SRTTP Compliance Equipment List.xlsx
XLSX spreadsheet 82 KB Posted
- Solicitation number
- N6247319R0033
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Equipment List Report Without Notes | ||||||
| SRTTP | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| 02-BS-210 - Bar Screen No. | Bar Screen | 02 - Influent | No | Hours | 0.00 | |
| 2.0 | Pump Station | |||||
| 02-BS-220 - Mechanical Bar | Bar Screen | 02- Influent | No | Hours | 0.00 | |
| Screen No. 1 | Pump Station | |||||
| 02-FE/FIT-170 - Raw | Flow Meter | 02- Influent | No | Hours | 0.00 | |
| Sewage Flowmeter | Pump Station | |||||
| 02-P-110 - Submersible | Pump | 02-Influent Pump | No | Hours | 0.00 | |
| Pump | Station | |||||
| 02-P-120 - Submersible | Pump | 02-Influent Pump | No | Hours | 0.00 | |
| Pump | Station | |||||
| A-D-3 - Aerobic Digester | Basin | Aerobic Digester | No | Hours | 0.00 | |
| 3.0 | ||||||
| 02-P-140 - Submersible | Pump | 02-Influent Pump | No | Hours | 0.00 | |
| Pump | Station | |||||
| 02-P-151 - Sump Pump | Pump | 02-Influent Pump | No | Hours | 0.00 | |
| Station | ||||||
| 02-P-152 - Sump Pump | Pump | 02-Influent Pump | No | Hours | 0.00 | |
| Station | ||||||
| 02-P-321 - Grit Pump | Pump | 02- Grit Collector | No | Hours | 0.00 | |
| Station | ||||||
| 02-P-351 - Grit Pump | Pump | 02-Grit Collector | No | Hours | 0.00 | |
| Station | ||||||
| 04-AE/AIT-280 - Disk Filter | Turbidity Meter | 04- disk filter | No | Hours | 0.00 | |
| Effluent Turdidity analyzer | ||||||
| 04-AE/AIT-350 - Disinfection | Cl2 Analyzer | 04- Disinfection | No | Hours | 0.00 | |
| Contact Basin Inluent Cl2 | Contact Basin | |||||
| Residual Analyzer | ||||||
| 04-AE/AIT-340 - Disinfection | Cl2 Analyzer | 04- Disinfection | No | Hours | 0.00 | |
| contact Basin effluent Cl2 | contact Basin | |||||
| Residual Analyzer | ||||||
| 04-FE/FIT-285 - Disk Filter | Flow Meter | 04-Disk Filters | No | Hours | 0.00 | |
| Backwash Flowmeter | ||||||
| 04-FE/FIT-300 - Disk Filter | Flow Meter | 04-Disk Filter | No | Hours | 0.00 | |
| Effluent Flowmeter | ||||||
| 04-FE/FIT-361 - Reclaimed | Flow Meter | 04-Reclaimed | No | Hours | 0.00 | |
| Water Effluent Flowmeter | Water Pump | |||||
| Station | ||||||
| 04-P-110 - Filter Feed Pump | Pump | 04-Flow EQ | No | Hours | 0.00 | |
| 12/18/2018 01:27 pm | 1 of | 33.0 |
Sheet2
| Equipment List Report Without Notes | ||||||
| SRTTP | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| 1.0 | Basin | |||||
| 04-P-120 - Filter Feed Pump | Pump | 04-Flow EQ | No | Hours | 0.00 | |
| 2.0 | Basin | |||||
| 04-P-130 - Filter Feed Pump | Pump | 04- Flow EQ | No | Hours | 0.00 | |
| 3.0 | Basin | |||||
| 04-P-205 - Filter | Pump | 04-Disk Filter 1 | No | Hours | 0.00 | |
| Backwash/Sludge Pump 1A | ||||||
| 04-P-210 - Filter | Pump | 04-Disk Filter 1 | No | Hours | 0.00 | |
| Backwash/Sludge Pump 1B | ||||||
| 04-P-225 - Filter | Pump | 04-Disk Filter 2 | No | Hours | 0.00 | |
| Backwash/sludge Pump 2A | ||||||
| 04-P-230 - Filter | Pump | 04-Disk Filter 2 | No | Hours | 0.00 | |
| Backwash/Sludge Pump 2B | ||||||
| 04-P-245 - Filter | Pump | 04-Disk Filter 3 | No | Hours | 0.00 | |
| Backwash/Sludge Pump 3A | ||||||
| 04-P-250 - Filter | Pump | 04-Disk Filter 3 | No | Hours | 0.00 | |
| Backwask/Sludge Pump 3B | ||||||
| 04-P-280 - Disk Filter Effluent | Pump | 04-disk Filter | No | Hours | 0.00 | |
| Turbidity Sample Pump | ||||||
| 04-P-305 - Disinfection | Pump | 04-Disinfection | No | Hours | 0.00 | |
| contact Basin Influent Cl2 | Contact Basin | |||||
| Residual Sample Pump | ||||||
| 04-P-310 - Reclaimed Water | Pump | 04-Reclaimed | No | Hours | 0.00 | |
| Pump 1 | Water Pump | |||||
| Station | ||||||
| 04-P-320 - Reclaimed Water | Pump | 04-Reclaimed | No | Hours | 0.00 | |
| Pump 2 | Water Pump | |||||
| Station | ||||||
| 04-P-330 - Reclaimed Water | Pump | 04-Reclaimed | No | Hours | 0.00 | |
| Pump 3 | Water Pump | |||||
| Station | ||||||
| 05-FE/FIT-101 - Aerobic | Flow Meter | 05-Digester | No | Hours | 0.00 | |
| Digester Influent Flow Meter | ||||||
| (WAS Meter) | ||||||
| 05-FE/FIT-110 - Digested | Flow Meter | 05-Soldis | No | Hours | 0.00 | |
| Sludge Flowmeter (gravity | Handling Room | |||||
| belt) NEW | ||||||
| 05-FE/FIT-210 - Digested | Flow Meter | 05-Solids | No | Hours | 0.00 | |
| Sludge Flow Meter | Handling Room | |||||
| 12/18/2018 01:27 pm | 2 of | 33.0 |
Sheet3
| Equipment List Report Without Notes | ||||||
| SRTTP | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| (Centrifuge) NEW | ||||||
| 05-M-120 - Aerobic Digester | Motor | North Blower | No | Hours | 0.00 | |
| Blower (MOTOR) | Room | |||||
| 05-M-130 - Aerobic Digester | Motor | North Blower | No | Hours | 0.00 | |
| Blower (MOTOR) | Room | |||||
| 05-M-140 - Aerobic Digester | Motor | Notrh Blower | No | Hours | 0.00 | |
| Blower (MOTOR) | Room | |||||
| 05-M-311 - Gravity Belt | Gravity Belt | 05-Solids | No | Hours | 0.00 | |
| Thickener | Handling Room | |||||
| 05-M-410 - Belt Filter Press 1 | Belt Press | 05-Solids | No | Hours | 0.00 | |
| Handling Room | ||||||
| 05-M-420 - Belt Filter Press 2 | Belt press | 05-Solids | No | Hours | 0.00 | |
| Handling | ||||||
| 05-M-430 - Sludge Conveyor | Conveyor | 05-Solids | No | Hours | 0.00 | |
| Belt 1 | Handling Room | |||||
| 05-P-210 - Digested Sludge | Pump | 05-Aerobic | No | Hours | 0.00 | |
| Pump 1 | Digester | |||||
| 05-P-220 - Digested Sludge | Pump | 05-Aerobic | No | Hours | 0.00 | |
| Pump 2 | Digestor | |||||
| 05-P-230 - Digested Sludge | Pump | 05-Aerobic | No | Hours | 0.00 | |
| Pump 3 | Digester | |||||
| 08-P-110 - Thickened Sludge | Pump | 05-solids | No | Hours | 0.00 | |
| Pump | Handling Room | |||||
| 06-M-410 - Polymer Blender | Polymer Mixer | 06-Chemical | No | Hours | 0.00 | |
| 1.0 | Storage Area | |||||
| 06-M-420 - Polymer Blender | Polymer Mixer | 06-Chemical | No | Hours | 0.00 | |
| 2.0 | Storage | |||||
| Handling | ||||||
| 06-M-430 - Polymer Blender | Polymer Mixer | 06-Chemical | No | Hours | 0.00 | |
| 3.0 | Storage Area | |||||
| 06-P-210 - Brine Transfer | Pump | 06-Chemical | No | Hours | 0.00 | |
| Pump 1 | Storage Area | |||||
| 06-P-220 - Brine transfer | Pump | 06-Chemical | No | Hours | 0.00 | |
| Pump 2 | Stroage Area | |||||
| 06-P-320 - NaOCl Metering | Pump | 06-Chemical | No | Hours | 0.00 | |
| Pump #1 | Storage Area | |||||
| 06-P-330 - NaOCl Metering | Pump | 06-Chemical | No | Hours | 0.00 | |
| 12/18/2018 01:27 pm | 3 of | 33.0 |
Sheet4
| Equipment List Report Without Notes | ||||||
| SRTTP | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| Pump 2 | Stroage Area | |||||
| 06-T-1 - Storage Tank 1 | Tank | 06-Chemical | No | Hours | 0.00 | |
| Storage Area | ||||||
| 06-T-3 - NaOCl Storage Tank | Tank | 06-Chemical | No | Hours | 0.00 | |
| 1.0 | Stroage Area | |||||
| 06-T-4 - NaOCl Storage Tank | Tank | 06-Chemical | No | Hours | 0.00 | |
| 2.0 | Storage Area | |||||
| 06-T-5 - Salt Saturator Tank | Tank | 06-Chemical | No | Hours | 0.00 | |
| Storage Area | ||||||
| 02-M-311 - Grit Collector No. | Grit | 02-Grit Collector | No | Hours | 0.00 | |
| 1.0 | Station | |||||
| 04-P 310 - RW PUMPS AND | EFFLUENT | E. Q. BASIN | STAFF | No | Hours | 0.00 |
| FILTER FEED PUMPS | PUMPS | AND CHLORINE | ||||
| CONTACT | ||||||
| TANK | ||||||
| 02-M-341 - Grit Collector | Grit Collector | 02-Grit Collector | No | Hours | 0.00 | |
| No.2 | Station | |||||
| 02-M-361 - Grit Classifier | Grit Classifier | 02-Influent Pump | No | Hours | 0.00 | |
| no.2 | Station | |||||
| 02-M-230 - Screenings | Compactor | 02-Influent Pump | No | Hours | 0.00 | |
| Washer-Compactor No.1 | Station | |||||
| 04-M-200 - Disk Filter #1 | Drive Motor | 04-Disk Filter# 1 | No | Hours | 0.00 | |
| Drive | Chain | |||||
| 04-M-220 - Disk Filter 2 Drive | Drive Motor | 04-Disk Filter# 2 | No | Hours | 0.00 | |
| Chain | ||||||
| 011 - florescent lighting | emergency | control room | No | Hours | 0.00 | |
| ballast | ||||||
| 04-M-300 - Disinfection | Motor | 04-Disinfection | No | Hours | 0.00 | |
| Contact Basin Influent Mixer | contact Basin | |||||
| 05-AE/AIT-113 - Aerobic | DO Probe | 05-Digester 1 | No | Hours | 0.00 | |
| digester No 1 Dissolved O2 | ||||||
| Analyzer | ||||||
| 05-AE/AIT-133 - Aerobic | DO Probe | 05-Digester 2 | No | Hours | 0.00 | |
| Digester No 2 Dissolved O2 | ||||||
| Analyzer | ||||||
| 06-B-310 - Hydrogen Gas | Blower | 06-Chemical | No | Hours | 0.00 | |
| Dilution Blower 2 | Storage Area | |||||
| 07-C-1 - Odor Control Cell 1 | Bio Beds | No | Hours | 0.00 | ||
| 12/18/2018 01:27 pm | 4 of | 33.0 |
Sheet5
| Equipment List Report Without Notes | ||||||
| SRTTP | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| OOPS - Sub-pump | Pump | OOPS | No | Hours | 0.00 | |
| 01-golf cart- - Golf Cart | Golf Cart | SRTP | Gerneral | No | Hours | 0.00 |
| services | ||||||
| PMP 601 PUMP #2 - | OOOPS | No | Hours | 0.00 | ||
| OOOPS | ||||||
| PT-342 - PRESSURE | TRANSMITTE | TAPS 3 | No | Hours | 0.00 | |
| TRANSMITTER | R | |||||
| 01-FH-6 - Fire Hydrant | Fire Hydrant | Headworks | No | Hours | 0.00 | |
| 01-M-100 - Emergency | Emergency | NE Site | Yes | Hours | 1.00 | |
| Electrical Generator | Generator | |||||
| 01-RPBD-1 - Site Potable | Backflow | Headworks | No | Hours | 0.00 | |
| Water Backflow Preventor | Preventor | |||||
| 01-RPBD-2 - site Industrial | Backflow | Headworks | No | Hours | 0.00 | |
| Water Backflow Preventor | Preventor | |||||
| 01-RPBD-3 - Site Fire | Backflow | Headworks | No | Hours | 0.00 | |
| Protection Water Backflow | Preventor | |||||
| Preventor | ||||||
| 02-EF-5 - Influent Pump | Fan | 02-Influent Pump | No | Hours | 0.00 | |
| Station Pumproom Exhaust | Station | |||||
| Fan | ||||||
| 02-SF-5 - Influent Pump | Fan | 02- Influent | No | Hours | 0.00 | |
| Station supply Fan | Pump Station | |||||
| 02-AE/AIT-102 - Influent | Gas Detetor | 02-Influent Pump | No | Hours | 0.00 | |
| Wetwell Combustible Gas | Station | |||||
| Detector | ||||||
| 02-AE/AIT-315 - Grit | Gas Detector | 02-Grit Collector | No | Hours | 0.00 | |
| Collector #1 Combustible | 1.0 | |||||
| Gas Detector | ||||||
| 02-AE/AIT-345 - Grit collector | Gas Detector | 02-Grit Collector | No | Hours | 0.00 | |
| #2 Combustible Gas Detector | 2.0 | |||||
| 02-BS-MCP-1 - Mechanical | Control Panel | 02-Influent Pump | No | Hours | 0.00 | |
| Barscreen N0.1 | Station | |||||
| 02-GAT-210 - Bar Screen #1 | Slide Gate | 02-Influent Pump | No | Hours | 0.00 | |
| Influent Gate | Station | |||||
| 02-GAT-211 - Bar Screen #1 | Slide Gate | 02-Influent Pump | No | Hours | 0.00 | |
| Effluent Gate | Station | |||||
| 02-GAT-240 - Bar Screen #2 | Slide Gate | 02-Influent Pump | No | Hours | 0.00 | |
| Influent Gate | Station | |||||
| 12/18/2018 01:27 pm | 5 of | 33.0 |
Sheet6
| Equipment List Report Without Notes | ||||||
| SRTTP | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| 02-GAT-241 - Bar Screen #2 | Slide Gate | 02-Influent Pump | No | Hours | 0.00 | |
| Effluent Gate | Station | |||||
| 02-GAT-310 - Grit Collector | Slide Gate | 02-Grit Collector | No | Hours | 0.00 | |
| #1 Influent Gate | ||||||
| 02-GAT-312 - Grit Collector | Slide Gate | 02-Grit Collector | No | Hours | 0.00 | |
| #1 Effluent Gate | ||||||
| 02-GAT-340 - Grit Collector | Slide Gate | 02-Grit Collector | No | Hours | 0.00 | |
| #2 Influent Gate | ||||||
| 02-GAT-342 - Grit Collector | Slide Gate | 02-Grit Collector | No | Hours | 0.00 | |
| #2 Effluent Gate | ||||||
| 02-KGV-110 - IPS #1 Knife | Knife Valve | 02-Influent Pump | No | Hours | 0.00 | |
| Gate | Station | |||||
| 02-KGV-120 - IPS #2 Knife | Knife Gate | 02-Influent Pump | No | Hours | 0.00 | |
| Gate | Station | |||||
| 02-KGV-130 - IPS #3 Knife | Knife Gate | 02-Influent Pump | No | Hours | 0.00 | |
| Gate | Station | |||||
| 02-KGV-140 - IPS #4 Knife | Knife Gate | 02-Influent Pump | No | Hours | 0.00 | |
| Gate | Station | |||||
| 02-KGV-171 - Flowmeter | Knife Gate | 02-Influent Pump | No | Hours | 0.00 | |
| Influent Knife Gate | Station | |||||
| 02-KGV-172 - Flowmeter | Knife Gate | 02-Influent Pump | No | Hours | 0.00 | |
| Effluent Knife Gate | Station | |||||
| 02-KGV-173 - Flowmeter | Knife Gate | 02-Influent Pump | No | Hours | 0.00 | |
| Bypass Influent Knife Gate | Station | |||||
| 02-LE/LIT-100A - Wetwell | Level | 02-Influent Pump | No | Hours | 0.00 | |
| Level Xmtr #1 | Transmitter | Station | ||||
| 02-LE/LIT-100B - Wetwell | Level | 02-Influent Pump | No | Hours | 0.00 | |
| Level Xmtr #2 | Transmitter | Station | ||||
| 02-LE/LIT-221 - Bar Screen | Level | 02-Influent Pump | No | Hours | 0.00 | |
| #1 Influent Channel Level | Transmitter | Station | ||||
| Xmtr | ||||||
| 02-LE/LIT-222 - Bar Screen | Level | 02-Influent Pump | No | Hours | 0.00 | |
| #1 Effluent Channel Level | Transmitter | Station | ||||
| Xmtr | ||||||
| 02-LSLL-100A - Influent | Level Switch | 02-Influent Pump | No | Hours | 0.00 | |
| Pump Station Wetwell Level | Station | |||||
| Switch #1 | ||||||
| 02-LSLL-100B - Influent | Level Switch | 02-Influent Pump | No | Hours | 0.00 | |
| 12/18/2018 01:27 pm | 6 of | 33.0 |
Sheet7
| Equipment List Report Without Notes | ||||||
| SRTTP | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| Pump Station Wetwell Level | Station | |||||
| Switch #2 | ||||||
| 02-PV-322 - Grit Pump | Plug Valve | 02-Grit Collector | No | Hours | 0.00 | |
| Discharge Plug Valve | ||||||
| 02-PV-360 - Grit Classifier #2 | Plug Valve | 02-Influent Pump | No | Hours | 0.00 | |
| Inlet Plug Valve | Station | |||||
| 03-AE/AIT-216 - SBR #1 | D.O. Probe | 03-SBR #1 | No | Hours | 0.00 | |
| D.O. Analyzer/Xmitter Probe | ||||||
| 03-AE/AIT-226 - SBR #2 | D.O. Probe | 03-SBR #2 | No | Hours | 0.00 | |
| D.O. Analyzer/Xmitter Probe | ||||||
| Lighting Fixture - light fixture | Flourescent | Electrical Room | No | Hours | 0.00 | |
| Bulb | ||||||
| 03-AE/AIT-246 - SBR #4 | D.O. Probe | 03-SBR #4 | No | Hours | 0.00 | |
| D.O. Analyzer/Xmitter Probe | ||||||
| 03-AE/AIT-256 - SBR #5 | D.O. Probe | 03-SBR #5 | No | Hours | 0.00 | |
| D.O. Analyzer/Xmitter Probe | ||||||
| 03-B-110 - SBR Blower #1 | Blower | 03-Operations | No | Hours | 0.00 | |
| (OLD) | Building/Blower | |||||
| Room | ||||||
| 03-B-120 - SBR Blower #2 | Blower | 03-Operations | No | Hours | 0.00 | |
| (OLD) | Building/Blower | |||||
| Room | ||||||
| 03-B-130 - SBR Blower #3 | Blower | 03-Operations | No | Hours | 0.00 | |
| (OLD) | Building/Blower | |||||
| Room | ||||||
| 03-B-140 - SBR Blower #4 | Blower | 03-Operations | No | Hours | 0.00 | |
| (OLD) | Building/Blower | |||||
| Room | ||||||
| 03-B-150 - SBR Blower #5 | Blower | 03-Operations | No | Hours | 0.00 | |
| (OLD) | Building/Blower | |||||
| Room | ||||||
| 03-B-180 - Decant Blower 1A | Blower | 03-Operations | No | Hours | 0.00 | |
| Building/Blower | ||||||
| Room | ||||||
| 03-B-185 - Decant Blower 1B | Blower | 03-Operations | No | Hours | 0.00 | |
| Building/Blower | ||||||
| Room | ||||||
| 03-B-190 - Decant Blower 2A | Blower | 03-Operations | No | Hours | 0.00 | |
| Building/Blower | ||||||
| Room | ||||||
| 12/18/2018 01:27 pm | 7 of | 33.0 |
Sheet8
| Equipment List Report Without Notes | ||||||
| SRTTP | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| 03-B-195 - Decant Blower 2B | Blower | 03-Operations | No | Hours | 0.00 | |
| Building/Blower | ||||||
| Room | ||||||
| 03-FE/FIT-161 - SBR 1 & 2 | Flow Meter | 03-Operations | No | Hours | 0.00 | |
| aeration Air Flowmeter | Building- Blower | |||||
| Room | ||||||
| 03-FE/FIT-171 - SBR 3,4 & 5 | Flow Meter | 03-Operations | No | Hours | 0.00 | |
| aeration Air Flowmeter | Building- Blower | |||||
| Room | ||||||
| 03-FV-182 - SBR 1 Decant | Plug Valve | 03-Operations | No | Hours | 0.00 | |
| Press Manifold Flow Control | Building-Blower | |||||
| Valve | Room | |||||
| 03-FV-210 - SBR 1 Influent | Plug Valve | 03-SBR 1 | No | Hours | 0.00 | |
| Isolation Valve | ||||||
| Sludge Beds 1-6 - sludge | Sludge Beds 1-6 | No | Hours | 0.00 | ||
| beds | ||||||
| 03-FV-230 - SBR 3 Influent | Plug Valve | 03-SBR 3 | No | Hours | 0.00 | |
| Isolation Valve | ||||||
| 03-FV-240 - SBR 4 Influent | Plug Valve | 03-SBR 4 | No | Hours | 0.00 | |
| Isolation Valve | ||||||
| 03-FV-250 - SBR 5 Influent | Plug Valve | 03-SBR 5 | No | Hours | 0.00 | |
| Isolation Valve | ||||||
| 03-FV-211 - SBR 1 Aeration | Butterfly Valve | 03- SBR 1 | No | Hours | 0.00 | |
| air Supply Valve | ||||||
| 03-FV-221 - SBR 2 Aeration | Butterfly Valve | 03- SBR 2 | No | Hours | 0.00 | |
| air Supply Valve | ||||||
| 03-FV-231 - SBR 3 Aeration | Butterfly Valve | 03- SBR 3 | No | Hours | 0.00 | |
| Air Supply Valve | ||||||
| 03-FV-241 - SBR 4 Aeration | Butterfly Valve | 03- SBR 4 | No | Hours | 0.00 | |
| Air Supply Valve | ||||||
| 03-FV-251 - SBR 5 Aeration | Butterfly Valve | 03- SBR 5 | No | Hours | 0.00 | |
| Air Supply Valve | ||||||
| 04-LSHH-102 - EQ Basin #1 | Level Switch | 04- EQ Basin 1 | No | Hours | 0.00 | |
| Low Level Switch | ||||||
| 05-LE/LIT-110 - Aerobic | Level | 05-Digester 1 | No | Hours | 0.00 | |
| Digester #1 Level Transmitter | Transmitter | |||||
| 05-LE/LIT-130 - Aerobic | Level | 05-Digester 2 | No | Hours | 0.00 | |
| Digester #2 Level Transmitter | Transmitter | |||||
| 12/18/2018 01:27 pm | 8 of | 33.0 |
Sheet9
| Equipment List Report Without Notes | ||||||
| SRTTP | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| 05-LSHH-112 - Aerobic | Level Switch | 05-Digester 1 | No | Hours | 0.00 | |
| Digester #1 High Level | ||||||
| Switch | ||||||
| 05-M-305 - Gravity Belt | Static Mixer | 05-Gravity Belt | No | Hours | 0.00 | |
| Polymer Static Mixer | ||||||
| 06-STR-100 - Alum Stroage | Strainer | 06-Chemical | No | Hours | 0.00 | |
| Tank Strainer | Storage Area | |||||
| 03-PV-214 - SBR 1 WAS | Plug Valve | 03-SBR 1 | No | Hours | 0.00 | |
| Recirculation Valve | ||||||
| 03-PV-224 - SBR 2 WAS | Plug Valve | 03-SBR 2 | No | Hours | 0.00 | |
| Recirculation Valve | ||||||
| 04-BFV-308 - Disinfection | Butterfly Valve | 04-Disinfection | No | Hours | 0.00 | |
| contact Basin 1 Influent Valve | Contact Basin | |||||
| 04-FV-206 - Disk Filter 1 | Butterflty Vlv, | 04-Disk filter | No | Hours | 0.00 | |
| Sludge Suction Valve | Motorized | |||||
| 04-FV-226 - Disk Filter 2 | Butterflty Vlv, | 04-Disk filter | No | Hours | 0.00 | |
| Sludge Suction Valve | Motorized | |||||
| 04-FV-208 - Disk Filter 1 | Butterfly Vlv | 04-Disk Filter | No | Hours | 0.00 | |
| Backwash Valve 2 | Motorized | |||||
| 04-FV-211 - Disk Filter 1 | Butterfly Vlv | 04-Disk Filter | No | Hours | 0.00 | |
| Backwash Valve 4 | Motorized | |||||
| 04-FV-212 - Disk Filter 1 | Butterfly Vlv | 04-Disk Filter | No | Hours | 0.00 | |
| Backwash Valve 5 | Motorized | |||||
| 04-FV-213 - Disk Filter 1 | Butterfly Vlv | 04-Disk Filter | No | Hours | 0.00 | |
| Backwash Valve 6 | Motorized | |||||
| 04-FV-227 - Disk Filter 2 | Butterfly Vlv | 04-Disk Filter | No | Hours | 0.00 | |
| Backwash Valve 1 | Motorized | |||||
| 04-FV-232 - Disk Filter 2 | Butterfly Vlv | 04-Disk Filter | No | Hours | 0.00 | |
| Backwash Valve 5 | Motorized | |||||
| 04-FV-247 - Disk Filter 3 | Butterfly Vlv | 04-Disk Filter | No | Hours | 0.00 | |
| Backwash Valve 1 | Motorized | |||||
| 04-FV-248 - Disk Filter 3 | Butterfly Vlv | 04-Disk Filter | No | Hours | 0.00 | |
| Backwash Valve 2 | Motorized | |||||
| 03-M-212 - SBR 1 Mixer | Mixer | 03-SBR 1 | No | Hours | 0.00 | |
| 03-M-222 - SBR 2 Mixer | Mixer | 03-SBR 2 | No | Hours | 0.00 | |
| 03-M-232 - SBR 3 Mixer | Mixer | 03-SBR 3 | No | Hours | 0.00 | |
| 03-M-242 - SBR 4 Mixer 1 | Mixer | 03-SBR 4 | No | Hours | 0.00 | |
| 12/18/2018 01:27 pm | 9 of | 33.0 |
Sheet10
| Equipment List Report Without Notes | ||||||
| SRTTP | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| 03-M-243 - SBR 4 Mixer 2 | Mixer | 03-SBR 4 | No | Hours | 0.00 | |
| 03-M-252 - SBR 5 Mixer 1 | Mixer | 03-SBR 5 | No | Hours | 0.00 | |
| 03-M-253 - SBR 5 Mixer 2 | Mixer | 03-SBR 5 | No | Hours | 0.00 | |
| 03-P-215 - SBR 1 WAS | Submersable | 03-SBR 1 | No | Hours | 0.00 | |
| Submersable Pump | Pump | |||||
| 03-P-225 - SBR 2 WAS | Submersable | 03-SBR 2 | No | Hours | 0.00 | |
| Submersable Pump | Pump | |||||
| 03-P-235 - SRB 3 WAS | Submersable | 03-SBR 3 | No | Hours | 0.00 | |
| Submersable Pump | Pump | |||||
| 03-P-245 - SRB 4 WAS | Submersable | 03-SBR 4 | No | Hours | 0.00 | |
| Submersable Pump | Pump | |||||
| 03-P-255 - SRB 5 WAS | Submersable | 03-SBR 5 | No | Hours | 0.00 | |
| Submersable Pump | Pump | |||||
| 04-LE/LIT-101 - EQ Basin 1 | Level | 04-EQ Basin | No | Hours | 0.00 | |
| Level Xmitter | Transmitter | |||||
| 04-LE/LIT-106 - EQ Basin 2 | Level | 04-EQ Basin | No | Hours | 0.00 | |
| Level Xmitter | Transmitter | |||||
| 04-LE/LIT-201 - Disk Filter 1 | Level | 04-Disk Filter 1 | No | Hours | 0.00 | |
| Level Xmitter | Transmitter | |||||
| 04-LE/LIT-221 - Disk Filter 2 | Level | 04-Disk Filter 2 | No | Hours | 0.00 | |
| Level Xmitter | Transmitter | |||||
| 04-LE/LIT-231 - Disk Filter 3 | Level | 04-Disk Filter 3 | No | Hours | 0.00 | |
| Level Xmitter | Transmitter | |||||
| 04-LE/LIT-350A - Disinfection | Level | 04-Disinfection | No | Hours | 0.00 | |
| Contact Basin Level Xmitter | Transmitter | Contact Basin | ||||
| 04-LE/LIT-350B - Disinfection | Level | 04-Disinfection | No | Hours | 0.00 | |
| Contact Basin Level Xmitter | Transmitter | Contact Basin | ||||
| 04-LE/LIT-400 - Off Spec | Level Xmitter | 04-Off Spec | No | Hours | 0.00 | |
| Tank Level Xmitter | Tank | |||||
| 04-LSHH-222 - Disk Filter 2 | Level Switch | 04-Disk Filter 2 | No | Hours | 0.00 | |
| High Level Switch | ||||||
| 03-PV-234 - SBR 3 WAS | Plug Valve | 03-SBR 3 | No | Hours | 0.00 | |
| Recirculation Valve | ||||||
| 03-PV-244 - SBR 4 WAS | Plug Valve | 03-SBR 4 | No | Hours | 0.00 | |
| Recirculation Valve | ||||||
| 03-PV-254 - SBR 5 WAS | Plug Valve | 03-SBR 5 | No | Hours | 0.00 | |
| 12/18/2018 01:27 pm | 10 of | 33.0 |
Sheet11
| Equipment List Report Without Notes | ||||||
| SRTTP | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| Recirculation Valve | ||||||
| 03-PV-215 - SBR 1 WAS | Plug Valve | 03-SBR 1 | No | Hours | 0.00 | |
| Pump Discharge Valve | ||||||
| 03-PV-225 - SBR 2 WAS | Plug Valve | 03-SBR 2 | No | Hours | 0.00 | |
| Pump Discharge Valve | ||||||
| 03-PV-235 - SBR 3 WAS | Plug Valve | 03-SBR 3 | No | Hours | 0.00 | |
| Pump Discharge Valve | ||||||
| 03-PV-245 - SBR 4 WAS | Plug Valve | 03-SBR 4 | No | Hours | 0.00 | |
| Pump Discharge Valve | ||||||
| 03-PV-255 - SBR 5 WAS | Plug Valve | 03-SBR 5 | No | Hours | 0.00 | |
| Pump Discharge Valve | ||||||
| 04-FV-253 - Disk Filter 3 | Butterfly Vlv | 04-Disk Filter | No | Hours | 0.00 | |
| Backwash Valve 6 | Motorized | |||||
| 08-EF-03 - Exhaust Fan,Miox | Fan | 08-Operations | Operation | No | Hours | 0.00 |
| Room(Roof)-fan in North | Building/ Blower | |||||
| Blower Room | Room | |||||
| 03-VFD-110 - SBR Blower #1 | VFD | Operation | No | Hours | 0.00 | |
| building/ Blower | ||||||
| Room | ||||||
| 03-VFD-140 - SBR Blower #4 | VFD | Operation | No | Hours | 0.00 | |
| building/ Blower | ||||||
| Room | ||||||
| 03-VFD-150 - SBR Blower #5 | VFD | Operation | No | Hours | 0.00 | |
| building/ Blower | ||||||
| Room | ||||||
| Miox 1 - Miox 1 unit | Hypo | 06-Chemical | No | Hours | 0.00 | |
| generator | Storage Area | |||||
| Miox 2 - miox unit 2 | Hypo | 06-Chemical | No | Hours | 0.00 | |
| //corrective | generator | Storage Area | ||||
| Miox 3 - Miox Unit 3 | hypo | 06-Chemical | No | Hours | 0.00 | |
| generator | Storage Area | |||||
| 02-VFD-110.CPX9000EATO | VFD,CPX | Ops Building | No | Hours | 0.00 | |
| N - Influent Pump #1 VFD | 9000(EATON) | Electrical Room | ||||
| 02-VFD-120.CPX9000EATO | VFD | Ops Building | No | Hours | 0.00 | |
| N - Influent Pump #2 VFD | Electrical Room | |||||
| 04-BFV-100 - EQ Basin 1 | Butterfly Valve | 04-EQ Basin | No | Hours | 0.00 | |
| Inlet Valve | ||||||
| 04-BFV-105 - EQ Basin 2 | Butterfly Valve | 04-EQ Basin | No | Hours | 0.00 | |
| 12/18/2018 01:27 pm | 11 of | 33.0 |
Sheet12
| Equipment List Report Without Notes | ||||||
| SRTTP | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| Inlet Valve | ||||||
| 04-BFV-104 - EQ Basin 1 | Butterfly Valve | 04-EQ Basin | No | Hours | 0.00 | |
| Outlet Valve | ||||||
| 04-BFV-109 - EQ Basin 2 | Butterfly Valve | 04-EQ Basin | No | Hours | 0.00 | |
| Outlet Valve | ||||||
| SBR #5 - corrective | SBR #5 | No | Hours | 0.00 | ||
| 03-LIT-247 - #4 SBR level | level | #4 SBR | No | Hours | 0.00 | |
| Transducer | transducer | |||||
| 03-D-SBR-1 - Membrane | Diffuser | SBR 1 | Ops | No | Hours | 0.00 |
| Diffusers | ||||||
| SBR #1 - SBR #1 Nitrate | Nitrate Probe | SBR #1 | Ops | No | Hours | 0.00 |
| Probe | ||||||
| 03-D-SBR-3 - Membrane | Diffuser | SBR-3 | OPS | No | Hours | 0.00 |
| diffuser | ||||||
| 03-D-SBR-4 - Membrane | Diffuser | SBR 4 | OPS | No | Hours | 0.00 |
| Diffuser | ||||||
| 03-D-SBR-5 - Membrane | Diffuser | SBR 5 | OPS | No | Hours | 0.00 |
| Diffuser | ||||||
| 04-AIT-305 - Influent DCB | Meter | Disinfection | Ops | No | Hours | 0.00 |
| Chlorine Analyzer | Chlorine Contact | |||||
| Chamber | ||||||
| 04-AIT-340 ( ATI) - Effluent | Meter | Disinfection | OPS | No | Hours | 0.00 |
| DCB Chlorine contact | Contact | |||||
| Chamber | Chamber | |||||
| 06-P-1 - Day Storage | Pump | 06-Chemical | Operations | No | Hours | 0.00 |
| Transfer Pump #1 | Storage Area | |||||
| 06-P-2 - Day Storage | Pump | 06-Chemical | Operations | No | Hours | 0.00 |
| Transfer Pump #2 | Storgae Area | |||||
| 03-Decant-SBR-3 - Decanter | Decanter | SBR 3 | OPS | No | Hours | 0.00 |
| SF-1 - Supply | Supply Fan #1 | Elec .Room Next | No | Hours | 0.00 | |
| Fan/Elec.Room Next to | To Control Room | |||||
| Control Room | ||||||
| EF-1/EF-2 - Exhaust Fan | Exhaust Fan | Operation Bld | OOPS | No | Hours | 0.00 |
| #200831A | ||||||
| SF-4 - Supply Fan | Supply Fan # | MCC Room | Operation | No | Hours | 0.00 |
| 4.0 | Bluid#200831B | Bluid#200831B | ||||
| Supply Fan #5 - SF#5 Next to | Supply Fan # | Digester Blower | No | Hours | 0.00 | |
| 12/18/2018 01:27 pm | 12 of | 33.0 |
Sheet13
| Equipment List Report Without Notes | ||||||
| SRTTP | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| back Exit Door-Above Bath | 5.0 | Room | ||||
| Room | ||||||
| 03-D-SBR-2 - Membrane | Diffuser | SBR 2 | Ops | No | Hours | 0.00 |
| Diffusers | ||||||
| PMP-530 - SRTTP RWPS 2 | Pump | No | Hours | 0.00 | ||
| Booster Pump #2 | ||||||
| PMP-510 - SRTTP RWPS 2 | Pump | No | Hours | 0.00 | ||
| Booster Pump #1(Jockey | ||||||
| Pump) | ||||||
| PMP-520 - SRTTP RWPS 2 | Pump | No | Hours | 0.00 | ||
| Booster Pump #1 | ||||||
| 03-LIT-217 - #1 SBR Level | Level | #1 SBR | No | Hours | 0.00 | |
| Transducer | Transducer | |||||
| 03-LIT-227 - #2 SBR Level | Level | #2 SBR | No | Hours | 0.00 | |
| Transducer | Transducer | |||||
| 03-LIT-237 - #3 SBR Level | Level | #3 SBR | No | Hours | 0.00 | |
| Transducer | Transducer | |||||
| SBR #4 - SBR | SBR #4 | No | Hours | 0.00 | ||
| 03-LIT-257 - #5 SBR Level | Level | #5 SBR | No | Hours | 0.00 | |
| Transducer | Transducer | |||||
| 05-M-405 - BFP Polymer | Static Mixer | 05-Belt Filter | No | Hours | 0.00 | |
| Static Mixer | Press | |||||
| 01-RPBD-4 - Water Softener | Backflow | Water Softener | No | Hours | 0.00 | |
| Backflow Preventor | Preventor | |||||
| 01-RPBD-5 - Water Meter | Backflow | Facility Water | No | Hours | 0.00 | |
| Bypass Backflow Preventor | Preventor | Meter | ||||
| 07-M-120 - Odor Control Fan | Fan | West of the Ops | No | Hours | 0.00 | |
| #1 | Building | |||||
| 04-RO-P-1 - RO Unit Feed | Pump | RO Unit | No | Hours | 0.00 | |
| Pump | ||||||
| 04-RO-P-2 - RO Unit Booster | Pump | South of the RO | No | Hours | 0.00 | |
| Pump | Unit | |||||
| 04-UV-01 - RO UV module | UV Module | South of the RO | No | Hours | 0.00 | |
| #1 | unit | |||||
| 04-UV-02 - RO UV module | UV Module | South of the RO | No | Hours | 0.00 | |
| #2 | unit | |||||
| 04-VFD-310.CP9000CUTLE | VFD | Control Building | No | Hours | 0.00 | |
| 12/18/2018 01:27 pm | 13 of | 33.0 |
Sheet14
| Equipment List Report Without Notes | ||||||
| SRTTP | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| RHAMMER - Reclaim Pump | Electrical Room | |||||
| #1 VFD | ||||||
| 04-VFD-320.CP9000CUTLE | VFD | Control Building | No | Hours | 0.00 | |
| RHAMMER - Reclaim Pump | Electrical Room | |||||
| #2 VFD | ||||||
| 04-VFD-330.CP9000CUTLE | VFD | Control Building | No | Hours | 0.00 | |
| RHAMMER - Reclaim Pump | Electrical Room | |||||
| #3 VFD | ||||||
| 04-VFD-110.SVX9000CUTL | VFD | Control Building | No | Hours | 0.00 | |
| ERHAMMER - Filter Feed | Electrical Room | |||||
| Pump #1 VFD | ||||||
| 04-VFD-120.SVX9000CUTL | VFD | Control Building | No | Hours | 0.00 | |
| ERHAMMER - Filter Feed | Electrical Room | |||||
| Pump #2 VFD | ||||||
| 04-VFD-130.SVX9000CUTL | VFD | Control Building | No | Hours | 0.00 | |
| ERHAMMER - Filter Feed | Electrical Room | |||||
| Pump #3 VFD | ||||||
| 02-VFD-130,SVX9000CUTL | VFD | Ops Building | No | Hours | 0.00 | |
| ERHAMMER - Influent Pump | Electrical Room | |||||
| #3 VFD | ||||||
| RCW-Line - reclaim water | C905 | No | Hours | 0.00 | ||
| line 20" | ||||||
| 07-C-2 - Odor Control Cell 2 | Bio Beds | No | Hours | 0.00 | ||
| 07-C-3 - Odor Control Cell 3 | Bio Beds | No | Hours | 0.00 | ||
| 07-M-130 - Odor Control Fan | West of the Ops | No | Hours | 0.00 | ||
| #2 | Building | |||||
| HP-1 - Heat Pump #1 | HVAC | North of the | No | Hours | 0.00 | |
| Control Building | ||||||
| HP-2 - Heat Pump #2 | HVAC | North of the | No | Hours | 0.00 | |
| Control Building | ||||||
| 04-T-1 - RPWS 2 Pump Skid | Tank | On RPWS 2 | No | Hours | 0.00 | |
| Hydro-pneumatic Tank | Pump Skid | |||||
| FCU-1 - Fan unit | Control Building | No | Hours | 0.00 | ||
| FCU-2 - Fan Unit | Fan | Control Building | No | Hours | 0.00 | |
| SF-2 - Fan | Headworks | No | Hours | 0.00 | ||
| EF-1 - Fan | Fan | Control building | No | Hours | 0.00 | |
| (Mens | ||||||
| Bathroom) | ||||||
| 12/18/2018 01:27 pm | 14 of | 33.0 |
Sheet15
| Equipment List Report Without Notes | ||||||
| SRTTP | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| EF-2 - Fan | Fan | Control Building | No | Hours | 0.00 | |
| (LAB Room) | ||||||
| EF-3 - Fan | Fan | OOps Building | No | Hours | 0.00 | |
| EF-4 - Exhaust Fan | Fan | Ops Building | No | Hours | 0.00 | |
| EF-5/Headworks - Fan | Fan | Headworks | No | Hours | 0.00 | |
| EF-6 - Fan | Fan | Control Building | No | Hours | 0.00 | |
| 04-RO-F-01 - RO Unit Pre | Filter | RO Unit | No | Hours | 0.00 | |
| Filter | ||||||
| 04-RO-1 - RO Unit | RO Unit | East of the | No | Hours | 0.00 | |
| Chlorine contact | ||||||
| tanks | ||||||
| MCC-1A - MCC | Electrical | Ops Building | No | Hours | 0.00 | |
| Electrical Room | ||||||
| MCC-1B - MCC | Electrical | Ops Building | No | Hours | 0.00 | |
| Electrical Room | ||||||
| MCC-1C - MCC | Electrical | Ops Building | No | Hours | 0.00 | |
| Electrical Room | ||||||
| MCC-2A - MCC | Electrical | Ops Building | No | Hours | 0.00 | |
| Electrical Room | ||||||
| MCC-2B - MCC | Electrical | Ops Building | No | Hours | 0.00 | |
| Electrical Room | ||||||
| MCC-3A - MCC | Electrical | Control Building | No | Hours | 0.00 | |
| Electrical Room | ||||||
| MCC-3B - MCC | Electrical | Control Building | No | Hours | 0.00 | |
| Electrical Room | ||||||
| MCC-4A - MCC | Electrical | Control Building | No | Hours | 0.00 | |
| Electrical Room | ||||||
| MCC-4B - MCC | Electrical | Control Building | No | Hours | 0.00 | |
| Electrical Room | ||||||
| PLC-2 - PLC-2 Secondary | Electrical | Ops Building | No | Hours | 0.00 | |
| Treatment (SBR PLC) | Electrical Room | |||||
| PLC-1 - PLC-1 Headworks, | Electrical | Ops Building | No | Hours | 0.00 | |
| Solids Handling, and | Electrical Room | |||||
| Chemical Facilities | ||||||
| PLC-4 - PLC-4 Disck Filter #1 | PLC | Disk Filters | No | Hours | 0.00 | |
| (04-DF-LCP-1) | ||||||
| 12/18/2018 01:27 pm | 15 of | 33.0 |
Sheet16
| Equipment List Report Without Notes | ||||||
| SRTTP | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| PLC-5 - PLC-5 Disck Filter #2 | PLC | Disk Filters | No | Hours | 0.00 | |
| (04-DF-LCP-2) | ||||||
| PLC-6 - PLC-6 Disck Filter #3 | PLC | Disk Filters | No | Hours | 0.00 | |
| (04-DF-LCP-3) | ||||||
| Switchgear - Facility | Switchgear | Ops Building | No | Hours | 0.00 | |
| Switchgear | Electrical Room | |||||
| PLC-3 - PLC-3 Tertiary | PLC | Control Building | No | Hours | 0.00 | |
| Electrical Room | ||||||
| 04-AIT-370 - Overflow | Outfall | No | Hours | 0.00 | ||
| Chlorine Analyzer | ||||||
| 04-AIT-290 - Effluent | Hach NH4Dsc | Disk Filters | No | Hours | 0.00 | |
| Ammonia Analyzer | Ammonia | |||||
| Senso | ||||||
| 04-AIT-150 Effluent Turbidty - | Contact chamber | No | Hours | 0.00 | ||
| process instrumentation | effluent | |||||
| 04-AIT-342 - Effluent | Contact chamber | No | Hours | 0.00 | ||
| conductivity meter | effluent | |||||
| 04-AIT-420 - Disk Filter | Hach Nitratax | Disk Filters | No | Hours | 0.00 | |
| Effluent Nitrate Analyzer | sc | |||||
| 04-P-370 - OOOPS Chlorine | Pump | OOOPS Circle | No | Hours | 0.00 | |
| Sample Pump | Weir | |||||
| 06-LCP-01 - Brine Pump | Control Panel | 06- Chemical | No | Hours | 0.00 | |
| Control Panel | Storage Area | |||||
| 02-ATI-102 - Headworks Gas | Gas Detector | Headworks | No | Hours | 0.00 | |
| Detector | Influent Channel | |||||
| 04- Disk Filter #2 - Filter | Filter | Disk Filter | No | Hours | 0.00 | |
| 04- Disk Filter#1 - Filter | Filter | Disk Filter | No | Hours | 0.00 | |
| 04-FIT-RWPS2 - Flow Meter | Flow Meter | RWPS 2 | No | Hours | 0.00 | |
| on RWPS2 | ||||||
| Golf cart-1 - Utility Golf Cart | Golf Cart | SRTP | Operations | No | Hours | 0.00 |
| OOOPS AREA - ooops | ooops | ooops | No | Hours | 0.00 | |
| PMP-602 PUMP #3 - | OOOPS | No | Hours | 0.00 | ||
| OOOPS PUMP | ||||||
| 04-AIT-341(Effluent PH) - | Contact chamber | No | Hours | 0.00 | ||
| process Instrumentation | effluent | |||||
| 04-DV-230 Drain Valve - Disk | Filter drain | 04-Disk Filter 3 | No | Hours | 0.00 | |
| Filter | valve | |||||
| 12/18/2018 01:27 pm | 16 of | 33.0 |
Sheet17
| Equipment List Report Without Notes | ||||||
| SRTTP | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| F-650 Dump Truck - | Dump Truck | Solids | Solids Room | No | Hours | 0.00 |
| bio-solids dump truck | processing | |||||
| building | ||||||
| GENERATOR OOPS - | GENERATOR | OOPS | No | Hours | 0.00 | |
| EMERGENCY GENERATOR | ||||||
| 04-AIT-290 Disk Filter - | HACH | Disk Filter | No | Hours | 0.00 | |
| Ammonia Analyzer | ||||||
| 04- Disk Filter#3 - Filter | Filter | Disk Filter | No | Hours | 0.00 | |
| 04-LT-220 - Disk Filter #2 | Level | Disk Filter | No | Hours | 0.00 | |
| Level Transducer | Transducer | |||||
| PMP-600 PUMP#1 - OOOPS | OOOPS | No | Hours | 0.00 | ||
| PUMP | ||||||
| Electric Room 904 - | Electric Room | No | Hours | 0.00 | ||
| Communication Back Board | 904.0 | |||||
| 02-AIT-102 WETWELL - | Gas Detector | 02-Influent Pump | No | Hours | 0.00 | |
| Combustible Gas Detector | Station | |||||
| 07-AIT-122 - Combustible | Gas Detector | West of the ops | No | Hours | 0.00 | |
| Gas Detector(odor control | Building | |||||
| Main vent Pipe) | ||||||
| 02-AIT-315 Grit Meter1 - | Gas Detector | 02-Grit Collector | No | Hours | 0.00 | |
| Combustible Gas detector | Station | |||||
| 02-AIT-345 Grit Meter2 - | Gas Detector | 02-Grit Collector | No | Hours | 0.00 | |
| Combustible Gas Detector | Station | |||||
| Miox Room - Combustible | Gas Detector | Sodium | No | Hours | 0.00 | |
| Gas Detector | Hypochlorite | |||||
| Generation | ||||||
| Room 802 | ||||||
| OOOPS FLOW METER - | Meter | ooops building | No | Hours | 0.00 | |
| flow meter-annual( | ||||||
| COMPLIANCE) | ||||||
| Wet well influent pump | Influent pump | No | Hours | 0.00 | ||
| station - clean-monthly | station | |||||
| 02-M-331 - Grit Classifier | Grit Classifier | 02-Influent pump | No | Hours | 0.00 | |
| no.1 | station | |||||
| OOOPS VFD#1 - VFD | VFD | OOOPS | No | Hours | 0.00 | |
| OOOPS VFD#2 - VFD | VFD | OOOPS | No | Hours | 0.00 | |
| OOOPS VFD#3 - VFD | VFD | OOOPS | No | Hours | 0.00 | |
| 12/18/2018 01:27 pm | 17 of | 33.0 |
Sheet18
| Equipment List Report Without Notes | ||||||
| SRTTP | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| Fire-Extinguisher #1 - | Fire-Extinguish | Control | No | Hours | 0.00 | |
| Monthly-Inspection | er | Room(LOBBY) | ||||
| Fire-Extinguisher#2 - | Fire-Extinguish | Control-Room(L | No | Hours | 0.00 | |
| Monthly-Inspection | er | AB) | ||||
| Fire-Extinguisher#3 - | Fire-Extinguish | Control | No | Hours | 0.00 | |
| Monthly-Inspection | er | Room(908 Hall) | ||||
| Fire-Extinguisher#4 - | Fire-Extinguish | Outside Control | No | Hours | 0.00 | |
| Monthly-Inspection | er | Room(WestSide) | ||||
| Fire-Extinguisher#5 - | Fire-Extinguish | Electric Room | No | Hours | 0.00 | |
| Monthly-Inspection | er | 904(Inside) | ||||
| Fire-Extinguisher#6 - | Fire-Extinguish | Chemical | No | Hours | 0.00 | |
| Monthly-Inspection | er | Storage | ||||
| Area(NorthSide) | ||||||
| Outside | ||||||
| Fire-Extinguisher#7 - | Fire-Extinguish | OutSide Solids | No | Hours | 0.00 | |
| Monthly-Inspection | er | BLDG(Next to | ||||
| Conveyor) | ||||||
| Fire-Extinguisher#8 - | Fire-Extinguish | Inside Solids | No | Hours | 0.00 | |
| Monthly-Inspection | er | Room(Next to | ||||
| Roll-up Door) | ||||||
| Fire-Extinguisher#10 - | Fire-Extinguish | ElectricRoom | No | Hours | 0.00 | |
| Monthly-Inspection | er | 804.0 | ||||
| Fire-Extinguisher#11 - | Fire-Extinguish | Sodium | No | Hours | 0.00 | |
| Monthly-Inspection | er | Hypochiorite | ||||
| Generation | ||||||
| Room 802 | ||||||
| Fire-Extinguisher#12 - | Fire-Extinguish | Outside Blower | No | Hours | 0.00 | |
| Monthly-Inspection | er | Room(wall) | ||||
| Fire-Extinguisher#13 - | Fire-Extinguish | Inside Blower | No | Hours | 0.00 | |
| Monthly-Inspection | er | Room 801(By | ||||
| back Door) | ||||||
| Fire-Extinguisher#9 - | Inside Solids | Fire-Extinguisher | No | Hours | 0.00 | |
| Monthly-Inspection | Bldg(Next to | |||||
| Back Exit Door) | ||||||
| Fire-Extinguisher#14 - | Fire-Extinguish | Aerobic Digester | No | Hours | 0.00 | |
| Monthly-Inspection | er | N0.1 (Wall) | ||||
| Fire-Extinguisher#15 - | Fire-Extinguish | Disk Filter No.1 | No | Hours | 0.00 | |
| Monthly-Inspection | er | (By Stairs) | ||||
| Fire-Extinguisher#16 - | Fire-Extinguish | Influent Pump | No | Hours | 0.00 | |
| Monthly-Inspection | er | Station (Down | ||||
| 12/18/2018 01:27 pm | 18 of | 33.0 |
Sheet19
| Equipment List Report Without Notes | ||||||
| SRTTP | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| stairway,inside) | ||||||
| Fire-Extinguisher#17 - | Fire-Extinguish | OOOPS Bldg | No | Hours | 0.00 | |
| Monthly-Inspection | er | (Inside) | ||||
| Electric Room 804 - Sweep | Electric room | No | Hours | 0.00 | ||
| Room | ||||||
| Blower Room - Sweep Room | Blower Room | No | Hours | 0.00 | ||
| OOOPS sample pump | sample pump | OOPS | No | Hours | 0.00 | |
| (WET-WELL) - sample pump | ||||||
| odor bed sprinklers - | No | Hours | 0.00 | |||
| sprinklers | ||||||
| polymer tote(Grit collector) - | No | Hours | 0.00 | |||
| polymer tote | ||||||
| 04- DiskFilter#4 - Filter | Filter | Disk Filter | No | Hours | 0.00 | |
| 03-P-265 - SBR 6 WAS | Submersable | 03-SBR 6 | No | Hours | 0.00 | |
| Submersable Pump | pump | |||||
| 03-P-275 - SBR 7 WAS | Submersable | 03-SBR 7 | No | Hours | 0.00 | |
| Submersable Pump | Pump | |||||
| SF-6 - supply fan #6 | supply fan | SBR Blower | No | Hours | 0.00 | |
| Room | ||||||
| SF-7 - supply fan #7 | supply fan | SBR Blower | No | Hours | 0.00 | |
| Room | ||||||
| 04-VFD-140.SVX9000EATO | VFD | South Electrical | No | Hours | 0.00 | |
| N - Filter Feed Pump #4 VFD | Room | |||||
| 04-P-140 - Filter Feed Pump | Pump | 04-Flow EQ | No | Hours | 0.00 | |
| #4 | Basin | |||||
| 03-B-111 - SBR Blower #1 | Blower | Operations | No | Hours | 0.00 | |
| Building/Blower | ||||||
| Room | ||||||
| 03-B-121 - SBR Blower #2 | Blower | Operations | No | Hours | 0.00 | |
| Building/Blower | ||||||
| Room | ||||||
| 03-B-131 - SBR Blower #3 | Blower | Operations | No | Hours | 0.00 | |
| Building/Blower | ||||||
| Room | ||||||
| 03-B-141 - SBR Blower #4 | Blower | Operations | No | Hours | 0.00 | |
| Building/Blower | ||||||
| Room | ||||||
| 12/18/2018 01:27 pm | 19 of | 33.0 |
Sheet20
| Equipment List Report Without Notes | ||||||
| SRTTP | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| 03-B-151 - SBR Blower #5 | Blower | Operations | No | Hours | 0.00 | |
| Building/Blower | ||||||
| Room | ||||||
| 03-B-161 - SBR Blower #6 | Blower | Operations | No | Hours | 0.00 | |
| Building/Blower | ||||||
| Room | ||||||
| 03-B-171 - SBR Blower #7 | Blower | Operations | No | Hours | 0.00 | |
| Building/Blower | ||||||
| Room | ||||||
| 04-M-260 - Diskfilter #4 Drive | Drive Motor | 04-Disk Filter# 4 | No | Hours | 0.00 | |
| Chain | ||||||
| 04-P-265 - Filter | Pump | 04-Diskfilter4 | No | Hours | 0.00 | |
| Backwash/Sludge pump 1A | ||||||
| 04-P-270 - Filter | Pump | 04-Diskfilter4 | No | Hours | 0.00 | |
| Backwash/Sludge Pump 1B | ||||||
| 02-BS-MCP2 - Mechanical | Barscreen | 02 Influent Pump | No | Hours | 0.00 | |
| Barscreen No.2 | Station | |||||
| 02-WC-MCP2 - Screenings | Compactor | 02-Influent Pump | No | Hours | 0.00 | |
| Washer-Compactor No.2 | Station | |||||
| 02-SG-280 - Bypass | gate | IPS Overflow | No | Hours | 0.00 | |
| Diversion Box | ||||||
| 02-SG-281 - Backflush | Gate | Next to ooops | No | Hours | 0.00 | |
| Diversion Box TO Lemon | ||||||
| Grove | ||||||
| 01-M-200 - Emergency | Emergency | southside | No | Hours | 0.00 | |
| Electrical Generator#2 | Generator | |||||
| 04-BFV-140 - EQ Basin 3 | butterfly valve | 04-EQ Basin | No | Hours | 0.00 | |
| Inlet valve | ||||||
| Reclaimed line 2" - | next to disk filter | No | Hours | 0.00 | ||
| Reclaimed line | #3 (next to wall) | |||||
| south side | ||||||
| Sump(Drain to headworks) - | chemical storage | No | Hours | 0.00 | ||
| sump | (Drain to | |||||
| headworks) | ||||||
| Polymer tote(Chemical | Chemical | No | Hours | 0.00 | ||
| Storage) - polymer tote | Storage | |||||
| fork lift(TL943) - fork | No | Hours | 0.00 | |||
| lift(refilled) | ||||||
| 02-SCR-260 - Influent Drum | Drum screen | No | Hours | 0.00 | ||
| 12/18/2018 01:27 pm | 20 of | 33.0 |
Sheet21
| Equipment List Report Without Notes | ||||||
| SRTTP | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| Screen NO.1 | ||||||
| 02-SCR-270 - Influent Drum | Drum screen | No | Hours | 0.00 | ||
| Screen NO.2 | ||||||
| Dilution Air Fan #1 - Blower | Blower | 06-chemical | No | Hours | 0.00 | |
| #1 | stroage area | |||||
| Dilution Air Fan #2 - Blower | Blower | 06-Chemical | No | Hours | 0.00 | |
| #2 | Stroage Area | |||||
| 08-C-210 - Centrifuge #1 | Centrifuge | 05-Solids | No | Hours | 0.00 | |
| Handling | ||||||
| 08-C-220 - Centrifuge #2 | Centrifuge | 05-Solids | No | Hours | 0.00 | |
| Handling | ||||||
| 05-B-110 - Aerobic Digester | Blower | Blower room | No | Hours | 0.00 | |
| Blower | (N.west) | |||||
| 05-B-120 - Aerobic Digester | Blower | Blower room | No | Hours | 0.00 | |
| Blower | (N.west) | |||||
| 05-B-130 - Aerobic Digester | Blower | Blower Room( | No | Hours | 0.00 | |
| Blower | N.West) | |||||
| 05-B-140 - Aerobic Digester | Blower | Blower room | No | Hours | 0.00 | |
| Blower | (N.West) | |||||
| 05-B-103 - Was Holding Tank | Blower | Blower Room | No | Hours | 0.00 | |
| Blower | (N.west) | |||||
| 02-WC-MCP1 - Screening | Washer | 02-Influent Pump | No | Hours | 0.00 | |
| washer compactor No.1 | Compactor | Station | ||||
| 05-P-101Rotary Lobe Pump - | Solids Pump | Adjacent to the | No | Hours | 0.00 | |
| Rotary Lobe Solids Pump | WAS Holding | |||||
| No.1 | Tank | |||||
| 05-P-102 Rotary Lobe Pump | Solids Pump | Adjacent to the | No | Hours | 0.00 | |
| - Rotary Lobe Solids Pump | WAS Holding | |||||
| Tank | ||||||
| Fire-Extinguisher# 18 - | Fire-Extinguish | New Bldg | No | Hours | 0.00 | |
| Monthly-inspection | er | 200831D(Elec.R | ||||
| oom) | ||||||
| Fire-Extinguisher#19 - | Fire-Extinguish | New Bldg | No | Hours | 0.00 | |
| Monthly-Inspection | er | 200831D | ||||
| (Blower Room) | ||||||
| P-100 (sample Pump) - | No | Hours | 0.00 | |||
| sample pump | ||||||
| P-400(Sample Pump) - | No | Hours | 0.00 | |||
| 12/18/2018 01:27 pm | 21 of | 33.0 |
Sheet22
| Equipment List Report Without Notes | ||||||
| SRTTP | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| sample pump | ||||||
| AD-3 - Methanol Feed pump | feed pump | SBR Methanol | No | Hours | 0.00 | |
| No.1 | System | |||||
| 06-P-281 - Methanol Feed | Feed Pump | SBR Methanol | No | Hours | 0.00 | |
| Pump No1 | System | |||||
| Golf Cart Camaro Z28 - golf | No | Hours | 0.00 | |||
| cart | ||||||
| Golf Cart E-Z-GO #1 - golf | No | Hours | 0.00 | |||
| cart | ||||||
| Vacuum cleaner - Hoover | Vacuum | No | Hours | 0.00 | ||
| Vacuum Cleaner | Cleaner | |||||
| wet well - wet well | drain pump | No | Hours | 0.00 | ||
| station | ||||||
| OOOPS Emergency | Emergency | No | Hours | 0.00 | ||
| Generator - Emergency | Generator | |||||
| Electrical Generator | ||||||
| Elec.Room 904 - | UPS | Elec.Room 904 | No | Hours | 0.00 | |
| Uninterruptible Power Supply | ||||||
| Solids Bldg - Drain covers | Solids Bldg | No | Hours | 0.00 | ||
| Elec. Room 804 - | UPS | Elec.Room804 | No | Hours | 0.00 | |
| Uninterruptible Power Supply | ||||||
| Elec.Room (Bldg.200831D) - | UPS | Bldg.200831D | No | Hours | 0.00 | |
| Uninterruptible Power Supply | ||||||
| Elec.Room (Bldg.200833) - | UPS | OOOPS BLDG | No | Hours | 0.00 | |
| Uninterruptible Power Supply | ||||||
| ballast - replace ballast in | locker room | No | Hours | 0.00 | ||
| locker room | ||||||
| Solar/smartgrid 300 - 382 KW | solar | No | Hours | 0.00 | ||
| Solar Site | ||||||
| 02-AIT-100D - Phosphate | Analyzer | Influent Pump | No | Hours | 0.00 | |
| Analyzer | Station | |||||
| FiltrationModule(Phosphate) - | Influent pump | No | Hours | 0.00 | ||
| Filtration Module(Phosphate) | Station | |||||
| sump pump Chemical .S.A - | chemical storage | No | Hours | 0.00 | ||
| sump pump | area | |||||
| 03-FV-220 - SBR 2 Influent | plug valve | 03-SBR-2 | No | Hours | 0.00 | |
| Isolation Valve | ||||||
| 12/18/2018 01:27 pm | 22 of | 33.0 |
Sheet23
| Equipment List Report Without Notes | ||||||
| SRTTP | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| PGM - Plant General | SRTTP | No | Hours | 0.00 | ||
| Maintenace | ||||||
| Bisulfite Tank-CheckTank | Next To OOOPS | No | Hours | 0.00 | ||
| Level - Bisulfite Tank | BLDG. | |||||
| Grit pump (Sump pump) - | Grit Pump Area | No | Hours | 0.00 | ||
| Sump Pump | ||||||
| 08-HM-210 - Hydraulic Motor | Motor | 05-solids | No | Hours | 0.00 | |
| (Grease) | Handling | |||||
| 08-BDM-210 - Bowl | Motor | 05-solids | No | Hours | 0.00 | |
| Drive(Motor) | Handling | |||||
| 08-HM-220 - Hydraulic Motor | Motor | 05-Solids | No | Hours | 0.00 | |
| (Grease) | Handling | |||||
| 08-BDM-220 - Bowl Drive | Motor | 05-Solids | No | Hours | 0.00 | |
| (Motor) | Handling | |||||
| 08-M-110 - Thickened Sludge | Motor | 05-Solids | No | Hours | 0.00 | |
| Motor | Handling | |||||
| 08-GBRM-110 - Gravity Belt | Motor | 05-Solids | No | Hours | 0.00 | |
| Roller Motor | Handling | |||||
| 08-WM-110 - Gravity Belt | Motor | 05-Solids | No | Hours | 0.00 | |
| water Line (Motor) | Handling | |||||
| F-150 Ford Truck - Ford pick | No | Hours | 0.00 | |||
| up truck | ||||||
| 03-BFV-152 - SBR Air Valve | Butterfly Valve | Westside by | No | Hours | 0.00 | |
| SBR#2 | ||||||
| 03-FV-281 - Air Valve(West) | Air Valve | Underground | No | Hours | 0.00 | |
| vault | ||||||
| 03-FV-271 - Air Valve(East) | Air Valve | Underground | No | Hours | 0.00 | |
| vault | ||||||
| PV-100 - Power Valve(Gear | Butterfly Valve | Chlorine Contact | No | Hours | 0.00 | |
| GS100.3) | Basin(Northside) | |||||
| PV-101 - Power Valve | Chlorine Contact | No | Hours | 0.00 | ||
| Basin | ||||||
| (Southside) | ||||||
| Dodge Truck - Maintenance | SRTTP | No | Hours | 0.00 | ||
| Truck | ||||||
| F-150 (Maintenance Truck) - | SRTTP | No | Hours | 0.00 | ||
| Truck | ||||||
| 12/18/2018 01:27 pm | 23 of | 33.0 |
Sheet24
| Equipment List Report Without Notes | ||||||
| SRTTP | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| 02-P-410 - Submersable | Submersable | Drain Pump | No | Hours | 0.00 | |
| Pump No.1 | Pump No.1 | Station | ||||
| 02-P-400 - sampling Pump | Sampling | Drain Pump | No | Hours | 0.00 | |
| Pump | Station | |||||
| 02-FIT-351 - Flow Meter | Flow Meter | Drain Pump | No | Hours | 0.00 | |
| Station | ||||||
| 02-AIT-450(Drain Pump | Gas Detector | Drain Pump | No | Hours | 0.00 | |
| Station) - Combustible Gas | Station | |||||
| Dectector | ||||||
| OOOPS W&T Chlorine | Effluent | OOOPS AREA | No | Hours | 0.00 | |
| Analyzer - Chlorine | Analyzer | |||||
| Analyzer(Wallace & Tiernan) | ||||||
| SWPP CORRECTIVE - | SRTTP | No | Hours | 0.00 | ||
| SWPP CORRECTIVE | ||||||
| Sweep Drum Screen Area - | Drum Screen | No | Hours | 0.00 | ||
| Sweep (Under Dumpsters) | Area | |||||
| 03-AIT-250 SBR#3 - | Ammonia/Nitra | SBR #3 | No | Hours | 0.00 | |
| Ammonia(service by Hach) | te Probe | |||||
| 03-AIT-269A SBR#6 - | Ammonia | SBR#6 | No | Hours | 0.00 | |
| Ammonia /Nitrate | Probe | |||||
| Probe(Service by Hach) | ||||||
| 03-AIT-269B SBR#6 - Nitrate | Nitrate probe | SBR#6 | No | Hours | 0.00 | |
| Probe (service by Hach) | ||||||
| 03-AIT-279A SBR#7 - | Ammonia | SBR#7 | No | Hours | 0.00 | |
| Ammonia/Nitrate | Probe | |||||
| Probe(Service by Hach) | ||||||
| 03-AIT-279B SBR#7 - Nitrate | Nitrate probe | SBR#7 | No | Hours | 0.00 | |
| Probe(service by Hach) | ||||||
| 02-AIT-100D Phosphax & | Phosphax & | 02-Influent Pump | No | Hours | 0.00 | |
| Filtrax - Service by Hach | Filtrax | Station | ||||
| 04-AIT-290 Disk Filters - | Ammonia & | Disk Filters | No | Hours | 0.00 | |
| Ammonia & Nitrate | Nitrate probe | |||||
| probe(service by Hach) | ||||||
| OOOPS Air Vac#1 - Air Vac | Air Vacuum | OOOPS LINE | No | Hours | 0.00 | |
| Release Valve | ||||||
| OOOPS Air Vac#2 - Air Vac | Air Vacuum | OOOPS LINE | No | Hours | 0.00 | |
| Release Valve | ||||||
| OOOPS Air Vac#3 - Air Vac | Air Vacuum | OOOPS LINE | No | Hours | 0.00 | |
| Release Valve | ||||||
| 12/18/2018 01:27 pm | 24 of | 33.0 |
Sheet25
| Equipment List Report Without Notes | ||||||
| SRTTP | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| OOOPS Air Vac#4 - Air Vac | Air Vacuum | OOOPS LINE | No | Hours | 0.00 | |
| Release Valve | ||||||
| OOOPS Air Vac#5 - Air Vac | Air Vacuum | OOOPS LINE | No | Hours | 0.00 | |
| Release Valve | ||||||
| OOOPS Air Vac#6 - Air Vac | Air Vacuum | OOOPS LINE | No | Hours | 0.00 | |
| Release Valve | ||||||
| A/C Unit-1 - Air Conditioner | Control Building | No | Hours | 0.00 | ||
| A/C Unit-2 - Air Conditioner | Control Building | No | Hours | 0.00 | ||
| Check for lockout/Tagout | Lockout/Tagou | SRTTP | No | Hours | 0.00 | |
| equip - Check for | t | |||||
| lockout/Tagout equip | ||||||
| Disinfection Contact Basin#1 | Tank | Disinfection | No | Hours | 0.00 | |
| - Chlorine Contact Basin | Contact Basin | |||||
| 02-M-260 Motor No.1 - motor | motor | Drum screen | No | Hours | 0.00 | |
| 02-M-270 Motor No.2 - motor | motor | Drum screen | No | Hours | 0.00 | |
| SF-8 - Supply fan#8 | Supply Fan | Maint.shop | No | Hours | 0.00 | |
| Suction Valve - Suction Valve | Aerobic Digester | No | Hours | 0.00 | ||
| # 1 | ||||||
| General Maintenance - | No | Hours | 0.00 | |||
| SRTTP General Maintenance | ||||||
| 05-M-101 Rotary Lobe - | Motor | Adjacent to the | No | Hours | 0.00 | |
| Rotary lobe Motor | WAS Holding | |||||
| Tank | ||||||
| 05-M-102 Rotary Lobe - | Motor | Adjacent to the | No | Hours | 0.00 | |
| Rotary Lobe Motor | WAS Holding | |||||
| Tank | ||||||
| TRASH PUMP( MULTIQUIP) | PUMP(Diesel) | No | Hours | 0.00 | ||
| - Portable Pump | ||||||
| 04-AIT-340 ( Rosemount) - | Meter | Disinfection | No | Hours | 0.00 | |
| CCT | Contact Tank | |||||
| 04-FIT-510 (Front Gate) - | Meter | RWPS | No | Hours | 0.00 | |
| RWPS | ||||||
| 02-FIT-180(COMPLI.SIEME | Meter | 02-Influent pump | No | Hours | 0.00 | |
| NS) - Raw sewage flow | station | |||||
| meter(Compliance-Siemens) | ||||||
| drum screen wheels - wheel | Drum screen | No | Hours | 0.00 | ||
| area | ||||||
| 12/18/2018 01:27 pm | 25 of | 33.0 |
Sheet26
| Equipment List Report Without Notes | ||||||
| SRTTP | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| RWPS Water Tank Bladder - | RWPS | No | Hours | 0.00 | ||
| Water Tank Bladder | ||||||
| UPS.(200831A) GE8K - | SRTTP | No | Hours | 0.00 | ||
| Uninterruptible Power Supply | (Bldg.200831A) | |||||
| CCBV - influent valve | Chlorine Contact | No | Hours | 0.00 | ||
| chlorine contact basin 1 | Basin | |||||
| UPS(200831B)EATON 9PK | UPS | SRTTP | No | Hours | 0.00 | |
| 11000 - Uninterruptible | (Bldg.200831B) | |||||
| Power Supply | ||||||
| UPS.200831B - Valve | SRTTP | No | Hours | 0.00 | ||
| Regulated Lead-Acid | (Bldg.200831B) | |||||
| UPS( VRLA )200831D - | SRTTP( | No | Hours | 0.00 | ||
| Valve Regulated Lead -Acid | Bldg.200831D) | |||||
| UPS.(200831D)PW 9155-3 - | SRTTP | No | Hours | 0.00 | ||
| Uninterruptible Power Supply | (Bldg.200831D) | |||||
| UPS.(OOOPS)Smart 2200 - | SRTTP(OOOPS) | No | Hours | 0.00 | ||
| Uninterruptible Power Supply | ||||||
| First Aid Station(locker room | Bldg.200831A | No | Hours | 0.00 | ||
| - First Aid Station | (Locker Room) | |||||
| FirstAidStationElec.Room804 | Elec.Room | No | Hours | 0.00 | ||
| - First aid Station | 804,Next to Miox | |||||
| Room | ||||||
| First Aid StationMaint-shop - | Bldg.200831D | No | Hours | 0.00 | ||
| First aid Station | ||||||
| First Aid Station.OOOPS | OOOPS | No | Hours | 0.00 | ||
| -Bldg - First aid Station | Bldg.200833 | |||||
| Empty polymer totes - | Next to grit | No | Hours | 0.00 | ||
| polymer totes | collector | |||||
| 03-AIT-273 SBR#6 - DO | SBR # 6 | No | Hours | 0.00 | ||
| Probe | ||||||
| 03-AIT-269 A SBR#6 - | SBR # 6 | No | Hours | 0.00 | ||
| Ammonia/Nitrate Probe | ||||||
| 03-AIT-269 B - Nitrate Probe | SBR # 6 | No | Hours | 0.00 | ||
| 03-AIT-270 - Solid TS Probe | SBR # 6 | No | Hours | 0.00 | ||
| 03-AIT-272 SBR#6 - ORP | SBR # 6 | No | Hours | 0.00 | ||
| Probe | ||||||
