Annex 0200000 C Management and Administration (SW SubKtr Safety) Revision 13 JUN.docx

DOCX document 73 KB Posted

Attached to
Operation & Maintenance of the Southern and Northern Regional Tertiary Treatment Plants on MCB Camp Pendleton
Solicitation number
N6247319R0033
Issued by

View the file

Other files

File Type Posted
Amendment 0005_N6247320R0033.pdf PDF
AMENDMENT 0004.pdf PDF
Amendment 0003_N6247320R0033.pdf PDF
P-1046B Construction Plans 04-05-2016.pdf PDF
RW_Overall.pdf PDF
EXHIBIT D REVISED _ Safety Data & Narrative.docx DOCX document
SRTTP & NRTTP Chemical Usage 2017 & 2018.xlsx XLSX spreadsheet
RWPS Electrical Equipment List.xlsx XLSX spreadsheet
Amendment 0002_N6247320R0033.pdf PDF
ELIN Pricing Schedule REVISED.xls XLS spreadsheet
EXHIBIT B REVISED _ Recent Relevant Experience of the Firm.docx DOCX document
RWPS Equipment List.xlsx XLSX spreadsheet
Rules and Regs Final_Signed April 2013 Edition.pdf PDF
SierraOne Equipment List.xlsx XLSX spreadsheet
Amendment 0001_N6247320R0033.pdf PDF
Annex 1503030 J Integrated Solid Waste Management v2.2.doc DOC document
ELINS Unpopulated.xls XLS spreadsheet
Annex 1503020 C Pest Control v2.3.docx DOCX document
NRTTP Equipment List.xlsx XLSX spreadsheet
SRTTP Equipment List.xlsx XLSX spreadsheet
EXHIBIT F _ Individual Small Business Subcontracting Plan.docx DOCX document
SRTTP EquipmentList_OM.xls XLS spreadsheet
SRTTP-NRTTP LOADINGS.XLSX XLSX spreadsheet
Annex 1503020 F Pest Control v2.3.doc DOC document
SRTTP Electrical Equipment List.xlsx XLSX spreadsheet
EXHIBIT D _ Safety Data & Narrative.docx DOCX document
Annex 1503010 F Custodial v2.3.doc DOC document
EXHIBIT B _ Recent Relevant Experience of the Firm.docx DOCX document
Annex 1503010 C Custodial v2.3 ck.doc DOC document
EXHIBIT G _ Request for Information (RFI).docx DOCX document
Section J Documents Exhibits & other Attachments Annex 0200000 J Management and Administration ver 2 5.doc DOC document
Annex 0100000 C General Information ver 2.2 (revised 040715).doc DOC document
EXHIBIT A _ Financial Questionnaire.docx DOCX document
NRTTP Electrical Equipment List.xlsx XLSX spreadsheet
SCA Wage Determination 16 SEP 19 .pdf PDF
Annex 1503050 C Grounds Maint & Landscaping v2.5.doc DOC document
EXHIBIT C _ Technical Capability (1).docx DOCX document
Annex 1604000 F Wastewater Ver 2.2.doc DOC document
Annex 1604000 C Wastewater Rev 2 13 JUN.docx DOCX document
EXHIBIT E _ Past Performance Questionnaire (Form PPQ).docx DOCX document
Annex 1503050 F Grounds Maint & Landscaping v2.3.doc DOC document
Annex 1503020 J Pest Control v2.4.docx DOCX document
NRTTP Boundary Map.pdf PDF
SRTTP Compliance Equipment List.xlsx XLSX spreadsheet
Annex 1503050 J Grounds Maint & Landscaping v2.6.docx DOCX document
Section F Deliveries or Performance Annex 0200000 F Management and Administration v2.8 (revised 12-6-2018).docx DOCX document
SRTTP Boundary Map.pdf PDF
Annex 1503010 J Custodial v2.3.doc DOC document
Annex 1503030 F Integrated Solid Waste Management v2.3.doc DOC document
Annex 1503030 C Integrated Solid Waste Management v2.3.doc DOC document
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ANNEX 0200000

MANAGEMENT AND ADMINISTRATION

SECTION C

0200000 – Management and Administration

Table of Contents

Spec Item
Title
2
Management and Administration
2.1
Definitions and Acronyms
2.2
General Information
2.2.1
Government Regular Working Hours
2.2.1.1
Observed Federal Holidays
2.2.1.2
Restriction to Contractor Working Hours
2.2.2
Wage Determinations
2.2.3
Requirements Hierarchy
2.3
General Administrative Requirements
2.3.1
Required Conferences and Meetings
2.3.2
Training for Maintenance and Operation of New and Replacement Systems and Equipment
2.3.3
Partnering
2.3.3.1
Formal Partnering
2.3.3.2
Contract Partnering Administration
2.3.3.3
Contract Partnering Session Attendees
2.3.4
Permits and Licenses
2.3.5
Insurance
2.3.5.1
Certificate of Insurance
2.3.5.2
Minimum Insurance Amounts
2.3.6
Protection of Government Property
2.3.7
Government Information Technology (IT) System
2.3.8
Directives, Instructions, and References
2.3.9
Invoicing Procedures
2.3.10
Forms
2.4
Government-Furnished Property, Materials and Services
2.4.1
Government-Furnished Facilities (GFF)
2.4.2
Government-Furnished Utilities
2.4.3
Government-Furnished Materials (GFM)
2.4.4
Government-Furnished Equipment (GFE)
2.4.5
Government-Furnished Services (GFS)
2.5
Contractor-Furnished Items
2.6
Management
2.6.1
Work Reception
2.6.2
Work Control
2.6.3
Work Schedule
2.6.4
Deliverables
2.6.5
Service Interruptions
2.6.6
Government’s Computerized Maintenance Management Systems (CMMS)
2.6.7
Quality Management System (QMS)
2.6.7.1
Quality Management (QM) Plan
2.6.7.2
Quality Inspection and Surveillance
2.6.7.3
Quality Inspection and Surveillance Report
2.6.8
Property Management Plan
2.6.9
System and Equipment Replacement
2.7
Personnel Requirements
2.7.1
Key Personnel
2.7.1.1
Project Manager (PM)
2.7.1.2
Quality Manager
2.7.1.3
Site Safety and Health Officer (SSHO)
2.7.1.4
Environmental/Energy Manager
2.7.2
Employee Requirements
2.7.2.1
Employee Certification and Training
2.7.2.2
Employee Appearance
2.7.2.3
Employee Conduct
2.7.2.4
Identification as Contractor Employee
2.7.2.5
Removal of Employees
2.7.2.6
Proof of Legal Residency
2.7.3
Enterprise-wide Contractor Manpower Reporting Application (eCMRA)
2.8
Security Requirements
2.8.1
Employee Listing
2.8.2
Vehicles
2.8.3
Passes and Badges
2.8.4
Access to Installation
2.8.4.1
DBIDS Program
2.8.4.2
Credentials
2.8.4.3
Paper Passes
2.8.5
Access to Buildings
2.8.6
Access Arrangements
2.8.6.1
Escort Arrangement for Secured Areas
2.8.7
Security Clearances
2.8.8
Access to Sensitive Unclassified Information
2.8.9
Employee Status
2.9
Contractor Safety Program
2.9.1
Contractor Safety Requirements
2.9.1.1
Contractor Experience Modification Rate (EMR)
2.9.1.2
Contractor OSHA Days Away From Work, Restricted Duty, or Job Transfer (DART) rate
2.9.2
Contractor and Subcontractor High Safety Risk Requirements
2.9.3
Accident Prevention Plan (APP)
2.9.4
Activity Hazard Analysis (AHA)
2.9.5
Occupational Risk and Compliance Plans
2.9.5.1
Abrasive Blasting Plan
2.9.5.2
Access/Haul Road Plan
2.9.5.3
Alcohol and Drug Abuse Prevention Plan
2.9.5.4
Asbestos Abatement Plan
2.9.5.5
Chemical Hazard Communication Program
2.9.5.6
Confined Space Program
2.9.5.7
Critical Lift Plan
2.9.5.8
Demolition Plan
2.9.5.9
Emergency Response Plans
2.9.5.10
Excavation/Trenching Plan
2.9.5.11
Fall Prevention and Protection Plan
2.9.5.12
Fire Prevention Program
2.9.5.13
Floating Plant Severe Weather Precaution Plan and Marine Emergency Plan
2.9.5.14
Hazardous Energy Control Program
2.9.5.15
Health Hazard Control Program and Hazard Communication Program
2.9.5.16
Heat/Cold Stress Monitoring Plan
2.9.5.17
Lead Compliance and Abatement Plan
2.9.5.18
Radiation Safety Program
2.9.5.19
Respiratory Protection Program
2.9.5.20
Site Sanitation Plan
2.9.5.21
Temporary Facility Layout Plan
2.9.5.22
Underground Emergency Rescue Plan
2.9.6
Accident and Damage Reporting
2.9.6.1
Accident Reporting and Notification Criteria
2.9.7
Fire Protection
2.9.8
Monthly On-Site Labor Report
2.9.9
OSHA Citations and Violations
2.9.10
Safety Inspections and Monitoring
2.9.11
Safety Certification
2.9.12
Safety Apparel on Jobsites
2.10
Environmental Management and Sustainability
2.10.1
Energy Management Program
2.10.1.1
Water Conservation Plan
2.10.1.2
Energy Efficient Products
2.10.2
Environmental Protection
2.10.2.1
ODS Requirements for Refrigerant Recycling
2.10.2.2
Non-Hazardous Waste Disposal
2.10.2.3
Hazardous Waste Disposal
2.10.2.4
Spill Prevention, Containment, and Clean-up
2.10.2.5
Hazardous Material Management
2.10.2.6
Protection of Endangered and Threatened Species (Flora and Fauna)
2.10.2.7
Noise Control
2.10.2.8
Salvage
2.10.2.9
Asbestos Containing Material (ACM)
2.10.3
Sustainable Procurement and Practices
2.10.3.1
Environmentally Preferable Products
2.10.3.2
Use of Recovered Materials
2.10.3.3
Use of Bio-based Products
2.11
Disaster Preparedness
2.12
Technical Library
2.13
Warranty Management
2.14
FFP Work Procedures
2.14.1
Notification to the Government for Work Above the FFP Limitations
2.14.2
FFP Exhibit Line Item Numbers (ELINs)
2.14.3
Common Output Level Standards (COLS) Options
2.14.3.1
Optional COLS CLINs for Region Funded Facility Services
2.14.3.2
Option to Change COLS at Contract Award
2.14.3.3
Option to Change COLS at Exercise of an Option Period
2.15
IDIQ Work
2.15.1
Unit Priced Task (UPT) Work (Non-Negotiated)
2.15.1.1
Acceptance and Performance
2.15.1.2
Invoicing and Receiving Payment
2.15.2
Unit Priced Labor (UPL)Work (Negotiated)
2.15.2.1
IDIQ Preparation of Proposals
2.15.2.1.1
Labor Requirements
2.15.2.1.2
Material and Equipment Requirements
2.15.2.2
Issuance of Final Task Order
2.15.3
IDIQ ELINS
2.16
Transition
2.16.1
Phase-in
2.16.2
Phase-out

0200000 - Management and Administration

Spec Item
Title
Description
2
Management and Administration
2.1
Definitions and Acronyms
Definitions and Acronyms are listed in J-0200000-01.
2.2
General Information
2.2.1
Government Regular Working Hours
The Government's regular working hours are from 0700-1600, five days per week, Monday through Friday, except observed Federal holidays. Exceptions to the regular hours of operation are detailed in subsequent sections of this PWS. Although the Plants are not required to be manned 24 hours a day, 7 days a week (24/7), it shall be monitored 24/7 to maintain operation in compliance with all Permit requirements.

Work in certain annexes or sub-annexes require Contractor continuous operations, 24 hours a day, every day of the year including holidays. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours requires prior KO approval.

2.2.1.1
Observed Federal Holidays
The Government observes the following holidays: New Year’s Day, Martin Luther King Jr.’s Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day.
2.2.1.2
Restriction to Contractor Working Hours
If the Contractor wishes to work outside of the Government's regular working hours for the Contractor’s convenience, the Contractor shall submit a written Request to Work Outside Government’s Regular Working Hours per Section F. Excludes work to be performed during specified hours.
2.2.2
Wage Determinations
Wage Determinations are included in J-0200000-02.
2.2.3
Requirements Hierarchy
Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1 and so on.

Likewise, Performance Standards specified at a lower digit level (i.e. spec item 3.1.1, 3.1.2, 3.1.2.1) apply when performance is assessed at a higher tier (i.e., spec item 3.1) based on the composite work requirements.

2.3
General Administrative Requirements
2.3.1
Required Conferences and Meetings
The Contractor may be required to attend administrative and coordination meetings. The Contractor shall attend meetings as shown in Section F.
2.3.2
Training for Maintenance and Operation of New and Replacement Systems and Equipment
When construction, renovation, or repair work is performed by means other than this contract, the Contractor shall attend Government provided training, as applicable, for maintenance and operation of new and replacement systems and equipment at no additional cost to the Government.
2.3.3
Partnering
To increase the likelihood of successful performance of this contract, the Government requires cohesive partnerships with its Contractors and subcontractors. Key stakeholders, including the supported commands who will receive services, principal individuals from NAVFAC, the performance assessment team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and subcontractors’ teams, including senior management personnel must participate. The partnership will draw on the strength of each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps.

Partnering should accomplish three goals:

- The first goal is to develop a cohesive team with common purpose, commitment and established communication processes.

- The second goal of partnering is contract specific, identifying risks and opportunities for the team to address.

- The third goal is to sustain the Partnership throughout the contract by identifying and addressing issues that affect the Partnership.

2.3.3.1
Informal Partnering
The Contracting Officer shall organize the initial Partnering Meeting with key personnel of the project team, including Contractor's personnel and Government personnel. The initial session will be scheduled concurrent with the Pre-Performance Conference and held no later than 30 days after award and will be held at a Government provided facility as designated by the KO.

The Initial Informal Partnering Session will be conducted and facilitated using electronic media (a video and accompanying forms) provided by Contracting Officer. The senior Government stakeholder present will lead the meeting, however, the Contractor’s PM or senior representative is encouraged to participate as co-lead.

The Partners will determine the frequency of the follow-on sessions.

2.3.3.2
Contract Partnering Administration
Upon award, the ACO will contact the Contractor, supported command(s), Region, and Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering. A partnership agreement, The Charter, should be in place as early as possible so issues arising, even before work begins, can be resolved using the issues resolution process. Replacement of Core Management Team members (stakeholders who attended the initial session and manage the contract work day-to-day) is discouraged since it will disrupt the synergy that has been developed. If replacement of a team member proves to be unavoidable, a follow-on partnering session must be held to officially turn the responsibilities of the position over to the new member.

The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions. These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.

2.3.3.3
Contract Partnering Session Attendees

The Contractor shall bring the necessary personnel to successfully partner on this contract. Asterisk indicates mandatory personnel.

President/Vice President

* Project Manager

* Quality Manager Site Safety and Health Officer

2.3.4
Permits and Licenses
The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable Federal, state and local laws and regulations. ACPD permit for generators/bio-beds, APCD permit for heavy equipment (DOORS), NPDES permit, Hot work permit for welding, and a hazardous waste permit. The Contractor shall submit copies of Permits and Licenses per Section F.
2.3.5
Insurance
The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause 52.228-5, INSURANCE – WORK ON A GOVERNMENT INSTALLATION. This insurance must be maintained during the performance period.
2.3.5.1
Certificate of Insurance
The Certificate of Insurance shall provide for at least 30 calendar days’ written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause.
2.3.5.2
Minimum Insurance Amounts
The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:

Comprehensive General Liability: $500,000 per occurrence

Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage

Workmen's Compensation: As required by Federal and state worker's compensation and occupational disease statutes

Employer's Liability coverage: $100,000, except in states where worker's compensation may not be written by private carriers

Other as required by state law

2.3.6
Protection of Government Property
During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of negligence under this contract to their original condition at no cost to the Government.
2.3.7
Government Information Technology (IT) System
Coordination through Designated Government Agent is required. Additional information about NMCI may be obtained at http://www.eds.com/nmci.
2.3.8
Directives, Instructions, and References
Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in J-0200000-03. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract.
2.3.9
Invoicing Procedures
Refer to Section G for invoicing instructions. Refer to Invoice Form in J-0200000-XX for sample.
2.3.10
Forms
Forms referenced in this Annex, e.g. accident reporting, and damage reporting are included among the Forms in J-0200000-05.
2.4
Government-Furnished Property, Materials and Services
In accordance with FAR 52.245, GOVERNMENT PROPERTY and NAVFAC Clause 5252.245-9300, GOVERNMENT-FURNISHED PROPERTY, MATERIALS AND SERVICES, and the following paragraphs, the Government will furnish or make available to the Contractor Certain Government-owned facilities, utilities, materials, equipment and services for use in connection with this contract as stated below.

A list of Government Furnished Property, Materials, and Services is provided in J-0200000-06.

Contractor requirements for support of initial and final inventories.

2.4.1
Government-Furnished Facilities (GFF)
The Contractor will be utilizing the Facilities noted within the contract. The Contractor shall maintain it as prescribe in the according contents of this contract. Contractor is to be responsible for repairs to within the area of constant use. An Existing Condition Inventory shall be conducted and furnished to the Government for record of acceptance upon start of contract. Contractor will be responsible for the maintenance of the facilities as describe within the contract. Damage caused by the Contractor outside of reasonable fair wear and tear will be the contractor’s responsibility. Contractor shall coordinate with Designated Government Authority for any repairs to facility outside of the contract.
2.4.2
Government-Furnished Utilities
The Government will furnish water and electricity at existing outlets required for the work to be performed under the contract at no cost to the Contractor. Information concerning the location of existing outlets may be secured from the KO. The Contractor shall provide and maintain, at its expense, the necessary service lines from the existing Government outlets to the work site. Provide and maintain backflow prevention devices on connections to domestic water lines and electrical transformer provisions on connections to electric lines. Meet all Federal, State, local, and installation codes and regulations for backflow prevention devices and electrical transformer provisions. Services required by the Contractor, for which there are no available Government outlets, shall be provided by the Contractor at no cost to the Government.
2.4.3
Government-Furnished Materials (GFM)
The Contractor may use Government Furnished Material at the discretion of the Government.
2.4.4
Government-Furnished Equipment (GFE)
Government-furnished equipment includes Government equipment taken into the custody by the Contractor for repair when the unit acquisition cost of the equipment exceeds the simplified acquisition threshold as defined in FAR 2.101. Individual components of Government equipment within larger systems contracted for repair or maintenance on a Government installation are considered units for purpose of this section only.
2.4.5
N/A
N/A
2.5
Contractor-Furnished Items
Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements. Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and polychlorinated biphenyls (PCBs) shall not be brought onsite. Energy efficient tools and equipment shall be used when available. The KO may at any time require Samples, Material Safety Data Sheets (MSDS) or Manufacturer’s Data Cut Sheets of Materials used in this contract.
2.6
Management
The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality assurance. The Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met.
2.6.1
Work Reception
The Contractor shall provide the capability to receive, prioritize, correspond, and respond to trouble/service calls and task orders during Government regular working hours and provide a point of contact at a local or toll free number who can perform the above function during other than Government regular working hours.
2.6.2
Work Control
The Contractor shall implement all necessary work control procedures to ensure timely accomplishment of work requirements, as well as to permit tracking and reporting of work in progress. The Contractor shall plan and schedule work to assure material, labor, and equipment are available to complete work requirements within the specified time limits and in conformance with the quality standards established herein. Verbal scheduling and work status updates shall be provided when requested by the KO. A status update of any item of work must be provided within two hours of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours.
2.6.3
Work Schedule
The Contractor's work shall not interfere with normal Government business. In those cases, where some interference is unavoidable, the Contractor shall minimize the impact and effects of the interference. The Contractor shall provide advance access of all of its work schedules to the Government. The Contractor shall notify the KO of any difficulty in scheduling work due to Government controls.
2.6.4
Deliverables
Records and reports are specified in Section C and listed as deliverables in Section F. The Contractor shall submit accurate and complete documents within the required timeframes as specified in Section F.

Government acceptance of deliverables will not relieve the Contractor of the responsibility for any error or omission which may exist in the deliverable, as the Contractor is responsible for all requirements of this contract.

The Contractor shall establish and maintain a secure website for posting an electronic copy of all deliverables listed in Section F. The Contractor shall allow only authorized Government and Contractor personnel to access the website. Government personnel access shall be limited to viewing and downloading of deliverables, but restricted from posting to the website. The Contractor shall notify the Government by email whenever there are new or updated deliverables posted to the website. Each deliverable posting on the website and each email notification shall include the title of the deliverable, the spec item requiring the deliverable, and the date and time the deliverable was posted. All deliverables shall be available to authorized Government personnel 24 hours/day and 365 days/year for the duration of the contract.

2.6.5
Service Interruptions
If any utilities or other services must be discontinued (even temporarily) due to scheduled contract work, the Contractor shall notify the KO, affected tenants, and customers in accordance with local procedures If the discontinued service is due to an emergency breakdown the Contractor shall notify the KO, affected tenants and customers as soon as practicable.
2.6.6
Government’s Computerized Maintenance Management Systems (CMMS)
The data is required for the Government’s use in long term asset management and planning.

Work order and asset data created by the Contractor is recorded in USMCmax MAXIMO for all work performed in 1501000 Facility Management, 1502000 Facility Investment and maintenance requirements specified in Annex 16 Utilities sub-annexes.

The information and format for data submission provided in Section J supports long term asset management and facilitates transfer to USMCmax MAXIMO The Government uses USMCmax MAXIMO for work order and asset management. The Contractor shall provide all required data for USMCmax MAXIMO as identified below:

Required data fields for Service Provider shall be provided for all work performed in 1502000 Facility Investment and 1604000 Wastewater. Further instructional information detailing the process for submitting the specified information for USMCmax MAXIMO Data Reporting is provided in J-0200000-08.

The Service Provider and Asset Interfaces are used for multiple processes by the Government and the format may be updated annually. As part of the update the Contractor may be asked to modify the file to add/move columns in their submission. The Contractor also shall provide up to 10 extra data elements or columns with as many as 150 characters per element for the Government to define during contract performance at no additional cost to the Government. The Government will provide the Contractor 60 calendar days’ notice of modifications to the Service Provider or Asset Interface file format.

The Contractor may provide data using one of the two following options detailed below depending on company’s internal resources and existing systems. The Contractor shall clearly document and notify the Government of how the information will be submitted and notify the Government in writing when they plan to alter the procedures. Notification of a change in methods shall be provided in writing to the Contracting Officer at least 30 calendar days prior to the change.

DIRECT ENTRY: The Contractor shall manually enter required work order and asset data directly into USMCmax MAXIMO. USMCmax MAXIMO System Access Procedures are provided in J-0200000-07. The Contractor shall ensure all information is updated by the end of each workday for all work performed.

The Contractor shall submit the Service Provider Information Report and Asset Information Report in a spreadsheet flat-file following the USMCmax MAXIMO Data Reporting process described in J-0200000-08 per Section F.

2.6.7
Quality Management System (QMS)
The Contractor shall establish and maintain a complete QMS program in accordance with the provisions specified herein. The Contractor’s QMS program shall provide an effective and efficient means of identifying and correcting problems throughout the entire scope of operations. The Contractor's QMS program shall address:

· Accurate documentation of work processes, procedures, and output measures.

· A systematic procedure for assessing compliance with performance objectives and standards.

· Accurate documentation of quality inspections and surveillance conducted throughout the execution of work.

· Assessment-driven corrective actions and process adjustments as appropriate in a timely manner.

2.6.7.1
Quality Management (QM) Plan
The Contractor shall develop and submit a QM Plan per Section F. The QM Plan shall describe the QMS methodology and approaches used under this contract. If any changes are made during the period of performance, submit to the KO a revised QM Plan for acceptance.

The Contractor’s QM Plan shall include, at a minimum, the following:

· Policy and objectives of Quality Management System (QMS)

· Quality organization

· List of personnel

· Responsibilities & lines of authority

· Training and qualifications

· Approach to assuring quality of services provided and conformance with performance objectives and standards

· Methods and procedures for effective planning, operation and control of processes and performance of work

· Procedures for inspection and surveillance of services

· Scheduling and performance of inspection and surveillance

· Measurement, data collection and analysis

· Corrective action, preventive action, and continuous improvement

· Oversight of subcontracted work

· Documentation and records management

· Communication with government (customers)

2.6.7.2
Quality Inspection and Surveillance
The Contractor shall establish and maintain an inspection and surveillance system in accordance with the FAR Clause 52.246-4, INSPECTION OF SERVICES – FIXED PRICE, to ensure that the work performed conforms to the contract requirements. The Contractor shall document and maintain a file of all scheduled and performed inspections and surveillances, inspection and surveillance results, and dates and details of corrective and preventive actions. The quality inspection and surveillance file shall be the property of the Government and made available during the Government’s regular working hours. The file shall be turned over to the KO within five calendar days of termination of the contract.
2.6.7.3
Quality Inspection and Surveillance Report
The Contractor shall submit a copy of the Contractor Quality Inspection and Surveillance Report per Section F. The Contractor Quality Inspection and Surveillance Report shall include a summary and results of the quality inspection and surveillance events performed and assessment-driven corrective actions and process adjustments during the previous month. The Government may adjust the frequency of the submittal based on the Contractor’s quality of performance.
2.6.8
Property Management Plan
The Contractor shall establish and maintain a plan that meets the contract clause requirements of Specification Item 2.4, Government-Furnished Property, Materials and Services, of this Annex. This plan shall identify the Contractor’s policies, procedures, and practices in receiving and performing physical inventories, repairing and maintaining, preserving and protecting, and reporting the disposition of accepted government property in its possession. The Property Management Plan shall be submitted per Section F.
2.6.9
System and Equipment Replacement
The Contractor shall maintain the integrity and performance of existing energy saving, water conservation or other sustainability design features of systems and equipment in the performance of repair and replacement work. Except where otherwise specified, replacement components shall be of the same model/style or equivalent as the component being replaced. Substitutes for replacement components must be accepted by the KO prior to use. The KO will furnish available information for the existing systems and equipment.
2.7
Personnel Requirements
The Contractor shall comply with the personnel requirements stated below.
2.7.1
Key Personnel
The Contractor shall submit a List of Key Personnel and Qualifications per Section F. The Contractor shall provide any additional information requested by the KO necessary to certify their qualifications.

The Contractor shall submit an Organizational Chart per Section F showing lines of authority of the key personnel and on-site supervisor(s) for this contract. The chart shall include names of personnel and their position title in this contract. As a minimum, include the PM, Quality Manager, SSHO, and on-site supervisor(s) and who they will report directly to for this contract. The key personnel shall be revised as applicable for the contract.

2.7.1.1
Project Manager (PM)
The Contractor shall provide a PM and designated alternate, as applicable, who has the have full authority to act for the Contractor on all contract matters relating to this contract. The PM or alternate shall be on-site during the Government's regular working hours and shall be available on-site within one hour after the Government's regular working hours.

The PM shall have at least five years of experience in managing a workforce providing services on contracts of similar size, scope and complexity.

2.7.1.2
Quality Manager
The Contractor shall provide a Quality Manager or designated alternate shall be on-site within during the Government's regular working hours and shall be available on-site within two hours after the Government’s regular working hours. The Quality Manager must report directly to a senior corporate official and shall not report directly to the Project Manager.

The Quality Manager shall have fulfilled the following pre-requisite training and experiences before being hired as the Quality Manager under this contract:

The Quality Manager shall have at least five years of experience in preparing and enforcing QMS programs on contracts of similar size, scope and complexity. The Quality Manager shall not be the same person as the SSHO.

2.7.1.3
Site Safety and Health Officer (SSHO)
The SSHO must meet the requirements of EM 385-1-1 Section 1 and ensure that the requirements of 29 CFR 1926.16 are met for the project. Provide a Safety oversight team that includes a minimum of one Competent Person at each project site to function as the Site Safety and Health Officer (SSHO). The SSHO or an equally-qualified Designated Representative/alternate shall be on-site at all times when work is being performed to implement and administer the Contractor's safety program and government-accepted Accident Prevention Plan. The SSHO's training, experience, and qualifications shall be as required by EM 385-1-1 paragraph 01.A.17, entitled SITE SAFETY AND HEALTH OFFICER (SSHO), and all associated sub-paragraphs.

A Competent Person shall be provided for all of the hazards identified in the Contractor's Safety and Health Program in accordance with the accepted Accident Prevention Plan, and shall be on-site at all times when the work that presents the hazards associated with their professional expertise is being performed. Provide the credentials of the Competent Persons(s) to the Contracting Officer for acceptance in consultation with the Safety Office.

The Contractor shall provide a SSHO whose primary duty and responsibility is to prepare and enforce the Contractor’s safety program on this contract. The SSHO shall have fulfilled the following pre-requisite training and experiences before being hired as the SSHO under this contract:

The SSHO shall have completed five years of satisfactory experience in preparing and enforcing safety programs on contracts of similar size and complexity in the past or three years’ experience if he possesses a Certified Safety Professional (CSP) or safety and health degree. The SSHO shall have completed the OSHA 30-hour construction safety class or equivalent and maintain competency through 24 hours of formal safety and health related coursework every four years. The SSHO shall not be the same person as the project manager.

2.7.1.4
Environmental/Energy Manager
The Contractor shall provide an Environmental/Energy Manager whose primary duty and responsibility is to ensure Contractor operations adhere to the goals and policies of the Environmental Management System, the Installation Energy Plan, and other specified Sustainability requirements affecting this contract. The Environmental/Energy Manager shall develop, implement and monitor environmental strategies, policies and programs that promote sustainable development and examine the contract activities to establish where improvements can be made and ensure compliance with environmental legislation and energy policy.

The Environmental/Energy Manager shall have a minimum two years experience with environmental procedures similar to those of this contract; familiarity with Environmental Management Systems (EMSs); and knowledge of environmental regulations and federal energy laws and policy (including energy and water reduction requirements and renewable energy requirements) that are applicable to operations similar to those of this contract.

2.7.1.5
Chief Waste Water Plant Operator
The Contractor shall provide an experienced, qualified and capable personnel with holding the correct credential and level of training as required by Title 23, Division 3, Chapter 26 classification requirements of the California Code of Regulations. A minimum, Grade IV Chief Plant Operator is required and will be responsible for overall operation of the wastewater treatment plants.
2.7.2
Employee Requirements
The Contractor shall provide experienced, qualified, and capable personnel to perform the work in this contract. Personnel shall be fully knowledgeable of all safety, environmental, and energy requirements associated with the work they perform. Personnel shall speak, read, and comprehend English to the extent that they can perform the contract requirements and comply with installation emergency procedures.
2.7.2.1
Employee Certification and Training
The Contractor shall maintain personnel certification, training, and licensing records for employee requirements specified herein and within all technical annexes/sub-annexes. Certification, training, and licensing records shall be kept current and on file for the duration of the contract including all option periods. Records shall be made available for Government review within 4 hours of request.
2.7.2.2
Employee Appearance
The Contractor shall ensure that all employees present a professional appearance that is appropriate for their position. The KO reserves the right to determine the acceptability of any clothing worn. All Contractor/subcontractor employees working under this contract shall be identified by a distinctive nameplate, emblem, or patch attached in a prominent place on an outer garment. Employee identification shall not be substituted for station required passes or badges.
2.7.2.3
Employee Conduct
Contractor employees shall conduct themselves in a proper, efficient, courteous and businesslike manner.
2.7.2.4
Identification as Contractor Employee
Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. All Contractor employees shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence.
2.7.2.5
Removal of Employees
The Contractor shall remove from the site any individual whose continued employment is deemed by the KO to be contrary to the public interest or inconsistent with the best interests of National Security.
2.7.2.6
Proof of Legal Residency
No employee or representative of the Contractor will be admitted to the site of work unless satisfactory Proof of Legal Residency is furnished per Section F.
2.7.3
Enterprise-wide Contractor Manpower Reporting Application (eCMRA)

The Contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: https://doncmra.nmci.navy.mil

Per Section F, reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk , linked at https://doncmra.nmci.navy.mil.

2.8
Security Requirements
The Contractor shall comply with all Federal, state, and local security statutes, regulations, and requirements. The Contractor shall become acquainted with and comply with all Government regulations as posted, or as requested by the KO when required to enter a Government site. The Contractor shall ensure that all security/entrance clearances are obtained.
2.8.1
Employee Listing
The Contractor shall maintain a current Employee List and submit per Section F. The list shall include employee’s name, supervisor, company, and level of security clearance.
2.8.2
Vehicles
The company name shall be displayed on each of the Contractor's vehicles in a manner and size that is clearly visible. All vehicles shall display a valid state license plate that complies with State Vehicle Code. Vehicles shall meet all other requirement of the State Vehicle Code, such as safety standards, and shall carry proof of insurance and state registration, if applicable.
2.8.3
Passes and Badges
All Contractor employees shall obtain the required employee and vehicle passes. The Contractor employees must be able to obtain Common Access Cards (CAC) in accordance with security requirements. Each employee shall wear the Government issued badge over the front of the outer clothing. When an employee leaves the Contractor's service, the employee's Passes and Badges shall be returned within 10 calendar days
2.8.4
Access to Installation
All Contractor personnel shall obtain access to the installation through enrollment and registration into the Defense Biometric Identification System (DBIDS).

The Contractor shall provide the KO with the name of their designated Service Contractor Administrator (SCA) for enrollment in DBIDS. Once enrolled, the Contractor must provide the DBIDS Registrar with an approved employee list and then direct their employees to register into DBIDS.

2.8.4.1
DBIDS Program
DBIDS is an enterprise identity management and perimeter installation access control solution in which Contractor personnel who enroll, and are approved, are subsequently granted access to the installation for a period up to three years, or the length of the contract, whichever is less, and are not required to obtain a new pass from the Base Pass and Identification Office for each visit. There are no fees associated with obtaining a DBIDS credential.

The Government performs background screening and credentialing. Throughout the year the Contractor employee must continue to meet background screening standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.

2.8.4.2
DBIDS Credentials
Contractor employees shall furnish a completed copy of the SECNAV 5512/1 form to obtain the required background check and visit the local Navy Installation Visitor Control Center to obtain a DBIDS credential once approved. The SECNAV 5512/1 form and additional information about DBIDS can be found at: https://www.cnic.navy.mil/om/dbids.html.

The Contractor may initiate the adjudication process when a background screen failure results in disqualification from participation in DBIDS and the Contractor employees do not agree with the reason for disqualification. The Contractor may also apply for a waiver when a background screening failure results in disqualification from participation in DBIDS. The Commanding Officer will be the final waiver determination authority.

The Contractor shall immediately collect employee DBIDS credentials and notify the KO in writing:

(1) That an employee has departed the company without having properly returned or surrendered their DBIDS credentials.

(2) That there is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the installation or anyone therein.

2.8.4.3
DBIDS Paper Passes
In the event that a visitor, vendor, or Contractor employee elects not to participate in DBIDS, the individual will be issued DBIDS paper pass from the Base Pass and Identification Office in order to access to the installation. The time standard for the validity of a pass to access an installation will be not more than thirty (30) days and may be further restricted based on local policy or by Federal, DOD, Navy, and CNIC guidance.

The Government will not be responsible for any cost or lost time associated with obtaining paper passes or added vetting or inspections incurred by non-participants in the DBIDS credentialing process.

2.8.5
Access to Buildings
The Contractor shall monitor and control access into restricted areas under their responsibility, allowing only those individuals who have been properly cleared into restricted areas or other controlled access areas. The Contractor shall comply with security requirements, plus those imposed by the installation Commander at all times. Personnel with access to special areas will have the appropriate screening and/or security clearance, and personnel requiring routine access to restricted areas will wear special badges authorizing access for those areas. Contractor personnel shall not enter restricted or controlled areas or installation facilities unless specifically authorized in performance of their duties. The Contractor shall secure all buildings and facilities entered during non-duty hours and will secure all building and facilities under the Contractor’s cognizance at the end of each work day or shift period.
2.8.6
Access Arrangements
The Contractor shall make all arrangements through the appropriate office necessary to obtain access to buildings, facilities and other work areas, and when necessary, arrange for them to be opened and closed by the controlling authority. The Government may issue keys to the Contractor. The Contractor shall use due diligence and be responsible for compromised security systems to include replacement costs that result from its action or inaction.
2.8.6.1
Escort Arrangement for Secured Areas
The Contractor shall make arrangements for Government escort into secured areas requiring escort. The KO will provide information on applicable buildings, spaces and the appropriate point of contact.

The Contractor may experience delays while waiting for escorts. The Government estimates the wait period can be up to 15 minutes. The Contractor shall notify the Government Performance Assessment Representative (PAR) and appropriate point of contract if an escort is not available after 15 minutes and access to accomplish the work is denied. Unscheduled requirements, e.g., trouble calls, may require a longer wait for an escort..

2.8.7
Security Clearances
The Contractor shall obtain all required corporate and personnel Security Clearances prior to commencement of work. The Contractor shall ensure that a list of all personnel with Security Clearances is maintained current, including clearances that are pending.
2.8.8
Access to Sensitive Unclassified Information
The Contractor personnel whose work involves access to sensitive unclassified information shall undergo a National Agency Check Investigation (NACI) to verify their suitability. If the Contractor personnel currently have a favorably adjudicated NACI the Contractor shall notify the Government Command Security Manager who will validate this in the Joint Personnel Adjudication System (JPAS).

The Contractor shall request from the Government for access to the E-QIP Direct program for the Contractor employees to complete the SF-85 form on line for an NACI. The Security Manager will determine suitability. Upon a favorable NACI, the Contractor personnel shall provide the completed Personnel Security Investigation (PSI) to the Security Manager along with the original signed release statements, applicant fingerprint card (FD87), and an OF-306 Declaration for Federal Employment per Section F. The Contractor shall be responsible for providing the fingerprint card.

The request shall be renewed annually or for the duration of the contract if less than one year.

2.8.9
Employee Status
The Contractor shall notify the KO of any changes to any employee’s status to include, but not limited to, termination, convictions/arrests, adverse actions taken on the job for any reason or any other documented misbehavior that may affect, or have the potential to affect, security standing in terms of access to federal facilities or IT systems.
2.9
Contractor Safety Program
The Contractor shall develop and implement a Safety Program detailing how the Contractor plans, staffs, performs, and controls all safety practices while delivering best value services to the Government without any accidents or mishaps. The Contractor’s safety program shall comply with all safety standards identified in the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1 and Public Law 91-596, Occupational Safety and Health Act.
2.9.1
Contractor and Subcontractor Safety Requirements
Neither Contractor nor any subcontractor shall enter into contract that fails to meet the following requirements. Note, the term subcontractor in the following paragraphs shall mean all subcontractors on the project, whether in contract with the Contractor or any subcontractor.

At least five days before any new subcontractor starts work, or at least five days prior to the preparatory meeting regarding the subcontractor's work, whichever is earlier, Contractor shall submit subcontractor's proof of compliance with requirements detailed below for Experience Modification Rate and DART rates, for Government acceptance.

2.9.1.1
Contractor and Subcontractor Experience Modification Rate (EMR)
No Contractor or subcontractor on the project shall have an effective EMR greater than 1.10 when entering into a contract or subcontract agreement with the prime contractor or a subcontractor at any tier as computed by the National Council on Compensation Insurance (NCCI) or if not available, as computed by the state agency's rating bureau in the state where the subcontractor is registered.

A written request may be submitted for additional consideration to the Contracting Officer Representative (COR) and Contracting Officer (KO) where the specified acceptable EMR range cannot be achieved for the Contractor or a particular subcontractor whose performance is uniquely critical to the service contract. Relaxation of the EMR range shall only be considered and/or granted on a case-by-case basis for special conditions and shall not be anticipated as tacit approval.

Contractor's Project Manager or Site Safety and Health Officer (SSHO) shall collect and maintain certified EMR ratings for ALL subcontractors on the project and shall make them available to the Government at the Government’s request per Section F.

2.9.1.2
Contractor and Subcontractor OSHA Days Away From Work, Restricted Duty, or Job Transfer (DART) rate
No Contractor or subcontractor on the project shall have a DART rate calculated from the most recent, complete calendar year greater than 3.0 when entering into a contract or subcontract agreement with the prime contractor or a subcontractor at any tier as computed by the National Council on Compensation Insurance (NCCI) or if not available, as computed by the state agency's rating bureau in the state where the subcontractor is registered.

The OSHA Dart Rate is calculated using the following formula:

(N/EH) x 200,000 where:

N = number of injuries and/or illnesses with days away, restricted work, or job transfer EH = total hours worked by all employees during most recent, compete calendar year 200,000 = base for 100 full-time equivalent workers (working 40 hours per week, 50 weeks per year)

A written request may be submitted for additional consideration to the Contracting Officer Representative (COR) and Contracting Officer (KO) where the specified acceptable OSHA Dart rate range cannot be achieved for the Contractor or a particular subcontractor whose performance is uniquely critical to the service contract. Relaxation of the OSHA DART rate range shall only be considered and/or granted on a case-by-case basis for special conditions and shall not be anticipated as tacit approval.

A Contractor's Project Manager or Site Safety and Health Officer (SSHO) shall collect and maintain self-certified OSHA DART rates for ALL subcontractors on the project and shall make them available to the Government at the Government's request per Section F.

2.9.2
Contractor and Subcontractor High Safety Risk Requirements
For any high safety risk work, the Contractor and/or Subcontractor shall schedule a safety prep meeting with the COR and KO prior to work commencing.

High safety risk work could be, but not limited to, chemical hazards/MSDS, lead paint/asbestos, underground utilities/utility clearance, WHE safety, crane safety, traffic control, hot work (welding/grinding), fall protection/working at heights (ladder safety, scaffolding/staging, aerial lifts, etc.), confined/enclosed space, trenching/excavations, electrical safety, lockout/tag-out (control of hazardous energy), and fire safety.

Min…