S02 Sol R0036 AttE SOW.Att15a_578-25-003 100 perc DWGS_Part 1of5_2025.01.24.pdf
PDF 7 MB Posted
- Attached to
- Z1DA--578-25-003 Renovate Elevators B200 (Construction) at the Hines VA Hospital in Hines, IL
- Solicitation number
- 36C25225R0036_3
About this file
This document is a comprehensive set of architectural and engineering design drawings for an elevator renovation project at the Edward Hines Jr. VA Medical Center in Hines, Illinois. The project involves modernizing eight elevators (five passenger and three service elevators) in Building 200, with a phased approach to minimize disruption to hospital operations. The design documents include detailed architectural plans for each floor from basement to the fourteenth floor, as well as the machine room, with specific renovation strategies for each elevator.
The project includes multiple bid alternates: the base bid covers elevator equipment modernization, while additional alternates cover lobby finish upgrades on the first floor and other floors, replacement of air handling units in the elevator machine room, and new elevator car enclosures. The design emphasizes infection control, patient safety, and minimal hospital operational interruption, with specific phasing notes requiring work to be completed during off-hours, using temporary barriers, and maintaining pedestrian traffic routes. The bid documents are dated January 24, 2025, with design development milestones ranging from June 2024 to January 2025, indicating a comprehensive planning and design process.
View the file
Other files
Show 40 more
Latest 50 of 73 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT OFFICER REPRESENTATIVE DATE
CHIEF OF ENGINEERING DATE
INTERIOR DESIGNER DATE
DEPARTMENT HEAD DATE
CONTRACT SPECIALIST DATE LEAD USER SIGNATURE DATE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
Architect:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEP Engineer:
NOT F
OR
CONSTRUCTIO
N
Elevator Consultant:
MES GROUP LERCH BATES
550 N. REO STREET SUITE 203
TAMPA, FL 33609
813.289.4700
216 S. JEFFERSON STREET
SUITE LL2
CHICAGO, IL 60661
312.256.1010
30% SCHEMATIC DESIGN 06/20/2024
60% DESIGN DEVELOPMENT 08/12/2024
90% QAQC REVIEW 09/23/2024
90% CONSTRUCTION DOCUMENTS 10/02/2024
100% QAQC REVIEW 10/25/2024
100% BID DOCUMENTS 1/20/2025
100% BID DOCUMENTS - REVISED BASE BID 1/24/2025
A u to d e s k D o c s /1
.6
.1
V A
H in e s E le v a to r
R e p la c e m e n t/
.6
.1
H in e s E le v a to rs
R
.r v t
/2
/2
:0
:3
A
M
GI000
COVER SHEET
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
RENOVATE ELEVATORS
BUILDING 200
5000 5TH AVE, HINES, IL 60141
578-25-003
1/24/2025 MT NL
100% BID DOCUMENTS
FULLY SPRINKLERED
Contact:Contact: Contact: Contact:
MEP DESIGN TEAM
Sary Chhoeung
Project Manager
MECHANICAL,
ELECTRICAL &
PLUMBING
EDWARD HINES JR. VAMC
Martin Pint/ Aaron Walsh
COR
5000 South 5th Avenue Hines, IL 60612 p: 708.202.8387 x 27247
708.202.8387 x 21152 e: martin.pint@va.gov aaron.walsh@va.gov
OWNER
GUIDON DESIGN INC.
Morris Thomas
Project Manager
1221 North Pennsylvania Street Indianapolis, IN 46202 p: 317.800.6388 x 176 e: mthomas@guidondesign.com
ARCHITECT
LERCH BATES
Jim Hoppensteadt Senior Consultant
VERTICAL
TRANSPORTATION
CONSULTANT
550 North Reo Street Suite 203 Tampa, FL 33609 p: 813.289.4700 x 2240 e: sary.chhoeung@mesgroupinc.com
216 S. Jefferson Street Suite LL2 Chicago, IL 60661 p: 312.256.1010 e: jim.hoppensteadt@lerchbates.com
AREA MAP
VICINITY MAP
CAMPUS MAP
PROJECT AREA
PROJECT BOUNDARY
E-700 ELECTRICAL SCHEDULES
E-603 RENOVATION PARTIAL ELECTRICAL ONE-LINE DIAGRAM
E-602 RENOVATION PARTIAL ELECTRICAL ONE-LINE DIAGRAM
E-601 DEMOLITION PARTIAL ELECTRICAL ONE-LINE DIAGRAM
E-600 DEMOLITION PARTIAL ELECTRICAL ONE-LINE DIAGRAM
E-500 ELECTRICAL DETAILS
ELE116 MACHINE ROOM LIGHTING PLAN
E116 MACHINE ROOM ELECTRICAL PLAN
E115 FIFTEENTH FLOOR ELECTRICAL PLAN
E101.1 FIRST - FOURTEENTH FLOOR ELECTRICAL PLAN (TYP)
E100.1 BASEMENT POWER PLAN
E100 BASEMENT POWER PLAN - OVERALL
ELD116 MACHINE ROOM DEMOLITION LIGHTING PLAN
ED116 MACHINE ROOM DEMOLITION ELECTRICAL PLAN
ED115 FIFTEENTH LEVEL DEMOLITION ELECTRICAL PLAN
ED101.1 FIRST - FOURTEENTH FLOOR DEMOLITION ELECTRICAL PLAN
ED100.1 BASEMENT DEMOLITION ELECTRICAL PLAN
ED100 BASEMENT DEMOLITION POWER PLAN - OVERALL
E001 ELECTRICAL LEGEND, NOTES, AND ABBREVIATIONS
Electrical
PP100.1 ENLARGED BASEMENT FLOOR PLAN - PLUMBING
PP100 BASEMENT FLOOR PLAN - PLUMBING - OVERALL
PD116 MACHINE ROOM FLOOR PLAN - PLUMBING DEMOLITION
P000 PLUMBING TITLE SHEET
Plumbing
FP116 MACHINE ROOM FLOOR PLAN - FIRE PROTECTION
F000 FIRE PROTECTION TITLE SHEET
Fire Protection
M601 MECHANICAL SCHEDULES
M501 MECHANICAL DETAILS AND CONTROLS
MH116 MACHINE ROOM FLOOR PLAN - MECHANICAL
MD116 MACHINE ROOM FLOOR PLAN - MECHANICAL DEMOLITION
M000 HVAC TITLE SHEET
Mechanical
AI203 ELEVATOR PANEL REFERENCES
AI202 LOBBY ELEVATIONS AND SCHEDULE
AI201 INTERIOR CAB ELEVATIONS AND SCHEDULE
AI101 INTERIOR FINISH PLAN
AE401 ENLARGED PLANS
AE116 MACHINE ROOM ARCHITECTURAL PLAN
AE114 FOURTEENTH LEVEL ARCHITECTURAL PLAN
AE113 THIRTEENTH LEVEL ARCHITECTURAL PLAN
AE111 ELEVENTH LEVEL ARCHITECTURAL PLAN
AE110 TENTH LEVEL ARCHITECTURAL PLAN
AE109 NINTH LEVEL ARCHITECTURAL PLAN
AE108 EIGTH LEVEL ARCHITECTURAL PLAN
AE107 SEVENTH LEVEL ARCHITECTURAL PLAN
AE106 SIXTH LEVEL ARCHITECTURAL PLAN
AE105 FIFTH LEVEL ARCHITECTURAL PLAN
AE104 FOURTH LEVEL ARCHITECTURAL PLAN
AE103 THIRD LEVEL ARCHITECTURAL PLAN
AE102 SECOND LEVEL ARCHITECTURAL PLAN
AE101 FIRST FLOOR ARCHITECTURAL PLAN
AE100 BASEMENT ARCHITECTURAL PLAN
AE001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS
AD114 FOURTEENTH LEVEL DEMOLITION PLAN
AD113 THIRTEENTH LEVEL DEMOLITION PLAN
AD111 ELEVENTH LEVEL DEMOLITION PLAN
AD110 TENTH LEVEL DEMOLITION PLAN
AD109 NINTH LEVEL DEMOLITION PLAN
AD108 EIGTH LEVEL DEMOLITION PLAN
AD107 SEVENTH LEVEL DEMOLITION PLAN
AD106 SIXTH LEVEL DEMOLITION PLAN
AD105 FIFTH LEVEL DEMOLITION PLAN
AD104 FOURTH LEVEL DEMOLITION PLAN
AD103 THIRD LEVEL DEMOLITION PLAN
AD102 SECOND LEVEL DEMOLITION PLAN
AD101 FIRST FLOOR DEMOLITION PLAN
AD100 BASEMENT DEMOLITION PLAN
Architectural
GC117 FOURTEENTH FLOOR PLAN PHASES
GC116 THIRTEENTH FLOOR PLAN PHASES
GC114 ELEVENTH FLOOR PLAN PHASES
GC113 TENTH FLOOR PLAN PHASES