| 03-AIT-273 - PH Probe | SBR # 6 | No | Hours | 0.00 | ||
| 12/18/2018 01:27 pm | 26 of | 33.0 |
Sheet27
| Equipment List Report Without Notes | ||||||
| SRTTP | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| Miox room (Transfer | Miox Room | No | Hours | 0.00 | ||
| pump#2) - Hypo transfer | ||||||
| pump | ||||||
| AC-1Split System Air Handler | Maint.shop | No | Hours | 0.00 | ||
| - HVAC Unit | ||||||
| 03-AIT-285 - TSS Probe | SBR # 7 | No | Hours | 0.00 | ||
| 03-AIT-288 - PH Probe | SBR # 7 | No | Hours | 0.00 | ||
| 03-AIT-242 SBR#3 - ORP | SBR # 3 | No | Hours | 0.00 | ||
| Probe | ||||||
| 03-AIT-240 - TSS Probe | SBR # 3 | No | Hours | 0.00 | ||
| 03-AIT-243 - PH Probe | SBR # 3 | No | Hours | 0.00 | ||
| Aerobic D-3 - Aerobic | Aerobic Digester | No | Hours | 0.00 | ||
| Diegster | # 3 | |||||
| Skid Steer - bucket | Sludge Beds | No | Hours | 0.00 | ||
| attachment | ||||||
| D-3 - Digester | Digester # 3 | No | Hours | 0.00 | ||
| SBR #7 DECANTER - | SBR #7 | No | Hours | 0.00 | ||
| Decanter | ||||||
| EQ- Basin #3 - Equalization | EQ #3 | No | Hours | 0.00 | ||
| Basin #3 | ||||||
| 06-P-283 - Methanol Feed | SBR Methanol | No | Hours | 0.00 | ||
| pump No.2 | System | |||||
| EQ- Basin #2 - Equalization | EQ #2 | No | Hours | 0.00 | ||
| Basin # 2 | ||||||
| EQ-Basin #1 - Equalization | EQ #1 | No | Hours | 0.00 | ||
| Basin # 1 | ||||||
| Drain Pump Station - | Next to Drum | No | Hours | 0.00 | ||
| Wet-Well | Screens | |||||
| Bio Solids Pump Station - | Next To Drying | No | Hours | 0.00 | ||
| Wet-Well | Beds | |||||
| Elec.light pole - light pole | Light pole next to | No | Hours | 0.00 | ||
| filter feed pumps | ||||||
| Odor Bed #3 - Gauge 0-30 | Odor Beds | No | Hours | 0.00 | ||
| ,in H20 | ||||||
| 04-FIT-240 - Disk filter TO | Flow Meter | Disk filter TO | No | Hours | 0.00 | |
| OOOPS | OOOPs | |||||
| 12/18/2018 01:27 pm | 27 of | 33.0 |
Sheet28
| Equipment List Report Without Notes | ||||||
| SRTTP | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| 02-P-130 - Submersible | Pump | 02-Influent Pump | No | Hours | 0.00 | |
| Pump | Station | |||||
| Golf Cart.Maint.cart - | No | Hours | 0.00 | |||
| E-Z-GO.Maint.cart | ||||||
| Safety Shower - Eyewash | SRTTP | No | Hours | 0.00 | ||
| Methanol Upper Safety | Methanol Area | No | Hours | 0.00 | ||
| Shower - Eyewash Shower | ||||||
| 02-VFD-140.SVX9000CUTL | VFD | ops building | No | Hours | 0.00 | |
| ERHAMMER - Influent | electrical room | |||||
| Pump#4 VFD | ||||||
| 05-VFD-210.SVX9000EATO | VFD | North Elec.Room | No | Hours | 0.00 | |
| N - Digested Sludge Pump#1 | ||||||
| 05-VFD-220.SVX9000EATO | VFD | North Elec.Room | No | Hours | 0.00 | |
| N - Digested Sludge Pump#2 | ||||||
| 05-VFD-230.SVX9000EATO | VFD | North Elec.Room | No | Hours | 0.00 | |
| N - Digested Sludge Pump#3 | ||||||
| 08-VFD-110.SVX9000EATO | VFD | North Elec.Room | No | Hours | 0.00 | |
| N - Thickened Sludge | ||||||
| Pump#1 | ||||||
| 05-VFD-101.SVX9000EATO | VFD | North Elec.Room | No | Hours | 0.00 | |
| N - GBT Feed Pump#1 | ||||||
| 05-VFD-102.SVX9000EATO | VFD | North Elec.Room | No | Hours | 0.00 | |
| N - GBT Feed Pump#2 | ||||||
| 03-VFD-111 - SBR Blower#1 | VFD | South.SBR | No | Hours | 0.00 | |
| Blower Room | ||||||
| 03-VFD-121 - SBR Blower#2 | VFD | South.SBR | No | Hours | 0.00 | |
| Blower Room | ||||||
| 03-VFD-131 - SBR Blower#3 | VFD | South.SBR | No | Hours | 0.00 | |
| Blower Room | ||||||
| 03-VFD-141 - SBR Blower#4 | VFD | South.SBR | No | Hours | 0.00 | |
| Blower Room | ||||||
| 03-VFD-151 - SBR Blower#5 | VFD | South.SBR | No | Hours | 0.00 | |
| Blower Room | ||||||
| 03-VFD-161 - SBR Blower#6 | VFD | South.SBR | No | Hours | 0.00 | |
| Blower Room | ||||||
| 03-VFD-171 - SBR Blower#7 | VFD | South.SBR | No | Hours | 0.00 | |
| Blower Room | ||||||
| 12/18/2018 01:27 pm | 28 of | 33.0 |
Sheet29
| Equipment List Report Without Notes | ||||||
| SRTTP | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| Fire-Extinguisher #18A - | Fire | North Exit Door | No | Hours | 0.00 | |
| Monthly inspection | Extinguisher | (rightside) | ||||
| 08-FIT-120 (SIEMENS) - | Flow Meter | Solids Building | No | Hours | 0.00 | |
| GBT TO Dig. | ||||||
| 08-FIT-110 (SIEMENS) - DIg. | Flow Meter | Solids Building | No | Hours | 0.00 | |
| TO Gravity Belt | ||||||
| 08-FIT-210 (SIEMENS) - | Flow Meter | Solids Building | No | Hours | 0.00 | |
| DIG. TO Centrifuge | ||||||
| 02-FIT-351 (SIEMENS) - | Flow Meter | Infront of Drum | No | Hours | 0.00 | |
| Drain Pump Station TO SBR | screen Area | |||||
| Influent | (Vault) | |||||
| 04-FIT-240 (SIEMENS) - | Flow Meter | Next To | No | Hours | 0.00 | |
| Disk filter TO Overflow | Overflow Weir | |||||
| 01-EW - Eye Wash Station | OOOPS | No | Hours | 0.00 | ||
| 02-EW - Eye Wash Station | Maintenace | No | Hours | 0.00 | ||
| Shop | ||||||
| Gravity Belt (Polymer Line) - | Solids Building | No | Hours | 0.00 | ||
| GBT Polymer Line | ||||||
| inspect ladders - safety | SRTTP | No | Hours | 0.00 | ||
| equipment | ||||||
| Catch Basin - Catch Basin | No | Hours | 0.00 | |||
| ,Sweap | ||||||
| Swap Influent Flow Meters - | Influent Pump | No | Hours | 0.00 | ||
| Flow Meters | Station | |||||
| UPS Batteries(Taps 1) - | TAPS 1 | No | Hours | 0.00 | ||
| Batteries | ||||||
| UPS Batteries(Water Tower) | Water tower | No | Hours | 0.00 | ||
| - Batteries | ||||||
| GAS ALERT MAX XTll (#19) | SRTTP | No | Hours | 0.00 | ||
| - Gas Alert | ||||||
| GAS ALERT MAX XTll (#54) | SRTTP | No | Hours | 0.00 | ||
| - Gas Alert | ||||||
| GAS ALERT MAX XTll (#58) | SRTTP | No | Hours | 0.00 | ||
| - Gas Alert | ||||||
| PLC-7 - PLC-Disk filter#4 | PLC | Disk filter#4 | No | Hours | 0.00 | |
| Ford Truck 4x4 (ON CALL) - | SRTTP | No | Hours | 0.00 | ||
| On call truck | ||||||
| 12/18/2018 01:27 pm | 29 of | 33.0 |
Sheet30
| Equipment List Report Without Notes | ||||||
| SRTTP | ||||||
| Average | ||||||
| Equipment | Type | Location | Department | Metered | Units | Per Day |
| AlumStorageArea(polymer | Alum Storage | No | Hours | 0.00 | ||
| Mixer) - Motor | Area | |||||
| 03-CV-265 - SBR WAS | Check Valve | 03-SBR#6 | No | Hours | 0.00 | |
| PUMP #6 Discharge Check | ||||||
| Valve | ||||||
| 03-CV-275 - SBR WAS | Check Valve | 03-SBR#7 | No | Hours | 0.00 | |
| PUMP #7 Discharge Check | ||||||
| Valve | ||||||
| heavy equipment - forklift | SRTTP | No | Hours | 0.00 | ||
| skidsteers wheel loader | ||||||
| dump truck | ||||||
| 03-AIT-287 SBR#7 - ORP | SBR#7 | No | Hours | 0.00 | ||
| Probe | ||||||
| 03-AIT-276 SBR#7 - DO | SBR#7 | No | Hours | 0.00 | ||
| Probe | ||||||
| 03-AIT-236 SBR#3 - SBR#3 | D.O Probe | 03-SBR#3 | No | Hours | 0.00 | |
| D.O. Analyzer/Xmitter Probe | ||||||
| 04-M-240 - Disk filter#3 drive | Drive Motor | 04-Disk Filter#3 | No | Hours | 0.00 | |
| Chain | ||||||
| SRTTP Spill Kit - Spill Kit | SRTTP | No | Hours | 0.00 | ||
| inspection | ||||||
| SRTTP ARC Flash Suit - | SRTTP | No | Hours | 0.00 | ||
| ARC Flash inspection | ||||||
| Chlorine Contact Sample | Westside | No | Hours | 0.00 | ||
| Pump - Sample | Chlorine Contact | |||||
| Pump(Westside) To Disk | Tank To Disk | |||||
| Filters | Filters | |||||
| Empty old polymer totes - | SRTTP | No | Hours | 0.00 | ||
| polymer tote | ||||||
| Bisulfite Pump NO.1 - LMI | OOOPS AREA | No | Hours | 0.00 | ||
| Pump | ||||||
| Bisulfite Pump No.2 - LMI | OOOPS AREA | No | Hours | 0.00 | ||
| Pump | ||||||
| Reclaim Line - 2" Digester | Digester/Was | No | Hours | 0.00 | ||
| Tanks | ||||||
| Bisulfite Tank Drain Valve - | Valve | OOOPS Area | No | Hours | 0.00 | |
| Drain Valve | ||||||
| Used Oil 55Gal Drums - | By Grit | No | Hours | 0.00 | ||
| 55Gal Drums | Collectors | |||||
| 12/18/2018 01:27 pm | 30 of | 33.0 |
Sheet31
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .