SRTTP Compliance Equipment List.xlsx

XLSX spreadsheet 82 KB Posted

Attached to
Operation & Maintenance of the Southern and Northern Regional Tertiary Treatment Plants on MCB Camp Pendleton
Solicitation number
N6247319R0033
Issued by

View the file

Other files

File Type Posted
Amendment 0005_N6247320R0033.pdf PDF
AMENDMENT 0004.pdf PDF
Amendment 0003_N6247320R0033.pdf PDF
P-1046B Construction Plans 04-05-2016.pdf PDF
RW_Overall.pdf PDF
EXHIBIT D REVISED _ Safety Data & Narrative.docx DOCX document
SRTTP & NRTTP Chemical Usage 2017 & 2018.xlsx XLSX spreadsheet
RWPS Electrical Equipment List.xlsx XLSX spreadsheet
Amendment 0002_N6247320R0033.pdf PDF
ELIN Pricing Schedule REVISED.xls XLS spreadsheet
EXHIBIT B REVISED _ Recent Relevant Experience of the Firm.docx DOCX document
RWPS Equipment List.xlsx XLSX spreadsheet
Rules and Regs Final_Signed April 2013 Edition.pdf PDF
SierraOne Equipment List.xlsx XLSX spreadsheet
Amendment 0001_N6247320R0033.pdf PDF
Annex 0200000 C Management and Administration (SW SubKtr Safety) Revision 13 JUN.docx DOCX document
Annex 1503030 J Integrated Solid Waste Management v2.2.doc DOC document
ELINS Unpopulated.xls XLS spreadsheet
Annex 1503020 C Pest Control v2.3.docx DOCX document
NRTTP Equipment List.xlsx XLSX spreadsheet
SRTTP Equipment List.xlsx XLSX spreadsheet
EXHIBIT F _ Individual Small Business Subcontracting Plan.docx DOCX document
SRTTP EquipmentList_OM.xls XLS spreadsheet
SRTTP-NRTTP LOADINGS.XLSX XLSX spreadsheet
Annex 1503020 F Pest Control v2.3.doc DOC document
SRTTP Electrical Equipment List.xlsx XLSX spreadsheet
EXHIBIT D _ Safety Data & Narrative.docx DOCX document
Annex 1503010 F Custodial v2.3.doc DOC document
EXHIBIT B _ Recent Relevant Experience of the Firm.docx DOCX document
Annex 1503010 C Custodial v2.3 ck.doc DOC document
EXHIBIT G _ Request for Information (RFI).docx DOCX document
Section J Documents Exhibits & other Attachments Annex 0200000 J Management and Administration ver 2 5.doc DOC document
Annex 0100000 C General Information ver 2.2 (revised 040715).doc DOC document
EXHIBIT A _ Financial Questionnaire.docx DOCX document
NRTTP Electrical Equipment List.xlsx XLSX spreadsheet
SCA Wage Determination 16 SEP 19 .pdf PDF
Annex 1503050 C Grounds Maint & Landscaping v2.5.doc DOC document
EXHIBIT C _ Technical Capability (1).docx DOCX document
Annex 1604000 F Wastewater Ver 2.2.doc DOC document
Annex 1604000 C Wastewater Rev 2 13 JUN.docx DOCX document
EXHIBIT E _ Past Performance Questionnaire (Form PPQ).docx DOCX document
Annex 1503050 F Grounds Maint & Landscaping v2.3.doc DOC document
Annex 1503020 J Pest Control v2.4.docx DOCX document
NRTTP Boundary Map.pdf PDF
Annex 1503050 J Grounds Maint & Landscaping v2.6.docx DOCX document
Section F Deliveries or Performance Annex 0200000 F Management and Administration v2.8 (revised 12-6-2018).docx DOCX document
SRTTP Boundary Map.pdf PDF
Annex 1503010 J Custodial v2.3.doc DOC document
Annex 1503030 F Integrated Solid Waste Management v2.3.doc DOC document
Annex 1503030 C Integrated Solid Waste Management v2.3.doc DOC document
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Equipment List Report Without Notes
SRTTP
Average
EquipmentTypeLocationDepartmentMeteredUnitsPer Day
02-BS-210 - Bar Screen No.Bar Screen02 - InfluentNoHours0.00
2.0Pump Station
02-BS-220 - Mechanical BarBar Screen02- InfluentNoHours0.00
Screen No. 1Pump Station
02-FE/FIT-170 - RawFlow Meter02- InfluentNoHours0.00
Sewage FlowmeterPump Station
02-P-110 - SubmersiblePump02-Influent PumpNoHours0.00
PumpStation
02-P-120 - SubmersiblePump02-Influent PumpNoHours0.00
PumpStation
A-D-3 - Aerobic DigesterBasinAerobic DigesterNoHours0.00
3.0
02-P-140 - SubmersiblePump02-Influent PumpNoHours0.00
PumpStation
02-P-151 - Sump PumpPump02-Influent PumpNoHours0.00
Station
02-P-152 - Sump PumpPump02-Influent PumpNoHours0.00
Station
02-P-321 - Grit PumpPump02- Grit CollectorNoHours0.00
Station
02-P-351 - Grit PumpPump02-Grit CollectorNoHours0.00
Station
04-AE/AIT-280 - Disk FilterTurbidity Meter04- disk filterNoHours0.00
Effluent Turdidity analyzer
04-AE/AIT-350 - DisinfectionCl2 Analyzer04- DisinfectionNoHours0.00
Contact Basin Inluent Cl2Contact Basin
Residual Analyzer
04-AE/AIT-340 - DisinfectionCl2 Analyzer04- DisinfectionNoHours0.00
contact Basin effluent Cl2contact Basin
Residual Analyzer
04-FE/FIT-285 - Disk FilterFlow Meter04-Disk FiltersNoHours0.00
Backwash Flowmeter
04-FE/FIT-300 - Disk FilterFlow Meter04-Disk FilterNoHours0.00
Effluent Flowmeter
04-FE/FIT-361 - ReclaimedFlow Meter04-ReclaimedNoHours0.00
Water Effluent FlowmeterWater Pump
Station
04-P-110 - Filter Feed PumpPump04-Flow EQNoHours0.00
12/18/2018 01:27 pm1 of33.0

Sheet2

Equipment List Report Without Notes
SRTTP
Average
EquipmentTypeLocationDepartmentMeteredUnitsPer Day
1.0Basin
04-P-120 - Filter Feed PumpPump04-Flow EQNoHours0.00
2.0Basin
04-P-130 - Filter Feed PumpPump04- Flow EQNoHours0.00
3.0Basin
04-P-205 - FilterPump04-Disk Filter 1NoHours0.00
Backwash/Sludge Pump 1A
04-P-210 - FilterPump04-Disk Filter 1NoHours0.00
Backwash/Sludge Pump 1B
04-P-225 - FilterPump04-Disk Filter 2NoHours0.00
Backwash/sludge Pump 2A
04-P-230 - FilterPump04-Disk Filter 2NoHours0.00
Backwash/Sludge Pump 2B
04-P-245 - FilterPump04-Disk Filter 3NoHours0.00
Backwash/Sludge Pump 3A
04-P-250 - FilterPump04-Disk Filter 3NoHours0.00
Backwask/Sludge Pump 3B
04-P-280 - Disk Filter EffluentPump04-disk FilterNoHours0.00
Turbidity Sample Pump
04-P-305 - DisinfectionPump04-DisinfectionNoHours0.00
contact Basin Influent Cl2Contact Basin
Residual Sample Pump
04-P-310 - Reclaimed WaterPump04-ReclaimedNoHours0.00
Pump 1Water Pump
Station
04-P-320 - Reclaimed WaterPump04-ReclaimedNoHours0.00
Pump 2Water Pump
Station
04-P-330 - Reclaimed WaterPump04-ReclaimedNoHours0.00
Pump 3Water Pump
Station
05-FE/FIT-101 - AerobicFlow Meter05-DigesterNoHours0.00
Digester Influent Flow Meter
(WAS Meter)
05-FE/FIT-110 - DigestedFlow Meter05-SoldisNoHours0.00
Sludge Flowmeter (gravityHandling Room
belt) NEW
05-FE/FIT-210 - DigestedFlow Meter05-SolidsNoHours0.00
Sludge Flow MeterHandling Room
12/18/2018 01:27 pm2 of33.0