GC112 NINTH FLOOR PLAN PHASES
GC111 EIGHTH FLOOR PLAN PHASES
GC110 SEVENTH FLOOR PLAN PHASES
GC109 SIXTH FLOOR PLAN PHASES
GC108 FIFTH FLOOR PLAN PHASES
GC107 FOURTH FLOOR PLAN PHASES
GC106 THIRD FLOOR PLAN PHASES
GC105 SECOND FLOOR PLAN PHASES
GC104.3 1ST-15TH FLOOR ARCHITECTURAL PLAN PHASE 8
GC104.2 1ST-15TH FLOOR ARCHITECTURAL PLAN PHASES 5-7
GC104.1 1ST-15TH FLOOR ARCHITECTURAL PLAN PHASES 1-4
GC103.3 BASEMENT ARCHITECTURAL PLAN PHASE 8
GC103.2 BASEMENT ARCHITECTURAL PLAN PHASES 5-7
GC103.1 BASEMENT ARCHITECTURAL PLAN PHASES 1-4
GC102 WALL CONSTRUCTION DETAILS
GC101 PHASING OVERALL PLAN AND MODERNIZATION SCOPE
GI101 LIFE SAFETY PLAN FIRST FLOOR - OVERALL
GI000 COVER SHEET
General
Sheet Number Sheet Name
SHEET INDEX
VA EDWARD HINES
5000 5TH AVE, HINES, IL 60141
100% BID DOCUMENTS
RENOVATE ELEVATORS BUILDING 200
578-25-003
Revisions: Date:
nlohse Stamp
UP
N
KEY PLAN
TRAVEL DISTANCE = 210'-5"
TR
A
VE
L
D
IS
TA
N
C E
4' -1
0"
TRAVEL DISTANCE = 278'-10"
TR
A
VE
L
D
IS
TA
N
C E
3' -6
ELEVATOR P1
ELEVATOR S7
ELEVATOR S8
TR
A
VE
L
D
IS
TA
N
C E
'-0
EXIT
EXIT
EXIT
EXIT
ELEVATOR P2
ELEVATOR P3
ELEVATOR P4
ELEVATOR P5
ELEVATOR S6
A
B C D E F G H I
J K L M N O P Q
TOTAL OCCUPANCY
FEC
EXIT
OCCUPANCY LOAD FACTOR
EXITS REQUIRED
SQUARE FOOTAGE
OCCUPANCY TYPE
EGRESS EXIT SIGNAGE
FIRE EXTINGUISHER CABINET
DIAGONAL DISTANCE
EXIT SEPARATION DISTANCE
EGRESS PATH
2 HR - FIRE SEPARATION
1 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
B
1500 SF
CODE ANALYSIS LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
Architect:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEP Engineer:
NOT F
OR
CONSTRUCTIO
N
Elevator Consultant:
MES GROUP LERCH BATES
550 N. REO STREET SUITE 203
TAMPA, FL 33609
813.289.4700
216 S. JEFFERSON STREET
SUITE LL2
CHICAGO, IL 60661
312.256.1010
30% SCHEMATIC DESIGN 06/20/2024
60% DESIGN DEVELOPMENT 08/12/2024
90% QAQC REVIEW 09/23/2024
90% CONSTRUCTION DOCUMENTS 10/02/2024
100% QAQC REVIEW 10/25/2024
100% BID DOCUMENTS 1/20/2025
A u to d e s k D o c s /1
.6
.1
V A
H in e s E le v a to r
R e p la c e m e n t/
.6
.1
H in e s E le v a to rs
R
.r v t
/2
/2
:0
:3
A
M
GI101
LIFE SAFETY PLAN FIRST FLOOR -
OVERALLGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
RENOVATE ELEVATORS
BUILDING 200
5000 5TH AVE, HINES, IL 60141
578-25-003
1/24/2025 MT NL
100% BID DOCUMENTS
FULLY SPRINKLERED
N
SCALE: 1/16" = 1'-0"GI101
1 LIFE SAFETY FIRST FLOOR OVERALL PLAN
Revisions: Date:
ELEVATOR P1
ELEVATOR P2
ELEVATOR P3
ELEVATOR P4
ELEVATOR P5
ELEVATOR S6
ELEVATOR S7
ELEVATOR S8
A
B C D E F G H I
J K L M N O P Q
OVERALL PROJECT AREA REFER
TO PHASING PLANS FOR
ADDITIONAL INFORMATION
NEW FIRE ALARM CONTROL PANEL
ROUTING FOR ELECTRICAL/COMMUNICATION CABLING TO FIRE
ALARM CONTROL PANEL. CONTRACTOR SHALL PROVIDE
RECOMMENDATION FOR ALIGHING THIS SCOPE OF WORK WITH
THE OVERALL PHASING TO ACCOMODATE THE EXPEDITED
COMPLETION OF ALL ELEVATORS. REFER TO ELECTRICAL
DRAWINGS FOR COMPLETE ELECTRICAL SCOPE. CONTRACTOR
SHALL COORDINATE WITH THE VA RELATIVE TO REMOVAL AND
REPLACEMENT OF CEILING TILE AND/OR SECTIONS OF CEILING
GRID TO ACCOMODATE INSTALLATION OF NECESSARY SYSTEM
COMPONENTS, CONDUITS, AND CABLING. ALL WORK SHALL BE
COORDINATED FOR COMPLETION WHILE HOSPITAL TRAFFIC IS AT
A MINIMUM. CONTRACTOR SHALL UTILIZE CONTAINMENT CARTS
TO MAINTAIN PATIENT AND STAFF TRAFFIC AT ALL TIMES.
1. EACH ELEVATOR WILL BE PHASED SEPERATELY
2. THE SEQUENCE OF PHASES WILL BE DETERMINED BASED UPON OPERATION
OF THE EXISTING ELEVATORS DURING CONSTRUCTION
3. ELEVATOR LOBBIES SHALL BE PHASED TO MINIMIZE INTERUPTION OF
PATIENT/GUEST TRAFFIC
A. FLOORING SHALL BE PREPPED AND INSTALLED IN AREAS TO
MAINTAIN TRAFFIC IN LOBBIES
B. ALL WORK SHALL BE COORDINATED WITH THE VA AND OCCUR
DURING SHIFTS THAT ACCOMODATE OPERATIONS OF THE
ADJACENT CLINICAL AREAS
C. AREAS OF FLOORING BEING REPLACED IN FOR EACH SHIFT
SHALL NOT EXCEED AN AMOUNT THAT CAN BE COMPLETED
DURING A SINGLE SHIFT.
4. COORDINATION OF ASSOCIATED MEP SCOPE AND EQUIPMENT
INSTALLATIONS SHALL BE COORDINATED TO MINIMIZE THE NEED TO SHUT
DOWN MULTIPLE ELEVATORS AT THE SAME TIME.
5. CONSTRUCTION OF WALL AND DOOR TO BE SCHEDULED WITH VA DURING
OFF HOURS FOR SURROUNDING DEPARTMENTS, I.E. NIGHTS & WEEKENDS.
WORK SHALL BE COMPLETED DURING EACH SHIFT AND/OR ISOLATED WHEN
CONSTRUCTION ACTIVITIES ARE PAUSED FOR DAILY OPERATIONS TO
MAINTAIN PEDESTRIAN TRAFFIC ROUTES TO ELEVATORS IN A CLEAN AND
SAFE MANNER.
6. FLOORING REPLACEMENT TO BE SCHEDULED WITH VA DURING OFF HOURS
FOR SURROUNDING DEPARTMENTS, I.E. NIGHTS & WEEKENDS
AREAS FOR DEMOLITION & INSTALLATION SHALL BE DIVIDED INTO SUB
PHASES TO BE COMPLETED WITHIN A SINGLE SHIFT.
7. TEMPORARY INFECTION CONTROL PROTECTION BARRIER ON ALL FLOORS
ABOVE LOWER LEVEL.
8. THE REPLACEMENT OF CEILING TILES AT THE END OF EACH SHIFT FOR
WORK AREAS OUTSIDE OF A RATED CONSTRUCTION BARRIER.
9. THE ELEVATOR DOOR IN THE AFFECTED ELEVATOR SHAFT IS REQUIRED TO
BE CLOSED AT THE END OF EACH WORKDAY.
PHASING GENERAL NOTES
STATEMENT OF BID ITEMS
ALL WORK ASSOCIATED WITH THE MODERNIZATION OF ELEVATOR EQUIPMENT
FOR PASSENGER AND SERVICE ELEVATORS, INFRASTRUCTURE TO SUPPORT
THE MODERNIZATION, PENTHOUSE REPAIRS & UPGRADES NOT INCLUDED IN
ALTERNATE BIDS. PROVIDE BREAKOUT COSTS FOR SCOPE RELATED TO EACH
INDIVIDUAL ELEVATOR’S MODERNIZATION & FOR PENTHOUSE REPAIRS &
UPGRADES INCLUDING CONTINGENCIES, GENERAL CONDITIONS, PROJECT
MANAGEMENT, AS WELL AS CONTRACTOR OVERHEAD AND PROFIT FOR VA
COST ACCOUNTING PURPOSES.
ADD ALTERNATE - ADD ALL WORK ASSOCIATED THE DEMOLITION AND
RENOVATION OF FINISHES IN FIRST FLOOR ELEVATOR LOBBY &
CONSTRUCTION OF SEPARATION BETWEEN PASSENGER & SERVICE ELEVATOR
LOBBIES.
ADD ALTERNATE - REPLACE FINISHES IN ELEVATOR LOBBIES IN BASEMENT &
ON FLOORS 2-14 AS INDICATED ON DRAWINGS. PROVIDE BREAKOUT COSTS
FOR SCOPE RELATED TO EACH INDIVIDUAL FLOOR INCLUDING
CONTINGENCIES, GENERAL CONDITIONS, PROJECT MANAGEMENT, AS WELL AS
CONTRACTOR OVERHEAD AND PROFIT FOR VA COST ACCOUNTING PURPOSES.
ADD ALTERNATE - REPLACE SIX (6) AIR HANDLING UNITS (AHU'S) IN ELEVATOR
MACHINE ROOM.
ADD ALTERNATE - PROVIDE NEW CAR ENCLOSURES FOR ALL ELEVATORS (P-1,
P-2, P-3, P-4, P-5, S-6, S-7, S-8). REFER TO SPECIFICATION SECTION 14 21 10 –
TRACTION ELEVATOR MODERNIZATION FOR ADDITIONAL INFORMATION.
