The file's text, extracted by GovTribe without its formatting.
ANNEX 1503030
INTEGRATED SOLID WASTE MANAGEMENT
SECTION C
1503030 – Integrated Solid Waste Management
Table of Contents
| 1.1 |
| Concept of Operations |
| 2 |
| Management and Administration |
| 2.1 |
| Definitions and Acronyms |
| 2.2.1 |
| Certification, Training, and Licensing |
| 2.3.1 |
| Recyclable Accounting |
| 2.3.2 |
| Weight Tickets (Non-Recyclable) |
| 2.3.3 |
| Permits and Licenses |
| 2.4 |
| References and Technical Documents |
| 3.1 |
| Solid Waste Collection |
| 3.1.1.1 |
| General Household Waste |
| 3.1.2.4 |
| Foreign Port Origin Waste |
| 3.2.3 |
| Foreign Port Origin Waste |
| 3.3 |
| Vehicles and Equipment |
| 3.4 |
| Solid Waste Containers |
| 3.4.4 |
| Foreign Port Origin |
| 3.5 |
| Compactors and Containers |
1503030 - Integrated Solid Waste Management
| Spec Item |
| Title |
| Description |
| 1 |
| General Information |
| The Contractor shall provide all labor, management, supervision, tools, material, and equipment required to perform refuse collection, disposal and recycling at Camp Pendleton, CA. |
| 1.1 |
| Concept of Operations |
| The intent of 1503030 Integrated Solid Waste Management is to specify the requirements related to the collection and disposal of solid waste and recyclable materials. |
The following services are not included in this Template:
· Waste removal from inside buildings and service locations to waste collection points. This is included in 1503010, Custodial.
· Removal and disposal of biohazardous waste is addressed in 1800000 Environmental.
· ISWM services do not include any repair work of facilities or fixtures. This is included in 1502000, Facilities Investment.
1503030 - Integrated Solid Waste Management
| Spec Item |
| Title |
| Description |
| 2 |
| Management and Administration |
| 2.1 |
| Definitions and Acronyms |
| Definitions and Acronyms are listed in J-1503030-01. |
| 2.2 |
| Personnel |
| The Contractor shall provide personnel with the qualifications, technical knowledge, experience and skills required for efficient operations within the Integrated Solid Waste Management function. |
| 2.2.1 |
| Certification, Training, and Licensing |
| 2.3.1 |
| Recyclable Accounting |
| The Contractor shall submit receipts denoting the date, type and quantity of material recycled. The Contractor shall submit receipts of revenue generated by sale of recyclable materials. The Contractor shall submit Defense Reutilization management Office (DRMO) receipts. Submit all Revenue Receipts per Section F with the Contractor’s monthly invoice. |
| 2.3.2 |
| Weight Tickets (Non-Recyclable) |
| Individual weight tickets denoting the date, type of truck or container, and tonnage disposed shall be submitted per Section F with the Contractor's monthly invoice. The Contractor shall also provide the total tabulated tonnage disposed during the month. |
| 2.3.3 |
| Permits and Licenses |
| Within 15 calendar days after contract award, the Contractor shall submit copies of disposal permits or other written documentation of approval and suitability of landfill or other final disposal methods. |
| 2.4 |
| References and Technical Documents |
| References and Technical Documents are listed in J-1503030-02. |
1503030 - Integrated Solid Waste Management
| Spec Item |
| Title |
| Performance Objective |
| Related Information |
| Performance Standard |
| 3 |
| FFP Work |
| The Contractor shall provide refuse collection, disposal and recycling services to ensure refuse and recyclables are properly collected and disposed. |
| The Contractor shall provide services based on the awarded CLINs listed in Section B. |
Refuse and recyclables are properly collected and disposed consistent with the provided in J-1503030-03.
Pickups are scheduled at the minimum number that will prevent waste container overflow.
Recycling is performed to reduce solid waste volume.
| 3.1 |
| Solid Waste Collection |
| The Contractor shall provide collection of residential, commercial, and industrial solid wastes to ensure refuse and recyclables are properly collected. |
| The Contractor shall develop and submit a schedule that has been optimized for solid waste collection per Section F. |
The Contractor shall submit changes to the solid waste collection schedule in writing to the KO for approval.
If the scheduled collection day falls on an observed holiday, pickup shall be on the following work day.
The Contractor shall collect and dispose of any spillage.
Descriptions and locations of waste containers are shown in the facilities area.
Residential, commercial, and industrial solid wastes are collected per the Contractor’s schedule.
Waste collection areas are free of waste following collection operations.
| 3.1.1 |
| Residential |
| N/A |
| N/A |
| N/A |
| 3.1.1.1 |
| General Household Waste |
| N/A |
| N/A |
| N/A |
| 3.1.1.2 |
| Recyclable Waste |
| N/A |
| N/A |
| N/A |
| 3.1.1.3 |
| Bulky Items |
| N/A |
| N/A |
| N/A |
| 3.1.2 |
| Non-Residential |
| The Contractor shall remove non-residential waste from containers to ensure refuse and recyclables are properly collected. |
| The Contractor shall return each waste container to its original location. |
Non-residential waste is removed from waste collection areas per the Contractor’s schedule.
| 3.1.2.1 |
| General Waste |
| The Contractor shall remove general waste from containers to ensure refuse is properly collected. |
General waste is removed from waste collection areas per the Contractor’s schedule.
Containers are returned to an upright position and lids are secured.
| 3.1.2.2 |
| Recyclable Waste |
| The Contractor shall remove recyclable waste from containers to ensure it is properly collected. |
| All recyclable waste will be placed in designated containers that are segregated by the type of recyclable waste, including paper, plastics, glass, metals, and cardboard. |
Recyclable Waste Collection Points are designated areas on each facilities site Recyclable waste is removed from waste collection areas per the Contractor’s schedule.
Containers are returned to an upright position and lids are secured.
| 3.1.2.3 |
| Bulky Waste |
| The Contractor shall remove bulky waste to ensure it is properly collected. |
| Bulky waste includes all refuse too large or heavy to be placed in designated containers but is within a waste deposit area. |
| Bulky waste is removed from waste collection areas per the Contractor’s schedule. |
| 3.1.2.4 |
| Foreign Port Origin Waste |
| N/A |
| N/A |
| N/A |
| 3.2 |
| Solid Waste Disposal |
| The Contractor shall dispose of residential, commercial, and industrial solid waste to ensure compliance with all applicable local, state, and federal laws and regulations. |
| Contractor is authorized to use on Installation dump locations IAW Camp Pendleton Regulations. Any fees associated with disposal shall be paid by the Contractor. |
Open burning is prohibited and is not an authorized means of solid waste disposal.
The Contractor shall collect and dispose of any spillage.
Solid waste disposal complies with all applicable local, state, and federal laws and regulations.
| 3.2.1 |
| Non-Recyclable |
| The Contractor shall dispose of non-recyclable solid waste to ensure compliance with all applicable local, state, and federal laws and regulations. |
| Prior to disposal, all solid wastes shall be sorted to remove recyclable materials. |
Solid waste disposal complies with all applicable local, state, and federal laws and regulations.
| 3.2.2 |
| Recyclable |
| The Contractor shall recycle solid waste to ensure compliance with the installation’s waste reduction policy. |
| Income generated from the sale of recyclable material shall be returned to the Government. |
The Contractor shall deliver industrial and commercial recyclable solid waste to the DRMO located at Camp Pendleton Solid waste is recycled in accordance with installation policy.
| 3.2.3 |
| Foreign Port Origin Waste |
| N/A |
| N/A |
| N/A |
| 3.3 |
| Vehicles and Equipment |
| The Contractor shall maintain vehicles and equipment in a manner to ensure a clean appearance, minimal foul odors, and normal working condition. |
| The Contractor shall not clean vehicles and equipment on Government property. |
| Vehicles and equipment are clean, have minimal foul odors, and are maintained in normal working condition. |
| 3.4 |
| Solid Waste Containers |
| The Contractor shall provide containers suitable for the collection and disposal of solid waste. |
| The Contractor shall submit recommended changes to the size and location of solid waste containers in writing to the KO for approval. |
The Contractor's name and phone number shall be prominently displayed on each container.
All doors, lids, hinges, rollers, breaking devices, and other moving parts shall be maintained to keep containers in normal working condition. Bent, damaged, leaking, rusting, and unsightly containers shall be repaired or replaced in a timely manner.
The Contractor shall not clean containers on Government property.
All containers are of standard commercial-industrial grade and are clean, have minimal foul odors, and maintained in normal working condition.
| 3.4.1 |
| Refuse |
| The Contractor shall provide containers suitable for the collection and disposal of refuse. |
| Containers shall be specifically designed for food waste and shall be leak-proof and rust-proof. |
| All containers are suitable for the collection and disposal of refuse. |
Containers do not leak.
| 3.4.2 |
| Recyclables |
| The Contractor shall provide containers suitable for the collection and recycling of materials. |
| Containers shall be labeled with the type of recyclable material to be collected. |
| All containers are suitable for the collection and recycling of materials and correctly labeled. |
| 3.4.3 |
| Residential |
| N/A |
| N/A |
| N/A |
| 3.4.4 |
| Foreign Port Origin |
| N/A |
| N/A |
| N/A |
| 3.5 |
| Compactors and Containers |
| N/A |
| N/A |
| N/A |
1503030 - Integrated Solid Waste Management
| Spec Item |
| Title |
| Performance Objective |
| Related Information |
| Performance Standard |
| 4 |
| IDIQ Work |
| IDIQ work may be ordered utilizing DoD EMALL in accordance with Section H or on a task order in accordance with the PROCEDURES FOR ISSUING ORDERS clause in Section G. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order. |
| Refer to IDIQ ELINs for task listings, descriptions, and related requirements. All periods of performance are measured from issue date of order to acceptance of the work. Performance standards for IDIQ work will be the same as those in Spec Item 3 where applicable. |