Sheet3

Equipment List Report Without Notes
SRTTP
Average
EquipmentTypeLocationDepartmentMeteredUnitsPer Day
(Centrifuge) NEW
05-M-120 - Aerobic DigesterMotorNorth BlowerNoHours0.00
Blower (MOTOR)Room
05-M-130 - Aerobic DigesterMotorNorth BlowerNoHours0.00
Blower (MOTOR)Room
05-M-140 - Aerobic DigesterMotorNotrh BlowerNoHours0.00
Blower (MOTOR)Room
05-M-311 - Gravity BeltGravity Belt05-SolidsNoHours0.00
ThickenerHandling Room
05-M-410 - Belt Filter Press 1Belt Press05-SolidsNoHours0.00
Handling Room
05-M-420 - Belt Filter Press 2Belt press05-SolidsNoHours0.00
Handling
05-M-430 - Sludge ConveyorConveyor05-SolidsNoHours0.00
Belt 1Handling Room
05-P-210 - Digested SludgePump05-AerobicNoHours0.00
Pump 1Digester
05-P-220 - Digested SludgePump05-AerobicNoHours0.00
Pump 2Digestor
05-P-230 - Digested SludgePump05-AerobicNoHours0.00
Pump 3Digester
08-P-110 - Thickened SludgePump05-solidsNoHours0.00
PumpHandling Room
06-M-410 - Polymer BlenderPolymer Mixer06-ChemicalNoHours0.00
1.0Storage Area
06-M-420 - Polymer BlenderPolymer Mixer06-ChemicalNoHours0.00
2.0Storage
Handling
06-M-430 - Polymer BlenderPolymer Mixer06-ChemicalNoHours0.00
3.0Storage Area
06-P-210 - Brine TransferPump06-ChemicalNoHours0.00
Pump 1Storage Area
06-P-220 - Brine transferPump06-ChemicalNoHours0.00
Pump 2Stroage Area
06-P-320 - NaOCl MeteringPump06-ChemicalNoHours0.00
Pump #1Storage Area
06-P-330 - NaOCl MeteringPump06-ChemicalNoHours0.00
12/18/2018 01:27 pm3 of33.0

Sheet4

Equipment List Report Without Notes
SRTTP
Average
EquipmentTypeLocationDepartmentMeteredUnitsPer Day
Pump 2Stroage Area
06-T-1 - Storage Tank 1Tank06-ChemicalNoHours0.00
Storage Area
06-T-3 - NaOCl Storage TankTank06-ChemicalNoHours0.00
1.0Stroage Area
06-T-4 - NaOCl Storage TankTank06-ChemicalNoHours0.00
2.0Storage Area
06-T-5 - Salt Saturator TankTank06-ChemicalNoHours0.00
Storage Area
02-M-311 - Grit Collector No.Grit02-Grit CollectorNoHours0.00
1.0Station
04-P 310 - RW PUMPS ANDEFFLUENTE. Q. BASINSTAFFNoHours0.00
FILTER FEED PUMPSPUMPSAND CHLORINE
CONTACT
TANK
02-M-341 - Grit CollectorGrit Collector02-Grit CollectorNoHours0.00
No.2Station
02-M-361 - Grit ClassifierGrit Classifier02-Influent PumpNoHours0.00
no.2Station
02-M-230 - ScreeningsCompactor02-Influent PumpNoHours0.00
Washer-Compactor No.1Station
04-M-200 - Disk Filter #1Drive Motor04-Disk Filter# 1NoHours0.00
DriveChain
04-M-220 - Disk Filter 2 DriveDrive Motor04-Disk Filter# 2NoHours0.00
Chain
011 - florescent lightingemergencycontrol roomNoHours0.00
ballast
04-M-300 - DisinfectionMotor04-DisinfectionNoHours0.00
Contact Basin Influent Mixercontact Basin
05-AE/AIT-113 - AerobicDO Probe05-Digester 1NoHours0.00
digester No 1 Dissolved O2
Analyzer
05-AE/AIT-133 - AerobicDO Probe05-Digester 2NoHours0.00
Digester No 2 Dissolved O2
Analyzer
06-B-310 - Hydrogen GasBlower06-ChemicalNoHours0.00
Dilution Blower 2Storage Area
07-C-1 - Odor Control Cell 1Bio BedsNoHours0.00
12/18/2018 01:27 pm4 of33.0

Sheet5

Equipment List Report Without Notes
SRTTP
Average
EquipmentTypeLocationDepartmentMeteredUnitsPer Day
OOPS - Sub-pumpPumpOOPSNoHours0.00
01-golf cart- - Golf CartGolf CartSRTPGerneralNoHours0.00
services
PMP 601 PUMP #2 -OOOPSNoHours0.00
OOOPS
PT-342 - PRESSURETRANSMITTETAPS 3NoHours0.00
TRANSMITTERR
01-FH-6 - Fire HydrantFire HydrantHeadworksNoHours0.00
01-M-100 - EmergencyEmergencyNE SiteYesHours1.00
Electrical GeneratorGenerator
01-RPBD-1 - Site PotableBackflowHeadworksNoHours0.00
Water Backflow PreventorPreventor
01-RPBD-2 - site IndustrialBackflowHeadworksNoHours0.00
Water Backflow PreventorPreventor
01-RPBD-3 - Site FireBackflowHeadworksNoHours0.00
Protection Water BackflowPreventor
Preventor
02-EF-5 - Influent PumpFan02-Influent PumpNoHours0.00
Station Pumproom ExhaustStation
Fan
02-SF-5 - Influent PumpFan02- InfluentNoHours0.00
Station supply FanPump Station
02-AE/AIT-102 - InfluentGas Detetor02-Influent PumpNoHours0.00
Wetwell Combustible GasStation
Detector
02-AE/AIT-315 - GritGas Detector02-Grit CollectorNoHours0.00
Collector #1 Combustible1.0
Gas Detector
02-AE/AIT-345 - Grit collectorGas Detector02-Grit CollectorNoHours0.00
#2 Combustible Gas Detector2.0
02-BS-MCP-1 - MechanicalControl Panel02-Influent PumpNoHours0.00
Barscreen N0.1Station
02-GAT-210 - Bar Screen #1Slide Gate02-Influent PumpNoHours0.00
Influent GateStation
02-GAT-211 - Bar Screen #1Slide Gate02-Influent PumpNoHours0.00
Effluent GateStation
02-GAT-240 - Bar Screen #2Slide Gate02-Influent PumpNoHours0.00
Influent GateStation
12/18/2018 01:27 pm5 of33.0

Sheet6

Equipment List Report Without Notes
SRTTP
Average
EquipmentTypeLocationDepartmentMeteredUnitsPer Day
02-GAT-241 - Bar Screen #2Slide Gate02-Influent PumpNoHours0.00
Effluent GateStation
02-GAT-310 - Grit CollectorSlide Gate02-Grit CollectorNoHours0.00
#1 Influent Gate
02-GAT-312 - Grit CollectorSlide Gate02-Grit CollectorNoHours0.00
#1 Effluent Gate
02-GAT-340 - Grit CollectorSlide Gate02-Grit CollectorNoHours0.00
#2 Influent Gate
02-GAT-342 - Grit CollectorSlide Gate02-Grit CollectorNoHours0.00
#2 Effluent Gate
02-KGV-110 - IPS #1 KnifeKnife Valve02-Influent PumpNoHours0.00
GateStation
02-KGV-120 - IPS #2 KnifeKnife Gate02-Influent PumpNoHours0.00
GateStation
02-KGV-130 - IPS #3 KnifeKnife Gate02-Influent PumpNoHours0.00
GateStation
02-KGV-140 - IPS #4 KnifeKnife Gate02-Influent PumpNoHours0.00
GateStation
02-KGV-171 - FlowmeterKnife Gate02-Influent PumpNoHours0.00
Influent Knife GateStation
02-KGV-172 - FlowmeterKnife Gate02-Influent PumpNoHours0.00
Effluent Knife GateStation
02-KGV-173 - FlowmeterKnife Gate02-Influent PumpNoHours0.00
Bypass Influent Knife GateStation
02-LE/LIT-100A - WetwellLevel02-Influent PumpNoHours0.00
Level Xmtr #1TransmitterStation
02-LE/LIT-100B - WetwellLevel02-Influent PumpNoHours0.00
Level Xmtr #2TransmitterStation
02-LE/LIT-221 - Bar ScreenLevel02-Influent PumpNoHours0.00
#1 Influent Channel LevelTransmitterStation
Xmtr
02-LE/LIT-222 - Bar ScreenLevel02-Influent PumpNoHours0.00
#1 Effluent Channel LevelTransmitterStation
Xmtr
02-LSLL-100A - InfluentLevel Switch02-Influent PumpNoHours0.00
Pump Station Wetwell LevelStation
Switch #1
02-LSLL-100B - InfluentLevel Switch02-Influent PumpNoHours0.00
12/18/2018 01:27 pm6 of33.0