BASE
BID
ALT #1
ALT #2
ALT #3
ALT #4
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
Architect:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEP Engineer:
NOT F
OR
CONSTRUCTIO
N
Elevator Consultant:
MES GROUP LERCH BATES
550 N. REO STREET SUITE 203
TAMPA, FL 33609
813.289.4700
216 S. JEFFERSON STREET
SUITE LL2
CHICAGO, IL 60661
312.256.1010
30% SCHEMATIC DESIGN 06/20/2024
60% DESIGN DEVELOPMENT 08/12/2024
90% QAQC REVIEW 09/23/2024
90% CONSTRUCTION DOCUMENTS 10/02/2024
100% QAQC REVIEW 10/25/2024
100% BID DOCUMENTS 1/20/2025
A u to d e s k D o c s /1
.6
.1
V A
H in e s E le v a to r
R e p la c e m e n t/
.6
.1
H in e s E le v a to rs
R
.r v t
/2
/2
:0
:2
A
M
GC101
PHASING OVERALL PLAN AND
MODERNIZATION SCOPEGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
RENOVATE ELEVATORS
BUILDING 200
5000 5TH AVE, HINES, IL 60141
578-25-003
1/24/2025 MT NL
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/16" = 1'-0"GC101
1 OVERALL FIRST FLOOR PROJECT AREA
N
R = RETAIN
N = NEW MODERNIZATION SCOPE
A = ALTER
N/A = NOT APPLICABLE
PIT OUTLETS N N
PIT LIGHTING A A
COOLING/HEATING MACHINE ROOM A/N-ALTERNATE #3 A/N-ALTERNATE #3
MACHINE DISCONNECT SWITCH N N
MACHINE ROOM ACCESS R R
MACHINE ROOM OUTLETS A A
MACHINE ROOM LIGHTING A A
MACHINE ROOM R & A R & A
CAB INTERIOR FINISHES N N
CAR POSITION INDICATORS N N
HALL LANTERNS N N
HALL PUSHBUTTONS N N
CAR OPERATING PANELS N N
SIGNALS N N
HOISTWAY WIRING TRAVELING CABLES N N
HOISTWAY DOOR SILLS R R
HOISTWAY DOOR PANELS R R
HOISTWAY ENTRANCE FRAMES R R
HOISTWAY DOOR EQUIPMENT N N
RAILS/SUPPORTS R R
CAR DOOR EQUIPMENT N N
CARE DOOR OPERATOR N N
ELEVATOR CAR ENCLOSURES R/N-ALTERNATE #4 R/N-ALTERNATE #4
COUNTERWEIGHT N N
SAFETY PLANK N N
PLATFORM N N
ROLLER/SLIDE GUIDES N N
CAR SLING N N
ELEVATOR MACHINE BEAMS R R
HOISTWAY EQUIPMENT (BUFFERS AND PIT EQUIPMENT) N N
GOVERNOR ROPE N N
GOVERNOR N N
HOIST ROPES N N
HOIST MACHINE N N
ENCODER N N
CONTROLS N N
CAPACITY R R
SPEED R R
CARS P1-P5 CARS S6-S8
PUBLIC
SIDE
AIR PRESSURE MONITOR
HAND SANITIZER
REFER TO TEMPORARY BARRIER TYPE FOR
REQUIRED CONDITION TO STRUCTURE ABOVE
VA / OSHA/ICRA/PCRA/ILSM AND EMERGENCY
CONTACT LIST PER SOW TEMPORARY
SIGNAGE
EDGEGUARD TEMPORARY CONSTRUCTION
ENCLOSURE WITH ALL ACCESSORIES TO
CONNECT TO ADJACENT WALLS, CEILING,
AND FLOORS FOR A CONTINUOUS BARRIER.
CONSTRUCTION ACTIVITY - INFECTION RISK: C
PATIENT RISK GROUP: LOW
CLASS OF PRECAUTION MATRIX: II
A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED
BY CLASS IN SPECIFICATION 010110 AND ADDITIONAL INFORMATION.
B. REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE
FOR ADDITIONAL INFORMATION.
C. PROJECT SHALL BE COMPLETED IN // EIGHT (8) PHASES //.
D. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
E. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY
IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE
APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND
PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA
PROTOCOLS AND PLAN IS APPROVED.
F. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE
PHASING INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR
PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW
THE FLOOR PLATE OF THE PROJECT BOUNDARY.
G. ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM
AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE
CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED
IN A SAFE MANNER UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED
AND BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.
H. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF
OPERATION.
I. WORK REQUIRING VIBRATION OR LOAD NOISE SHALL TAKE PLACE BETWEEN
THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO
KEEP NOISE AND VIBRATION TO A MINIMUM.
J. PROVIDE THE FOLLOWING INFECTION CONTROL MEASURES, A 24"X36"
STICKY WALK OFF MAT AND HAND SANITIZER AT EACH TEMPORARY DOOR
LOCATION. MAT SHALL BE REPLACED OR CLEANED AS NECESSARY
K. PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
L. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,
MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
M. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED
WITH 4 MIL. POLY SHEET.
N. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED
WITH A LID.
O. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
P. PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE
PROJECT BOUNDARY.
A. AREAS SURROUNDING OR ADJACENT TO PROJECT AREAS TO BE OCCUPIED
BY STAFF AND VETERANS THROUGHOUT CONSTRUCTION.
B. PROJECT SHALL BE COMPLETED DURING DAY SHIFTS, 8:00 AM TO 5:00 PM.,
UNLESS NOTED OTHERWISE. COORDINATE WITH COR. ALL WORK TO BE
COMPLETED AND OPEN FOR PUBLIC USE AT THE END OF EACH NIGHT'S
WORK.
C. REFER TO SPECIFICATION 01 00 00 FOR INFORMATION ON WORK DURATION
FOR EACH PHASE AND AREA OF WORK.
PHASING GENERAL NOTES
INFECTION CONTROL GENERAL NOTES
INFECTION CONTROL PROJECT INFORMATION
TEMPORARY WALLS. SEE PLAN AND PLAN NOTES
TEMPORARY CONSTRUCTION ACCESS DOORS
REFERENCE AREA FOR ABOVE CEILING
WORK ON FLOOR BELOW.
RE: ENGINEERING DRAWINGS FOR FULL
SCOPE OF WORK
BEYOND PROJECT BOUNDARY
PROJECT BOUNDARY
IC / PHASING LEGEND
PHASING LEGEND
PHASE #1
ELEVATOR: P4
PHASE #2
ELEVATOR: P5
PHASE #3
ELEVATORS: S8, P1
PHASE #4
ELEVATORS: S7, P2
PHASE #5A/B/C
ELEVATORS: S6, P3, FINISHES
PHASE #6
NEW WALL AND DOOR FF
PHASE #7A/B
NEW FINISHES
PHASE #8A/B/C/D
NEW FINISHES
1. EACH ELEVATOR WILL BE PHASED SEPERATELY
2. THE SEQUENCE OF PHASES WILL BE DETERMINED BASED UPON OPERATION
OF THE EXISTING ELEVATORS DURING CONSTRUCTION
3. ELEVATOR LOBBIES SHALL BE PHASED TO MINIMIZE INTERUPTION OF
PATIENT/GUEST TRAFFIC
A. FLOORING SHALL BE PREPPED AND INSTALLED IN AREAS TO
MAINTAIN TRAFFIC IN LOBBIES
B. ALL WORK SHALL BE COORDINATED WITH THE VA AND OCCUR
DURING SHIFTS THAT ACCOMODATE OPERATIONS OF THE
ADJACENT CLINICAL AREAS
C. AREAS OF FLOORING BEING REPLACED IN FOR EACH SHIFT
SHALL NOT EXCEED AN AMOUNT THAT CAN BE COMPLETED
DURING A SINGLE SHIFT.
4. COORDINATION OF ASSOCIATED MEP SCOPE AND EQUIPMENT
INSTALLATIONS SHALL BE COORDINATED TO MINIMIZE THE NEED TO SHUT
DOWN MULTIPLE ELEVATORS AT THE SAME TIME.
5. CONSTRUCTION OF WALL AND DOOR TO BE SCHEDULED WITH VA DURING
OFF HOURS FOR SURROUNDING DEPARTMENTS, I.E. NIGHTS & WEEKENDS.
WORK SHALL BE COMPLETED DURING EACH SHIFT AND/OR ISOLATED WHEN
CONSTRUCTION ACTIVITIES ARE PAUSED FOR DAILY OPERATIONS TO
MAINTAIN PEDESTRIAN TRAFFIC ROUTES TO ELEVATORS IN A CLEAN AND
SAFE MANNER.
6. FLOORING REPLACEMENT TO BE SCHEDULED WITH VA DURING OFF HOURS
FOR SURROUNDING DEPARTMENTS, I.E. NIGHTS & WEEKENDS
AREAS FOR DEMOLITION & INSTALLATION SHALL BE DIVIDED INTO SUB
PHASES TO BE COMPLETED WITHIN A SINGLE SHIFT.
7. TEMPORARY INFECTION CONTROL PROTECTION BARRIER ON ALL FLOORS
ABOVE LOWER LEVEL.
8. THE REPLACEMENT OF CEILING TILES AT THE END OF EACH SHIFT FOR
WORK AREAS OUTSIDE OF A RATED CONSTRUCTION BARRIER.
9. THE ELEVATOR DOOR IN THE AFFECTED ELEVATOR SHAFT IS REQUIRED TO
BE CLOSED AT THE END OF EACH WORKDAY.
PHASING GENERAL NOTES
WALL TAG
STRUCTURAL
SIZE
FINISH DIM FIRE RATING UL LISTING
MIN STC
RATING
COMMENTS
S3A.2F 3 5/8" 6 1/8" NA40U4192 HR.
LINE OF STRUCTURE ABOVE
LINE OF STRUCTURE BELOW
PLAN
1 1/4"
STRUCTURAL SIZE
1 1/4"
FINISH DIMENSION
2 LAYERS 5/8" TYPE X GYP BD
BEAD OF CONT. SEALANT
STEEL STUDS @ 16" O.C.
STEEL STUD BRACING @ 4'-0" O.C.
