SRTTP Equipment List.xlsx
XLSX spreadsheet 121 KB Posted
- Solicitation number
- N6247319R0033
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Equipment List Report Without Notes | ||||||
| Southern Region Teritary Treatment Plant | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| 02-BS-210 - Bar Screen No. | Bar Screen | 02 - Influent | No | Hours | 0.00 | |
| 2.0 | Pump Station | |||||
| 02-BS-220 - Mechanical Bar | Bar Screen | 02- Influent | No | Hours | 0.00 | |
| Screen No. 1 | Pump Station | |||||
| 02-FE/FIT-170 - Raw | Flow Meter | 02- Influent | No | Hours | 0.00 | |
| Sewage Flowmeter | Pump Station | |||||
| 02-P-110 - Submersible | Pump | 02-Influent Pump | No | Hours | 0.00 | |
| Pump | Station | |||||
| 02-P-120 - Submersible | Pump | 02-Influent Pump | No | Hours | 0.00 | |
| Pump | Station | |||||
| A-D-3 - Aerobic Digester | Basin | Aerobic Digester | No | Hours | 0.00 | |
| 3.0 | ||||||
| 02-P-140 - Submersible | Pump | 02-Influent Pump | No | Hours | 0.00 | |
| Pump | Station | |||||
| 02-P-151 - Sump Pump | Pump | 02-Influent Pump | No | Hours | 0.00 | |
| Station | ||||||
| 02-P-152 - Sump Pump | Pump | 02-Influent Pump | No | Hours | 0.00 | |
| Station | ||||||
| (OPS) 02-P-321 - Grit Pump | Pump | 02- Grit Collector | No | Hours | 0.00 | |
| No.1 | Station | |||||
| (OPS) 02-P-351 - Grit Pump | Pump | 02-Grit Collector | No | Hours | 0.00 | |
| No.2 | Station | |||||
| (OPS) 04-AE/AIT-2809 - Disk | Turbidity Meter | 04- disk filter | No | Hours | 0.00 | |
| Filter Effluent Turbidity | ||||||
| analyzer | ||||||
| 04-AE/AIT-350 - Disinfection | Cl2 Analyzer | 04- Disinfection | No | Hours | 0.00 | |
| Contact Basin Inluent Cl2 | Contact Basin | |||||
| Residual Analyzer | ||||||
| 04-AE/AIT-340 - Disinfection | Cl2 Analyzer | 04- Disinfection | No | Hours | 0.00 | |
| contact Basin effluent Cl2 | contact Basin | |||||
| Residual Analyzer | ||||||
| 04-FE/FIT-285 - Disk Filter | Flow Meter | 04-Disk Filters | No | Hours | 0.00 | |
| Backwash Flowmeter | ||||||
| 04-FE/FIT-300 - Disk Filter | Flow Meter | 04-Disk Filter | No | Hours | 0.00 | |
| Effluent Flowmeter | ||||||
| 04-FE/FIT-361 - Reclaimed | Flow Meter | 04-Reclaimed | No | Hours | 0.00 | |
| Water Effluent Flowmeter | Water Pump | |||||
| Station | ||||||
| 12/18/2018 01:26 pm | 1 of | 53.0 |
Sheet2
| Equipment List Report Without Notes | ||||||
| Southern Region Teritary Treatment Plant | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| 04-P-110 - Filter Feed Pump | Pump | 04-Flow EQ | No | Hours | 0.00 | |
| 1.0 | Basin | |||||
| 04-P-120 - Filter Feed Pump | Pump | 04-Flow EQ | No | Hours | 0.00 | |
| 2.0 | Basin | |||||
| 04-P-130 - Filter Feed Pump | Pump | 04- Flow EQ | No | Hours | 0.00 | |
| 3.0 | Basin | |||||
| (OPS)04-P-205 - Filter | Pump | 04-Disk Filter 1 | No | Hours | 0.00 | |
| Backwash/Sludge Pump 1A | ||||||
| (OPS)04-P-210 - Filter | Pump | 04-Disk Filter 1 | No | Hours | 0.00 | |
| Backwash/Sludge Pump 1B | ||||||
| (OPS)04-P-225 - Filter | Pump | 04-Disk Filter 2 | No | Hours | 0.00 | |
| Backwash/sludge Pump 2A | ||||||
| (OPS)04-P-230 - Filter | Pump | 04-Disk Filter 2 | No | Hours | 0.00 | |
| Backwash/Sludge Pump 2B | ||||||
| (OPS)04-P-245 - Filter | Pump | 04-Disk Filter 3 | No | Hours | 0.00 | |
| Backwash/Sludge Pump 3A | ||||||
| (OPS)04-P-250 - Filter | Pump | 04-Disk Filter 3 | No | Hours | 0.00 | |
| Backwask/Sludge Pump 3B | ||||||
| 04-P-280 - Disk Filter Effluent | Pump | 04-disk Filter | No | Hours | 0.00 | |
| Turbidity Sample Pump | ||||||
| 04-P-305 - Disinfection | Pump | 04-Disinfection | No | Hours | 0.00 | |
| contact Basin Influent Cl2 | Contact Basin | |||||
| Residual Sample Pump | ||||||
| 04-P-310 - Reclaimed Water | Pump | 04-Reclaimed | No | Hours | 0.00 | |
| Pump 1 | Water Pump | |||||
| Station | ||||||
| 04-P-320 - Reclaimed Water | Pump | 04-Reclaimed | No | Hours | 0.00 | |
| Pump 2 | Water Pump | |||||
| Station | ||||||
| 04-P-330 - Reclaimed Water | Pump | 04-Reclaimed | No | Hours | 0.00 | |
| Pump 3 | Water Pump | |||||
| Station | ||||||
| 04-P-340 - Disinfection | Pump | 04-Reclaimed | No | Hours | 0.00 | |
| contact Basin Effluent Cl2 | Water Pump | |||||
| Residual Sample Pump | Station | |||||
| 04-T-400 - Off Spec Tank | Tank | Off Spec Tank | No | Hours | 0.00 | |
| 05-FE/FIT-101 - Aerobic | Flow Meter | 05-Digester | No | Hours | 0.00 | |
| Digester Influent Flow Meter | ||||||
| (WAS Meter) | ||||||
| 12/18/2018 01:26 pm | 2 of | 53.0 |
Sheet3
| Equipment List Report Without Notes | ||||||
| Southern Region Teritary Treatment Plant | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| 05-FE/FIT-110 - Digested | Flow Meter | 05-Soldis | No | Hours | 0.00 | |
| Sludge Flowmeter (gravity | Handling Room | |||||
| belt) NEW | ||||||
| 05-FE/FIT-210 - Digested | Flow Meter | 05-Solids | No | Hours | 0.00 | |
| Sludge Flow Meter | Handling Room | |||||
| (Centrifuge) NEW | ||||||
| 05-M-110 - Aerobic Digester | Motor | North Blower | No | Hours | 0.00 | |
| Blower (MOTOR #1) | Room | |||||
| 05-M-120 - Aerobic Digester | Motor | North Blower | No | Hours | 0.00 | |
| Blower (MOTOR #2) | Room | |||||
| 05-M-130 - Aerobic Digester | Motor | North Blower | No | Hours | 0.00 | |
| Blower (MOTOR #3) | Room | |||||
| 05-M-140 - Aerobic Digester | Motor | Notrh Blower | No | Hours | 0.00 | |
| Blower (MOTOR #4) | Room | |||||
| 05-M-311 - Gravity Belt | Gravity Belt | 05-Solids | No | Hours | 0.00 | |
| Thickener | Handling Room | |||||
| 05-M-410 - Belt Filter Press 1 | Belt Press | 05-Solids | No | Hours | 0.00 | |
| Handling Room | ||||||
| 05-M-420 - Belt Filter Press 2 | Belt press | 05-Solids | No | Hours | 0.00 | |
| Handling | ||||||
| 05-M-430 - Sludge Conveyor | Conveyor | 05-Solids | No | Hours | 0.00 | |
| Belt 1 | Handling Room | |||||
| 05-P-210 - Digested Sludge | Pump | 05-Aerobic | No | Hours | 0.00 | |
| Pump 1 | Digester | |||||
| 05-P-220 - Digested Sludge | Pump | 05-Aerobic | No | Hours | 0.00 | |
| Pump 2 | Digestor | |||||
| 05-P-230 - Digested Sludge | Pump | 05-Aerobic | No | Hours | 0.00 | |
| Pump 3 | Digester | |||||
| 08-P-110 - Thickened Sludge | Pump | 05-solids | No | Hours | 0.00 | |
| Pump | Handling Room | |||||
| 06-M-410 - Polymer Blender | Polymer Mixer | 06-Chemical | No | Hours | 0.00 | |
| 1.0 | Storage Area | |||||
| 06-M-420 - Polymer Blender | Polymer Mixer | 06-Chemical | No | Hours | 0.00 | |
| 2.0 | Storage | |||||
| Handling | ||||||
| 06-M-430 - Polymer Blender | Polymer Mixer | 06-Chemical | No | Hours | 0.00 | |
| 3.0 | Storage Area | |||||
| 06-P-110 - Alum Metering | Pump | Chemical | No | Hours | 0.00 | |
| 12/18/2018 01:26 pm | 3 of | 53.0 |
Sheet4
| Equipment List Report Without Notes | ||||||
| Southern Region Teritary Treatment Plant | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| Pump 1 | Storage Area | |||||
| 06-P-120 - Alum Metering | Pump | 06-Chemical | No | Hours | 0.00 | |
| Pump 2 | Storage Area | |||||
| 06-P-210 - Brine Transfer | Pump | 06-Chemical | No | Hours | 0.00 | |
| Pump 1 | Storage Area | |||||
| 06-P-220 - Brine transfer | Pump | 06-Chemical | No | Hours | 0.00 | |
| Pump 2 | Stroage Area | |||||
| 06-P-320 - NaOCl Metering | Pump | 06-Chemical | No | Hours | 0.00 | |
| Pump #1 | Storage Area | |||||
| 06-P-330 - NaOCl Metering | Pump | 06-Chemical | No | Hours | 0.00 | |
| Pump 2 | Stroage Area | |||||
| 06-T-1 - Storage Tank 1 | Tank | 06-Chemical | No | Hours | 0.00 | |
| Storage Area | ||||||
| 06-T-3 - NaOCl Storage Tank | Tank | 06-Chemical | No | Hours | 0.00 | |
| 1.0 | Stroage Area | |||||
| 06-T-4 - NaOCl Storage Tank | Tank | 06-Chemical | No | Hours | 0.00 | |
| 2.0 | Storage Area | |||||
| 06-T-5 - Salt Saturator Tank | Tank | 06-Chemical | No | Hours | 0.00 | |
| Storage Area | ||||||
| 02-M-311 - Grit Collector No. | Grit | 02-Grit Collector | No | Hours | 0.00 | |
| 1.0 | Station | |||||
| 04-P 310 - RW PUMPS AND | EFFLUENT | E. Q. BASIN | STAFF | No | Hours | 0.00 |
| FILTER FEED PUMPS | PUMPS | AND CHLORINE | ||||
| CONTACT | ||||||
| TANK | ||||||
| 02-M-341 - Grit Collector | Grit Collector | 02-Grit Collector | No | Hours | 0.00 | |
| No.2 | Station | |||||
| (OPS) 02-M-361 - Grit | Grit Classifier | 02-Influent Pump | No | Hours | 0.00 | |
| Classifier no.2 | Station | |||||
| 02-M-230 - Screenings | Compactor | 02-Influent Pump | No | Hours | 0.00 | |
| Washer-Compactor No.1 | Station | |||||
| 02-SP-151 - Influent Pump | Sump Pump | 02-Influent Pump | No | Hours | 0.00 | |
| Station Sump Pump No.1 | Station | |||||
| 02-SP-152 - Influent Pump | Sump Pump | 02-Influent Pump | No | Hours | 0.00 | |
| Station sump Pump No.2 | Station | |||||
| 04-FI-280 - Pump P-280 Flow | Flow Tube | 04-Disk Filters | No | Hours | 0.00 | |
| Indicator | ||||||
| 12/18/2018 01:26 pm | 4 of | 53.0 |
Sheet5
| Equipment List Report Without Notes | ||||||
| Southern Region Teritary Treatment Plant | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| 04-FI-305 - Pump P-305 Flow | Flow Tube | 04-Disk Filter | No | Hours | 0.00 | |
| Indicator | ||||||
| 04-FI-340 - Pump P-340 Flow | Flow tude | 04-Reclaimed | No | Hours | 0.00 | |
| Indicator | Water Pump | |||||
| Station | ||||||
| 04-M-200 - Disk Filter #1 | Drive Motor | 04-Disk Filter# 1 | No | Hours | 0.00 | |
| Drive | Chain | |||||
| 04-M-220 - Disk Filter 2 Drive | Drive Motor | 04-Disk Filter# 2 | No | Hours | 0.00 | |
| Chain | ||||||
| 011 - florescent lighting | emergency | control room | No | Hours | 0.00 | |
| ballast | ||||||
| 04-M-300 - Disinfection | Motor | 04-Disinfection | No | Hours | 0.00 | |
| Contact Basin Influent Mixer | contact Basin | |||||
| (OPS) 05-AE/AIT-113 - | DO Probe | 05-Digester 1 | No | Hours | 0.00 | |
| Aerobic digester No 1 | ||||||
| Dissolved O2 Analyzer | ||||||
| 05-AE/AIT-133(OPS) - | DO Probe | 05-Digester 2 | No | Hours | 0.00 | |
| Aerobic Digester No 2 | ||||||
| Dissolved O2 Analyzer | ||||||
| 06-B-300 - Hydrogen Gas | Blower | 06-Chemical | No | Hours | 0.00 | |
| Dilution Blower 1 | Storage Area | |||||
| 06-B-310 - Hydrogen Gas | Blower | 06-Chemical | No | Hours | 0.00 | |
| Dilution Blower 2 | Storage Area | |||||
| 06-AE/AIT-205 - NaOCl | Gas Detector | 06-NAOCl | No | Hours | 0.00 | |
| Generator hydrogen Gas | Generator Room | |||||
| Detector | ||||||
| 07-C-1 - Odor Control Cell 1 | Bio Beds | No | Hours | 0.00 | ||
| OOPS - Sub-pump | Pump | OOPS | No | Hours | 0.00 | |
| 01-golf cart- - Golf Cart | Golf Cart | SRTP | Gerneral | No | Hours | 0.00 |
| services | ||||||
| PMP-601 PUMP #2 - | OOOPS Area | No | Hours | 0.00 | ||
| OOOPS Pump | ||||||
| PT-342 - PRESSURE | TRANSMITTE | TAPS 3 | No | Hours | 0.00 | |
| TRANSMITTER | R | |||||
| 01-FH-6 - Fire Hydrant | Fire Hydrant | Headworks | No | Hours | 0.00 | |
| 01-GV-1 - Fire Hydrant | Valve | Fire Hydrant 1 | No | Hours | 0.00 | |
| Isolation Valve | ||||||
| 12/18/2018 01:26 pm | 5 of | 53.0 |
Sheet6
| Equipment List Report Without Notes | ||||||
| Southern Region Teritary Treatment Plant | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| 01-GV-2 - Fire Protection | Valve | SE of control | No | Hours | 0.00 | |
| Water Sect Vlv | building | |||||
| 01-GV-3 - Fire Hydrant | Valve | Fire Hydrant 2 | No | Hours | 0.00 | |
| Isolation Valve | ||||||
| 01-GV-4 - Fire Protection | Valve | SE 0f | No | Hours | 0.00 | |
| Water Sect Vlv | Disinfection | |||||
| contact Basin | ||||||
| 01-GV-5 - Fire Hydrant | Valve | Fire Hydrant 3 | No | Hours | 0.00 | |
| Isolation Valve | ||||||
| 01-GV-6 - Fire Hydrant | Valve | Fire Hydrant 4 | No | Hours | 0.00 | |
| Isolation Valve | ||||||
| 01-GV-7 - Fire Protection | Valve | SE of Operations | No | Hours | 0.00 | |
| Water Sect Vlv | Building | |||||
| 01-GV-8 - Fire Hydrant 5 | Valve | Fire Hydrant 5 | No | Hours | 0.00 | |
| Isolation Valve | ||||||
| 01-GV-9 - Fire Hydrant 6 | Valve | Fire Hydrant 6 | No | Hours | 0.00 | |
| Isolation Valve | ||||||
| 01-M-100 - Emergency | Emergency | NW Site | Yes | Hours | 1.00 | |
| Electrical Generator | Generator | |||||
| 01-RPBD-1 - Site Potable | Backflow | Headworks | No | Hours | 0.00 | |
| Water Backflow Preventor | Preventor | |||||
| 01-RPBD-2 - site Industrial | Backflow | Headworks | No | Hours | 0.00 | |
| Water Backflow Preventor | Preventor | |||||
| 01-RPBD-3 - Site Fire | Backflow | Headworks | No | Hours | 0.00 | |
| Protection Water Backflow | Preventor | |||||
| Preventor | ||||||
| 02-EF-5 - Influent Pump | Fan | 02-Influent Pump | No | Hours | 0.00 | |
| Station Pumproom Exhaust | Station | |||||
| Fan | ||||||
| 02-SF-5 - Influent Pump | Fan | 02- Influent | No | Hours | 0.00 | |
| Station supply Fan | Pump Station | |||||
| 02-AE/AIT-102 - Influent | Gas Detetor | 02-Influent Pump | No | Hours | 0.00 | |
| Wetwell Combustible Gas | Station | |||||
| Detector | ||||||
| 02-AE/AIT-315 - Grit | Gas Detector | 02-Grit Collector | No | Hours | 0.00 | |
| Collector #1 Combustible | 1.0 | |||||
| Gas Detector | ||||||
| 02-AE/AIT-345 - Grit collector | Gas Detector | 02-Grit Collector | No | Hours | 0.00 | |
| #2 Combustible Gas Detector | 2.0 | |||||
| 12/18/2018 01:26 pm | 6 of | 53.0 |
Sheet7
| Equipment List Report Without Notes | ||||||
| Southern Region Teritary Treatment Plant | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| 02-BS-MCP-1 - Mechanical | Control Panel | 02-Influent Pump | No | Hours | 0.00 | |
| Barscreen N0.1 | Station | |||||
| 02-BV-174 - Alum Injection | Ball Valve | 02-Influent Pump | No | Hours | 0.00 | |
| Station | ||||||
| 02-CV-110 - IPS 1 check | Check Valve | 02-Influent Pump | No | Hours | 0.00 | |
| Valve | Station | |||||
| 02-CV-120 - IPS 2 Check | Check Valve | 02-Influent pump | No | Hours | 0.00 | |
| Valve | Station | |||||
| 02-CV-130 - IPS 3 Check | Check Valve | 02-Influent Pump | No | Hours | 0.00 | |
| Valve | Station | |||||
| 02-CV-140 - IPS 4 Check | Check Valve | 02-Influent Pump | No | Hours | 0.00 | |
| Valve | Station | |||||
| 02-CV-321 - Grit Pump #1 | Check Valve | 02-Grit Collector | No | Hours | 0.00 | |
| Check Valve | Pump Pit | |||||
| 02-CV-351 - Grit pump #2 | Check Valve | 02-Grit Collector | No | Hours | 0.00 | |
| Check Valve | Pump Pit | |||||
| 02-FV-313 - Grit Coleector 1 | Soleniod Valve | 02-Grit Collector | No | Hours | 0.00 | |
| Grit Flush Valve | Pump Pit | |||||
| 02-FV-343 - Grit Collector #2 | Solenoid Valve | 02-Grit Collector | No | Hours | 0.00 | |
| Grit Flush Valve | Pump Pit | |||||
| 02-GAT-210 - Bar Screen #1 | Slide Gate | 02-Influent Pump | No | Hours | 0.00 | |
| Influent Gate | Station | |||||
| 02-GAT-211 - Bar Screen #1 | Slide Gate | 02-Influent Pump | No | Hours | 0.00 | |
| Effluent Gate | Station | |||||
| 02-GAT-240 - Bar Screen #2 | Slide Gate | 02-Influent Pump | No | Hours | 0.00 | |
| Influent Gate | Station | |||||
| 02-GAT-241 - Bar Screen #2 | Slide Gate | 02-Influent Pump | No | Hours | 0.00 | |
| Effluent Gate | Station | |||||
| 02-GAT-310 - Grit Collector | Slide Gate | 02-Grit Collector | No | Hours | 0.00 | |
| #1 Influent Gate | ||||||
| 02-GAT-312 - Grit Collector | Slide Gate | 02-Grit Collector | No | Hours | 0.00 | |
| #1 Effluent Gate | ||||||
| 02-GAT-340 - Grit Collector | Slide Gate | 02-Grit Collector | No | Hours | 0.00 | |
| #2 Influent Gate | ||||||
| 02-GAT-342 - Grit Collector | Slide Gate | 02-Grit Collector | No | Hours | 0.00 | |
| #2 Effluent Gate | ||||||
| 02-GCO-MCP-1 - Grit | Control Panel | 02-Grit Collector | No | Hours | 0.00 | |
| 12/18/2018 01:26 pm | 7 of | 53.0 |
Sheet8
| Equipment List Report Without Notes | ||||||
| Southern Region Teritary Treatment Plant | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| Collector Control Panel | ||||||
| 02-KGV-110 - IPS #1 Knife | Knife Valve | 02-Influent Pump | No | Hours | 0.00 | |
| Gate | Station | |||||
| 02-KGV-120 - IPS #2 Knife | Knife Gate | 02-Influent Pump | No | Hours | 0.00 | |
| Gate | Station | |||||
| 02-KGV-130 - IPS #3 Knife | Knife Gate | 02-Influent Pump | No | Hours | 0.00 | |
| Gate | Station | |||||
| 02-KGV-140 - IPS #4 Knife | Knife Gate | 02-Influent Pump | No | Hours | 0.00 | |
| Gate | Station | |||||
| 02-KGV-171 (Electric | Knife Gate | 02-Influent Pump | No | Hours | 0.00 | |
| Actuator) - Flowmeter Bypass | Station | |||||
| Influent Knife Gate | ||||||
| 02-KGV-172 - Flowmeter | Knife Gate | 02-Influent Pump | No | Hours | 0.00 | |
| Effluent Knife Gate | Station | |||||
| 02-KGV-173 (Electric | Knife Gate | 02-Influent Pump | No | Hours | 0.00 | |
| Actuator) - Flowmeter Bypass | Station | |||||
| Influent Knife Gate | ||||||
| 02-LE/LIT-100A - Wetwell | Level | 02-Influent Pump | No | Hours | 0.00 | |
| Level Xmtr #1 | Transmitter | Station | ||||
| 02-LE/LIT-100B - Wetwell | Level | 02-Influent Pump | No | Hours | 0.00 | |
| Level Xmtr #2 | Transmitter | Station | ||||
| 02-LE/LIT-221 - Bar Screen | Level | 02-Influent Pump | No | Hours | 0.00 | |
| #1 Influent Channel Level | Transmitter | Station | ||||
| Xmtr | ||||||
| 02-LE/LIT-222 - Bar Screen | Level | 02-Influent Pump | No | Hours | 0.00 | |
| #1 Effluent Channel Level | Transmitter | Station | ||||
| Xmtr | ||||||
| 02-LSHH-101 - Influent Pump | Level Switch | 02-Influent Pump | No | Hours | 0.00 | |
| Station Wetwell High Level | Station | |||||
| Alarm | ||||||
| 02-LSHH-201 - Bar Screen | Level Switch | 02-Influent Pump | No | Hours | 0.00 | |
| #2 High Level Alarm | Station | |||||
| 02-LSHH-223 - Bar Screen | Level Switch | 02-Influent Pump | No | Hours | 0.00 | |
| #1 High Level Alarm | Station | |||||
| 02-LSLL-100A & 100B - | Level Switch | 02-Influent Pump | No | Hours | 0.00 | |
| Influent Pump Station | Station ( Dri-Pit) | |||||
| Wetwell Level Switch #1 & 2 | Sump | |||||
| 02-LSLL-100B - Influent | Level Switch | 02-Influent Pump | No | Hours | 0.00 | |
| Pump Station Wetwell Level | Station | |||||
| 12/18/2018 01:26 pm | 8 of | 53.0 |
Sheet9
| Equipment List Report Without Notes | ||||||
| Southern Region Teritary Treatment Plant | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| Switch #2 | ||||||
| 02-M-220 - Bar Screen Motor | Motor | 02-Influent pump | No | Hours | 0.00 | |
| Station | ||||||
| 02-PV-110 - IPS #1 Suction | Plug Valve | 02-Influent pump | No | Hours | 0.00 | |
| Plug Valve | Station | |||||
| 02-PV-120 - IPS #2 Suction | Plug Valve | 02-Influent pump | No | Hours | 0.00 | |
| Plug Valve | Station | |||||
| 02-PV-130 - IPS #3 Suction | Plug Valve | 02-Influent Pump | No | Hours | 0.00 | |
| Plug Valve | Station | |||||
| 02-PV-140 - IPS #4 Suction | Plug Valve | 02-Influent Pump | No | Hours | 0.00 | |
| Plug Valve | Station | |||||
| 02-PV-320 - Grit Pump #1 | Plug Valve | 02-Grit Collector | No | Hours | 0.00 | |
| Suction Plug Valve | ||||||
| 02-PV-321 - Grit Pump #1 | Plug Valve | 02-Grit Collector | No | Hours | 0.00 | |
| Discharge Plug Valve | ||||||
| 02-PV-322 - Grit Pump | Plug Valve | 02-Grit Collector | No | Hours | 0.00 | |
| Discharge Plug Valve | ||||||
| 02-PV-325 - Cross Over Tie | Plug Valve | 02-Grit Collector | No | Hours | 0.00 | |
| Plug Valve | ||||||
| 02-PV-330 - Grit Classifier #1 | Plug Valve | 02-Influent Pump | No | Hours | 0.00 | |
| Inlet Plug Valve | Station | |||||
| 02-PV-360 - Grit Classifier #2 | Plug Valve | 02-Influent Pump | No | Hours | 0.00 | |
| Inlet Plug Valve | Station | |||||
| 02-PV-350 - Grit Pump #2 | Plug Valve | 02-Grit Collector | No | Hours | 0.00 | |
| Suction Plug Valve | ||||||
| 02-PV-351 - Grit Pump #2 | Plug Valve | 02-Grit Collector | No | Hours | 0.00 | |
| Discahrge Plug Valve | ||||||
| 02-PV-352 - Grit Pump | Plug Valve | 02-Grit Collector | No | Hours | 0.00 | |
| Discharge Plug Valve | ||||||
| (OPS) 03-AE/AIT-216 - SBR | D.O. Probe | 03-SBR #1 | No | Hours | 0.00 | |
| #1 D.O. Analyzer/Xmitter | ||||||
| Probe | ||||||
| (OPS) 03-AE/AIT-226 - SBR | D.O. Probe | 03-SBR #2 | No | Hours | 0.00 | |
| #2 D.O. Analyzer/Xmitter | ||||||
| Probe | ||||||
| Lighting Fixture - light fixture | Flourescent | Electrical Room | No | Hours | 0.00 | |
| Bulb | ||||||
| 12/18/2018 01:26 pm | 9 of | 53.0 |
Sheet10
| Equipment List Report Without Notes | ||||||
| Southern Region Teritary Treatment Plant | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| (OPS) 03-AE/AIT-246 - SBR | D.O. Probe | 03-SBR #4 | No | Hours | 0.00 | |
| #4 D.O. Analyzer/Xmitter | ||||||
| Probe | ||||||
| (OPS) 03-AE/AIT-256 - SBR | D.O. Probe | 03-SBR #5 | No | Hours | 0.00 | |
| #5 D.O. Analyzer/Xmitter | ||||||
| Probe | ||||||
| 03-B-110 - SBR Blower #1 | Blower | 03-Operations | No | Hours | 0.00 | |
| (OLD) | Building/Blower | |||||
| Room | ||||||
| 03-B-120 - SBR Blower #2 | Blower | 03-Operations | No | Hours | 0.00 | |
| (OLD) | Building/Blower | |||||
| Room | ||||||
| 03-B-130 - SBR Blower #3 | Blower | 03-Operations | No | Hours | 0.00 | |
| (OLD) | Building/Blower | |||||
| Room | ||||||
| 03-B-140 - SBR Blower #4 | Blower | 03-Operations | No | Hours | 0.00 | |
| (OLD) | Building/Blower | |||||
| Room | ||||||
| 03-B-150 - SBR Blower #5 | Blower | 03-Operations | No | Hours | 0.00 | |
| (OLD) | Building/Blower | |||||
| Room | ||||||
| 03-B-180 - Decant Blower 1A | Blower | North Blower | No | Hours | 0.00 | |
| Room | ||||||
| 03-B-185 - Decant Blower 1B | Blower | 03-Operations | No | Hours | 0.00 | |
| Building/Blower | ||||||
| Room | ||||||
| 03-B-190 - Decant Blower 2A | Blower | 03-Operations | No | Hours | 0.00 | |
| Building/Blower | ||||||
| Room | ||||||
| 03-B-195 - Decant Blower 2B | Blower | 03-Operations | No | Hours | 0.00 | |
| Building/Blower | ||||||
| Room | ||||||
| 03-BFV-111 - SBR Blower 1 | Butterfly Valve | 03-Operations | No | Hours | 0.00 | |
| Discharge Butterfly Valve | Building/Blower | |||||
| Room | ||||||
| 03-BFV-121 - SBR Blower 2 | Butterfly Valve | 03-Operations | No | Hours | 0.00 | |
| Discharge Butterfly Valve | Building/Blower | |||||
| Room | ||||||
| 03-BFV-131 - SBR Blower 3 | Butterfly Valve | 03-Operations | No | Hours | 0.00 | |
| Discharge Butterfly Valve | Building/Blower | |||||
| Room | ||||||
| 12/18/2018 01:26 pm | 10 of | 53.0 |
Sheet11
| Equipment List Report Without Notes | ||||||
| Southern Region Teritary Treatment Plant | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| 03-BFV-141 - SBR Blower 4 | Butterfly Valve | 03-Operations | No | Hours | 0.00 | |
| Discharge Butterfly Valve | Building/Blower | |||||
| Room | ||||||
| 03-BFV-151 - SBR Blower 5 | Butterfly Valve | 03-Operations | No | Hours | 0.00 | |
| Discharge Butterfly Valve | Building/Blower | |||||
| Room | ||||||
| 03-BFV-161 - SBR Aeration | Butterfly Valve | 03-Operations | No | Hours | 0.00 | |
| Header Section Valve | Building/Blower | |||||
| Room | ||||||
| 03-BFV-171 - SBR Aeration | Butterfly Valve | 03-Operations | No | Hours | 0.00 | |
| Header Section Valve | Building/Blower | |||||
| Room | ||||||
| 03-BFV-175 - Decant Blower | Butterfly Valve | 03-Operations | No | Hours | 0.00 | |
| 1A & 1B Vacuum Header | Building/Blower | |||||
| Isolation Valve | Room | |||||
| 03-BFV-176 - Decant Blower | Butterfly Valve | 03-Operations | No | Hours | 0.00 | |
| 2A & 2B Vacuum Header | Building/Blower | |||||
| Isolation Valve | Room | |||||
| 03-CV-110 - SBR Blower #1 | Check Valve | 03-Operations | No | Hours | 0.00 | |
| Discharge Check Valve | Building/Blower | |||||
| Room | ||||||
| 03-CV-120 - SBR Blower #2 | Check Valve | 03-Operations | No | Hours | 0.00 | |
| Discharge Check Valve | Building/Blower | |||||
| Room | ||||||
| 03-CV-130 - SBR Blower #3 | Check Valve | 03-Operations | No | Hours | 0.00 | |
| Discharge Check Valve | Building/Blower | |||||
| Room | ||||||
| 03-CV-140 - SBR Blower #4 | Check Valve | 03-Operations | No | Hours | 0.00 | |
| Discharge Check Valve | Building/Blower | |||||
| Room | ||||||
| 03-CV-150 - SBR Blower #5 | Check Valve | 03-Operations | No | Hours | 0.00 | |
| Discharge Check Valve | Building/Blower | |||||
| Room | ||||||
| 03-CV-180 - Decant Blower | Check Valve | 03-Operations | No | Hours | 0.00 | |
| 1A Discharge Check Valve | Building/Blower | |||||
| Room | ||||||
| 03-CV-185 - Decant Blower | Check Valve | 03-Operations | No | Hours | 0.00 | |
| 1B Discharge Check Valve | Building/Blower | |||||
| Room | ||||||
| 03-CV-190 - Decant Blower | Check Valve | 03-Operations | No | Hours | 0.00 | |
| 2A Discharge Check Valve | Building/Blower | |||||
| 12/18/2018 01:26 pm | 11 of | 53.0 |
Sheet12
| Equipment List Report Without Notes | ||||||
| Southern Region Teritary Treatment Plant | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| Room | ||||||
| 03-CV-195 - Decant Blower | Check Valve | 03-Operations | No | Hours | 0.00 | |
| 2B Discharge Check Valve | Building/Blower | |||||
| Room | ||||||
| 03-CV-215 - SBR WAS | Check Valve | 03- SBR 1 | No | Hours | 0.00 | |
| Pump #1 Discharge Check | ||||||
| Valve | ||||||
| 03-CV-225 - SBR WAS | Check Valve | 03- SBR 2 | No | Hours | 0.00 | |
| Pump #2 Discharge Check | ||||||
| Valve | ||||||
| 03-CV-235 - SBR WAS | Check Valve | 03- SBR 3 | No | Hours | 0.00 | |
| Pump #3 Discharge Check | ||||||
| Valve | ||||||
| 03-CV-245 - SBR WAS | Check Valve | 03- SBR 4 | No | Hours | 0.00 | |
| Pump #4 Discharge Check | ||||||
| Valve | ||||||
| 03-CV-255 - SBR WAS | Check Valve | 03- SBR 5 | No | Hours | 0.00 | |
| Pump #5 Discharge Check | ||||||
| Valve | ||||||
| 03-FE/FIT-161 - SBR 1 & 2 | Flow Meter | 03-Operations | No | Hours | 0.00 | |
| aeration Air Flowmeter | Building- Blower | |||||
| Room | ||||||
| 03-FE/FIT-171 - SBR 3,4 & 5 | Flow Meter | 03-Operations | No | Hours | 0.00 | |
| aeration Air Flowmeter | Building- Blower | |||||
| Room | ||||||
| 03-FV-175 - Decant Blower | Plug Valve | 03-Operations | No | Hours | 0.00 | |
| 1A & 1B inlet haeder Flow | Building - Blower | |||||
| control Plug Valve | Room | |||||
| 03-FV-176 - Decant Blower | Plug Valve | 03-Operations | No | Hours | 0.00 | |
| 2A & 2B inlet haeder Flow | Building - Blower | |||||
| control Plug Valve | Room | |||||
| 03-FV-182 - SBR 1 Decant | Plug Valve | 03-Operations | No | Hours | 0.00 | |
| Press Manifold Flow Control | Building-Blower | |||||
| Valve | Room | |||||
| 03-FV-183 - SBR 2 Decant | Plug Valve | 03-Operations | No | Hours | 0.00 | |
| Press Manifold Flow Control | Building-Blower | |||||
| Valve | Room | |||||
| 03-FV-184 - SBR 3 Decant | Plug Valve | 03-Operations | No | Hours | 0.00 | |
| Press Manifold Flow Control | Building-Blower | |||||
| Valve | Room | |||||
| 12/18/2018 01:26 pm | 12 of | 53.0 |
Sheet13
| Equipment List Report Without Notes | ||||||
| Southern Region Teritary Treatment Plant | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| 03-FV-187 - SBR 1 Decant | Plug Valve | 03-Operations | No | Hours | 0.00 | |
| Vacuum Manifold Flow | Building-Blower | |||||
| Control Valve | Room | |||||
| 03-FV-188 - SBR 2 Decant | Plug Valve | 03-Operations | No | Hours | 0.00 | |
| Vacuum Manifold Flow | Building-Blower | |||||
| Control Valve | Room | |||||
| 03-FV-189 - SBR 3 Decant | Plug Valve | 03-Operations | No | Hours | 0.00 | |
| Vacuum Manifold Flow | Building-Blower | |||||
| Control Valve | Room | |||||
| 03-FV-192 - SBR 4 Decant | Plug Valve | 03-Operations | No | Hours | 0.00 | |
| Press Manifold Flow Control | Building-Blower | |||||
| Valve | Room | |||||
| 03-FV-193 - SBR 5 Decant | Plug Valve | 03-Operations | No | Hours | 0.00 | |
| Press Manifold Flow Control | Building-Blower | |||||
| Valve | Room | |||||
| 03-FV-197 - SBR 4 Decant | Plug Valve | 03-Operations | No | Hours | 0.00 | |
| Vacuum Manifold Flow | Building-Blower | |||||
| Control Valve | Room | |||||
| 03-FV-198 - SBR 5 Decant | Plug Valve | 03-Operations | No | Hours | 0.00 | |
| Vacuum Manifold Flow | Building-Blower | |||||
| Control Valve | Room | |||||
| 03-FV-210 - SBR 1 Influent | Plug Valve | 03-SBR 1 | No | Hours | 0.00 | |
| Isolation Valve | ||||||
| Sludge Beds 1-6 - sludge | Sludge Beds 1-6 | No | Hours | 0.00 | ||
| beds | ||||||
| 03-FV-230 - SBR 3 Influent | Plug Valve | 03-SBR 3 | No | Hours | 0.00 | |
| Isolation Valve | ||||||
| 03-FV-240 - SBR 4 Influent | Plug Valve | 03-SBR 4 | No | Hours | 0.00 | |
| Isolation Valve | ||||||
| 03-FV-250 - SBR 5 Influent | Plug Valve | 03-SBR 5 | No | Hours | 0.00 | |
| Isolation Valve | ||||||
| 03-FV-211 - SBR 1 Aeration | Butterfly Valve | 03- SBR 1 | No | Hours | 0.00 | |
| air Supply Valve | ||||||
| 03-FV-221 - SBR 2 Aeration | Butterfly Valve | 03- SBR 2 | No | Hours | 0.00 | |
| air Supply Valve | ||||||
| 03-FV-231 - SBR 3 Aeration | Butterfly Valve | 03- SBR 3 | No | Hours | 0.00 | |
| Air Supply Valve | ||||||
| 03-FV-241 - SBR 4 Aeration | Butterfly Valve | 03- SBR 4 | No | Hours | 0.00 | |
| Air Supply Valve | ||||||
| 12/18/2018 01:26 pm | 13 of | 53.0 |
Sheet14
| Equipment List Report Without Notes | ||||||
| Southern Region Teritary Treatment Plant | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| 03-FV-251 - SBR 5 Aeration | Butterfly Valve | 03- SBR 5 | No | Hours | 0.00 | |
| Air Supply Valve | ||||||
| 03-LSHH-218 - SBR 1 | Level Switch | SBR 1 | No | Hours | 0.00 | |
| High-High Level Switch | ||||||
| 03-LSHH-228 - SBR 2 | Level Switch | SBR 2 | No | Hours | 0.00 | |
| High-High Level Switch | ||||||
| 03-LSHH-238 - SBR 3 | Level Switch | SBR 3 | No | Hours | 0.00 | |
| High-High Level Switch | ||||||
| 03-LSHH-248 - SBR 4 | Level Switch | SBR 4 | No | Hours | 0.00 | |
| High-High Level Switch | ||||||
| 03-LSHH-258 - SBR 5 | Level Switch | SBR 5 | No | Hours | 0.00 | |
| High-High Level Switch | ||||||
| 04-LSHH-102 - EQ Basin #1 | Level Switch | 04- EQ Basin 1 | No | Hours | 0.00 | |
| Low Level Switch | ||||||
| 04-LSHH-107 - EQ Basin #2 | Level Switch | 04- EQ Basin 2 | No | Hours | 0.00 | |
| Low Level Switch | ||||||
| 04-LSLL-351 - Reclaimed | Level Switch | 04- Reclaimed | No | Hours | 0.00 | |
| Water Pump Station Low | Water Pump | |||||
| Level Switch | Station | |||||
| 04-PRV-400 - Off Spec Tank | Pressure | 04-Off Spec | No | Hours | 0.00 | |
| Inlet Pressure control Valve | Reducing | Tank | ||||
| Valve | ||||||
| 05-LE/LIT-110 - Aerobic | Level | 05-Digester 1 | No | Hours | 0.00 | |
| Digester #1 Level Transmitter | Transmitter | |||||
| 05-LE/LIT-130 - Aerobic | Level | 05-Digester 2 | No | Hours | 0.00 | |
| Digester #2 Level Transmitter | Transmitter | |||||
| 05-LSHH-112 - Aerobic | Level Switch | 05-Digester 1 | No | Hours | 0.00 | |
| Digester #1 High Level | ||||||
| Switch | ||||||
| 05-LSHH-132 - Aerobic | Level Switch | 05-Digester 2 | No | Hours | 0.00 | |
| Digester #2 High Level | ||||||
| Switch | ||||||
| 05-M-305 - Gravity Belt | Static Mixer | 05-Gravity Belt | No | Hours | 0.00 | |
| Polymer Static Mixer | ||||||
| 05-TSV-115 - Aerobic | Telescoping | 05-Aerobic | No | Hours | 0.00 | |
| Digester #1 Telescoping | Valve | Digester 1 | ||||
| Valve | ||||||
| 05-TSV-135 - Aerobic | Telescoping | 05-Aerobic | No | Hours | 0.00 | |
| Digester #2 Telescoping | Valve | Digester 2 | ||||
| 12/18/2018 01:26 pm | 14 of | 53.0 |
Sheet15
| Equipment List Report Without Notes | ||||||
| Southern Region Teritary Treatment Plant | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| Valve | ||||||
| 06-DV-100 - Alum Tank 1 | Diaphram | 06-Chemical | No | Hours | 0.00 | |
| Truck Fill Valve | Storage Area | |||||
| 06-LE/LIT-100 - Alum | Level | 06-Chemical | No | Hours | 0.00 | |
| Storage Tank Level | Transmitter | Storage Area | ||||
| Transmitter | ||||||
| 06-LSHH-101 - Alum Storage | Level Switch | 06-Chemical | No | Hours | 0.00 | |
| Area Sump High Level | Storage Area | |||||
| Switch | ||||||
| 06-STR-100 - Alum Stroage | Strainer | 06-Chemical | No | Hours | 0.00 | |
| Tank Strainer | Storage Area | |||||
| 03-PIT-160 - SBR 1 & 2 | Pressure | 03-Operations | No | Hours | 0.00 | |
| Aeration Header Pressure | Transmitter | Building/Blower | ||||
| Transmitter | Room | |||||
| 03-PIT-170 - SBR 3, 4 & 5 | Pressure | 03-Operations | No | Hours | 0.00 | |
| Aeration Header Pressure | Transmitter | Building/Blower | ||||
| Transmitter | Room | |||||
| 03-PIT-182 - SBR 1 Decant | Pressure | 03-Operation | No | Hours | 0.00 | |
| Pressure Transmitter | Transmitter | Building/SBR | ||||
| Decanter Pwr | ||||||
| Unit SBR 1 | ||||||
| 03-PIT-183 - SBR 2 Decant | Pressure | 03-Operation | No | Hours | 0.00 | |
| Pressure Transmitter | Transmitter | Building/SBR | ||||
| Decanter Pwr | ||||||
| Unit SBR 2 | ||||||
| 03-PIT-184 - SBR 3 Decant | Pressure | 03-Operation | No | Hours | 0.00 | |
| Pressure Transmitter | Transmitter | Building/SBR | ||||
| Decanter Pwr | ||||||
| Unit SBR 3 | ||||||
| 03-PIT-192 - SBR 4 Decant | Pressure | 03-Operation | No | Hours | 0.00 | |
| Pressure Transmitter | Transmitter | Building/SBR | ||||
| Decanter Pwr | ||||||
| Unit SBR 4 | ||||||
| 03-PIT-193 - SBR 5 Decant | Pressure | 03-Operation | No | Hours | 0.00 | |
| Pressure Transmitter | Transmitter | Building/SBR | ||||
| Decanter Pwr | ||||||
| Unit SBR 5 | ||||||
| 03-PRV-112 - SBR Blower 1 | Pressure | 03-Operations | No | Hours | 0.00 | |
| Discharge Pressure Relief | Relief Valve | Building/Blower | ||||
| Valve | ||||||
| 03-PRV-122 - SBR Blower 2 | Pressure | 03-Operations | No | Hours | 0.00 | |
| 12/18/2018 01:26 pm | 15 of | 53.0 |
Sheet16
| Equipment List Report Without Notes | ||||||
| Southern Region Teritary Treatment Plant | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| Discharge Pressure Relief | Relief Valve | Building/Blower | ||||
| Valve | ||||||
| 03-PVR-132 - SBR Blower 3 | Pressure | 03-Operations | No | Hours | 0.00 | |
| Discharge Pressure Relief | Relief Valve | Building/Blower | ||||
| Valve | ||||||
| 03-PRV-142 - SBR Blower 4 | Pressure | 03-Operations | No | Hours | 0.00 | |
| Discharge Pressure Relief | Relief Valve | Building/Blower | ||||
| Valve | ||||||
| 18842 - SBR Blower 5 | Pressure | 03-Operations | No | Hours | 0.00 | |
| Discharge Pressure Relief | Relief Valve | Building/Blower | ||||
| Valve | ||||||
| 03-PRV-180 - Decant Blower | Pressure | 03-Operations | No | Hours | 0.00 | |
| 1A Discahrge Pressure Relief | Relief Valve | Building/Blower | ||||
| Valve | Room | |||||
| 03-PRV-185 - Decant Blower | Pressure | 03-Operations | No | Hours | 0.00 | |
| 1B Discahrge Pressure Relief | Relief Valve | Building/Blower | ||||
| Valve | Room | |||||
| 03-PRV-190 - Decant Blower | Pressure | 03-Operations | No | Hours | 0.00 | |
| 2A Discahrge Pressure Relief | Relief Valve | Building/Blower | ||||
| Valve | Room | |||||
| 03-PRV-195 - Decant Blower | Pressure | 03-Operations | No | Hours | 0.00 | |
| 2B Discahrge Pressure Relief | Relief Valve | Building/Blower | ||||
| Valve | Room | |||||
| (OPS) 03-PV-214 - SBR 1 | Plug Valve | 03-SBR 1 | No | Hours | 0.00 | |
| WAS Recirculation Valve | ||||||
| (OPS) 03-PV-224 - SBR 2 | Plug Valve | 03-SBR 2 | No | Hours | 0.00 | |
| WAS Recirculation Valve | ||||||
| 04-BFV-301 - Disinfection | Butterfly Valve | 04-Disinfection | No | Hours | 0.00 | |
| Contact Basin Influent | Contact Basin | |||||
| Flowmeter Inlet Valve | ||||||
| 04-BFV-302 - Disinfection | Butterfly Valve | 04-Disinfection | No | Hours | 0.00 | |
| Contact Basin Influent | Contact Basin | |||||
| Flowmeter Outlet Valve | ||||||
| 04-BFV-303 - Disinfection | Butterfly Valve | 04-Disinfection | No | Hours | 0.00 | |
| Contact Basin Influent | Contact Basin | |||||
| Flowmeter Bypass Valve | ||||||
| 04-BFV-304 - Disinfection | Butterfly Valve | 04-Disinfection | No | Hours | 0.00 | |
| Contact Basin Influent Mixer | Contact Basin | |||||
| Outlet Valve | ||||||
| 04-BFV-308 - Disinfection | Butterfly Valve | 04-Disinfection | No | Hours | 0.00 | |
| 12/18/2018 01:26 pm | 16 of | 53.0 |
Sheet17
| Equipment List Report Without Notes | ||||||
| Southern Region Teritary Treatment Plant | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| contact Basin 1 Influent Valve | Contact Basin | |||||
| 04-BFV-309 - Disinfection | Butterfly Valve | 04-Disinfection | No | Hours | 0.00 | |
| contact Basin 2 Influent Valve | Contact Basin | |||||
| 04-BFV-310 - Reclaimed | Butterfly Valve | 04-Reclaimed | No | Hours | 0.00 | |
| Water Pump 1 Discharge | Water Pump | |||||
| Valve | Station | |||||
| 04-BFV-320 - Reclaimed | Butterfly Valve | 04-Reclaimed | No | Hours | 0.00 | |
| Water Pump 2 Discharge | Water Pump | |||||
| Valve | Station | |||||
| 04-BFV-330 - Reclaimed | Butterfly Valve | 04-Reclaimed | No | Hours | 0.00 | |
| Water Pump 3 Discharge | Water Pump | |||||
| Valve | Station | |||||
| 04-BFV-362 - Reclaimed | Butterfly Valve | 04-Reclaimed | No | Hours | 0.00 | |
| Water System Effluent Valve | Water Pump | |||||
| Station | ||||||
| 04-BFV-370 - Flow | Butterfly Valve | 04-Off Spec | No | Hours | 0.00 | |
| IsolationValve to Off Spec | Tank | |||||
| Tank | ||||||
| 04-BFV-380 - Flow Isolation | Butterfly Valve | 04-Off Spec | No | Hours | 0.00 | |
| to MCBCP Reclaimed Water | Tank | |||||
| System | ||||||
| 04-CV-110 - Filter Feed | Check Valve | 04-EQ Basin | No | Hours | 0.00 | |
| Pump 1 Discharge Check | ||||||
| Valve | ||||||
| 04-CV-120 - Filter Feed | Check Valve | 04-EQ Basin | No | Hours | 0.00 | |
| Pump 2 Discharge Check | ||||||
| Valve | ||||||
| 04-CV-130 - Filter Feed | Check Valve | 04-EQ Basin | No | Hours | 0.00 | |
| Pump 3 Discharge Check | ||||||
| Valve | ||||||
| 04-FV-206 - Disk Filter 1 | Butterflty Vlv, | 04-Disk filter | No | Hours | 0.00 | |
| Sludge Suction Valve | Motorized | |||||
| 04-FV-226 - Disk Filter 2 | Butterflty Vlv, | 04-Disk filter | No | Hours | 0.00 | |
| Sludge Suction Valve | Motorized | |||||
| 04-FV-246 - Disk Filter 3 | Butterflty Vlv, | 04-Disk filter | No | Hours | 0.00 | |
| Sludge Suction Valve | Motorized | |||||
| 04-FV-207 - Disk Filter 1 | Butterfly Vlv | 04-Disk Filter | No | Hours | 0.00 | |
| Backwash Valve 1 | Motorized | |||||
| 04-FV-208 - Disk Filter 1 | Butterfly Vlv | 04-Disk Filter | No | Hours | 0.00 | |
| Backwash Valve 2 | Motorized | |||||
| 12/18/2018 01:26 pm | 17 of | 53.0 |
Sheet18
| Equipment List Report Without Notes | ||||||
| Southern Region Teritary Treatment Plant | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| 04-FV-209 - Disk Filter 1 | Butterfly Vlv | 04-Disk Filter | No | Hours | 0.00 | |
| Backwash Valve 3 | Motorized | |||||
| 04-FV-211 - Disk Filter 1 | Butterfly Vlv | 04-Disk Filter | No | Hours | 0.00 | |
| Backwash Valve 4 | Motorized | |||||
| 04-FV-212 - Disk Filter 1 | Butterfly Vlv | 04-Disk Filter | No | Hours | 0.00 | |
| Backwash Valve 5 | Motorized | |||||
| 04-FV-213 - Disk Filter 1 | Butterfly Vlv | 04-Disk Filter | No | Hours | 0.00 | |
| Backwash Valve 6 | Motorized | |||||
| 04-FV-227 - Disk Filter 2 | Butterfly Vlv | 04-Disk Filter | No | Hours | 0.00 | |
| Backwash Valve 1 | Motorized | |||||
| 04-FV-228 - Disk Filter 2 | Butterfly Vlv | 04-Disk Filter | No | Hours | 0.00 | |
| Backwash Valve 2 | Motorized | |||||
| 04-FV-229 - Disk Filter 2 | Butterfly Vlv | 04-Disk Filter | No | Hours | 0.00 | |
| Backwash Valve 3 | Motorized | |||||
| 04-FV-231 - Disk Filter 2 | Butterfly Vlv | 04-Disk Filter | No | Hours | 0.00 | |
| Backwash Valve 4 | Motorized | |||||
| 04-FV-232 - Disk Filter 2 | Butterfly Vlv | 04-Disk Filter | No | Hours | 0.00 | |
| Backwash Valve 5 | Motorized | |||||
| 04-FV-233 - Disk Filter 2 | Butterfly Vlv | 04-Disk Filter | No | Hours | 0.00 | |
| Backwash Valve 6 | Motorized | |||||
| 04-FV-247 - Disk Filter 3 | Butterfly Vlv | 04-Disk Filter | No | Hours | 0.00 | |
| Backwash Valve 1 | Motorized | |||||
| 04-FV-248 - Disk Filter 3 | Butterfly Vlv | 04-Disk Filter | No | Hours | 0.00 | |
| Backwash Valve 2 | Motorized | |||||
| 04-FV-249 - Disk Filter 3 | Butterfly Vlv | 04-Disk Filter | No | Hours | 0.00 | |
| Backwash Valve 3 | Motorized | |||||
| 04-FV-251 - Disk Filter 3 | Butterfly Vlv | 04-Disk Filter | No | Hours | 0.00 | |
| Backwash Valve 4 | Motorized | |||||
| 04-FV-252 - Disk Filter 3 | Butterfly Vlv | 04-Disk Filter | No | Hours | 0.00 | |
| Backwash Valve 5 | Motorized | |||||
| 03-M-212 - SBR 1 Mixer | Mixer | 03-SBR 1 | No | Hours | 0.00 | |
| 03-M-222 - SBR 2 Mixer | Mixer | 03-SBR 2 | No | Hours | 0.00 | |
| 03-M-232 - SBR 3 Mixer | Mixer | 03-SBR 3 | No | Hours | 0.00 | |
| 03-M-242 - SBR 4 Mixer 1 | Mixer | 03-SBR 4 | No | Hours | 0.00 | |
| 03-M-243 - SBR 4 Mixer 2 | Mixer | 03-SBR 4 | No | Hours | 0.00 | |
| 12/18/2018 01:26 pm | 18 of | 53.0 |
Sheet19
| Equipment List Report Without Notes | ||||||
| Southern Region Teritary Treatment Plant | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| 03-M-252 - SBR 5 Mixer 1 | Mixer | 03-SBR 5 | No | Hours | 0.00 | |
| 03-M-253 - SBR 5 Mixer 2 | Mixer | 03-SBR 5 | No | Hours | 0.00 | |
| 03-P-215 - SBR 1 WAS | Submersable | 03-SBR 1 | No | Hours | 0.00 | |
| Submersable Pump | Pump | |||||
| 03-P-225 - SBR 2 WAS | Submersable | 03-SBR 2 | No | Hours | 0.00 | |
| Submersable Pump | Pump | |||||
| 03-P-235 - SRB 3 WAS | Submersable | 03-SBR 3 | No | Hours | 0.00 | |
| Submersable Pump | Pump | |||||
| 03-P-245 - SRB 4 WAS | Submersible | 03-SBR 4 | No | Hours | 0.00 | |
| Submersible Pump | Pump | |||||
| 03-P-255 - SRB 5 WAS | Submersible | 03-SBR 5 | No | Hours | 0.00 | |
| Submersible Pump | Pump | |||||
| 04-LE/LIT-101 - EQ Basin 1 | Level | 04-EQ Basin | No | Hours | 0.00 | |
| Level Xmitter | Transmitter | |||||
| 04-LE/LIT-106 - EQ Basin 2 | Level | 04-EQ Basin | No | Hours | 0.00 | |
| Level Xmitter | Transmitter | |||||
| 04-LE/LIT-201 - Disk Filter 1 | Level | 04-Disk Filter 1 | No | Hours | 0.00 | |
| Level Xmitter | Transmitter | |||||
| 04-LE/LIT-221 - Disk Filter 2 | Level | 04-Disk Filter 2 | No | Hours | 0.00 | |
| Level Xmitter | Transmitter | |||||
| 04-LE/LIT-231 - Disk Filter 3 | Level | 04-Disk Filter 3 | No | Hours | 0.00 | |
| Level Xmitter | Transmitter | |||||
| 04-LE/LIT-350A - Disinfection | Level | 04-Disinfection | No | Hours | 0.00 | |
| Contact Basin Level Xmitter | Transmitter | Contact Basin | ||||
| 04-LE/LIT-350B - Disinfection | Level | 04-Disinfection | No | Hours | 0.00 | |
| Contact Basin Level Xmitter | Transmitter | Contact Basin | ||||
| 04-LE/LIT-400 - Off Spec | Level Xmitter | 04-Off Spec | No | Hours | 0.00 | |
| Tank Level Xmitter | Tank | |||||
| 04-LSHH-103 - EQ Basin 1 | Level Switch | 04-EQ Basin 1 | No | Hours | 0.00 | |
| High Level Switch | ||||||
| 04-LSHH-108 - EQ Basin 2 | Level Switch | 04-EQ Basin 2 | No | Hours | 0.00 | |
| High Level Switch | ||||||
| 04-LSHH-202 - Disk Filter 1 | Level Switch | 04-Disk Filter 1 | No | Hours | 0.00 | |
| High Level Switch | ||||||
| 04-LSHH-222 - Disk Filter 2 | Level Switch | 04-Disk Filter 2 | No | Hours | 0.00 | |
| High Level Switch | ||||||
| 04-LSHH-242 - Disk Filter 3 | Level Switch | 04-Disk Filter 3 | No | Hours | 0.00 | |
| 12/18/2018 01:26 pm | 19 of | 53.0 |
Sheet20
| Equipment List Report Without Notes | ||||||
| Southern Region Teritary Treatment Plant | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| High Level Switch | ||||||
| 04-LSHH-352 - Reclaimed | Level Switch | 04-Reclaimed | No | Hours | 0.00 | |
| Water Pump Station High | Water Station | |||||
| Level Switch | ||||||
| 04-LSHH-401 - Off Spec | Level Switch | 04-Off Spec | No | Hours | 0.00 | |
| Tank High Level Switch | Tank | |||||
| (OPS) 03-PV-234 - SBR 3 | Plug Valve | 03-SBR 3 | No | Hours | 0.00 | |
| WAS Recirculation Valve | ||||||
| (OPS) 03-PV-244 - SBR 4 | Plug Valve | 03-SBR 4 | No | Hours | 0.00 | |
| WAS Recirculation Valve | ||||||
| (OPS) 03-PV-254 - SBR 5 | Plug Valve | 03-SBR 5 | No | Hours | 0.00 | |
| WAS Recirculation Valve | ||||||
| (OPS) 03-PV-215 - SBR 1 | Plug Valve | 03-SBR 1 | No | Hours | 0.00 | |
| WAS Pump Discharge Valve | ||||||
| (OPS) 03-PV-225 - SBR 2 | Plug Valve | 03-SBR 2 | No | Hours | 0.00 | |
| WAS Pump Discharge Valve | ||||||
| (OPS) 03-PV-235 - SBR 3 | Plug Valve | 03-SBR 3 | No | Hours | 0.00 | |
| WAS Pump Discharge Valve | ||||||
| (OPS) 03-PV-245 - SBR 4 | Plug Valve | 03-SBR 4 | No | Hours | 0.00 | |
| WAS Pump Discharge Valve | ||||||
| (OPS) 03-PV-255 - SBR 5 | Plug Valve | 03-SBR 5 | No | Hours | 0.00 | |
| WAS Pump Discharge Valve | ||||||
| 04-AE/AIT-305 - Disinfection | CL 2 Analyzer | 04-Disinfection | No | Hours | 0.00 | |
| Contact Basin Influent CL2 | Contact Basin | |||||
| Residual Analyzer | ||||||
| 04-AVRV-110 - Filter Feed | Air/Vacuum | 04-EQ Basin | No | Hours | 0.00 | |
| Pump 1 Discharge | Relief Valve | |||||
| Air/Vacuum Relief | ||||||
| 04-AVRV-120 - Filter Feed | Air/Vacuum | 04-EQ Basin | No | Hours | 0.00 | |
| Pump 2 Discharge | Relief Valve | |||||
| Air/Vacuum Relief | ||||||
| 04-AVRV-130 - Filter Feed | Air/Vacuum | 04-EQ Basin | No | Hours | 0.00 | |
| Pump 3 Discharge | Relief Valve | |||||
| Air/Vacuum Relief | ||||||
| 04-AVRV-310 - Reclaimed | Air/Vacuum | 04-Reclaimed | No | Hours | 0.00 | |
| Water Pump 1 Discharge | Relief Valve | Water Pump | ||||
| Air/Vacuum Relief Valve | Station | |||||
| 04-FV-253 - Disk Filter 3 | Butterfly Vlv | 04-Disk Filter | No | Hours | 0.00 | |
| Backwash Valve 6 | Motorized | |||||
| 12/18/2018 01:26 pm | 20 of | 53.0 |
Sheet21
| Equipment List Report Without Notes | ||||||
| Southern Region Teritary Treatment Plant | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| 04-FV-370 - Flow Control | Butterfly Vlv, | 04- Headworks | No | Hours | 0.00 | |
| Valve to Off Spec Tank | Motorized | |||||
| 04-FV-380 - Flow Control | Butterfly Vlv, | 04- Headworks | No | Hours | 0.00 | |
| Valve to MCBCP Reclaimed | Motorized | |||||
| Water System | ||||||
| 04-FV-390 - Off-Spec Tank | Pinch Valve, | 04- Headworks | No | Hours | 0.00 | |
| Level control Valve | Motorized | |||||
| 08-EF-03 - Exhaust Fan,Miox | Fan | 08-Operations | Operation | No | Hours | 0.00 |
| Room(Roof)-fan in North | Building/ Blower | |||||
| Blower Room | Room | |||||
| 03-VFD-110 - SBR Blower #1 | VFD | Operation | No | Hours | 0.00 | |
| building/ Blower | ||||||
| Room | ||||||
| 03-VFD-140 - SBR Blower #4 | VFD | Operation | No | Hours | 0.00 | |
| building/ Blower | ||||||
| Room | ||||||
| 03-VFD-150 - SBR Blower #5 | VFD | Operation | No | Hours | 0.00 | |
| building/ Blower | ||||||
| Room | ||||||
| Miox 1 - Miox 1 unit | Hypo | 06-Chemical | No | Hours | 0.00 | |
| generator | Storage Area | |||||
| Miox 2 - miox unit 2 | Hypo | 06-Chemical | No | Hours | 0.00 | |
| generator | Storage Area | |||||
| 04- SW Sump Pump - Sump | pump | 04 - Storm Water | No | Hours | 0.00 | |
| Pump | Basin | |||||
| 02-VFD-110.CPX9000EATO | VFD,CPX | Ops Building | No | Hours | 0.00 | |
| N - Influent Pump #1 VFD | 9000(EATON) | Electrical Room | ||||
| 02-VFD-120.CPX9000EATO | VFD | Ops Building | No | Hours | 0.00 | |
| N - Influent Pump #2 VFD | Electrical Room | |||||
| 04-AVRV-320 - Reclaimed | Air/Vacuum | 04-Reclaimed | No | Hours | 0.00 | |
| Water Pump 2 Discharge | Relief Valve | Water Pump | ||||
| Air/Vacuum Relief Valve | Station | |||||
| 04-AVRV-330 - Reclaimed | Air/Vacuum | 04-Reclaimed | No | Hours | 0.00 | |
| Water Pump 3 Discharge | Relief Valve | Water Pump | ||||
| Air/Vacuum Relief Valve | Station | |||||
| 04-BFV-100 - EQ Basin 1 | Butterfly Valve | 04-EQ Basin | No | Hours | 0.00 | |
| Inlet Valve | ||||||
| 04-BFV-105 - EQ Basin 2 | Butterfly Valve | 04-EQ Basin | No | Hours | 0.00 | |
| Inlet Valve | ||||||
| 12/18/2018 01:26 pm | 21 of | 53.0 |
Sheet22
| Equipment List Report Without Notes | ||||||
| Southern Region Teritary Treatment Plant | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| 04-BFV-104 - EQ Basin 1 | Butterfly Valve | 04-EQ Basin | No | Hours | 0.00 | |
| Outlet Valve | ||||||
| 04-BFV-109 - EQ Basin 2 | Butterfly Valve | 04-EQ Basin | No | Hours | 0.00 | |
| Outlet Valve | ||||||
| 04-BFV-110 - Filter Feed | Butterfly Valve | 04-EQ Basin | No | Hours | 0.00 | |
| Pump 1 Discharge Valve | ||||||
| 04-BFV-130 - Filter Feed | Butterfly Valve | 04-EQ Basin | No | Hours | 0.00 | |
| Pump 3 Discharge Valve | ||||||
| 04-BFV-200 - Disk Filter 1 | Butterfly Valve | 04-Disk filter | No | Hours | 0.00 | |
| Influent Butterfly Valve | ||||||
| 04-BFV-220 - Disk Filter 2 | Butterfly Valve | 04-Disk filter | No | Hours | 0.00 | |
| Influent Butterfly Valve | ||||||
| 04-BFV-340 - Disk Filter 3 | Butterfly Valve | 04-Disk filter | No | Hours | 0.00 | |
| Influent Butterfly Valve | ||||||
| SBR #5 - corrective | SBR #5 | No | Hours | 0.00 | ||
| 03-LIT-247 - #4 SBR level | level | #4 SBR | No | Hours | 0.00 | |
| Transducer | transducer | |||||
| 03-D-SBR-1 - Membrane | Diffuser | SBR 1 | Ops | No | Hours | 0.00 |
| Diffusers | ||||||
| SBR #1 - SBR #1 Nitrate | Nitrate Probe | SBR #1 | Ops | No | Hours | 0.00 |
| Probe | ||||||
| 03-D-SBR-3 - Membrane | Diffuser | SBR-3 | OPS | No | Hours | 0.00 |
| diffuser | ||||||
| 03-D-SBR-4 - Membrane | Diffuser | SBR 4 | OPS | No | Hours | 0.00 |
| Diffuser | ||||||
| 03-D-SBR-5 - Membrane | Diffuser | SBR 5 | OPS | No | Hours | 0.00 |
| Diffuser | ||||||
| 04-AIT-305 - Influent DCB | Meter | Disinfection | Ops | No | Hours | 0.00 |
| Chlorine Analyzer | Chlorine Contact | |||||
| Chamber | ||||||
| 04-AIT-340 ( ATI) - Effluent | Meter | Disinfection | OPS | No | Hours | 0.00 |
| DCB Chlorine contact | Contact | |||||
| Chamber | Chamber | |||||
| 06-P-1 - Day Storage | Pump | 06-Chemical | Operations | No | Hours | 0.00 |
| Transfer Pump #1 | Storage Area | |||||
| 06-P-2 - Day Storage | Pump | 06-Chemical | Operations | No | Hours | 0.00 |
| Transfer Pump #2 | Storgae Area | |||||
| 12/18/2018 01:26 pm | 22 of | 53.0 |
Sheet23
| Equipment List Report Without Notes | ||||||
| Southern Region Teritary Treatment Plant | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| 03-Decant-SBR-3 - Decanter | Decanter | SBR 3 | OPS | No | Hours | 0.00 |
| SF-1 - Supply | Supply Fan #1 | Elec .Room Next | No | Hours | 0.00 | |
| Fan/Elec.Room Next to | To Control Room | |||||
| Control Room | ||||||
| EF-1/EF-2 - Exhaust Fan | Exhaust Fan | Operation Bld | OOPS | No | Hours | 0.00 |
| #200831A | ||||||
| SF-4 - Supply Fan | Supply Fan # | MCC Room | Operation | No | Hours | 0.00 |
| 4.0 | Bluid#200831B | Bluid#200831B | ||||
| Supply Fan #5 - SF#5 Next to | Supply Fan # | Digester Blower | No | Hours | 0.00 | |
| back Exit Door-Above Bath | 5.0 | Room/Need | ||||
| Room | boom lift | |||||
| 03-D-SBR-2 - Membrane | Diffuser | SBR 2 | Ops | No | Hours | 0.00 |
| Diffusers | ||||||
| PMP-530 - SRTTP RWPS 2 | Pump | No | Hours | 0.00 | ||
| Booster Pump #2 | ||||||
| PMP-510 - SRTTP RWPS 2 | Pump | No | Hours | 0.00 | ||
| Booster Pump #1(Jockey | ||||||
| Pump) | ||||||
| PMP-520 - SRTTP RWPS 2 | Pump | No | Hours | 0.00 | ||
| Booster Pump #1 | ||||||
| 03-LIT-217 - #1 SBR Level | Level | #1 SBR | No | Hours | 0.00 | |
| Transducer | Transducer | |||||
| 03-LIT-227 - #2 SBR Level | Level | #2 SBR | No | Hours | 0.00 | |
| Transducer | Transducer | |||||
| 03-LIT-237 - #3 SBR Level | Level | #3 SBR | No | Hours | 0.00 | |
| Transducer | Transducer | |||||
| SBR #4 - SBR | SBR #4 | No | Hours | 0.00 | ||
| 03-LIT-257 - #5 SBR Level | Level | #5 SBR | No | Hours | 0.00 | |
| Transducer | Transducer | |||||
| New Static Mixer (Centrifuge) | Static Mixer | Solids Room | No | Hours | 0.00 | |
| - Polymer Static Mixer | ||||||
| 01-RPBD-4 - Water Softener | Backflow | Water Softener | No | Hours | 0.00 | |
| Backflow Preventor | Preventor | |||||
| 01-RPBD-5 - Water Meter | Backflow | Facility Water | No | Hours | 0.00 | |
| Bypass Backflow Preventor | Preventor | Meter | ||||
| 07-M-120 - Odor Control Fan | Fan | West of the Ops | No | Hours | 0.00 | |
| #1 | Building | |||||
| 12/18/2018 01:26 pm | 23 of | 53.0 |
Sheet24
| Equipment List Report Without Notes | ||||||
| Southern Region Teritary Treatment Plant | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| 04-RO-P-1 - RO Unit Feed | Pump | RO Unit | No | Hours | 0.00 | |
| Pump | ||||||
| 04-RO-VFD-01 - RO Feed | VFD | RO Unit Control | No | Hours | 0.00 | |
| Pump VFD | Panel | |||||
| 04-RO-P-2 - RO Unit Booster | Pump | South of the RO | No | Hours | 0.00 | |
| Pump | Unit | |||||
| 04-UV-01 - RO UV module | UV Module | South of the RO | No | Hours | 0.00 | |
| #1 | unit | |||||
| 04-UV-02 - RO UV module | UV Module | South of the RO | No | Hours | 0.00 | |
| #2 | unit | |||||
| 04-VFD-310.CP9000CUTLE | VFD | Control Building | No | Hours | 0.00 | |
| RHAMMER - Reclaim Pump | Electrical Room | |||||
| #1 VFD | ||||||
| 04-VFD-320.CP9000CUTLE | VFD | Control Building | No | Hours | 0.00 | |
| RHAMMER - Reclaim Pump | Electrical Room | |||||
| #2 VFD | ||||||
| 04-VFD-330.CP9000CUTLE | VFD | Control Building | No | Hours | 0.00 | |
| RHAMMER - Reclaim Pump | Electrical Room | |||||
| #3 VFD | ||||||
| 04-VFD-110.SVX9000CUTL | VFD | Control Building | No | Hours | 0.00 | |
| ERHAMMER - Filter Feed | Electrical Room | |||||
| Pump #1 VFD | ||||||
| 04-VFD-120.SVX9000CUTL | VFD | Control Building | No | Hours | 0.00 | |
| ERHAMMER - Filter Feed | Electrical Room | |||||
| Pump #2 VFD | ||||||
| 04-VFD-130.SVX9000CUTL | VFD | Control Building | No | Hours | 0.00 | |
| ERHAMMER - Filter Feed | Electrical Room | |||||
| Pump #3 VFD | ||||||
| 02-VFD-130,SVX9000CUTL | VFD | Ops Building | No | Hours | 0.00 | |
| ERHAMMER - Influent Pump | Electrical Room | |||||
| #3 VFD | ||||||
| RCW-Line - reclaim water | C905 | No | Hours | 0.00 | ||
| line 20" | ||||||
| 07-C-2 - Odor Control Cell 2 | Bio Beds | No | Hours | 0.00 | ||
| 07-C-3 - Odor Control Cell 3 | Bio Beds | No | Hours | 0.00 | ||
| 07-M-130 - Odor Control Fan | West of the Ops | No | Hours | 0.00 | ||
| #2 | Building | |||||
| HP-1 - Heat Pump #1 | HVAC | North of the | No | Hours | 0.00 | |
| Control Building | ||||||
| 12/18/2018 01:26 pm | 24 of | 53.0 |
Sheet25
| Equipment List Report Without Notes | ||||||
| Southern Region Teritary Treatment Plant | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| HP-2 - Heat Pump #2 | HVAC | North of the | No | Hours | 0.00 | |
| Control Building | ||||||
| 04-T-1 - RPWS 2 Pump Skid | Tank | On RPWS 2 | No | Hours | 0.00 | |
| Hydro-pneumatic Tank | Pump Skid | |||||
| FCU-1 - Fan unit | Control Building | No | Hours | 0.00 | ||
| FCU-2 - Fan Unit | Fan | Control Building | No | Hours | 0.00 | |
| SF-2 - Fan | Headworks | No | Hours | 0.00 | ||
| EF-1 - Fan | Fan | Control building | No | Hours | 0.00 | |
| (Mens | ||||||
| Bathroom) | ||||||
| EF-2 - Fan | Fan | Control Building | No | Hours | 0.00 | |
| (LAB Room) | ||||||
| EF-3 - Fan, OOOPS Bldg. | Fan | OOOPS Building | No | Hours | 0.00 | |
| EF-4 - Exhaust Fan | Fan | Ops Building | No | Hours | 0.00 | |
| EF-5/Headworks - Fan | Fan | Headworks | No | Hours | 0.00 | |
| EF-6(LAB) - Exhaust Fan | Fan | SRTTP/LAB | No | Hours | 0.00 | |
| 04-RO-F-01 - RO Unit Pre | Filter | RO Unit | No | Hours | 0.00 | |
| Filter | ||||||
| 04-RO-1 - RO Unit | RO Unit | East of the | No | Hours | 0.00 | |
| Chlorine contact | ||||||
| tanks | ||||||
| MCC-1A - MCC | Electrical | Ops Building | No | Hours | 0.00 | |
| Electrical Room | ||||||
| MCC-1B - MCC | Electrical | Ops Building | No | Hours | 0.00 | |
| Electrical Room | ||||||
| MCC-1C - MCC | Electrical | Ops Building | No | Hours | 0.00 | |
| Electrical Room | ||||||
| MCC-2A - MCC | Electrical | Ops Building | No | Hours | 0.00 | |
| Electrical Room | ||||||
| MCC-2B - MCC | Electrical | Ops Building | No | Hours | 0.00 | |
| Electrical Room | ||||||
| MCC-3A - MCC | Electrical | Control Building | No | Hours | 0.00 | |
| Electrical Room | ||||||
| MCC-3B - MCC | Electrical | Control Building | No | Hours | 0.00 | |
| Electrical Room | ||||||
| 12/18/2018 01:26 pm | 25 of | 53.0 |
Sheet26
| Equipment List Report Without Notes | ||||||
| Southern Region Teritary Treatment Plant | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| MCC-4A - MCC | Electrical | Control Building | No | Hours | 0.00 | |
| Electrical Room | ||||||
| MCC-4B - MCC | Electrical | Control Building | No | Hours | 0.00 | |
| Electrical Room | ||||||
| PLC-2 - PLC-2 Secondary | Electrical | Ops Building | No | Hours | 0.00 | |
| Treatment (SBR PLC) | Electrical Room | |||||
| PLC-1 - PLC-1 Headworks, | Electrical | Ops Building | No | Hours | 0.00 | |
| Solids Handling, and | Electrical Room | |||||
| Chemical Facilities | ||||||
| PLC-4 - PLC-4 Disck Filter #1 | PLC | Disk Filters | No | Hours | 0.00 | |
| (04-DF-LCP-1) | ||||||
| PLC-5 - PLC-5 Disck Filter #2 | PLC | Disk Filters | No | Hours | 0.00 | |
| (04-DF-LCP-2) | ||||||
| PLC-6 - PLC-6 Disck Filter #3 | PLC | Disk Filters | No | Hours | 0.00 | |
| (04-DF-LCP-3) | ||||||
| Switchgear - Facility | Switchgear | Ops Building | No | Hours | 0.00 | |
| Switchgear | Electrical Room | |||||
| PLC-3 - PLC-3 Tertiary | PLC | Control Building | No | Hours | 0.00 | |
| Electrical Room | ||||||
| (OPS) 04-AIT-370 - Overflow | Outfall | No | Hours | 0.00 | ||
| Chlorine Analyzer | ||||||
| 04-AIT-290 - Effluent | Hach NH4Dsc | Disk Filters | No | Hours | 0.00 | |
| Ammonia Analyzer | Ammonia | |||||
| Senso | ||||||
| 04-AIT-150 Effluent NTU - | Contact chamber | No | Hours | 0.00 | ||
| process instrumentation | effluent | |||||
| 04-AIT-342 - Effluent | Contact chamber | No | Hours | 0.00 | ||
| conductivity meter | effluent | |||||
| 04-AIT-420 - Disk Filter | Hach Nitratax | Disk Filters | No | Hours | 0.00 | |
| Effluent Nitrate Analyzer | sc | |||||
| 04-P-370 - OOOPS Chlorine | Pump | OOOPS Circle | No | Hours | 0.00 | |
| Sample Pump | Weir | |||||
| 06-LCP-01 - Brine Pump | Control Panel | 06- Chemical | No | Hours | 0.00 | |
| Control Panel | Storage Area | |||||
| 02-ATI-102 - Headworks Gas | Gas Detector | Headworks | No | Hours | 0.00 | |
| Detector | Influent Channel | |||||
| 02-LSHH-153 - Influent Sump | Float | Influnet Sump | No | Hours | 0.00 | |
| Pump High High Float | ||||||
| 12/18/2018 01:26 pm | 26 of | 53.0 |
Sheet27
| Equipment List Report Without Notes | ||||||
| Southern Region Teritary Treatment Plant | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| 02-LSH-153 - Influent Sump | Float | Influent Sump | No | Hours | 0.00 | |
| High Level Float | ||||||
| 04-DV-220 - Disk Filter /Drain | Filter Drain | 04-Disk Filter 2 | No | Hours | 0.00 | |
| valve | Valve | |||||
| (OPS) 04- Disk Filter #2 - | Filter | Disk Filter | OPS | No | Hours | 0.00 |
| Filter | ||||||
| (OPS) 04- Disk Filter#1 - | Filter | Disk Filter | No | Hours | 0.00 | |
| Filter | ||||||
| 02-LSL-153 - Influent Sump | Float | Influent Sump | No | Hours | 0.00 | |
| Low Level Float | ||||||
| 04-FIT-RWPS2 - Flow Meter | Flow Meter | RWPS 2 | No | Hours | 0.00 | |
| on RWPS2 | ||||||
| Golf cart-1 - Utility Golf Cart | Golf Cart | SRTP | Operations | No | Hours | 0.00 |
| OOOPS AREA - ooops | ooops | ooops | No | Hours | 0.00 | |
| PMP-602 PUMP #3 - | OOOPS Area | No | Hours | 0.00 | ||
| OOOPS PUMP | ||||||
| 04-AIT-341(Effluent PH) - | Contact chamber | No | Hours | 0.00 | ||
| process Instrumentation | effluent | |||||
| 04-DV-210/Drain Valve - Disk | Filter drain | 04-Disk Filter 1 | No | Hours | 0.00 | |
| Filter | valve | |||||
| 04-DV-230 Drain Valve - Disk | Filter drain | 04-Disk Filter 3 | No | Hours | 0.00 | |
| Filter | valve | |||||
| F-650 Dump Truck - | Dump Truck | Solids | Solids Room | No | Hours | 0.00 |
| bio-solids dump truck | processing | |||||
| building | ||||||
| GENERATOR OOPS - | GENERATOR | OOPS | No | Hours | 0.00 | |
| EMERGENCY GENERATOR | ||||||
| (OPS) 04-AIT-290 Disk Filter | HACH | Disk Filter | No | Hours | 0.00 | |
| - Ammonia Analyzer | ||||||
| (OPS) 04- Disk Filter#3 - | Filter | Disk Filter | No | Hours | 0.00 | |
| Filter | ||||||
| 04-LT-220 - Disk Filter #2 | Level | Disk Filter | No | Hours | 0.00 | |
| Level Transducer | Transducer | |||||
| PMP-600 PUMP #1 - | OOOPS Area | No | Hours | 0.00 | ||
| OOOPS PUMP | ||||||
| Electric Room 904 - | Electric Room | No | Hours | 0.00 | ||
| Communication Back Board | 904.0 | |||||
| 12/18/2018 01:26 pm | 27 of | 53.0 |
Sheet28
| Equipment List Report Without Notes | ||||||
| Southern Region Teritary Treatment Plant | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| 02-AIT-102 WETWELL - | Gas Detector | 02-Influent Pump | No | Hours | 0.00 | |
| Combustible Gas Detector | Station | |||||
| 07-AIT-122 - Combustible | Gas Detector | West of the ops | No | Hours | 0.00 | |
| Gas Detector(odor control | Building | |||||
| Main vent Pipe) | ||||||
| 02-AIT-315 Grit Meter1 - | Gas Detector | 02-Grit Collector | No | Hours | 0.00 | |
| Combustible Gas detector | Station | |||||
| 02-AIT-345 Grit Meter2 - | Gas Detector | 02-Grit Collector | No | Hours | 0.00 | |
| Combustible Gas Detector | Station | |||||
| Miox Room - Combustible | Gas Detector | Sodium | No | Hours | 0.00 | |
| Gas Detector | Hypochlorite | |||||
| Generation | ||||||
| Room 802 | ||||||
| OOOPS FLOW METER - | Meter | ooops building | No | Hours | 0.00 | |
| flow meter-annual( | ||||||
| COMPLIANCE) | ||||||
| Wet well influent pump | Influent pump | No | Hours | 0.00 | ||
| station - clean-monthly | station | |||||
| (OPS) 02-M-331 - Grit | Grit Classifier | 02-Influent pump | No | Hours | 0.00 | |
| Classifier no.1 | station | |||||
| OOOPS VFD#1 - VFD | VFD | OOOPS | No | Hours | 0.00 | |
| OOOPS VFD#2 - VFD | VFD | OOOPS | No | Hours | 0.00 | |
| OOOPS VFD#3 - VFD | VFD | OOOPS | No | Hours | 0.00 | |
| Fire-Extinguisher #1 - | Fire-Extinguish | Control | No | Hours | 0.00 | |
| Monthly-Inspection | er | Room(LOBBY) | ||||
| Fire-Extinguisher#2 - | Fire-Extinguish | Control-Room(L | No | Hours | 0.00 | |
| Monthly-Inspection | er | AB) | ||||
| Fire-Extinguisher#3 - | Fire-Extinguish | Control | No | Hours | 0.00 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .