This is a Special Inspections drawing specification document for the Portland International Airport Terminal Upper Roadway Joint Replacement project, a construction project under the jurisdiction of the City of Portland, Oregon. The document outlines comprehensive special inspection and testing requirements for the installation of expansion joints and anchorage systems, reinforcing steel, concrete placement, welding, and structural steel components. The project, identified as PDX 2026-514, involves the replacement of upper roadway joints at Portland International Airport's terminal facility located at 111 SW Fifth Ave., Suite 2600, Portland, OR 97204. The specifications reference the 2022 Oregon Structural Specialty Code (OSSC), ACI 318 standards, AISC 341 and 360 standards, and various ASTM testing protocols. The inspection requirements are categorized by frequency type—continuous, periodic, observe, and perform—with detailed provisions for concrete curing verification, reinforcing steel placement inspection, mechanical and adhesive anchor installation verification, and welding inspector qualifications per AWS D1.1 standards.
Special inspection and testing shall be performed by an approved, accredited independent agency meeting ASTM E329 requirements, with inspection reports submitted to the building official, structural engineer, architect, contractor, and owner following each inspection activity. Special inspectors must be approved by the building official, and the inspection agency must furnish a copy of its scope of accreditation to the structural engineer and architect. A final report must be submitted stating that all inspected work conforms to approved construction documents and that all noted discrepancies have been corrected. The document was prepared by S. Thomas de Boer as designer, drawn by Jay Ostlund, checked by C. Totten, and submitted for the October 2026 construction document phase. The drawing, numbered S0.004 and part of sheet 17 of the specification set, was digitally signed on June 30, 2026, with a progress print date of September 24, 2026.
View the file
Other files
Show 40 more
Latest 50 of 57 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTILLATION OF EXPANSION JOINTS INCLUDING
ANCHORAGE
1705.1 X
VERIFY PROPER INSTILLATION OF
EXPANSION JOINTS PER
MANUFACTURERS INSTRUCTIONS.
ANCHORAGE TO BE INSPECTED AS
REQUIRED PER ANCHOR REQUIREMENTS
POST INSTALLED MECHANICAL ANCHORS AND
ADHESIVE ANCHORS (EXCLUDING CONDITIONS
NOTED ABOVE) IN HARDENED CONCRETE
X
POST INSTALLED ADHESIVE ANCHORS WITH
SUSTAINED TENSION LOADS INSTALLED
HORIZONTALLY OR AT AN UPWARD INCLINE IN
HARDENED CONCRETE ACI 318: 17.2.5
X
NOTE 8
SPECIAL CASES / PRE-ENGINEERED
STRUCTURES
1705.1.1 MBMA X X
REFER TO DEFERRED SUBMITTALS AND
FABRICATORS REQUIREMENTS
SUBMITTALS TO THE BUILDING OFFICIAL 1704.5 X
CERTIFICATES OF COMPLIANCE,
REPORTS OF PRE-CONSTRUCTION TESTS,
OR REPORTS OF MATERIAL PROPERTIES
SHALL BE SUBMITTED TO THE BUILDING
OFFICIAL.
DEFERRED SUBMITTALS X
SPECIAL INSPECTION REQUIREMENTS
FOR DEFERRED SUBMITTAL ITEMS,
INCLUDING REQUIREMENTS FOR
DESIGNATED SEISMIC SYSTEMS IN
ACCORDANCE WITH OSSC SECTION
1705.13.4 IF APPLICABLE, TO BE
SPECIFIED BY THE SYSTEM ENGINEER
AND INCLUDED WITH DEFERRED
SUBMITTAL DOCUMENTS.
FABRICATORS
1705.11 1704.2.5
SPECIAL INSPECTION IS REQUIRED FOR
STRUCTURAL LOAD-BEARING MEMBERS
AND ASSEMBLIES FABRICATED ON THE
PREMISES OF A FABRICATOR'S SHOP,
SPECIAL INSPECTIONS SHALL BE
PERFORMED DURING FABRICATION.