DEEP LEG SLIP TRACK AT DECK
HOLD GYPSUM BACK FROM DECK FOR
DEFLECTION
FILL FLUTES OF DECK WITH FIRE SAFING
AT FIRE RATED WALLS
INSULATION PRESENT WITH QUALIFER (i OR t)
FRAMING STUD HEADER
HOLLOW METAL FRAME,
RE: DOOR SCHEDULE
SEALANT, BOTH SIDES
WALL TYPE,
RE: PLANS
HOLLOW METAL FRAME,
RE: DOOR SCHEDULE
WALL TYPE,
RE: PLANS
DOUBLE STUD FRAMING
SEALANT, BOTH SIDES
JAMB ANCHOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
Architect:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEP Engineer:
NOT F
OR
CONSTRUCTIO
N
Elevator Consultant:
MES GROUP LERCH BATES
550 N. REO STREET SUITE 203
TAMPA, FL 33609
813.289.4700
216 S. JEFFERSON STREET
SUITE LL2
CHICAGO, IL 60661
312.256.1010
30% SCHEMATIC DESIGN 06/20/2024
60% DESIGN DEVELOPMENT 08/12/2024
90% QAQC REVIEW 09/23/2024
90% CONSTRUCTION DOCUMENTS 10/02/2024
100% QAQC REVIEW 10/25/2024
100% BID DOCUMENTS 1/20/2025
A u to d e s k D o c s /1
.6
.1
V A
H in e s E le v a to r
R e p la c e m e n t/
.6
.1
H in e s E le v a to rs
R
.r v t
/2
/2
:0
:2
A
M
GC102
WALL CONSTRUCTION DETAILS
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
RENOVATE ELEVATORS
BUILDING 200
5000 5TH AVE, HINES, IL 60141
578-25-003
1/24/2025 MT NL
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"GC102
1 TEMPORARY WALL CONSTRUCTION ELEVATION
SCALE: 1 1/2" = 1'-0"GC102
2 WALL TYPE LEGEND
SCALE: 3" = 1'-0"GC102
3 DOOR HEAD DETAIL, HM
SCALE: 3" = 1'-0"GC102
4 DOOR JAMB DETAIL, HM
N
KEY PLAN
ELEVATOR S6
ELEVATOR S7
ELEVATOR S8
ELEVATOR P4 ELEVATOR P5
ELEVATOR P3 ELEVATOR P2 ELEVATOR P1
10' - 0"
3'
1 2
ELEVATOR S6
ELEVATOR S7
ELEVATOR S8
ELEVATOR P4 ELEVATOR P5
ELEVATOR P3 ELEVATOR P2 ELEVATOR P1
10' - 0"
3'
1 2
ELEVATOR S6
ELEVATOR S7
ELEVATOR S8
ELEVATOR P4 ELEVATOR P5
ELEVATOR P3 ELEVATOR P2 ELEVATOR P1
10' - 2"
3'
8'
3' - 0"
1 2
ELEVATOR S6
ELEVATOR S7
ELEVATOR S8
ELEVATOR P4 ELEVATOR P5
ELEVATOR P3 ELEVATOR P2 ELEVATOR P1
11' - 4"
3'
3' - 0"
9'
0"
1 2
PHASING LEGEND
PHASE #1
ELEVATOR: P4
PHASE #2
ELEVATOR: P5
PHASE #3
ELEVATORS: S8, P1
PHASE #4
ELEVATORS: S7, P2
PHASE #5A/B/C
ELEVATORS: S6, P3, FINISHES
PHASE #6
NEW WALL AND DOOR FF
PHASE #7A/B
NEW FINISHES
PHASE #8A/B/C/D
NEW FINISHES
1. EACH ELEVATOR WILL BE PHASED SEPERATELY
2. THE SEQUENCE OF PHASES WILL BE DETERMINED BASED UPON OPERATION
OF THE EXISTING ELEVATORS DURING CONSTRUCTION
3. ELEVATOR LOBBIES SHALL BE PHASED TO MINIMIZE INTERUPTION OF
PATIENT/GUEST TRAFFIC
A. FLOORING SHALL BE PREPPED AND INSTALLED IN AREAS TO
MAINTAIN TRAFFIC IN LOBBIES
B. ALL WORK SHALL BE COORDINATED WITH THE VA AND OCCUR
DURING SHIFTS THAT ACCOMODATE OPERATIONS OF THE
ADJACENT CLINICAL AREAS
C. AREAS OF FLOORING BEING REPLACED IN FOR EACH SHIFT
SHALL NOT EXCEED AN AMOUNT THAT CAN BE COMPLETED
DURING A SINGLE SHIFT.
4. COORDINATION OF ASSOCIATED MEP SCOPE AND EQUIPMENT
INSTALLATIONS SHALL BE COORDINATED TO MINIMIZE THE NEED TO SHUT
DOWN MULTIPLE ELEVATORS AT THE SAME TIME.
5. CONSTRUCTION OF WALL AND DOOR TO BE SCHEDULED WITH VA DURING
OFF HOURS FOR SURROUNDING DEPARTMENTS, I.E. NIGHTS & WEEKENDS.
WORK SHALL BE COMPLETED DURING EACH SHIFT AND/OR ISOLATED WHEN
CONSTRUCTION ACTIVITIES ARE PAUSED FOR DAILY OPERATIONS TO
MAINTAIN PEDESTRIAN TRAFFIC ROUTES TO ELEVATORS IN A CLEAN AND
SAFE MANNER.
6. FLOORING REPLACEMENT TO BE SCHEDULED WITH VA DURING OFF HOURS
FOR SURROUNDING DEPARTMENTS, I.E. NIGHTS & WEEKENDS
AREAS FOR DEMOLITION & INSTALLATION SHALL BE DIVIDED INTO SUB
PHASES TO BE COMPLETED WITHIN A SINGLE SHIFT.
7. TEMPORARY INFECTION CONTROL PROTECTION BARRIER ON ALL FLOORS
ABOVE LOWER LEVEL.
8. THE REPLACEMENT OF CEILING TILES AT THE END OF EACH SHIFT FOR
WORK AREAS OUTSIDE OF A RATED CONSTRUCTION BARRIER.
9. THE ELEVATOR DOOR IN THE AFFECTED ELEVATOR SHAFT IS REQUIRED TO
BE CLOSED AT THE END OF EACH WORKDAY.
PHASING GENERAL NOTES
1. SIGNAGE/TEMPORARY CONTROLS AS REQUIRED.
2. TEMPORARY INFECTION CONTROL WALL AND DOOR UTILIZE EDGE GUARD
SYSTEM IN ALL PUBLIC LOBBIES.
3. TEMPORARY INFECTION CONTROL BARRIER.
PHASING NOTES #
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
Architect:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEP Engineer:
NOT F
OR
CONSTRUCTIO
N
Elevator Consultant:
MES GROUP LERCH BATES
550 N. REO STREET SUITE 203
TAMPA, FL 33609
813.289.4700
216 S. JEFFERSON STREET
SUITE LL2
CHICAGO, IL 60661
312.256.1010
30% SCHEMATIC DESIGN 06/20/2024
60% DESIGN DEVELOPMENT 08/12/2024
90% QAQC REVIEW 09/23/2024
90% CONSTRUCTION DOCUMENTS 10/02/2024
100% QAQC REVIEW 10/25/2024
100% BID DOCUMENTS 1/20/2025
A u to d e s k D o c s /1
.6
.1
V A
H in e s E le v a to r
R e p la c e m e n t/
.6
.1
H in e s E le v a to rs
R
.r v t
/2
/2
:0
:2
A
M
GC103.1
BASEMENT ARCHITECTURAL PLAN
PHASES 1-4GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
RENOVATE ELEVATORS
BUILDING 200
5000 5TH AVE, HINES, IL 60141
578-25-003
1/24/2025 MT NL
100% BID DOCUMENTS
FULLY SPRINKLERED
N N
N N
SCALE: 1/8" = 1'-0"GC103.1
1 PHASE 1 - BASEMENT FLOOR PLAN
SCALE: 1/8" = 1'-0"GC103.1
2 PHASE 2 - BASEMENT FLOOR PLAN
SCALE: 1/8" = 1'-0"GC103.1
3 PHASE 3 - BASEMENT FLOOR PLAN
SCALE: 1/8" = 1'-0"GC103.1
4 PHASE 4 - BASEMENT FLOOR PLAN
ELEVATOR S6
ELEVATOR S7
ELEVATOR S8
ELEVATOR P4 ELEVATOR P5
ELEVATOR P3 ELEVATOR P2 ELEVATOR P1
9' - 10"
3'
8'
3' - 0"
1 2
ELEVATOR S6
ELEVATOR S7
ELEVATOR S8
ELEVATOR P4 ELEVATOR P5
ELEVATOR P3 ELEVATOR P2 ELEVATOR P1
ELEVATOR S6
ELEVATOR S7
ELEVATOR S8
ELEVATOR P4 ELEVATOR P5
ELEVATOR P3 ELEVATOR P2 ELEVATOR P1
7A
7B
PHASING LEGEND
PHASE #1
ELEVATOR: P4
PHASE #2
ELEVATOR: P5
PHASE #3
ELEVATORS: S8, P1
PHASE #4
ELEVATORS: S7, P2
PHASE #5A/B/C
ELEVATORS: S6, P3, FINISHES
PHASE #6
NEW WALL AND DOOR FF
PHASE #7A/B
NEW FINISHES
PHASE #8A/B/C/D
NEW FINISHES
1. EACH ELEVATOR WILL BE PHASED SEPERATELY
2. THE SEQUENCE OF PHASES WILL BE DETERMINED BASED UPON OPERATION
OF THE EXISTING ELEVATORS DURING CONSTRUCTION
3. ELEVATOR LOBBIES SHALL BE PHASED TO MINIMIZE INTERUPTION OF
PATIENT/GUEST TRAFFIC
A. FLOORING SHALL BE PREPPED AND INSTALLED IN AREAS TO
MAINTAIN TRAFFIC IN LOBBIES
B. ALL WORK SHALL BE COORDINATED WITH THE VA AND OCCUR
DURING SHIFTS THAT ACCOMODATE OPERATIONS OF THE
ADJACENT CLINICAL AREAS
C. AREAS OF FLOORING BEING REPLACED IN FOR EACH SHIFT
SHALL NOT EXCEED AN AMOUNT THAT CAN BE COMPLETED
DURING A SINGLE SHIFT.
4. COORDINATION OF ASSOCIATED MEP SCOPE AND EQUIPMENT
INSTALLATIONS SHALL BE COORDINATED TO MINIMIZE THE NEED TO SHUT
DOWN MULTIPLE ELEVATORS AT THE SAME TIME.
