Rules and Regs Final_Signed April 2013 Edition.pdf

PDF 118 KB Posted

Attached to
Operation & Maintenance of the Southern and Northern Regional Tertiary Treatment Plants on MCB Camp Pendleton
Solicitation number
N6247319R0033
Issued by

View the file

Other files

File Type Posted
Amendment 0005_N6247320R0033.pdf PDF
AMENDMENT 0004.pdf PDF
Amendment 0003_N6247320R0033.pdf PDF
P-1046B Construction Plans 04-05-2016.pdf PDF
RW_Overall.pdf PDF
EXHIBIT D REVISED _ Safety Data & Narrative.docx DOCX document
SRTTP & NRTTP Chemical Usage 2017 & 2018.xlsx XLSX spreadsheet
RWPS Electrical Equipment List.xlsx XLSX spreadsheet
Amendment 0002_N6247320R0033.pdf PDF
ELIN Pricing Schedule REVISED.xls XLS spreadsheet
EXHIBIT B REVISED _ Recent Relevant Experience of the Firm.docx DOCX document
RWPS Equipment List.xlsx XLSX spreadsheet
SierraOne Equipment List.xlsx XLSX spreadsheet
Amendment 0001_N6247320R0033.pdf PDF
Annex 0200000 C Management and Administration (SW SubKtr Safety) Revision 13 JUN.docx DOCX document
Annex 1503030 J Integrated Solid Waste Management v2.2.doc DOC document
ELINS Unpopulated.xls XLS spreadsheet
Annex 1503020 C Pest Control v2.3.docx DOCX document
NRTTP Equipment List.xlsx XLSX spreadsheet
SRTTP Equipment List.xlsx XLSX spreadsheet
EXHIBIT F _ Individual Small Business Subcontracting Plan.docx DOCX document
SRTTP EquipmentList_OM.xls XLS spreadsheet
SRTTP-NRTTP LOADINGS.XLSX XLSX spreadsheet
Annex 1503020 F Pest Control v2.3.doc DOC document
SRTTP Electrical Equipment List.xlsx XLSX spreadsheet
EXHIBIT D _ Safety Data & Narrative.docx DOCX document
Annex 1503010 F Custodial v2.3.doc DOC document
EXHIBIT B _ Recent Relevant Experience of the Firm.docx DOCX document
Annex 1503010 C Custodial v2.3 ck.doc DOC document
EXHIBIT G _ Request for Information (RFI).docx DOCX document
Section J Documents Exhibits & other Attachments Annex 0200000 J Management and Administration ver 2 5.doc DOC document
Annex 0100000 C General Information ver 2.2 (revised 040715).doc DOC document
EXHIBIT A _ Financial Questionnaire.docx DOCX document
NRTTP Electrical Equipment List.xlsx XLSX spreadsheet
SCA Wage Determination 16 SEP 19 .pdf PDF
Annex 1503050 C Grounds Maint & Landscaping v2.5.doc DOC document
EXHIBIT C _ Technical Capability (1).docx DOCX document
Annex 1604000 F Wastewater Ver 2.2.doc DOC document
Annex 1604000 C Wastewater Rev 2 13 JUN.docx DOCX document
EXHIBIT E _ Past Performance Questionnaire (Form PPQ).docx DOCX document
Annex 1503050 F Grounds Maint & Landscaping v2.3.doc DOC document
Annex 1503020 J Pest Control v2.4.docx DOCX document
NRTTP Boundary Map.pdf PDF
SRTTP Compliance Equipment List.xlsx XLSX spreadsheet
Annex 1503050 J Grounds Maint & Landscaping v2.6.docx DOCX document
Section F Deliveries or Performance Annex 0200000 F Management and Administration v2.8 (revised 12-6-2018).docx DOCX document
SRTTP Boundary Map.pdf PDF
Annex 1503010 J Custodial v2.3.doc DOC document
Annex 1503030 F Integrated Solid Waste Management v2.3.doc DOC document
Annex 1503030 C Integrated Solid Waste Management v2.3.doc DOC document
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rules and Regulations for Recycled Water Use and

Distribution Marine Corps Base Camp Pendleton

April 2013

Amendment to Engineering Report for the Production, Distribution and Use of Recycled/Reused Water Southern Regional Tertiary Treatment Plant

Marine Corps Base Camp Pendleton

RULES AND REGULATIONS FOR RECYCLED WATER USE AND DISTRIBUTION

MARINE CORPS BASE CAMP PENDLETON

April 2013

G-Facilities

TABLE OF CONTENTS

SECTION 1: INTRODUCTION

1.1 BACKGROUND

1.2 POLICY

1.3 GOALS

SECTION 2: DEFINITIONS

SECTION 3: RECYCLED WATER SERVICE REQUIRMENTS

3.1 GENERAL

3.2 AUTHORIZED USES OF RECYCLED WATER

3.3 CONDITIONS FOR RECYCLED WATER SERVICE

3.3.1 Control of Recycled Water Service and Facilities

3.3.2 Prohibition of Changes

3.3.3 Service to Common Areas

3.3.4 Temporary Discontinuation of Recycled Water Service

3.4 NOTIFICATION PROCEDURE

3.4.1 Preliminary Notification

3.4.2 Compliance with Regulatory Requirements

3.4.3 Regulatory Plan Submittal

3.4.4 Review of Plans and Specifications

3.4.5 Construction Review and Inspections

3.5 ESTABLISHING SERVICE

3.5.1 Temporary Use of Potable Water Prior to Recycle Water Service Connection

3.5.2 Initial Inspection of Recycled Water Facilities

3.5.3 Request for Service Connection

3.6 UNLAWFUL CONNECTIONS, TAMPERING OR USE

3.6.1 Unlawful Connections

3.6.2 Bypassing Recycled Water Meter

3.6.3 Tampering with or Obstructing Recycled Water System

3.6.4 Unauthorized Use of Recycled Water

SECTION 4: FACILITIES DESIGN AND CONSTRUCTION

4.1 DESIGN GUIDELINES FOR FACILITIES

4.1.1 Quadrennial Shutdown Test Design Requirement

4.1.2 Design Requirements for the Protection of Supply Wells

4.1.3 Recycled Water Storage Facility Hundred Year Flood Clause

4.1.3.1 Runoff and Erosion

4.1.3.2 Peak Flood Levels

4.1.4 Protection of Groundwater Quality

4.1.5 Run-off, Ponding, and Windblown Sprays

4.1.6 Protection of Drinking Fountains and Public Facilities

4.1.7 Hose Bibs and Quick Couplers

4.1.8 Cross-Connection Control

4.1.8.1 Type of Backflow Prevention

4.1.9 Pressure Requirements

4.1.9.1 Recycled Water Booster Pumps

4.1.9.2 Sealing Water

4.1.10 Distribution Equipment and Service Connections

4.1.10.1 Recycle Water Meters

4.1.11 Depth of Pipe Cover

4.1.12 Separations

4.1.12.1 Horizontal

4.1.12.2 Vertical

4.1.13 Blow-off Assemblies and Air Release Valves

4.1.14 Valve Casings, Frame, Cover Box Identification and

Requirements

4.1.15 Identification of Recycled Water Pipes and Facilities

4.1.15.1 Identification Tapes

4.1.15.2 Color-coding Exposed Recycled Water Facilities

4.2 ADDITIONAL DESIGN GUIDELINES FOR DUAL PLUMBED

FACILITIES

4.2.1 Pipeline Headers in the Chase

4.2.2 Potable/Recycle Water Piping in the Walls

4.2.3 Aquatherm Piping

4.2.4 Copper Piping

4.2.5 Access Panels

4.2.6 Valves

4.3 ADDITIONAL DESIGN GUIDELINES FOR RECYCLED WATER FILL

STATIONS FOR CONSTRUCTION USE

4.3.1 Recycled Water Fill Stations

4.4 PLANS AND SPECIFICATIONS FOR RECYCLED WATER PLAN

CHECK

4.4.1 Information on Plans

4.4.1.1 Recycled Water Notes for Inclusion on Plans

SECTION 5: CONVERSION BETWEEN RECYCLED WATER AND POTABLE

WATER

5.1 CONVERSION FROM RECYCLED TO POTABLE WATER SERVICE .. 28

5.1.1 Isolation of the Recycled Water Supply

5.1.2 Installation of Backflow Prevention Assemblies

5.1.3 Installation of Potable Water System

5.1.4 Removal of Existing Fittings

5.1.5 Threshold Valves

5.1.6 Hydraulic Testing and Disinfection

5.1.7 Notification

5.1.8 Warning Labels/Signs

5.1.9 Revised As-Built Drawings

5.2 CONVERSION FROM POTABLE WATER TO RECYCLED WATER

SERVICE

5.2.1 Notification

5.2.2 Designation of a Recycled Water Site Supervisor

5.2.3 Conditions of Recycled Water Conversion

5.2.4 Verification of Existing Pipeline

5.2.5 Revised As-Built Drawings

SECTION 6: FACILITIES OPERATION

6.1 RECYCLED WATER DISTRIBUTION SYSTEMS

6.2 OFF-BASE RECYCLED WATER USE

6.2.1 Dust Control

6.3 RECYCLED WATER FACILITIES WITHIN A DESIGNATED USE AREA

ON BASE

6.3.1 RWM Responsibilities

6.3.2 End User’s (Area Command/Contractor/Customer)

Responsibilities

6.3.3 Recycled Water Site Supervisor Responsibilities

6.3.4 ES WW Responsibilities

6.3.5 Recycled Water Meters

6.3.6 Recycled Water Construction Equipment Operations

6.4 PUBLIC NOTICES

6.4.1 Signage

6.4.1.1 Golf Course Water Hazards

6.4.1.2 Dual Plumbing

6.4.1.3 Recycled Water for Construction Use

SECTION 7: INSPECTION AND MONITORING

7.1 INSPECTIONS

7.1.1 Installation Inspections

7.1.2 Quarterly Inspections

7.1.3 Backflow Prevention Inspections

7.1.4 Annual Inspections

7.1.5 Quadrennial Shutdown Tests

7.2 MONITORING

SECTION 8: REFERENCES

SECTION 1: INTRODUCTION

1.1 BACKGROUND

United States Marine Corps Base Camp Pendleton (MCB CAMPEN) in San Diego County, California intends to promote and implement innovative water management strategies to conserve water and energy resources while still satisfying its water needs. MCB CAMPEN has been producing recycled water at the Southern Region Tertiary Treatment Plant (SRTTP) since November 2006. It is currently operating under Order No. R9-2009-0021 Master Reclamation Permit for SRTTP United States Marine Corps, Camp Pendleton, San Diego County, California. Pursuant to California Water Code Section 13523.1(b)(3), MCB CAMPEN is required to establish and enforce rules and regulations governing the design, construction, distribution and use of recycled water. These rules and regulations shall be based on the following:

• California Water Code, Division 7, Water Quality

• Health and Safety Code, Division 104, Part 12, Drinking Water

• California Code of Regulations Title 22, Division 4, Chapter 3, Wastewater Recycling Criteria

• California Code of Regulations Title 17, Division 1, Chapter 5, Subchapter 1, Group 4, Drinking Water Supplies

• Department of Environmental Health Recycled Water Plan Check and

Inspection Manual

• The California Department of Public Health Preparation of an

Engineering Report for the Production, Distribution and Use of Recycled Water

• Any measures that are deemed necessary for protection of public health, such as the American Water Works Association California-Nevada Section, Guidelines for the Distribution of Non-Potable Water and Guidelines for the On-Site Retrofit of Facilities Using Disinfected Tertiary Recycled Water or alternate measures that are acceptable to the California Department of Public Health

1.2 POLICY

The California Water Code (CWC) establishes a state requirement to use recycled water to the maximum extent possible where recycled water is otherwise reasonably available in order to augment existing water supplies and prevent the waste of water (CWC Sections 13510-13512, and 13551). MCB CAMPEN is mandated by Executive Order 13423 and 13514, Base Order 5000.2K, the Camp Pendleton Water Resources Plan and the Energy Independence and Security Act (EISA) of 2007, to reduce water consumption while implementing water reuse strategies. It is in the best interest of MCB CAMPEN to use recycled water for any purpose approved for recycled water use to the extent practically and economically feasible. Use of potable water for non-potable uses is contrary to the Base’s water resource management interests, and shall be avoided to the maximum extent possible whenever recycled or raw water is otherwise reasonably available. The distribution and use of recycled water shall be consistent with the legally enforceable standards and requirements of regulatory agencies for the protection of public health and welfare, and the preservation of environmental quality on Camp Pendleton.

1.3 GOALS

These Rules and Regulations establish procedures for the distribution and use of recycled water within designated use areas under the following conditions:

1. Recycled water shall be distributed and used in a manner that meets all applicable Federal, State, and Base requirements. Any amendment to Federal, State, and Base requirements pertinent to these Rules and Regulations shall be incorporated accordingly.

2. Recycled water shall be distributed and used in a manner that shall not cause pollution, contamination, or nuisance, as defined by Section 13050 of the California Water Code.

3. Recycled water shall be distributed and used in a manner that protects public health (CWC Sections 13521, 13522, 13550(a)(3)).

4. Recycled water shall be distributed and used in a manner that prevents direct human consumption.

5. Recycled water shall be distributed and used in a manner that prevents cross-connection between recycled and potable water systems.

6. Recycled water shall be distributed and used in a manner that prevents contamination by other sources, such as wastewater, sludge, and urban run-off.

7. Recycled water shall be distributed and used in a manner that minimizes or eliminates the possibility of unlawful connections, tampering or use.

(The rules and regulations set forth herein are an amendment to MCB CAMPEN’s SRTTP Engineering Report for the Production, Distribution and Use of Recycled Water)

SECTION 2: DEFINITIONS

The following terms, unless otherwise specified, shall have the following meanings:

AGRONOMIC RATE: An application rate, which matches the nutrient requirements for a specific crop on an annual basis and shall be based on the most limiting nutrient which may create potential environmental degradation or public health concern if it is applied beyond the need of the crop. This includes, but is not limited to, nitrate and phosphate.

AIR-GAP SEPARATION: A physical break between a supply of pipe and a receiving vessel. The air-gap separation shall be at least double the diameter of the supply pipe, measured vertically above the flood rim of the vessel, and in no case less than one inch. The design shall be to the satisfaction of the MCB CAMPEN Public Works Department (PWD).

AMERICAN WATER WORKS ASSOCIATION (AWWA): American Water Works Association California-Nevada Section.

APPROVED BACKFLOW PREVENTER: An assembly installed to protect the potable water supply from contamination as approved by California Department of Public Health and the Foundation for Cross-Connection Control and Hydraulic Research, University of Southern California, School of Engineering.

APPROVED CHECK VALVE: A watertight semiautomatic device which seats readily and completely and is designed to permit flow in only one direction, as approved by California Department of Public Health and the Foundation for Cross-Connection Control and Hydraulic Research, University of Southern California, School of Engineering.

APPROVED DOUBLE CHECK VALVE ASSEMBLY (DC): An assembly of at least two independently acting approved check valves including tightly closing shut-off valves on each side of the check valves and test cocks available for testing the water tightness of each check valve as approved by California Department of Public Health and the Foundation for Cross-Connection and Hydraulic Research, University of Southern California, School of Engineering.

APPROVED USE: The use of recycled water in a manner and for the purposes designated in MCB CAMPEN’s Master Reclamation Permit and in compliance with any and all applicable regulatory agency requirements.

AREA FACILITY MANAGER (AFM): An individual designated by FMD to manage the facilities maintenance of a specific Base cantonment area.

AS-BUILT DRAWINGS (see RECORD AS-BUILT DRAWINGS).

AUTOMATIC IRRIGATION SYSTEM: A reclaimed water irrigation system using automatic controllers, valves, and associated equipment to allow programming of appropriate water application rates.

BASE: Marine Corps Base Camp Pendleton, California.

BEQ: Bachelor Enlisted Quarters BMP: Best Management Practices. A practice or combination of practices determined to be an effective and practicable (including technical, economical, and institutional considerations) means of preventing or reducing the amount of pollution or potential for pollution (such as soil erosion, over spray, ponding, etc.)

as a result of recycled water use.

CERTIFIED CROSS-CONNECTION CONTROL SPECIALIST: Cross-connection specialist who holds a current Cross-Connection Control Specialist certificate issued by the California-Nevada Section of the American Water Works Association or an organization with equivalent certification requirements.

CONSTRUCTION USE: Approved use of recycled water to support construction activities such as soil compaction and dust control during grading.

CONTRACTOR: An entity entering into a legal agreement with the Base for the performance of work on any portion of facilities subject to these regulations.

COUNTY: County of San Diego, California.

CROSS-CONNECTION: An unprotected connection between any part of a potable water system and recycled water system, or between any part of recycled water system and other sources such as sewers and sludge force mains whereby contamination may enter the potable water system.

CROSS-CONNECTION PROGRAM MANAGER (CCPM): An individual within Facilities Maintenance Department that manages the cross-connection and backflow prevention program for MCB CAMPEN and maintains a current Cross- Connection Control Specialist certificate.

CALIFORNIA CODE OF REGULATIONS (CCR): Current edition of the California Code of Regulations.

CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH): Department of Public Health for the state of California.

DEPARTMENT OF ENVIRONMENTAL HEALTH (DEH): County of San Diego Department of Environmental Health.

DIRECT BENEFICIAL USE: Use of recycled water which has been transported from the point of production to the point of use without an intervening discharge to waters of the State.

DESIGNATED USE AREA: An area with defined boundaries identified by and limited to those uses permitted by MCB CAMPEN’s Master Reclamation Permit, Federal and State regulatory agencies and the Base for recycled water use.

DISCHARGE: Recycled water discharge.

DUAL PLUMBING SYSTEM: Non-cross connected building plumbing for potable water and for reclaimed water. The reclaimed water plumbing supplies water for toilets and urinals.

END USER: An entity that uses recycled water within a designated use area.

End users for their designated use areas are responsible for the maintenance and repair of recycled water service lines and facilities, and the designation of a Recycle Water Site Supervisor. The end user may be the Area Command, contractor, customer, Navy, MCCS, MCAS, CalTrans, agriculture, etc.

ES WW: Assistant Chief of Staff, Environmental Security Wastewater Branch.

FMD: Facilities Maintenance Department GPH: Gallons per hour.

GPM: Gallons per minute.

INFILTRATION RATE: Rate at which water penetrates the soil surface and enters the soil profile typically expressed in inches per hour.

INSPECTOR: An individual authorized by the Base to perform inspections of recycled water facilities or proposed or designated use areas.

LANDSCAPE IMPOUNDMENT: Contained body of recycled water, aesthetically sited but restricted from all body contact activities.

MCB CAMPEN: Marine Corps Base Camp Pendleton NAVFAC: Naval Facilities Engineering Command NON-POTABLE WATER: Non-consumable water such as recycled water and raw water.

OPERATIONS PERSONNEL: All workers whose regular or assigned work involves the supervision, operation, or maintenance of equipment, facilities, or a system using recycled water.

POC: Point of connection between the distribution main line and service line.

PONDING: Surface retention of recycled water for a period of time following the cessation of an approved recycled water use activity such that a public health issue results.

POTABLE WATER: Water suitable and designated for human consumption which conforms to CCR Title 22, the California Safe Drinking Water Act, and any other related laws and regulations.

PWD: Public Works Department.

RECLAIMED WATER: Recycled water. (See RECYCLED WATER) RECORD AS-BUILT DRAWINGS shall mean approved drawings that correctly depict completed, constructed facilities. These drawings shall have accurate site locations of all potable water, recycled water, sewer lines, and other utility systems.

RECYCLED WATER: Water as defined by CCR Title 22, Division 4 suitable for a direct beneficial use or a controlled use. Specifically excluded from this definition is graywater.

RECYCLED WATER DISTRIBUTION MAINS: Recycled water pipelines and appurtenances used for the distribution of recycled water from recycled water transmission mains to recycled water service connections.

RECYCLED WATER FACILITIES: Systems, structures, etc., used for the treatment, storage, pumping, transmission and distribution of recycled water.

RECYCLE WATER MANAGER (RWM): An individual designated by the Facilities Maintenance Department responsible for ensuring that all recycled water systems and facilities on Base are operated and maintained in accordance with these Rules and Regulations. The RWM shall maintain a current Recycled Water Site Supervisor certificate and a current Cross-Connection Control Specialist certificate.

RECYCLED WATER METER: Recycled water measuring monitor RECYCLED WATER SERVICE CONNECTION: Point of connection (POC) between the distribution main line and service line.

RECYCLED WATER SERVICE LINES: Recycled water lines from POC to a designated reclaimed water use areas.

RECYCLED WATER SITE SUPERVISOR: An individual designated by the end user and authorized by the RWM to operate and maintain recycled water facilities within a designated use area. The Recycle Water Site Supervisor shall be responsible for the application of the guidelines, criteria, and standards of these Rules and Regulations. The Recycled Water Site Supervisor shall maintain a current Recycled Water Site Supervisor certificate and assume the responsibilities outlined in Section 6.3.3.

RECYCLED WATER TRANSMISSION MAINS: Major recycled water pipelines and appurtenances used for the distribution of recycled water from the water reclamation plant to pump stations, reservoirs, and/or recycled water distribution mains.

REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTION ASSEMBLY

(RP): A backflow preventer incorporating not less than two check valves, and automatically operated differential relief valve located between the two check valves, a tightly closing shut-off valve on each side of the check valves, and equipped with necessary test cocks for testing as approved by California Department of Public Health and the Foundation for Cross-Connection and Hydraulic Research, University of Southern California, School of Engineering.

REGULATORY AGENCIES: Public entities authorized by Federal, State, and Base statutes to protect public health and safety and water quality.

ROICC: Resident Officer in Charge of Construction RULES AND REGULATIONS: MCB CAMPEN Rules and Regulations for Recycled Water Use and Distribution.

RUN-OFF: Flow of recycled water beyond the boundaries of the designated reclaimed water use area.

RWQCB: Regional Water Quality Control Board of the State of California, San Diego Region.

SEPARATION: Horizontal and vertical distance between a recycled water pipeline and a potable water pipeline, sewer pipeline, or a sludge force main.

The separation shall be the clear outside-to-outside distance between the pipelines in question.

SPRAY IRRIGATION: Reclaim water sprinkler or pipe orifice spray application to maintain vegetation.

SRTTP: Southern Region Tertiary Treatment Plant UNAUTHORIZED DISCHARGE: Discharge of recycled water that violates these Rules and Regulations or any applicable Federal, State, or Base statutes, regulations, ordinances, contracts or other requirements.

WASTEWATER: Domestic waste carrying water permitted to discharge to the sanitary sewer.

WINDBLOWN SPRAY: Dispersed, airborne particles of recycled water.

SECTION 3: RECYCLED WATER SERVICE

REQUIREMENTS

3.1 GENERAL

The Recycled Water Manager (RWM) shall provide recycled water service in accordance with these Rules and Regulations to areas identified in MCBCP’s Master Reclamation Permit subject to both End User and MCB CAMPEN constraints AND existing recycled water infrastructure limitations.

3.2 AUTHORIZED USES OF RECYCLED WATER

The potential uses of disinfected tertiary treated recycled water on Camp Pendleton include, but are not limited to; landscape and agricultural irrigation, construction dust control and soil compaction, toilet and urinal flushing, landscape impoundment, treatment wetlands, aquifer recharge and seawater intrusion prevention, and in-plant uses at SRTTP. Each use must be considered for approval by the PWD on a case-by-case basis as per Section 3.4 and should be consistent with the strategic objectives of the Camp Pendleton Water Resources Plan (WRP) and the priorities outlined in the Base Recycled Water Master Plan (completed on February 2012). Prior to approval of major new uses of recycled water, the proposed use should be--to the extent practicable--coordinated for supportability, feasibility and cost effectiveness with pertinent staff sections during meetings of the Base Water Steering Committee.

Specific uses allowed shall be implemented in accordance with the standards set forth in the CCR Title 22. The Recycled Water Site Supervisor shall restrict the use of recycled water to those uses designated specifically for that use area set forth in MCB CAMPEN’s Master Reclamation Permit and approved by the PWD.

ES WW shall obtain regulatory approval and a permit amendment from the RWQCB for any proposed new use.

3.3 CONDITIONS FOR RECYCLED WATER SERVICE

Recycled water service shall be subject to all the terms and conditions of MCB CAMPEN’s Master Reclamation Permit; State and Federal regulations; these Rules and Regulations; the WRP, the Base Recycled Water Master Plan and the following:

3.3.1 Control of Recycled Water Service and Facilities

No person other than the RWM shall control, deliver or schedule recycled water service to a facility. No other person except authorized representatives or contractors of the RWM shall have the right to operate, adjust, repair, change, alter, move or relocate any portion of the Base’s recycled water distribution mains. Maintenance and repair of recycled water service lines, meters and facilities within a designated use area are the responsibility of the end user (Area Command, contractor, customer, Navy, Marine Corps Community

Services (MCCS), Marine Corps Air Station (MCAS), CalTrans, agriculture, etc.). The RWM shall be responsible for ensuring that the end user maintains and repairs the on-site recycled water systems per the Rules and Regulations.

The RWM shall be entitled to inspect and test all recycled water service connections, meters and facilities.

3.3.2 Prohibition of Changes

No one shall change the character of use of recycled water, or update, change, modify or add to the recycled water system or the potable system in a designated use area unless written notification is provided in a timely manner to the RWM and the changes are approved by the RWM as per Section 3.4. All changes shall be designed and constructed in accordance with the requirements, conditions, and standards set forth in these Rules and Regulations. All changes shall also comply with any and all applicable Federal, State, and Base regulations, contracts and requirements. All facility modifications must be inspected by either the RWM, Resident Officer in Charge of Construction (ROICC), Cross Connection Program Manager (CCPM) and/or a certified Cross-Connection Control Specialist as per Section 7.1.1 upon completion of construction. Any unintended changes or alterations to existing recycled water facilities must be reported in writing immediately to the RWM.

All changes from approved plans, intended or unintended, shall be reflected in revised as-built drawings and submitted to the RWM and ES WW as soon as possible and prior to use.

3.3.3 Services to Common Areas

The RWM reserves the right to supply recycled water to contiguous areas of a single facility through a single recycled water service connection. A recycled water service connection and water meter shall not be used to supply any facility not designated within a use area or permitted by an amendment of the MCB CAMPEN’s Master Reclamation Permit. All recycled water must pass through a meter.

3.3.4 Temporary Discontinuation of Recycled Water Service

Recycled water service to a designated use area will temporarily cease on occurrence of any of the following:

a. When SRTTP effluent does not meet the requirements of MCB CAMPEN’s Master Reclamation Permit or CCR Title 22. Recycled water service will recommence when the SRTTP effluent meets regulatory requirements once again.

b. When the PWD determines that a recycled water or delivery capacity shortage exists or is threatened.

c. When the RWM and/or ES WW determines that recycled water use potentially threatens the health, safety, or welfare of Base residents.

d. When a contractor/end user/customer/AFM identifies a recycled meter as non-functioning, non-registering, or out of service; a notice shall be sent to the Recycle Water Site Supervisor within 24 hours. The Recycled Water

Site Supervisor must repair and/or replace the meter as soon as possible as per Section 6.3.5.

e. At recycled water designated use areas where potable water lines are on the same property and located in the same area as recycled water lines, a cross-connection control shutdown test every four years is required as per Section 7.1.5.

The RWM shall notify the Recycled Water Site Supervisor as soon as possible of any interruptions of recycled water service. The Recycled Water Site Supervisor shall be responsible for implementing FMD’s Contingency Plan for Interrupted Recycle Water Service (Port-a-Johns, no irrigation, etc.) as applicable until recycled water service is reestablished.

3.4 NOTIFICATION PROCEDURE

3.4.1 Preliminary Notification

The design contractor shall coordinate with the PWD during the design phase prior to construction or modification of any recycled water facility. The PWD shall obtain approval by all concerned parties (RWM, FMD, ES WW, OWR, etc.) including the end user of the proposed recycled water use/change before proceeding to the construction phase. When potable water lines are located within the same area as proposed recycled water lines, and the potable water facility can not support a quadrennial shutdown test as per Section 7.1.5 (e.g.

Hospital), the PWD shall not allow recycled water facilities to be incorporated into the design. Once the contractor has obtained approval from the PWD for the proposed use, the contractor shall submit the following information to the RWM and ES WW prior to regulatory plan submittal:

a. The purpose for which the property will be used.

b. The proposed use of recycled water.

c. If potable water lines will be located within the same area as the proposed recycled water lines.

d. The estimated recycle water service requirement (peak GPM and annual average usage in AFY).

e. Any special condition for service pursuant to these Rules and

Regulations.

Fifteen (15) working days prior to commencement of any excavation or site improvements, the contractor/ROICC shall notify the RWM.

3.4.2 Compliance of Application with Regulatory Requirements

The Area Command/contractor/end user/customer proposing use of recycled water shall agree to comply with the requirements of these Rules and Regulations and all other Federal, State, and Base regulations.

3.4.3 Regulatory Plan Submittal

The contractor shall submit one set of recycled water system design drawings and specifications which include record as-built drawings concurrently to the RWM, ROICC, PWD, and ES WW. These uses include but are not limited to landscape irrigation, dual plumbing, landscape impoundment, and in-plant uses at SRTTP.

For recycled water use at construction sites with a construction storm water discharge permit, appropriate best management practices (BMP) shall be included in the project’s Stormwater Pollution Prevention Plan (SWPPP), subject to ROICC or base approval. For sites without a construction storm water discharge permit, appropriate BMPs shall be included in the project’s environmental control plan or similar, subject to base approval.

The contractor shall provide an electronic copy of the submittal(s) to ES WW.

The contractor shall be responsible for all recycled water use regulatory fees associated with the project.

3.4.4 Review of Plans and Specifications

Upon receipt of plans and specifications for recycled water service, the RWM, PWD, ES WW, and, when applicable, ROICC shall review the submittal and conduct any necessary investigation in order to determine if the submittals are in compliance with these Rules and Regulations and are adequate for regulatory submittal. ES WW will submit the recycled water system design drawings and specifications to the appropriate regulatory agencies for review.

The RWM, PWD, and ES WW will coordinate with the end users and their construction contracting agents (ROICC, FSC, etc.) to ensure that the contractors make appropriate changes to their submissions, if necessary, to comply with these Rules and Regulations and obtain regulatory approval.

These changes may include design, materials of construction, method of operations, and/or conditions of service. The contractor shall resubmit to the RWM, PWD, and ES WW all revised submittals, which include all required modifications, with the submittal revision number clearly indicated on the front coversheet. All facility modifications must be inspected by the RWM, ROICC, CCPM and/or a certified Cross-Connection Control Specialist upon completion of construction as per Section 7.1.1. Prior to final payment of the contractor, as-built drawing shall be submitted to the RWM, PWD, and ES WW, as per Section 5.1.9. The RWM will authorize recycled water service only when regulatory approval has been obtained and the RWM, PWD, and ES WW concur that the new use area is in compliance with these Rules and Regulations.

3.4.5 Construction Review and Inspections

Prior to construction of recycled water use facilities, the contractor shall notify the FMD/ROICC cross-connection specialist to schedule compliance inspections during construction. Before any recycled water piping can be enclosed or backfilled, it must be inspected by the government representative.

3.5 ESTABLISHING SERVICE

3.5.1 Temporary Use of Potable Water Prior to Recycle Water Service Connection For systems that are designed to accommodate the use of recycled water in areas where recycled water service is not immediately available, provisions shall be made for connection to the recycled water system when it becomes available as per Section 4. In the interim, potable water will be supplied to the recycled water facilities through an approved potable water connection. As long as the recycled water facilities have never been used with recycled water, potable water may be used without an air-gap separation until recycled water is available. If the recycled water facilities have previously been used with recycled water, a temporary connection to the potable water system shall be provided with an air-gap separation which complies with the requirements of Sections 7602(a) and 7603(a) of Title 17 and installed to the satisfaction of DEH, CDPH, the RWM and the CCPM. An inspection of the recycled water facilities shall be conducted by the RWM, ROICC, CCPM and/or a certified Cross-Connection Control Specialist as per Section 7.1.1 before the facility receives potable water.

3.5.2 Initial Inspection of Recycled Water Facilities

Prior to commencement of recycled water service or potable water service in the case that recycled water service is not yet available, an inspection of the recycled water facilities shall be conducted as per Section 7.1.1 to verify that the facilities are in compliance with MCB CAMPEN’s Master Reclamation Permit and these Rules and Regulations.

3.5.3 Request for Service Connection

Following the completion of plan check, inspection and approval by the RWM, ES WW, DEH, CDPH and RWQCB of the recycled water facilities, the contractor and/or end user shall request the RWM to authorize installation of a service connection when a recycled water distribution main is available. The RWM shall oversee and inspect the connection.

3.6 UNLAWFUL CONNECTIONS, TAMPERING OR USE

3.6.1 Unlawful Connections

Connections to recycled water facilities are prohibited unless authorized by the

RWM.

3.6.2 Bypassing Recycled Water Meter

The use of recycled water that has not passed through a meter is prohibited.

Additionally, any bypass, or maintenance of a bypass, is prohibited.

3.6.3 Tampering with or Obstructing Recycled Water System

Only persons authorized by the RWM may operate, maintain, modify, or otherwise work on the recycled water system. Tampering with the recycled water system in any way, or otherwise obstructing, damaging, or degrading it, is prohibited.

3.6.4 Unauthorized Use of Recycled Water

The RWM may terminate service to a recycled water service to an end user, recycled water use facility, or a designated use area that is not in compliance with Federal, State, or Base regulations.

SECTION 4: FACILITIES DESIGN AND CONSTRUCTION

4.1 DESIGN GUIDELINES FOR FACILITIES

The design of recycled water facilities, including the preparation of plans and specifications shall be under the responsibility of a registered Landscape Architect, Civil or Mechanical Engineer. All facilities shall comply with the latest edition of the following standards in the order listed:

1. Health and Safety Code, Division 104, Part 12, Drinking Water

2. California Water Code, Division 7, Water Quality

3. CCR Title 22, Division 4, Chapter 3, Wastewater Recycling Criteria

4. CCR Title 17, Division 1, Chapter 5, Subchapter 1, Group 4, Drinking

Water Supplies

5. American Water Works Association California-Nevada Section Guidelines for the Distribution of Non-Potable Water and Guidelines for the On-Site Retrofit of Facilities Using Disinfected Tertiary Recycled Water developed

6. San Diego Area Regional Standard Drawings

7. Standard Specifications for Public Works Construction including the

Regional Amendments of the County and MCB CAMPEN

4.1.1 Quadrennial Shutdown Test Design Requirement

When potable water lines are located within the same area as proposed recycled water lines, and the potable water facility can not support a quadrennial shutdown test as per Section 7.1.5 recycled water facilities shall not be incorporated into the design.

4.1.2 Design Requirements for the Protection of Supply Wells

Design will follow Section 60310 of the CCR Title 22 as it relates to groundwater water supply wells:

a. No impoundment of disinfected tertiary recycled water will occur within 100 feet of any domestic water supply well.

b. No irrigation with disinfected tertiary recycled water shall take place within 50 feet of any domestic water supply well.

4.1.3 Recycled Water Storage Facility Hundred Year Flood Clause

4.1.3.1 Runoff and Erosion

All new recycled water storage facility designs shall incorporate protection against erosion, overland runoff, and other impacts resulting from a design 100-year frequency unless the Regional Board approves relaxed storm protection measures for the facility.

4.1.3.2 Peak Flood Levels

All new recycled water storage facility designs shall incorporate protection against 100-year frequency peak stream flows as defined by the County of San Diego flood control agency unless the Regional Board approves relaxed storm protection measures for the facility.

4.1.4 Protection of Groundwater Quality

Recycled water irrigation systems shall be designed to deliver recycled water at agronomic rates to ensure that the application of recycled water does not degrade the quality of the groundwater.

4.1.5 Run-off, Ponding and Windblown Sprays

Recycled water irrigation systems shall be designed to meet the peak moisture demand of all plant materials used within the design area and to deliver recycled water in a manner compatible with the infiltration rates of the soil types within the approved use area. Recycled water facilities shall be designed to prevent run-off, ponding or windblown sprays of recycled water outside of the designated use areas.

4.1.6 Protection of Drinking Fountains and Public Facilities

All drinking fountains located within a designated recycled water use area shall be protected by re-siting or isolation with a protective structure from contact with recycled water, whether by windblown spray, mist, runoff or by direct application through irrigation or other approved uses. Recycled water irrigation systems shall not be installed near food establishments or public facilities such as picnic tables.

4.1.7 Hose Bibs and Quick Couplers

Installation of hose bibs recycled water systems regardless of style, construction, or identifications is not permitted. The use of quick couplers is at the sole discretion of the PWD and CCPM. Quick coupling valves used in recycled water systems shall conform to the following:

a. Shall be a type approved for recycled water use with a normal working pressure of 150 p.s.i.

b. Shall be different from potable water quick coupling valves.

c. Shall be operated only with a special coupler key with an acme thread for opening and closing the valve in order to prevent unauthorized use.

d. Shall have permanently attached covers that are purple rubber or vinyl and lock.

4.1.8 Cross-Connection Control

The primary purpose of cross-connection prevention is to protect the Base’s potable water supply from contamination by any potential pollutant or contaminant, including recycled water, in accordance with CCR Title 17. The secondary purpose is to protect the recycled water system from contaminants.

The following provisions are in addition to, and not in lieu of, the controls and requirements of regulatory agencies.

4.1.8.1 Type of Backflow Prevention

All backflow prevention assemblies shall be located above grade as close as possible to the source. The level of protection required is related to the degree of hazard that the PWD or the CCPM determines exists on the premises served. The following protective assemblies may be required:

Reduced Pressure Principle Backflow Prevention Assembly (RP), Double Check Valve Assembly (DC), and/or an Air-Gap Separation (AG). The contractor may choose a higher level of protection than required by the PWD and the CCPM. Minimum types required, relative to various situations, are listed below. Situations not listed shall be evaluated on a case-by-case basis and the appropriate level of protection required shall be determined by the PWD and the CCPM.

Minimum Backflow Prevention Assembly Required on Service Connections:

a. Facility where potable water is used to supplement the recycled water supply. Air-Gap Separation (AG)

b. Facility that intends to use recycled water where recycled water is not and has not previously been available. Reduced Pressure Principle Backflow Prevention Assembly (RP).

c. Facility where recycled water is used and there is no interconnection with the potable water system. Reduced Pressure Principle Backflow Prevention Assembly (RP).

d. Facilities using recycled water for landscape irrigation. Reduced Pressure Principle Backflow Prevention Assembly (RP) unless otherwise specified by the PWD and/or the CCPM.

Backflow prevention for the Base’s recycled water supply shall be provided and installed by the contractor in accordance with the specifications of the PWD and CCPM.

4.1.9 Pressure Requirements

Service pressure requirements shall be determined by the PWD. The contractor shall design based on available pressure.

4.1.9.1 Recycle Water Booster Pumps

The contractor shall incorporate booster pumps into the facility design when an increase in operating pressure is required. Booster specifications shall be compatible with system specifications to avoid release of recycled water in an uncontrolled manner. The contractor shall also design proper drainage of the pump packing seal water to the sanitary sewer system. The contractor shall post at least one sign indicating recycled water on the premises of the booster pumps which can be clearly seen by all operations personnel.

4.1.9.2 Sealing Water

Potable water will not be used as seal water for recycle water pumps.

4.1.10 Distribution Equipment and Service Connections

The PWD will provide guidelines to determine the size and location of recycled water service lines, service connections, and meters. When a recycled water main is not available, the contractor shall extend the recycled water service line to a PWD determined curb line, or facility boundary, abutting upon a street, highway, road, or the Base’s easement in which recycled water distribution mains are installed. All recycled water mains shall be HDPE (High-Density Polyethylene Pipe). The maximum allowable velocity shall be 6.5 ft/s. The minimum allowable velocity at daily peak reclaim demand shall be 2 ft/s. The minimum inside diameter of mains shall be in accordance with MCB CAMPEN Camp Pendleton Requirements. Service lines may be polypropylene, HDPE or PVC class 200 (C-900) and must be properly identified as per Section 4.1.15.

Pipe fitting materials and size shall be as per the requirements of the current California Plumbing Code. The contractor must include a strainer and a meter assembly on every recycled water service connection to the main.

4.1.10.1 Recycled Water Meters

The contractor shall install a water meter on the recycled water service line to monitor the recycled water supply to a designated use area. Meters shall be centrally located if feasible, above ground and protected from physical damage as per MCB CAMPEN’s Energy Management Memorandum for Base Utility Meters. Large master meters shall be fenced with gravel or concrete pads. Working clearance must be approved by the RWM. The meter assembly shall include a curb cock or wheel valve as approved by the PWD on the inlet side of the meter, which shall be used exclusively by the RWM for controlling the recycled water supply through the recycled water service line.

Meters shall be Neptune or equal with an Itron ERT/RF compatible model 100W series endpoint. All new meters shall be compatible, field tested and verified with the existing Itron MV-RS wireless RF meter reading system.

Wireless devices should be mounted on the meter or under the pit lid or on the wall of the mechanical room depending on the location of the meter. The meter shall be sized for the appropriate load of the recycle water facility. The meter size and location is subject to approval by the PWD. The meter shall be installed by the contractor and inspected by the RWM.

4.1.11 Depth of Pipe Cover

The minimum depth of cover required is 36 inches for 12-inch mains and smaller. The base and sides shall be compacted to 90%. Mains over 12 inches require special design and approval from PWD at the design stage.

4.1.12 Separations

4.1.12.1 Horizontal

A 10-foot horizontal separation between recycled water pipelines and parallel potable water pipelines and sanitary sewer or sludge pipelines shall be maintained at all times. All special construction requirements for horizontal separations less than 10-feet, or crossovers, must be in accordance with the Department of Health Services (now CDPH) Guidance Memo No. 2003-02 and approved by the PWD and RWM prior to commencement of construction.

Common trench construction shall not be permitted. In any event, a horizontal separation less than four (4) feet shall not be allowed.

4.1.12.2 Vertical

Potable water, recycled water, and sewer lines shall be vertically located below the finished ground surface in order of descending quality. Potable water shall be above recycled water which should be above sewer. Minimum vertical separation between a potable water line and a recycled water line shall be one foot between the outside top and bottom surfaces of the pipes.

No special construction requirements are necessary provided that one foot vertical separation is maintained. Intermittently pressurized recycled water irrigation lines serving sprinkler heads may be installed above potable water line(s). A constant pressure recycled water irrigation line must be installed with an approved Class 200 PVC protective sleeve when installed above a potable water line or less than one foot below a potable water line.

4.1.13 Blow-Off Assemblies and Air Release Valves

Either in-line or end-of-line blow-off or drain assemblies shall be installed for removing water, air or sediment from the pipe. The line tap for the assembly shall be no closer than 18 inches to a valve, coupling, joint, or fitting unless it is at the end of the line (refer to San Diego Regional Standard Drawings). All existing buried copper lines connected to an air release valve will be encased in a purple 6-Mil poly sleeve.

4.1.14 Valve Casings, Frame, Cover Box Identification and Requirements The contractor shall clearly tag main recycled water shut-off valves clearly indicating recycled water. All covers must have a recognizable inscription indicating recycled water cast on the top surface. Valve cans and risers shall be 6 inch PVC class 200, C-900 Pipe and colored purple pantone #522. Three valve clusters will be installed at all tee connections unless otherwise approved by the PWD. Valves must be easily accessible.

4.1.15 Identification of Recycled Water Pipes and Facilities

All recycled water piping and appurtenances in new installations and appurtenances in retrofit installations shall be colored purple pantone #522 or distinctively wrapped with purple tape as per Section 4.1.15.1. The contractor shall prepare and install public notice signage at all new recycled water use areas in accordance with Section 6.4.

4.1.15.1 Identification Tapes

Color coded identification (caution) tape differentiating the recycled water piping from other utility lines shall be consistent throughout a use area. The contractor shall install warning tapes, polyethylene sleeves or tags with metallic backing and “CAUTION: RECYCLED WATER - DO NOT DRINK” printed in black sans serif 40 (min) font on a purple field continuously on all recycled water lines that are not painted purple (such as ductile iron, copper, brass, etc.) before the pipe is placed in the trench. The overall width of the tape shall be at least three inches. The contractor shall attach 10-guage tracer wire on all non-metallic pipes. The contractor shall also install warning tape continuously 2-feet below the finished surface. Other satisfactory means of securing the tape during backfill of the trench may be used as determined by RWM, PWD, or ROICC.

4.1.15.2 Color-Coding Exposed Recycled Water Facilities.

All above ground, exposed facilities shall be consistently color-coded purple pantone #522 and marked to differentiate recycled water facilities from potable water and/or wastewater facilities.

4.2 ADDITIONAL DESIGN GUIDELINES FOR DUAL PLUMBED

FACILITIES

This section establishes additional guidelines to aid the designer and installer of dual plumbing projects. Potable water design and construction standards shall be followed in the absence of recycled water standards for dual plumbing systems. The design of dual plumbing systems, including the preparation of plans and specifications, shall be under the responsibility of a registered Mechanical Engineer. A Registered Architect or a Civil Engineer can Seal (emboss stamp) and sign and date the drawings if he/she is directly responsible for the dual plumbing system design. The contractor shall submit one set each of final recycled water system record as-built drawings and specifications concurrently to RWM, PWD, and ES WW as per Section 3.4.

The provisions of this section shall apply to the installation, construction, alteration, and repair of recycled water systems intended to supply water closets and urinals. The recycled water system shall have no connections to any potable water system, with or without mechanical backflow prevention devises. If recycled water is utilized on the premises, all potable water supplies shall be provided with appropriate backflow protection.

Before the building may be occupied, the installer shall perform the initial cross-connection test in the presence of the RWM, cross-connection specialist, and/or any other regulators.

The recycled water system and the potable water system within the building shall be provided with the required appurtenances (valves, air/vacuum relief valves, etc.) to allow for deactivation or drainage as may be required by this section.

4.2.1 Pipeline Headers in the Chase

To the extent permitted by structural conditions, recycled water headers and branches off risers shall not be run in the same wall or ceiling cavity of the toilet room where potable water piping is run. Pipeline headers in the chase may be manifolded (side by side; a 10 foot horizontal separation does not apply). If the recycle and potable water pipelines in the chase are constructed with significantly different materials, no labeling is required. However, in the mechanical room, the contractor shall install purple labeling on the recycled water pipelines and blue labeling on the potable water pipelines as required by regulations.

4.2.2 Potable/Recycle Water Piping in the Walls

Any potable piping shall not share the same wall stud bay as recycled water piping.

4.2.3 Aquatherm Piping

No additional labeling/tape is required on aquatherm piping in the walls since it is integrally purple and labeled by the manufacturer.

4.2.4 Copper Piping

The copper piping located between aquatherm piping and the future toilet angle stop shall be painted purple or wrapped in warning tape with metallic backing and “CAUTION: RECYCLED WATER - DO NOT DRINK” printed in black font on a purple field. A chrome sleeve shall be installed on all copper piping located outside the finished wall.

4.2.5 Access Panels

Access panels for valves shall be screw driver (tool) operated. The contractor shall install signage on the inside door of all recycle water access panels which clearly identifies recycled water.

4.2.6 Valves

For annual inspection purposes, valves in dual plumbed systems shall be designed for easy access. Each recycled water valve shall have a break away tag (valve seal) that has a unique serial number. In the event that the valve is operated, the tag connection is broken.