Sheet7

Equipment List Report Without Notes
SRTTP
Average
EquipmentTypeLocationDepartmentMeteredUnitsPer Day
Pump Station Wetwell LevelStation
Switch #2
02-PV-322 - Grit PumpPlug Valve02-Grit CollectorNoHours0.00
Discharge Plug Valve
02-PV-360 - Grit Classifier #2Plug Valve02-Influent PumpNoHours0.00
Inlet Plug ValveStation
03-AE/AIT-216 - SBR #1D.O. Probe03-SBR #1NoHours0.00
D.O. Analyzer/Xmitter Probe
03-AE/AIT-226 - SBR #2D.O. Probe03-SBR #2NoHours0.00
D.O. Analyzer/Xmitter Probe
Lighting Fixture - light fixtureFlourescentElectrical RoomNoHours0.00
Bulb
03-AE/AIT-246 - SBR #4D.O. Probe03-SBR #4NoHours0.00
D.O. Analyzer/Xmitter Probe
03-AE/AIT-256 - SBR #5D.O. Probe03-SBR #5NoHours0.00
D.O. Analyzer/Xmitter Probe
03-B-110 - SBR Blower #1Blower03-OperationsNoHours0.00
(OLD)Building/Blower
Room
03-B-120 - SBR Blower #2Blower03-OperationsNoHours0.00
(OLD)Building/Blower
Room
03-B-130 - SBR Blower #3Blower03-OperationsNoHours0.00
(OLD)Building/Blower
Room
03-B-140 - SBR Blower #4Blower03-OperationsNoHours0.00
(OLD)Building/Blower
Room
03-B-150 - SBR Blower #5Blower03-OperationsNoHours0.00
(OLD)Building/Blower
Room
03-B-180 - Decant Blower 1ABlower03-OperationsNoHours0.00
Building/Blower
Room
03-B-185 - Decant Blower 1BBlower03-OperationsNoHours0.00
Building/Blower
Room
03-B-190 - Decant Blower 2ABlower03-OperationsNoHours0.00
Building/Blower
Room
12/18/2018 01:27 pm7 of33.0

Sheet8

Equipment List Report Without Notes
SRTTP
Average
EquipmentTypeLocationDepartmentMeteredUnitsPer Day
03-B-195 - Decant Blower 2BBlower03-OperationsNoHours0.00
Building/Blower
Room
03-FE/FIT-161 - SBR 1 & 2Flow Meter03-OperationsNoHours0.00
aeration Air FlowmeterBuilding- Blower
Room
03-FE/FIT-171 - SBR 3,4 & 5Flow Meter03-OperationsNoHours0.00
aeration Air FlowmeterBuilding- Blower
Room
03-FV-182 - SBR 1 DecantPlug Valve03-OperationsNoHours0.00
Press Manifold Flow ControlBuilding-Blower
ValveRoom
03-FV-210 - SBR 1 InfluentPlug Valve03-SBR 1NoHours0.00
Isolation Valve
Sludge Beds 1-6 - sludgeSludge Beds 1-6NoHours0.00
beds
03-FV-230 - SBR 3 InfluentPlug Valve03-SBR 3NoHours0.00
Isolation Valve
03-FV-240 - SBR 4 InfluentPlug Valve03-SBR 4NoHours0.00
Isolation Valve
03-FV-250 - SBR 5 InfluentPlug Valve03-SBR 5NoHours0.00
Isolation Valve
03-FV-211 - SBR 1 AerationButterfly Valve03- SBR 1NoHours0.00
air Supply Valve
03-FV-221 - SBR 2 AerationButterfly Valve03- SBR 2NoHours0.00
air Supply Valve
03-FV-231 - SBR 3 AerationButterfly Valve03- SBR 3NoHours0.00
Air Supply Valve
03-FV-241 - SBR 4 AerationButterfly Valve03- SBR 4NoHours0.00
Air Supply Valve
03-FV-251 - SBR 5 AerationButterfly Valve03- SBR 5NoHours0.00
Air Supply Valve
04-LSHH-102 - EQ Basin #1Level Switch04- EQ Basin 1NoHours0.00
Low Level Switch
05-LE/LIT-110 - AerobicLevel05-Digester 1NoHours0.00
Digester #1 Level TransmitterTransmitter
05-LE/LIT-130 - AerobicLevel05-Digester 2NoHours0.00
Digester #2 Level TransmitterTransmitter
12/18/2018 01:27 pm8 of33.0

Sheet9

Equipment List Report Without Notes
SRTTP
Average
EquipmentTypeLocationDepartmentMeteredUnitsPer Day
05-LSHH-112 - AerobicLevel Switch05-Digester 1NoHours0.00
Digester #1 High Level
Switch
05-M-305 - Gravity BeltStatic Mixer05-Gravity BeltNoHours0.00
Polymer Static Mixer
06-STR-100 - Alum StroageStrainer06-ChemicalNoHours0.00
Tank StrainerStorage Area
03-PV-214 - SBR 1 WASPlug Valve03-SBR 1NoHours0.00
Recirculation Valve
03-PV-224 - SBR 2 WASPlug Valve03-SBR 2NoHours0.00
Recirculation Valve
04-BFV-308 - DisinfectionButterfly Valve04-DisinfectionNoHours0.00
contact Basin 1 Influent ValveContact Basin
04-FV-206 - Disk Filter 1Butterflty Vlv,04-Disk filterNoHours0.00
Sludge Suction ValveMotorized
04-FV-226 - Disk Filter 2Butterflty Vlv,04-Disk filterNoHours0.00
Sludge Suction ValveMotorized
04-FV-208 - Disk Filter 1Butterfly Vlv04-Disk FilterNoHours0.00
Backwash Valve 2Motorized
04-FV-211 - Disk Filter 1Butterfly Vlv04-Disk FilterNoHours0.00
Backwash Valve 4Motorized
04-FV-212 - Disk Filter 1Butterfly Vlv04-Disk FilterNoHours0.00
Backwash Valve 5Motorized
04-FV-213 - Disk Filter 1Butterfly Vlv04-Disk FilterNoHours0.00
Backwash Valve 6Motorized
04-FV-227 - Disk Filter 2Butterfly Vlv04-Disk FilterNoHours0.00
Backwash Valve 1Motorized
04-FV-232 - Disk Filter 2Butterfly Vlv04-Disk FilterNoHours0.00
Backwash Valve 5Motorized
04-FV-247 - Disk Filter 3Butterfly Vlv04-Disk FilterNoHours0.00
Backwash Valve 1Motorized
04-FV-248 - Disk Filter 3Butterfly Vlv04-Disk FilterNoHours0.00
Backwash Valve 2Motorized
03-M-212 - SBR 1 MixerMixer03-SBR 1NoHours0.00
03-M-222 - SBR 2 MixerMixer03-SBR 2NoHours0.00
03-M-232 - SBR 3 MixerMixer03-SBR 3NoHours0.00
03-M-242 - SBR 4 Mixer 1Mixer03-SBR 4NoHours0.00
12/18/2018 01:27 pm9 of33.0

Sheet10

Equipment List Report Without Notes
SRTTP
Average
EquipmentTypeLocationDepartmentMeteredUnitsPer Day
03-M-243 - SBR 4 Mixer 2Mixer03-SBR 4NoHours0.00
03-M-252 - SBR 5 Mixer 1Mixer03-SBR 5NoHours0.00
03-M-253 - SBR 5 Mixer 2Mixer03-SBR 5NoHours0.00
03-P-215 - SBR 1 WASSubmersable03-SBR 1NoHours0.00
Submersable PumpPump
03-P-225 - SBR 2 WASSubmersable03-SBR 2NoHours0.00
Submersable PumpPump
03-P-235 - SRB 3 WASSubmersable03-SBR 3NoHours0.00
Submersable PumpPump
03-P-245 - SRB 4 WASSubmersable03-SBR 4NoHours0.00
Submersable PumpPump
03-P-255 - SRB 5 WASSubmersable03-SBR 5NoHours0.00
Submersable PumpPump
04-LE/LIT-101 - EQ Basin 1Level04-EQ BasinNoHours0.00
Level XmitterTransmitter
04-LE/LIT-106 - EQ Basin 2Level04-EQ BasinNoHours0.00
Level XmitterTransmitter
04-LE/LIT-201 - Disk Filter 1Level04-Disk Filter 1NoHours0.00
Level XmitterTransmitter
04-LE/LIT-221 - Disk Filter 2Level04-Disk Filter 2NoHours0.00
Level XmitterTransmitter
04-LE/LIT-231 - Disk Filter 3Level04-Disk Filter 3NoHours0.00
Level XmitterTransmitter
04-LE/LIT-350A - DisinfectionLevel04-DisinfectionNoHours0.00
Contact Basin Level XmitterTransmitterContact Basin
04-LE/LIT-350B - DisinfectionLevel04-DisinfectionNoHours0.00
Contact Basin Level XmitterTransmitterContact Basin
04-LE/LIT-400 - Off SpecLevel Xmitter04-Off SpecNoHours0.00
Tank Level XmitterTank
04-LSHH-222 - Disk Filter 2Level Switch04-Disk Filter 2NoHours0.00
High Level Switch
03-PV-234 - SBR 3 WASPlug Valve03-SBR 3NoHours0.00
Recirculation Valve
03-PV-244 - SBR 4 WASPlug Valve03-SBR 4NoHours0.00
Recirculation Valve
03-PV-254 - SBR 5 WASPlug Valve03-SBR 5NoHours0.00
12/18/2018 01:27 pm10 of33.0