5. CONSTRUCTION OF WALL AND DOOR TO BE SCHEDULED WITH VA DURING
OFF HOURS FOR SURROUNDING DEPARTMENTS, I.E. NIGHTS & WEEKENDS.
WORK SHALL BE COMPLETED DURING EACH SHIFT AND/OR ISOLATED WHEN
CONSTRUCTION ACTIVITIES ARE PAUSED FOR DAILY OPERATIONS TO
MAINTAIN PEDESTRIAN TRAFFIC ROUTES TO ELEVATORS IN A CLEAN AND
SAFE MANNER.
6. FLOORING REPLACEMENT TO BE SCHEDULED WITH VA DURING OFF HOURS
FOR SURROUNDING DEPARTMENTS, I.E. NIGHTS & WEEKENDS
AREAS FOR DEMOLITION & INSTALLATION SHALL BE DIVIDED INTO SUB
PHASES TO BE COMPLETED WITHIN A SINGLE SHIFT.
7. TEMPORARY INFECTION CONTROL PROTECTION BARRIER ON ALL FLOORS
ABOVE LOWER LEVEL.
8. THE REPLACEMENT OF CEILING TILES AT THE END OF EACH SHIFT FOR
WORK AREAS OUTSIDE OF A RATED CONSTRUCTION BARRIER.
9. THE ELEVATOR DOOR IN THE AFFECTED ELEVATOR SHAFT IS REQUIRED TO
BE CLOSED AT THE END OF EACH WORKDAY.
PHASING GENERAL NOTES
1. SIGNAGE/TEMPORARY CONTROLS AS REQUIRED.
2. TEMPORARY INFECTION CONTROL WALL AND DOOR UTILIZE EDGE GUARD
SYSTEM IN ALL PUBLIC LOBBIES.
3. TEMPORARY INFECTION CONTROL BARRIER.
PHASING NOTES #
ELEVATOR S6
ELEVATOR S7
ELEVATOR S8
ELEVATOR P4 ELEVATOR P5
ELEVATOR P3 ELEVATOR P2 ELEVATOR P1
5B5C
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
Architect:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEP Engineer:
NOT F
OR
CONSTRUCTIO
N
Elevator Consultant:
MES GROUP LERCH BATES
550 N. REO STREET SUITE 203
TAMPA, FL 33609
813.289.4700
216 S. JEFFERSON STREET
SUITE LL2
CHICAGO, IL 60661
312.256.1010
30% SCHEMATIC DESIGN 06/20/2024
60% DESIGN DEVELOPMENT 08/12/2024
90% QAQC REVIEW 09/23/2024
90% CONSTRUCTION DOCUMENTS 10/02/2024
100% QAQC REVIEW 10/25/2024
100% BID DOCUMENTS 1/20/2025
A u to d e s k D o c s /1
.6
.1
V A
H in e s E le v a to r
R e p la c e m e n t/
.6
.1
H in e s E le v a to rs
R
.r v t
/2
/2
:0
:3
A
M
GC103.2
BASEMENT ARCHITECTURAL PLAN
PHASES 5-7GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
RENOVATE ELEVATORS
BUILDING 200
5000 5TH AVE, HINES, IL 60141
578-25-003
1/24/2025 MT NL
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"GC103.2
1 PHASE 5A - BASEMENT FLOOR PLAN
SCALE: 1/8" = 1'-0"GC103.2
3 PHASE 6 - BASEMENT FLOOR PLAN (NO WORK)
SCALE: 1/8" = 1'-0"GC103.2
4 PHASE 7 - BASEMENT FLOOR PLAN
N N
N N
SCALE: 1/8" = 1'-0"GC103.2
2 PHASE 5B & C - BASEMENT FLOOR PLAN
PHASING LEGEND
PHASE #1
ELEVATOR: P4
PHASE #2
ELEVATOR: P5
PHASE #3
ELEVATORS: S8, P1
PHASE #4
ELEVATORS: S7, P2
PHASE #5A/B/C
ELEVATORS: S6, P3, FINISHES
PHASE #6
NEW WALL AND DOOR FF
PHASE #7A/B
NEW FINISHES
PHASE #8A/B/C/D
NEW FINISHES
1. EACH ELEVATOR WILL BE PHASED SEPERATELY
2. THE SEQUENCE OF PHASES WILL BE DETERMINED BASED UPON OPERATION
OF THE EXISTING ELEVATORS DURING CONSTRUCTION
3. ELEVATOR LOBBIES SHALL BE PHASED TO MINIMIZE INTERUPTION OF
PATIENT/GUEST TRAFFIC
A. FLOORING SHALL BE PREPPED AND INSTALLED IN AREAS TO
MAINTAIN TRAFFIC IN LOBBIES
B. ALL WORK SHALL BE COORDINATED WITH THE VA AND OCCUR
DURING SHIFTS THAT ACCOMODATE OPERATIONS OF THE
ADJACENT CLINICAL AREAS
C. AREAS OF FLOORING BEING REPLACED IN FOR EACH SHIFT
SHALL NOT EXCEED AN AMOUNT THAT CAN BE COMPLETED
DURING A SINGLE SHIFT.
4. COORDINATION OF ASSOCIATED MEP SCOPE AND EQUIPMENT
INSTALLATIONS SHALL BE COORDINATED TO MINIMIZE THE NEED TO SHUT
DOWN MULTIPLE ELEVATORS AT THE SAME TIME.
5. CONSTRUCTION OF WALL AND DOOR TO BE SCHEDULED WITH VA DURING
OFF HOURS FOR SURROUNDING DEPARTMENTS, I.E. NIGHTS & WEEKENDS.
WORK SHALL BE COMPLETED DURING EACH SHIFT AND/OR ISOLATED WHEN
CONSTRUCTION ACTIVITIES ARE PAUSED FOR DAILY OPERATIONS TO
MAINTAIN PEDESTRIAN TRAFFIC ROUTES TO ELEVATORS IN A CLEAN AND
SAFE MANNER.
6. FLOORING REPLACEMENT TO BE SCHEDULED WITH VA DURING OFF HOURS
FOR SURROUNDING DEPARTMENTS, I.E. NIGHTS & WEEKENDS
AREAS FOR DEMOLITION & INSTALLATION SHALL BE DIVIDED INTO SUB
PHASES TO BE COMPLETED WITHIN A SINGLE SHIFT.
7. TEMPORARY INFECTION CONTROL PROTECTION BARRIER ON ALL FLOORS
ABOVE LOWER LEVEL.
8. THE REPLACEMENT OF CEILING TILES AT THE END OF EACH SHIFT FOR
WORK AREAS OUTSIDE OF A RATED CONSTRUCTION BARRIER.
9. THE ELEVATOR DOOR IN THE AFFECTED ELEVATOR SHAFT IS REQUIRED TO
BE CLOSED AT THE END OF EACH WORKDAY.
PHASING GENERAL NOTES
1. SIGNAGE/TEMPORARY CONTROLS AS REQUIRED.
2. TEMPORARY INFECTION CONTROL WALL AND DOOR UTILIZE EDGE GUARD
SYSTEM IN ALL PUBLIC LOBBIES.
3. TEMPORARY INFECTION CONTROL BARRIER.
PHASING NOTES #
ELEVATOR S6
ELEVATOR S7
ELEVATOR S8
ELEVATOR P4 ELEVATOR P5
ELEVATOR P3 ELEVATOR P2 ELEVATOR P1
8A 8C
8B 8D
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
Architect:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEP Engineer:
NOT F
OR
CONSTRUCTIO
N
Elevator Consultant:
MES GROUP LERCH BATES
550 N. REO STREET SUITE 203
TAMPA, FL 33609
813.289.4700
216 S. JEFFERSON STREET
SUITE LL2
CHICAGO, IL 60661
312.256.1010
30% SCHEMATIC DESIGN 06/20/2024
60% DESIGN DEVELOPMENT 08/12/2024
90% QAQC REVIEW 09/23/2024
90% CONSTRUCTION DOCUMENTS 10/02/2024
100% QAQC REVIEW 10/25/2024
100% BID DOCUMENTS 1/20/2025
A u to d e s k D o c s /1
.6
.1
V A
H in e s E le v a to r
R e p la c e m e n t/
.6
.1
H in e s E le v a to rs
R
.r v t
/2
/2
:0
:3
A
M
GC103.3
BASEMENT ARCHITECTURAL PLAN
PHASE 8GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
RENOVATE ELEVATORS
BUILDING 200
5000 5TH AVE, HINES, IL 60141
578-25-003
1/24/2025 MT NL
100% BID DOCUMENTS
FULLY SPRINKLERED
N
SCALE: 1/8" = 1'-0"GC103.3
1 PHASE 8 - BASEMENT FLOOR PLAN
ELEVATOR S6
ELEVATOR S7
ELEVATOR S8
ELEVATOR P4 ELEVATOR P5
ELEVATOR P3 ELEVATOR P2 ELEVATOR P1
1'
7' - 6"
ELEVATOR S6
ELEVATOR S7
ELEVATOR S8
ELEVATOR P4 ELEVATOR P5
ELEVATOR P3 ELEVATOR P2 ELEVATOR P1
6' - 2"
1'
ELEVATOR S6
ELEVATOR S7
ELEVATOR S8
ELEVATOR P4 ELEVATOR P5
ELEVATOR P3 ELEVATOR P2 ELEVATOR P1
6' - 2" 1'
1' - 0"
6'
0"
ELEVATOR S6
ELEVATOR S7
ELEVATOR S8
ELEVATOR P4 ELEVATOR P5
ELEVATOR P3 ELEVATOR P2 ELEVATOR P1
6' - 2"1'
1' - 0"
6'
PHASING LEGEND
PHASE #1
ELEVATOR: P4
PHASE #2
ELEVATOR: P5
PHASE #3
ELEVATORS: S8, P1
PHASE #4
ELEVATORS: S7, P2
PHASE #5A/B/C
ELEVATORS: S6, P3, FINISHES
PHASE #6
NEW WALL AND DOOR FF
PHASE #7A/B
NEW FINISHES
PHASE #8A/B/C/D
NEW FINISHES
1. EACH ELEVATOR WILL BE PHASED SEPERATELY
2. THE SEQUENCE OF PHASES WILL BE DETERMINED BASED UPON OPERATION
OF THE EXISTING ELEVATORS DURING CONSTRUCTION
3. ELEVATOR LOBBIES SHALL BE PHASED TO MINIMIZE INTERUPTION OF
PATIENT/GUEST TRAFFIC
A. FLOORING SHALL BE PREPPED AND INSTALLED IN AREAS TO
MAINTAIN TRAFFIC IN LOBBIES
B. ALL WORK SHALL BE COORDINATED WITH THE VA AND OCCUR
DURING SHIFTS THAT ACCOMODATE OPERATIONS OF THE
ADJACENT CLINICAL AREAS
C. AREAS OF FLOORING BEING REPLACED IN FOR EACH SHIFT
SHALL NOT EXCEED AN AMOUNT THAT CAN BE COMPLETED
DURING A SINGLE SHIFT.
4. COORDINATION OF ASSOCIATED MEP SCOPE AND EQUIPMENT
INSTALLATIONS SHALL BE COORDINATED TO MINIMIZE THE NEED TO SHUT
DOWN MULTIPLE ELEVATORS AT THE SAME TIME.
5. CONSTRUCTION OF WALL AND DOOR TO BE SCHEDULED WITH VA DURING
OFF HOURS FOR SURROUNDING DEPARTMENTS, I.E. NIGHTS & WEEKENDS.
WORK SHALL BE COMPLETED DURING EACH SHIFT AND/OR ISOLATED WHEN
CONSTRUCTION ACTIVITIES ARE PAUSED FOR DAILY OPERATIONS TO
MAINTAIN PEDESTRIAN TRAFFIC ROUTES TO ELEVATORS IN A CLEAN AND
SAFE MANNER.
6. FLOORING REPLACEMENT TO BE SCHEDULED WITH VA DURING OFF HOURS
FOR SURROUNDING DEPARTMENTS, I.E. NIGHTS & WEEKENDS
AREAS FOR DEMOLITION & INSTALLATION SHALL BE DIVIDED INTO SUB
PHASES TO BE COMPLETED WITHIN A SINGLE SHIFT.
7. TEMPORARY INFECTION CONTROL PROTECTION BARRIER ON ALL FLOORS
ABOVE LOWER LEVEL.
8. THE REPLACEMENT OF CEILING TILES AT THE END OF EACH SHIFT FOR
WORK AREAS OUTSIDE OF A RATED CONSTRUCTION BARRIER.
9. THE ELEVATOR DOOR IN THE AFFECTED ELEVATOR SHAFT IS REQUIRED TO
BE CLOSED AT THE END OF EACH WORKDAY.
PHASING GENERAL NOTES
1. SIGNAGE/TEMPORARY CONTROLS AS REQUIRED.
2. TEMPORARY INFECTION CONTROL WALL AND DOOR UTILIZE EDGE GUARD
SYSTEM IN ALL PUBLIC LOBBIES.
3. TEMPORARY INFECTION CONTROL BARRIER.
PHASING NOTES #
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
Architect:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEP Engineer:
NOT F
OR
CONSTRUCTIO
N
Elevator Consultant:
MES GROUP LERCH BATES
550 N. REO STREET SUITE 203
TAMPA, FL 33609
813.289.4700
216 S. JEFFERSON STREET
SUITE LL2
CHICAGO, IL 60661
312.256.1010
30% SCHEMATIC DESIGN 06/20/2024
60% DESIGN DEVELOPMENT 08/12/2024
90% QAQC REVIEW 09/23/2024
90% CONSTRUCTION DOCUMENTS 10/02/2024
100% QAQC REVIEW 10/25/2024
100% BID DOCUMENTS 1/20/2025
A u to d e s k D o c s /1
.6
.1
V A
H in e s E le v a to r
R e p la c e m e n t/
.6
.1
H in e s E le v a to rs
R
.r v t
/2
/2
:0
:3
A
M
GC104.1
1ST-15TH FLOOR ARCHITECTURAL
PLAN PHASES 1-4GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
RENOVATE ELEVATORS
BUILDING 200
5000 5TH AVE, HINES, IL 60141
578-25-003
1/24/2025 MT NL
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"GC104.1
1 PHASE 1 - 1ST-15TH FLOOR PLAN
SCALE: 1/8" = 1'-0"GC104.1
2 PHASE 2 - 1ST-15TH FLOOR PLAN
SCALE: 1/8" = 1'-0"GC104.1
3 PHASE 3 - 1ST-15TH FLOOR PLAN
SCALE: 1/8" = 1'-0"GC104.1
4 PHASE 4 - 1ST-15TH FLOOR PLAN
N N
N N
ELEVATOR S6
ELEVATOR S7
ELEVATOR S8
ELEVATOR P4 ELEVATOR P5
ELEVATOR P3 ELEVATOR P2 ELEVATOR P1
6' - 2"
1'
6'
1' - 0"
ELEVATOR S6
ELEVATOR S7
ELEVATOR S8
ELEVATOR P4 ELEVATOR P5
ELEVATOR P3 ELEVATOR P2 ELEVATOR P1
ELEVATOR S6
ELEVATOR S7
ELEVATOR S8
ELEVATOR P4 ELEVATOR P5
ELEVATOR P3 ELEVATOR P2 ELEVATOR P1
7A 7B
PHASING LEGEND
PHASE #1
ELEVATOR: P4
PHASE #2
ELEVATOR: P5
PHASE #3
ELEVATORS: S8, P1
PHASE #4
ELEVATORS: S7, P2
PHASE #5A/B/C
ELEVATORS: S6, P3, FINISHES
PHASE #6
NEW WALL AND DOOR FF
PHASE #7A/B
NEW FINISHES
PHASE #8A/B/C/D
NEW FINISHES
1. EACH ELEVATOR WILL BE PHASED SEPERATELY
2. THE SEQUENCE OF PHASES WILL BE DETERMINED BASED UPON OPERATION
OF THE EXISTING ELEVATORS DURING CONSTRUCTION
3. ELEVATOR LOBBIES SHALL BE PHASED TO MINIMIZE INTERUPTION OF
PATIENT/GUEST TRAFFIC
A. FLOORING SHALL BE PREPPED AND INSTALLED IN AREAS TO
MAINTAIN TRAFFIC IN LOBBIES
B. ALL WORK SHALL BE COORDINATED WITH THE VA AND OCCUR
DURING SHIFTS THAT ACCOMODATE OPERATIONS OF THE
ADJACENT CLINICAL AREAS
C. AREAS OF FLOORING BEING REPLACED IN FOR EACH SHIFT
SHALL NOT EXCEED AN AMOUNT THAT CAN BE COMPLETED
DURING A SINGLE SHIFT.
4. COORDINATION OF ASSOCIATED MEP SCOPE AND EQUIPMENT
INSTALLATIONS SHALL BE COORDINATED TO MINIMIZE THE NEED TO SHUT
DOWN MULTIPLE ELEVATORS AT THE SAME TIME.
5. CONSTRUCTION OF WALL AND DOOR TO BE SCHEDULED WITH VA DURING
OFF HOURS FOR SURROUNDING DEPARTMENTS, I.E. NIGHTS & WEEKENDS.
WORK SHALL BE COMPLETED DURING EACH SHIFT AND/OR ISOLATED WHEN
CONSTRUCTION ACTIVITIES ARE PAUSED FOR DAILY OPERATIONS TO
MAINTAIN PEDESTRIAN TRAFFIC ROUTES TO ELEVATORS IN A CLEAN AND
SAFE MANNER.
6. FLOORING REPLACEMENT TO BE SCHEDULED WITH VA DURING OFF HOURS
FOR SURROUNDING DEPARTMENTS, I.E. NIGHTS & WEEKENDS
AREAS FOR DEMOLITION & INSTALLATION SHALL BE DIVIDED INTO SUB
PHASES TO BE COMPLETED WITHIN A SINGLE SHIFT.
7. TEMPORARY INFECTION CONTROL PROTECTION BARRIER ON ALL FLOORS
ABOVE LOWER LEVEL.
8. THE REPLACEMENT OF CEILING TILES AT THE END OF EACH SHIFT FOR
WORK AREAS OUTSIDE OF A RATED CONSTRUCTION BARRIER.
9. THE ELEVATOR DOOR IN THE AFFECTED ELEVATOR SHAFT IS REQUIRED TO
BE CLOSED AT THE END OF EACH WORKDAY.
PHASING GENERAL NOTES
1. SIGNAGE/TEMPORARY CONTROLS AS REQUIRED.
2. TEMPORARY INFECTION CONTROL WALL AND DOOR UTILIZE EDGE GUARD
SYSTEM IN ALL PUBLIC LOBBIES.
3. TEMPORARY INFECTION CONTROL BARRIER.
PHASING NOTES #
ELEVATOR S6
ELEVATOR S7
ELEVATOR S8
ELEVATOR P4 ELEVATOR P5
ELEVATOR P3 ELEVATOR P2 ELEVATOR P1
5C 5B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
Architect:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEP Engineer:
NOT F
OR
CONSTRUCTIO
N
Elevator Consultant:
MES GROUP LERCH BATES
550 N. REO STREET SUITE 203
TAMPA, FL 33609
813.289.4700
216 S. JEFFERSON STREET
SUITE LL2
CHICAGO, IL 60661
312.256.1010
30% SCHEMATIC DESIGN 06/20/2024
60% DESIGN DEVELOPMENT 08/12/2024
90% QAQC REVIEW 09/23/2024
90% CONSTRUCTION DOCUMENTS 10/02/2024
100% QAQC REVIEW 10/25/2024
100% BID DOCUMENTS 1/20/2025
A u to d e s k D o c s /1
.6
.1
V A
H in e s E le v a to r
R e p la c e m e n t/
.6
.1
H in e s E le v a to rs
R
.r v t
/2
/2
:0
:3
A
M
GC104.2
1ST-15TH FLOOR ARCHITECTURAL
PLAN PHASES 5-7GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
RENOVATE ELEVATORS
BUILDING 200
5000 5TH AVE, HINES, IL 60141
578-25-003
1/24/2025 MT NL
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"GC104.2
1 PHASE 5 - 1ST-15TH FLOOR PLAN
SCALE: 1/8" = 1'-0"GC104.2
3 PHASE 6 - FIRST FLOOR PLAN
SCALE: 1/8" = 1'-0"GC104.2
4 PHASE 7 - FIRST FLOOR PLAN
N N
N N
SCALE: 1/8" = 1'-0"GC104.2
2 PHASE 5C/B - FIRST FLOOR PLAN
PHASING LEGEND
PHASE #1
ELEVATOR: P4
PHASE #2
ELEVATOR: P5
PHASE #3
ELEVATORS: S8, P1
PHASE #4
ELEVATORS: S7, P2
PHASE #5A/B/C
ELEVATORS: S6, P3, FINISHES
PHASE #6
NEW WALL AND DOOR FF
PHASE #7A/B
NEW FINISHES
PHASE #8A/B/C/D
NEW FINISHES
1. EACH ELEVATOR WILL BE PHASED SEPERATELY
2. THE SEQUENCE OF PHASES WILL BE DETERMINED BASED UPON OPERATION
OF THE EXISTING ELEVATORS DURING CONSTRUCTION
3. ELEVATOR LOBBIES SHALL BE PHASED TO MINIMIZE INTERUPTION OF
PATIENT/GUEST TRAFFIC
A. FLOORING SHALL BE PREPPED AND INSTALLED IN AREAS TO
MAINTAIN TRAFFIC IN LOBBIES
B. ALL WORK SHALL BE COORDINATED WITH THE VA AND OCCUR
DURING SHIFTS THAT ACCOMODATE OPERATIONS OF THE
ADJACENT CLINICAL AREAS
C. AREAS OF FLOORING BEING REPLACED IN FOR EACH SHIFT
SHALL NOT EXCEED AN AMOUNT THAT CAN BE COMPLETED
DURING A SINGLE SHIFT.
4. COORDINATION OF ASSOCIATED MEP SCOPE AND EQUIPMENT
INSTALLATIONS SHALL BE COORDINATED TO MINIMIZE THE NEED TO SHUT
DOWN MULTIPLE ELEVATORS AT THE SAME TIME.
5. CONSTRUCTION OF WALL AND DOOR TO BE SCHEDULED WITH VA DURING
OFF HOURS FOR SURROUNDING DEPARTMENTS, I.E. NIGHTS & WEEKENDS.
WORK SHALL BE COMPLETED DURING EACH SHIFT AND/OR ISOLATED WHEN
CONSTRUCTION ACTIVITIES ARE PAUSED FOR DAILY OPERATIONS TO
MAINTAIN PEDESTRIAN TRAFFIC ROUTES TO ELEVATORS IN A CLEAN AND
SAFE MANNER.
6. FLOORING REPLACEMENT TO BE SCHEDULED WITH VA DURING OFF HOURS
FOR SURROUNDING DEPARTMENTS, I.E. NIGHTS & WEEKENDS
AREAS FOR DEMOLITION & INSTALLATION SHALL BE DIVIDED INTO SUB
PHASES TO BE COMPLETED WITHIN A SINGLE SHIFT.
7. TEMPORARY INFECTION CONTROL PROTECTION BARRIER ON ALL FLOORS
ABOVE LOWER LEVEL.
8. THE REPLACEMENT OF CEILING TILES AT THE END OF EACH SHIFT FOR
WORK AREAS OUTSIDE OF A RATED CONSTRUCTION BARRIER.
9. THE ELEVATOR DOOR IN THE AFFECTED ELEVATOR SHAFT IS REQUIRED TO
BE CLOSED AT THE END OF EACH WORKDAY.
PHASING GENERAL NOTES
1. SIGNAGE/TEMPORARY CONTROLS AS REQUIRED.
2. TEMPORARY INFECTION CONTROL WALL AND DOOR UTILIZE EDGE GUARD
SYSTEM IN ALL PUBLIC LOBBIES.
3. TEMPORARY INFECTION CONTROL BARRIER.
PHASING NOTES #
ELEVATOR S6
ELEVATOR S7
ELEVATOR S8
ELEVATOR P4 ELEVATOR P5
ELEVATOR P3 ELEVATOR P2 ELEVATOR P1
8A 8C
8B 8D
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
Architect:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEP Engineer:
NOT F
OR
CONSTRUCTIO
N
Elevator Consultant:
MES GROUP LERCH BATES
550 N. REO STREET SUITE 203
TAMPA, FL 33609
813.289.4700
216 S. JEFFERSON STREET
SUITE LL2
CHICAGO, IL 60661
312.256.1010
30% SCHEMATIC DESIGN 06/20/2024
60% DESIGN DEVELOPMENT 08/12/2024
90% QAQC REVIEW 09/23/2024
90% CONSTRUCTION DOCUMENTS 10/02/2024
100% QAQC REVIEW 10/25/2024
100% BID DOCUMENTS 1/20/2025
A u to d e s k D o c s /1
.6
.1
V A
H in e s E le v a to r
R e p la c e m e n t/
.6
.1
H in e s E le v a to rs
R
.r v t
/2
/2
:0
:3
A
M
GC104.3
1ST-15TH FLOOR ARCHITECTURAL
PLAN PHASES 8GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
RENOVATE ELEVATORS
BUILDING 200
5000 5TH AVE, HINES, IL 60141
578-25-003
1/24/2025 MT NL
100% BID DOCUMENTS
FULLY SPRINKLERED
N
SCALE: 1/8" = 1'-0"GC104.3
1 PHASE 8 - FIRST FLOOR PLAN
ELEVATOR S6
ELEVATOR S7
ELEVATOR S8
ELEVATOR P4 ELEVATOR P5
ELEVATOR P3 ELEVATOR P2 ELEVATOR P1
7A
7B
ELEVATOR S6
ELEVATOR S7
ELEVATOR S8
ELEVATOR P4 ELEVATOR P5
ELEVATOR P3 ELEVATOR P2 ELEVATOR P1
8A
8B
8C
8D
PHASING LEGEND
PHASE #1
ELEVATOR: P4
PHASE #2
ELEVATOR: P5
PHASE #3
ELEVATORS: S8, P1
PHASE #4
ELEVATORS: S7, P2
PHASE #5A/B/C
ELEVATORS: S6, P3, FINISHES
PHASE #6
NEW WALL AND DOOR FF
PHASE #7A/B
NEW FINISHES
PHASE #8A/B/C/D
NEW FINISHES
1. EACH ELEVATOR WILL BE PHASED SEPERATELY
2. THE SEQUENCE OF PHASES WILL BE DETERMINED BASED UPON OPERATION
OF THE EXISTING ELEVATORS DURING CONSTRUCTION
3. ELEVATOR LOBBIES SHALL BE PHASED TO MINIMIZE INTERUPTION OF
PATIENT/GUEST TRAFFIC
A. FLOORING SHALL BE PREPPED AND INSTALLED IN AREAS TO
MAINTAIN TRAFFIC IN LOBBIES
B. ALL WORK SHALL BE COORDINATED WITH THE VA AND OCCUR
DURING SHIFTS THAT ACCOMODATE OPERATIONS OF THE
ADJACENT CLINICAL AREAS
C. AREAS OF FLOORING BEING REPLACED IN FOR EACH SHIFT
SHALL NOT EXCEED AN AMOUNT THAT CAN BE COMPLETED
DURING A SINGLE SHIFT.
4. COORDINATION OF ASSOCIATED MEP SCOPE AND EQUIPMENT
INSTALLATIONS SHALL BE COORDINATED TO MINIMIZE THE NEED TO SHUT
DOWN MULTIPLE ELEVATORS AT THE SAME TIME.
5. CONSTRUCTION OF WALL AND DOOR TO BE SCHEDULED WITH VA DURING
OFF HOURS FOR SURROUNDING DEPARTMENTS, I.E. NIGHTS & WEEKENDS.
WORK SHALL BE COMPLETED DURING EACH SHIFT AND/OR ISOLATED WHEN
CONSTRUCTION ACTIVITIES ARE PAUSED FOR DAILY OPERATIONS TO
MAINTAIN PEDESTRIAN TRAFFIC ROUTES TO ELEVATORS IN A CLEAN AND
SAFE MANNER.
6. FLOORING REPLACEMENT TO BE SCHEDULED WITH VA DURING OFF HOURS
FOR SURROUNDING DEPARTMENTS, I.E. NIGHTS & WEEKENDS
AREAS FOR DEMOLITION & INSTALLATION SHALL BE DIVIDED INTO SUB
PHASES TO BE COMPLETED WITHIN A SINGLE SHIFT.
7. TEMPORARY INFECTION CONTROL PROTECTION BARRIER ON ALL FLOORS
ABOVE LOWER LEVEL.
8. THE REPLACEMENT OF CEILING TILES AT THE END OF EACH SHIFT FOR
WORK AREAS OUTSIDE OF A RATED CONSTRUCTION BARRIER.
9. THE ELEVATOR DOOR IN THE AFFECTED ELEVATOR SHAFT IS REQUIRED TO
BE CLOSED AT THE END OF EACH WORKDAY.
PHASING GENERAL NOTES
1. SIGNAGE/TEMPORARY CONTROLS AS REQUIRED.
2. TEMPORARY INFECTION CONTROL WALL AND DOOR UTILIZE EDGE GUARD
SYSTEM IN ALL PUBLIC LOBBIES.
3. TEMPORARY INFECTION CONTROL BARRIER.
PHASING NOTES #
ELEVATOR S6
ELEVATOR S7
ELEVATOR S8
ELEVATOR P4 ELEVATOR P5
ELEVATOR P3 ELEVATOR P2 ELEVATOR P1
5B5C
ELEVATOR S6
ELEVATOR S7
ELEVATOR S8
ELEVATOR P4 ELEVATOR P5
ELEVATOR P3 ELEVATOR P2 ELEVATOR P1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
Architect:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEP Engineer:
NOT F
OR
CONSTRUCTIO
N
Elevator Consultant:
MES GROUP LERCH BATES
550 N. REO STREET SUITE 203
TAMPA, FL 33609
813.289.4700
216 S. JEFFERSON STREET
SUITE LL2
CHICAGO, IL 60661
312.256.1010
30% SCHEMATIC DESIGN 06/20/2024
60% DESIGN DEVELOPMENT 08/12/2024
90% QAQC REVIEW 09/23/2024
90% CONSTRUCTION DOCUMENTS 10/02/2024
100% QAQC REVIEW 10/25/2024
100% BID DOCUMENTS 1/20/2025
A u to d e s k D o c s /1
.6
.1
V A
H in e s E le v a to r
R e p la c e m e n t/
.6
.1
H in e s E le v a to rs
R
.r v t
/2
/2
:0
:3
A
M
GC105
SECOND FLOOR PLAN PHASES
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
RENOVATE ELEVATORS
BUILDING 200
5000 5TH AVE, HINES, IL 60141
578-25-003
1/24/2025 MT NL
100% BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"GC105
6 PHASE 7 - SECOND FLOOR PLAN
SCALE: 1/8" = 1'-0"GC105
4 PHASE 8 - SECOND FLOOR PLAN
N N
N N
SCALE: 1/8" = 1'-0"GC105
3 PHASE 5 - SECOND FLOOR PLAN
SCALE: 1/8" = 1'-0"GC105
2 PHASE 6 - SECOND FLOOR PLAN (NO WORK)
PHASING LEGEND
PHASE #1
ELEVATOR: P4
PHASE #2
ELEVATOR: P5
PHASE #3
ELEVATORS: S8, P1
PHASE #4
ELEVATORS: S7, P2
PHASE #5A/B/C
ELEVATORS: S6, P3, FINISHES
PHASE #6
NEW WALL AND DOOR FF
PHASE #7A/B
NEW FINISHES
PHASE #8A/B/C/D
NEW FINISHES
1. EACH ELEVATOR WILL BE PHASED SEPERATELY
2. THE SEQUENCE OF PHASES WILL BE DETERMINED BASED UPON OPERATION
OF THE EXISTING ELEVATORS DURING CONSTRUCTION
3. ELEVATOR LOBBIES SHALL BE PHASED TO MINIMIZE INTERUPTION OF
PATIENT/GUEST TRAFFIC
A. FLOORING SHALL BE PREPPED AND INSTALLED IN AREAS TO
MAINTAIN TRAFFIC IN LOBBIES
B. ALL WORK SHALL BE COORDINATED WITH THE VA AND OCCUR
DURING SHIFTS THAT ACCOMODATE OPERATIONS OF THE
ADJACENT CLINICAL AREAS
C. AREAS OF FLOORING BEING REPLACED IN FOR EACH SHIFT
SHALL NOT EXCEED AN AMOUNT THAT CAN BE COMPLETED
DURING A SINGLE SHIFT.
4. COORDINATION OF ASSOCIATED MEP SCOPE AND EQUIPMENT
INSTALLATIONS SHALL BE COORDINATED TO MINIMIZE THE NEED TO SHUT
DOWN MULTIPLE ELEVATORS AT THE SAME TIME.
5. CONSTRUCTION OF WALL AND DOOR TO BE SCHEDULED WITH VA DURING
OFF HOURS FOR SURROUNDING DEPARTMENTS, I.E. NIGHTS & WEEKENDS.
WORK SHALL BE COMPLETED DURING EACH SHIFT AND/OR ISOLATED WHEN
CONSTRUCTION ACTIVITIES ARE PAUSED FOR DAILY OPERATIONS TO
MAINTAIN PEDESTRIAN TRAFFIC ROUTES TO ELEVATORS IN A CLEAN AND
SAFE MANNER.
6. FLOORING REPLACEMENT TO BE SCHEDULED WITH VA DURING OFF HOURS
FOR SURROUNDING DEPARTMENTS, I.E. NIGHTS & WEEKENDS
AREAS FOR DEMOLITION & INSTALLATION SHALL BE DIVIDED INTO SUB
PHASES TO BE COMPLETED WITHIN A SINGLE SHIFT.
7. TEMPORARY INFECTION CONTROL PROTECTION BARRIER ON ALL FLOORS
ABOVE LOWER LEVEL.
8. THE REPLACEMENT OF CEILING TILES AT THE END OF EACH SHIFT FOR
WORK AREAS OUTSIDE OF A RATED CONSTRUCTION BARRIER.
9. THE ELEVATOR DOOR IN THE AFFECTED ELEVATOR SHAFT IS REQUIRED TO
BE CLOSED AT THE END OF EACH WORKDAY.
PHASING GENERAL NOTES
1. SIGNAGE/TEMPORARY CONTROLS AS REQUIRED.
2. TEMPORARY INFECTION CONTROL WALL AND DOOR UTILIZE EDGE GUARD
SYSTEM IN ALL PUBLIC LOBBIES.
3. TEMPORARY INFECTION CONTROL BARRIER.
PHASING NOTES #
ELEVATOR S6
ELEVATOR S7
ELEVATOR S8
ELEVATOR P4 ELEVATOR P5
ELEVATOR P3 ELEVATOR P2 ELEVATOR P1
5B5C
ELEVATOR S6
ELEVATOR S7
ELEVATOR S8
ELEVATOR P4 ELEVATOR P5
ELEVATOR P3 ELEVATOR P2 ELEVATOR P1
8A
8B
8C
8D
ELEVATOR S6
ELEVATOR S7
ELEVATOR S8
ELEVATOR P4 ELEVATOR P5
ELEVATOR P3 ELEVATOR P2 ELEVATOR P1
ELEVATOR S6
ELEVATOR S7
ELEVATOR S8
ELEVATOR P4 ELEVATOR P5
ELEVATOR P3 ELEVATOR P2 ELEVATOR P1
7A
7B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
Architect:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
MEP Engineer:
NOT F
OR
CONSTRUCTIO
N
Elevator Consultant:
MES GROUP LERCH BATES
550 N. REO STREET SUITE 203
TAMPA, FL 33609
813.289.4700
216 S. JEFFERSON STREET
SUITE LL2
CHICAGO, IL 60661
312.256.1010
30% SCHEMATIC DESIGN 06/20/2024
60% DESIGN DEVELOPMENT 08/12/2024
90% QAQC REVIEW 09/23/2024
90% CONSTRUCTION DOCUMENTS 10/02/2024
100% QAQC REVIEW 10/25/2024
100% BID DOCUMENTS 1/20/2025
A u to d e s k D o c s /1
.6
.1
V A
H in e s E le v a to r
R e p la c e m e n t/
.6
.1
H in e s E le v a to rs
R
.r v t
/2
/2
:0
:3
A
M
GC106
THIRD FLOOR PLAN PHASES
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
RENOVATE ELEVATORS
BUILDING 200
5000 5TH AVE, HINES, IL 60141
578-25-003
1/24/2025 MT NL
100% BID DOCUMENTS
FULLY SPRINKLERED
N N
N N
SCALE: 1/8" = 1'-0"GC106
1 PHASE 5 - THIRD FLOOR PLAN
SCALE: 1/8" = 1'-0"GC106
4 PHASE 8 - THIRD FLOOR PLAN
SCALE: 1/8" = 1'-0"GC106
2 PHASE 6 - THIRD FLOOR PLAN (NO WORK)
SCALE: 1/8" = 1'-0"GC106
3 PHASE 7 - THIRD FLOOR PLAN
ELEVATOR S6
ELEVATOR S7
ELEVATOR S8
ELEVATOR P4 ELEVATOR P5
ELEVATOR P3 ELEVATOR P2 ELEVATOR P1
7A
7B
ELEVATOR S6
ELEVATOR S7
ELEVATOR S8
ELEVATOR P4 ELEVATOR P5
ELEVATOR P3 ELEVATOR P2 ELEVATOR P1
8A 8C
8B 8D
PHASING LEGEND
PHASE #1
ELEVATOR: P4
PHASE #2
ELEVATOR: P5
PHASE #3
ELEVATORS: S8, P1
PHASE #4
ELEVATORS: S7, P2
PHASE #5A/B/C
ELEVATORS: S6, P3, FINISHES
PHASE #6
NEW WALL AND DOOR FF
PHASE #7A/B
NEW FINISHES
PHASE #8A/B/C/D
NEW FINISHES
1. EACH ELEVATOR WILL BE PHASED SEPERATELY
2. THE SEQUENCE OF PHASES WILL BE DETERMINED BASED UPON OPERATION
OF THE EXISTING ELEVATORS DURING CONSTRUCTION
3. ELEVATOR LOBBIES SHALL BE PHASED TO MINIMIZE INTERUPTION OF
PATIENT/GUEST TRAFFIC
A. FLOORING SHALL BE PREPPED AND INSTALLED IN AREAS TO
MAINTAIN TRAFFIC IN LOBBIES
B. ALL WORK SHALL BE COORDINATED WITH THE VA AND OCCUR
DURING SHIFTS THAT ACCOMODATE OPERATIONS OF THE
ADJACENT CLINICAL AREAS
C. AREAS OF FLOORING BEING REPLACED IN FOR EACH SHIFT
SHALL NOT EXCEED AN AMOUNT THAT CAN BE COMPLETED
DURING A SINGLE SHIFT.
4. COORDINATION OF ASSOCIATED MEP SCOPE AND EQUIPMENT
INSTALLATIONS SHALL BE COORDINATED TO MINIMIZE THE NEED TO SHUT
DOWN MULTIPLE ELEVATORS AT THE SAME TIME.
5. CONSTRUCTION OF WALL AND DOOR TO BE SCHEDULED WITH VA DURING
OFF HOURS FOR SURROUNDING DEPARTMENTS, I.E. NIGHTS & WEEKENDS.