This is an architectural drawing sheet containing expansion joint details for Building 60 repairs at Portsmouth Naval Shipyard in Kittery, Maine. The document is a NAVFAC (Naval Facilities Engineering Systems Command) technical drawing dated September 14, 2023, with an amendment dated March 16, 2026, and serves as part of the project design documentation for a federal military construction project.

The sheet provides detailed specifications for eight separate expansion joint conditions throughout the building, including elevator/floor expansion joint section details (Details 4-8) and electrical room expansion joint details at windows (Details 1-2). The drawings illustrate construction requirements involving 8-inch concrete masonry unit (CMU) walls, metal stud wall fastening, 5/8-inch gypsum board, steel beams and columns, concrete slabs, existing wood strip flooring, metal decking, and continuation sealant systems. Additional details specify wood blocking dimensions (2x6 and 2x8), plywood facing, and attachment methods to existing window frames and mullions. The expansion joint system is consistently referenced to Detail D4/AE530 across multiple floor levels (Second Floor elevation 39.64', First Floor Mezzanine elevation 20.86'). All drawings are marked as unclassified and have received final approval for construction, with cross-references to related architectural sheets AE001, AE411, AE421, AE601, and AE602 for wall types, door schedules, and repair specifications.

View the file

Other files

File Type Posted
Att. Y) PPI responses AMD 0010.pdf PDF
Att. FF) Amendment 0010 Attachment Table of Contents.pdf PDF
01 11 00.00 22_AMENDMENT 010.pdf PDF
14 24 23_AMENDMENT 010.pdf PDF
119_AE440_R1_AMENDMENT 010.pdf PDF
123_AE444_R1_AMENDMENT 010.pdf PDF
138_AE640_R1_AMENDMENT 010.pdf PDF
164_PD102_R1_AMENDMENT 010.pdf PDF
172_P-104_R1_AMENDMENT 010.pdf PDF
174_P-106_R1_AMENDMENT 010.pdf PDF
176_P-108_R1_AMENDMENT 010.pdf PDF
180_P-403_R1_AMENDMENT 010.pdf PDF
183_P-701_R1_AMENDMENT 010.pdf PDF
222_M-703_R1_AMENDMENT 010.pdf PDF
Att. T) Price Schedule AMD 0009.pdf PDF
Att. EE) Amendment 0009 Attachment Table of Contents.pdf PDF
01 91 00.15 22_R1_AMENDMENT 009.pdf PDF
129_AE530_R1_AMENDMENT 009.pdf PDF
246_ES101_R1_AMENDMENT 009.pdf PDF
249_EP102_R1_AMENDMENT 009.pdf PDF
252_EP105_R1_AMENDMENT 009.pdf PDF
255_EP501_R1_AMENDMENT 009.pdf PDF
257_EP503_R1_AMENDMENT 009.pdf PDF
261_EP602_R1_AMENDMENT 009.pdf PDF
266_EL102_R1_AMENDMENT 009.pdf PDF
273_EL702_R1_AMENDMENT 009.pdf PDF
Att.pdf PDF
02 83 00.00 22_R1_AMENDMENT 008.pdf PDF
02 84 16.00 22_R1_AMENDMENT 008.pdf PDF
148_AE804_R1_AMENDMENT 008.pdf PDF
193_MD109_R1_AMENDMENT 008.pdf PDF
210_MP107_R1_AMENDMENT 008.pdf PDF
Att. F) Individual Small Business Subcontracting Plan AMD 0004.docx DOCX document
Att. Z) B60 Continuation Sheet AMD 004.pdf PDF
Solicitation Amendment N6247026R00120004 SF 30.pdf PDF
Att. A) Construction and Design Experience Project Data Sheet.doc.docx DOCX document
Att. E) Small Business Participation Commitment Document (SBPCD) AMD 0004.docx DOCX document
Att. W) DBIDS 5512 FORM.pdf PDF
Att. X) DBIDS ACCESS REQUEST FORM.docx DOCX document
Amendment N6247026R00120003.pdf PDF
Solicitation Amendment N6247026R00120002.pdf PDF
Att. T) Price_schedule AMD 0002.pdf PDF
Att. I) Specifications Volume 2.pdf PDF
Att. L) Drawings Volume 1b.pdf PDF
Att. P) 01 45 35a Statement_of_Special_Inspections.xlsx XLSX spreadsheet
Solicitation Amendment N6247026R00120001.pdf PDF
Att. G) - PIEE Vendor Access Instructions.pdf PDF
Att. M) Drawings Volume 2a.pdf PDF
Att. S) FFE Package.pdf PDF
Att. U) Submittal Register.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8" CMU WALL - SEE

STRUCTURAL SHEETS

FASTEN MTL STUD WALL TO CMU

5/8" GYP BD, PNT

ALIGN

CORNER BEAD (TYP)

EXPANSION JOINT

SYSTEM - SEE DETAIL

D4/AE530

NF

NA

1A

STEEL COLUMN, SEE

STRUCTURAL SHEETS

NE

8" CMU WALL - SEE

STRUCTURAL SHEETS

FASTEN MTL STUD WALL TO CMU

5/8" GYP BD, PNT

ALIGN

GYP BD RETURN

EDGE OF FLOOR

SLAB

CORNER BEAD (TYP)

J BEAD (TYP)

EXPANSION JOINT

SYSTEM - SEE DETAIL

D4/AE530

NF

1A

NE

5/8" GYP BD, PNT

SECOND FLOOR

ELEV=39.64'

STEEL BEAM - SEE

STRUCTURAL SHEETS

EXISTING CONC SLAB

EXISTING WOOD STRIP

FLOORING

JOINT

2"

J BEAD (TYP)

EXPANSION JOINT

SYSTEM - SEE DETAIL

D4/AE530

NB

1A

CONT SEALANT (TYP)

NA

FIRST FLOOR MEZZANINE

ELEV=20.86'

STEEL BEAM - SEE

STRUCTURAL SHEETS

CONC SLAB (TYP) - SEE

STRUCT SHEETS

FLOOR FINISH AS

SCHEDULED (TYP)

JOINT

2"

J BEAD (TYP)

5/8" GYP BD, PNT

CONT SEALANT (TYP)

EXPANSION JOINT

SYSTEM - SEE DETAIL

D4/AE530

NB1A

NA

2"

5/8" GYP BD, PNT

SECOND FLOOR

ELEV=39.64'

EXISTING CONCRETE

ENCASED STEEL BEAM -

SEE STRUCTURAL SHEETS

EXISTING CONC SLAB

EXISTING WOOD STRIP

FLOORING

JOINT

2"

FASTEN MTL STUD WALL

TO CMU

5/8" GYP BD

J BEAD (TYP)

J BEAD (TYP)

EXPANSION JOINT

SYSTEM - SEE DETAIL

D4/AE530

1A

1A

NE

NA

EXISTING WINDOW

METAL CEILING JOIST -

SEE STRUCTURAL SHEETS

METAL DECK - SEE

STRUCTURAL SHEETS

FACE OF EXISTING

MASONRY BEYOND

CONT 2x6 WD BLOCKING, FASTEN TO EXISTING

WINDOW FRAME AND

CENTER MULLION

SEALANT AT PERIMETER

OF METAL DECK (TYP)

ALIGN

2x6 WD BLOCKING, NOTCH AT

EXISTING WINDOW TRIM AND

FASTEN TO PERIMETER FRAME

AND CENTER MULLION

1/2" PLYWOOD, FASTEN TO 2x

BLOCKING, PAINT (BLACK)

FACES EXPOSED TO WINDOW

PRIOR TO INSTALLATION

EXISTING WINDOW SILL

EXISTING HISTORIC

BRICK WALL

CONT 2X6 WD BLOCKING

BEYOND

METAL CEILING JOIST -

SEE STRUCTURAL SHEETS

METAL DECK - SEE

STRUCTURAL SHEETS

FACE OF EXISTING

MASONRY BEYOND

EXISTING WINDOW

2x8 WD BLOCKING, NOTCH AT

EXISTING WINDOW TRIM AND

FASTEN TO PERIMETER FRAME

AND CENTER MULLION, PAINT

(BLACK) FACES EXPOSED TO

WINDOW SIDE PRIOR TO

INSTALLATION

EXISTING WINDOW SILL

EXISTING HISTORIC

BRICK WALL

J-BEAD (TYP)

SEALANT AT

PERIMETER OF METAL

DECK (TYP)

SEE FLOOR PLANS

FOR WALL TYPES

ALIGN

SATISFACTORY TO DATE

APPROVED

FOR COMMANDER NAVFAC

SEAL

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SHEET

NAVFAC DRAWING NO.

DESIGNER

DRAWN BY

CHECKED BY

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 14 SEP 2023

DESIGN MANAGER

PROJECT MANAGER

FEAD/PM&E

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

P O

R T

S M

O U

T H

N A

V A

L S

H

IP

Y A

R D

K

IT

T

E R

Y M

E

UNCLASSIFIED

UNCLASSIFIED

U N

C L

A S

S

IF

IE

D

ACTIVITY

1740579

T. CARLETON

L. LYONS

S. RUCINSKI

/1

/2

:5

:3

A

M

C U s e rs \m d o n o v a n \D o c u m e n ts \2

.2

B L

D G

A

R C

H

IT

E C

T U

R A

L -V m d o n o v a n

V F

X R

.r v t

AE531

B

R

E P

A

IR

S

E X

P A

N S

IO

N

J O

IN

T

D E

T A

IL

S

RSH

JMR

CJE

K

IT

T E

R Y

M

E P

O R

T S

M O

U T

H N

A V

A L S

H

IP

Y A

R D

R O

IC

C

-M E

A E

3" = 1' - 0" 0 3" 6" 1'

GENERAL NOTES

GRAPHIC SCALE(S)

1. SEE SHEET AE001 FOR WALL TYPES.

2. SEE SHEET AE601 FOR DOOR SCHEDULE.

3. SEE SHEET AE602 FOR DOOR REPAIR AND RESTORATION

SCHEDULE.

SCALE: 3" = 1'-0" (AE411)

C1

ELEVATOR/FLOOR EXPANSION JOINT PLAN DETAIL 4

SCALE: 3" = 1'-0" (AE411)

C3

ELEVATOR/FLOOR EXPANSION JOINT PLAN DETAIL 5

SCALE: 3" = 1'-0" (AE411)

C4

ELEVATOR/FLOOR EXPANSION JOINT SECTION DETAIL 6

SCALE: 3" = 1'-0" (AE411)

B1

ELEVATOR/FLOOR EXPANSION JOINT SECTION DETAIL 7

SCALE: 3" = 1'-0" (AE411)

B4

ELEVATOR/FLOOR EXPANSION JOINT SECTION DETAIL 8

SCALE: 3" = 1'-0" (AE421)

A3

ELECTRICAL ROOM EXPANSION JOINT AT WINDOW DETAIL 1

SCALE: 3" = 1'-0" (AE421)

A1

ELECTRICAL ROOM EXPANSION JOINT AT WINDOW DETAIL 2

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

F

IN

A L

S U

B M

IS

S

IO

N

/0

1/

R

S H

A

M E

N D

M E

N T

/1

6/

R

S H

11 11

Sheets
AD104 - SECOND FLOOR REMOVALS PLAN
AD105 - SECOND FLOOR MEZZANINE REMOVALS PLAN
AE104 - FIRST FLOOR MEZZANINE PART PLAN - WEST
AE105 - SECOND FLOOR PLAN
AE411 - ENLARGED ELEVATOR PLANS AND SECTIONS
AE441 - ENLARGED STAIR PLANS 2
AE444 - STAIR DETAILS
AE511 - METAL PANEL DETAILS
AE530 - EXPANSION JOINT DETAILS 1
AE531 - EXPANSION JOINT DETAILS 2
AE601 - DOOR SCHEDULE AND DETAILS
AE640 - ROOM FINISH SCHEDULE
HM101 - FIRST FLOOR HAZARDOUS MATERIALS PART PLAN - EAST
SP101 - STRUCTURAL PROTECTION PART PLAN AND DETAILS