Sheet11

Equipment List Report Without Notes
SRTTP
Average
EquipmentTypeLocationDepartmentMeteredUnitsPer Day
Recirculation Valve
03-PV-215 - SBR 1 WASPlug Valve03-SBR 1NoHours0.00
Pump Discharge Valve
03-PV-225 - SBR 2 WASPlug Valve03-SBR 2NoHours0.00
Pump Discharge Valve
03-PV-235 - SBR 3 WASPlug Valve03-SBR 3NoHours0.00
Pump Discharge Valve
03-PV-245 - SBR 4 WASPlug Valve03-SBR 4NoHours0.00
Pump Discharge Valve
03-PV-255 - SBR 5 WASPlug Valve03-SBR 5NoHours0.00
Pump Discharge Valve
04-FV-253 - Disk Filter 3Butterfly Vlv04-Disk FilterNoHours0.00
Backwash Valve 6Motorized
08-EF-03 - Exhaust Fan,MioxFan08-OperationsOperationNoHours0.00
Room(Roof)-fan in NorthBuilding/ Blower
Blower RoomRoom
03-VFD-110 - SBR Blower #1VFDOperationNoHours0.00
building/ Blower
Room
03-VFD-140 - SBR Blower #4VFDOperationNoHours0.00
building/ Blower
Room
03-VFD-150 - SBR Blower #5VFDOperationNoHours0.00
building/ Blower
Room
Miox 1 - Miox 1 unitHypo06-ChemicalNoHours0.00
generatorStorage Area
Miox 2 - miox unit 2Hypo06-ChemicalNoHours0.00
//correctivegeneratorStorage Area
Miox 3 - Miox Unit 3hypo06-ChemicalNoHours0.00
generatorStorage Area
02-VFD-110.CPX9000EATOVFD,CPXOps BuildingNoHours0.00
N - Influent Pump #1 VFD9000(EATON)Electrical Room
02-VFD-120.CPX9000EATOVFDOps BuildingNoHours0.00
N - Influent Pump #2 VFDElectrical Room
04-BFV-100 - EQ Basin 1Butterfly Valve04-EQ BasinNoHours0.00
Inlet Valve
04-BFV-105 - EQ Basin 2Butterfly Valve04-EQ BasinNoHours0.00
12/18/2018 01:27 pm11 of33.0

Sheet12

Equipment List Report Without Notes
SRTTP
Average
EquipmentTypeLocationDepartmentMeteredUnitsPer Day
Inlet Valve
04-BFV-104 - EQ Basin 1Butterfly Valve04-EQ BasinNoHours0.00
Outlet Valve
04-BFV-109 - EQ Basin 2Butterfly Valve04-EQ BasinNoHours0.00
Outlet Valve
SBR #5 - correctiveSBR #5NoHours0.00
03-LIT-247 - #4 SBR levellevel#4 SBRNoHours0.00
Transducertransducer
03-D-SBR-1 - MembraneDiffuserSBR 1OpsNoHours0.00
Diffusers
SBR #1 - SBR #1 NitrateNitrate ProbeSBR #1OpsNoHours0.00
Probe
03-D-SBR-3 - MembraneDiffuserSBR-3OPSNoHours0.00
diffuser
03-D-SBR-4 - MembraneDiffuserSBR 4OPSNoHours0.00
Diffuser
03-D-SBR-5 - MembraneDiffuserSBR 5OPSNoHours0.00
Diffuser
04-AIT-305 - Influent DCBMeterDisinfectionOpsNoHours0.00
Chlorine AnalyzerChlorine Contact
Chamber
04-AIT-340 ( ATI) - EffluentMeterDisinfectionOPSNoHours0.00
DCB Chlorine contactContact
ChamberChamber
06-P-1 - Day StoragePump06-ChemicalOperationsNoHours0.00
Transfer Pump #1Storage Area
06-P-2 - Day StoragePump06-ChemicalOperationsNoHours0.00
Transfer Pump #2Storgae Area
03-Decant-SBR-3 - DecanterDecanterSBR 3OPSNoHours0.00
SF-1 - SupplySupply Fan #1Elec .Room NextNoHours0.00
Fan/Elec.Room Next toTo Control Room
Control Room
EF-1/EF-2 - Exhaust FanExhaust FanOperation BldOOPSNoHours0.00
#200831A
SF-4 - Supply FanSupply Fan #MCC RoomOperationNoHours0.00
4.0Bluid#200831BBluid#200831B
Supply Fan #5 - SF#5 Next toSupply Fan #Digester BlowerNoHours0.00
12/18/2018 01:27 pm12 of33.0

Sheet13

Equipment List Report Without Notes
SRTTP
Average
EquipmentTypeLocationDepartmentMeteredUnitsPer Day
back Exit Door-Above Bath5.0Room
Room
03-D-SBR-2 - MembraneDiffuserSBR 2OpsNoHours0.00
Diffusers
PMP-530 - SRTTP RWPS 2PumpNoHours0.00
Booster Pump #2
PMP-510 - SRTTP RWPS 2PumpNoHours0.00
Booster Pump #1(Jockey
Pump)
PMP-520 - SRTTP RWPS 2PumpNoHours0.00
Booster Pump #1
03-LIT-217 - #1 SBR LevelLevel#1 SBRNoHours0.00
TransducerTransducer
03-LIT-227 - #2 SBR LevelLevel#2 SBRNoHours0.00
TransducerTransducer
03-LIT-237 - #3 SBR LevelLevel#3 SBRNoHours0.00
TransducerTransducer
SBR #4 - SBRSBR #4NoHours0.00
03-LIT-257 - #5 SBR LevelLevel#5 SBRNoHours0.00
TransducerTransducer
05-M-405 - BFP PolymerStatic Mixer05-Belt FilterNoHours0.00
Static MixerPress
01-RPBD-4 - Water SoftenerBackflowWater SoftenerNoHours0.00
Backflow PreventorPreventor
01-RPBD-5 - Water MeterBackflowFacility WaterNoHours0.00
Bypass Backflow PreventorPreventorMeter
07-M-120 - Odor Control FanFanWest of the OpsNoHours0.00
#1Building
04-RO-P-1 - RO Unit FeedPumpRO UnitNoHours0.00
Pump
04-RO-P-2 - RO Unit BoosterPumpSouth of the RONoHours0.00
PumpUnit
04-UV-01 - RO UV moduleUV ModuleSouth of the RONoHours0.00
#1unit
04-UV-02 - RO UV moduleUV ModuleSouth of the RONoHours0.00
#2unit
04-VFD-310.CP9000CUTLEVFDControl BuildingNoHours0.00
12/18/2018 01:27 pm13 of33.0

