Annex 1503050 C Grounds Maint & Landscaping v2.5.doc

DOC document 125 KB Posted

Attached to
Operation & Maintenance of the Southern and Northern Regional Tertiary Treatment Plants on MCB Camp Pendleton
Solicitation number
N6247319R0033
Issued by

View the file

Other files

File Type Posted
Amendment 0005_N6247320R0033.pdf PDF
AMENDMENT 0004.pdf PDF
Amendment 0003_N6247320R0033.pdf PDF
P-1046B Construction Plans 04-05-2016.pdf PDF
RW_Overall.pdf PDF
EXHIBIT D REVISED _ Safety Data & Narrative.docx DOCX document
SRTTP & NRTTP Chemical Usage 2017 & 2018.xlsx XLSX spreadsheet
RWPS Electrical Equipment List.xlsx XLSX spreadsheet
Amendment 0002_N6247320R0033.pdf PDF
ELIN Pricing Schedule REVISED.xls XLS spreadsheet
EXHIBIT B REVISED _ Recent Relevant Experience of the Firm.docx DOCX document
RWPS Equipment List.xlsx XLSX spreadsheet
Rules and Regs Final_Signed April 2013 Edition.pdf PDF
SierraOne Equipment List.xlsx XLSX spreadsheet
Amendment 0001_N6247320R0033.pdf PDF
Annex 0200000 C Management and Administration (SW SubKtr Safety) Revision 13 JUN.docx DOCX document
Annex 1503030 J Integrated Solid Waste Management v2.2.doc DOC document
ELINS Unpopulated.xls XLS spreadsheet
Annex 1503020 C Pest Control v2.3.docx DOCX document
NRTTP Equipment List.xlsx XLSX spreadsheet
SRTTP Equipment List.xlsx XLSX spreadsheet
EXHIBIT F _ Individual Small Business Subcontracting Plan.docx DOCX document
SRTTP EquipmentList_OM.xls XLS spreadsheet
SRTTP-NRTTP LOADINGS.XLSX XLSX spreadsheet
Annex 1503020 F Pest Control v2.3.doc DOC document
SRTTP Electrical Equipment List.xlsx XLSX spreadsheet
EXHIBIT D _ Safety Data & Narrative.docx DOCX document
Annex 1503010 F Custodial v2.3.doc DOC document
EXHIBIT B _ Recent Relevant Experience of the Firm.docx DOCX document
Annex 1503010 C Custodial v2.3 ck.doc DOC document
EXHIBIT G _ Request for Information (RFI).docx DOCX document
Section J Documents Exhibits & other Attachments Annex 0200000 J Management and Administration ver 2 5.doc DOC document
Annex 0100000 C General Information ver 2.2 (revised 040715).doc DOC document
EXHIBIT A _ Financial Questionnaire.docx DOCX document
NRTTP Electrical Equipment List.xlsx XLSX spreadsheet
SCA Wage Determination 16 SEP 19 .pdf PDF
EXHIBIT C _ Technical Capability (1).docx DOCX document
Annex 1604000 F Wastewater Ver 2.2.doc DOC document
Annex 1604000 C Wastewater Rev 2 13 JUN.docx DOCX document
EXHIBIT E _ Past Performance Questionnaire (Form PPQ).docx DOCX document
Annex 1503050 F Grounds Maint & Landscaping v2.3.doc DOC document
Annex 1503020 J Pest Control v2.4.docx DOCX document
NRTTP Boundary Map.pdf PDF
SRTTP Compliance Equipment List.xlsx XLSX spreadsheet
Annex 1503050 J Grounds Maint & Landscaping v2.6.docx DOCX document
Section F Deliveries or Performance Annex 0200000 F Management and Administration v2.8 (revised 12-6-2018).docx DOCX document
SRTTP Boundary Map.pdf PDF
Annex 1503010 J Custodial v2.3.doc DOC document
Annex 1503030 F Integrated Solid Waste Management v2.3.doc DOC document
Annex 1503030 C Integrated Solid Waste Management v2.3.doc DOC document
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ANNEX 1503050

GROUNDS, MAINTENANCE AND LANDSCAPING

SECTION C

1503050 – Grounds Maintenance and Landscaping

Table of Contents

Spec Item
Title
1
General Information
1.1
Concept of Operations
2
Management and Administration
2.1
Definitions and Acronyms
2.2
Personnel
2.2.1
Certification, Training, and Licensing
2.3
Special Requirements
2.3.1
Vehicles on Sidewalks or Lawns
2.3.2
Equipment Restrictions
2.3.3
Safety
2.3.4
Work Identification
2.3.5
Working Adjacent to Parking Areas
2.3.6
Access Coordination
2.3.7
Water Management
2.3.7.1
Water Conservation Plan
2.4
References and Technical Documents
3
FFP Work
3.1
Improved Grounds
3.1.1
Lawn Care
3.1.1.1
Mowing and Trimming
3.1.1.2
Edging
3.1.1.3
Lawn Maintenance
3.1.2
Vegetation Control
3.1.3
Irrigation Systems Operation
3.1.4
Debris Removal
3.1.5
Shrub and Hedge Maintenance
3.1.6
Plant Maintenance
3.1.7
Plant Bed Maintenance
3.1.8
Tree Maintenance
3.1.9
Maintenance of Artificial Turf
3.1.10
Maintenance of Xeriscape Area
3.1.11
Maintenance of Disposal Ponds (Basins)
3.2
Semi-improved Grounds
3.2.1
Grounds Care
3.2.2
Tree Control
3.2.3
Vegetation Control
3.3
Unimproved Grounds
3.3.1
Grounds Care
3.3.2
Tree Control
3.4
Storm Drainage Systems
4
IDIQ Work

1503050 - Grounds Maintenance and Landscaping

Spec Item
Title
Description
1
General Information
The Contractor shall provide all labor, management, supervision, tools, materials, and equipment necessary to provide grounds maintenance and landscaping services located at Camp Pendleton, CA
1.1
Concept of Operations
The intent of 1503050 Grounds Maintenance and Landscaping is to specify the requirements related to lawn maintenance, vegetation removal, and debris removal within installation grounds parcels designated as improved, semi-improved and unimproved areas. Services include mowing and trimming, edging, irrigation systems maintenance. Weed control is limited to application of herbicides.

The following services are not included in this Template:

· Exterior trash cans and debris removal within 5 feet of designated buildings are excluded from this specification. This is included in 1503010, Custodial.

· As required for weed control contiguous to buildings, streets, roads and railroad tracks included within this specification, 1503020, Pest Control, is used for the application of herbicides and control of pests in grassed areas, on plants, trees, and shrubs.

· Maintenance and repair of irrigation system and components. This is included in 1502000, Facility Investment

1503050 - Grounds Maintenance and Landscaping

Spec Item
Title
Description
2
Management and Administration
2.1
Definitions and Acronyms
Definitions and Acronyms are listed in J-1503050-01.
2.2
Personnel
The Contractor shall provide personnel with the qualifications, technical knowledge, experience and skills required to efficiently provide grounds maintenance and landscaping services.
2.2.1
Certification, Training, and Licensing
Certified arborist shall be used for all tree pruning if applicable.
2.3
Special Requirements
2.3.1
Vehicles on Sidewalks or Lawns
Vehicles shall not be permitted on sidewalks or lawns without prior approval from the KO. The Contractor's request shall include the methods on how he intends to protect the lawns and sidewalks from damage. Replace or restore all lawns, plants, and property damaged by the Contractor to their original condition or better at no additional cost to the Government.
2.3.2
Equipment Restrictions
Use of powered equipment is prohibited in environmentally sensitive areas identified on the Site Maps provided in J-0200000.

Use of grazing animals is subject to prior Government approval.

2.3.3
Safety
Grounds maintenance and landscaping equipment shall be approved for use around ammunition bunkers.
2.3.4
Work Identification
The Contractor shall identify and recommend IDIQ work as appropriate to the KO.
2.3.5
Working Adjacent to Parking Areas
Work shall be performed with care on grounds adjacent to parking areas so as to prevent damage to parked vehicles.
2.3.6
Access Coordination

The Contractor shall coordinate all access to performance areas such as airfields and firing ranges through the KO. If required, the Contractor shall be in radio contact with the controlling authority during work performance.

2.3.7
Water Management
The Contractor shall conform to waste and water management measures imposed on the Navy and the Navy-imposed water conservation requirements
2.3.7.1
Water Conservation Plan
The Contractor shall develop and submit a Water Conservation Plan per Section F. The plan shall be in effect year round with emphasis on the rainy season (e.g., October through April) and other times of the year during heavy rain. The plan shall be signed and dated by the Contractor’s Project Manager and Quality Control Manager. At a minimum, the plan shall include the following:

1. Procedures for ensuring water sprinklers are shut off during heavy rains.

2. Procedures for obtaining current information on weather conditions.

3. Procedures for notifying the Government prior to shutting off and turning on water sprinklers.

4. Procedures for maintaining all existing rain control devices during the entire contract period.

5. Procedures for periodic activation of all irrigation systems to ensure proper working condition of heads and proper spray patterns and that no water sprays onto paved areas, roads, or buildings.

6. Identification of areas that may require watering more than three times per week, exceeding Board of Water Supply guidance, in order to maintain the health/appearance of the grounds.

7. Identification of lawn areas that may need dethatching/aeration to improve the health of the lawn and reduce future watering requirements.

8. Identification of areas currently requiring manual watered (no irrigation system is present or an in ground manual irrigation system is present with no irrigation controller).

9. Description of how all contract performance standards will be met while complying with the Water Conservation Plan.

The Contractor may request changes by subsequent written addendum to the plan, which shall require the KO's approval.

2.4
References and Technical Documents
References and Technical Documents are listed in J-1503050-02.

1503050 - Grounds Maintenance and Landscaping

Spec Item
Title
Performance Objective
Related Information
Performance Standard
3
FFP Work
The Contractor shall maintain Improved grounds, semi-improved grounds, and unimproved grounds to ensure a sightly appearance.

Work includes routine, seasonal and cyclic services.

Refer to 1503020, Pest Control, for herbicide restrictions, procedures and reporting requirements.

This specification contains three different areas of grounds maintenance; improved, semi improved and unimproved as well as maintenance of storm drainage systems.

The Contractor shall submit MSDS sheets and catalog cut sheets or samples of all proposed fertilizers and mulch per Section F.

Grounds areas to be maintained are within the boundaries and fence lines of each facility.

Improved, semi-improved, and unimproved grounds are maintained per the specified Standards provided

3.1
Improved Grounds
The Contractor shall maintain improved grounds to ensure a sightly appearance.
The Contractor shall maintain improved grounds, including prestige areas.

Remove all clippings and trimmings, excluding grass clippings, in a timely manner to promote a neat and healthy appearance.

Grass clippings not removed shall promote a neat and healthy appearance.

Appearance of Improved Grounds is consistent with the specified lists.

3.1.1
Lawn Care
N/A
N/A
N/A
3.1.1.1
Mowing and Trimming
N/A
N/A
N/A
3.1.1.2
Edging
N/A
N/A
N/A
3.1.1.3
Lawn Maintenance
N/A
N/A
N/A
3.1.2
Vegetation Control
The Contractor shall control undesired vegetation to ensure areas are free of undesired vegetation.
Remove unwanted vegetation from fence lines, fence fabric, brick walls, sidewalks, curbs, gutters, aggregate areas and paved surfaces including parking lots.

Refer to 1503020, Pest Control, for herbicide restrictions, procedures and reporting requirements.

The Contractor shall develop and submit a schedule for the control of undesired vegetation per Section F.

Areas are maintained clear of undesired vegetation per the Contractor’s schedule.

Services are performed as specified in list in J-1503050-XX.

3.1.3
Irrigation Systems Operation
N/A
N/A
N/A
3.1.4
Debris Removal
The Contractor shall remove debris to ensure a clean and neat appearance.
The Contractor shall remove and appropriately dispose of all debris including seasonal debris, e.g., fruit, seed pods, dry brush throughout improved grounds areas.

Fallen leaves and other seasonal debris shall be removed as necessary to present an overall neat appearance. Increased attention shall be provided seasonally to ensure no build-up of natural debris.

The Contractor shall develop and submit a schedule for debris removal per Section F.

Informational Notes. The Government has found that on previous contracts a frequency twice a month has maintained services at an acceptable level.

Debris is removed as necessary to present an overall neat appearance.

Areas are maintained clear of debris per the Contractor’s schedule.

Services are performed as specified in list in J-1503050-04.

3.1.5
Shrub and Hedge Maintenance
N/A
N/A
N/A
3.1.6
Plant Maintenance
N/A
N/A
N/A
3.1.7
Plant Bed Maintenance
N/A
N/A
N/A
3.1.8
Tree Maintenance
N/A
N/A
N/A
3.1.9
Maintenance of Artificial Turf
N/A
N/A
N/A
3.1.10
Maintenance of Xeriscape Area
N/A
N/A
N/A
3.1.11
Maintenance of Disposal Ponds (Basins)
The Contractor shall control undesired vegetation to ensure areas are free of undesired vegetation.
Remove unwanted vegetation from the Basins and immediate adjacent areas in the San Mateo and San Onofre Disposal Ponds (Basins).

Refer to 1503020, Pest Control, for herbicide restrictions, procedures and reporting requirements.

The Contractor shall develop and submit a schedule for the control of undesired vegetation per Section F.

Debris is removed as necessary to present an overall neat appearance.

Areas are maintained clear of debris per the Contractor’s schedule.

Services are performed as specified in list in J-1503050-03.

3.2
Semi-improved Grounds
The Contractor shall maintain semi-improved grounds to ensure grounds present a sightly appearance and do not interfere with operational requirements.
Areas governed by specific requirements are identified on the Site Maps provided in J-0200000.
Semi-improved grounds present a sightly appearance and do not interfere with operational requirements.
3.2.1
Grounds Care
N/A
N/A
N/A
3.2.2
Tree Control
N/A
N/A
N/A
3.2.3
Vegetation Control
The Contractor shall control undesired vegetation to ensure areas are free of undesired vegetation.
Remove unwanted vegetation from, fence lines, fence fabric, brick walls, sidewalks, curbs, gutters, aggregate areas and paved surfaces including parking lots.

Refer to 1503020, Pest Control, for herbicide restrictions, procedures and reporting requirements.

The Contractor shall develop and submit a schedule for the control of undesired vegetation per Section F.

Areas are maintained clear of undesired vegetation per the Contractor’s schedule.

3.3
Unimproved Grounds
The Contractor shall maintain unimproved grounds to ensure grounds do not interfere with operational requirements.
Unimproved grounds areas governed by specific requirements are identified on the Site Maps provided in J-1503050-03.
Unimproved grounds do not interfere with operational requirements.
3.3.1
Grounds Care
The Contractor shall maintain grounds to ensure no interference with operational requirements.

Vegetation adjacent to fencing, poles, walls, valves, valve boxes and other similar objects shall be maintained.

Grazing animal use shall be subject to prior Government approval.

Refer to 1503020, Pest Control, for herbicide restrictions, procedures and reporting requirements.

Maintain roadway clearances up to 30 feet of either side of the roadway center. Maintain fire lanes and roadways free of all debris that interferes with vehicular passage. Maintain areas adjacent to perimeter fences within 20 feet from either side of the fence, and vegetation height not to exceed one foot. Maintain firebreaks clear of vegetation.

The Contractor shall maintain fire lanes and roadways free of all debris that interferes with vehicular passage.

Prior to mowing or trimming, the Contractor shall remove and appropriately dispose of all debris that interferes with the mowing or trimming operation.

The Contractor shall develop and submit a schedule for the control of undesired vegetation per Section F.

Fire lanes, areas adjacent to perimeter fences, and roadway clearances are maintained clear of vegetation as specified.

Fire lanes and roadways are clear of obstructions that interfere with vehicular passage.

Areas are maintained clear of undesired vegetation per the Contractor’s schedule.

3.3.2
Tree Control
The Contractor shall provide tree control to ensure trees do not encroach on roadways and fence lines.

Maintain a 20 feet clear zone from either side of the fence.

Maintain roadway clearances up to 30 feet of either side of the roadway center.

Tree control shall be accomplished by or under guidance of a certified arborist.

Remove and properly dispose of all tree trimmings.

Trees do not encroach on roadways and fence lines.

3.4
Storm Drainage Systems
The Contractor shall remove obstructions and control vegetation in storm drainage systems to ensure unrestricted flow of storm water runoff.
Drainage systems include curb gutters, curb inlets, brow ditches, drainage channels, swales, catch basins, yard drains, and other devices used to direct the flow of runoff.

The Contractor shall clean and remove debris from drainage systems that would inhibit drainage.

Aboveground storm drainage systems shall be maintained clear of obstructions, debris, weeds, and anything else which may restrict runoff flow.

Drain covers and grates of underground systems shall be maintained clear of obstructions, however, covers and grates shall not be removed for cleaning drainage systems. The KO shall be notified within 24 hours, in writing, of obstructions in subsurface drain lines beyond Contractor responsibility. Missing or damaged yard drain covers and grates shall be reported immediately to the KO.

No evidence of obstructions in the visible area of the drainage systems.

1503050 - Grounds Maintenance and Landscaping

Spec Item
Title
Performance Objective
Related Information
Performance Standard
4
IDIQ Work
IDIQ work may be ordered utilizing DoD EMALL in accordance with Section H or on a task order in accordance with the PROCEDURES FOR ISSUING ORDERS clause in Section G. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.
Refer to IDIQ ELINs for task listings, descriptions, and related requirements. All periods of performance are measured from issue date of order to acceptance of the work. Performance standards for IDIQ work will be the same as those in Spec Item 3 where applicable.

File details come from the government source that posted it. Updated .