This is a traffic control plan drawing for the Port of Portland's Terminal Upper Roadway Joint Replacement project at Portland International Airport. The project encompasses expansion joint replacement and gutter rehabilitation work across ten designated work areas (WA-1 through WA-10) along the upper roadway system. Work Area 1 involves expansion joint replacement with an estimated duration of two nights and includes multiple traffic management options ranging from maintaining one lane to complete roadway closure, with available work hours between 9 PM and 4 AM or 12 AM and 3:30 AM depending on the traffic configuration selected. Work Areas 2 and 3 require expansion joint replacement and gutter rehabilitation over two nights each, with minimum two to three lane traffic maintenance requirements. Work Areas 4, 5, and 6 focus on expansion joint replacement over three nights while maintaining minimum two-lane traffic and five feet of pedestrian clearance at crosswalks with positive protection barriers. Work Area 7 involves expansion joint replacement over two nights with flexible traffic lane requirements, while Work Area 8 requires gutter rehabilitation and expansion joint replacement in one night with a minimum 12-foot traffic lane maintained and the upper outer roadway remaining open. Work Area 9 necessitates expansion joint replacement in one night with upper outer roadway closure and traffic diversion to the inner roadway. Work Area 10 addresses pothole maintenance in one night with an 11-foot minimum lane requirement. All work areas operate under Monday through Friday schedules with specific nighttime hour restrictions ranging from 9 PM to 4 AM or 10 PM to 3:30 AM.

The drawing, dated October 2026 with a professional engineer license expiration of December 31, 2026, was prepared by the Port of Portland and includes detailed site layout information with graphic scales and traffic control specifications. The project plan indicates contractor flexibility in scheduling and traffic management strategies to minimize impact on airport operations while completing necessary roadway maintenance and rehabilitation. No pricing information, contract terms, award dates, or bidding timelines are detailed within this traffic control plan document.

View the file

Other files

File Type Posted
PDX 2026-514 (2) GI1.02.pdf PDF
PDX 2026-514 (10) C1.00.pdf PDF
PDX 2026-514 (13) C3.00.pdf PDF
PDX 2026-514 (1) GI1.01.pdf PDF
PDX 2026-514 (9) GI1.09.pdf PDF
PDX 2026-514 (34) S2.251.pdf PDF
PDX 2026-514 (37) S2.262.pdf PDF
PDX 2026-514 (21) S2.201.pdf PDF
PDX 2026-514 (11) C2.00.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
PDX 2026-514 (5) GI1.05.pdf PDF
PDX 2026-514 (16) S0.003.pdf PDF
PDX 2026-514 (15) S0.002.pdf PDF
PDX 2026-514 (36) S2.261.pdf PDF
PDX 2026-514 (49) S6.107.pdf PDF
PDX 2026-514 (39) S2.272.pdf PDF
PDX 2026-514 (7) GI1.07.pdf PDF
PDX 2026-514 (30) S2.231.pdf PDF
PDX 2026-514 (50) S6.108.pdf PDF
PDX 2026-514 (53) S6.121.pdf PDF
PDX 2026-514 (44) S6.102.pdf PDF
PDX 2026-514 (24) S2.204.pdf PDF
PDX 2026-514 (40) S2.282.pdf PDF
PDX 2026-514 (26) S2.211.pdf PDF
PDX 2026-514 (14) S0.001.pdf PDF
Substitution Request Form.pdf PDF
PDX 2026-514 (22) S2.202.pdf PDF
PDX 2026-514 (41) S2.283.pdf PDF
PDX 2026-514 (54) S6.122.pdf PDF
PDX 2026-514 (42) S6.100.pdf PDF
PDX 2026-514 (4) GI1.04.pdf PDF
PDX 2026-514 (18) S0.005.pdf PDF
PDX 2026-514 (29) S2.222.pdf PDF
PDX 2026-514 (20) S2.200.pdf PDF
PDX 2026-514 (31) S2.232.pdf PDF
PDX 2026-514 (19) S0.050.pdf PDF
PDX 2026-514 (47) S6.105.pdf PDF
PDX 2026-514 (17) S0.004.pdf PDF
PDX 2026-514 (6) GI1.06.pdf PDF
PDX 2026-514 (33) S2.242.pdf PDF
PDX 2026-514 (12) C2.01.pdf PDF
PDX 2026-514 (27) S2.212.pdf PDF
PDX 2026-514 (35) S2.252.pdf PDF
PDX 2026-514 (32) S2.241.pdf PDF
PDX 2026-514 (38) S2.271.pdf PDF
PDX 2026-514 (43) S6.101.pdf PDF
PDX 2026-514 (46) S6.104.pdf PDF
PDX 2026-514 (51) S6.109.pdf PDF
PDX 2026-514 (45) S6.103.pdf PDF
PDX 2026-514 (28) S2.221.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E2 E3 E4 E5

