This document is a fire protection design drawing set for an elevator replacement project at the Hines VA Hospital in Hines, Illinois. The drawing set includes a title sheet (F000) and a machine room floor plan (FP116) with comprehensive fire protection details, symbols, and general notes. Key requirements include full sprinkler system installation following multiple NFPA and building code standards, with specific guidelines for sprinkler head guards, demolition limits, and coordination between mechanical, electrical, and fire protection contractors. The project is part of VA Project Number 578-25-003, with bid documents dated 01/24/2025, and involves replacing and protecting sprinkler systems in the elevator machine room while adhering to strict VA technical information library and fire prevention standards.

The drawings specify detailed requirements such as installing sprinkler head guards on all existing sprinkler heads in the elevator machine room, completely demolishing existing sidewall sprinklers and associated branch piping, and ensuring fire protection piping is not routed above electrical equipment. Contractors must provide drain pans where necessary, submit shop drawings and O&M manuals, maintain as-built documentation, and coordinate with other trades. The project follows the 2024 editions of International Building, Mechanical, Plumbing, Energy Conservation, and Fire Codes, as well as multiple NFPA standards, with an emphasis on maintaining fire and smoke-rated assembly integrity.

View the file

Other files

File Type Posted
36C25225R0036 0007.docx DOCX document
S06 36C25225R0036 006_Att02 25-0725 Supplemental Sketches.pdf PDF
BLDG200F13R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att07 26 22 00 Low-Voltage Transformers.pdf PDF
BLDG200F3R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att05 Physical Access Control Clarifications.pdf PDF
S06 36C25225R0036 006_Att12 Sole Source Listing__full.e.pdf PDF
S06 36C25225R0036 006_Att06 26 43 13 Surge Protection Devices - Addendum 1.pdf PDF
BLDG200F7R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att11 Photos_Existing Conditions.pdf PDF
BLDG200F6R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att01 Finish and Lighting Changes.pdf PDF
BLDG200 F10R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att09 Hines State Tax Exempt 2025.pdf PDF
BLDG200F4R2010.xls XLS spreadsheet
BLDG200F11R2010.xls XLS spreadsheet
BLDG200F9R2010.xls XLS spreadsheet
BLDG200BSMTR2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att10 OFFER SCHEDULE.R1 578-25-003 B200 Elevators.pdf PDF
BLDG200F2R2010.xls XLS spreadsheet
BLDG200F1R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att08 GKT15-30W-10_Specification.pdf PDF
BLDG200F8R2010.xls XLS spreadsheet
S06 36C25225R0036 006_Att04 _ Wage Rates IL20250009.R3 2025.08.01.pdf PDF
BLDG200F14R2010.xls XLS spreadsheet
BLDG200F5R2010.xls XLS spreadsheet
36C25225R0036 0006.docx DOCX document
S06 36C25225R0036 0005.docx DOCX document
S06 36C25225R0036 0005.pdf PDF
S06 36C25225R0036 004 578-25-003_Att Finish Schedule.pdf PDF
36C25225R0036 0004.docx DOCX document
S06 36C25225R0036 003 Att2 Sign-in Site Visit_02_rev.pdf PDF
36C25225R0036 0003.docx DOCX document
S06 36C25225R0036 003 Att1 Sign-in Site Visit_01.pdf PDF
S06 36C25225R0036 002 Att2 Sign-in Site Visit_02.pdf PDF
S06 36C25225R0036 002 Att1 Sign-in Site Visit_01.pdf PDF
S06 36C25225R0036 002 578-25-003.docx DOCX document
S06 001 Att1 Sign-in Site Visit_01 for 578-25-003 Elevators 2025.06.18.pdf PDF
36C25225R0036 0001.docx DOCX document
36C25225R0036_3.docx DOCX document
S02 Sol R0036 AttA VAAR 852.219-75 Certification 578-25-003.docx DOCX document
S02 Sol R0036 AttC Contractor EMR Safety Info 578-25-003.docx DOCX document
S02 Sol R0036 AttE SOW.Att00_Descriptive Project Scope of Work 578-25-003_r.pdf PDF
S02 Sol R0036 AttE SOW.Att15d_578-25-003 100 perc DWGS Part 4of5_2025.01.24.pdf PDF
S02 Sol R0036 AttE SOW.Att12_Cutting Welding and Other Hot Work.pdf PDF
S02 Sol R0036 AttE SOW.Att18b_Building 220 Colored Space Drawings.pdf PDF
S02 Sol R0036 AttB Contractor Info 578-25-003.docx DOCX document
36C25225R0036_3.docx DOCX document
S02 Sol R0036 AttE SOW.Att09_Infection Control Risk Assessment_ICRA-1.3.pdf PDF
S02 Sol R0036 AttE SOW.Att14a _578-25-003_Replace Elevators B200_SPECS VOL 1of 2_updated.pdf PDF
Show 40 more

Latest 50 of 73 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N.T.S.

2 5/8" [67 mm]

2 5/8" [67 mm]

3" [75 mm]

3" [75 mm]

EXISTING

SPRINKLER

HEAD

SPRINKLER HEAD GUARD

EXISTING

SPRINKLER

HEAD

WITH UPRIGHT SPRINKLER WITH PENDENT SPRINKLER

1 SPRINKLER HEAD GUARD DETAIL

(E)

2"

KEYNOTE

CONTINUATION SYMBOL

NUMBER OF SHEET WHERE DETAIL APPEARS

NUMBER OF DETAIL ON SHEET

REVISION NUMBER - SHOWN ON PLANS

GENERAL MECHANICAL SYMBOLS

ROOM NAME AND NUMBER

POINT WHERE NEW CONNECTS TO EXISTING

EXISTING PIPE TAG

ITEM TO BE DEMOLISHED

AREA NOT IN CONTRACT

PIPING BEING DEMOLISHED

ABOVE GROUND PIPING

PIPE SIZE TAG (DIAMETER)

PIPE RISE

PIPE DROP

PIPE TEE

BELOW GROUND PIPING

PIPE INVERT ELEVATION TAG

PIPE SLOPE TAG

Room

INVERT: -105' - 1"

1/8" / 12" SLOPE

FIRE PROTECTION SYMBOLS

FIRE PROTECTION OTHER

FIRE PROTECTION DRY

FIRE PROTECTION PRE-ACTION

FIRE PROTECTION WET

Ø DIAMETER

ABV ABOVE

AFF ABOVE FINISHED FLOOR

ARCH ARCHITECT/ARCHITECTURAL

BFF BELOW FINISHED FLOOR

BLW BELOW

CAP CAPACITY

CLG CEILING

D DEGREE

DN DOWN

ELEC ELECTRICAL

F FAHRENHEIT

FDC FIRE DEPARTMENT CONNECTION

FPM FEET PER MINUTE

FT FOOT/FEET

GAL GALLON

GPM GALLONS PER MINUTE

HYD HYDRANT

IN INCH

INV INVERT

LB POUND

MAX MAXIMUM

MECH MECHANICAL

MIN MINIMUM

MISC MISCELLANEOUS

NIC NOT IN CONTRACT

NO NUMBER

NTS NOT TO SCALE

PD PRESSURE DROP

PIV POST INDICATOR VALVE

PSI POUNDS PER SQUARE INCH

REC RECESSED

RM ROOM

SF SQUARE FOOT/FEET

SP STANDPIPE

SP STATIC PRESSURE

TYP TYPICAL

UG UNDERGROUND

ABBREVIATIONS

PIPE ACCESSORY TAGS

BALANCING VALVE

1/4 TURN BALL VALVE

CHECK VALVE

UPRIGHT SPRINKLER HEAD

PENDENT SPRINKLER HEAD

DRY SPRINKLER HEAD

CAP

SIDEWALL SPRINKLER HEAD

EXTENDED COVERAGE SIDEWALL

SPRINKLER HEAD

RECESSED SPRINKLER HEAD

CONCEALED SPRINKLER HEAD

ALARM CHECK VALVE

DRY PIPE VALVE

INDICATING BUTTERFLY

VALVE

OS&Y VALVE PREACTION VALVE

POST INDICATOR VALVE

RISER

THRUST BLOCK

VALVE NONRISING STEM

DRY SIDEWALL SPRINKLER HEAD

DRY EXTENDED COVERAGE SIDEWALL

SPRINKLER HEAD

EXISTING SPRINKLER HEAD

GENERAL NOTES

FIRE PROTECTION NOTES

* NOTE *

ALL OF GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL OTHER

DRAWINGS IN THIS SET.THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS

SHEET MAY OR MAY NOT BE USED IN THIS SET OF DRAWINGS.

FREESTANDING SIAMESE

DEPARTMENT FIRE

CONNECTION

PRESSURE REDUCING

VALVE

SINGLE FIRE DEPARTMENT

CONNECTION

SIAMESE FIRE CONNECTION

DEPARTMENT

1. THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND INDICATIVE OF

WORK TO BE PROVIDED (FURNISHED AND INSTALLED) UNDER THIS

CONTRACT. DRAWINGS SHOULD NOT BE SCALED.

4. CONTRACTOR SHALL NOTE ANY SPECIAL REQUIREMENTS FOR

INSTALLATION OF WORK UNDER THIS CONTRACT. DISMANTLE AND

REASSEMBLE EQUIPMENT AS NECESSARY FOR ENTRY INTO THE BUILDING

AND THE LOCATION OF INSTALLATION.

5. THE CONTRACTOR SHALL MAINTAIN A COMPLETE PROJECT SCHEDULE AND

SHALL UPDATE THIS SCHEDULE WEEKLY. ANY CHANGES SHALL BE NOTED

AND AN UPDATED SCHEDULE SHALL BE PROVIDED TO THE OWNER.

6. ALL PERMITS, FEES, TAXES, ETC SHALL BE PAID BY CONTRACTOR AS PART

OF THE TOTAL PROJECT COST.

7. MAINTAIN THE INTEGRITY OF ALL FIRE AND SMOKE RATED WALLS,

PARTITIONS, CEILINGS, AND FLOORS. SEAL ALL PENETRATIONS THROUGH

RATED ASSEMBLIES WITH FIRESTOP MATERIAL IN ACCORDANCE WITH U.L.

REQUIREMENTS TO MAINTAIN THE ASSEMBLY RATING.

8. CONTRACTOR SHALL FURNISH U.L. APPROVED DRAWINGS FOR EACH TYPE

OF FIRE AND SMOKE RATED ASSEMBLY PENETRATION BY DUCTS, PIPES, OR

CONDUITS, AND SHALL DISPLAY THESE DRAWINGS ON THE JOB SITE AT ALL

TIMES DURING CONSTRUCTION.

9. CONTRACTOR SHALL REFER TO ALL DETAILS FOR PROPER GUIDANCE.

10.THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND EQUIPMENT

SUBMITTALS FOR ALL PRODUCTS USED ON PROJECT.

11.THE ENGINEER'S APPROVAL OF SUBMITTAL DATA SHALL NOT RELIEVE THE

CONTRACTOR OF RESPONSIBILITY FOR DEVIATIONS FROM THE

REQUIREMENTS OF CONTRACT DOCUMENTS UNLESS THE CONTRACTOR

HAS RECEIVED WRITTEN APPROVAL FROM THE ENGINEER TO THE SPECIFIC

DEVIATION. THE ENGINEER'S APPROVAL OF SUBMITTAL DATA SHALL NOT

RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR ERRORS OR

OMISSIONS IN HIS OR HER SUBMITTAL DATA.

12.THE CONTRACTOR IS REQUIRED TO SUBMIT THREE COMPLETE O&M

MANUALS IN THREE RING BINDERS AT SUBSTANTIAL COMPLETION.

MANUALS SHALL INCLUDE INSTALLATION AND MAINTENANCE DATA ON ALL

NEW EQUIPMENT AND MATERIALS, CERTIFIED TECHNICAL PRODUCT DATA,

EQUIPMENT SHOP DRAWINGS, SPARE PARTS DATA, ETC. PROVIDE AN INDEX

AND ASSOCIATED DIVIDERS.

13.CLOSE OUT DOCUMENTS: THE CONTRACTOR IS TO MAINTAIN ONE SET OF

CONSTRUCTION DRAWINGS ON SITE AND KEEP CURRENT WITH MARK UP

AS-BUILT CONDITIONS DURING CONSTRUCTION OF THE PROJECT. THIS SET

IS TO INCLUDE ALL CONTRACT CHANGES, MODIFICATIONS AND

CLARIFICATIONS. THIS SET ALONG WITH ALL SHOP DRAWINGS SHALL BE

TURNED OVER TO THE ARCHITECT/ENGINEER AFTER CONSTRUCTION

COMPLETION.

14.IT IS THE RESPONSIBILITY OF ALL BIDDERS TO THOROUGHLY REVIEW AND

UNDERSTAND ALL CONSTRUCTION DOCUMENTS. THIS INCLUDES BUT IS NOT

LIMITED TO ALL DRAWINGS, SPECIFICATION SECTIONS, ETC. THE DRAWINGS

ARE SCHEMATIC IN NATURE. THEREFORE BEFORE STARTING ANY WORK,

THE CONTRACTOR SHALL REVIEW ALL OTHER CONSTRUCTION DOCUMENTS,

VERIFY FIELD CONDITIONS AND SHALL MAKE ANY REQUIRED MINOR

ADJUSTMENTS WITHOUT EXTRA COST TO THE OWNER. ANY MAJOR

DISCREPANCIES FOUND SHALL BE BROUGHT TO THE ATTENTION OF THE

ARCHITECT/ENGINEER. THE BASE BID SHALL REFLECT THE TOTAL COST OF

NEW EQUIPMENT INSTALLATION. THIS INCLUDES LABOR, EQUIPMENT AND

MATERIALS. NO CHANGE ORDERS SHALL BE ISSUED WITHOUT WRITTEN

CONSENT AND APPROVAL FROM ENGINEER AND ARCHITECT.

A.THE SYSTEM SHALL BE INSTALLED ACCORDING TO MANUFACTURER'S

SPECIFICATIONS AND RECOMMENDATIONS AND AS PER REQUIREMENTS OF

ALL FEDERAL VA AUTHORITIES, NFPA, AND FACTORY MUTUAL.

B. THIS CONTRACTOR SHALL COORDINATE PHASING OF SPRINKLER WORK

WITH THE GENERAL CONTRACTOR PRIOR TO STARTING WORK.

C.REFER TO REFLECTED CEILING PLANS FOR ADDITIONAL INFORMATION

REGARDING SPRINKLER HEAD LOCATION AND PIPE, UNLESS NOTED

OTHERWISE.

D. DIVISION 21 CONTRACTOR SHALL COORDINATE WITH THE ELECTRICAL

CONTRACTOR FOR PROPER INSTALLATION OF THE FIRE PROTECTION

SYSTEMS ALARM DEVICES INVOLVED WITH FIRE SPRINKLER SYSTEM.

E. THE CONTRACTOR SHALL PROVIDE ALL ADDITIONAL SPRINKLER HEADS AS

REQUIRED TO ENSURE AN APPROVED FIRE PROTECTION SYSTEM AT NO

ADDITIONAL COST TO THE OWNER.

F. SHOW ALL ROOM NUMBERS ON SHOP DRAWING PLANS.

LIMIT OF DEMOLITION

2. PERFORM ALL WORK IN COMPLIANCE WITH ALL APPLICABLE FEDERAL,

STATE, AND LOCAL CODES, REGULATIONS, AND STANDARDS ADOPTED BY

THE AUTHORITY HAVING JURISDICTION. IF CONFLICTS EXIST BETWEEN

THESE ENGINEERING DOCUMENTS AND CODES, THE MOST STRINGENT

REQUIREMENTS SHALL GOVERN.

3. ALL CONSTRUCTION WORK SHALL ALSO MEET THE FOLLOWING CODE

REQUIREMENTS:

· VA TECHNICAL INFORMATION LIBRARY (TIL)

· INTERNATIONAL BUILDING CODE (IBC) 2024

· INTERNATIONAL EXISTING BUILDING CODE 2024

· INTERNATIONAL MECHANICAL CODE 2024

· INTERNATIONAL PLUMBING CODE 2024

· INTERNATIONAL ENERGY CONSERVATION CODE 2024

· INTERNATIONAL FIRE CODE 2024

· NFPA 1-2024, THE UNIFORM FIRE CODE

· NFPA 101-2024, THE LIFE SAFETY CODE

· NFPA 51B-2024, STANDARD FOR FIRE PREVENTION DURING WELDING,

CUTTING AND OTHER HOT WORK

· NFPA 13-2022, STANDARD FOR THE INSTALLATION OF SPRINKLER

SYSTEMS

· NFPA 70-2023, NATIONAL ELECTRICAL CODE

· NFPA 90A-2024, STANDARD FOR THE INSTALLATION OF AIR

CONDITIONING AND VENTING SYSTEMS.

· NFPA 99-2024, STANDARD FOR HEALTH CARE FACILITIES

· NFPA 241-2022, STANDARD FOR SAFEGUARDING CONSTRUCTION,

ALTERATION AND DEMOLITION OPERATIONS.

FP-W

FP-PA

FP-O

FP-D

D

D D

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

Architect:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEP Engineer: Elevator Consultant:

MES GROUP LERCH BATES

550 N. REO STREET SUITE 203

TAMPA, FL 33609

813.289.4700

216 S. JEFFERSON STREET

SUITE LL2

CHICAGO, IL 60661

312.256.1010

30% SCHEMATIC DESIGN 06/20/2024

60% DESIGN DEVELOPMENT 08/12/2024

90% QAQC REVIEW 09/23/2024

90% CONSTRUCTION DOCUMENTS 10/02/2024

100% QAQC REVIEW 10/25/2024

100% BID DOCUMENTS 01/20/2025

100% BID DOCUMENTS - REVISED BASE BID 01/24/2025

A u to d e s k D o c s /1

.6

.1

V A

H in e s E le v a to r

R e p la c e m e n t/

.6

.1

H in e s E le v a to rs M

E P

R

.r v t

/2

/2

:1

:4

A

M

F000

FIRE PROTECTION TITLE SHEET

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

ELEVATOR REPLACEMENT

5000 5TH AVE, HINES, IL 60141

578-25-003

01/24/2025 NPS PBJ

100% BID DOCUMENTS

FULLY SPRINKLERED

FIRE PROTECTION SHEET INDEX

F000 FIRE PROTECTION TITLE SHEET

FP116 MACHINE ROOM FLOOR PLAN - FIRE PROTECTION

FIRE RATING LEGEND

1 HOUR FIRE WALL

2 HOUR FIRE WALL

Revisions: Date:

Date Signed: 01/24/2025 License Expires: 02/28/2027

A. EXISTING EQUIPMENT, PIPING, SPRINKLER HEADS, AND ASSOCIATED

COMPONENTS SHOWN ON DRAWINGS ARE APPROXIMATE LOCATIONS AND

ARE PROVIDED FOR REFERENCE USE ONLY. FIELD VERIFY AND

COORDINATE WITH EXACT LOCATIONS, ELEVATIONS, SIZES, NUMBER OF

SPRINKLER HEADS, AND CONDITIONS OF EXISTING COMPONENTS.

B. FIRE PROTECTION PIPING SHALL NOT BE LOCATED OR ROUTED ABOVE ANY

ELECTRICAL EQUIPMENT. DRAIN PANS SHALL BE PROVIDED WHERE

NECESSARY TO PREVENT ANY DAMAGE TO EQUIPMENT.

FIRE PROTECTION GENERAL NOTES

1. GUARDS SHALL BE PROVIDED ON ALL EXISTING SPRINKLER HEADS

(PENDENT, UPRIGHT, AND SIDEWALL) LOCATED IN ELEVATOR MACHINE

ROOM. CONTRACTOR SHALL FIELD VERIFY EXACT NUMBER OF SPRINKLER

HEADS IN SPACE PRIOR TO ORDERING GUARDS. ALL EXISTING SPRINKLER

HEAD GUARDS SHALL BE REPLACED WITH NEW GUARDS.

2. EXISTING SIDEWALL SPRINKLER SHALL BE DEMOLISHED COMPLETELY. ALL

ASSOCIATED FIRE SPRINKLER BRANCH PIPING SHALL BE DEMOLISHED

COMPLETELY BACK TO LIMIT OF DEMOLITION SHOWN ON DRAWING. CAP

AND SEAL.

FIRE PROTECTION KEYNOTES -

H I J

ENGINEERING MECHANICAL

ROOM

OPEN TO BELOW

OPEN TO BELOW

(TYP.)

(TYP.)

(TYP.)

(TYP.)

(E) 2" FP-W

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

Architect:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

MEP Engineer: Elevator Consultant:

MES GROUP LERCH BATES

550 N. REO STREET SUITE 203

TAMPA, FL 33609

813.289.4700

216 S. JEFFERSON STREET

SUITE LL2

CHICAGO, IL 60661

312.256.1010

30% SCHEMATIC DESIGN 06/20/2024

60% DESIGN DEVELOPMENT 08/12/2024

KEY PLAN

NO SCALE

N

90% QAQC REVIEW 09/23/2024

90% CONSTRUCTION DOCUMENTS 10/02/2024

100% QAQC REVIEW 10/25/2024

100% BID DOCUMENTS 01/20/2025

100% BID DOCUMENTS - REVISED BASE BID 01/24/2025

A u to d e s k D o c s /1

.6

.1

V A

H in e s E le v a to r

R e p la c e m e n t/

.6

.1

H in e s E le v a to rs M

E P

R

.r v t

/2

/2

:1

:4

A

M

FP116

MACHINE ROOM FLOOR PLAN -

FIRE PROTECTIONGUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

ELEVATOR REPLACEMENT

5000 5TH AVE, HINES, IL 60141

578-25-003

01/24/2025 NPS PBJ

100% BID DOCUMENTS

FULLY SPRINKLERED

N

SCALE: 1/4" = 1'-0"FP116

1 MACINE ROOM FLOOR PLAN - FIRE PROTECTION

Revisions: Date:

Date Signed: 01/24/2025 License Expires: 02/28/2027