PERFORMING SPECIAL INSPECTIONS IS
NOT REQUIRED, WHERE FABRICATOR
HAS BEEN APPROVED AS AN APPROVED
FABRICATOR, PER SECTION 1704.2.5.1.
CONTINUOUS PERIODIC
SYSTEM OR MATERIAL
OSSC CODE
REFERENCE
CODE OR
STANDARD
REFERENCE
FREQUENCY (NOTE 6)
REMARKS
GENERAL - SPECIAL INSPECTIONS
REINFORCING STEEL MECHANICAL COUPLERS,
TERMINATORS AND FORMSAVERS
ICC
EVALUATION
REPORTS
X
EMBEDDED ITEMS IN CONCRETE X
ALL NON-STRUCTURAL EMBEDDED
ITEMS, SUCH AS CONDUITS, PIPES AND
SLEEVES, SHALL BE REVIEWED FOR
CONFORMANCE WITH STRUCTURAL
DOCUMENTS FOR SIZE, SPACING,
LOCATION, EDGE DISTANCE AND TRIM
REINFORCING.
VERIFICATION OF FORMWORK
ACI 318:
26.11.1.2(b), 26.13.3.3
X
SPECIAL INSPECTIONS APPLY TO SHAPE,
LOCATION AND DIMENSIONS OF THE
CONCRETE MEMBER BEING FORMED
CONCRETE CURING 1908.1
ACI 318: 26.5.3 -
26.5.5, 26.13.3.3 X
VERIFY MAINTENANCE OF SPECIFIED
CURING TEMPERATURES AND
TECHNIQUES
CONCRETE PLACEMENT, NON-SHRINK GROUT 1908
ACI 318: 26.5,
26.13.3.2(a)
X
CONCRETE SPECIMENS FOR TESTING
ASTM C172
ASTM C31
ACI 318: 26.5,
26.12
X
PRIOR TO CONCRETE PLACEMENT,
FABRICATE CONCRETE SPECIMENS FOR
TESTING. SEE THE CONCRETE TESTING
TABLE FOR ADDITIONAL INFORMATION.
VERIFYING USE OF REQUIRED MIX DESIGN(S)
1904.1 1904.2
ACI 318: CH. 19,
26.4.3, 26.4.4 X
INSPECT ANCHORS/BOLTS CAST IN CONCRETE -
ACI 318:
26.13.3.3(g) X X
ALL CAST-IN-PLACE ANCHORS/BOLTS
SHALL BE VISUALLY INSPECTED.
REFERENCE STEEL INSPECTIONS FOR
ADDITIONAL INSTALLATION, MATERIAL
AND WELDING INSPECTIONS OF STEEL
ITEMS EMBEDDED IN CONCRETE
(HEADED STUDS, DBA's, ETC.)
REINFORCING STEEL PLACEMENT 1901.5
ACI 318: CH. 20,
25.2, 25.3, 26.6.1-26.6.3, 26.13.3.3
X
REINFORCING TO COMPLY WITH ALL
CODE PROTECTION, SPACING AND
TOLERANCE LIMITS.
GENERAL
1705.3 1901.6
ACI 318: 26.13
SPECIAL INSPECTIONS OF CONCRETE
SHALL CONFORM TO THE
REQUIREMENTS OF SECTION 1705.3 OF
THE IBC AND SECTION 26.13 OF ACI 318.
CONTINUOUS PERIODIC
SYSTEM OR MATERIAL
OSSC CODE
REFERENCE
CODE OR
STANDARD
REFERENCE
FREQUENCY (NOTE 6)
REMARKS
CONCRETE - SPECIAL INSPECTIONS
DOCUMENT (D): INDICATES CONTRACTOR AND SPECIAL INSPECTOR TO PROVIDE DOCUMENTATION IN
ACCORDANCE WITH AISC 341.
RBS - REDUCED BEAM SECTION
MT - MAGNETIC PARTICLE TESTING
C.J.P. - COMPLETE JOINT PENETRATION
NDT - NON-DESTRUCTIVE TESTING
9 TESTING ABBREVIATIONS:
● SPECIAL INSPECTOR SHALL PROVIDE DOCUMENTATION AT THE END OF ANCHOR INSTALLATIONS
STATING THAT THE ANCHORS WERE INSPECTED PER APPROVED ANCHOR EVALUATION REPORT.
● INSPECTION REPORTS SHALL IDENTIFY NAMES OF INSTALLERS.
8 SPECIAL INSPECTION OF MECHANICAL POST INSTALLED ANCHORS SHALL BE IN STRICT CONFORMANCE WITH THE ICC REPORT AND MANUFACTURER'S INSTALLATION REQUIREMENTS. ANCHOR INSTALLERS
SHALL BE QUALIFIED AS REQUIRED BY JURISDICTION REQUIREMENTS.
7 PERFORM INSPECTION PRIOR TO FINAL ACCEPTANCE OF THE ITEM FOR TEN WELDS TO BE MADE BY A
GIVEN WELDER, WITH THE WELDER DEMONSTRATING UNDERSTANDING OF REQUIREMENTS AND
POSSESSION OF SKILLS AND TOOLS TO VERIFY THESE ITEMS, THE PERFORM DESIGNATION OF THIS TASK
SHALL BE REDUCED TO OBSERVE, AND THE WELDER SHALL PERFORM THIS TASK. SHOULD THE
INSPECTOR DETERMINE THAT THE WELDER HAS DISCONTINUED PERFORMANCE OF THIS TASK, THE TASK
SHALL BE RETURNED TO PERFORM UNTIL SUCH TIME AS THE INSPECTOR HAS RE-ESTABLISHED
ADEQUATE ASSURANCE THAT THE WELDER WILL PERFORM THE INSPECTION TASKS LISTED.
PERFORM : INSPECTIONS SHALL BE PERFORMED PRIOR TO THE FINAL ACCEPTANCE OF THE ITEM.
OBSERVE : OBSERVE THESE FUNCTIONS ON A RANDOM, DAILY BASIS. OPERATIONS NEED NOT BE
DELAYED PENDING OBSERVATIONS.
PERIODIC : THE PART-TIME OR INTERMITTENT OBSERVATION OF WORK REQUIRING SPECIAL INSPECTION BY AN APPROVED SPECIAL INSPECTOR WHO IS PRESENT IN THE AREA WHERE THE WORK HAS BEEN OR
IS BEING PERFORMED AND AT THE COMPLETION OF THE WORK.
CONTINUOUS : THE FULL-TIME OBSERVATION OF WORK REQUIRING SPECIAL INSPECTION BY AN
APPROVED SPECIAL INSPECTOR WHO IS PRESENT IN THE AREA WHERE THE WORK IS BEING
PERFORMED.
6 INSPECTION TYPES:
5 QUALITY ASSURANCE (QA) IS REQUIRED FOR STRUCTURAL STEEL ITEMS PER AISC 360 AND 341 UNLESS SPECIFICALLY NOTED OTHERWISE. QUALITY CONTROL (QC) TO BE PROVIDED BY THE FABRICATOR, ERECTOR OR OTHER RESPONSIBLE CONTRACTOR AS APPLICABLE. CONTRACTOR AND SPECIAL
INSPECTOR TO DOCUMENT QUALITY CONTROL AS REQUIRED IN AISC 360 SECTION N3 AND AISC 341
SECTION J2.
4. THE SPECIAL INSPECTOR SHALL FURNISH INSPECTION REPORTS FOR EACH INSPECTION TO THE BUILDING OFFICIAL, STRUCTURAL ENGINEER, ARCHITECT, CONTRACTOR, AND OWNER. THE SPECIAL INSPECTION AGENCY SHALL SUBMIT A FINAL REPORT STATING THAT THE WORK REQUIRING SPECIAL
INSPECTION WAS INSPECTED AND IS IN CONFORMANCE WITH THE APPROVED CONSTRUCTION
DOCUMENTS AND THAT ALL DISCREPANCIES NOTED IN THE INSPECTION REPORTS HAVE BEEN
CORRECTED.
3. THE SPECIAL INSPECTOR SHALL OBSERVE THE INDICATED WORK FOR COMPLIANCE WITH THE APPROVED CONSTRUCTION DOCUMENTS. ALL DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE
CONTRACTOR FOR CORRECTION AND NOTED IN THE INSPECTION REPORTS.
2. SPECIAL INSPECTIONS AND ASSOCIATED TESTING SHALL BE PERFORMED BY AN APPROVED ACCREDITED INDEPENDENT AGENCY MEETING THE REQUIREMENTS OF ASTM E329 (MATERIALS). THE INSPECTION AND TESTING AGENCY SHALL FURNISH TO THE STRUCTURAL ENGINEER ARCHITECT A COPY OF THEIR SCOPE OF ACCREDITATION. SPECIAL INSPECTORS SHALL BE APPROVED BY THE BUILDING OFFICIAL. WELDING
INSPECTORS SHALL BE QUALIFIED PER SECTION 6.1.4.1(1) OF AWS D1.1.
1. SPECIAL INSPECTIONS SHALL CONFORM TO SECTION 1705 OF THE 2022 OSSC, CONTRACT DOCUMENTS AND APPROVED SUBMITTALS. REFER TO SPECIAL INSPECTION AND TESTING TABLES FOR PROJECT
REQUIREMENTS.
STATEMENT OF SPECIAL INSPECTION NOTES:
/4
/2
G R
A P
H
IC
S C
A L E
-F O
R R
E F
E R
E N
C E
O N
L Y d a rk g ra y b la c k lig h t g ra y
C A
N Y
O U
S E
E T
H E
A
IR
P L A
N E
S
T
H E
A D
J A
C E
N T
S A
M P
L E
S S
H O
W T
H R
E E
D
IF
F E
R E
N T
L E
V E
L S
O
F S
H A
D
IN
G S
E T
T
IN
G S
F O
R V
IE
W
IN
G
A N
D P
R
IN
T
IN
G D
R A
W
IN
G C
O N
T E
N T
A R
E O
P T
IM
IZ
E D
W
H E
N A
L L T
H R
E E
P L A
N E
S A
R E
V
IS
IB
L E
T
H
IS
G U
ID
A
N C
E I S
P R
O V
ID
E
D F
O R
R E
F E
R E
N C
E O
N L Y
DESIGN NUMBER PROJECT NUMBER
DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17".
NO. DATENO. DATE BY REVISIONS APP REVISIONS APPBY
DISC. SHT. NO.
DESIGN BY
DRAWN BY
CHECKED BY
DATE
SHEET NO.
SUBMITTED BY
DRAWING NO.
TYPE:
IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING
D R
A W
IN
G
S C
A L E
I S
R E
D U
C E
D
W H
E N
S H
E E
T S
IZ
E
I S x
501 SE 14TH AVE., SUITE 103
PORTLAND, OR 97214
P 503.973.5151 - F 503.973.5060
9/24/2026 12:13:55 PM Autodesk Docs://10022500555 - PDX Roadway Rehab/PDX-102970-STR-Roadway.rvt
SPECIAL INSPECTIONS - 1
1029702025D018
S. THOMAS
J. DE BOER
C. TOTTEN
OCTOBER 2026
S0.004
JAY OSTLUND
PDX 2026-514
CD
TERMINAL UPPER ROADWAY JOINT REPLACEMENT
PORTLAND INTERNATIONAL AIRPORT
111 SW Fifth Ave., Suite 2600 Portland, OR 97204 O 503.227.3251 - F 503.227.7980
P ro gr es s P rin t
DIGITALLY SIGNED
06-30-26
| 2026-09-24T17:05:02-0700 | |
| Craig Totten |