LANE

ONLY

LANE

ONLY

LANE

ONLY

POLICE

PARKING

OPS

PARKING

PO

LI

C E

PA

R

KI

N

G O

N L

Y

POLICE

PARKING

POLICE

PARKING

STOP

E6 E7 E8 E9

THRU

THRU

THRU

T P

N

SCALE: IN Feet

2001000 50 300

12/11/2024

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

EAN PAN

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

THE AREA BELOW IS TO BE LEFT BLANK - FOR

USE BY CITY FOR PERMIT REVIEW STAMP ONLY-

7:34:34 AM EBERTP R:\Aviation\PDX\2026\0514 - Uppr Roadway Joint Replacement\Port of Portland drawings\Traffic Control plan.dwg

DISC. SHT. NO.

DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

PORTLAND INTERNATIONAL AIRPORT

TERMINAL UPPER ROADWAY JOINT REPLACEMENT

EXPANSION JOINT AND GUTTER REHAB WORK AREA LIMITS AND CONDITIONS

A. JEFFREY

A. JEFFREY

P. EBERT

J. OSTLUND

OCT 2026

8 CD

PDX 2026-514 GI1.082025D018 102970

WA-1WA-2

WA-3

WA-4

WA-5

WA-6

WA-7

WA-8

WA-9

WA-10

WORK AREA 1 (WA-1) DAY/HOUR RESTRICTIONS:

· IF CONTRACTOR MAINTAINS ONE LANE OF TRAFFIC, THEN AVAILABLE WORK HOURS ARE 9 PM - 4 AM, MONDAY - FRIDAY.

· IF CONTRACTOR CLOSES UPPER INNER ROADWAY AND DIVERTS TRAFFIC TO UPPER OUTER

ROADWAY, THEN AVAILABLE WORK HOURS ARE 10 PM - 3:30 AM, TUESDAY - WEDNESDAY.

· IF CONTRACTOR CLOSES UPPER OUTER ROADWAY AND DIVERTS TRAFFIC TO UPPER INNER

ROADWAY, THEN AVAILABLE WORK HOURS ARE 10 PM - 3:30 AM, TUESDAY - WEDNESDAY.

· IF CONTRACTOR CLOSES UPPER ROADWAY AND DIVERTS TRAFFIC TO LOWER ROADWAY, THEN

AVAILABLE WORK HOURS ARE 12 AM - 3:30 AM, TUESDAY - WEDNESDAY.

WORK AREA 1 DESCRIPTIONS:

· EXPANSION JOINT REPLACEMENT.

· ESTIMATED DURATION: TWO NIGHTS.

WORK AREA 2 (WA-2) DAY/HOUR RESTRICTIONS:

· CONTRACTOR SHALL MAINTAIN A MINIMUM TWO LANES OF TRAFFIC. AVAILABLE WORK HOURS ARE 9

PM - 4 AM, MONDAY - FRIDAY.

WORK AREA 2 DESCRIPTIONS:

· EXPANSION JOINT REPLACEMENT AND GUTTER REHAB.

· ESTIMATED DURATION: TWO NIGHTS.

WORK AREA 3 (WA-3) DAY/HOUR RESTRICTIONS:

· IF CONTRACTOR MAINTAINS THREE LANES OF TRAFFIC, THEN AVAILABLE WORK HOURS ARE 9 PM - 4

AM, MONDAY - FRIDAY.

· IF CONTRACTOR MAINTAINS TWO LANES OF TRAFFIC, THEN AVAILABLE WORK HOURS ARE 10 PM - 4

AM, MONDAY - FRIDAY.

WORK AREA 3 DESCRIPTIONS:

· EXPANSION JOINT REPLACEMENT AND GUTTER REHAB.

· ESTIMATED DURATION: TWO NIGHTS.

WORK AREAS 4, 5, & 6 (WA-4, WA-5, & WA-6) DAY/HOUR RESTRICTIONS:

· CONTRACTOR SHALL LEAVE A MINIMUM 5 FT. OF PEDESTRIAN CLEAR SPACE AT CROSSWALKS AT

ALL TIMES.

· CONTRACTOR SHALL PROVIDE POSITIVE PROTECTION (I.E. BARRICADES) BETWEEN WORK AREA

AND CROSSWALK.

· CONTRACTOR SHALL MAINTAIN A MINIMUM TWO LANES OF TRAFFIC. AVAILABLE WORK HOURS ARE 9

PM - 4 AM, MONDAY - FRIDAY.

WORK AREA 4, 5, & 6 DESCRIPTIONS:

· EXPANSION JOINT REPLACEMENT.

· ESTIMATED DURATION: THREE NIGHTS.

WORK AREA 7 (WA-7 DAY/HOUR RESTRICTIONS:

· IF CONTRACTOR MAINTAINS THREE LANES OF TRAFFIC, THEN AVAILABLE WORK HOURS ARE 9 PM - 4

AM, MONDAY - FRIDAY.

· IF CONTRACTOR MAINTAINS TWO LANES OF TRAFFIC, THEN AVAILABLE WORK HOURS ARE 10 PM - 4

AM, MONDAY - FRIDAY.

WORK AREA 7 DESCRIPTIONS:

· EXPANSION JOINT REPLACEMENT.

· ESTIMATED DURATION: TWO NIGHTS.

WORK AREA 8 (WA-8) DAY/HOUR RESTRICTIONS:

· CONTRACTOR SHALL MAINTAIN A MINIMUM 12 FT. LANE OF TRAFFIC AT ALL TIMES. WORK HOURS

ARE 10 PM - 3:30 AM, MONDAY - FRIDAY.

· UPPER OUTER ROADWAY (WA-1 AND WA-9) SHALL REMAIN OPEN DURING WA-8 CONSTRUCTION.

WORK AREA 8 DESCRIPTIONS:

· EXPANSION JOINT REPLACEMENT AND GUTTER REHAB.

· ESTIMATED DURATION: ONE NIGHT.

ISLAND 2

ISLAND 3

TRANSPORTATION

PLAZA EXIT

ISLAND 1

WORK AREA 9 (WA-9) DAY/HOUR RESTRICTIONS:

· AVAILABLE WORK HOURS ARE 10 PM - 3:30 AM, MONDAY - FRIDAY.

· CONTRACTOR SHALL CLOSE UPPER OUTER ROADWAY AT NORTH END AND DIVERT TRAFFIC TO

UPPER INNER ROADWAY.

WORK AREA 9 DESCRIPTIONS:

· EXPANSION JOINT REPLACEMENT.

· ESTIMATED DURATION: ONE NIGHT.

WORK AREA 10 (WA-10) DAY/HOUR RESTRICTIONS:

· CONRACTOR SHALL MAINTAIN A MINIMUM 11 FT LANE OF TRAFFIC AT ALL TIMES. AVAILABLE WORK

HOURS ARE 9 PM - 4 AM, MONDAY - FRIDAY.

WORK AREA 10 DESCRIPTIONS:

· POTHOLE MAINTENANCE.

· ESTIMATED DURATION: ONE NIGHT.

SCALE:

PLAN

1" = 100'1

JA NUA RY 10 , 200 6

JA CK R. OST LUND JR.

EXP: 12/31/2026

ENGINEER

RE

GIS

TERED PROFESSIONAL

OREGON

52,278

2026-09-25T13:08:47-0700
Jay Ostlund
I have reviewed this document

File details come from the government source that posted it. Updated .