Section J Documents Exhibits & other Attachments Annex 0200000 J Management and Administration ver 2 5.doc

DOC document 312 KB Posted

Attached to
Operation & Maintenance of the Southern and Northern Regional Tertiary Treatment Plants on MCB Camp Pendleton
Solicitation number
N6247319R0033
Issued by

View the file

Other files

File Type Posted
Amendment 0005_N6247320R0033.pdf PDF
AMENDMENT 0004.pdf PDF
Amendment 0003_N6247320R0033.pdf PDF
P-1046B Construction Plans 04-05-2016.pdf PDF
RW_Overall.pdf PDF
EXHIBIT D REVISED _ Safety Data & Narrative.docx DOCX document
SRTTP & NRTTP Chemical Usage 2017 & 2018.xlsx XLSX spreadsheet
RWPS Electrical Equipment List.xlsx XLSX spreadsheet
Amendment 0002_N6247320R0033.pdf PDF
ELIN Pricing Schedule REVISED.xls XLS spreadsheet
EXHIBIT B REVISED _ Recent Relevant Experience of the Firm.docx DOCX document
RWPS Equipment List.xlsx XLSX spreadsheet
Rules and Regs Final_Signed April 2013 Edition.pdf PDF
SierraOne Equipment List.xlsx XLSX spreadsheet
Amendment 0001_N6247320R0033.pdf PDF
Annex 0200000 C Management and Administration (SW SubKtr Safety) Revision 13 JUN.docx DOCX document
Annex 1503030 J Integrated Solid Waste Management v2.2.doc DOC document
ELINS Unpopulated.xls XLS spreadsheet
Annex 1503020 C Pest Control v2.3.docx DOCX document
NRTTP Equipment List.xlsx XLSX spreadsheet
SRTTP Equipment List.xlsx XLSX spreadsheet
EXHIBIT F _ Individual Small Business Subcontracting Plan.docx DOCX document
SRTTP EquipmentList_OM.xls XLS spreadsheet
SRTTP-NRTTP LOADINGS.XLSX XLSX spreadsheet
Annex 1503020 F Pest Control v2.3.doc DOC document
SRTTP Electrical Equipment List.xlsx XLSX spreadsheet
EXHIBIT D _ Safety Data & Narrative.docx DOCX document
Annex 1503010 F Custodial v2.3.doc DOC document
EXHIBIT B _ Recent Relevant Experience of the Firm.docx DOCX document
Annex 1503010 C Custodial v2.3 ck.doc DOC document
EXHIBIT G _ Request for Information (RFI).docx DOCX document
Annex 0100000 C General Information ver 2.2 (revised 040715).doc DOC document
EXHIBIT A _ Financial Questionnaire.docx DOCX document
NRTTP Electrical Equipment List.xlsx XLSX spreadsheet
SCA Wage Determination 16 SEP 19 .pdf PDF
Annex 1503050 C Grounds Maint & Landscaping v2.5.doc DOC document
EXHIBIT C _ Technical Capability (1).docx DOCX document
Annex 1604000 F Wastewater Ver 2.2.doc DOC document
Annex 1604000 C Wastewater Rev 2 13 JUN.docx DOCX document
EXHIBIT E _ Past Performance Questionnaire (Form PPQ).docx DOCX document
Annex 1503050 F Grounds Maint & Landscaping v2.3.doc DOC document
Annex 1503020 J Pest Control v2.4.docx DOCX document
NRTTP Boundary Map.pdf PDF
SRTTP Compliance Equipment List.xlsx XLSX spreadsheet
Annex 1503050 J Grounds Maint & Landscaping v2.6.docx DOCX document
Section F Deliveries or Performance Annex 0200000 F Management and Administration v2.8 (revised 12-6-2018).docx DOCX document
SRTTP Boundary Map.pdf PDF
Annex 1503010 J Custodial v2.3.doc DOC document
Annex 1503030 F Integrated Solid Waste Management v2.3.doc DOC document
Annex 1503030 C Integrated Solid Waste Management v2.3.doc DOC document
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ANNEX 0200000

MANAGEMENT AND ADMINISTRATION

SECTION J: DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J

DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

TABLE OF CONTENTS

ATTACHMENT NUMBER
ATTACHMENT TITLE
J-0200000-01
DEFINITIONS AND ACRONYMS
J-0200000-02
WAGE DETERMINATIONS
J-0200000-03
DIRECTIVES, INSTRUCTIONS, AND REFERENCES
J-0200000-04
INVOICING
J-0200000-05
FORMS
J-0200000-06
GOVERNMENT-FURNISHED PROPERTY, OR MATERIALS
J-0200000-07
USMC MAXIMO SYSTEM ACCESS PROCEDURES
J-0200000-08
USMC MAXIMO DATA REPORT
J-0200000-09
INSTALLATION SPILL CONTROL PLAN
J-0200000-10
CONTRACTOR HAZARDOUS MATERIAL INVENTORY LOG
J-0200000-11
EXHIBIT LINE ITEM NUMBERS

ATTACHMENT J-0200000-01

DEFINITIONS AND ACRONYMS

Definition
Description
Assessment
A general term referring to either a survey or inspection of a facility to determine condition.
Asset
A general term used to refer to an item, such as a component, system, building or facility, which is managed by an automated data management program.
Business Management System (BMS)
A web-based tool that provides a systematic method for the management of business processes, common practices, and process quality improvements that produce and support the most efficient and effective delivery of NAVFAC’s products and services.
Competent Person
A person who has the professional experience and training necessary to identify existing and predictable hazards at a work or service environment, and who has the authority to take prompt and corrective action to eliminate or remove dangers from the environment.

