Annex 1503050 F Grounds Maint & Landscaping v2.3.doc

DOC document 46 KB Posted

Attached to
Operation & Maintenance of the Southern and Northern Regional Tertiary Treatment Plants on MCB Camp Pendleton
Solicitation number
N6247319R0033
Issued by

View the file

Other files

File Type Posted
Amendment 0005_N6247320R0033.pdf PDF
AMENDMENT 0004.pdf PDF
Amendment 0003_N6247320R0033.pdf PDF
P-1046B Construction Plans 04-05-2016.pdf PDF
RW_Overall.pdf PDF
EXHIBIT D REVISED _ Safety Data & Narrative.docx DOCX document
SRTTP & NRTTP Chemical Usage 2017 & 2018.xlsx XLSX spreadsheet
RWPS Electrical Equipment List.xlsx XLSX spreadsheet
Amendment 0002_N6247320R0033.pdf PDF
ELIN Pricing Schedule REVISED.xls XLS spreadsheet
EXHIBIT B REVISED _ Recent Relevant Experience of the Firm.docx DOCX document
RWPS Equipment List.xlsx XLSX spreadsheet
Rules and Regs Final_Signed April 2013 Edition.pdf PDF
SierraOne Equipment List.xlsx XLSX spreadsheet
Amendment 0001_N6247320R0033.pdf PDF
Annex 0200000 C Management and Administration (SW SubKtr Safety) Revision 13 JUN.docx DOCX document
Annex 1503030 J Integrated Solid Waste Management v2.2.doc DOC document
ELINS Unpopulated.xls XLS spreadsheet
Annex 1503020 C Pest Control v2.3.docx DOCX document
NRTTP Equipment List.xlsx XLSX spreadsheet
SRTTP Equipment List.xlsx XLSX spreadsheet
EXHIBIT F _ Individual Small Business Subcontracting Plan.docx DOCX document
SRTTP EquipmentList_OM.xls XLS spreadsheet
SRTTP-NRTTP LOADINGS.XLSX XLSX spreadsheet
Annex 1503020 F Pest Control v2.3.doc DOC document
SRTTP Electrical Equipment List.xlsx XLSX spreadsheet
EXHIBIT D _ Safety Data & Narrative.docx DOCX document
Annex 1503010 F Custodial v2.3.doc DOC document
EXHIBIT B _ Recent Relevant Experience of the Firm.docx DOCX document
Annex 1503010 C Custodial v2.3 ck.doc DOC document
EXHIBIT G _ Request for Information (RFI).docx DOCX document
Section J Documents Exhibits & other Attachments Annex 0200000 J Management and Administration ver 2 5.doc DOC document
Annex 0100000 C General Information ver 2.2 (revised 040715).doc DOC document
EXHIBIT A _ Financial Questionnaire.docx DOCX document
NRTTP Electrical Equipment List.xlsx XLSX spreadsheet
SCA Wage Determination 16 SEP 19 .pdf PDF
Annex 1503050 C Grounds Maint & Landscaping v2.5.doc DOC document
EXHIBIT C _ Technical Capability (1).docx DOCX document
Annex 1604000 F Wastewater Ver 2.2.doc DOC document
Annex 1604000 C Wastewater Rev 2 13 JUN.docx DOCX document
EXHIBIT E _ Past Performance Questionnaire (Form PPQ).docx DOCX document
Annex 1503020 J Pest Control v2.4.docx DOCX document
NRTTP Boundary Map.pdf PDF
SRTTP Compliance Equipment List.xlsx XLSX spreadsheet
Annex 1503050 J Grounds Maint & Landscaping v2.6.docx DOCX document
Section F Deliveries or Performance Annex 0200000 F Management and Administration v2.8 (revised 12-6-2018).docx DOCX document
SRTTP Boundary Map.pdf PDF
Annex 1503010 J Custodial v2.3.doc DOC document
Annex 1503030 F Integrated Solid Waste Management v2.3.doc DOC document
Annex 1503030 C Integrated Solid Waste Management v2.3.doc DOC document
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ANNEX 1503050

GROUNDS, MAINTENANCE AND LANDSCAPING

SECTION F: DELIVERIES OR PERFORMANCE

DELIVERABLES

Annex/ Spec Item
Form Attachment Number
Deliverable Title
Date (s) of Submission
Distribution
Frequency
Original/ Copies
Number of Copies (including original)
1503050 / 2.3.7.1
N/A
Water Conservation Plan
As specified
KO
2
15 days after award/Annually
1503050 / 3
N/A
MSDS sheets and catalog cut sheets or samples for fertilizer and mulch
As specified
KO
2
As required
1503050 / 3.1.2, 3.2.3, 3.3.1
N/A
Vegetation Control Schedule
As specified
KO
2
15 days after award/Annually
1503050 / 3.1.4
N/A
Debris Removal Schedule
As specified
KO
2
15 days after award/Annually

<<Note to Spec Writer:

DELIVERABLES FORM PREPARATION INSTRUCTION

1.

Prepare a Deliverable Report Preparation Instruction for each deliverable requirement. Specify information that should be included in the report. Instructions should be meaningful, complete, and clear. If another document provides instructions, reference the instruction paragraph and state where/how the Contractor may obtain the referenced document (e.g., Existing permit is on file in the Technical Library.”). If no specific format is required, state that Contractor’s format is acceptable. If specific Government forms are to be used by the Contractor, prepare and insert the blank forms into Section J. Only insert forms that are required for Contractor use. If a Contractor-provided form is acceptable, no Government form is required.

2.

Instruction form preparation (see sample form below):

Government Approval Required:

Check “yes” if you want the Contractor to submit a “draft” document for Government approval, before a “final” document is submitted.

Check “no” if you do not need the Contractor to submit a “draft” document for Government approval before a “final” document is submitted, or if Government approval is not required even for a “draft”.

For check mark use capitalized “X”, bold, italic, and underlined. Delete extraneous underline markings.

Media:

Check the type(s) of document you want the Contractor to submit (hard copy, electronic and/or direct input into a system). For check mark use capitalized “X”, bold, italic, and underlined. Delete extraneous underline markings.

For “Electronic” specify in the preparation instructions if you want the report by e-mail, diskette or CD.

Direct system input means inputting the information into an established Government system such as DCPDS or MODERN (for HRO) and SPM. It does not mean inputting into an Access( or Excel( database, etc.

Instructions:

Do not include contract performance requirements here that belongs in the PWS

Include any other special instructions or information the Contractor needs to prepare the deliverable (e.g., data must be input into a specific system).

If report is required electronically, note if the report should be e-mailed or submitted on CD or diskette (3.5 diskette, 100MB or 250MB zip disk). If applicable, specify the required file format (i.e. Excel(, Word(, Access(, etc.).

Include description of approval chain (if required).

An example of unclear instructions: “As determined by the Contractor to include all applicable regulatory information.”

Report Preparation Instruction

Report Title: Maintenance Summary Report

Form Attachment No.: J-1503050-XX

Government Approval Required: __ Yes __ No

Media:

__ Hard Copy __ Electronic __ Direct System Input

Preparation Instructions:

<<Note to Spec Writer: Specify information that should be included in the report. Instructions should be meaningful, complete, and clear. If another document provides instructions, reference the instruction paragraph and state where/how the Contractor may obtain the referenced document (e.g., Existing permit is on file in the Technical Library.”). If no specific format is required, state that Contractor’s format is acceptable.

An example of good instructions:

“The report shall be prepared using Microsoft Office software.

The report shall include each soil batch number and the associated quantity of waste, source of waste, and analytical test results.

Submit an initial, electronic draft copy via email to recipients on the distribution list for Government review and comment.

1. If PWD Environmental accepts this draft version as final, the Government shall notify the Contractor of Government acceptance.

2. If PWD Environmental responds to this draft version with review comments, then incorporate the Government’s comments and resubmit the revised draft version via email to recipients on the distribution list. Continue this cycle until the Government notifies the Contractor of Government acceptance.

PWD Environmental will forward a hard copy version of the final to GEPA.”

An example of unclear instructions:

“As determined by the Contractor to include all applicable regulatory information.”

Do not include contract performance requirements here (that belongs in the PWS!)

Include any other special instructions or information the Contractor needs to prepare the report (e.g., data must be input into a specific system).

If report is required electronically, note if the report should be e-mailed or submitted on CD or DVD.

If applicable, specify the required file format (i.e. Excel(, Word(, Access(, etc.).

Include description of approval chain (if required).>>

File details come from the government source that posted it. Updated .