PDX 2026-514 (9) GI1.09.pdf
PDF 555 KB Posted
- Solicitation number
- 146793
- Issued by
- Multnomah County, Oregon
About this file
This is a traffic control plan drawing for the Port of Portland's Terminal Upper Roadway Joint Replacement project at Portland International Airport. The document provides detailed work area specifications and lane closure restrictions for the application of REPLAY bio-based asphalt rejuvenator across five designated work areas (WA-11 through WA-15) along the upper roadway.
Work Areas 11, 12, and 13 each permit single-lane closures between 10 PM and 4 AM, Monday through Friday, with an estimated one-night duration per area. Work Area 14 offers flexible scheduling options depending on traffic maintenance levels: three lanes maintained allows 9 PM to 4 AM operations, two lanes maintained permits 10 PM to 4 AM work, and full roadway closures with traffic diversion are limited to 10 PM to 3:30 AM or 12 AM to 3:30 AM on Tuesday and Wednesday only. Work Area 15, involving Islands 2, 3, and the Transportation Plaza Exit, requires coordination with Landside Operations and prohibits simultaneous closures of Islands 2 and 3 or either island with the Transportation Plaza Exit, with available work hours from 12 AM to 3:30 AM, Monday through Friday. All work areas are subject to coordination requirements with the Port of Portland's respective departments, and the contractor must maintain traffic flow while completing the asphalt rejuvenation application.
View the file
Other files
Show 40 more
Latest 50 of 57 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E2 E3 E4 E5
LANE
ONLY
LANE
ONLY
LANE
ONLY
POLICE
PARKING
OPS
PARKING
PO
LI
C E
PA
R
KI
N
G O
N L
Y
POLICE
PARKING
POLICE
PARKING
STOP
KEEP CLEAR
KEEP CLEAR
E6 E7 E8 E9 E10 E11
THRU
THRU
THRU
T P
N
SCALE: IN Feet
2001000 50 300
12/11/2024
C
AN
Y O
U S
EE
T
H E
AI
R
PL
AN
ES
T H
E
AD
JA
C
EN
T
SA
M
PL
ES
S H
O W
T H
R
EE
D
IF
FE
R
EN
T
LE
VE
LS
O
F
SH
AD
IN
G
SE
TT
IN
G
S
FO
R V
IE
W
IN
G
A N
D P
R
IN
TI
N
G D
R
AW
IN
G
C O
N
TE
N T
AR
E
O
PT
IM
IZ
ED
W
H
EN
AL
L
TH
R
EE
P
LA
N
ES
A
R E
VI
SI
BL
E.
T H
IS
G
U
ID
AN
C
E
IS
P R
O
VI
D
ED
F O
R R
EF
ER
EN
C
E O
N
LY
PRINTED:
lig ht da rk gr ay bl ac k
EAN PAN
2"
G R
AP
H
IC
S
C
AL
E
- F
O R
R
EF
ER
EN
C E
O N
LY
gr ay
THE AREA BELOW IS TO BE LEFT BLANK - FOR
USE BY CITY FOR PERMIT REVIEW STAMP ONLY-
7:34:56 AM EBERTP R:\Aviation\PDX\2026\0514 - Uppr Roadway Joint Replacement\Port of Portland drawings\Traffic Control plan.dwg
DISC. SHT. NO.
DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"
DESIGN BY
DRAWN BY
CHECKED BY
DATE
SHEET NO.
SUBMITTED BY
DRAWING NO.
TYPE:
1/
4" 1/
2" 1"
1/
4" 1/
2" 1"
DATE BY REVISION APPDATE BY REVISION APP ##
IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING
PORTLAND INTERNATIONAL AIRPORT
TERMINAL UPPER ROADWAY JOINT REPLACEMENT
REPLAY (BIO-BASED ASPHALT REJUVENATOR)
WORK AREA LIMITS AND CONDITIONS
A. JEFFREY
A. JEFFREY
P. EBERT
J. OSTLUND
OCT 2026
9 CD
PDX 2026-514 GI1.092025D018 102970
WORK AREA 11 (WA-11) DAY/HOUR RESTRICTIONS:
· CONTRACTOR SHALL ONLY CLOSE ONE LANE AT A TIME.
· AVAILABLE HOURS ARE 10 PM TO 4 AM, MONDAY - FRIDAY.
WORK AREA 11 DESCRIPTIONS:
· REPLAY (BIO-BASED ASPHALT REJUVENATOR) APPLICATION..
· ESTIMATED DURATION: ONE NIGHT.
WORK AREA 12 (WA-12) DAY/HOUR RESTRICTIONS:
· CONTRACTOR SHALL ONLY CLOSE ONE LANE AT A TIME.
· AVAILABLE HOURS ARE 10 PM TO 4 AM, MONDAY - FRIDAY.
· COORDINATE WITH PORT PARKING DEPARTMENT REGARDING ACCESS/CLOSING ANY ENTRY
LANES INTO THE GARAGE.
WORK AREA 12 DESCRIPTIONS:
· REPLAY (BIO-BASED ASPHALT REJUVENATOR) APPLICATION.
· ESTIMATED DURATION: ONE NIGHT.
WORK AREA 13 (WA-13) DAY/HOUR RESTRICTIONS:
· CONTRACTOR SHALL ONLY CLOSE ONE LANE AT A TIME.
· AVAILABLE HOURS ARE 10 PM TO 4 AM, MONDAY - FRIDAY.
WORK AREA 13 DESCRIPTIONS:
· REPLAY (BIO-BASED ASPHALT REJUVENATOR) APPLICATION..
· ESTIMATED DURATION: ONE NIGHT.
WORK AREA 14 (WA-14) DAY/HOUR RESTRICTIONS:
· IF CONTRACTOR MAINTAINS THREE LANES OF TRAFFIC, THEN AVAILABLE WORK HOURS ARE 9 PM
TO 4 AM, MONDAY - FRIDAY.
· IF CONTRACTOR MAINTAINS TWO LANES OF TRAFFIC, THEN AVAILABLE HOURS ARE 10 PM TO 4 AM, MONDAY - FRIDAY.
· IF CONTRACTOR CLOSES UPPER OUTER ROADWAY AND DIVERTS TRAFFIC TO UPPER INNER
ROADWAY, THEN AVAILABLE WORK HOURS ARE 10 PM - 3:30 AM, TUESDAY - WEDNESDAY.
· IF CONTRACTOR CLOSES UPPER ROADWAY AND DIVERTS TRAFFIC TO LOWER ROADWAY, THEN
AVAILABLE WORK HOURS ARE 12 AM - 3:30 AM, TUESDAY - WEDNESDAY.
WORK AREA 14 DESCRIPTIONS:
· REPLAY (BIO-BASED ASPHALT REJUVENATOR) APPLICATION..
· ESTIMATED DURATION: ONE NIGHT.
WORK AREA 15 (WA-15) DAY/HOUR RESTRICTIONS:
· CONTRACTOR SHALL COORDINATE ISLAND 2, ISLAND 3, AND TRANSPORTATION PLAZA EXIT
CLOSURES WITH LANDSIDE OPERATIONS.
· CONTRACTOR SHALL NOT CLOSE ISLANDS 2 AND 3 AT THE SAME TIME.
· CONTRACTOR SHALL NOT CLOSE THE TRANSPORTATION PLAZA EXIT AT THE SAME TIME AS
ISLANDS 2 OR 3.
· CONTRACTOR MAY CLOSE ISLANDS 2 OR 3 AND DIVERT TRAFFIC TO ISLAND 1. AVAILABLE WORK
HOURS ARE 12 AM TO 3:30 AM, MONDAY - FRIDAY.
· CONTRACTOR SHALL COORDINATE WITH LANDSIDE OPERATIONS PRIOR TO CLOSING
TRANSPORTATION PLAZA EXIT. CLOSURE MAY BE LIMITED TO ONE HOUR BASED ON LANDSIDE
OPERATIONS DIRECTIVE.
WORK AREA 15 DESCRIPTIONS:
· REPLAY (BIO-BASED ASPHALT REJUVENATOR) APPLICATION.
· ESTIMATED DURATION: ONE NIGHT.
ISLAND 2
ISLAND 3
TRANSPORTATION
PLAZA EXIT
ISLAND 1
(NOT INCLUDED IN
WORK AREAS)
WA-11
WA-13
WA-14
WA-15
WA-12
SCALE:
PLAN
1" = 100'1
JA NUA RY 10 , 200 6
JA CK R. OST LUND JR.
EXP: 12/31/2026
ENGINEER
RE
GIS
TERED PROFESSIONAL
OREGON
52,278
| 2026-09-25T13:10:11-0700 | |
| Jay Ostlund | |
| I have reviewed this document |
File details come from the government source that posted it. Updated .