Sheet14

Equipment List Report Without Notes
SRTTP
Average
EquipmentTypeLocationDepartmentMeteredUnitsPer Day
RHAMMER - Reclaim PumpElectrical Room
#1 VFD
04-VFD-320.CP9000CUTLEVFDControl BuildingNoHours0.00
RHAMMER - Reclaim PumpElectrical Room
#2 VFD
04-VFD-330.CP9000CUTLEVFDControl BuildingNoHours0.00
RHAMMER - Reclaim PumpElectrical Room
#3 VFD
04-VFD-110.SVX9000CUTLVFDControl BuildingNoHours0.00
ERHAMMER - Filter FeedElectrical Room
Pump #1 VFD
04-VFD-120.SVX9000CUTLVFDControl BuildingNoHours0.00
ERHAMMER - Filter FeedElectrical Room
Pump #2 VFD
04-VFD-130.SVX9000CUTLVFDControl BuildingNoHours0.00
ERHAMMER - Filter FeedElectrical Room
Pump #3 VFD
02-VFD-130,SVX9000CUTLVFDOps BuildingNoHours0.00
ERHAMMER - Influent PumpElectrical Room
#3 VFD
RCW-Line - reclaim waterC905NoHours0.00
line 20"
07-C-2 - Odor Control Cell 2Bio BedsNoHours0.00
07-C-3 - Odor Control Cell 3Bio BedsNoHours0.00
07-M-130 - Odor Control FanWest of the OpsNoHours0.00
#2Building
HP-1 - Heat Pump #1HVACNorth of theNoHours0.00
Control Building
HP-2 - Heat Pump #2HVACNorth of theNoHours0.00
Control Building
04-T-1 - RPWS 2 Pump SkidTankOn RPWS 2NoHours0.00
Hydro-pneumatic TankPump Skid
FCU-1 - Fan unitControl BuildingNoHours0.00
FCU-2 - Fan UnitFanControl BuildingNoHours0.00
SF-2 - FanHeadworksNoHours0.00
EF-1 - FanFanControl buildingNoHours0.00
(Mens
Bathroom)
12/18/2018 01:27 pm14 of33.0

Sheet15

Equipment List Report Without Notes
SRTTP
Average
EquipmentTypeLocationDepartmentMeteredUnitsPer Day
EF-2 - FanFanControl BuildingNoHours0.00
(LAB Room)
EF-3 - FanFanOOps BuildingNoHours0.00
EF-4 - Exhaust FanFanOps BuildingNoHours0.00
EF-5/Headworks - FanFanHeadworksNoHours0.00
EF-6 - FanFanControl BuildingNoHours0.00
04-RO-F-01 - RO Unit PreFilterRO UnitNoHours0.00
Filter
04-RO-1 - RO UnitRO UnitEast of theNoHours0.00
Chlorine contact
tanks
MCC-1A - MCCElectricalOps BuildingNoHours0.00
Electrical Room
MCC-1B - MCCElectricalOps BuildingNoHours0.00
Electrical Room
MCC-1C - MCCElectricalOps BuildingNoHours0.00
Electrical Room
MCC-2A - MCCElectricalOps BuildingNoHours0.00
Electrical Room
MCC-2B - MCCElectricalOps BuildingNoHours0.00
Electrical Room
MCC-3A - MCCElectricalControl BuildingNoHours0.00
Electrical Room
MCC-3B - MCCElectricalControl BuildingNoHours0.00
Electrical Room
MCC-4A - MCCElectricalControl BuildingNoHours0.00
Electrical Room
MCC-4B - MCCElectricalControl BuildingNoHours0.00
Electrical Room
PLC-2 - PLC-2 SecondaryElectricalOps BuildingNoHours0.00
Treatment (SBR PLC)Electrical Room
PLC-1 - PLC-1 Headworks,ElectricalOps BuildingNoHours0.00
Solids Handling, andElectrical Room
Chemical Facilities
PLC-4 - PLC-4 Disck Filter #1PLCDisk FiltersNoHours0.00
(04-DF-LCP-1)
12/18/2018 01:27 pm15 of33.0

Sheet16

Equipment List Report Without Notes
SRTTP
Average
EquipmentTypeLocationDepartmentMeteredUnitsPer Day
PLC-5 - PLC-5 Disck Filter #2PLCDisk FiltersNoHours0.00
(04-DF-LCP-2)
PLC-6 - PLC-6 Disck Filter #3PLCDisk FiltersNoHours0.00
(04-DF-LCP-3)
Switchgear - FacilitySwitchgearOps BuildingNoHours0.00
SwitchgearElectrical Room
PLC-3 - PLC-3 TertiaryPLCControl BuildingNoHours0.00
Electrical Room
04-AIT-370 - OverflowOutfallNoHours0.00
Chlorine Analyzer
04-AIT-290 - EffluentHach NH4DscDisk FiltersNoHours0.00
Ammonia AnalyzerAmmonia
Senso
04-AIT-150 Effluent Turbidty -Contact chamberNoHours0.00
process instrumentationeffluent
04-AIT-342 - EffluentContact chamberNoHours0.00
conductivity metereffluent
04-AIT-420 - Disk FilterHach NitrataxDisk FiltersNoHours0.00
Effluent Nitrate Analyzersc
04-P-370 - OOOPS ChlorinePumpOOOPS CircleNoHours0.00
Sample PumpWeir
06-LCP-01 - Brine PumpControl Panel06- ChemicalNoHours0.00
Control PanelStorage Area
02-ATI-102 - Headworks GasGas DetectorHeadworksNoHours0.00
DetectorInfluent Channel
04- Disk Filter #2 - FilterFilterDisk FilterNoHours0.00
04- Disk Filter#1 - FilterFilterDisk FilterNoHours0.00
04-FIT-RWPS2 - Flow MeterFlow MeterRWPS 2NoHours0.00
on RWPS2
Golf cart-1 - Utility Golf CartGolf CartSRTPOperationsNoHours0.00
OOOPS AREA - ooopsooopsooopsNoHours0.00
PMP-602 PUMP #3 -OOOPSNoHours0.00
OOOPS PUMP
04-AIT-341(Effluent PH) -Contact chamberNoHours0.00
process Instrumentationeffluent
04-DV-230 Drain Valve - DiskFilter drain04-Disk Filter 3NoHours0.00
Filtervalve
12/18/2018 01:27 pm16 of33.0

Sheet17

Equipment List Report Without Notes
SRTTP
Average
EquipmentTypeLocationDepartmentMeteredUnitsPer Day
F-650 Dump Truck -Dump TruckSolidsSolids RoomNoHours0.00
bio-solids dump truckprocessing
building
GENERATOR OOPS -GENERATOROOPSNoHours0.00
EMERGENCY GENERATOR
04-AIT-290 Disk Filter -HACHDisk FilterNoHours0.00
Ammonia Analyzer
04- Disk Filter#3 - FilterFilterDisk FilterNoHours0.00
04-LT-220 - Disk Filter #2LevelDisk FilterNoHours0.00
Level TransducerTransducer
PMP-600 PUMP#1 - OOOPSOOOPSNoHours0.00
PUMP
Electric Room 904 -Electric RoomNoHours0.00
Communication Back Board904.0
02-AIT-102 WETWELL -Gas Detector02-Influent PumpNoHours0.00
Combustible Gas DetectorStation
07-AIT-122 - CombustibleGas DetectorWest of the opsNoHours0.00
Gas Detector(odor controlBuilding
Main vent Pipe)
02-AIT-315 Grit Meter1 -Gas Detector02-Grit CollectorNoHours0.00
Combustible Gas detectorStation
02-AIT-345 Grit Meter2 -Gas Detector02-Grit CollectorNoHours0.00
Combustible Gas DetectorStation
Miox Room - CombustibleGas DetectorSodiumNoHours0.00
Gas DetectorHypochlorite
Generation
Room 802
OOOPS FLOW METER -Meterooops buildingNoHours0.00
flow meter-annual(
COMPLIANCE)
Wet well influent pumpInfluent pumpNoHours0.00
station - clean-monthlystation
02-M-331 - Grit ClassifierGrit Classifier02-Influent pumpNoHours0.00
no.1station
OOOPS VFD#1 - VFDVFDOOOPSNoHours0.00
OOOPS VFD#2 - VFDVFDOOOPSNoHours0.00
OOOPS VFD#3 - VFDVFDOOOPSNoHours0.00
12/18/2018 01:27 pm17 of33.0

Sheet18

Equipment List Report Without Notes
SRTTP
Average
EquipmentTypeLocationDepartmentMeteredUnitsPer Day
Fire-Extinguisher #1 -Fire-ExtinguishControlNoHours0.00
Monthly-InspectionerRoom(LOBBY)
Fire-Extinguisher#2 -Fire-ExtinguishControl-Room(LNoHours0.00
Monthly-InspectionerAB)
Fire-Extinguisher#3 -Fire-ExtinguishControlNoHours0.00
Monthly-InspectionerRoom(908 Hall)
Fire-Extinguisher#4 -Fire-ExtinguishOutside ControlNoHours0.00
Monthly-InspectionerRoom(WestSide)
Fire-Extinguisher#5 -Fire-ExtinguishElectric RoomNoHours0.00
Monthly-Inspectioner904(Inside)
Fire-Extinguisher#6 -Fire-ExtinguishChemicalNoHours0.00
Monthly-InspectionerStorage
Area(NorthSide)
Outside
Fire-Extinguisher#7 -Fire-ExtinguishOutSide SolidsNoHours0.00
Monthly-InspectionerBLDG(Next to
Conveyor)
Fire-Extinguisher#8 -Fire-ExtinguishInside SolidsNoHours0.00
Monthly-InspectionerRoom(Next to
Roll-up Door)
Fire-Extinguisher#10 -Fire-ExtinguishElectricRoomNoHours0.00
Monthly-Inspectioner804.0
Fire-Extinguisher#11 -Fire-ExtinguishSodiumNoHours0.00
Monthly-InspectionerHypochiorite
Generation
Room 802
Fire-Extinguisher#12 -Fire-ExtinguishOutside BlowerNoHours0.00
Monthly-InspectionerRoom(wall)
Fire-Extinguisher#13 -Fire-ExtinguishInside BlowerNoHours0.00
Monthly-InspectionerRoom 801(By
back Door)
Fire-Extinguisher#9 -Inside SolidsFire-ExtinguisherNoHours0.00
Monthly-InspectionBldg(Next to
Back Exit Door)
Fire-Extinguisher#14 -Fire-ExtinguishAerobic DigesterNoHours0.00
Monthly-InspectionerN0.1 (Wall)
Fire-Extinguisher#15 -Fire-ExtinguishDisk Filter No.1NoHours0.00
Monthly-Inspectioner(By Stairs)
Fire-Extinguisher#16 -Fire-ExtinguishInfluent PumpNoHours0.00
Monthly-InspectionerStation (Down
12/18/2018 01:27 pm18 of33.0

Sheet19

Equipment List Report Without Notes
SRTTP
Average
EquipmentTypeLocationDepartmentMeteredUnitsPer Day
stairway,inside)
Fire-Extinguisher#17 -Fire-ExtinguishOOOPS BldgNoHours0.00
Monthly-Inspectioner(Inside)
Electric Room 804 - SweepElectric roomNoHours0.00
Room
Blower Room - Sweep RoomBlower RoomNoHours0.00
OOOPS sample pumpsample pumpOOPSNoHours0.00
(WET-WELL) - sample pump
odor bed sprinklers -NoHours0.00
sprinklers
polymer tote(Grit collector) -NoHours0.00
polymer tote
04- DiskFilter#4 - FilterFilterDisk FilterNoHours0.00
03-P-265 - SBR 6 WASSubmersable03-SBR 6NoHours0.00
Submersable Pumppump
03-P-275 - SBR 7 WASSubmersable03-SBR 7NoHours0.00
Submersable PumpPump
SF-6 - supply fan #6supply fanSBR BlowerNoHours0.00
Room
SF-7 - supply fan #7supply fanSBR BlowerNoHours0.00
Room
04-VFD-140.SVX9000EATOVFDSouth ElectricalNoHours0.00
N - Filter Feed Pump #4 VFDRoom
04-P-140 - Filter Feed PumpPump04-Flow EQNoHours0.00
#4Basin
03-B-111 - SBR Blower #1BlowerOperationsNoHours0.00
Building/Blower
Room
03-B-121 - SBR Blower #2BlowerOperationsNoHours0.00
Building/Blower
Room
03-B-131 - SBR Blower #3BlowerOperationsNoHours0.00
Building/Blower
Room
03-B-141 - SBR Blower #4BlowerOperationsNoHours0.00
Building/Blower
Room
12/18/2018 01:27 pm19 of33.0

Sheet20

Equipment List Report Without Notes
SRTTP
Average
EquipmentTypeLocationDepartmentMeteredUnitsPer Day
03-B-151 - SBR Blower #5BlowerOperationsNoHours0.00
Building/Blower
Room
03-B-161 - SBR Blower #6BlowerOperationsNoHours0.00
Building/Blower
Room
03-B-171 - SBR Blower #7BlowerOperationsNoHours0.00
Building/Blower
Room
04-M-260 - Diskfilter #4 DriveDrive Motor04-Disk Filter# 4NoHours0.00
Chain
04-P-265 - FilterPump04-Diskfilter4NoHours0.00
Backwash/Sludge pump 1A
04-P-270 - FilterPump04-Diskfilter4NoHours0.00
Backwash/Sludge Pump 1B
02-BS-MCP2 - MechanicalBarscreen02 Influent PumpNoHours0.00
Barscreen No.2Station
02-WC-MCP2 - ScreeningsCompactor02-Influent PumpNoHours0.00
Washer-Compactor No.2Station
02-SG-280 - BypassgateIPS OverflowNoHours0.00
Diversion Box
02-SG-281 - BackflushGateNext to ooopsNoHours0.00
Diversion Box TO Lemon
Grove
01-M-200 - EmergencyEmergencysouthsideNoHours0.00
Electrical Generator#2Generator
04-BFV-140 - EQ Basin 3butterfly valve04-EQ BasinNoHours0.00
Inlet valve
Reclaimed line 2" -next to disk filterNoHours0.00
Reclaimed line#3 (next to wall)
south side
Sump(Drain to headworks) -chemical storageNoHours0.00
sump(Drain to
headworks)
Polymer tote(ChemicalChemicalNoHours0.00
Storage) - polymer toteStorage
fork lift(TL943) - forkNoHours0.00
lift(refilled)
02-SCR-260 - Influent DrumDrum screenNoHours0.00
12/18/2018 01:27 pm20 of33.0

Sheet21

Equipment List Report Without Notes
SRTTP
Average
EquipmentTypeLocationDepartmentMeteredUnitsPer Day
Screen NO.1
02-SCR-270 - Influent DrumDrum screenNoHours0.00
Screen NO.2
Dilution Air Fan #1 - BlowerBlower06-chemicalNoHours0.00
#1stroage area
Dilution Air Fan #2 - BlowerBlower06-ChemicalNoHours0.00
#2Stroage Area
08-C-210 - Centrifuge #1Centrifuge05-SolidsNoHours0.00
Handling
08-C-220 - Centrifuge #2Centrifuge05-SolidsNoHours0.00
Handling
05-B-110 - Aerobic DigesterBlowerBlower roomNoHours0.00
Blower(N.west)
05-B-120 - Aerobic DigesterBlowerBlower roomNoHours0.00
Blower(N.west)
05-B-130 - Aerobic DigesterBlowerBlower Room(NoHours0.00
BlowerN.West)
05-B-140 - Aerobic DigesterBlowerBlower roomNoHours0.00
Blower(N.West)
05-B-103 - Was Holding TankBlowerBlower RoomNoHours0.00
Blower(N.west)
02-WC-MCP1 - ScreeningWasher02-Influent PumpNoHours0.00
washer compactor No.1CompactorStation
05-P-101Rotary Lobe Pump -Solids PumpAdjacent to theNoHours0.00
Rotary Lobe Solids PumpWAS Holding
No.1Tank
05-P-102 Rotary Lobe PumpSolids PumpAdjacent to theNoHours0.00
- Rotary Lobe Solids PumpWAS Holding
Tank
Fire-Extinguisher# 18 -Fire-ExtinguishNew BldgNoHours0.00
Monthly-inspectioner200831D(Elec.R
oom)
Fire-Extinguisher#19 -Fire-ExtinguishNew BldgNoHours0.00
Monthly-Inspectioner200831D
(Blower Room)
P-100 (sample Pump) -NoHours0.00
sample pump
P-400(Sample Pump) -NoHours0.00
12/18/2018 01:27 pm21 of33.0

Sheet22

Equipment List Report Without Notes
SRTTP
Average
EquipmentTypeLocationDepartmentMeteredUnitsPer Day
sample pump
AD-3 - Methanol Feed pumpfeed pumpSBR MethanolNoHours0.00
No.1System
06-P-281 - Methanol FeedFeed PumpSBR MethanolNoHours0.00
Pump No1System
Golf Cart Camaro Z28 - golfNoHours0.00
cart
Golf Cart E-Z-GO #1 - golfNoHours0.00
cart
Vacuum cleaner - HooverVacuumNoHours0.00
Vacuum CleanerCleaner
wet well - wet welldrain pumpNoHours0.00
station
OOOPS EmergencyEmergencyNoHours0.00
Generator - EmergencyGenerator
Electrical Generator
Elec.Room 904 -UPSElec.Room 904NoHours0.00
Uninterruptible Power Supply
Solids Bldg - Drain coversSolids BldgNoHours0.00
Elec. Room 804 -UPSElec.Room804NoHours0.00
Uninterruptible Power Supply
Elec.Room (Bldg.200831D) -UPSBldg.200831DNoHours0.00
Uninterruptible Power Supply
Elec.Room (Bldg.200833) -UPSOOOPS BLDGNoHours0.00
Uninterruptible Power Supply
ballast - replace ballast inlocker roomNoHours0.00
locker room
Solar/smartgrid 300 - 382 KWsolarNoHours0.00
Solar Site
02-AIT-100D - PhosphateAnalyzerInfluent PumpNoHours0.00
AnalyzerStation
FiltrationModule(Phosphate) -Influent pumpNoHours0.00
Filtration Module(Phosphate)Station
sump pump Chemical .S.A -chemical storageNoHours0.00
sump pumparea
03-FV-220 - SBR 2 Influentplug valve03-SBR-2NoHours0.00
Isolation Valve
12/18/2018 01:27 pm22 of33.0

Sheet23

Equipment List Report Without Notes
SRTTP
Average
EquipmentTypeLocationDepartmentMeteredUnitsPer Day
PGM - Plant GeneralSRTTPNoHours0.00
Maintenace
Bisulfite Tank-CheckTankNext To OOOPSNoHours0.00
Level - Bisulfite TankBLDG.
Grit pump (Sump pump) -Grit Pump AreaNoHours0.00
Sump Pump
08-HM-210 - Hydraulic MotorMotor05-solidsNoHours0.00
(Grease)Handling
08-BDM-210 - BowlMotor05-solidsNoHours0.00
Drive(Motor)Handling
08-HM-220 - Hydraulic MotorMotor05-SolidsNoHours0.00
(Grease)Handling
08-BDM-220 - Bowl DriveMotor05-SolidsNoHours0.00
(Motor)Handling
08-M-110 - Thickened SludgeMotor05-SolidsNoHours0.00
MotorHandling
08-GBRM-110 - Gravity BeltMotor05-SolidsNoHours0.00
Roller MotorHandling
08-WM-110 - Gravity BeltMotor05-SolidsNoHours0.00
water Line (Motor)Handling
F-150 Ford Truck - Ford pickNoHours0.00
up truck
03-BFV-152 - SBR Air ValveButterfly ValveWestside byNoHours0.00
SBR#2
03-FV-281 - Air Valve(West)Air ValveUndergroundNoHours0.00
vault
03-FV-271 - Air Valve(East)Air ValveUndergroundNoHours0.00
vault
PV-100 - Power Valve(GearButterfly ValveChlorine ContactNoHours0.00
GS100.3)Basin(Northside)
PV-101 - Power ValveChlorine ContactNoHours0.00
Basin
(Southside)
Dodge Truck - MaintenanceSRTTPNoHours0.00
Truck
F-150 (Maintenance Truck) -SRTTPNoHours0.00
Truck
12/18/2018 01:27 pm23 of33.0

Sheet24

Equipment List Report Without Notes
SRTTP
Average
EquipmentTypeLocationDepartmentMeteredUnitsPer Day
02-P-410 - SubmersableSubmersableDrain PumpNoHours0.00
Pump No.1Pump No.1Station
02-P-400 - sampling PumpSamplingDrain PumpNoHours0.00
PumpStation
02-FIT-351 - Flow MeterFlow MeterDrain PumpNoHours0.00
Station
02-AIT-450(Drain PumpGas DetectorDrain PumpNoHours0.00
Station) - Combustible GasStation
Dectector
OOOPS W&T ChlorineEffluentOOOPS AREANoHours0.00
Analyzer - ChlorineAnalyzer
Analyzer(Wallace & Tiernan)
SWPP CORRECTIVE -SRTTPNoHours0.00
SWPP CORRECTIVE
Sweep Drum Screen Area -Drum ScreenNoHours0.00
Sweep (Under Dumpsters)Area
03-AIT-250 SBR#3 -Ammonia/NitraSBR #3NoHours0.00
Ammonia(service by Hach)te Probe
03-AIT-269A SBR#6 -AmmoniaSBR#6NoHours0.00
Ammonia /NitrateProbe
Probe(Service by Hach)
03-AIT-269B SBR#6 - NitrateNitrate probeSBR#6NoHours0.00
Probe (service by Hach)
03-AIT-279A SBR#7 -AmmoniaSBR#7NoHours0.00
Ammonia/NitrateProbe
Probe(Service by Hach)
03-AIT-279B SBR#7 - NitrateNitrate probeSBR#7NoHours0.00
Probe(service by Hach)
02-AIT-100D Phosphax &Phosphax &02-Influent PumpNoHours0.00
Filtrax - Service by HachFiltraxStation
04-AIT-290 Disk Filters -Ammonia &Disk FiltersNoHours0.00
Ammonia & NitrateNitrate probe
probe(service by Hach)
OOOPS Air Vac#1 - Air VacAir VacuumOOOPS LINENoHours0.00
Release Valve
OOOPS Air Vac#2 - Air VacAir VacuumOOOPS LINENoHours0.00
Release Valve
OOOPS Air Vac#3 - Air VacAir VacuumOOOPS LINENoHours0.00
Release Valve
12/18/2018 01:27 pm24 of33.0

Sheet25

Equipment List Report Without Notes
SRTTP
Average
EquipmentTypeLocationDepartmentMeteredUnitsPer Day
OOOPS Air Vac#4 - Air VacAir VacuumOOOPS LINENoHours0.00
Release Valve
OOOPS Air Vac#5 - Air VacAir VacuumOOOPS LINENoHours0.00
Release Valve
OOOPS Air Vac#6 - Air VacAir VacuumOOOPS LINENoHours0.00
Release Valve
A/C Unit-1 - Air ConditionerControl BuildingNoHours0.00
A/C Unit-2 - Air ConditionerControl BuildingNoHours0.00
Check for lockout/TagoutLockout/TagouSRTTPNoHours0.00
equip - Check fort
lockout/Tagout equip
Disinfection Contact Basin#1TankDisinfectionNoHours0.00
- Chlorine Contact BasinContact Basin
02-M-260 Motor No.1 - motormotorDrum screenNoHours0.00
02-M-270 Motor No.2 - motormotorDrum screenNoHours0.00
SF-8 - Supply fan#8Supply FanMaint.shopNoHours0.00
Suction Valve - Suction ValveAerobic DigesterNoHours0.00
# 1
General Maintenance -NoHours0.00
SRTTP General Maintenance
05-M-101 Rotary Lobe -MotorAdjacent to theNoHours0.00
Rotary lobe MotorWAS Holding
Tank
05-M-102 Rotary Lobe -MotorAdjacent to theNoHours0.00
Rotary Lobe MotorWAS Holding
Tank
TRASH PUMP( MULTIQUIP)PUMP(Diesel)NoHours0.00
- Portable Pump
04-AIT-340 ( Rosemount) -MeterDisinfectionNoHours0.00
CCTContact Tank
04-FIT-510 (Front Gate) -MeterRWPSNoHours0.00
RWPS
02-FIT-180(COMPLI.SIEMEMeter02-Influent pumpNoHours0.00
NS) - Raw sewage flowstation
meter(Compliance-Siemens)
drum screen wheels - wheelDrum screenNoHours0.00
area
12/18/2018 01:27 pm25 of33.0

Sheet26

Equipment List Report Without Notes
SRTTP
Average
EquipmentTypeLocationDepartmentMeteredUnitsPer Day
RWPS Water Tank Bladder -RWPSNoHours0.00
Water Tank Bladder
UPS.(200831A) GE8K -SRTTPNoHours0.00
Uninterruptible Power Supply(Bldg.200831A)
CCBV - influent valveChlorine ContactNoHours0.00
chlorine contact basin 1Basin
UPS(200831B)EATON 9PKUPSSRTTPNoHours0.00
11000 - Uninterruptible(Bldg.200831B)
Power Supply
UPS.200831B - ValveSRTTPNoHours0.00
Regulated Lead-Acid(Bldg.200831B)
UPS( VRLA )200831D -SRTTP(NoHours0.00
Valve Regulated Lead -AcidBldg.200831D)
UPS.(200831D)PW 9155-3 -SRTTPNoHours0.00
Uninterruptible Power Supply(Bldg.200831D)
UPS.(OOOPS)Smart 2200 -SRTTP(OOOPS)NoHours0.00
Uninterruptible Power Supply
First Aid Station(locker roomBldg.200831ANoHours0.00
- First Aid Station(Locker Room)
FirstAidStationElec.Room804Elec.RoomNoHours0.00
- First aid Station804,Next to Miox
Room
First Aid StationMaint-shop -Bldg.200831DNoHours0.00
First aid Station
First Aid Station.OOOPSOOOPSNoHours0.00
-Bldg - First aid StationBldg.200833
Empty polymer totes -Next to gritNoHours0.00
polymer totescollector
03-AIT-273 SBR#6 - DOSBR # 6NoHours0.00
Probe
03-AIT-269 A SBR#6 -SBR # 6NoHours0.00
Ammonia/Nitrate Probe
03-AIT-269 B - Nitrate ProbeSBR # 6NoHours0.00
03-AIT-270 - Solid TS ProbeSBR # 6NoHours0.00
03-AIT-272 SBR#6 - ORPSBR # 6NoHours0.00
Probe
03-AIT-273 - PH ProbeSBR # 6NoHours0.00
12/18/2018 01:27 pm26 of33.0

Sheet27

Equipment List Report Without Notes
SRTTP
Average
EquipmentTypeLocationDepartmentMeteredUnitsPer Day
Miox room (TransferMiox RoomNoHours0.00
pump#2) - Hypo transfer
pump
AC-1Split System Air HandlerMaint.shopNoHours0.00
- HVAC Unit
03-AIT-285 - TSS ProbeSBR # 7NoHours0.00
03-AIT-288 - PH ProbeSBR # 7NoHours0.00
03-AIT-242 SBR#3 - ORPSBR # 3NoHours0.00
Probe
03-AIT-240 - TSS ProbeSBR # 3NoHours0.00
03-AIT-243 - PH ProbeSBR # 3NoHours0.00
Aerobic D-3 - AerobicAerobic DigesterNoHours0.00
Diegster# 3
Skid Steer - bucketSludge BedsNoHours0.00
attachment
D-3 - DigesterDigester # 3NoHours0.00
SBR #7 DECANTER -SBR #7NoHours0.00
Decanter
EQ- Basin #3 - EqualizationEQ #3NoHours0.00
Basin #3
06-P-283 - Methanol FeedSBR MethanolNoHours0.00
pump No.2System
EQ- Basin #2 - EqualizationEQ #2NoHours0.00
Basin # 2
EQ-Basin #1 - EqualizationEQ #1NoHours0.00
Basin # 1
Drain Pump Station -Next to DrumNoHours0.00
Wet-WellScreens
Bio Solids Pump Station -Next To DryingNoHours0.00
Wet-WellBeds
Elec.light pole - light poleLight pole next toNoHours0.00
filter feed pumps
Odor Bed #3 - Gauge 0-30Odor BedsNoHours0.00
,in H20
04-FIT-240 - Disk filter TOFlow MeterDisk filter TONoHours0.00
OOOPSOOOPs
12/18/2018 01:27 pm27 of33.0

Sheet28

Equipment List Report Without Notes
SRTTP
Average
EquipmentTypeLocationDepartmentMeteredUnitsPer Day
02-P-130 - SubmersiblePump02-Influent PumpNoHours0.00
PumpStation
Golf Cart.Maint.cart -NoHours0.00
E-Z-GO.Maint.cart
Safety Shower - EyewashSRTTPNoHours0.00
Methanol Upper SafetyMethanol AreaNoHours0.00
Shower - Eyewash Shower
02-VFD-140.SVX9000CUTLVFDops buildingNoHours0.00
ERHAMMER - Influentelectrical room
Pump#4 VFD
05-VFD-210.SVX9000EATOVFDNorth Elec.RoomNoHours0.00
N - Digested Sludge Pump#1
05-VFD-220.SVX9000EATOVFDNorth Elec.RoomNoHours0.00
N - Digested Sludge Pump#2
05-VFD-230.SVX9000EATOVFDNorth Elec.RoomNoHours0.00
N - Digested Sludge Pump#3
08-VFD-110.SVX9000EATOVFDNorth Elec.RoomNoHours0.00
N - Thickened Sludge
Pump#1
05-VFD-101.SVX9000EATOVFDNorth Elec.RoomNoHours0.00
N - GBT Feed Pump#1
05-VFD-102.SVX9000EATOVFDNorth Elec.RoomNoHours0.00
N - GBT Feed Pump#2
03-VFD-111 - SBR Blower#1VFDSouth.SBRNoHours0.00
Blower Room
03-VFD-121 - SBR Blower#2VFDSouth.SBRNoHours0.00
Blower Room
03-VFD-131 - SBR Blower#3VFDSouth.SBRNoHours0.00
Blower Room
03-VFD-141 - SBR Blower#4VFDSouth.SBRNoHours0.00
Blower Room
03-VFD-151 - SBR Blower#5VFDSouth.SBRNoHours0.00
Blower Room
03-VFD-161 - SBR Blower#6VFDSouth.SBRNoHours0.00
Blower Room
03-VFD-171 - SBR Blower#7VFDSouth.SBRNoHours0.00
Blower Room
12/18/2018 01:27 pm28 of33.0

Sheet29

Equipment List Report Without Notes
SRTTP
Average
EquipmentTypeLocationDepartmentMeteredUnitsPer Day
Fire-Extinguisher #18A -FireNorth Exit DoorNoHours0.00
Monthly inspectionExtinguisher(rightside)
08-FIT-120 (SIEMENS) -Flow MeterSolids BuildingNoHours0.00
GBT TO Dig.
08-FIT-110 (SIEMENS) - DIg.Flow MeterSolids BuildingNoHours0.00
TO Gravity Belt
08-FIT-210 (SIEMENS) -Flow MeterSolids BuildingNoHours0.00
DIG. TO Centrifuge
02-FIT-351 (SIEMENS) -Flow MeterInfront of DrumNoHours0.00
Drain Pump Station TO SBRscreen Area
Influent(Vault)
04-FIT-240 (SIEMENS) -Flow MeterNext ToNoHours0.00
Disk filter TO OverflowOverflow Weir
01-EW - Eye Wash StationOOOPSNoHours0.00
02-EW - Eye Wash StationMaintenaceNoHours0.00
Shop
Gravity Belt (Polymer Line) -Solids BuildingNoHours0.00
GBT Polymer Line
inspect ladders - safetySRTTPNoHours0.00
equipment
Catch Basin - Catch BasinNoHours0.00
,Sweap
Swap Influent Flow Meters -Influent PumpNoHours0.00
Flow MetersStation
UPS Batteries(Taps 1) -TAPS 1NoHours0.00
Batteries
UPS Batteries(Water Tower)Water towerNoHours0.00
- Batteries
GAS ALERT MAX XTll (#19)SRTTPNoHours0.00
- Gas Alert
GAS ALERT MAX XTll (#54)SRTTPNoHours0.00
- Gas Alert
GAS ALERT MAX XTll (#58)SRTTPNoHours0.00
- Gas Alert
PLC-7 - PLC-Disk filter#4PLCDisk filter#4NoHours0.00
Ford Truck 4x4 (ON CALL) -SRTTPNoHours0.00
On call truck
12/18/2018 01:27 pm29 of33.0

Sheet30

Equipment List Report Without Notes
SRTTP
Average
EquipmentTypeLocationDepartmentMeteredUnitsPer Day
AlumStorageArea(polymerAlum StorageNoHours0.00
Mixer) - MotorArea
03-CV-265 - SBR WASCheck Valve03-SBR#6NoHours0.00
PUMP #6 Discharge Check
Valve
03-CV-275 - SBR WASCheck Valve03-SBR#7NoHours0.00
PUMP #7 Discharge Check
Valve
heavy equipment - forkliftSRTTPNoHours0.00
skidsteers wheel loader
dump truck
03-AIT-287 SBR#7 - ORPSBR#7NoHours0.00
Probe
03-AIT-276 SBR#7 - DOSBR#7NoHours0.00
Probe
03-AIT-236 SBR#3 - SBR#3D.O Probe03-SBR#3NoHours0.00
D.O. Analyzer/Xmitter Probe
04-M-240 - Disk filter#3 driveDrive Motor04-Disk Filter#3NoHours0.00
Chain
SRTTP Spill Kit - Spill KitSRTTPNoHours0.00
inspection
SRTTP ARC Flash Suit -SRTTPNoHours0.00
ARC Flash inspection
Chlorine Contact SampleWestsideNoHours0.00
Pump - SampleChlorine Contact
Pump(Westside) To DiskTank To Disk
FiltersFilters
Empty old polymer totes -SRTTPNoHours0.00
polymer tote
Bisulfite Pump NO.1 - LMIOOOPS AREANoHours0.00
Pump
Bisulfite Pump No.2 - LMIOOOPS AREANoHours0.00
Pump
Reclaim Line - 2" DigesterDigester/WasNoHours0.00
Tanks
Bisulfite Tank Drain Valve -ValveOOOPS AreaNoHours0.00
Drain Valve
Used Oil 55Gal Drums -By GritNoHours0.00
55Gal DrumsCollectors
12/18/2018 01:27 pm30 of33.0

Sheet31

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .