOW)
(E)STM (ABOVE)
(E)CR (BELOW)
[ABANDONED]
(E)STM (ABOVE)
(E)CR (BELOW)
[ABANDONED]
(E)CD
(E)EF-12
(E)LOUVER
(E)SF-EL1
(E)LOUVER
ENGINEERING
MECHANICAL
ROOM
(E)EF-7
EXISTING ABANDONED
PIPING UP TO ROOF ABOVE
EXISTING ABANDONED
PIPING
4 4
(E) 4" CHWS
(E) 4" CHWR
(E) 2 1/2" CHWS
(E) 2 1/2" CHWR
8 8
(E) 1 1/2" CHWR
(E) 1 1/2" CHWS
(E) 1" CD(E) 1" CD
(E) 1" CD
(E
/2
C D
(E) 1 1/2" CD
(E
C D
(E
/2
C H
W R
(E
/2
C H
W S
(E
/2
C H
W R
(E
/2
C H
W S
(E) 2 1/2" CHWS
(E) 2 1/2" CHWR
(E) 2" CD(E) 2" CD
(E) 1 1/2" CHWS
(E) 1 1/2" CHWR
(E) 2" CD
(E) 2" CD
H I J
A. EXISTING EQUIPMENT, PIPING, AND ASSOCIATED COMPONENTS SHOWN ON
DRAWINGS ARE APPROXIMATE LOCATIONS AND ARE PROVIDED FOR
REFERENCE USE ONLY. FIELD VERIFY AND COORDINATE WITH EXACT
LOCATIONS, ELEVATIONS, SIZES, AND CONDITIONS OF EXISTING
COMPONENTS.
B. ALL EXISTING EQUIPMENT TO BE REUSED SHALL BE PRESSURE TESTED,
THOROUGHLY CLEANED, AND SANITIZED TO AVOID POSSIBLE
CONTAMINATION.
C. PATCH ALL HOLES THROUGH WALLS, FLOORS, AND ROOFS TO MATCH
EXISTING CONSTRUCTION.
D. ALL EXISTING EQUIPMENT REMOVED SHALL BE TURNED OVER TO THE
OWNER OR DISPOSED OF AS REQUESTED BY OWNER.
MECHANICAL DEMOLITION GENERAL NOTES
1. EXISTING EXHAUST FAN (EF-7) SHALL BE DEMOLISHED COMPLETELY
INCLUDING BUT NOT LIMITED TO ALL ASSOCIATED COMPONENTS. WALL
OPENING SHALL BE PATCHED AND SEALED TO MATCH EXISTING
CONSTRUCTION. EXISTING DISCONNECT SWITCH SHALL BE DEMOLISHED.
REFER TO ELECTRICAL FOR MORE INFORMATION.
2. EXISTING EXHAUST FAN (EF-12) SHALL BE DEMOLISHED COMPLETELY
INCLUDING BUT NOT LIMITED TO ALL ASSOCIATED COMPONENTS. WALL
OPENING SHALL BE PATCHED AND SEALED TO MATCH EXISTING
CONSTRUCTION. EXISTING DISCONNECT SWITCH SHALL BE DEMOLISHED.
REFER TO ELECTRICAL FOR MORE INFORMATION.
3. EXISTING SUPPLY FAN (SF-EL1) SHALL BE DEMOLISHED COMPLETELY
INCLUDING BUT NOT LIMITED TO ALL ASSOCIATED COMPONENTS. WALL
OPENING SHALL BE PATCHED AND SEALED TO MATCH EXISTING
CONSTRUCTION. EXISTING DISCONNECT SWITCH SHALL BE DEMOLISHED.
REFER TO ELECTRICAL FOR MORE INFORMATION.
4. EXISTING ABANDONED STEAM PIPING SHALL BE DEMOLISHED BACK TO
NEAREST MAIN AND CAPPED. PATCH AND SEAL WALL PIPE PENETRATIONS
TO MATCH EXISTING CONSTRUCTION.
5. EXISTING ABANDONED PIPING SHALL BE TO DEMOLISHED TO JUST ABOVE
EXISTING ROOF AND CAPPED. PATCH AND SEAL ROOF PIPE PENETRATIONS
TO MATCH EXISTING CONSTRUCTION.
6. EXISTING THERMOSTAT SHALL REMAIN. IF ALTERNATE DEDUCT IS
ACCEPTED, EXISTING THERMOSTATS SHALL BE DEMOLISHED COMPLETELY.
7. EXISTING CONDENSATE DRAINAGE PIPING SHALL BE DEMOLISHED BACK TO
MAIN DRAIN LINE. CAP, SEAL, AND INSULATE TO MATCH EXISTING.
8. EXISTING 1-1/2" CHILLED WATER SUPPLY AND RETURN PIPING SHALL BE
DEMOLISHED BACK TO EXISTING BALANCING VALVE.
9. TEMPORARILY CAP EXISTING CHILLED WATER PIPING AT LIMIT OF
DEMOLITION UNTIL CONNECTION OF NEW CHILLED WATER PIPING.
MECHANICAL DEMOLITION KEYNOTES -
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
Architect:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEP Engineer: Elevator Consultant:
MES GROUP LERCH BATES
550 N. REO STREET SUITE 203
TAMPA, FL 33609
813.289.4700
216 S. JEFFERSON STREET
SUITE LL2
CHICAGO, IL 60661
312.256.1010
30% SCHEMATIC DESIGN 06/20/2024
60% DESIGN DEVELOPMENT 08/12/2024
KEY PLAN
NO SCALE
N
90% QAQC REVIEW 09/23/2024
90% CONSTRUCTION DOCUMENTS 10/02/2024
100% QAQC REVIEW 10/25/2024
100% BID DOCUMENTS 01/20/2025
100% BID DOCUMENTS - REVISED BASE BID 01/24/2025
A u to d e s k D o c s /1
.6
.1
V A
H in e s E le v a to r
R e p la c e m e n t/
.6
.1
H in e s E le v a to rs M
E P
R
.r v t
/2
/2
:1
:5
A
M
MD116
MACHINE ROOM FLOOR PLAN -
MECHANICAL DEMOLITIONGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
ELEVATOR REPLACEMENT
5000 5TH AVE, HINES, IL 60141
578-25-003
01/24/2025 NPS PBJ
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"MD116
1 MACHINE ROOM FLOOR PLAN - MECHANICAL DEMOLITION
N
Revisions: Date:
M
M M
M
M
M
ENGINEERING
MECHANICAL
ROOM
(E)STM (ABOVE)
(E)CR (BELOW)
[ABANDONED] (E)STM (ABOVE)
(E)CR (BELOW)
[ABANDONED]EXISTING ABANDONED
PIPING
AHU-AS2
AHU-AS1
AHU-AS3
AHU-A1FAHU-A2F
AHU-A3F
(E) 2 1/2" CHWR
(E) 2 1/2" CHWS
(E) 4" CHWR
(E) 4" CHWS
2 1/2" CHWS
2 1/2" CHWR
1 1/2" CHWR
1 1/2" CHWS
2 1/2" CHWR
2 1/2" CHWS
1 1/2" CHWR
1 1/2" CHWS
2 1/2" CHWS
2 1/2" CHWR
(E) 1 1/2" CD
(E) 1" CD
CONTROL
VALVE
CONTROL VALVE
CONTROL VALVE
OPEN TO BELOW
OPEN TO BELOW
(E) 1" CD
(E) 1 1/2" CHWS
(E) 1 1/2" CHWR
(E) 1 1/2" CHWR (ABOVE)
(E) 1 1/2" CHWS (BELOW)
CONTROL
VALVE
1" CD
1 1/2" CHWR (ABOVE)
1 1/2" CHWS (BELOW)
1 1/2" CHWR (ABOVE)
1 1/2" CHWS (BELOW)
1" CD
CONTROL
VALVE
(E) 1 1/2" CD
T T
AHU-AS1
AHU-AS2
T
AHU-AS3
T T
AHU-A1F
AHU-A2F
T
AHU-A3F
A
(E) 1 1/2" CHWR (ABOVE)
(E) 1 1/2" CHWS (BELOW)
(E
/2
C D
(E
C D
(E) 2 1/2" CHWS
(E) 2 1/2" CHWR
(E) 2" CD
(E) 1" CD (E) 1" CD
(E) 1 1/2" CHWS
(E) 1 1/2" CHWR
(E) 2" CD
(E
/2
C H
W R
(E
/2
C H
W S
(E
/2
C H
W R
(E
/2
C H
W S
1 1/2" CHWR
1 1/2" CHWS
1" CD
2" CD DN TO
FLR BELOW
1" CD DN TO
FLR BELOW
1 5
1 5
1 5 1 5
1 5
H I J
A. EXISTING EQUIPMENT, PIPING, AND ASSOCIATED COMPONENTS SHOWN ON
DRAWINGS ARE APPROXIMATE LOCATIONS AND ARE PROVIDED FOR
REFERENCE USE ONLY. FIELD VERIFY AND COORDINATE WITH EXACT
LOCATIONS, ELEVATIONS, SIZES, AND CONDITIONS OF EXISTING
COMPONENTS.
B. ALL EXISTING EQUIPMENT TO BE REUSED SHALL BE PRESSURE TESTED,
THOROUGHLY CLEANED, AND SANITIZED TO AVOID POSSIBLE
CONTAMINATION. REFER TO SPECIFICATIONS FOR MORE INFORMATION.
C. PATCH ALL HOLES THROUGH WALLS, FLOORS, AND ROOFS TO MATCH
EXISTING CONSTRUCTION.
D. MECHANICAL EQUIPMENT AND MECHANICAL PIPING SHALL NOT BE LOCATED
OR ROUTED ABOVE ANY ELECTRICAL EQUIPMENT. DRAIN PANS SHALL BE
PROVIDED WHERE NECESSARY TO PREVENT ANY DAMAGE TO EQUIPMENT.
MECHANICAL GENERAL NOTES
1. PER 2022 ASME A17.1 SECTION 2.7.4.1, "ELEVATOR MACHINE ROOMS,
CONTROL ROOMS, AND MACHINERY SPACES CONTAINING AN ELEVATOR
DRIVING MACHINE NOT LOCATED IN THE HOISTWAY SHALL HAVE A CLEAR
HEADROOM OF NOT LESS THAN 84 INCHES." AIR HANDLING UNIT SHALL BE
INSTALLED AT A HEIGHT TO MEET PROPER HEADROOM REQUIREMENTS.
BASE BID: EXISTING AIR HANDLING UNIT SHALL BE RAISED AS REQUIRED TO
MEET CODE REQUIREMENTS.
ALTERNATE: NEW AIR HANDLING UNIT SHALL BE INSTALLED AT PROPER
HEIGHT TO MEET CODE REQUIREMENTS.
2. BASE BID: EXISTING THERMOSTAT TO REMAIN AND SHALL BE INTEGRATED
INTO EXISTING BUILDING AUTOMATION SYSTEM (BAS).
ALTERNATE: NEW THERMOSTAT TO BE INSTALLED WITH NEW AIR HANDLING
UNIT. INTEGRATE NEW THERMOSTAT WITH EXISTING BAS.
3. PROVIDE SECONDARY DRAIN PAN WITH WATER-LEVEL DETECTION DEVICE
UNDERNEATH EACH AIR HANDLING UNIT. REFER TO DETAIL ON DRAWING
M501 FOR MORE INFORMATION.
4. ROUTE CONDENSATE DRAINAGE DOWN TO FLOOR BELOW AND DISPOSE AT
NEAREST FLOOR DRAIN. DO NOT ROUTE CONDENSATE OVER ANY
ELECTRICAL EQUIPMENT.
5. PER NFPA 90A (2024) PARAGRAPH 6.4.2.1, "SMOKE DETECTORS LISTED FOR
USE IN AIR DISTRIBUTION SYSTEMS SHALL BE LOCATED AS FOLLOWS:
(1) DOWNSTREAM OF THE AIR FILTERS AND AHEAD OF ANY BRANCH
CONNECTIONS IN AIR SUPPLY SYSTEMS HAVING A CAPACITY GREATER
THAN 2,000 CFM." SMOKE DETECTORS SHALL BE INSTALLED IN SUPPLY AIR
OPENING OF EACH AIR HANDLING UNIT IN ELEVATOR MACHINE ROOM.
MECHANICAL KEYNOTES -
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
Architect:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEP Engineer: Elevator Consultant:
MES GROUP LERCH BATES
550 N. REO STREET SUITE 203
TAMPA, FL 33609
813.289.4700
216 S. JEFFERSON STREET
SUITE LL2
CHICAGO, IL 60661
312.256.1010
30% SCHEMATIC DESIGN 06/20/2024
60% DESIGN DEVELOPMENT 08/12/2024
KEY PLAN
NO SCALE
N
90% QAQC REVIEW 09/23/2024
90% CONSTRUCTION DOCUMENTS 10/02/2024
100% QAQC REVIEW 10/25/2024
100% BID DOCUMENTS 01/20/2025
100% BID DOCUMENTS - REVISED BASE BID 01/24/2025
A u to d e s k D o c s /1
.6
.1
V A
H in e s E le v a to r
R e p la c e m e n t/
.6
.1
H in e s E le v a to rs M
E P
R
.r v t
/2
/2
:1
:5
A
M
MH116
MACHINE ROOM FLOOR PLAN -
MECHANICALGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
ELEVATOR REPLACEMENT
5000 5TH AVE, HINES, IL 60141
578-25-003
01/24/2025 NPS PBJ
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"MH116
1 MACINE ROOM FLOOR PLAN - MECHANICAL
N
Revisions: Date:
m m
M A
X
A B
PROVIDE INSULATION SHIELD
& INSERT FOR ALL PIPING
(200mm [8"] MIN.)
BAND
43mm [1-5/8"] 12 GAUGE
CHANNEL OR 50x50x6.4mm
[2"X2"X1/4"] ANGLE
15mm [1/2"] DIA.
HANGER RODS WITH
900mm [36"] MAX.
SPACING ON EACH
CHANNEL
WELD
SADDLEINSULATION SHIELD
AT HANGER
PROVIDE HIGH
COMPRESSIVE
STRENGTH INSULATION
(9 PSF MIN. DENSITY)
UNDER INSULATION
SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
NOTE:
SEE SPECIFER FOR DETAILED
HANGER REQUIREMENTS
N.T.S.
1 PIPE HANGERS DETAIL
N.T.S.
2 SECURING HANGER RODS IN CONCRETE DETAIL
N.T.S.
3 AIR HANDLING UNIT DRAIN TRAP DETAIL
SINGLE COIL
N.T.S.
4 CHILLED WATER COIL PIPING CONNECTION DETAIL
COIL DRAIN
MAV
PETE'S
PLUG
(TYP.)
STRAINER W/
BLOWDOWN VALVE
3/4" DRAIN
LEG WITH
BALL VALVE
IAQ SLOPED
INSULATED DRAIN PAN
PROVIDED WITH UNIT
C.O.
MANUAL AIR VENT
(TERMINATE DISCHARGE IN
AN ACCESSIBLE LOCATION)
TO DRAIN.
SLOPE
COIL CONDENSATE
FLOW
AIR
CHW COIL
(N.C.)
M
CHILLED WATER
MODULATING CONTROL VALVE
(N.C.)
CHWS
AO-FROM EXISTING BAS
NOTE-3
CHWR
BALANCING VALVE
UNION
(TYP.)
MV
OR
AV
N.T.S.
6 DRAIN VALVE & AIR VENT CONNECTION DETAILS
(AHU-AS1 & AS2)
(AHU-AS3, A1F, A2F & A3F)
SINGLE COIL
N.T.S.
5 CHILLED WATER COIL PIPING CONNECTION DETAIL
COIL DRAIN
MAV
PETE'S
PLUG
(TYP.)
STRAINER W/
BLOWDOWN VALVE
3/4" DRAIN
LEG WITH
BALL VALVE
IAQ SLOPED
INSULATED DRAIN PAN
PROVIDED WITH UNIT
C.O.
MANUAL AIR VENT
(TERMINATE DISCHARGE IN
AN ACCESSIBLE LOCATION)
TO DRAIN.
SLOPE
COIL CONDENSATE
FLOW
AIR
CHW COIL
(N.C.)
M
CHILLED WATER
MODULATING CONTROL VALVE
(N.C.)
CHWS
AO-FROM EXISTING BAS
NOTE-3
CHWR
BALANCING VALVE
UNION
(TYP.)
SLOPE
C OUTLETL
BI - ALARM
BI - TROUBLE
N.T.S.
7 AHU SECONDARY DRAIN PAN DETAIL
FAN
T
SC
9 COOLING ONLY AHU CONTROL DIAGRAM
N.T.S.
ALARM
PROCESSING
S C
H E
D U
LE
S
T A
R T /S
T O
P
S T A
T U
S
SYSTEM
A
LA
R M
E
LE
C T R
IC
D
E V
IC
E
S P
E E
D C
O M
M A
N D
P O
IN
T
ID
SPACE TEMPERATURE (T-1)
SYSTEM COMPONENT:
COOLING COIL VALVE (V-1)
SUPPLY FAN STATUS (ON/OFF)
O P
E N
/C L O
S E
S T A
R T /S
T O
P -- V
A
LV
E P
O S
IT
IO
N
D A
M P
E R
P O
S
IT
IO
N
JOB: 578-25-003
AIR HANDLING UNIT (COOLING ONLY)
EDWARD HINES, JR. VA HOSPITAL
SYSTEM:
BUILDING:
LEGEND
POINT
BINARY
T E
M P
E R
A T U
R E
F
IR
E A
LA
R
M
SYSTEM INPUTS
ANA- BINARY ANALOG
S P
A C
E T
E M
P . C
O N
T R
O L
REMARKS
SYSTEM SOFTWARE/CONTROL PAGE:
SUPPLY FAN SPEED (START/STOP)
BI-1
BO-1
AO-2
AI-2
T R
E N
D
IN
G
A B
B R
E V
IA
T
IO
N
SF-STS
SF-SPD
CLG-V1
ST-T1
OUTPUTS
LOG
T ROOM THERMOSTAT/TRANSMITTER - WALL MOUNT
TT TEMPERATURE TRANSMITTER
HS HAND SWITCH (HAND-OFF-AUTO SWITCH)
ZC VALVE OR DAMPER POSITION CONTROLLER
CONTROLS SYMBOLS
HVAC AIR HANDLING UNIT CONTROLLER
ECC
TC
SC
HVAC
APPLICATION/
FUNCTION
8 CONTROLS SYMBOLS
10 POINTS LIST - COOLING ONLY AHU
SIDE VIEW TRAPEZE HANGER FOR UP TO
453KG [1000 LB.] UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER
TYPE 1 - SEE SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER
TYPE 43 - SEE SPECIFICATIONS
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
NOM.
PIPE
TUBING
mm
[IN]
mm
[FT]
mm
[FT]
THRU 20
[THRU 3
4] [7]
[5]
[1]
[7]
[6]
[11
4]
[7]
[7]
[11
2]
[9]
[8]
[2]
[10]
[8]
[21
2] [11]
[9]
[3]
[12]
[10]
[4]
[14]
[12]
[5]
[16]
[13]
[6]
[17]
[14]
[8]
[19]
[16]
[10]
[22]
[12]
[23]
[14]
[25]
[16]
[27]
[18]
[28]
[20]
[30]
[24]
[32]
STEEL EXPANSION SHIELD FOR EXISTING
CONSTRUCTION AND INSERTS FOR NEW
CONSTRICTION THIS TYPE SHALL BE USED
ONLY IN SLABS OR BEAMS OF 4" [100mm] MIN
DEPTH
3/8" [10mm] MIN DIA EXPANSION BOLTS FOR
EXISTING CONSTRUCTION AND INSERTS
FOR NEW CONSTRUCTION
CONCRETE
FLOOR SLAB
CLIP
ANGLE
NUTS & WASHERS
3/8" [10mm] MIN DIA
HANGER RODS
FOR PIPES UNDER 2" [50mm] IN SIZE USE 1 1/2"x1
1/2"x1/4" [40x40x6.4mm] ANGLE. ALL PIPES 2"
[50mm] & LARGER USE 3"x3"x1/4" [75x75x6.4mm]
ANGLE
TURNBUCKLE
3/8" [10mm] MIN DIA
HANGER RODS
3/8" [10mm] MIN DIA
INSERTS NEW
CONSTRUCTION ONLY.
DRAW THRU
BLOW THRU
2" [50mm]
PLUS X
1" [25mm]
MINIMUM
X
2X
UNIT TYPE A B
WHERE X = STATIC PRESSURE IN PAN
DRAIN LINE SHALL BE AT LEAST THE SAME SIZE
AS THE NIPPLE ON THE DRAIN PAN
PIPING SHALL BE RIGID COPPER TYPE L OR TYPE
M UNLESS NOTE BELOW IS MET
PITCH DOWN
TOWARD DRAIN
CLEAN OUT
FLOOR SINK
DRAIN
PAN
NOTE: 1. CPVC PIPE MAY BE USED ONLY IF APPROVED BY LOCAL VA AND
IS INDOORS AND DOES NOT PASS THROUGH RATED BARRIERS.
2. DIELECTRIC FITTING TO BE USED WHEN TWO DISSIMILAR METALS ARE
TO BE CONNECTED.
[2 m m
DIELECTRIC
FITTING
MANUAL AIR
VENT (TYP.)
BALL VALVE
(TYP.)
NOTES:
1. REFER TO DRAWINGS FOR ROUTING OF CHILLED WATER PIPING AND PIPE SIZES SERVING AIR
HANDLERS.
2. CONTRACTOR SHALL PROVIDE NECESSARY OFFSETS AND UNIONS IN PIPING AT UNIT COIL TO
ALLOW TUBE PULL. INSTALL COIL PIPING TO AVOID CONFLICT WITH COIL PULL.
3. CONTROL VALVE TO BE FURNISHED AND WIRED BY CONTROLS CONTRACTOR; TO BE INSTALLED BY
MECHANICAL CONTRACTOR.
TYPICAL MANUAL AIR VENT
TYPICAL CHILLED WATER PIPING DRAIN VALVE CONNECTIONS
ELEVATION
THREADED PIPING
ELEVATION
WELDED PIPING
TYPICAL WATER PIPING
REDUCER, IF REQUIRED
3/4" [20mm] BALL VALVE
ADAPTER TO 3/4" [20mm] HOSE
THREAD-PROVIDE HOSE CAP NUT
NOTES:
1. DRAIN ALL LOW POINTS AS INDICATED ABOVE.
2. WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS
AND/OR PLANS LOCATE DRAIN AT BOTTOM OF SCALE POCKET.
AIR VENT
1/2" [15mm]
BALL VALVE
1/4" [8mm]
COPPER TUBING
1/2" [15mm] x 4" [100mm]
NIPPLE
CIRCULATING WATER PIPING
ELEVATION
NOTES:
1. VENT ALL HIGH POINTS
INDICATED ABOVE.
2. IF AUTOMATIC AIR VENTS
ARE USED, PIPE
DISCHARGE TO DRAIN.
MANUAL AIR
VENT (TYP.)
BALL VALVE
(TYP.)
NOTES:
1. REFER TO DRAWINGS FOR ROUTING OF CHILLED WATER PIPING AND PIPE SIZES SERVING AIR
HANDLERS.
2. CONTRACTOR SHALL PROVIDE NECESSARY OFFSETS AND UNIONS IN PIPING AT UNIT COIL TO
ALLOW TUBE PULL. INSTALL COIL PIPING TO AVOID CONFLICT WITH COIL PULL.
3. CONTROL VALVE TO BE FURNISHED AND WIRED BY CONTROLS CONTRACTOR; TO BE INSTALLED BY
MECHANICAL CONTRACTOR.
TAPE STYLE WATER DETECTOR, AS
MANUFACTURED BY KELE MODEL WD-2-T WITH
SELF-ADHESIVE SENSOR TAPE WITH COPPER
FIBER ELECTRODES. TAPE SHALL INCLUDE A
TAPE INTEGRITY - SELF CHECK FEATURE.
SENSOR SHALL BE PROVIDED WITH TWO (2)
ALARM RELAYS.
DRAIN PAN TO BE ALL
WELDED WATER TIGHT
CONSTRUCTION.
MIN.
DIST.
4-INCH FORMED
CHANNEL BASE FRAME
ROUTE CONDENSATE
TO MAIN DRAIN LINE.
IAQ SLOPED DRAIN PAN BY
AHU MANUFACTURER
NEOPRENE
GASKET
1" COPPER DRAIN PIPING W/
SOLDERED JOINTS.
1" BUSHING (FEMALE THRD. X
MALE ADAPTER)
CONTRACTOR TO PROVIDE A 4" HIGH
GALVANIZED STEEL DRAIN PAN UNDER
ENTIRE BASE FRAME OF LOWER UNIT.
1" BACK-UP NUT W/
WASHER TO FORM
TIGHT SEAL
AGAINST PAN.
CONTROL WIRING AND 24V POWER
WIRING FROM DDC PANEL; BY
CONTROLS CONTRACTOR.
1/2" DIA. HANGER ROD (TYP.)
TYPICAL OPP. HAND
NOTES:
1. CONTRACTOR SHALL SUPPORT SECONDARY DRAIN PAN INDEPENDENT OF AIR HANDLER.
2. LEAK DETECTOR SIGNAL TO BMS SHALL "DISABLE" AIR HANDLER AND ALARM BMS.
2" WALL THICKNESS
COOLING COIL
FILTER
RA
CHS
CHR
T-1
V-1
ROOM TEMPERATURE SENSOR,
WALL MOUNTED [48" AFF].
CONTROL SEQUENCE - AHU (COOLING ONLY)
1. AIR HANDLING UNIT SHALL OPERATE ON A SCHEDULE AS SET BY THE EXISTING BAS.
2. MODULATE V-1 TO MAINTAIN SPACE SET POINT AND FAN SHALL CYCLE W/TEMPERATURE.
3. ALARM IF SPACE TEMPERATURE OUTSIDE OF RANGES.
SA
NOTES:
1. AIR HANDLING UNIT SHALL BE INTEGRATED INTO EXISTING BAS. (TRIDIUM NIAGARA)
INTEGRATE CONTROL POINT ON REMOTE GRAPHICS
WORKSTATION AT ENERGY CONTROL CENTER
TEMPERATURE CONTROLLER. SEE SEQUENCE OF
OPERATION
SPEED CONTROLLER. SEE SEQUENCE OF OPERATION
TO EXISTING BAS
AHU CONTROLLER
SD
SD SMOKE DETECTOR
SD-1
SMOKE DETECTOR (SD-1) - SD-1 CONNECT TO FIRE ALARM
SIZE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
Architect:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEP Engineer: Elevator Consultant:
MES GROUP LERCH BATES
550 N. REO STREET SUITE 203
TAMPA, FL 33609
813.289.4700
216 S. JEFFERSON STREET
SUITE LL2
CHICAGO, IL 60661
312.256.1010
30% SCHEMATIC DESIGN 06/20/2024
60% DESIGN DEVELOPMENT 08/12/2024
90% QAQC REVIEW 09/23/2024
90% CONSTRUCTION DOCUMENTS 10/02/2024
100% QAQC REVIEW 10/25/2024
100% BID DOCUMENTS 01/20/2025
100% BID DOCUMENTS - REVISED BASE BID 01/24/2025
A u to d e s k D o c s /1
.6
.1
V A
H in e s E le v a to r
R e p la c e m e n t/
.6
.1
H in e s E le v a to rs M
E P
R
.r v t
/2
/2
:1
:4
A
M
M501
MECHANICAL DETAILS &
CONTROLSGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
ELEVATOR REPLACEMENT
5000 5TH AVE, HINES, IL 60141
578-25-003
01/24/2025 NPS PBJ
100% BID DOCUMENTS
FULLY SPRINKLERED
Revisions: Date:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
Architect:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEP Engineer: Elevator Consultant:
MES GROUP LERCH BATES
550 N. REO STREET SUITE 203
TAMPA, FL 33609
813.289.4700
216 S. JEFFERSON STREET
SUITE LL2
CHICAGO, IL 60661
312.256.1010
30% SCHEMATIC DESIGN 06/20/2024
60% DESIGN DEVELOPMENT 08/12/2024
90% QAQC REVIEW 09/23/2024
90% CONSTRUCTION DOCUMENTS 10/02/2024
100% QAQC REVIEW 10/25/2024
100% BID DOCUMENTS 01/20/2025
100% BID DOCUMENTS - REVISED BASE BID 01/24/2025
A u to d e s k D o c s /1
.6
.1
V A
H in e s E le v a to r
R e p la c e m e n t/
.6
.1
H in e s E le v a to rs M
E P
R
.r v t
/2
/2
:1
:4
A
M
M601
MECHANICAL SCHEDULES
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
ELEVATOR REPLACEMENT
5000 5TH AVE, HINES, IL 60141
578-25-003
01/24/2025 NPS PBJ
100% BID DOCUMENTS
FULLY SPRINKLERED
5 MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL SMOKE DETECTOR IN EACH AIR HANDLING UNIT PER NFPA 90A REQUIREMENTS. CONNECT TO EXISTING FIRE ALARM SYSTEM.
4. UNIT CONTROLLER SHALL HAVE CAPABILITY FOR BACNET INTEGRATION TO EXISTING BUILDING AUTOMATION SYSTEM (BAS). (EXISTING BAS IS TRIDIUM NIAGARA)
3. PROVIDE ALL REQUIRED INTERFACES,THERMOSTAT, SUB-COMPONENTS, AND SENSORS FOR A COMPLETE INSTALLATION.
2. PROVIDE WITH 0-10VDC ANALOG CONTROLLER FOR FAN SPEED CONTROL.
1. DISCONNECT FURNISHED BY MANUFACTURER; INSTALLED BY ELECTRICAL CONTRACTOR.
NOTES:
* DESIGN...
AHU-A3F ELEVATOR MACHINE ROOM HORIZONTAL DAIKIN BCHD030 3000 0.10 75.0/63.0 104.6 78.7 17.4 42.0 8.17 1-1/2 MERV 8 2.0 3.5 15 460/3 1-4
AHU-A2F ELEVATOR MACHINE ROOM HORIZONTAL DAIKIN BCHD030 3000 0.10 75.0/63.0 104.6 78.7 17.4 42.0 8.17 1-1/2 MERV 8 2.0 3.5 15 460/3 1-4
AHU-A1F ELEVATOR MACHINE ROOM HORIZONTAL DAIKIN BCHD030 3000 0.10 75.0/63.0 104.6 78.7 17.4 42.0 8.17 1-1/2 MERV 8 2.0 3.5 15 460/3 1-4
AHU-AS3 ELEVATOR MACHINE ROOM HORIZONTAL DAIKIN BCHD030 3000 0.10 75.0/63.0 104.6 78.7 17.4 42.0 8.17 1-1/2 MERV 8 2.0 3.5 15 460/3 1-4
AHU-AS2 ELEVATOR MACHINE ROOM HORIZONTAL DAIKIN BCHD030 3000 0.10 75.0/63.0 104.6 78.7 17.4 42.0 8.17 1-1/2 MERV 8 2.0 3.5 15 460/3 1-4
AHU-AS1 ELEVATOR MACHINE ROOM HORIZONTAL DAIKIN BCHD030 3000 0.10 75.0/63.0 104.6 78.7 17.4 42.0 8.17 1-1/2 MERV 8 2.0 3.5 15 460/3 1-4
EAT DB/WB
TOTAL COOLING
(MBH)
SENSIBLE
COOLING (MBH)
FLOW
(GPM)
EWT WPD RUNOUT SIZE (IN) HP MCA MOCP VOLTS/Ø
MARK LOCATION TYPE MANUFACTURER MODEL #
FAN AIRFLOW
(CFM)
EXTERNAL APD
CHILLED WATER COIL
FILTER
FAN MOTOR
NOTES
COOLING ONLY TWO PIPE FAN COIL UNIT SCHEDULE (ALTERNATE DEDUCT #1)
Revisions: Date:
| Sheets |
| F000 - FIRE PROTECTION TITLE SHEET |
| FP116 - MACHINE ROOM FLOOR PLAN - FIRE PROTECTION |
| M000 - HVAC TITLE SHEET |
| MD116 - MACHINE ROOM FLOOR PLAN - MECHANICAL DEMOLITION |
| MH116 - MACHINE ROOM FLOOR PLAN - MECHANICAL |
| M501 - MECHANICAL DETAILS & CONTROLS |
| M601 - MECHANICAL SCHEDULES |
File details come from the government source that posted it. Updated .