AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Purpose of this Amendment 0005 is to revise the Government’s response to Requests for Information and to provide Revised Factor 1 – Recent, Relevant Experience of the Firm.
1. CONTRACT ID CODE PAGE OF PAGES
1 14
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Jan-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247320R0033
X 9B. DATED (SEE ITEM 11)
12-Dec-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Jan-2020
CODE
NAVFAC SOUTHWEST
CAMP PENDLETON FEAD/CODE ROPCN
MARINE CORPS BASE CAMP PENDLETON
PO BOX 555229 BLDG 22101
CAMP PENDLETON CA 92055-5229
N62473 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6247320R0033
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0005
The Purpose of this Amendment 0005 is to revise the Government’s response to Requests for Information and to provide Revised Factor 1 – Recent, Relevant Experience of the Firm.
1) The following are Revised Responses to Requests for Information:
Question #12: Factor 1 of the RFP states that project experience must have been "awarded within the last five (5) years prior to the initial solicitation issuance date;" Operations & Maintenance contracts typically run anywhere from 5 - 20 years in duration (from award through options years). We respectfully request the Government revise this to state "awarded within last ten (10) years."
Response #12: Factor 1 remains unchanged; pursuant to Factor 1 – Recent, Relevant Experience of the Firm, a relevant project is a project or task order that “was awarded within the last five (5) years prior to the initial solicitation issuance.” Factor 1 – Recent, Relevant Experience of the Firm has been revised.
Question #59: Project experience requires that a project, contract, or task order must have been awarded within the last 5 years. Since most O&M contracts include a Base Year plus 4 to 9 Option Years, are Offerors permitted to submit an Option year as relevant project as long as it was awarded within the last 5 years and meets all other minimum requirements as indicated in Factor 1?
Response #59: No. Pursuant to Factor 1 – Recent, Relevant Experience of the Firm, a relevant project is a project or task order that “was awarded within the last five (5) years prior to the initial solicitation issuance.” Factor 1 – Recent, Relevant Experience of the Firm has been revised.
Question #66: Many recent O&M contracts at DoD facilities are part of longer-term design-build-operate contracts.
As such the "award date" is greater than 5 years ago. The O&M, either as an exercised option or a continuation of the contract will have started within the past 5 years, however, is not a stand-alone contract. May Offerors use that experience, as long as the annual costs are broken out.
Response #66: No. Pursuant to Factor 1 – Recent, Relevant Experience of the Firm, a relevant project is a project or task order that “was awarded within the last five (5) years prior to the initial solicitation issuance.” Factor 1 – Recent, Relevant Experience of the Firm has been revised.
Question #75: Typically, RFP project experience criteria is designed to assess Offerors’ recent and relevant experience, however, Factor 1 of the RFP states that project experience must have been "awarded within the last five
(5) years prior to the initial solicitation issuance date". The award date of a project has less significance than the recency and relevancy of the work. We request that NAVFAC consider revising this requirement to “performed within the last five (5) years prior to the initial solicitation issuance date.”
Response #75: Factor 1 reflects the Government’s intent; pursuant to Factor 1 – Recent, Relevant Experience of the Firm, a relevant project is a project or task order that “was awarded within the last five (5) years prior to the initial solicitation issuance.” Factor 1 – Recent, Relevant Experience of the Firm has been revised.
2) The conformed changes to Factor 1 follow in 52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014).
The revision to Factor 1 – Recent, Relevant Experience of the Firm is, as follows:
(a) Factor 1 - Recent, Relevant Experience of the Firm:
Solicitation Submittal Requirements: Submit Exhibit B (Recent, Relevant Experience of Firm Project Data Sheet) for each project under Tab “1”. Exhibit B is MANDATORY. The Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total page limit for each project data sheet shall not exceed three (3) single-sided 8.5” x 11” pages. The offeror shall ensure this form is complete and calculations are correct.
NOTE: Projects submitted under Factor 1 - Recent, Relevant Experience of Firm must be the same projects submitted for Factor 4 - Past Performance.
(i) Submit a minimum of one (1) and a maximum of two (2) relevant projects for the offeror as the Prime Contractor that best describes the offeror’s experience on projects that are similar in size, scope, and complexity to the projects that may be ordered under the solicited contract.
(ii) Project experience is defined as a project performed under a single task order or contract For multiple award contracts and IDIQ type contracts, the contract as a whole shall not be submitted as a project; rather the offeror shall submit the work performed under a task order project. For the purposes of this evaluation, a relevant project is further defined as a government or commercial contract, project or task order that: Project experience is defined as recurring services for operations and maintenance performed under a single award. Projects will only qualify for consideration when recurring requirements are funded for the period of performance; consequently, IDIQ type contracts for non-recurring requirements are disqualified from consideration. For the purposes of this evaluation, a relevant project is further defined as a government or commercial contract that:
1) Is at least 50% self-performed as the Prime Contractor in terms of the cost of contract performance; Was actively in performance within the last five (5) years prior to the initial solicitation issuance date;
2) Is at least 50% complete in terms of amount paid for contract performance; Was actively self-performed at least 50%, in terms of cost, as the Prime Contractor for a duration of twelve (12) months or more;
3) Was awarded within the last five (5) years prior to the initial solicitation issuance date; Has a total annual award value of $1 Million or more (at the date of contract award); and;
4) Has a period of performance of 12 months or more;
5) Has a total annual award value of $1 Million or more (at the date of contract award); and
6) Demonstrates experience in Annex 1604000 Wastewater for services related to the operation and maintenance of wastewater treatment plants similar in size (treating at least .5 Million Gallons per Day) at a tertiary treatment plant.
(iii) The Government will not consider any project submitted for experience that was performed by a firm other than the offeror, except:
1) If the offeror is a Joint Venture (JV), relevant project experience shall be submitted for project(s) completed by the JV entity. If the JV does not have shared experience, relevant projects shall be submitted for each JV member provided the JV offeror’s proposal includes a copy of the supporting JV agreement identifying the firm in question as a member of the JV for this procurement in the Price Proposal under Tab #5.
2) The Government will consider otherwise relevant projects that were performed by the offeror’s proposed key personnel; however, experience of proposed subcontractor employees will not be considered; and,
3) The Government will consider otherwise relevant projects performed by affiliates/subsidiaries/parent/Limited Liability Company (LLC)/ Limited Company (LTD) member companies (i.e. any office(s) of the offeror other than the one (1) submitting the current proposal as stated on the SF1449), provided the proposal clearly e xplains thatthe affiliates/subsidiaries/parent/LLC/LTD firm will have meaningful involvement in the performance of this contract.
Regarding such submitted project(s), if the offeror fails to demonstrate the affiliate/subsidiary/parent/LLC/LTD meaningful involvement in the performance of this contract, the project may not be considered relevant and may not be evaluated.
(iv) Exhibit B, Offeror Recent, Relevant Experience of the Firm Project Data Sheets submitted that exceed the maximum, three (3) single-sided 8.5” x 11” page limit will be removed prior to evaluation. Exhibit B Project Data Sheets submitted for multiple award contracts and/or IDIQ type contracts as a whole will be removed prior to evaluation. Exhibit B Project Data Sheets submitted for projects that are not at least 50% complete within five (5) years prior to the solicitation issuing date will be deemed not similar in scope and not relevant.
The Government reserves the right to contact the POC for each project to confirm at least 50% of the project was completed within the last five (5) years in terms of the amount paid for contract performance, at least 50% self-performed in terms of the cost of contract performance, and the accuracy of any other project information provided for evaluation.
*Self-Performed: Refers to the offeror who performs relevant work that is the same or similar in size, scope and complexity of the work requirements in the solicitation, by in-house workforce and not by sub-contractor(s). This does not include administrative or management functions.
(v) For each project, the offeror shall provide a detailed description of work and identify the percentage (%) and dollar amount that the firm selfperformed for each annex. Each project must demonstrate self-performance experience in Annex 160400 Wastewater for services related to the operation and maintenance of wastewater treatment plants similar in size (treating at least .5 Million Gallons per Day) at a tertiary treatment plant.
(vi) Basis of Evaluation: The basis of evaluation will include the offeror’s demonstrated experience in performing relevant work that is the same or similar in size, scope and complexity of the work requirements in the solicitation.
The assessment of the offeror’s relevant experience will be used as a means of evaluating the ability of the offeror to successfully meet the requirements of the solicitation. The Government will only review two (2) projects; any projects submitted in excess of the limitation will not be considered.
The offer may be rated “Acceptable” for this factor if the offeror submits a minimum of one (1) relevant project that complies with all of the following:
1) Are at least 50% self-performed as the Prime Contractor in terms of the cost of contract performance; Was actively performed within the last five (5) years prior to the initial solicitation issuance date;
2) Are at least 50% complete in terms of amount paid for contract perfortmance; Was actively self-performed at least 50%, in terms of cost, as the Prime Contractor for a duration of twelve (12) months or more;
3) Were awarded within the last five (5) years prior to the initial solicitation issuance date; Has a total annual award value of $1 Million or more (at the date of contract award); and
4) Have a period of performance of 12 months or more;
5) Have a total annual award value of $1 Million or more (at the date of contract award); and
6) Demonstrate experience in Annex 1604000 Wastewater for services related to the operation and maintenance of wastewater treatment plants similar in size (treating at least .5 Million Gallons per Day) at a tertiary treatment plant.
3) All other terms and conditions remain unchanged.
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
1. The solicitation requires the evaluation of price and the following non-price factors:
Factor 1 – Recent, Relevant Experience of the Firm Factor 2 – Technical Capability Factor 3 – Safety Factor 4 – Past Performance
The distinction between the firm’s experience and past performance is the firm’s experience pertains to the types of work and volume of work completed by a contractor that are comparable to the types of work covered by this requirement, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.
2. Basis of Evaluation and Submittal Requirements for Each Factor.
a. Price Factor:
Price Proposal: Submit original and one (1) copy. A copy of the Price Proposal shall be placed on one (1) CD-ROM and inserted in the original Price Proposal Binder – Volume 1
(1) Solicitation Submittal Requirements: The price proposals will be evaluated to determine that proposed prices are reasonable,balanced, and complete. Price proposal shall be submitted in separate binders from the Technical Proposal, and clearly marked “Volume 1 – Price Proposal.” Include a separate tab for each item shown below:
TAB #1: Cover Letter, and Standard Form (SF) 1449 Solicitation/Contract/Order for Commercial Items (offeror to complete blocks 12, 17, 23, 24 and 30a thru 30c).
Include telephone number, email address, tax identification number (TIN), Dun & Bradstreet (DUNs) Number, and Commercial and Government Entity (CAGE) Code on the SF 1449, in Block 17a. Include the following on the cover letter:
Solicitation Number N62473-20-R-0033 Name, address, telephone, and email address of the offeror. The offeror’s contact information shall match what is shown on the offeror’s System for Award Management (SAM) profile.
Point(s) of contact with title, telephone, fax, email address of person(s) authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation.
An alternate point of contact (POC) with whom the Government can correspond regarding the solicitation.
The cover letter signed by an authorized representative.
The offeror shall agree to hold its offer firm until July 1, 2020.
The offeror shall acknowledge in their cover letter there are no technical assumptions and/or qualifiers/conditions in the proposal. See below for details:
TECHNICAL ASSUMPTIONS:
Any technical assumptions made by the offeror in its proposal will not be binding on the Government. The offeror will not be entitled to any equitable adjustments based on assumptions made by the offeror in its proposal.
QUALIFIERS/CONDITIONS:
Any qualifiers / conditions made by the offeror in its proposal will not be binding on the Government. The offeror will not be entitled to any equitable adjustments based on qualifiers / conditions made by the offeror in its proposal.
Note: An Offeror who includes any technical assumptions and/or qualifiers /conditions in their proposal may be ineligible for award.
TAB #2: Exhibit Line Item Number (ELIN) Pricing: Complete a paper copy of ELIN price schedule for the proposed initial task order, and an electronic version on a CD-ROM using Excel worksheets that the Government will post online at the following website: https://www.neco.navy.mil/ and/or http://www.fbo.gov. Leave all excel formulas open in the spreadsheet. In addition, Offerors shall round all proposal figures in the ELIN schedule to two
(2) decimal places.
TAB #3: Completed Exhibit A, “Financial Questionnaire” from the offeror’s banking institution. Exhibit A is
MANDATORY.
TAB #4: Copy of the Online Representations and Certifications from the SAM, at the following website:
www.sam.gov, including all completed applicable sections of the FAR Clause 52.212-3, Offeror Representations and Certifications – Commercial Items (Mar 2015).
TAB #5: If the offeror is proposing as a joint venture (JV) and/or Mentor-Protégé, the offeror shall provide a copy of the JV agreement and, if the JV is with a mentorprotégé, a copy of the relevant mentor-protégé agreement approved by the Small Business Administration.
TAB #6: Complete Attachment D, Small Business Subcontracting Plan. NAVFAC's command-wide small business subcontracting targets are shown below. These may be higher or lower than percentages that would represent realistic, challenging small business subcontracting goals for this acquisition. Offerors representing as other than small businesses shall establish small business subcontracting plan goals and shall document in their subcontracting plans the basis for all proposed goals. Plans shall be submitted with initial offers.
Program Subcontracting Goals
SB 46%
SDB 30%
HUBZone 6%
WOSB 7%
SDVOSB 4%
Note: Small Business (SB), Small Disadvantaged Business (SDB), Historically
Underutilized Business Zones (HUBZone), Woman Owned Small Business (WOSB), and Service Disabled Veteran-Owned Small Business (SDVOSB).
The subcontracting plan shall be negotiated prior to award. Failure to submit and negotiate an acceptable subcontracting plan shall make the Offeror ineligible for award of a contract. See FAR 52.219-9, Small Business Subcontracting Plan (Aug 2018) Alternate II (Nov 2016) for details. FAR 52.219-9 Alternate II is referenced in FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders -- Commercial Items (Aug 2018).
TAB #7: Copy of the VETS-4212 annual report. Legislatively mandated under 38 U.S. Code, Section 4212, codified at 41 CFR Section 61-300, respectively, contractors and subcontractors who enter into, or modify a contract or subcontract with the Federal Government, and whose contract meets the criteria set forth in the above legislation/regulations, are required to report annually on their affirmative action efforts in employing veterans.
Veterans’ Employment and Training Service (VETS) has a legislative requirement to collect, and make available to OFCCP, reported data contained on the VETS-4212 report for compliance enforcement.
http://www.dol.gov/vets/vets4212.htm.
Federal Contractor Reporting – VET 4212
In accordance with FAR 22.13, any contractor or subcontractor with a contract or subcontract with the Federal Government of $150,000 or more that was entered into on or after October 1, 2015 (or $100,000 or more that was entered prior to October 1, 2015) must take affirmative action to hire and promote qualified covered veterans which includes, special disabled veterans, veterans of the Vietnam-era, recently separated veterans, and any other veterans who served on active duty during a war or in a campaign or expedition for which a campaign badge has been authorized.
If subject to the reporting requirements, companies must file an annual VETS-4212 Report, which shows the number of covered veterans in their workforce and number of new hires, including covered veterans hired during the reporting period. Instructions, information, and follow-up assistance is provided at VETS-4212 Internet site at http://www.dol.gov/vets/vets4212.htm or employers may contact the VETS-4212 customer support at
(866) 237-0275 or e-mail at VETS4212- customersupport@dol.gov.
VETS-4212 Reports must be filed between August 1 and September 30 of each year following a calendar year in which a contractor or subcontractor held a covered contract or subcontract.
Upon the successful submission of a VETS-4212 report, federal contractors will receive an email confirmation of receipt notification for their records. Offerors shall include a copy of their confirmation notification email in their proposal as verification of submission for the current reporting period. DO NOT SUBMIT A COPY OF THE REPORT ITSELF. If this requirement is not applicable to your firm, provide a statement that your firm does not have any contracts subject to this requirement.
A contract cannot be awarded to a contractor that has not submitted a required annual form VETS-4212, Federal Contractor Veterans’ Employment Report (VETS-4212 Report) if subject to the reporting requirements of 38 U.S.C.
4212(d) for that fiscal year.
(2) Basis of Evaluation: The Government will evaluate price based on the total price for the proposed award. Total price consists of the reccuring and non-recurring basic requirements and all option items. The Government intends to evaluate all options and has included the provision FAR 52.217-5, Evaluation of Options (JUL 1990) in Section M of the solicitation. In accordance with FAR 52.217-5, Evaluation of Options will not obligate the Government to exercise the option(s). Analysis will be performed by one (1) or more of the following techniques to ensure a fair and reasonable price:
(a) Comparison of proposed prices received in response to the solicitation.
(b) Comparison of proposed prices with the IGCE.
(c) Comparison of proposed prices with available historical information.
(d) Comparison of market survey results.
A price that is found to be unreasonably high in relation to the proposed work may result in the overall proposal being considered Unacceptable. The burden of proof of price reasonableness rests solely with the offeror.
The LPTA process is selected as appropriate for this acquisition because the best value is expected to result from selection of the technically acceptable proposal with the lowest evaluated price. In order to promote efficient competition, proposals will be initially screened for price and placed in order of price (lowest price to highest price).
Price evaluation will be conducted for all proposals independently by the SSEB Price Evaluator to ensure fair and reasonable pricing. A written evaluation documenting the outcome of the analysis of price proposals will be prepared as part of the SSEB Report and will include a narrative determination of price reasonableness/unreasonableness explaining all aspects of price proposals supporting the determination.
b. Technical Factors:
(1) Solicitation Submittal Requirements: Submit an original & four (4) copies, plus one (1) CD (with documents in Microsoft Word). Technical proposal copies shall be submitted in three-ring binders separate from price proposals, and clearly marked: Volume 2- Technical Proposal. The technical proposal shall address each evaluation factor in accordance with the criteria shown below under Factors 1 through 4. Provide a separate tab within Volume 2 for each factor shown below:
TAB #1: Factor 1 – Recent, Relevant Experience of the Firm TAB #2: Factor 2 – Technical Capability TAB #3: Factor 3 – Safety TAB #4: Factor 4 – Past Performance
(2) A copy of the Technical Proposal shall be placed on one (1) CD and inserted in the original Technical Proposal Binder – Volume 2.
(3) Failure to acknowledge any material amendments to the solicitation may cause an offeror's proposal to be rejected as unacceptable
(a) Factor 1 - Recent, Relevant Experience of the Firm:
Solicitation Submittal Requirements: Submit Exhibit B (Recent, Relevant Experience of Firm Project Data Sheet) for each project under Tab “1”. Exhibit B is MANDATORY. The Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total page limit for each project data sheet shall not exceed three (3) single-sided 8.5” x 11” pages. The offeror shall ensure this form is complete and calculations are correct.
NOTE: Projects submitted under Factor 1 - Recent, Relevant Experience of Firm must be the same projects submitted for Factor 4 - Past Performance.
(i) Submit a minimum of one (1) and a maximum of two (2) relevant projects for the offeror as the Prime Contractor that best describes the offeror’s experience on projects that are similar in size, scope, and complexity to the projects that may be ordered under the solicited contract.
(ii) Project experience is defined as recurring services for operations and maintenance performed under a single award. Projects will only qualify for consideration when recurring requirements are funded for the period of performance; consequently, IDIQ type contracts for non-recurring requirements are disqualified from consideration. For the purposes of this evaluation, a relevant project is further defined as a government or commercial contract that:
1) Was actively in performance within the last five (5) years prior to the initial solicitation issuance date;
2) Was actively self-performed at least 50%, in terms of cost, as the Prime Contractor for a duration of twelve
(12) months or more;
3) Has a total annual award value of $1 Million or more (at the date of contract award); and
4) Demonstrates experience in Annex 1604000 Wastewater for services related to the operation and maintenance of wastewater treatment plants similar in size (treating at least .5 Million Gallons per Day) at a tertiary treatment plant.
(iii) The Government will not consider any project submitted for experience that was performed by a firm other than the offeror, except:
1) If the offeror is a Joint Venture (JV), relevant project experience shall be submitted for project(s) completed by the JV entity. If the JV does not have shared experience, relevant projects shall be submitted for each JV member provided the JV offeror’s proposal includes a copy of the supporting JV agreement identifying the firm in question as a member of the JV for this procurement in the Price Proposal under Tab #5.
2) The Government will consider otherwise relevant projects that were performed by the offeror’s proposed key personnel; however, experience of proposed subcontractor employees will not be considered; and,
3) The Government will consider otherwise relevant projects performed by affiliates/subsidiaries/parent/Limited Liability Company (LLC)/ Limited Company (LTD) member companies (i.e. any office(s) of the offeror other than the one (1) submitting the current proposal as stated on the SF1449), provided the proposal clearly explains that the affiliates/subsidiaries/parent/LLC/LTD firm will have meaningful involvement in the performance of this contract. Regarding such submitted project(s), if the offeror fails to demonstrate the affiliate/subsidiary/parent/LLC/LTD meaningful involvement in the performance of this contract, the project may not be considered relevant and may not be evaluated.
(iv) Exhibit B, Offeror Recent, Relevant Experience of the Firm Project Data Sheets submitted that exceed the maximum, three (3) single-sided 8.5” x 11” page limit will be removed prior to evaluation. Exhibit B Project Data Sheets submitted for multiple award contracts and/or IDIQ type contracts as a whole will be removed prior to evaluation. Exhibit B Project Data Sheets submitted for projects that are not at least 50% complete within five
(5) years prior to the solicitation issuing date will be deemed not similar in scope and not relevant.
The Government reserves the right to contact the POC for each project to confirm at least 50% of the project was completed within the last five (5) years in terms of the amount paid for contract performance, at least 50% self-performed in terms of the cost of contract performance, and the accuracy of any other project information provided for evaluation.
*Self-Performed: Refers to the offeror who performs relevant work that is the same or similar in size, scope and complexity of the work requirements in the solicitation, by in-house workforce and not by sub-contractor(s). This does not include administrative or management functions.
(v) For each project, the offeror shall provide a detailed description of work and identify the percentage (%) and dollar amount that the firm selfperformed for each annex. Each project must demonstrate self-performance experience in Annex 160400 Wastewater for services related to the operation and maintenance of wastewater treatment plants similar in size (treating at least .5 Million Gallons per Day) at a tertiary treatment plant.
(vi) Basis of Evaluation: The basis of evaluation will include the offeror’s demonstrated experience in performing relevant work that is the same or similar in size, scope and complexity of the work requirements in the solicitation. The assessment of the offeror’s relevant experience will be used as a means of evaluating the ability of the offeror to successfully meet the requirements of the solicitation. The Government will only review two (2) projects; any projects submitted in excess of the limitation will not be considered.
The offer may be rated “Acceptable” for this factor if the offeror submits a minimum of one (1) relevant project that complies with all of the following:
1) Was actively in performance within the last five (5) years prior to the initial solicitation issuance date;
2) Was actively self-performed at least 50%, in terms of cost, as the Prime Contractor for a duration of twelve
(12) months or more;
3) Have a total annual award value of $1 Million or more (at the date of contract award); and
4) Demonstrate experience in Annex 1604000 Wastewater for services related to the operation and maintenance of wastewater treatment plants similar in size (treating at least .5 Million Gallons per Day) at a tertiary treatment plant.
(b) Factor 2 – Technical Capability:
Submit Exhibit C under Tab #2 of the Technical Proposal Volume 2. Exhibit C is MANDATORY. Individual blocks on this form may be expanded; however, the total page limit using 8.5” x 11” pages and 12-point Times New Roman font shall not exceed three (3) single-sided pages (Exhibit C, Paragraphs 1-2) and two (2) single-sided pages (Exhibit C, Paragraph 3 Chief Plant Operator Resume). The offeror shall submit the information described below of the proposed approach to meeting the requirement of this solicitation.
(i) Permit Compliance: Offeror shall provide a proposed plan that is detailed, specific, and demonstrates how the Offeror has the capability to comply with all permit requirements.
(ii) Operations: Offeror shall provide a proposed plan that is detailed, specific and demonstrates how the offeror has the necessary capability to meet the requirements as defined in Annex 16, Spec Item 3.1 (Operations), 3.2 (PM) and
3.3 (IMP-Repair and Replace) and successfully operate and maintain the SRTTP and NRTTP concurrently.
(iii) Chief Plant Operator: Offeror shall provide the resume of its Chief Plant Operator, Grade IV or above, whom meets the requirements of the position per Annex 1604000 Wastewater, Spec Item 2.2.1.
(iv) Basis of Evaluation: The offeror’s proposal shall demonstrate to the Government that the offeror has a management approach and the ability to carry out the plans provided to manage and control the execution of work as outlined in the Performance Work Statement (PWS). Failure to provide any of the elements described within the Technical Capability may result in a proposal rated “Unacceptable”.
The offeror may be rated “Acceptable” if the offeror complies with all of the following:
1) The offeror has established capabilities to successfully comply with all permit requirements at SRTTP and NRTTP on MCB Camp Pendleton;
2) The offeror has established methods to meet the requirements as defined in Annex 16, Spec Item 3.1 (Operations), 3.2 (PM) and 3.3 (IMP-Repair and Replace) and successfully operate and maintain the SRTTP and NRTTP concurrently; and
3) The offeror has submitted the resume of its Chief Plant Operator, Grade IV or above, whom meets the requirements of the position per Annex 1604000 Wastewater Section C, Spec Item 2.2.1.
(c) Factor 3 - Safety:
Solicitation Submittal Requirements: Submit Exhibit D (Safety Data Sheet/Safety Narrative) under Tab #3. The offeror shall submit the following information: (For a partnership or JV; the following submittal requirements are required for each offeror who is part of the partnership or joint venture; however, only one (1) safety narrative is required. EMR and DART Rates shall not be submitted for subcontractors). Exhibit D is MANDATORY and shall be used to submit safety information. The safety narrative shall be limited to four (4) 8.5” x 11” pages.
(i) Experience Modification Rate (EMR): Include three (3) previous complete calendar years’ worth of data (2016, 2017, and 2018). This rate compares company’s annual losses in insurance claims against its policy premiums.
The offeror may submit an insurance company-provided equivalent rate if no EMR exists. If the offeror has no EMR or premium, for any year, affirmatively state so and explain why. Any extenuating circumstances that affect the EMR and negative trends shall be addressed as part of the factor submission.
(ii) OSHA DART Rate: Include three (3) previous complete calendar years’ worth of data (2016, 2017, and 2018). If an offeror cannot submit an OSHA DART rates, for any year, affirmatively state so and an explanation must be provided. Any extenuating circumstances that affected the OSHA DART rate data negatively shall be addressed as part of this factor submission.
(iii) Technical Approach to Safety: Submit the plan for safety that will be implemented to evaluate safety performance of potential subcontractors as part of the selection process for all levels of subcontractors. The offeror shall submit a narrative that fully describes the safety management system that they will use to oversee the safety compliance and performance of selfperformed and subcontractor performed work. The offeror shall describe any innovative methods that will be employed to ensure and monitor safe work practices at self-performed and/or all subcontractor levels. Additionally, the offeror shall describe their methodology to execute an effective program that facilitates sound mishap prevention techniques and processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps. The technical approach to safety narrative shall be limited to two (2) pages.
(iv) Basis of Evaluation: The evaluation will collectively consider the following:
Experience Modification Rate (EMR) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Offeror’s Technical Approach to Safety Other sources of information available to the Government
1) Experience Modification Rate (EMR): For the three (3) previous complete calendar years (2016, 2017, and 2018) the offeror shall submit EMR. If no EMR exists, the offeror may submit an insurance company-provided equivalent rate explaining why not. If an insurance company-provided equivalent rate is provided, it will be treated the same as an EMR. Any extenuating circumstances that affected the EMR and negative trends shall be addressed as part of this selection factor. The board will evaluate the EMR to determine if the offeror has demonstrated a history of safe work practices taking into account any negative trends and extenuating circumstances that impact the rating.
2) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rates: For the three (3) previous complete calendar years (2016, 2017, and 2018), the offeror shall submit their OSHA DART, as defined by the U.S.
Department of Labor, Occupational Safety and Health Administration. If unable to submit OSHA DART rates, affirmatively state so, and an explanation shall be provided. Any extenuating circumstances that affected the OSHA DART rate data and negative trends shall be addressed as part of this element. The board will evaluate the OSHA DART rate to determine if the offeror has demonstrated a history of safe work practices taking into account any upward trends and extenuating circumstances that impact rates.
3) Technical Approach to Safety: The offeror shall describe their plan to evaluate their safety performance and that of potential subcontractors. Also, describe any innovative methods that the offeror will employ to ensure and monitor safe work practices at all subcontractor levels. The Safety Narrative shall be limited to two (2) pages. The board will evaluate the narrative to determine the degree to which subcontractor safety performance will be considered in the selection of all levels of subcontractors on the upcoming project. The board will evaluate the narrative to determine the degree to which innovations are being proposed that may enhance safety on this procurement and validate the contractor has addressed methodology to be used in the execution of an effective program that facilitates sound mishap prevention techniques/processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps.
4) Other sources of information available to the Government – other sources for safety may include but are not limited to OSHA data, NAVFAC’s Contractor Incident Reporting System (CIRS) in Enterprise Safety Applications Management System (ESAMS), CPARS and other related databases.
c. Past Performance Factor:
(1) Factor 4 - Past Performance:
Solicitation Submittal Requirements: Submit Exhibit E (Past Performance Questionnaire (PPQ) and CPARS evaluations under Tab #4 of the Technical Proposal Volume 2.
NOTE: Projects submitted for Factor 4 – Past Performance must be the same projects submitted under Factor 1 – Recent, Relevant Experience of the Firm.
IF A COMPLETED CPARS EVALUATION IS AVAILABLE, IT SHALL BE SUBMITTED WITH THE
PROPOSAL. IF THERE IS NOT A COMPLETED CPARS EVALUATION, the PPQ included in the solicitation is provided for the offeror or their team members to submit to the client for each project the offeror includes in their proposal for Factor 1 – Recent, Relevant Experience of the Firm. AN OFFEROR SHALL NOT SUBMIT A PPQ
WHEN A COMPLETED CPARS IS AVAILABLE.
IF A CPARS EVALUATION IS NOT AVAILABLE, ensure correct phone numbers and email addresses are provided for the client point of contact. Completed PPQs should be submitted with the proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Exhibit E), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Sunshine Hernandez via email at sunshine.hernandez@navy.mil prior to the solicitation due date.
Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other solicitations. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the PPIRS using all CAGE/Entity Identifier numbers of team members (partnership, joint venture, teaming arrangement, or parent company/ subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), and any other known sources not provided by the offeror.
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the offeror.
A copy of the blank Past Performance Questionnaire to be used for requesting client references is included as Exhibit E.
(a) Basis of Evaluation: The degree to which past performance evaluations and all other past performance information reviewed by the Government (e.g., PPIRS, FAPIIS, eSRS, performance recognition documents, and information obtained from any other source) reflect a trend of satisfactory performance considering:
A pattern of successful completion of tasks;
A pattern of deliverables that are timely and of good quality;
A pattern of cooperativeness and teamwork with the Government at all levels (task managers, contracting officers, auditors, etc.); and, Recency of tasks performed that are identical to, similar to, or related to the task at hand.
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
The following have been deleted:
252.204-7006 Billing Instructions OCT 2005
(End of Summary of Changes)
File details come from the government source that posted it. Updated .