One who can identify existing and predictable hazards in the working environment or working conditions that are dangerous to personnel and who has authorization to take prompt corrective measures to eliminate them.

Component Inventory Management Unit (CIMU)
An organization of like-kind real property into manageable maintenance units. CIMU is a building component, group of components or component assemblies, serving a specific purpose in a facility that can be expected to follow a common and predictable lifecycle behavior. This class of non-equipment will include items such as exterior walls, exterior windows, interior finish, and roofs. This class of equipment will include items such as fan coil units, air handling units, lighting, and water closets. CIMUs can include one or more items of installed equipment typically subject to routine scheduled maintenance.
Confined Work Space
A space that is large enough and so configured that a person may bodily enter a space (such as in tanks, vessels, silos, storage bins, hoppers, vaults, pits, and like spaces where there is limited means of entry) and is hindered or restricted from escaping during an emergency.
Contracting Officer (KO)
That individual with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.
Contracting Officer’s Representative (COR)
The individual appointed by the KO responsible for monitoring the Contractor’s technical compliance and progress, relative to assigned contract(s)/orders(s), based on the contract requirements specified in the PWS and in accordance with the PAP. The COR performs a variety of contract administration duties that includes oversight of PA, documenting and rating Contractor performance, reviewing invoices, and acceptance of work. Assignment as a COR is a collateral duty typically performed by the FSCM or SPAR.
Contractor
That entity or its representative responsible for the delivery of the services or materials specified in this contract, as designated by contract award. The term Contractor as used herein refers to both the prime Contractor and any subcontractors. The prime Contractor shall insure that subcontractors comply with the provision of this contract.
Contractor Representative
That individual appointed by the Contractor, either orally or in writing, who has been assigned responsibility for executing the requirements of this contract.
Direct Material Costs
The actual vendor invoice charges for materials used for performance of work under this contract. Direct material costs shall include transportation charges when such charges are included on the invoice by the vendor, as well as any discounts allowed for prompt payment and discounts or rebates for core value or salvage value that accrue to the Contractor. When questions arise concerning the cost of materials, material costs will be based on the lowest of quotes provided by the Contractor from at least three different commercial vendors for the direct material cost. The Government retains the right to obtain additional quotes in questionable situations. The lowest price will be used.
Electronic Operation And Maintenance And Support Information (eOMSI)
A set of consultant-prepared data and document files that contain detailed, as-built technical information that describes the efficient, economical and safe operation, maintenance and repair of a facility, plant, equipment or system throughout its life cycle. Generally, it is prepared during construction and submitted upon completion of a new facility or major facility upgrade. eOMSI’s typically include asset information, staffing and budgeting information, supply support including critical spare parts, operating procedures, troubleshooting and diagnostic guides, extended warranty data, maintenance task frequencies and documentation, technical data, repair procedures and manufacturer’s product data. eOMSI data and document files are provided in electronic formats.
Equipment
Tangible asset that is functionally complete for its intended purpose, durable, and non-expendable.
Facility
A building or structure designed and created to serve a particular function.
Fixed Burden Rate (FBR)
The additional costs (expressed in percent of direct material cost) for ordering, handling, and stockpiling materials and repair parts. For example, if the offeror's Fixed Burden Rate for materials in the Base Period is 10% then:

$100,000.00 + ($100,000.00 x 10%) = $110,000.00

The Government will compensate the Contractor for the required parts and materials and not the total amount shown in Schedule of Indefinite Delivery Indefinite Quantity Work.

Frequency Of Service
<<Note to Spec Writer: Edit as appropriate>>

Annual (A). Services performed once during each 12-month period of the contract at intervals of 335 to 395 days.

Biennial (B). Services performed once during each 24-month period of the contract at internals of 670 to 790 days.

Daily (D5). Services performed once each calendar day, Monday through Friday, including holidays unless otherwise noted.

Daily (D7). Services performed once each calendar day, seven days per week, including weekends and holidays.

Monthly (M). Services performed 12 times during each 12-month period of the contract at intervals of 28 to 31 calendar days.

Quarterly (Q). Services performed four times during each 12-month period of the contract at intervals of 80 to 100 calendar days.

Semiannual (SA). Services performed twice during each 12-month period of the contract at intervals of 160 to 200 calendar days.

Semimonthly (SM). Services performed 24 times during each 12-month period of the contract at intervals of 14 to 16 calendar days.

Three times weekly (3W). Services performed three times a week, such as Monday, Wednesday, and Friday.

Twice weekly (2W). Services performed twice a week, such as Monday and Thursday or Tuesday and Friday.

Weekly (W). Services performed 52 times during each 12-month period of the contract at intervals of six to eight calendar days.

Government Furnished Property (GFP)
Property in the possession of, or directly acquired by, the Government and subsequently furnished to the contractor for performance of a contract. Government furnished property includes, but is not limited to, spares and property furnished for repairs, maintenance, overhaul, or modification. Government furnished property also includes contractor acquired property if the contractor acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.
Infrastructure Condition Assessment Program (ICAP)
A Navy automated data management program that utilizes historical asset lifecycle data and a structured assessment process to evaluate the condition facilities and their components.
Inspection
A rigorous, detailed assessment of the condition of a facility performed to generate a fundable scope and cost estimate for prioritization and funding of maintenance and repair.
Job or Work Order
An authorization for work that requires planning and estimating and has an individual line of accounting for financial and performance evaluation.
Load Handling Equipment
A term used to describe cranes, hoists and all other hoisting equipment (hoisting equipment means equipment, including crane, derricks, hoists and power operated equipment used WITH RIGGING to raise, lower and/or horizontally move a load.
Maintenance And Repair
The preservation or restoration of a piece of equipment, system, or facility to such condition that it may be effectively used for its designated purposes. Maintenance/repair may be adjustment, overhaul, reprocessing, or replacement of constituent parts or materials that are missing or have deteriorated by action of the elements or usage, or replacement of the entire unit or system if beyond economical repair.
NAVFAC MAXIMO
A specially configured software version of MAXIMO®, a commercially available computerized maintenance management system (CMMS), adopted by NAVFAC for enterprise facility asset data management. The terms “MAXIMO”, “NAVFAC MAXIMO” or “Government’s MAXIMO” shall be used interchangeably in the document.
Performance Assessment
A method used by the Government to provide some measure of control over the quality of purchased goods and services received.
Performance Assessment Representative (PAR)
The individual(s) assigned as a Technical Point of Contact (TPOC) / Subject Matter Expert (SME) to the COR to perform duties as the on-site representative who assesses Contractor performance. The PAR periodically observes Contractor performance, reviews delivered services, reviews quality management corrective actions, periodically assesses and documents Contractor performance on PAWs and the MPAS, and communicates findings as necessary with the Contractor, SPAR, and COR.
Pre-Expended Bin Materials And Supplies
The minor materials and supplies that are incidental to the job, for which the total direct cost of any one material line item shown on the material estimate is $10.00 or less. Examples of pre-expended bin materials and supplies include, but are not limited to, solder, lead, flux, electrical connectors, electrical tape, fuses, nails, screws, bolts, nuts, washers, spacers, masking tape, sand paper, solvent, cleaners, lubricants, grease, oil, rags, mops, glue, epoxy, spackling compound, joint tape, plumbers tape and compound, clips, welding rods, and touch up paint.
Property Administrator
An authorized representative of the Contracting Officer who is responsible for administering contract property requirements, terms and conditions of the contract
Property Management Program
A Government program established for the purpose of reviewing and approving the Contractor’s Property Management Plan and System through performance of a system analysis whenever government property is in the possession of the Contractor.
Quality Assurance (QA)
The planned and systematic activities implemented in a quality system so that quality requirements for a product or service will be fulfilled.
Quality Control (QC)
The observation techniques and activities used to fulfill requirements for quality.
R. S. Means
A data collection and organization system developed by R. S. Means Company which can be used to prepare accurate, dependable construction estimates and budgets in a variety of ways. The Contractor shall use the latest edition. Material prices are based on a national average and computed labor costs are based on a 30-city national average. An estimate prepared using this data is called a "Means estimate"; data may simply be referred to as "Means".
Real Property Inventory Equipment (RPIE)
A Government owned or leased individual pieces of equipment, apparatus, or fixture that are essential to the function of the real property (i.e. plumbing, electrical, heating, cooling and elevators). It is physically attached to, integrated into, and built in or on the property.

Individual RPIE’s can be combined to make a CIMU to facilitate facilities management. An individual RPIE can also be a CIMU if the equipment is complex enough to require its own management planning.

Response Time
The time allowed the Contractor after initial notification of a work requirement to be physically on the premises at the work site with appropriate personnel, tools, equipment, and materials, ready to perform the work required.
Unit Priced Labor (UPL) Hour
The unit price bid by the Contractor to perform one hour of work-in-place. With the exception of direct material and construction equipment costs, the unit price includes all indirect and direct costs associated with performing work. The price includes the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity; costs for pre-expended bin materials, union agreements, crew sizes, hand tools, payroll burdens and fringes, overtime, job (field) overhead (including clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance), general and administrative (home office) overhead, and profit. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements are included.

ATTACHMENT J-0200000-01

DEFINITIONS AND ACRONYMS

Acronym
Title
ACO
Administrative Contracting Officer
BW
Biweekly
CDR
Contract Discrepancy Report
CIA
Controlled Industrial Area
CIMU
Component Inventory Management Unit
CMMS
Computerized Maintenance Management System
COR
Contracting Officer Representative
COR
Condition of Readiness
DBH
Diameter at Breast Height
DCR
Direct Condition Rating
DoD
Department of Defense
DoN
Department of Navy
DRMO
Defense Reutilization Management Office
EPA
Environmental Protection Agency
EPCRA
Emergency Planning and Community Right-to-Know Act
FAR
Federal Acquisition Regulation
FFP
Firm Fixed Price
FIFRA
Federal Insecticide, Fungicide, and Rodenticide Act
FSC
Facility Support Contract
FSCM
Facility Support Contract Manager
GIS
Geospatial Information System
GFE
Government-furnished Equipment
GFF
Government-furnished Facilities
GFM
Government-furnished Materials
HCA
Head Contracting Agency
ICAP
Infrastructure Condition Assessment Program
ICP
Integrated Contingency Plan
IDIQ
Indefinite Delivery Indefinite Quantity
iNFADS
Internet Navy Facilities Asst Data Store
IPM
Integrated Pest Management
IPMIS
Integrated Pest Management Information System
IPMP
Integrated Pest Management Plan
KO
Contracting Officer
LAN
Local Area Network
M
Monthly
MAP
Maintenance Action Plan
MDI
Mission Dependency Index
MEP
Mechanical, Electrical and Plumbing
MPAS
Monthly Performance Assessment Summary
MRI
Mission Readiness Index
MSDS
Material Safety Data Sheets
NAVFAC
Naval Facilities Engineering Command
NMCI
Navy Marine Corps Intranet
NOSC
Navy-On-Scene Coordinator
PAP
Performance Assessment Plan
PAR
Performance Assessment Representative
PAW
Performance Assessment Worksheet
PEO
Program Executive Officer
PM
Project Manager
PM
Planned Maintenance or Preventative Maintenance
PRCSP
Permit Required Confined Space Program
PWS
Performance Work Statement
PWO
Public Works Officer
Q
Quarterly
QC
Quality Control
RPIE
Real Property Inventory Equipment
RSL
Remaining Service Life
SC
Security Clearances
SM
Semimonthly
SPAR
Senior Performance Assessment Representative
TE
Technical Exhibit
VIQ
Variation in Quantity
WBS
Work Breakdown Structure

ATTACHMENT J-0200000-02

WAGE DETERMINATIONS

CONTRACT SPECIALIST Placeholder for Service Contract Act and Davis-Bacon Act Determinations.

ATTACHMENT J-0200000-03

DIRECTIVES, INSTRUCTIONS, AND REFERENCES

Reference
Title
EM 385-1-1
U.S. Army Corps of Engineers Safety and Health Requirements
P.L. 91-596
Occupational Safety and Health Act

ATTACHMENT J-0200000-04

INVOICE FORM

WAWF WILL BE UTILIZED

ATTACHMENT J-0200000-05

FORMS

Other forms will be forward to the Contractor after award.

ATTACHMENT J-0200000-05

ATTACHMENT "A"

CONTRACTOR CRANE OPERATING CHECKLIST FOR CRITICAL LIFTS
YES
NO
1
Does the operator know the weight of the load to be lifted?
2
Is the load to be lifted within the crane manufacturer's rated capacity in its present configuration?
3
Is the crane level and on firm ground?
4
Are outriggers required?
5
If so, are outriggers fully extended and down, and the load off the wheels?
6
If blocking is required, is the entire surface of the outrigger pad supported, and is the blocking material of sufficient strength to safely support the loaded outrigger pad?
7
If outriggers are not used, is the crane rated for on-rubber lifts by the manufacturer's load chart?
8
Is the swing radius of the crane counterweight clear of people and obstructions and accessible areas within the swing area barricaded to prevent injury, damage and unplanned encroachment?
9
Has the hook been centered over the load in such a manner to prevent swing (deflection, side loading, load-moment)?
10
Is the load well secured and balanced in the sling or lifting device before it is lifted (free and clear) more than a few inches?
11
Is the lift swing path clear of obstructions?
12
If rotation of the load being lifted is hazardous, is tag line or restraint line being used?
13
Are personnel prevented from standing or passing under a suspended load?
14
Are personnel prevented from entering the load fall zone?
15
Is the crane operator's attention diverted?
16
Are proper signals being used at all times?
17
If radio communications are used is the frequency isolated to the crane team?
18
Do the operations ensure that side and tip loading is prohibited?
19
Are start and stop motions in a smooth fluid motion (no sudden acceleration or deceleration)?
20
If operating near electric power lines, are the rules and guidelines understood and adhered to as specified in NAVFAC P-307?
21
Is the lift a critical lift?
22
If so, are critical lift regulations understood, check-off sheets initialed and signed off, and was there an interactive brief conducted with associated personnel?
23
Is Attachment "A" current, filled out completely, and posted in the crane?

Contractor Name (Print Legibly):

Contractor Name (Signature):

Location:
Date:

CRANE AND RIGGING GEAR ACCIDENT REPORT

Accident Category:

Crane Accident Rigging Gear Accident

From:

UIC:

To:

Navy Crane Center

Bldg. 491 NNSY

Portsmouth, VA 23709

Fax: 757-967-3808

Activity:

Report No:

Crane No:

Category:

Accident Date:

Time: hrs:

Category of Service:

SPS

GPS

Crane Type:

Crane Manufacturer:

Was Crane/Rigging Gear Being Used in SPS: Yes No
Was Crane/Rigging Gear Being Used in a Complex Lift/Critical Non-Crane Rigging Operation: Yes No

Location:

Weather:

Crane Capacity:

Hook Capacity:

Weight of Load on hook:

Fatality or Permanent Disability? Yes No

Material/Property Cost Estimate:

Reported to NAVSAFECEN? Yes No

Accident Type:

Personal Injury Overload Derail Damaged Rigging Gear

Load Collision Two Blocked Dropped Load Damaged Crane

Crane Collision Damaged Load Other: Specify

Cause of Accident:

Improper Operation Equipment Failure Inadequate Visibility

Improper Rigging Switch Alignment inadequate Communication

Track Condition Procedural Failure

Chargeable to:

Crane Walker Rigger Operator

Maintenance Management/Supervision

Crane Function:

Travel Hoist Rotate Luffing Telescoping Other N/A

Is this accident indicative of a recurring problem?

Yes No

If yes, list Accident Report Nos.:

ATTACH COMPLETE AND CONCISE SITUATION DESCRIPTION AND CORRECTIVE/PREVENTIVE ACTIONS TAKEN AS ENCLOSURE (1). Include probable cause and contributing factors. Assess damages and define responsibility. For equipment malfunction or failure, include specific description of the component and the resulting effect or problem caused by the malfunction or failure. List immediate and long term corrective/preventive actions assigned and respective codes.

Preparer:

Phone:

E-mail:

Code:

Date:

Concurrences: (Include Code, Signature and Date)

Code:

Date:

Code:

Date:

Certifying Official (Crane Accident Only):

Code:

Date:

CRANE AND RIGGING GEAR ACCIDENT REPORT INSTRUCTIONS

This form is designed for fax transmission without a cover page or by e-mail and, with enclosures and signatures, shall be the official document. Electronic submission will be accepted without signatures but the names of the preparer, concurring personnel, and certifying official (for crane accidents only) shall be filled in. The e-mail address is m_nfsh_ncc_accident@navy.mil. The fax number is (757) 967-3808.

1. Accident Category: Indicate either crane accident or rigging gear accident.

2. From: The naval activity that is responsible for reporting the accident and UIC number.

3. Activity: The naval activity where the accident took place.

4. Report No.: The activity assigned accident number (e.g., 95-001).

5. Crane No.: The activity assigned crane number (e.g., PC-5), if applicable.

6. Category: Identify category of crane (i.e., 1, 2, 3, or 4), if applicable.

7. Accident Date: The date the accident occurred.

8. Time: The time (24 hour clock) the accident occurred (e.g., 1300).

9. Category of Service: Check the applicable service (SPS as defined by NAVSEA 0989-030-7000).

10. Crane Type: The type of crane involved in the accident (e.g., mobile, bridge), if applicable.

11. Crane Manufacturer: The manufacturer of the crane (e.g., Dravo, Grove, P&H), if applicable.

12. SPS: Was the crane or rigging gear being used in an SPS lift?

13. Complex lift: Was the crane or rigging gear being used in a complex lift?

14. Location: The detailed location where the accident took place (e.g., building 213, dry dock 5).

15. Weather: The weather conditions at time of accident (e.g., wind, rain, cold).

16. Crane Capacity: The certified capacity of the crane (e.g., 120,000 pounds), if applicable.

17. Hook Capacity: The capacity of the hook involved in the accident at the max radius of the operation, if applicable.

18. Weight of Load on Hook: If applicable, the weight of the load on the hook.

19. Fatality or Permanent Disability?: Check yes or no.

20. Material/Property Cost Estimate: Estimate total cost of damage resulting from the accident.

21. Reported to NAVSAFECEN?: Self-explanatory.

22. Accident Type: Check all that apply.

23. Cause of Accident: Check all that apply.

24. Chargeable to: Check all that apply.

25. Crane Function: Check all functions in operation at time of accident. Check N/A if a rigging gear accident.

26. Is this a recurring problem?: Check yes or no. Identify any other similar accidents.

27. Situation Description/Corrective Actions: Self-explanatory.

28. Preparer: Self-explanatory.

29. Concurrences: Self-explanatory.

30. Certifying Official (Crane Accidents Only): Self-explanatory.

31. Brief Description: No more than one paragraph summarizing the resultant incident.

32. Background and Detailed Description: Provide the relevant background in a descriptive timeline of preconditions leading up to the event, as well as a detailed description of the event.

33. Corrective Actions: List all short term and long term corrective actions that are taken to prevent recurrence of the incident. Short Term Corrective Actions are those actions taken that will allow return to work in short time frame. Long Term actions are more ‘programmatic’ in nature and typically include: process revision, changes in training, ‘mistake proofing’, etc.

ATTACHMENT J-0200000-05

FORMS

CRANE AND RIGGING GEAR NEAR MISS REPORT

Near Miss Category:

Crane Near Miss

Rigging Gear Near Miss

From:

UIC:

To: Navy Crane Center

Bldg 491 NNSY

Portsmouth, VA 23709

Fax (757) 967-3808 nfsh_ncc_accident@navy.mil

Activity:
Report No:
Crane/Equipment No:
Category:
Near Miss Date:
Time: hrs

Category of Service:

SPS

GPS
Crane /Equipment Type:
Crane/Equipment Manufacturer:
Location:
Weather:
Crane/Equipment Capacity:
Hook Capacity:
Weight of Load on Hook:

Is this near miss indicative of a recurring problem?

Yes

No

If yes, list report numbers:

In the space below, include a brief description of the event and corrective actions taken to prevent recurrence:

Preparer:

Phone and email

Code
Date

FORMS

CRANE AND RIGGING GEAR NEAR MISS INSTRUCTIONS

This form is designed for fax transmission without a cover page or by e-mail and, with enclosures and signatures, shall be the official document. Electronic submission will be accepted without signatures but the names of the preparer, concurring personnel, and certifying official (for crane accidents only) shall be filled in. The e-mail address is nfsh_ncc_accident@navy.mil. The fax number is (757) 967-3808.

1. Near Miss Category: Indicate either crane or rigging gear near miss.

2. From: The naval activity that is responsible for reporting the near miss and UIC number.

3. Activity: The naval activity where the near miss took place.

4. Report No.: The activity assigned near miss number (e.g., 95-001).

5. Crane No.: The activity assigned crane number (e.g., PC-5), if applicable.

6. Category: Identify category of crane (i.e., 1, 2, 3, or 4), if applicable.

7. Near Miss Date: The date the near miss occurred.

8. Time: The time (24 hour clock) the near miss occurred (e.g., 1300).

9. Category of Service: Check the applicable service (SPS as defined by NAVSEA 0989-030-7000).

10. Crane Type: The type of crane involved in the near miss (e.g., mobile, bridge), if applicable.

11. Crane Manufacturer: The manufacturer of the crane (e.g., Dravo, Grove, P&H), if applicable.

12. Location: The detailed location where the near miss took place (e.g., building 213, dry dock 5).

13. Weather: The weather conditions at time of the near miss (e.g., wind, rain, cold).

14. Crane Capacity: The certified capacity of the crane (e.g., 120,000 pounds), if applicable.

15. Hook Capacity: The capacity of the hook involved in the near miss at the maximum radius of the operation, if applicable.

16. Weight of Load on Hook: If applicable, the weight of the load on the hook.

17. Is this a recurring problem?: Check yes or no. Identify any other similar near misses or accidents.

18. Situation Description/Corrective Actions: Self-explanatory.

19. Preparer: Self-explanatory.

ATTACHMENT J-0200000-06

GOVERNMENT-FURNISHED PROPERTY, MATERIALS, AND SERVICES

Government Furnished Property

ATTACHMENT J-0200000-07

USMC MAXIMO SYSTEM ACCESS PROCEDURES

PURPOSE AND OVERVIEW

The purpose of this attachment is to provide guidance on how data is to be recorded and provided by the Contractor in reporting Service Provider, Asset, Specification, and Characteristic Meter Reading Information for USMC MAXIMO. This document outlines the methods that must be utilized by the Contractor and associated USMC business process and procedures for how data is to be submitted.

The Contractor is required 10 use the Government's CMMS, which is currently USMC Maximo Version 7.5, for Asset Management, The Contractor is informed that be current version is subject to change prior to and after contract award. The Contractor, at no additional cost to the Government, shall accept and employ any future USMC Maximo version and seamlessly transfer data.

Specific procedures for USMC Maximo Account Access will be provided to the Contractor, upon request, after award of the contract.

ACCOUNT ACCESS REQUIREMENTS

Within Is-calendar days after award of this Task Order, the Contractor shall:

Employ a minimum of two data entry clerks where one data entry clerk is the alternate The data entry clerks shall manage the USMC Maximo data entry for this Contract daily during normal working hours. The Contractor, at no additional cost to the Government, shall add more date entry clerks to perform the Maximo data entry duties should the efforts of the Contractor's data entry clerk(s) become insufficient.

Contractor (CTR) New Combined Access Card (CAC) Process

Submit a list of the data entry clerks, to include alternate data entry clerks, who will require USMC Maximo Account Access to perform data entry as part of maintenance management.

Complete all Information Awareness (IA) training to satisfy security clearance requirements required by the Information Assurance Manager CAM).

Certifications are required and shall be produced upon request. Note: IA training for all personnel accessing the CMMS shall be conducted annually.

FSC will provide names of New CTR's requiring a CAC and the name to either the Training Coordinator (Dawn Richie) or the Customer Service Supervisor Training Coordinator is located in the Facilities Maintenance Division (FMD) Customer Service Section in Bldg. 2291, Rm 24 and can be reached via telephone at 760-725-4981.

The following steps must be followed tor a new Contract Employee to obtain his or her CAC:

The Contractor must. create a Marine Net account. in order to access required Cyber C Annual Information Assurance (IA) Training. This Training is required to obtain a CAC. Marine Net requires a government sponsor. Provide them with the following POC:

Customer Service Supervisor 760-725-0587

Once Marine Net receives confirmation of sponsorship they will activate the CTR's Marine Net account which time the CTR can begin their training.

The new CTR will then log in to Marine Net and complete the Cyber C course which consists of 2 online courses (Cyber Awareness Challenge and PII). Marine Net can be accessed at the base library (Bldg. 1146) or on a private computer with internet access. Once the 2 courses are complete Marine Net will auto generate the Cyber C certification (3rd certificate).

Complete a SAAR Form, DD Form 2875, Aug 2009. If the Contracting Company does not have a copy of this form it can be obtained through FSC or the Training Coordinator. The SAAR form MUST be completed electronically (if ink is used it will be returned to the Training Coordinator).

Upon completion, the CTR or CTR Representative will return alt three documents (SAAR, CYBER C Cert and PII Cert.) electronically to the Training Coordinator.

The Training Coordinator will verify the accuracy of the documents and route the SAAR electronically for the appropriate signatures. Once the Training

Coordinator has obtained all signatures the SAAR form wilt then be forwarded to Base Security so they can start the CTR's Background Investigation. The CTR is required to provide Base Security their Social Security Number-

Once the background investigation is completed, Base Security will email the SAAR form back to the Training Coordinator who will do the appropriate paperwork and send a ticket to FMD's IT Staff. FMD IT will obtain an official email address. Once obtained, electronic documentation will be emailed to the Training Coordinator.

Finally, at this point the Training Coordinator will make contact with the CTR either via telephone or email. The Training Coordinator will request a meeting with the CTR so the CTR's information can be entered into the CVS computer system and then the CTR will be directed to Pass and ID. They must present 2 forms of ID to obtain their CAC.

Once the CTR has the CAC in hand they need to call FMD IT Personnel to determine a good time for the CTR to digitally sign their SAAR form.

Within 45-calcndar days after award of this Contract, the Contractor's data entry clerks shall have completed all IA training, met all security clearance requirements, possess a CAC, have a user Access account, and be fully prepared and qualified to begin data entry into USMC Maximo.

The Contractor shall bear all costs associated with required training, security clearances, and CAC of personnel throughout the duration of the contract.

The Contractor shall furnish all necessary computer hardware, internet access, CAC card reader and the name of persons that are qualified and authorized to receive Government training and USMC MAXIMO access.

The level of access and restriction of the user shall be determined by a USMC MAXIMO Government representative. Once all requirements are met, the Contactor will be notified that a USMC MAXIMO) account has been created, as well as USER ID, password and USMC MAXIMO Access URL details.

MANAGEMENT REQUIREMENT

The Contractor shall employ a minimum of two data entry clerks where one data entry clerk is the alternate. The data entry clerk's responsibility is to ensure data is entered properly into the Maximo "Work Order" module and be capable or resolving problems that may occur during the data entry process. The data entry clerks shall provide a quality product to the Government. The data entry clerks shall resolve all concerns. issues and problems addressed by the Government and to the Government's satisfaction at no additional cost to the Government. The data entry clerks shall be available to address any of the Government's concerns during normal working hours.

STAFFING

The Contractor shall provide a staff of experienced and qualified data input clerks to perform the following data entry processes:

Enter data into received work orders from the instance that the work order is received by the Contractor's work reception, while work is in progress, and to completion.

Create templates (PM records) in the Preventive Maintenance module to generate scheduled preventive maintenance work orders. Utilize following sub-modules "PM”, “Frequency", "Seasonal Dates", “Job Plan Sequence", “PM Hierarchy" and "Forecast", and populate the respective fields in each.

Use USMC Maximo Preventive Maintenance Asset Management and Maintenance Guidelines for additional information. Create templates in the Master PM module to create, modify, update and review PMS. Utilize following sub-modules "Master PM", "Frequency", "Seasonal Dates", and Job Plan Sequence" and populate the respective fields in each. See the Attachment USMC Maximo Preventive Maintenance Asset Management and Maintenance Guidelines for additional information. Maintain the data in the Preventive Maintenance module and the Master PM module current.

Note: Where PM records already exist, the Contractor's staff shall verify that the existing preventive maintenance requirements and schedules to be accurate and in accordance with the original manufacturer's preventive maintenance recommendations or in accordance with other Government preventive maintenance requirements. The Contractor and their staff shall correct any deficiencies found in the existing preventive maintenance requirements and schedules to comply with the original manufacturer's preventive maintenance recommendations or in accordance with other Government preventive maintenance requirements. The Contractor's staff and data entry clerks shall monitor the preventive maintenance alerts and ensure that the respective maintenance shops/technicians receive the scheduled preventive maintenance work orders well in advance to ensure preventive maintenance is performed on schedule. The Contractor's staff and data entry clerks shall run monthly reports of received, in-progress and completed work orders and submit the reports to the Designated Government Agent (DGA). The Contractor's staff and data entry clerks, upon direction from the Government, shall remove preventive maintenance records from the USMC Maximo data base. Create service requests, to include entering data into alt applicable fields.

All data entry clerks shall be competent in the use and data entry into USMC Maximo 7.5 "Work Order" module.

The Government will accept data entry clerks that are performing the same responsibilities on other MCB Camp Pendleton awarded task orders

TRAINING

The Contractor shalt ensure at least one data entry clerk has completed the IBM Maximo Asset Management 7.5 Fundamental training within 90-calendar days after award of this Contract. Certification of completed training shall be submitted to the ACO and DGA within 14-calendar days after completion of the training to validate for completeness.

The Contractor shall schedule a one-day indoctrination session with the Government within 45-calendar days after award of this Contract. The scheduled indoctrination shall be done as group indoctrination.

AUTHORIZED USE

Contractors shall attempt to view, create, enter data, edit data, run reports or otherwise access data related only to this Contract. Any unauthorized attempt to do otherwise shall be grounds for removal of access privileges and Termination of this Contract. Contractors will be assigned a specific work center code for their work and shall utilize this code for all such data entry and retrieval.

ATTACHMENT J-0200000-08

USMC MAXIMO DATA REPORTING

USMC MAXIMO DATA ENTRY

USMC Maximo Data Entry in the Work Order Module

After logging into US Maximo, the Contractor shall access the "Work Order" module by selecting "Go To" and opening the drop down menu and selecting "Work Order" and then selecting ''Work Order Tracking". Once in "Work Order Tracking" enter the desired work order number and hit "enter" or click "Search". Once the data entry clerk is in the "Work Order Tracking" module for the desired work order the data entry clerk will sec several sub-modules. The Contractor is responsible for their data entry clerk to enter data in the following sub-modules: "Work Order", "Actuals", "Safety Plan", and "Log" and is responsible for the "Status".

Enter data in the fields of the following sub-modules:

"Work Order"

Scheduling Information

Follow-up Work

Check "Vandalism" box when applicable

Attachments (add photos, specifications, etc.)

"Actuals" (click "New Row")

Labor (populate the "Labor", "Name", "Shift", "Start Date", "Regular Hours" and "Rate"). The Contractor shall submit a table listing each tradesmen/technician's fully burdened labor rate to the ACO and PAR within 30-calendar days after award. The labor rate will be entered into the "Rate" field.

Materials (populate "Task", "Item", "Description", "Transaction Type", and "Quantity"). In the "Item" sub-module field list each item and its cost. Tools (populate "Select Tools" and "Planned Tools')

“Safety Plan”

Hazards and Precautions (enter/paste APP and AHA)

Hazardous Materials

Lock Out / Tag Out

"Log" (click “New Row")

Type (enter "WORK?)

Summary

Details (Be specific)

When applicable, click the "Change Status" icon on the tool bar. Once the dialog box opens click the "New Status" drop down menu and cater the appropriate status.

Click the "Save" icon to save data.

At the Government provided MAXIMO training the USMC Maximo Support team will provide the data entry clerks with a USMC Maximo training syllabus.

USMC Maximo Data Entry in the Preventive Maintenance Module

After logging into US Maximo, the Contractor shall access the "Preventive Maintenance" module by selecting "Go To" and opening the drop down menu and selecting “Preventive Maintenance" and then selecting "Preventive Maintenance" or "Master PM. Once in the chosen the data entry clerk will see several submodules. The data entry clerk shall enter all necessary data in the fields of each sub-module, Sec the Attachment USMC Maximo Preventive Maintenance Asset Management and Maintenance Guidelines" for additional information.

Creating a Service Request

'The Contractor's data entry clerks shall create work order requests for all unscheduled preventive and corrective maintenance. After logging into US Maximo, the Contractor shall access the "Service Request" module by selecting "Go To" and opening the drop down menu and selecting "Service Request" and then selecting the "New Service Request" icon. The data entry clerk shall populate all of the shaded fields marked by an asterisk and any other fields deemed necessary by the Government. Once the fields have been populated click the "Save" icon. The data entry clerk shall ensure that sufficient information is entered into the description field. The work order request requires Government approval before the Contractor takes further action, i.e. the Contractor shall monitor the work order request for an approval status.

PART 2 GUIDELINE FOR THE WORK ORDER PROCESS

Work Order Information

The Contractor's Work Order Reception function primarily receives a work order electronically through USMC Maximo, however as circumstances dictate, the Contractor may receive work orders from the COR.

The Contractor's Work Order Reception function is responsible for disseminating the work order(s) to the appropriate management personnel, who in turn are responsible for ensuring that the, appropriate qualified technician(s) receive the work order, perform and complete the maintenance as described in the work order.

The Contractor's Work Order Reception function shall ensure, all USMC Maximo data is input in the applicable "Work Order" module and its fields are properly and fully populated, i.e. from the date and time of reception of the work order to the date or completion.

The Contractor's Work Order Reception function shall submit a USMC Maximo Work Order Traceability Report as part of the Monthly Report. The USMC Maximo Work Order Traceability Report shall be reviewed at the monthly QC meetings.

The Contractor staff shall enter a service request for all actions, to include unscheduled PM, corrective maintenance and any other necessary services and repairs.

ATTACHMENT J-0200000-09

INSTALLATION SPILL CONTROL PLAN

TO BE ISSUED AFTER AWARD.

ATTACHMENT J-0200000-10

CONTRACTOR HAZARDOUS MATERIAL INVENTORY LOG

ATTACHMENT J-0200000-11

EXHIBIT LINE ITEM NUMBERS

CONTRACT SPECIALIST TO USE PLACE HOLDER.

File details come from the government source that posted it. Updated .