This document is an amendment to a solicitation for the design and construction of an electrical power plant at Camp Lemonnier, Djibouti. The Navy seeks a single contractor to provide all services for CLINs 1 and 2, with options for CLINs 3 through 9. Key details include an extension of the proposal due date from November 28 to December 4, 2023. The amendment responds to contractor questions, revises pricing terms to require pricing for all CLINs, and adjusts bonding requirements if options are exercised. Products and services encompass the design and construction of two new generator buildings, auxiliary support spaces, and integration with existing power plants.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
MILCON PROJECTS P-332 and P-334 ELECTRICAL POWER PLANT, CAMP LEMONNIER, DJIBOUTI
See Block 14 SF30 Continuation Page
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Nov-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247023R0001
X 9B. DATED (SEE ITEM 11)
19-Jul-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Nov-2023
CODE
COMNAVFACSYSCOM ATLANTIC
6506 HAMPTON BLVD
NORFOLK VA 23508-1278
N62470 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6247023R0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0007
The purpose of this amendment is to:
1. Extend the proposal due date
2. Respond to Preproposal Inquires (PPIs)
3. Revise the Solicitation
1. The proposal due date is extended from Tuesday, 28 November 2023 at 2:00 PM Norfolk, VA local time to Monday, 04 December 2023 at 2:00 PM Norfolk, VA local time.
2. Responses to PPIs
167. Inquiry: (Reference: Page CU 101) Underground fire containment (fuel/water) tanks do not shown any means to pump out the tanks. Confirm no pump out insfrastructure required?
Response: Propose in accordance with the solicitation. See Sheet C-507.
168. Inquiry: (Reference: Page CU 102) Fuel containment dikes around the above ground fuel storage tanks do not appear to have any means to drain rain water from the area during normal operation.
Please confirm the fuel containment dikes are designed to hold rain water at all times unless removed manually and contractor is not required to provide any dewatering equipment.
Response: Correct. Draining the fuel containment dikes will be through manual operations.
169. Inquiry: (Reference: PL 102) The drawings do not include HX for domestic water. On other NAVFAC projects constructed in Djibouti, the domestic cold water required a CHW heat exchanger to reduce incoming water temps. Note tepid water for the emergency eyewash/showers are required to be between 15.5C and 37.8C. Please confirm domestic water heat exchangers are not required to precool incoming water.
Response: Domestic water heat exchangers are not required to pre-cool incoming water.
Contractor shall bid construction documents as shown.
170. Inquiry: (Reference 01 14 00) MILCON P334 Construction (Option) - Item #13: Stormwater conveyance system associated with fuel farm and fuel truck offloading containment. Currently there is no oil water separator shown in the design. Please confirm an oil water separator is not required.
Response: Confirmed. No oil water separator is required.
171. Inquiry: (Reference 23 09 00 and 23 09 23.02) Specification 230900 - Section 1.1.2.d states "The hardware is installed such that individual control equipment can be replaced by similar control equipment from other equipment manufacturers with no loss of system functionality. Please confirm if this is related to just field devices (e.g. temperature sensors, relays, actuators,..) and not related to DDC controllers.
Response: Confirmed. Interchangeability is related to field devices, not Direct Digital Control
(DDC) controllers. See paragraph 1.1.1 or 1.1 for these sections.
172. Inquiry: (Reference 23 09 00) Specification 230900 - Section 1.5.c Table II - Items #8 (XIF Files and LNS Plug-Ins ), 9(Draft LNS Database ),& 14 (Final LNS Database) reference data and/or software related to a LON system. Spec 23 09 23.02 required the BAS to be BACnet. Please confirm the provided BAS system is BACnet.
Response: Confirmed. The provided Building Automation Systems (BAS) is to be Building
Automation and Control Network (BACnet) compatible.
173. Inquiry: Due to the design and function of the building (sombustion air, roll up doors, etc) the air barrier test has no purpose for this project. Please remove this requirement.
Response: Air Barrier inspection only is required for the Engine Hall. Air Barrier testing is required for the rest of the building.
174. Inquiry: In the prevous Q&As it was noted that site demolition for P-332 would be put into CLIN
1B since it was OUTSIDE of the facility 1.5 meterline. Are we to include all demolition for the project (P332 and P334) in CLIN 1B since all of it is technically outside the 1.5 meterline?
Response: See revised Bid Schedule, Amendment 0006 and reference Sheet GI003. Site work associated with each Military Construction (MILCON) project should be allocated appropriately to their respective CLINs.
175. Inquiry: Please clearly denote what demolition scope is to be included with P-332 and what is to be included with P-334.
Response: Refer to PPI#174. Additionally, review Specification Section 01 14 00 WORK
RESTRICTIONS in their entirety, including attachments.
176. Inquiry: (Reference 26 32 15.00) Limiting the entrance velocity around the perimeter of the radiator group is required to prevent derating caused by circulating warm air flow. Industry standard is approximately 2.5 m/s maximum air velocity at the unobstructed perimeter line. With the radiators grouped together as shown on CS101, the bottom of the radiator cores should be placed at roughly 6-7 meters above ground level using basis of design radiators shown on MP603.
This elevation exceeds standard base frame offerings from most radiator vendors, and an engineered equipment platform will be required. Can the DOR provide a conceptual design for the platform to allow competitive bidding between contractors? A final equipment-specific design by contractor will be necessary.
Response: The design is reflective of the placement and the elevation needed in the drawings.
The elevation is critical to the airflow and was engineered for both performance and radiated sound. Propose in accordance with the solicitation.
177. Inquiry: (Reference Page SF103 and SF301) SF103, SF301 and AE301 provide only a general information on hook coverage, hook vertical travel, clear hook height. The implied coverage of 1000mm from the face of wall may not achieveable due to the configuration of an overhead crane.
Also, the hook height of 7010mm may not be achieveable with crane trolley. Note that the distance from the face of wall to the centerline of the crane rail is 300mm. Please provide the basis of design crane used by NAVFAC to design the layout of the generator bays
Response: Propose in accordance with the solicitation.
178. Inquiry: (Reference Page SF301) The continuous corbel design for the support of a crane rails is problematic due to the following. 1. ACI concrete tolerances for the height of the corbel allow a greater variation in height than CMAA crane rail requirements. 2. The embed detail does not allow for field adjustment. 3. Welding the rail to the base plate makes rail replacement difficult.
Response: Refer to Overhead Bridge Crane Notes, Sheet SF101, and to Typical Crane Runway
Haunch Detail, Sheet SF503. Rail attachment to the haunch is part of the delegated design. Use of rail clips, shims, and pad is anticipated. The indicated embed plate may be omitted if not needed for rail. Drawings to not indicate welding of rail to base plate.
179. Inquiry: (Reference Section 412213) Has Navy Cranes reviewed and approved the design, specifically the installation procedures? On previous NAVFAC projects, Navy Cranes has required a roof hatch on the cranes centerline to facilitate installation.
Response: Navy Crane Center involvement not required for the cranes. Propose in accordance with the solicitation.
180. Inquiry: (Reference Section 412213) Please confirm that crane test weights will be supplied by the Navy.
Response: Refer to Spec 41 22 13.14, para 3.4.2, Contractor must furnish test weights.
181. Inquiry: (Reference Page SF301) Per section C1, there is 240 mm between the bottom of the steel trusses and the top of the crane clear zone. Has design coordinated any and all utilities that need to occupy this void, such as, fire protection?
Response: Design has been coordinated. Refer to Overhead Bridge Crane Notes, Sheet SF101.
182. Inquiry: (Reference Page CS101) Please provide dimenstions on the acoustical wall panel length.
Response: Refer to PPI#42, Amendment 0004.
183. Inquiry: (Reference 211313 Fire Protection) Specification States, "A waterflow test was performed on 10/20/2021 along Third Street and resulted in a static pressure of 448.2 kPa with a residual pressure of 413.7 kPa while flowing 8086 L/min. Perform a fire hydrant flow test prior to shop drawing submittal in accordance with NFPA 291. Results must include hydrant elevations relative to the building and hydrant number/identifiers for the tested hydrants, including which were flowed, which had a gauge. This information must be presented in a tabular form if multiple hydrants were flowed. The results must be included with the hydraulic calculations." Please confirm that if water pressures are lower than those listed in the specification, a contract modification will be issued.
Response: Propose in accordance with the solicitation. Differences in the flow tests will be evaluated on a case-by-case basis.
184. Inquiry: (Reference 014500.0020 Fire Protection) The requirement for a full time US registered
FPE is an unnecessary expense for the complexity of this project. (Also, staffing the project is problematic.) Inspection of underground piping installation, flusihing, and testing can be conducted by the QC team. The faciliity has minimal ceings. Inspection of the FP piping and Fire Alarm installation can be inspected by a FPE in less than two weeks.
Response: No question is posed. Propose in accordance with the solicitation.
185. Inquiry: (Reference Section 33000) All of the aggregate available in Djibouiti is susceptible to
ACR. Fly ash, which has been imported, is the recommended solution to the ACR problem. Given the existing known problem, is testing necessary?
Response: Prohibition on aggregate susceptible to ACR (alkali-carbonate) remains. Fly ash (as specified) helps mitigate ASR (alkali-silicate). Retain testing requirement, as aggregate is not required to be sourced locally.
186. Inquiry: (Reference Page AF601 Section 096723.13 and 09723.15) Epoxy Resinous Flooring inlcuding the fuel resistant is not durable. It is easily scarred. Sealed concrete provides a durable more cost effecitive finish. Consider removing to reduct initial and long term maintenance costs.
Response: Epoxy Resinous Flooring provides the chemical resistance this facility requires. Epoxy
Resinous Flooring remains the floor finish for all rooms indicated to receive floor finishes ERF1 or ERF2, per drawing AF601. Propose in accordance with the solicitation.
187. Inquiry: (Reference Section 99713.27) What steel receives the High Performance Coating for
Steel Buildings? Please confirm only steel.
Response: The high performance coating is for steel structures. To clarify, the word “structures” includes more than inhabitable buildings. Per Paragraph 3.2 of Specification 09 97 13.27, “Coat exterior surfaces of structure including steel roof, shell, legs, stair, railing, and other appurtenances."
188. Inquiry (Reference Page AF601, Section 99713.27) Certified Industrial Hygienist. Given the location of the project, steel will prAobably be painted at the fabricator. Is a CIH required for shop painting. Given the small amount of steel on the project, consider removing CIH requirement.
Response: Shop painting is not permitted, so the Certified Industrial Hygienist requirement still applies. Review specification Section 09 97 13.27, Paragraph 2.2.
189. Inquiry (Reference Page EW632 Section 251011) The Control System Description pm EW632 states "The SCADA System works with the PCS to allow remote monitoring and control of PP4 as well as the existing Prime Power Plants through their respecitve control systems." There is not currently any infromation provided to the bidders regarding the existing PP2A or PP3. Please provide single lines and as-built drawings of PP2A and PP3. Please make sure the information on PP2A and PP3 inlude all manufacturer and model #s for all existing gensets(specifically local control panel and version), breakers, relays, synchronizers, etc. Also needed is SCADA and PCS documentation of the existing PP2A and PP3. This information will be critical to successfully implement this integration.
Response: Review previous inquiry and responses. As-built data is not available. Propose in accordance with the solicitation.
190. Inquiry (Reference Section 251011) 251011 states "Identify existing generator paralleling and
SCADA equipment and provide new power plant PP4 equipment that is compatible with the existing equipment. Provide replacements or upgrades to existing generator paralleling and SCADA equipment as needed to fully integrate existing equipment with new power plant PP4."
Please provide I/O list of the existing PCS(Plant Control System) read/write registers of PP2A and PP3 that are currently integrated into the exisitng SCADA system?
Response: The existing equipment should be verified by the system integrator. Final control system design should be developed by the system integrator.
191. Inquiry: Please provide the contact for the person who the Camp buys their Low Sulfur Diesel from so that we can contact them for our flushing and testing purposes.
Response: Point of Contact will be provided to the awardee.
192. Inquiry: (Reference Page CD101) General Note Number 5 on Sheet CD101 states, Removal of generators will be in phases to ensure a continuous supply of power to power plant and to coordinate with new installation of generators from previous project. Southwest three generators will be removed first, leaving the newly installed generators to the northeast. After construction is complete for P-332/P-334 Power Plant, the Northeast three generators are to be removed. Please inform us what generators are to be removed first and last using the generator numbers on the demolition sheet.
Response: Review SPEC 01 14 00 WORK RESTRICTIONS. On site coordination will occur locally with the Public Works Department and Contracting Officer's Representative.
193. Inquiry: (Reference Section 251011) Spec 251011 paragraph 1.1 states the following: "Provide replacements or upgrades to existing generator paralleling and SCADA equipment as needed to fully integrate existing equipment with new power plant PP4." Please confirm if currently there exists a single point of connection for SCADA system interface or network at each of the two plants: PP3 and PP2 PP2A. Also confirm if the protective relays installed and the generators and tie breaker controllers (Woodward etc...) are on the sam network and configured to interface together
Response: There is currently a functioning generator paralleling and SCADA system connecting
PP2 and PP3. The new power plant PP4 should be fully integrated with this system. Final control
194. Inquiry: (Reference Section 251011) Spec 251011 paragraph 1.1 states the following: "Provide replacements or upgrades to existing generator paralleling and SCADA equipment as needed to fully integrate existing equipment with new power plant PP4." Please advise if currently there exists any control ability to open breakers, start/sop a genset from pp2 to pp3 and from PP3 to PP2 HMIs
Response: There is currently a functioning generator paralleling and SCADA system with the ability to open breakers, start/sop a genset from Power Plant 2 (PP2) to Power Plant 3 (PP3) and from PP2 to PP3 HMIs. The new power plant, P332/P334, should be fully integrated with this system.
195. Inquiry: (Reference Section 251011) During the site visit it was identified that several of the generators and tie breakers were controlled by a Woodward EASYGen relays. Please provide an as built of the the Woodward network layout assuming they are networked together.
196. Inquiry: (Reference 251011) Is is posisible to get a list of each existing genset and its controller relay make and model? For example: Woodward MSLC/DSLC or Easy genAsk for each genset controller type.
197. Inquiry: (Reference Page EW602) Please confirm if the SCADA system is required to control any of the load center LVS-PP4-L1A/B breakers.
Response: The SCADA system is not required to control any of the load center LVS-PP4-L1A/B breakers.
198. Inquiry: (Reference Section 33000) Based on recent research and experience in Djibouti, there are no in country testing labs that meet the specification requirements. Is NAVFAC aware of any in country firms that comply with the specification?
Response: No. Propose in accordance with the solicitation.
199. Inquiry: (Reference 33000) Please clarify the role of the Quality Manager in the 33000 specification. Does this person work for the concrete supplier? Or are they part of the contractor's CQC team? How is this person's duties different from the special inspector. Please clarify.
Response: Refer to Section 03 30 00, para 1.6.6, Quality Control (QC) personnel must be employed by the contractor. Additionally, review Specification Sections 01 45 00 and 01 45 35 for additional QC requirements.
200. Inquiry: (Reference Pricing Schedule) Please clarify the CLIN1 BASE PRICE is the addition of only 1A SUBTOTAL OF BASE PRICE and 1B SUBTOTAL OF BASE PRICE and does not include any other "Optional Pricing CLINs".
Response: Bid Schedule updated in Amendment 0006. Propose in accordance with solicitation.
201. Inquiry: (Reference Section 01 11 00) Section 01 11 00, Paragraph 1.2.1 Base Bid - MILCON
P332
We kindly request some additional information to enhance our understanding of the project's scope. Specifically, we are seeking clarification regarding the components and systems covered by the term "Ancillary space for power generation support systems." Additionally, we would greatly appreciate further details on the scope of work and what is included within each package for the various generator sets outlined in the contract.
In particular, we are interested in understanding the specifics for the following generator sets:
DG-10 & DG-09 under CLIN-1A DG-08 under CLIN-2 DG-07 under CLIN-3 DG-06 under CLIN-4 DG-03 thru DG-05 under CLIN-5.
We are looking for a more detailed overview of the scope of work, including components such as electrical, fire protection, plumbing, HVAC, and any other relevant elements associated with these generator sets. Your assistance in providing this clarification will be immensely helpful in ensuring the successful execution of the project.
Response: No question is posed. Propose in accordance with the solicitation.
202. Inquiry (Reference 251011) Spec 251011 paragraph 1.1 states the following: "Provide replacements or upgrades to existing generator paralleling and SCADA equipment as needed to fully integrate existing equipment with new power plant PP4." Please confirm if currently there exists a single point of connection for SCADA system interface or network at each of the two plants: PP3 and PP2 PP2A. Also confirm if the protective relays installed and the generators and tie breaker controllers (Woodward etc...) are on the sam network and configured to interface together.
Response: The SCADA and Generator Control will require separate networks. Both networks should interconnect with the existing system at PP2A.
203. Inquiry: (Reference 251011) Spec 251011 paragraph 1.1 states the following: "Provide replacements or upgrades to existing generator paralleling and SCADA equipment as needed to fully integrate existing equipment with new power plant PP4." Please advise if currently there exists any control ability to open breakers, start/stop a genset from PP2 to PP3 and from PP3 to PP2 HMIs?
Response: Currently, it is possible to open breakers and start/stop a genset from PP2 to PP3 and from PP3 to PP2 HMIs.
204. Inquiry: (Reference Page EW601 and EW711) Feedes M-103 and M-105 show a neutral however the downstream Main Switchgear (MVS-PP4-M1) is only a 3W switchgear. Cable tray details on EW509 show this neutral and also show as same diameter of the 11kV phases but based on 337102 2.5.5 states the neutrals can be 600V rated? Please advise if this neutral is needed and cable rating and if is needed, where does it terminate in MVS-PP4-M1?
Response: This neutral is not needed.
205. Inquiry: (Reference Section 263215) The Engine Emissions Limit in the genset specificaiton references multiple 40 CFR documents. The expection of low emissions is a key piece to selecting the correct genset based on the design showing multiple low emission elements such as the SCR, dosing, DEF tanks/pumps, etc. All of these emissions related items add signifigant costs to the project. The specification and expectation should be made clear as to what the emissions limits are and what the factory and onsite testing requirements are for emissions for this project.
Response: Propose in accordance with the solicitation. Please review the solicitation and attachments in their entirety.
206. Inquiry: (Reference Page EW631) Can a design intent be provided to show what is intended to be controlled from the MAUX(Mechancial Auxilary Panel) and what is intended to be controlled from the GAUX(Generator Auxilary Panel) associated with each genset?
Response: The functions of the GAUX panels will be determined by the genset manufacturer.
MAUX should provide all mechanical functions as described in the mechanical Sequence of Operations (SOO).
207. Inquiry: (Reference Page EW601) Since Generator Switchgear MVS-PP4-G1 is associated with
Gensets 1 through 5, can this switchgear be removed from the project 332 Price Schedule Line Items 1 through 4 and only be carried in project 334 Price Schedule line items?
Response: No changes to switchgear lineup. Propose in accordance with the solicitation.
208. Inquiry: (Reference Page EW601) Since Isolation Transformer XFMR-PP4-1A is associated with
MVS-PP4-G1, can this transformer be removed from the project 332 Price Schedule Line Items 1 through 4 and only be carried in project 334 Price Schedule line items?
Response: No changes to switchgear lineup. Propose in accordance with the solicitation.
209. Inquiry: (Reference Section 26 28 01.00 10) Please confirm if coordination studies are required for each stage of construction, or only the final result.
Response: Both P332 and P334 will be awarded. Only one study for the finalized project is necessary.
210. Inquiry: (Reference Page EW630-631) The existing PP3 Plant Control System does not meet the requirements implied on EW630 or EW631 (Vector D1) in many ways, please confirm it is the contractor’s responsibility to upgrade and meet these requirements within PP3 to have redundant SCADA networks and redundant generator load sharing networks. This would require replacement of some components, and modification of the facilities current SCADA and load sharing network scheme in addition to protection relay modifications.
Response: Redundant networking equipment should be provided for PP4 and interconnected with existing system. Upgrades to existing networking equipment is not required.
211. Inquiry: The existing PP3 Plant Control System has been in the middle of SEL Relay Upgrades for 3 years now, please confirm these protection relays will be complete and are not the responsibility of the contractor to bring system up to PP332/PP334’s SCADA Requirements (such as replacing the current Multilin Protection Devices)
212. Inquiry: Please identify If during P332 plant startup that PP2A will be split bus to accommodate paralleling control restrictions of conflicting systems.
Response: Coordination will occur with Public Works Department and Contracting Officer's
Representative. Propose in accordance with the solicitation.
213. Inquiry: (Reference Page EW632) Sequence of operation on EW632 identifies no Automatic starting and yet spec section 26.32.15.00 2.25.1 indicates automatic starting based on load, please advise which one? If automatic starting (LDSS – Load Dependent Start and Stop) is required, does PP3 Engines have to be included in this? Are there any advance notification requirements of impending start that is needed to accommodate this?
Response: SCADA and controls should follow precedent set by the existing system. Final control
2. Revise the Solicitation:
CURRENT:
2.1.5 The Government intends to award a contract to a single contractor for CLIN 1, with CLINs 2 through 9 as priced options. The Government reserves the unilateral right to award CLINs 2 through 9 to the Contractor at the proposed price at the time of award or within 365 calendar days after the contract award. A firm fixed proposed price is required for ALL CLINs (CLINS 1 through 9). No provision is made for economic price adjustment. Offerors not submitting pricing for all CLINs will be considered nonresponsive to the solicitation and will not be evaluated.
REVISED TO:
2.1.5 Award will be made on the total sum of CLINs 1 through 9.
The Government intends to award a contract to a single contractor for CLIN 1 and 2, with CLINs 3-9 as priced options.
If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
The Government reserves the unilateral right to award CLINs 3, 4, 5, 6, 7, 8, and 9 to the Contractor at the proposed price within 365 calendar days after the contract award. A firm fixed proposed price is required for all CLINs. No provision is made for economic price adjustment.
Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206(b) Evaluation not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for CLIN 1 and 2. In accordance with FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the Option(s).
If all CLINS are exercised at the time of award, the contract completion date remains 1,348 calendar days after issuance of the NOTICE TO PROCEED. The award of one or more options will NOT extend the contract completion date (regardless of the number of options awarded). Offerors not submitting pricing for all CLINs will be considered nonresponsive to the solicitation and will not be evaluated.
The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices, which are significantly overstated for other work.
If any of the Option CLINs 3, 4, 5, 6, 7, 8, and/or 9 are exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all Items.
CURRENT:
ALL SUBMITTALS MUST BE RECEIVED AT THE LOCATION SPECIFIED ABOVE PRIOR TO
2:00PM Norfolk, VA local time, Tuesday, 28 November 2023. LATE SUBMITTALS WILL NOT BE
CONSIDERED. LATE RESPONSES WILL BE HANDLED IN ACCORDANCE WITH FAR 52.215-1. THE
GOVERNMENT WILL NOT BE HELD RESPONSIBLE FOR DELAYS OF ANY COMMERCIAL
CARRIER.
REVISED TO:
ALL SUBMITTALS MUST BE RECEIVED AT THE LOCATION SPECIFIED ABOVE PRIOR TO
2:00PM Norfolk, VA local time, Monday, 04 December 2023. LATE SUBMITTALS WILL NOT BE
CONSIDERED. LATE RESPONSES WILL BE HANDLED IN ACCORDANCE WITH FAR 52.215-1. THE
GOVERNMENT WILL NOT BE HELD RESPONSIBLE FOR DELAYS OF ANY COMMERCIAL
CARRIER.
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 28-Nov-2023 02:00 PM to 04-Dec-2023 02:00 PM.
SECTION 01 00 00 - GENERAL REQUIREMENTS
The following have been deleted:
52.203-17 Contractor Employee Whistleblower Rights and Requirement
To Inform Employees of Whistleblower Rights
JUN 2020
(End of Summary of Changes)