Attachment H - Drawings 8 of 18 ARCHITECTURAL.pdf

PDF 6 MB Posted

Attached to
P-332/P-334, Design-Bid-Build, Electrical Power Plant at Camp Lemonnier, Djibouti
Solicitation number
N6247023R0001
Issued by

About this file

This solicitation is for design-bid-build services for an electrical power plant at Camp Lemonnier, Djibouti. Key details include that the Naval Facilities Engineering Command is seeking proposals for architectural and engineering design services, with construction to follow. Offerors should have experience with electrical power plant design and familiarity with Unified Facilities Criteria standards. Proposals are due by December 4, 2022 and the period of performance is anticipated to last until December 2024. The total contract value is not specified.

View the file

Other files

File Type Posted
N6247023R0001 Amendment 0009.pdf PDF
N6247023R0001 Amend 0008.pdf PDF
Attachment T - CE18 Electrical.pdf PDF
Attachment S - Electrical ES401 ES601.pdf PDF
N6247023R0001 Amend 0007.pdf PDF
Attachment R - P332 Elect Pwr Plnt FDA - MECH.pdf PDF
N6247023R0001 Amend 0006.pdf PDF
Revised Attachment E - Price Proposal Form_11OCT2023.pdf PDF
Attachment L - P332 Elect Pwr Plnt FDA - AE105 - ROOF PLAN.pdf PDF
Attachment K - P332 Elect Pwr Plnt FDA - AE103 - PARTIAL GROUND FLOOR PLAN - B.pdf PDF
N6247023R0001 Amend 0005.pdf PDF
Attachment N - P332 Elect Pwr Plnt FDA - AE402 - STAIR PLANS.pdf PDF
Attachment P - P332 Elect Pwr Plnt FDA - AF102 - GROUND LEVEL FINISH AND SIGNAGE PLAN - PARTIAL B.pdf PDF
Attachment Q - P332 Elect Pwr Plnt FDA - AG601 - SIGNAGE DETAILS AND SCHEDULE.pdf PDF
Attachment M - P332 Elect Pwr Plnt FDA - AE201 - EXTERIOR ELEVATIONS.pdf PDF
Attachment O - P332 Elect Pwr Plnt FDA - AF101 - GROUND LEVEL FINISH AND SIGNAGE PLAN - PARTIAL A.pdf PDF
N6247023R0001 Amend 0004.pdf PDF
N6247023R0001 Amend 0003.pdf PDF
N6247023R0001 Amend 0002.pdf PDF
Attachment J - Site Visit Log.pdf PDF
N6247023R0001 Amend 0001.pdf PDF
N6247023R0001.pdf PDF
Attachment A - Pre-Proposal Inquiry Form.xls XLS spreadsheet
Attachment H - Drawings 3 of 18 GEOTECH.pdf PDF
Attachment H - Drawings 10 of 18 FIRE PROTECTION.pdf PDF
Attachment H - Drawings 11 of 18 PLUMBING.pdf PDF
Attachment I Base Access Request Form.pdf PDF
Attachment H - Drawings 1 of 18 GENERAL.pdf PDF
Attachment B - SEC-NAV_5512_1_11787 Form.pdf PDF
Attachment H - Drawings 17 of 18 ELECTRICAL.pdf PDF
Attachment C - Construction Experience Project Data Sheet.pdf PDF
Attachment E - Price Proposal Form.pdf PDF
Attachment F - LRA Commercial Vehicle Inspection Procedures.pdf PDF
Attachment H - Specifications 1 of 3.pdf PDF
Attachment H - Drawings 7 of 18 STRUCTURAL.pdf PDF
Attachment H - Drawings 16 of 18 ELECTRICAL.pdf PDF
Attachment H - Drawings 14 of 18 MECHANICAL.pdf PDF
Attachment H - Drawings 2 of 18 LIFE SAFETY.pdf PDF
Attachment H - Drawings 18 of 18 TELECOM.pdf PDF
Attachment H - Specifications 3 of 3.pdf PDF
Attachment H - Specifications 2 of 3.pdf PDF
Attachment D - Past Performance Questionnaire (PPQ).pdf PDF
Attachment H - Drawings 12 of 18 MECHANICAL.pdf PDF
Attachment H - Drawings 9 of 18 INTERIORS.pdf PDF
Attachment H - Drawings 6 of 18 CIVIL.pdf PDF
Attachment H - Drawings 5 of 18 CATHODIC PROTECTION.pdf PDF
Attachment H - Drawings 15 of 18 ELECTRICAL.pdf PDF
Attachment H - Drawings 13 of 18 MECHANICAL.pdf PDF
Attachment H - Drawings 4 of 18 CIVIL.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AND&

EXIST EXISTING

VINYL COMPOSITION TILEVCT

ADJ

AT

APPROX

AFF

BD

ALUM

APPROXIMATE

BOARD

ABOVE FINISH FLOOR

ALUMINUM

ADJUSTABLE, ADJUST

CEILING

COL

CLG

DIA

CMU

CONC

DOWNDN

EQUIP

ELEC

ELEV

EQUIPMENT

ELECTRIC

ELEVATION

CONCRETE MASONRY UNIT

CONCRETE

DIAMETER

COLUMN

FLOOR

FO

FLR

GWB

HC

GYPSUM WALLBOARD

HANDICAPPED

FACE OF

EQ EQUAL

CENTER LINE

HORIZ HORIZONTAL

TYPICALTYP

TOC TOP OF CONCRETE

WIDTH

VERT

W

VERTICAL

UNLESS OTHERWISE NOTEDUON

HOLLOW METALHM

VIF VERIFY IN FIELD

CL

ALT ALTERNATE

ACT ACOUSTICAL CEILING TILE

BLDG BUILDING

BLKG BLOCKING

CORNER GUARDCG

CONTROL JOINTCJ

CLEARCLR

CONST CONSTRUCTION

CONT CONTINUOUS

DBL DOUBLE

DIAG DIAGONAL

DIM DIMENSION

DISP DISPENSER

DOWNSPOUTDS

DRAWINGDWG

EACHEA

EXPANSION JOINTEJ

EXP EXPANSION / EXPOSED

EXT EXTERIOR

FD FLOOR DRAIN

FEB FIRE EXTINGUISHER BRACKET

FEC FIRE EXTINGUISHER CABINET

FF FINISH FLOOR

FIN FINISH

GA GAUGE

GALV GALVANIZED

GL GLASS

HDW HARDWARE

HT HEIGHT

HVAC HEATING, VENTILATION, & AIR

CONDITIONING

INSUL INSULATION

INT INTERIOR

JT JOINT

L LENGTH / LONG

SUSPENDEDSUSP

TOW TOP OF WALL

VINYL BASEVB

VTR VENT THRU ROOF

WITHW/

WITHOUTW/O

WOODWD

METALMTL

NIC

MISC

OC

MISCELLANEOUS

ON CENTER

NOT IN CONTRACT

ROOM

SIMILAR

R

RM

SIM

RO

SS

RADIUS

STAINLESS STEEL

ROUGH OPENING

MAX MAXIMUM

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MO MASONRY OPENING

NO NUMBER

NTS NOT TO SCALE

OD OUTSIDE DIAMETER

OH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

PL PLATE

PLAM PLASTIC LAMINATE

PLYWD PLYWOOD

PR PAIR

PTD PAINTED

REINF REINFORCING

REQ'D REQUIRED

SF SQUARE FEET

SQUARESQ

STRUCTURALSTRUCT

STD STANDARD

STL STEEL

TTL TOTAL

GC GENERAL CONTRACTOR

CONCRETE

WOOD BLOCKING - INTERRUPTED

BRICK

CONCRETE MASONRY UNIT (CMU)

INSULATION - BATT / LOOSE / BLANKET

PLYWOOD

EARTH

INSULATION - MINERAL WOOL

WOOD BLOCKING / FRAMING - CONTINUOUS

INSULATION - RIGID

POROUS FILL

INSULATION - SPRAY FOAM

GWB / PLASTER / GROUT / SPRAY FIREPROOFING

A

DEMOLITION KEYNOTE

A1

AE201

A1

AE201

A3

A2A4

NEW WORK KEYNOTE

PARTITION / WALL TYPE

DETAIL / PLAN NUMBER

SHEET WHERE SHOWN

ELEVATION NUMBER

SHEET WHERE SHOWN

XX.X

COLUMN GRID LINE

ELEVATION DATUM

+12'-0"

FIRST FLOOR

ROOM DESIGNATION

DIRECTION OF SLOPE ROOF SLOPE

FLOOR DRAIN

FIRE EXTINGUISHER CABINET FIRE EXTINGUISHER BRACKET

FD

DETAIL, SECTION,

ELEVATION TITLE

DETAIL / ENLARGED PLANPLAN TITLE

AND NORTH ARROW

INTERIOR ELEVATION

EXTERIOR ELEVATION

ELEVATION NUMBER

SHEET WHERE SHOWN

BUILDING SECTION

SECTION NUMBER

SHEET WHERE SHOWN

DETAIL / WALL SECTION

DOOR NUMBER

AE301

A1

AE301

A1

AE301

A1

A1

AE101

WINDOW / LOUVER / CURTAIN WALL / STOREFRONT

DESIGNATION

FEC FEB

A1 / AE101

ADJACENT AREA REFERENCE

W1 L1 C1 S1

ACCESSIBLE BEDROOMS - MOBILITY FEATURES ACCESSIBLE BEDROOMS - COMMUNICATION FEATURES

SPECIALTY ITEM DESIGNATION

MATCHLINE

BUILDING

SHEET WHERE SHOWN

SECTION NUMBER

NAME

SCALE:A1

NAME

SCALE:

TRUE NORTH INDICATOR

PLAN NORTH INDICATOR

ROOM NAME

2' x 2' ACOUSTICAL TILE LAY-IN CEILING

GWB CEILING / SOFFIT

OS

S

H P

LIGHT FIXTURE / EMERGENCY EGRESS LIGHT FIXTURE

EXIT LIGHT / EXIT LIGHT W/ ARROW

FIRE ALARM STROBE / FIRE ALARM HORN STROBE

SPEAKER / SPEAKER W/ STROBE

OCCUPANCY SENSOR

CARBON MONOXIDE SENSOR

HEAT SENSOR / PHOTO SENSOR

SMOKE DETECTOR

CEILING HEIGHT

EXPOSED CEILING

SPRINKLER HEAD

CO

8'-0"

S

S

EXP

SUPPLY GRILLE / RETURN GRILLE

V F

EXHAUST FAN

ACCESS PANEL

1. PLAN DIMENSIONS SHOWN ARE TO FACE OF FRAMING MEMBERS, FACE OF CONCRETE,

FACE OF EXISTING WALL AND TO CENTERLINE OF COLUMNS.

2. ALL NOTES, DETAILS, AND FEATURES DRAWN AS APPLICABLE FOR ONE CONDITION ARE

APPLICABLE TO SIMILAR CONDITIONS, WHETHER OR NOT SPECIFICALLY INDICATED.

3. LOCATE ALL INTERIOR DOOR FRAMES 102mm FROM THE THROAT RETURN TO THE CLOSEST

ADJACENT PERPENDICULAR PARTITION, UON.

4. ALL ELEVATIONS ARE MEASURED FROM THE REFERENCE ELEVATION +0, WHICH IS THE TOP

OF THE FIRST FLOOR SLAB, UON.

5. DO NOT SCALE DRAWINGS TO DETERMINE DIMENSIONS OR SIZES OF BUILDING ELEMENTS.

6. ALL WOOD BLOCKING AND MISCELLANEOUS STEEL SHOWN IN DETAILS AND SECTIONS

SHALL BE CONTINUOUS, UON.

7. USE FIRE-RETARDANT TREATED WOOD PRODUCTS FOR ALL CONCEALED WOOD BLOCKING,

UON.

8. USE PRESERVATIVE-TREATED WOOD PRODUCTS FOR ALL WOOD BLOCKING IN CONTACT

WITH EXTERIOR CONCRETE WALLS, AND FOR ALL WOOD BLOCKING IN CONTACT WITH

CONCRETE SLABS ON GRADE.

9. VERIFY ALL DIMENSIONS. BRING ANY DISCREPANCIES TO THE IMMEDIATE ATTENTION OF

THE ARCHITECT.

10. PROVIDE WOOD OR METAL BLOCKING BEHIND GYPSUM BOARD AT THE FOLLOWING

LOCATIONS:

A. ALL WALL-MOUNTED DOOR STOPS AND OTHER HARDWARE.

B. ALL WALL-MOUNTED TOILET ACCESSORIES. AT GRAB BARS, PROVIDE BLOCKING

CAPABLE OF RESISTING A MINIMUM LOAD OF 113.4 kg APPLIED VERTICALLY OR

HORIZONTALLY AT ANY POINT ON THE GRAB BAR.

C. ALL WALL-MOUNTED PLUMBING FIXTURES, INCLUDING BUT NOT LIMITED TO LAVATORIES,

SINKS, URINALS, WATER CLOSETS, AND WATER COOLERS. PROVIDE BLOCKING CAPABLE

OF RESISTING A MINIMUM LOAD OF 181.4 kg APPLIED VERTICALLY AT ANY POINT ON THE

PLUMBING FIXTURE.

D. ALL WALL-MOUNTED CABINETRY, SHELVING, AND SIMILAR ITEMS.

11. ALL MATERIALS USED IN THE PROJECT SHALL BE NEW AND PROVIDED BY THE

CONTRACTOR, UON.

12. NOTIFY ARCHITECT OF ANY DISCREPANCY BETWEEN DRAWINGS, SPECIFICATIONS AND/OR

EXISTING CONDITIONS.

13. ALL NOTES, DETAILS, AND FEATURES DRAWN AS APPLICABLE FOR ONE CONDITION ARE

APPLICABLE TO SIMILAR CONDITIONS, WHETHER OR NOT SPECIFICALLY INDICATED.

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

DESIGN DIRECTOR

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

A T

L A

N T

IC

N

O R

F O

L K

V

A

AS NOTED

1643338

A T

LA

N

T

IC

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N

DPS

/4 /2

:0 :3

A

M B

IM

/P

E le c tr ic a l P o w e r

P la n t F

D A

/8

P

E le c t P w r

P ln t F

D A

A

.r v t

A-001

P -3

/P

-3 E

L E

C T

R

IC

A L P

O W

E R

P L A

N T

A R

C H

IT

E

C T

U R

A L

LE

G

E N

D S

A N

D N

O

TE

S

RAM

14124448

SEB SEB

JWH/SCN

D

JI

B O

U T

I, D

JI

B

O U

T I

C A

M P

L E

M O

N N

IE

R

RICHARD STEPHENS

DER

ARCHITECTURAL GENERAL NOTES

ARCHITECTURAL ABBREVIATIONS

ARCHITECTURAL SYMBOLOGY

MATERIAL LEGEND

RATED PARTITION LEGEND

RCP LEGEND

NOT ALL ABBREVIATIONS, SYMBOLS, AND LEGEND GRAPHICS LISTED ARE NECESSARILY USED

ON THIS PROJECT. REFER TO DOCUMENTS FOR SPECIFIC INFORMATION.

ONE HALF HOUR FIRE RATING

ONE HOUR FIRE RATING

TWO HOUR FIRE RATING

THREE HOUR FIRE RATING

FOUR HOUR FIRE RATING

(SB) SMOKE BARRIER (SB), SMOKE PARTITION

(SP), OR PARTITION CAPABLE OF

RESISTING THE PASSAGE OF SMOKE (S)

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

UP

ZONE 1

ZONE 2

(HIGH BAY)

A B D

E

GROUND FLOOR

B.O. ROOF DECK - HIGH

B.O. ENGINE HALL ROOF DECK - HIGH

13150

C

ZONE 1

ZONE 2

(HIGH BAY)

ROOF ACCESS LEVEL

ABDE

AIR BARRIER BOUNDARY

AREA WITHIN AIR BARRIER

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

DESIGN DIRECTOR

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

A T

L A

N T

IC

N

O R

F O

L K

V

A

AS NOTED

1643338

A T

LA

N

T

IC

D E

S

IG

N A

N D

C O

N S

T R

U C

T

/4 /2

:0 :4

A

M B

IM

/P

E le c tr ic a l P o w e r

P la n t F

D A

/8

P

E le c t P w r

P ln t F

D A

A

.r v t

A-002

P -3

/P

-3 E

L E

C T

R

IC

A L P

O W

E R

P L A

N T

A

IR

B A

R R

IE

R

K E

Y P

LA

N

A N

D S

E C

T

IO

N

Checker

14124449

SEB SEB

JWH/SCN

D

JI

B O

U T

I, D

JI

B

O U

T I

C A

M P

L E

M O

N N

IE

R

RICHARD STEPHENS

DER

A. AIR BARRIER BOUNDARY EXTENTS ARE INDICATED ON KEY PLAN(S).

B. CONSTRUCTION CONTRACTOR TO CONDUCT AIR BARRIER TESTING (AS

MINIMUM) IN AREAS IDENTIFIED IN AIR BARRIER KEY PLANS. CONTRACTOR

HAS THE OPTION TO TEST ZONES OR BUILDING IN ITS ENTIRETY.

D. CONSTRUCTION CONTRACTOR TO VERIFY PROPER INSTALLATION &

INTEGRITY OF AIR BARRIER ASSEMBLIES IN AREAS TO BE CONCEALED (I.E.

INACCESSIBLE ENCLOSED VOID SPACES, ETC.) PRIOR TO COMMENCING

WITH CONCEALMENT. MULTIPLE TESTS MAY BE REQUIRED TO VERIFY

PROPER INSTALLATION.

E. THE VARIOUS COMPONENTS OF THE AIR BARRIER ASSEMBLY ARE

IDENTIFIED WITH "(AIR BARRIER)" THROUGHOUT THIS DRAWING SET. SEE

WALL SECTIONS, DETAILS & SECTION SHEETS FOR ADDITIONAL AIR

BARRIER INFORMATION.

F. PENETRATIONS THROUGH AIR BARRIER ASSEMBLIES TO BE SEALED PER

ASSEMBLY MATERIAL MANUFACTURER'S DETAILS, SPECIFICATIONS, AND

WRITTEN RECOMMENDATIONS.

G. UTILITY EQUIPMENT, DUCT WORK, PIPING AND ASSOCIATED

APPURTENANCES NOT SHOWN IN AIR BARRIER SECTIONS FOR CLARITY.

ALL PENETRATIONS THRU THE AIR BARRIER WILL BE PER PENETRATED

MATERIAL MANUFACTURER'S RECOMMENDATIONS / SPECIFICATIONS.

Z O

N E

691.93 SM

TOTAL AIR BARRIER ZONE SURFACE AREA:

TOTAL FLOOR SURFACE AREA:

TOTAL WALL SURFACE AREA:

TOTAL CEILING SURFACE AREA:

Z O

N E

TOTAL AIR BARRIER ZONE SURFACE AREA:

TOTAL FLOOR SURFACE AREA:

TOTAL WALL SURFACE AREA:

TOTAL CEILING SURFACE AREA:

900.99 SM

669.37 SM

2262.29 SM

1687.65 SM

2334.18 SM

1764.43 SM

5786.26 SM

AIR BARRIER KEY PLAN LEGEND

GENERAL NOTES

NOT TO SCALEA1

AIR BARRIER KEY PLAN

NOT TO SCALEC3

SECTION - AIR BARRIER

AIR BARRIER CALCULATIONS

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

AE201

A1

AE201

B1

AE201

D1

AE201

B3

A1

AE301

A1

AE301

VESTIBULE

CORRIDOR

JANITOR

TOILET

TOILET

CONTROL

OFFICE

OFFICE

STORAGE

SCADA

COMM

RISER

ROOM

MECHANICAL

ELECTRICAL

VESTIBULE

WORKSHOP

FUEL OIL

OVERFLOW

TANK

DAY TANK

DAY TANK

DAY TANK

DAY TANK

DAY TANK

DAY TANK

LUBE OIL

AE401

A1

1000 1000

1000 1000

AE102

A1

AE103

A1

32900

BATTERY

C3

A-002

______________ C3

A-002

0 41

14000

AE402

A1

AE402

A2

AE402

C1

AE402

C2

A B D

157001200

157001200

ENGINE

HALL

ENGINE

HALL

AE202

A1

AE202

B3

AE202

B1

AE202

D1

C1

AE301

C1

AE301

11000

33900

E

FUEL PUMP

ROOM

1. PLAN DIMENSIONS SHOWN ARE TO FACE OF FRAMING MEMBERS, FACE OF

CONCRETE, FACE OF EXISTING WALL, AND TO CENTER LINE OF COLUMNS,

EXCLUSIVE OF INTERIOR WALLS.

2. ALL INTERIOR DIMENSIONS ARE TO FACE OF PARTITION ASSEMBLY AS DEFINED

BY THE PARTITION SCHEDULE AND ARE EXCLUSIVE OF ANY APPLIED FINISH.

3. ALL DIMENSIONS TO BE FIELD VERIFIED PRIOR TO INSTALLATION OF EQUIPMENT

/ SHELVING / CASEWORK.

4. ANY CONFLICTING INFORMATION BETWEEN THE ARCHITECTURAL DRAWINGS

AND OTHER DRAWINGS OR SPECIFICATIONS IN THIS SET SHALL BE NOTED IN

WRITING TO THE ARCHITECT FOR REVIEW AND MUST BE CLARIFIED PRIOR TO

COMMENCING THE CONSTRUCTION IN QUESTION.

5. PROVIDE FIRE RETARDANT TREATED WOOD BLOCKING IN METAL STUD

PARTITIONS FOR MOUNTING FIXTURES, MILLWORK, SHELVING, HARDWARE,

DOOR STOPS AND OTHER EQUIPMENT.

6. VERIFY AND COORDINATE PENETRATIONS THROUGH FOUNDATION, FLOOR

SLAB, ROOF ASSEMBLIES, AND PARTITIONS WITH APPROPRIATE ENGINEERING

DRAWINGS.

7. VERIFY AND COORDINATE FINISH FLOOR ELEVATIONS WITH CIVIL AND

STRUCTURAL PRIOR TO COMMENCING CONSTRUCTION. NOTIFY ARCHITECT IN

WRITING BEFORE CONSTRUCTION OF ANY CONFLICTS.

8. REFER TO SHEET AE601 FOR DOOR SCHEDULE.

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

DESIGN DIRECTOR

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

A T

L A

N T

IC

N

O R

F O

L K

V

A

AS NOTED

1643338

A T

LA

N

T

IC

D E

S

IG

N A

N D

C O

N S

T R

U C

T

/4 /2

:0 :4

A

M B

IM

/P

E le c tr ic a l P o w e r

P la n t F

D A

/8

P

E le c t P w r

P ln t F

D A

A

.r v t

AE101

P -3

/P

-3 E

L E

C T

R

IC

A L P

O W

E R

P L A

N T

O V

E R

A

LL

G R

O U

N D

L E

V E

L P

LA

N

RAM

14124450

SEB SEB

JWH/SCN

D

JI

B O

U T

I, D

JI

B

O U

T I

C A

M P

L E

M O

N N

IE

R

RICHARD STEPHENS

DER

1 : 200

GROUND LEVEL PLAN

A

B

1:200 0 5 10 15 20m

GRAPHIC SCALE(S)

GENERAL NOTES

KEY PLAN

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

UP

MECHANICAL

WORKSHOP

FUEL OIL

OVERFLOW

TANK

DAY TANK

DAY TANK

DAY TANK

VESTIBULE

RISER

ROOM

STORAGE

CONTROL

COMM

SCADA

OFFICE

OFFICE

CORRIDOR

VESTIBULE

TOILET

TOILET

101A101B 116B

116A

102A

104A 105A 106A

107A

108A

109A

110A

111A111A

122A

121A

122A

120A

119A

118A

113A

112A

117A117B

117C

117D

123A

S100NS100N

S100N

S100N

S100N

C250R1

S100N

S150N

S150N

S150N

S150N S150N

S150N

C250S100C300R3

C300R3

C300S100

C300R3

C300R3

C300R3

C250R1

C300S100

C300R3

C300R3

C300R3

C300R3

C300S100

C300R3

46002600

C300S100

W1

W1

W1

113B

TYP.

2 2

TYP.

TYP.

C

C300S100

C300S100

113C

A B D

ENGINE

HALL

117F

117E

E

C300

1. PLAN DIMENSIONS SHOWN ARE TO FACE OF FRAMING MEMBERS, FACE OF

CONCRETE, FACE OF EXISTING WALL, AND TO CENTER LINE OF COLUMNS,

EXCLUSIVE OF INTERIOR WALLS.

2. ALL INTERIOR DIMENSIONS ARE TO FACE OF PARTITION ASSEMBLY AS DEFINED

BY THE PARTITION SCHEDULE AND ARE EXCLUSIVE OF ANY APPLIED FINISH.

3. ALL DIMENSIONS TO BE FIELD VERIFIED PRIOR TO INSTALLATION OF EQUIPMENT

/ SHELVING / CASEWORK.

4. ANY CONFLICTING INFORMATION BETWEEN THE ARCHITECTURAL DRAWINGS

AND OTHER DRAWINGS OR SPECIFICATIONS IN THIS SET SHALL BE NOTED IN

WRITING TO THE ARCHITECT FOR REVIEW AND MUST BE CLARIFIED PRIOR TO

COMMENCING THE CONSTRUCTION IN QUESTION.

5. PROVIDE FIRE RETARDANT TREATED WOOD BLOCKING IN METAL STUD

PARTITIONS FOR MOUNTING FIXTURES, MILLWORK, SHELVING, HARDWARE,

DOOR STOPS AND OTHER EQUIPMENT.

6. VERIFY AND COORDINATE PENETRATIONS THROUGH FOUNDATION, FLOOR

SLAB, ROOF ASSEMBLIES, AND PARTITIONS WITH APPROPRIATE ENGINEERING

DRAWINGS.

7. VERIFY AND COORDINATE FINISH FLOOR ELEVATIONS WITH CIVIL AND

STRUCTURAL PRIOR TO COMMENCING CONSTRUCTION. NOTIFY ARCHITECT IN

WRITING BEFORE CONSTRUCTION OF ANY CONFLICTS.

8. REFER TO SHEET AE601 FOR DOOR SCHEDULE.

PARTITION TYPES

TAG SYMBOL TYPE DESCRIPTION

S100N

S150N

100 STL STUDS WITH 13 GWB (EACH SIDE) AND 89 SOUND ATTENUATION BLANKETS

150 STL STUDS WITH 13 GWB (EACH SIDE) AND 89 SOUND ATTENUATION BLANKETS

SN

- STL STUD

- INSULATED

CS

- CONCRETE

- STL STUD

ENCLOSURE

- INSULATED

C250S100

C300S100

250 CONCRETE (3 HR RATING), 100 STL STUDS @ 400 OC WITH 13 GWB (ONE SIDE) AND 89 SOUND

ATTENUATION BLANKETS

300 CONCRETE (3 HR RATING), 100 STL STUDS @ 400 OC WITH 13 GWB (ONE SIDE) AND 89 SOUND

ATTENUATION BLANKETS

GENERAL PARTITION NOTES:

1. METAL STUD GAUGE AND SPACING TO BE DETERMINED BY METAL STUD MANUFACTURER GUIDELINES AND TEST REPORTS IN ORDER TO MEET THE FOLLOWING PERFORMANCE REQUIREMENTS FOR HORIZONTAL DEFLECTION, UON IN THE SPECIFICATIONS.

A. TYPICAL PARTITION STUD GAUGE SHALL BE DESIGNED TO AN L/120 DEFLECTION OR LESS AS REQUIRED BY CODE, UON.

2. PARTITION DIMENSIONING AND PARTITION TYPE DESIGNATIONS ARE INDEPENDENT OF APPLIED FINISHES. REFER TO FINISH SCHEDULE FOR

INFORMATION REGARDING APPLIED FINISHES.

3. ALL PARTITIONS TO RUN FROM FINISH FLOOR TO UNDERSIDE OF DECK, UON.

4. PROVIDE WATER RESISTANT GWB FULL LENGTH OF TOILET / URINAL WALLS AND WITHIN 2 FEET HORIZONTALLY AND 4 FEET VERTICALLY OF SINKS, LAVATORIES AND JANITORS CLOSETS AND ARE NOT SCHEDULED TO RECEIVE TILE.

5. REFER TO LIFE SAFETY PLAN FOR LOCATIONS OF WALLS WITH HOURLY RATINGS.

6. INSTALL ALL FIRE RATED WALL ASSEMBLIES IN STRICT ACCORDANCE WITH APPLICABLE CODES, ORDINANCE, OR LAWS AND UL DESIGN.

7. ALL PENETRATIONS IN RATED WALL ASSEMBLIES SHALL BE BY UL APPROVED FIRE RATED ASSEMBLIES.

8. ALL FIRE RATED AND SMOKE BARRIER PARTITIONS SHALL BE LABELED ABOVE CEILING WITH 2" TALL (MIN) LETTERS AT NOT MORE THAN 8'-0" OC.

AN EXAMPLE LABEL IS AS FOLLOWS: "ONE HOUR FIRE PARTITION"

C250 250 CONCRETE

C

- CONCRETE

C250R3

C300R3

250 CONCRETE, 3 HR RATING

300 CONCRETE, 3 HR RATING

CR

- CONCRETE

- RATED

C300 300 CONCRETE

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

DESIGN DIRECTOR

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

A T

L A

N T

IC

N

O R

F O

L K

V

A

AS NOTED

1643338

A T

LA

N

T

IC

D E

S

IG

N A

N D

C O

N S

T R

U C

T

/1 /2

:3

:5

P

M B

IM

/P

E le c tr ic a l P o w e r

P la n t F

D A

/8

P

E le c t P w r

P ln t F

D A

A

.r v t

AE102

P -3

/P

-3 E

L E

C T

R

IC

A L P

O W

E R

P L A

N T

P A

R T

IA

L

G R

O U

N D

F

LO

O R

P

LA

N

A

RAM

14124451

SEB SEB

JWH/SCN

D

JI

B O

U T

I, D

JI

B

O U

T I

C A

M P

L E

M O

N N

IE

R

RICHARD STEPHENS

DER

1 : 100A1

GROUND LEVEL - PARTIAL A

A

B

1:100 0 9 10m87654321

GRAPHIC SCALE(S)

GENERAL NOTES

KEY PLAN

SEE SHEET AE103

# KEY NOTES

1 METAL GRATING OVER UTILITY TRENCH

2 DEF STORAGE TANK. SEE MECHANICAL.

3 DEF PUMP. SEE MECHANICAL.

4 FUEL OIL COMPRESSOR PUMP. SEE MECHANICAL.

5 SURGE TANK. SEE MECHANICAL.

6 FUEL FILTER COALESCER. SEE MECHANICAL.

7 WASTE LUBE OIL TANK. SEE MECHANICAL.

9 DIESEL GENERATOR. SEE MECHANICAL.

10 DECENTRALIZED CHILLED WATER SYSTEM. SEE MECHANICAL.

11 DECENTRALIZED COMPRESSED AIR SYSTEM. SEE MECHANICAL.

12 DAY TANK. SEE MECHANICAL.

13 FUEL OIL OVERFLOW TANK. SEE MECHANICAL.

14 FUEL OIL OVERFLOW PUMP. SEE MECHANICAL.

15 EMERGENCY EYEWASH / SHOWER. SEE PLUMBING.

16 PREFINISHED METAL DOWNSPOUT WITH SPLASH BLOCK.

45 EXHAUST STACK. SEE MECHANICAL.

48 PREFINISHED METAL DOWNSPOUT. CONNECT TO UNDERGROUND PIPING. SEE

CIVIL.

51 EXHAUST STACK SUPPORT. SEE STRUCTURAL.

52 STEEL BOLLARD, CONCRETE-FILLED. SEE CIVIL.

53 VENTILATION LOUVER. SEE MECHANICAL.

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

ELECTRICAL

JANITOR

CORRIDOR

VESTIBULE

DAY TANK

DAY TANK

DAY TANK

LUBE OIL

VESTIBULE

101A101B

103A

124A

116B123A

123C 123D

125A

126A

127A

114A

114B114C

C300R3

C300R3

C300R3

C250S100 C250S100

C300R3

S150N

C300R3 C300R3

S150N

C300S100

C300R3

C300R3

S150N S150N

106A105A104A

102A

C300S100

C300S100

C300S100

BATTERY

TYP

TYP

TYP

CA B D

123B

TYP.

ENGINE

HALL

123E

123F

115A

63 63

E

FUEL PUMP

ROOM

128A

C250

C250

C250R2

PARTITION TYPES

TAG SYMBOL TYPE DESCRIPTION

GENERAL PARTITION NOTES:

1. METAL STUD GAUGE AND SPACING TO BE DETERMINED BY METAL STUD MANUFACTURER GUIDELINES AND TEST REPORTS IN ORDER TO MEET THE FOLLOWING PERFORMANCE REQUIREMENTS FOR HORIZONTAL DEFLECTION, UON IN THE SPECIFICATIONS.

A. TYPICAL PARTITION STUD GAUGE SHALL BE DESIGNED TO AN L/120 DEFLECTION OR LESS AS REQUIRED BY CODE, UON.

2. PARTITION DIMENSIONING AND PARTITION TYPE DESIGNATIONS ARE INDEPENDENT OF APPLIED FINISHES. REFER TO FINISH SCHEDULE FOR

INFORMATION REGARDING APPLIED FINISHES.

3. ALL PARTITIONS TO RUN FROM FINISH FLOOR TO UNDERSIDE OF DECK, UON.

4. PROVIDE WATER RESISTANT GWB FULL LENGTH OF TOILET / URINAL WALLS AND WITHIN 2 FEET HORIZONTALLY AND 4 FEET VERTICALLY OF SINKS, LAVATORIES AND JANITORS CLOSETS AND ARE NOT SCHEDULED TO RECEIVE TILE.

5. REFER TO LIFE SAFETY PLAN FOR LOCATIONS OF WALLS WITH HOURLY RATINGS.

6. INSTALL ALL FIRE RATED WALL ASSEMBLIES IN STRICT ACCORDANCE WITH APPLICABLE CODES, ORDINANCE, OR LAWS AND UL DESIGN.

7. ALL PENETRATIONS IN RATED WALL ASSEMBLIES SHALL BE BY UL APPROVED FIRE RATED ASSEMBLIES.

8. ALL FIRE RATED AND SMOKE BARRIER PARTITIONS SHALL BE LABELED ABOVE CEILING WITH 2" TALL (MIN) LETTERS AT NOT MORE THAN 8'-0" OC.

AN EXAMPLE LABEL IS AS FOLLOWS: "ONE HOUR FIRE PARTITION"

S100N

S150N

100 STL STUDS WITH 13 GWB (EACH SIDE) AND 89 SOUND ATTENUATION BLANKETS

150 STL STUDS WITH 13 GWB (EACH SIDE) AND 89 SOUND ATTENUATION BLANKETS

SN

- STL STUD

- INSULATED

CS

- CONCRETE

- STL STUD

ENCLOSURE

- INSULATED

C250S100

C300S100

250 CONCRETE (3 HR RATING), 100 STL STUDS @ 400 OC WITH 13 GWB (ONE SIDE) AND 89 SOUND

ATTENUATION BLANKETS

300 CONCRETE (3 HR RATING), 100 STL STUDS @ 400 OC WITH 13 GWB (ONE SIDE) AND 89 SOUND

ATTENUATION BLANKETS

C250 250 CONCRETE

C

- CONCRETE

C250R3

C300R3

250 CONCRETE, 3 HR RATING

300 CONCRETE, 3 HR RATING

CR

- CONCRETE

- RATED

C300 300 CONCRETE

1. PLAN DIMENSIONS SHOWN ARE TO FACE OF FRAMING MEMBERS, FACE OF

CONCRETE, FACE OF EXISTING WALL, AND TO CENTER LINE OF COLUMNS,

EXCLUSIVE OF INTERIOR WALLS.

2. ALL INTERIOR DIMENSIONS ARE TO FACE OF PARTITION ASSEMBLY AS DEFINED

BY THE PARTITION SCHEDULE AND ARE EXCLUSIVE OF ANY APPLIED FINISH.

3. ALL DIMENSIONS TO BE FIELD VERIFIED PRIOR TO INSTALLATION OF EQUIPMENT

/ SHELVING / CASEWORK.

4. ANY CONFLICTING INFORMATION BETWEEN THE ARCHITECTURAL DRAWINGS

AND OTHER DRAWINGS OR SPECIFICATIONS IN THIS SET SHALL BE NOTED IN

WRITING TO THE ARCHITECT FOR REVIEW AND MUST BE CLARIFIED PRIOR TO

COMMENCING THE CONSTRUCTION IN QUESTION.

5. PROVIDE FIRE RETARDANT TREATED WOOD BLOCKING IN METAL STUD

PARTITIONS FOR MOUNTING FIXTURES, MILLWORK, SHELVING, HARDWARE,

DOOR STOPS AND OTHER EQUIPMENT.

6. VERIFY AND COORDINATE PENETRATIONS THROUGH FOUNDATION, FLOOR

SLAB, ROOF ASSEMBLIES, AND PARTITIONS WITH APPROPRIATE ENGINEERING

DRAWINGS.

7. VERIFY AND COORDINATE FINISH FLOOR ELEVATIONS WITH CIVIL AND

STRUCTURAL PRIOR TO COMMENCING CONSTRUCTION. NOTIFY ARCHITECT IN

WRITING BEFORE CONSTRUCTION OF ANY CONFLICTS.

8. REFER TO SHEET AE601 FOR DOOR SCHEDULE.

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

DESIGN DIRECTOR

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

A T

L A

N T

IC

N

O R

F O

L K

V

A

AS NOTED

1643338

A T

LA

N

T

IC

D E

S

IG

N A

N D

C O

N S

T R

U C

T

/1 /2

:3

:5

P

M B

IM

/P

E le c tr ic a l P o w e r

P la n t F

D A

/8

P

E le c t P w r

P ln t F

D A

A

.r v t

AE103

P -3

/P

-3 E

L E

C T

R

IC

A L P

O W

E R

P L A

N T

P A

R T

IA

L

G R

O U

N D

F

LO

O R

P

LA

N

B

RAM

14124452

SEB SEB

JWH/SCN

D

JI

B O

U T

I, D

JI

B

O U

T I

C A

M P

L E

M O

N N

IE

R

RICHARD STEPHENS

DER

1 : 100A1

GROUND LEVEL - PARTIAL B

SEE SHEET AE102

1:100 0 9 10m87654321

GRAPHIC SCALE(S)

GENERAL NOTES

KEY PLAN

# KEY NOTES

A

B

1 METAL GRATING OVER UTILITY TRENCH

8 ELECTRICAL PANEL. SEE ELECTRICAL.

12 FUEL OIL DAY TANK. SEE MECHANICAL.

13 FUEL OIL OVERFLOW TANK. SEE MECHANICAL.

14 FUEL OIL OVERFLOW PUMP. SEE MECHANICAL.

15 EMERGENCY EYEWASH / SHOWER. SEE PLUMBING.

16 PREFINISHED METAL DOWNSPOUT WITH SPLASH BLOCK.

27 SWITCHGEAR. SEE ELECTRICAL.

45 EXHAUST STACK. SEE MECHANICAL.

46 LUBE OIL TANK. SEE MECHANICAL.

47 LUBE OIL PUMP. SEE MECHANICAL.

48 PREFINISHED METAL DOWNSPOUT. CONNECT TO UNDERGROUND PIPING. SEE

CIVIL.

51 EXHAUST STACK SUPPORT. SEE STRUCTURAL.

52 PREFINISHED METAL STAIR WITH METAL GRATING TREADS.

53 VENTILATION LOUVER. SEE MECHANICAL.

54 ELECTRIC WATER COOLER. SEE PLUMBING.

55 STEEL BOLLARD, CONCRETE-FILLED. SEE CIVIL.

61 TRANSFORMER. SEE ELECTRICAL.

62 CONCRETE EQUIPMENT PAD. SEE STRUCTURAL.

63 CONCRETE CONTAINMENT DIKE. SEE STRUCTURAL.

64 METAL LOUVER OVER CONTAINMENT DIKE

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

1. PLAN DIMENSIONS SHOWN ARE TO FACE OF FRAMING MEMBERS, FACE OF

CONCRETE, FACE OF EXISTING WALL, AND TO CENTER LINE OF COLUMNS,

EXCLUSIVE OF INTERIOR WALLS.

2. ALL INTERIOR DIMENSIONS ARE TO FACE OF PARTITION ASSEMBLY AS DEFINED

BY THE PARTITION SCHEDULE AND ARE EXCLUSIVE OF ANY APPLIED FINISH.

3. ALL DIMENSIONS TO BE FIELD VERIFIED PRIOR TO INSTALLATION OF EQUIPMENT

/ SHELVING / CASEWORK.

4. ANY CONFLICTING INFORMATION BETWEEN THE ARCHITECTURAL DRAWINGS

AND OTHER DRAWINGS OR SPECIFICATIONS IN THIS SET SHALL BE NOTED IN

WRITING TO THE ARCHITECT FOR REVIEW AND MUST BE CLARIFIED PRIOR TO

COMMENCING THE CONSTRUCTION IN QUESTION.

5. PROVIDE FIRE RETARDANT TREATED WOOD BLOCKING IN METAL STUD

PARTITIONS FOR MOUNTING FIXTURES, MILLWORK, SHELVING, HARDWARE,

DOOR STOPS AND OTHER EQUIPMENT.

6. VERIFY AND COORDINATE PENETRATIONS THROUGH FOUNDATION, FLOOR

SLAB, ROOF ASSEMBLIES, AND PARTITIONS WITH APPROPRIATE ENGINEERING

DRAWINGS.

7. VERIFY AND COORDINATE FINISH FLOOR ELEVATIONS WITH CIVIL AND

STRUCTURAL PRIOR TO COMMENCING CONSTRUCTION. NOTIFY ARCHITECT IN

WRITING BEFORE CONSTRUCTION OF ANY CONFLICTS.

8. REFER TO SHEET AE601 FOR DOOR SCHEDULE.

AE201

A1

AE201

B1

AE201

D1

AE201

B3

A1

AE301

A1

AE301

C1

AE301

______________ C1

AE301

OPEN TO ENGINE

HALL BELOW

OPEN TO ENGINE

HALL BELOW

201A

201B

A B D

TYP

AE202

A1

AE202

B3

AE202

B1

AE202

D1

O P

E N

IN

G

OPENING

10100+/- 60

- 3

O P

E N

IN

G

O P

E N

IN

G

O P

E N

IN

G

O P

E N

IN

G

O P

E N

IN

G

E

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

DESIGN DIRECTOR

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

A T

L A

N T

IC

N

O R

F O

L K

V

A

AS NOTED

1643338

A T

LA

N

T

IC

D E

S

IG

N A

N D

C O

N S

T R

U C

T

/4 /2

:0 :1

A

M B

IM

/P

E le c tr ic a l P o w e r

P la n t F

D A

/8

P

E le c t P w r

P ln t F

D A

A

.r v t

AE104

P -3

/P

-3 E

L E

C T

R

IC

A L P

O W

E R

P L A

N T

M E

C H

A N

IC

A

L P

LA

TF

O R

M L

E V

E L

P

LA

N

RAM

14124453

SEB SEB

JWH/SCN

D

JI

B O

U T

I, D

JI

B

O U

T I

C A

M P

L E

M O

N N

IE

R

RICHARD STEPHENS

DER

1:100 0 9 10m87654321

GRAPHIC SCALE(S)

GENERAL NOTES

KEY PLAN

# KEY NOTES

A

B

12 FUEL OIL DAY TANK. SEE MECHANICAL.

13 FUEL OIL OVERFLOW TANK. SEE MECHANICAL.

14 FUEL OIL OVERFLOW PUMP. SEE MECHANICAL.

17 PREFINISHED METAL GUTTER.

21 PVC ROOFING MEMBRANE

40 MECHANICAL MAINTENANCE PLATFORM. SEE STRUCTURAL.

41 AIR HANDLER UNIT. SEE MECHANICAL.

42 METAL GRATING ROOF ACCESS PLATFORM (DASHED IF ABOVE). COORDINATE

WITH STRUCTURAL.

43 REMOVABLE PREFINISHED METAL GUARD RAIL

44 CHILLER UNIT. SEE MECHANICAL.

45 EXHAUST STACK SUPPORT. SEE STRUCTURAL.

46 LUBE OIL TANK. SEE MECHANICAL.

47 LUBE OIL PUMP. SEE MECHANICAL.

62 METAL ROOF ACCESS LADDER

1 : 200

MECHANICAL PLATFORM LEVEL PLAN

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

M M

M

AE201

A1

AE201

B1

AE201

D1

A1

AE301

A1

AE301

15:300

15:300

C1

AE301

______________ C1

AE301

C

A B D

AE202

A1

AE202

B1

AE202

D1

E

1. COORDINATE WITH MECHANICAL AND PLUMBING DRAWINGS FOR LOCATION

OF ROOF PENETRATIONS THAT MAY NOT BE SHOWN ON THIS DRAWING.

2. REFER TO SHEET AE501 FOR ROOF DETAILS.

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

DESIGN DIRECTOR

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

A T

L A

N T

IC

N

O R

F O

L K

V

A

AS NOTED

1643338

A T

LA

N

T

IC

D E

S

IG

N A

N D

C O

N S

T R

U C

T

/4 /2

:0 :1

A

M B

IM

/P

E le c tr ic a l P o w e r

P la n t F

D A

/8

P

E le c t P w r

P ln t F

D A

A

.r v t

AE105

P -3

/P

-3 E

L E

C T

R

IC

A L P

O W

E R

P L A

N T

R O

O F

P

LA

N

RAM

14124454

SEB SEB

JWH/SCN

D

JI

B O

U T

I, D

JI

B

O U

T I

C A

M P

L E

M O

N N

IE

R

RICHARD STEPHENS

DER

1 : 200

ROOF PLAN

1:200

0 5 10 15 20m

GRAPHIC SCALE(S)

GENERAL NOTES

KEY PLAN

# KEY NOTES

A

B

17 PREFINISHED METAL GUTTER

21 PVC ROOFING MEMBRANE

40 MECHANICAL MAINTENANCE PLATFORM. SEE STRUCTURAL.

41 AIR HANDLER UNIT. SEE MECHANICAL.

43 REMOVABLE PREFINISHED METAL GUARD RAIL, 1070 mm H MIN.

45 EXHAUST STACK SUPPORT. SEE STRUCTURAL.

49 PREFINISHED METAL GUARDRAIL, 1070 mm H MIN.

51 EXHAUST STACK. SEE MECHANICAL.

58 GRAVITY VENTILATOR. SEE MECHANICAL.

61 VENT THROUGH ROOF. SEE PLUMBING.

63 METAL ROOF HATCH

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

A1

AE301

A1

AE301

MECHANICAL

RISER

ROOM

ELECTRICAL

STORAGE

COMM

SCADA

OFFICE

OFFICE

VESTIBULE

CONTROL

JANITOR

CORRIDOR

VESTIBULE

TOILET

DAY TANK

DAY TANK

DAY TANK

LUBE OIL

TOILET

DAY TANK

DAY TANK

DAY TANK

FUEL OIL

OVERFLOW

TANK

WORKSHOP

2750 2750

EXP

EXP

EXP

EXP

EXP

EXP

EXP

9250EXP

EXP

EXP

EXP

EXP

EXP

C1

AE301

______________ C1

AE301

C

A B D

E

1. REFER TO SHEET A-001 FOR RCP LEGEND

2. HVAC & LIGHTING FIXTURES SHOWN ARE FOR GRAPHICAL PURPOSES

ONLY. GC TO REFER TO PME DRAWINGS AND SPRINKLER PIPING SHOP

DRAWINGS AND SHOULD NOTIFY ARCHITECT IMMEDIATELY OF ANY

CONFLICTS OR DISCREPANCIES.

3. GENERAL CONTRACTOR TO COORDINATE ALL SOFFIT/ BULKHEAD

FRAMING WITH FINAL LIGHTING FIXTURES & HVAC DIFFUSER LOCATIONS.

4. GENERAL CONTRACTOR TO FIELD VERIFY CEILING HEIGHTS SHOWN ON

RCP DRAWINGS PRIOR TO INSTALLATION OF ALL MECHANICAL

DUCTWORK, SPRINKLER PIPING, ELECTRICAL EQUIPMENT, CONDUITS,

ETC. ARCHITECT TO BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCIES.

5. GENERAL CONTRACTOR TO INSTALL WIRE HANGERS @ ALL CORNERS OF

LIGHT FIXTURES, REGISTERS, & GRILLES.

6. REFER TO INTERIOR & EXTERIOR SECTIONS FOR ADDITIONAL CEILING

DETAILS NOT NOTED ON THIS SHEET.

7. ALL RECESSED LIGHTING SHALL BE CENTERED WITHIN THE SOFFIT

DIMENSIONS, UON.

8. WHERE ACT IS LOCATED, ALL FIXTURES INCLUDING BUT NOT LIMITED TO

MOTION DETECTORS, FIRE ALARM DEVICES, & SPRINKLER HEADS, ARE TO

BE LOCATED IN THE CENTER OF THE TILE.

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

DESIGN DIRECTOR

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

A T

L A

N T

IC

N

O R

F O

L K

V

A

AS NOTED

1643338

A T

LA

N

T

IC

D E

S

IG

N A

N D

C O

N S

T R

U C

T

/4 /2

:0 :1

A

M B

IM

/P

E le c tr ic a l P o w e r

P la n t F

D A

/8

P

E le c t P w r

P ln t F

D A

A

.r v t

AE111

P -3

/P

-3 E

L E

C T

R

IC

A L P

O W

E R

P L A

N T

G R

O U

N D

L E

V E

L R

E F

LE

C

TE

D

C E

IL

IN

G P

LA

N

RAM

14124455

SEB SEB

JWH/SCN

D

JI

B O

U T

I, D

JI

B

O U

T I

C A

M P

L E

M O

N N

IE

R

RICHARD STEPHENS

DER

1 : 200

GROUND LEVEL REFLECTED CEILING PLAN

1:200 0 5 10 15 20m

GRAPHIC SCALE(S)

GENERAL NOTES

KEY PLAN

# KEY NOTES

A

B

47 9.5-TON BRIDGE CRANE.

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

1. REFER TO SHEET AE202 FOR CONCRETE REVEAL LOCATIONS. REFER TO

SHEET AE502 FOR DETAIL. COORDINATE WITH STRUCTURAL.

2. REFER TO SHEET AE601 FOR WINDOW, LOUVER AND DOOR ELEVATIONS.

3. REFER TO AND COORDINATE WITH CIVIL AND LANDSCAPING DRAWINGS

FOR ALL FINISHED GRADES.

C1

AE301

C1

AE301

30 3023 30 3019

TYP.

12345678910111213

434343434943 41 41 41 41 41 41

BEYOND

BEYOND

BEYOND

52 52

L2

13300 620011100 80008500 10500 7900

54TYP.

CL OF

DOWNSPOUT

CL OF

DOWNSPOUT

CL OF

DOWNSPOUT

CL OF

DOWNSPOUT

CL OF

DOWNSPOUT

CL OF

DOWNSPOUT

CL OF

DOWNSPOUT

CL OF

DOWNSPOUT

48 48 48 48 48 48 48 48

58 58 58

63 49 49

A1

AE301

A1

AE301

TYP.

30 3032

CA B D

43 41

54 TYP.

L3 L3

63 49

E

A1

AE301

A1

AE301

TYP.

C ABD

44 44

41 43

L1

54 TYP.

L3 L3

8249825063

E

C1

AE301

C1

AE301

TYP.

30 24242424

1 2 3 4 5 6 7 8 9 10 11 12 13

45 45 45 45 45

12000 14260 14000 11850

50 50 50 50 50 50 50 50 50 50

5151515151

5252 60

L4 L4 L4 L4

CL OF

DOWNSPOUT

CL OF

DOWNSPOUT

CL OF

DOWNSPOUT

CL OF

DOWNSPOUT

CL OF

DOWNSPOUT

CL OF

DOWNSPOUT

CL OF

DOWNSPOUT

CL OF

DOWNSPOUT

TYP.

BEYOND

16 16 16 16 16

58 58 58 58 58

60 60 60 60 60

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

DESIGN DIRECTOR

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

A T

L A

N T

IC

N

O R

F O

L K

V

A

AS NOTED

1643338

A T

LA

N

T

IC

D E

S

IG

N A

N D

C O

N S

T R

U C

T

/4 /2

:0 :4

A

M B

IM

/P

E le c tr ic a l P o w e r

P la n t F

D A

/8

P

E le c t P w r

P ln t F

D A

A

.r v t

AE201

P -3

/P

-3 E

L E

C T

R

IC

A L P

O W

E R

P L A

N T

E X

TE

R

IO

R

E

LE

V A

T

IO

N S

RAM

14124456

SEB SEB

JWH/SCN

D

JI

B O

U T

I, D

JI

B

O U

T I

C A

M P

L E

M O

N N

IE

R

RICHARD STEPHENS

DER

1 : 200A1

EAST ELEVATION

1:200 0 5 10 15 20m

GRAPHIC SCALE(S)

GENERAL NOTES

# KEY NOTES

1 : 200B1

SOUTH ELEVATION

1 : 200B3

NORTH ELEVATION

1 : 200D1

WEST ELEVATION

16 PREFINISHED METAL DOWNSPOUT WITH SPLASH BLOCK.

17 PREFINISHED METAL GUTTER.

18 INSULATED COILING OVERHEAD DOOR.

19 ALUMINUM STOREFRONT DOORS AND FRAME.

20 FIXED ALUMINUM WINDOW.

21 PVC ROOFING MEMBRANE

22 DIRECT APPLIED EXTERIOR FINISH SYSTEM (DAEFS), COLOR 1.

23 DIRECT APPLIED EXTERIOR FINISH SYSTEM (DAEFS), COLOR 2.

24 VENTILATION LOUVER. SEE MECHANICAL.

25 WALL-MOUNTED LIGHT FIXTURE. SEE ELECTRICAL.

28 PREFINISHED METAL ROOF EDGE FASCIA/RAKE CLOSURE TRIM.

29 APPROXIMATE FINISH GRADE. SEE CIVIL.

30 INSULATED HOLLOW METAL DOOR AND FRAME.

32 PREFINISHED HORIZONTAL METAL JOINT.

40 MECHANICAL MAINTENANCE PLATFORM. SEE STRUCTURAL.

41 AIR HANDLER UNIT. SEE MECHANICAL.

43 REMOVABLE PREFINISHED METAL GUARD RAIL, 1070 mm H MIN.

44 CHILLER UNIT. SEE MECHANICAL.

45 EXHAUST STACK SUPPORT. SEE STRUCTURAL.

48 PREFINISHED METAL DOWNSPOUT. CONNECT TO UNDERGROUND PIPING. SEE

CIVIL.

49 PREFINISHED METAL GUARDRAIL, 1070 mm H MIN.

50 SELECTIVE CATALYTIC REDUCTION. SEE MECHANICAL.

51 EXHAUST STACK. SEE MECHANICAL.

52 STEEL BOLLARD, CONCRETE-FILLED. SEE CIVIL.

54 CONCRETE REVEAL

56 FDC. SEE FIRE PROTECTION.

57 BACKFLOW PREVENTER TEST HEADER. SEE FIRE PROTECTION.

58 GRAVITY VENTILATOR. SEE MECHANICAL.

59 EXHAUST FAN. SEE MECHANICAL.

60 EVACUATION AIR FILTER INLET WITH WEATHER HOOD. SEE MECHANICAL.

63 METAL ROOF HATCH

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

12345678910111213

60006000 6600

CL OF CHAMFER REVEAL

CL OF CHAMFER REVEAL

CL OF CHAMFER REVEAL

TYP.

FROM REVEAL TO T.O. WALL

41506300 6500 5650 6000 6400 4920 1425520024505200

CL OF CHAMFER REVEALS

CA B D

TYP.

+/- 2300 5500 5700 5500 +/-4000 4994

CL OF CHAMFER

REVEAL

CL OF CHAMFER

REVEAL

CL OF CHAMFER

REVEAL

FROM REVEAL

TO T.O. WALL

CL OF

CHAMFER

REVEALS

E C ABD

CL OF CHAMFER

REVEAL

CL OF CHAMFER

REVEAL

CL OF CHAMFER

REVEAL

FROM REVEAL

TO T.O. WALL

CL OF CHAMFER REVEALS

5000 5000 550057005500+/- 4000

TYP.

E

1 2 3 4 5 6 7 8 9 10 11 12 13

CL OF CHAMFER REVEAL

CL OF CHAMFER REVEAL

CL OF CHAMFER REVEAL

CL OF CHAMFER REVEALS

3750 83003750830037505048 9150 12300, 5050

TYP.

FROM REVEAL TO T.O. WALL

3680 9200

1. MECHANICAL AND ELECTRICAL EQUIPMENT NOT SHOWN FOR CLARITY.

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

DESIGN DIRECTOR

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

A T

L A

N T

IC

N

O R

F O

L K

V

A

AS NOTED

1643338

A T

LA

N

T

IC

D E

S

IG

N A

N D

C O

N S

T R

U C

T

/4 /2

:0 :0

A

M B

IM

/P

E le c tr ic a l P o w e r

P la n t F

D A

/8

P

E le c t P w r

P ln t F

D A

A

.r v t

AE202

P -3

/P

-3 E

L E

C T

R

IC

A L P

O W

E R

P L A

N T

C O

N C

R E

TE

R

E V

E A

L E

LE

V

A T

IO

N

S

RAM

14124457

SEB SEB

JWH/SCN

D

JI

B O

U T

I, D

JI

B

O U

T I

C A

M P

L E

M O

N N

IE

R

RICHARD STEPHENS

DER

1:200 0 5 10 15 20m

GRAPHIC SCALE(S)

GENERAL NOTES

# KEY NOTES

1 : 200A1

EAST ELEVATION

1 : 200B1

SOUTH ELEVATION

1 : 200B3

NORTH ELEVATION

1 : 200D1

WEST ELEVATION

22 DIRECT APPLIED EXTERIOR FINISH SYSTEM (DAEFS), COLOR 1.

23 DIRECT APPLIED EXTERIOR FINISH SYSTEM (DAEFS), COLOR 2.

54 CONCRETE REVEAL

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

GROUND FLOOR

AE311

A2

33 33 33 33

363636363636

26 26

38 44

4537 37

15 15

30 30 30 30 18

3030303030

CRANE HAUNCH

ROOF ACCESS LEVEL

ENGINE HALL

ENGINE HALL

BEYOND BEYOND BEYOND BEYOND

4949 49 63 58585858585858 58

GROUND FLOOR

B.O. ROOF DECK - HIGH

B.O. ENGINE HALL ROOF DECK - HIGH

13150

A1

AE301

A1

AE301

AE311

A1

AE311

A4

MECHANICAL

1811915

35 1

40 42 43

33 33

ROOF ACCESS LEVEL

ROOF ACCESS

ENGINE HALL

GROUND FLOOR .

BEYOND

1. REFER TO SHEET AE202 FOR CONCRETE REVEAL LOCATIONS. REFER TO

SHEET AE502 FOR DETAIL. COORDINATE WITH STRUCTURAL.

2. REFER TO SHEET AE601 FOR WINDOW, LOUVER AND DOOR ELEVATIONS.

3. REFER TO AND COORDINATE WITH CIVIL AND LANDSCAPING DRAWINGS

FOR ALL FINISHED GRADES.

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

DESIGN DIRECTOR

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

A T

L A

N T

IC

N

O R

F O

L K

V

A

AS NOTED

1643338

A T

LA

N

T

IC

D E

S

IG

N A

N D

C O

N S

T R

U C

T

/4 /2

:0 :1

A

M B

IM

/P

E le c tr ic a l P o w e r

P la n t F

D A

/8

P

E le c t P w r

P ln t F

D A

A

.r v t

AE301

P -3

/P

-3 E

L E

C T

R

IC

A L P

O W

E R

P L A

N T

B U

IL

D

IN

G

S E

C T

IO

N

S

RAM

14124458

SEB SEB

JWH/SCN

D

JI

B O

U T

I, D

JI

B

O U

T I

C A

M P

L E

M O

N N

IE

R

RICHARD STEPHENS

DER

1 : 100A1

SECTION - NORTH-SOUTH

1 : 100C1

SECTION - EAST-WEST

1:100 0 9 10m87654321

GRAPHIC SCALE(S)

GENERAL NOTES# KEY NOTES

1 METAL GRATING OVER UTILITY TRENCH

2 DEF STORAGE TANK. SEE MECHANICAL.

9 DIESEL GENERATOR. SEE MECHANICAL.

11 DECENTRALIZED COMPRESSED AIR SYSTEM. SEE MECHANICAL.

15 EMERGENCY EYEWASH / SHOWER. SEE PLUMBING.

16 PREFINISHED METAL DOWNSPOUT.

17 PREFINISHED METAL GUTTER.

18 INSULATED COILING OVERHEAD DOOR.

26 CRANE CLEAR ZONE (APPROX. 35,585 L x 20,600 W x 1980 H).

30 INSULATED HOLLOW METAL DOOR AND FRAME.

33 BUILDING FOUNDATION. SEE STRUCTURAL.

35 CONCRETE FLOOR SLAB. SEE STRUCTURAL.

36 CONCRETE COLUMN. SEE STRUCTURAL.

37 CONCRETE HAUNCH. SEE STRUCTURAL.

38 ROOF TRUSS, TYPICAL. SEE STRUCTURAL.

40 MECHANICAL MAINTENANCE PLATFORM. SEE STRUCTURAL.

41 AIR HANDLER UNIT. SEE MECHANICAL.

42 METAL GRATING ROOF ACCESS PLATFORM (DASHED IF ABOVE).

43 REMOVABLE PREFINISHED METAL GUARD RAIL, 1070 mm H MIN.

44 ROOF ASSEMBLY: PVC ROOFING MEMBRANE, COVER BOARD, RIGID INSULATION

(R-25), AIR BARRIER, CONCRETE SLAB ON METAL ROOF DECK.

45 EXTERIOR WALL ASSEMBLY: DIRECT APPLIED EXTERIOR FINISH SYSTEM

(DAEFS) WITH WATER RESISTIVE MEMBRANE & AIR BARRIER (PAREX USA OR

EQUAL) ON CONCRETE WALL.

47 EXHAUST STACK WITH STRUCTURAL SUPPORT SYSTEM

48 PREFINISHED METAL DOWNSPOUT. CONNECT TO UNDERGROUND PIPING. SEE

CIVIL.

49 PREFINISHED METAL GUARDRAIL, 1070 mm H MIN.

52 PREFINISHED METAL STAIR WITH METAL GRATING TREADS.

58 GRAVITY VENTILATOR. SEE MECHANICAL.

63 METAL ROOF HATCH

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

1. REFER TO SHEET AE202 FOR CONCRETE REVEAL LOCATIONS. REFER TO

SHEET AE502 FOR DETAIL. COORDINATE WITH STRUCTURAL.

2. REFER TO SHEET AE601 FOR WINDOW, LOUVER AND DOOR ELEVATIONS.

3. REFER TO AND COORDINATE WITH CIVIL AND LANDSCAPING DRAWINGS

FOR ALL FINISHED GRADES.

GROUND FLOOR

PAVING. SEE CIVIL.

VAPOR RETARDER.

TURN DOWN

TO TOP OF FOOTING.

CONCRETE FLOOR SLAB.

SEE STRUCTURAL.

POROUS FILL. SEE

STRUCTURAL.

CONCRETE FOUNDATION.

SEE STRUCTURAL.

PREFINISHED

METAL DOWNSPOUT,

BEYOND, TYPICAL

OVERHEAD COILING DOOR

CONCRETE WALL,

SEE STRUCTURAL.

METAL ROOF TRUSS,

SEE STRUCTURAL.

CONCRETE SLAB ON STEEL

DECK, SEE STRUCTURAL.

13 mm HIGH DENSITY

COVER BOARD, TYP

PREFABRICATED

SPLASH BLOCK BEYOND

BELOW GRADE

WATERPROOFING,

TYPICAL

D

PVC ROOF

MEMBRANE, TYP

VAPOR RETARDER

(AIR BARRIER)

115 mm RIGID INSULATION

PREFINISHED MTL

GUTTER AND

DOWNSPOUT

450DIRECT APPLIED

EXTERIOR FINISH

SYSTEM (DAEFS) WITH

WATER RESISTIVE

MEMBRANE / AIR

BARRIER (PAREX USA OR

EQUAL) ON CONCRETE

E

GROUND FLOOR

CRANE HAUNCH

MTL ROOF TRUSS,

SEE STRUCTURAL.

A

13 mm HIGH DENSITY

COVER BOARD, TYP

VAPOR RETARDER

CONCRETE SLAB,

SEE STRUCTURAL.

13 mm PRE-FORMED

JOINT FILLER

PAVING. SEE CIVIL.

CONCRETE FOOTING,

SEE STRUCTURAL.

CONCRETE WALL,

SEE STRUCTURAL.

BLDG WRAP MEMBRANE

(AIR BARRIER)

DOWNSPOUT CONNECTION,

T.O. APPROX. 300 mm ABOVE

FIN. GRADE

EXHAUST STACK

SUPPORT. SEE

STRUCTURAL.

SELECTIVE

CATALYTIC

REDUCTION. SEE

MECHANICAL.

CONCRETE

CRANE

HAUNCH. SEE

STRUCTURAL.

BELOW GRADE

WATERPROOFING,

TYPICAL

CONCRETE WALL,

SEE STRUCTURAL.

CONCRETE SLAB ON STEEL

DECK, SEE STRUCTURAL.

PVC ROOF MEMBRANE, TYP

VAPOR RETARDER

(AIR BARRIER)

115 mm RIGID INSULATION

PREFINISHED MTL GUTTER

AND DOWNSPOUT

METAL WEEP SCREED

CONCRETE-FILLED STEEL

BOLLARDS, TYPICAL. SEE

CIVIL.

DIRECT APPLIED EXTERIOR

FINISH SYSTEM (DAEFS) WITH

WATER RESISTIVE MEMBRANE /

AIR BARRIER (PAREX USA OR

EQUAL) ON CONCRETE

DIRECT APPLIED EXTERIOR

FINISH SYSTEM (DAEFS) WITH

WATER RESISTIVE MEMBRANE /

AIR BARRIER (PAREX USA OR

EQUAL) ON CONCRETE

GROUND FLOOR

APPROXIMATE FINISH

GRADE. SEE CIVIL.

VAPOR RETARDER. TURN

DOWN TO TOP OF FOOTING.

CONCRETE FLOOR SLAB.

SEE STRUCTURAL.

POROUS FILL. SEE

STRUCTURAL.

CONCRETE FOUNDATION.

SEE STRUCTURAL.

CONCRETE WALL,

SEE STRUCTURAL.

13mm HIGH DENSITY

COVER BOARD, TYP

BELOW GRADE

WATERPROOFING,

TYPICAL

CONTINUOUS BENT

PLATE, SEE

STRUCTURAL.

CONCRETE WALL,

SEE STRUCTURAL.

CONCRETE SLAB

ON STEEL DECK,

SEE STRUCTURAL.

PVC ROOF

MEMBRANE, TYP

VAPOR RETARDER

(AIR BARRIER)

115 mm RIGID INSULATION

METAL FASCIA COVER

WITH DRIP EDGE

SEALANT AT ALL

METAL COVER EDGES

CONCRETE WALL,

SEE STRUCTURAL.

METAL WEEP SCREED

DIRECT APPLIED

EXTERIOR FINISH

SYSTEM (DAEFS) WITH

WATER RESISTIVE

MEMBRANE / AIR

BARRIER (PAREX USA OR

EQUAL) ON CONCRETE

DIRECT APPLIED

EXTERIOR FINISH

SYSTEM (DAEFS) WITH

WATER RESISTIVE

MEMBRANE / AIR

BARRIER (PAREX USA OR

EQUAL) ON CONCRETE

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

DESIGN DIRECTOR

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

A T

L A

N T

IC

N

O R

F O

L K

V

A

AS NOTED

1643338

A T

LA

N

T

IC

D E

S

IG

N A

N D

C O

N S

T R

U C

T

/4 /2

:0 :1

A

M B

IM

/P

E le c tr ic a l P o w e r

P la n t F

D A

/8

P

E le c t P w r

P ln t F

D A

A

.r v t

AE311

P -3

/P

-3 E

L E

C T

R

IC

A L P

O W

E R

P L A

N T

W A

LL

S

E C

T

IO

N S

RAM

14124459

SEB SEB

JWH/SCN

D

JI

B O

U T

I, D

JI

B

O U

T I

C A

M P

L E

M O

N N

IE

R

RICHARD STEPHENS

DER

1:25 0 0.5 2.5m1 1.5 2

GRAPHIC SCALE(S)

GENERAL NOTES

# KEY NOTES

1 : 25A1

WALL SECTION

1 : 25A4

WALL SECTION

1 : 25A2

WALL SECTION

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

JANITOR

CORRIDOR

TOILET

TOILET

CONTROL

S150N

S150N S150N

S150N

C250S100

S150N C250S100

C300S100

C300R3

C300R3

104A

102A

103A

105A 106A

G

F

E

HA

B

C

DD

C

B

A

H

G

F

E

J

AE401

C1

AE401

A3

D1

D2

C2 B3D3

C3

AE401

B2

A2

A2

C300S100

C300S100

GROUND FLOOR

F

H

E

G

A

B

PORCELAIN WALL TILE.

SEE SHEET AF601 FOR

TILE LAYOUT.

GROUND FLOOR

A B C

PORCELAIN WALL TILE.

SEE SHEET AF601 FOR

TILE LAYOUT.

GROUND FLOOR

D

PAINTED GYPSUM

WALLBOARD

GROUND FLOOR

9 84

E H

F

G

PORCELAIN WALL TILE.

SEE SHEET AF601 FOR

TILE LAYOUT.

GROUND FLOOR

J

STAINLESS STEEL

MOP GUARD

GROUND FLOOR

J

STAINLESS STEEL

MOP GUARD

GROUND FLOOR

M A

X

A

B

F

E

G H

GROUND FLOOR

G

F

E

H

1041PORCELAIN WALL TILE.

SEE SHEET AF601 FOR

TILE LAYOUT.

GROUND FLOOR

D

GROUND FLOOR

M A

X

M A

X

C B A

PORCELAIN WALL TILE.

SEE SHEET AF601 FOR

TILE LAYOUT.

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

DESIGN DIRECTOR

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

A T

L A

N T

IC

N

O R

F O

L K

V

A

AS NOTED

1643338

A T

LA

N

T

IC

D E

S

IG

N A

N D

C O

N S

T R

U C

T

/4 /2

:1 :0

A

M B

IM

/P

E le c tr ic a l P o w e r

P la n t F

D A

/8

P

E le c t P w r

P ln t F

D A

A

.r v t

AE401

P -3

/P

-3 E

L E

C T

R

IC

A L P

O W

E R

P L A

N T

E N

LA

R

G E

D P

LA

N

, E

LE

V A

TI

O

N S

T

O

IL

E T

A C

C E

S S

O R

Y S

C H

E D

U

LE

RAM

14124460

SEB SEB

JWH/SCN

D

JI

B O

U T

I, D

JI

B

O U

T I

C A

M P

L E

M O

N N

IE

R

RICHARD STEPHENS

DER

1:50 0 2 4 5m1 30.5

GRAPHIC SCALE(S)

GENERAL NOTES

1 : 50A1

ENLARGED PLAN

1 : 50C1

TOILET 104

1 : 50D1

TOILET 104

1 : 50D2

TOILET 104

1 : 50C2

TOILET 104

1 : 50B2

JANITOR 103

1 : 50A2

JANITOR 103

1 : 50A3

TOILET 105

1 : 50B3

TOILET 105

1 : 50C3

TOILET 105

1 : 50D3

TOILET 105

MARK DESCRIPTION MANUF / MODEL MOUNTING HT NOTES

A MIRROR UNIT, 610 X 914 BOBRICK B-2908 BOTTOM EDGE OF REFLECTIVE SURFACE TO BE 1016 (MAX) A.F.F. 2, 4

B SOAP DISPENSER, WALL-MOUNTED BOBRICK B-2111 CENTER OF DISPENSER CONTROL TO BE 1118 (MAX) A.F.F. 1

C RECESSED COMBINATION PAPER TOWEL DISPENSER/

WASTE RECEPTACLE

BOBRICK B-3803 TOP OF DISPENSER SLOT TO BE 1220 (MAX) A.F.F. 1

D COAT HOOK WITH BUMPER BOBRICK B-212 CENTER OF HOOK TO BE AT 1220 (MAX) A.F.F. 1

E STRAIGHT GRAB BAR BOBRICK B-6806.99 x 42 CENTER 838-915 A.F.F., ANCHOR END 305 FROM BACK WALL 2, 5

F STRAIGHT GRAB BAR BOBRICK B-6806.99 x 18 INSTALLED VERTICALLY, ANCHOR BOTTOM 1041 A.F.F. 2, 5

G SURFACE-MOUNTED TOILET TISSUE DISPENSER BOBRICK B-6867 CENTER OF DISPENSER TO BE 457 A.F.F. 1, 3

H STRAIGHT GRAB BAR BOBRICK B-6806.99 x 36 CENTER 838-915 A.F.F., ANCHOR END 152 FROM SIDE WALL 2, 5

J SHELF WITH MOP & BROOM HOLDERS AND RAG

HOLDERS

BOBRICK B-224 TOP OF SHELF TO BE 1676 (MAX) A.F.F. 1

TOILET ACCESSORY SCHEDULE

A. FIXTURE AND ACCESSORY DIMENSIONS ARE FROM FACE OF FINISH, UON.

B. MANUFACTURER(S) / MODEL(S) IDENTIFIED IN ACCESSORY SCHEDULE &

KEY NOTES ON THIS SHEET ARE TO BE CONSIDERED BASIS-OF-DESIGN

TO ESTABLISH DESIGN INTENT, QUALITY, TYPE, FEATURES AND OTHER

SALIENT PROPERTIES. THE LISTINGS ARE NOT INTENDED TO LIMIT THE

SELECTION OF EQUIVALENT PRODUCTS BY OTHER MANUFACTURERS.

C. REFER TO FINISH SCHEDULE SHEET AF601 FOR FINISH MATERIAL

INFORMATION AND COLORS NOT REFERENCED ON THIS SHEET.

D. ALL ACCESSORIES WITH TUMBLER LOCK(S) TO BE KEYED THE SAME.

TOILET ACCESSORY SCHEDULE NOTES

1. CONCEALED FASTENERS

2. MIRROR UNIT TO HAVE STAINLESS STEEL ANGLE FRAME HANGING

SYSTEM, 6mm FLOAT GLASS, AND GUARANTEED FOR 15 YEARS AGAINST

SILVER SPOILAGE. CENTER MIRROR UNIT OVER SINK BASIN.

3. HEAVY DUTY CAST ALUMINUM BODY WITH SATIN FINISH AND SPINDLES OF

HIGH IMPACT ABS WITH RETRACTABLE PINS AND CONCEALED LOCKING

MECHANISM.

4. ALL WELDED CONSTRUCTION.

5. GRAB BAR TO BE 32mm DIAMETER WITH PEENED GRIPPING SURFACE.

PAINTED GYPSUM

WALLBOARD

PORCELAIN WALL TILE.

SEE SHEET AF601 FOR

TILE LAYOUT.

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

B

UP

UP

A1

AE403

B

T

R E

A D

S

E A

0 18

B C

B

A1

AE403

201B

UP

UP

T

R E

A D

S

E A

0 130

B C

B

UP

A3

AE403

1150 200 1150

T

R E

A D

S

E A

B

201A

A3

AE403

UP

UP

T

R E

A D

S

E A

1150 200 1150

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

DESIGN DIRECTOR

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

A T

L A

N T

IC

N

O R

F O

L K

V

A

AS NOTED

1643338

A T

LA

N

T

IC

D E

S

IG

N A

N D

C O

N S

T R

U C

T

/4 /2

:1 :0

A

M B

IM

/P

E le c tr ic a l P o w e r

P la n t F

D A

/8

P

E le c t P w r

P ln t F

D A

A

.r v t

AE402

P -3

/P

-3 E

L E

C T

R

IC

A L P

O W

E R

P L A

N T

S

TA

IR

P

LA

N

S

RAM

14124461

SEB SEB

JWH/SCN

D

JI

B O

U T

I, D

JI

B

O U

T I

C A

M P

L E

M O

N N

IE

R

RICHARD STEPHENS

DER

1 : 50A1

NORTH INTERIOR STAIR PLAN - GROUND LEVEL

1 : 50C1

NORTH INTERIOR STAIR PLAN - MID-LEVEL

1 : 50A2

SOUTH INTERIOR STAIR PLAN - GROUND LEVEL

1 : 50C2

SOUTH INTERIOR STAIR PLAN - MID-LEVEL

1:50 0 2 4 5m1 30.5

GRAPHIC SCALE(S)

GENERAL NOTES

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

GROUND FLOOR

ROOF ACCESS LEVEL

MECHANICAL

R

IS

E

R S

E

A

R

IS

E

R S

E

A

R

IS

E

R S

E

A

R

IS

E

R S

E

A

11 TREADS @ 280 EA.

LANDING

LANDING

11 TREADS @ 280 EA.

LANDING

ROOF ACCESS LEVEL

R

IS

E

R S

E

A

R

IS

E

R S

E

A

R

IS

E

R S

E

A

LANDING

11 TREADS @ 280 EA.

LANDING

LANDING

11 TREADS @ 280 EA.

R

IS

E

R S

E

A

ENGINE HALL

GROUND FLOOR .

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

DESIGN DIRECTOR

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

A T

L A

N T

IC

N

O R

F O

L K

V

A

AS NOTED

1643338

A T

LA

N

T

IC

D E

S

IG

N A

N D

C O

N S

T R

U C

T

/4 /2

:1 :0

A

M B

IM

/P

E le c tr ic a l P o w e r

P la n t F

D A

/8

P

E le c t P w r

P ln t F

D A

A

.r v t

AE403

P -3

/P

-3 E

L E

C T

R

IC

A L P

O W

E R

P L A

N T

S

TA

IR

S

E C

TI

O

N S

RAM

14124462

SEB SEB

JWH/SCN

D

JI

B O

U T

I, D

JI

B

O U

T I

C A

M P

L E

M O

N N

IE

R

RICHARD STEPHENS

DER

1 : 50A1

NORTH INTERIOR STAIR SECTION

1 : 50A3

SOUTH INTERIOR STAIR SECTION

1:50 0 2 4 5m1 30.5

GRAPHIC SCALE(S)

GENERAL NOTES

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

STL. END PLATE

METAL ANGLED

NOSING, TYPICAL

METAL BEARING

BARS, TYPICAL

STL. STRINGER BEYOND

S E

E S

T A

IR

S

E C

T

IO

N S

T Y

P

IC

A L

R

IS

E R

M

IN

M

IN

38mm PTD. STL.

PIPE HANDRAIL, TYP.

WALL MOUNTED HANDRAIL

BRACKETS AT 1200mm O.C.

MAX., EQUALLY SPACED

PLAN AT ENDS

SECTION

PTD. STL. CAP AT

HANDRAIL ENDS

ELEVATION

MIN.

1 1/2" NOM PIPE

GUARDRAIL, CENTER

VERTICAL POSTS ON

STRINGER

STL. CHANNEL LANDING

SUPPORT BEAM

METAL GRATING TREAD,

TYPICAL

T Y

P

IC

A L

4T

Y P

IC

A

L

STL. CHANNEL STRINGER

METAL GRATING LANDING

1 1/2" NOM. PIPE HANDRAIL

W/ 1/2" DIA. SUPPORTS @

EACH VERT. POST

CL

SEE PLANS FOR LANDING DEPTH

6 mm CLOSURE PLATE AT

LANDING BETWEEN STRINGERS

CONT. STEEL ANGLE LANDING

STEEL ANGLES

BETWEEN STRINGERS

STEEL CHANNEL STRINGER

38 mm NOM. PIPE HANDRAIL W/

SUPPORT BRACKETS BEYOND,

RETURN ENDS TO WALL

(WHERE APPLICABLE)

38 mm NOM. PIPE HANDRAIL W/ 12 mm DIA. SUPPORTS @

EACH VERT. POST RETURN

HANDRAIL TO GUARDRAIL

38 mm NOM. PIPE GUARDRAIL

CENTER VERT. POSTS ON STRINGER

STRINGER BEYOND

14090

CL CL CL

SEE PLANS FOR LANDING DEPTHS

T Y

P

IC

A L

M

AX

TYP.

38 mm DIA NOM PTD.

STL. PIPE GUARDRAIL

38 mm PTD. STL.

HANDRAIL WITH 6 mm

DIAMETER SUPPORTS @

EACH VERTICAL POST

CL

CL

T Y

P

IC

A L

4T

Y P

IC

A

L

EQ

U

AL

EQ

U

AL

38 mm DIA NOM PTD.

STL. PIPE, TYPICAL

METAL GRATING TREAD,

TYPICAL

38 mm DIA NOM PTD.

STL. PIPE VERTICAL

POST, CENTER ON

STRINGER, TYPICAL

STL. STRINGER BEYOND

CL

38 mm NOM. PIPERAIL

GUARDRAIL, CENTER VERT.

POSTS ON STRINGER

38 mm NOM. PIPERAIL HANDRAIL W/ 6 mm DIA.

SUPPORTS @ EACH VERT.

POST RETURN HANDRAIL TO

GUARDRAIL

CONC. FLOOR SLAB

STL. CHANNEL STRINGER

METAL GRATING TREAD,

TYPICAL

CLIP ANGLE @ EA

STRINGER SET ON NON-

SHRINK GROUT W/

EXPANSION ANCHOR BOLT

CL

T Y

P

IC

A L

T Y

P

IC

A L

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

DESIGN DIRECTOR

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

A T

L A

N T

IC

N

O R

F O

L K

V

A

AS NOTED

1643338

A T

LA

N

T

IC

D E

S

IG

N A

N D

C O

N S

T R

U C

T

/4 /2

:1 :0

A

M B

IM

/P

E le c tr ic a l P o w e r

P la n t F

D A

/8

P

E le c t P w r

P ln t F

D A

A

.r v t

AE404

P -3

/P

-3 E

L E

C T

R

IC

A L P

O W

E R

P L A

N T

S

TA

IR

D

E

TA

IL

S

RAM

14124463

SEB SEB

JWH/SCN

D

JI

B O

U T

I, D

JI

B

O U

T I

C A

M P

L E

M O

N N

IE

R

RICHARD STEPHENS

RST

1 : 5C5

TYPICAL TREAD DETAIL

1 : 5A5

TYPICAL HANDRAIL DETAIL

1 : 10C1

STAIR @ TOP LANDING

1 : 10A1

STAIR @ INTERMEDIATE LANDINGS

1 : 10C3

STAIR BETWEEN LANDINGS

1 : 10A3

STAIR @ GROUND LEVEL

1:5 0 0.1 0.4 0.5m0.30.2

1:10 0 0.5 1m

GRAPHIC SCALE(S)

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

VAPOR RETARDER

CONCRETE SLAB,

SEE STRUCTURAL.

12 mm PRE-FORMED

JOINT FILLER

GRADE VARIES

BELOW GRADE

WATERPROOFING,

TYPICAL

GROUND LEVEL

CONCRETE WALL,

SEE STRUCTURAL.

CONCRETE FOOTING,

SEE STRUCTURAL.

METAL WEEP SCREED

DIRECT APPLIED EXTERIOR

FINISH SYSTEM (DAEFS) WITH

WATER RESISTIVE MEMBRANE /

AIR BARRIER (PAREX USA OR

EQUAL) ON CONCRETE

MTL ROOF TRUSS,

SEE STRUCTURAL.

A

CONCRETE WALL,

SEE STRUCTURAL.

CONCRETE SLAB ON STEEL

DECK, SEE STRUCTURAL.

PVC ROOF MEMBRANE, TYP

13 mm HIGH DENSITY

COVER BOARD, TYP

VAPOR RETARDER

(AIR BARRIER)

115 mm RIGID INSULATION

PREFINISHED MTL

GUTTER AND

DOWNSPOUT

DIRECT APPLIED

EXTERIOR FINISH SYSTEM

(DAEFS) WITH WATER

RESISTIVE MEMBRANE /

AIR BARRIER (PAREX USA

OR EQUAL) ON CONCRETE

CONCRETE SLAB

ON STEEL DECK,

SEE STRUCTURAL.

C

METAL WEEP SCREED

VAPOR RETARDER

(AIR BARRIER)

MTL ROOF TRUSS,

SEE STRUCTURAL.

CONCRETE WALL,

SEE STRUCTURAL.

PVC ROOFING

MEMBRANE, TYP

13 mm HIGH DENSITY

COVER BOARD, TYP

115 mm RIGID INSULATION

R U

N P

V C

U

W

A

LL

DIRECT APPLIED EXTERIOR

FINISH SYSTEM (DAEFS) WITH

WATER RESISTIVE MEMBRANE /

AIR BARRIER (PAREX USA OR

EQUAL) ON CONCRETE

MTL ROOF TRUSS,

SEE STRUCTURAL.

A

CONCRETE WALL,

SEE STRUCTURAL.

CONCRETE SLAB ON STEEL

DECK, SEE STRUCTURAL.

PVC ROOF MEMBRANE, TYP

13 mm HIGH DENSITY

COVER BOARD, TYP

VAPOR RETARDER

(AIR BARRIER)

115 mm RIGID INSULATION

PREFINISHED MTL

GUTTER AND

DOWNSPOUT

DIRECT APPLIED EXTERIOR

FINISH SYSTEM (DAEFS) WITH

WATER RESISTIVE MEMBRANE /

AIR BARRIER (PAREX USA OR

EQUAL) ON CONCRETE

16 mm GYPSUM WALLBOARD ON 100 mm MTL STUD FRAMING

WITH SOUND ATTENUATION

INSULATION (ROOMS 101, 106,

107, & 108 ONLY)

ACOUSTICAL CEILING

TILE SYSTEM, SEE SHEET

AE111 FOR LOCATIONS.

CONTINUOUS BENT

PLATE, SEE

STRUCTURAL.

CONCRETE WALL,

SEE STRUCTURAL.

CONCRETE SLAB

ON STEEL DECK,

SEE STRUCTURAL.

PVC ROOF MEMBRANE, TYP

VAPOR RETARDER

(AIR BARRIER)

115 mm RIGID INSULATION

SEALANT AT ALL

METAL COVER EDGES

METAL FASCIA COVER

WITH DRIP EDGE

SEALANT AT ALL

METAL COVER EDGES

13mm HIGH DENSITY

COVER BOARD, TYP

DIRECT APPLIED

EXTERIOR FINISH

SYSTEM (DAEFS) WITH

WATER RESISTIVE

MEMBRANE / AIR

BARRIER (PAREX USA

OR EQUAL) ON

CONCRETE

VAPOR RETARDER

CONCRETE SLAB,

SEE STRUCTURAL.

12 mm PRE-FORMED

JOINT FILLER

BELOW GRADE

WATERPROOFING,

TYPICAL

GROUND LEVEL

CONCRETE WALL,

SEE STRUCTURAL.

METAL WEEP SCREED

MTL GRATING

EMBEDDED ANGLE,

SEE STRUCTURAL.

SLOPE DIKE WALL TO

DRAIN INTO PIT

CONCRETE

CONTAINMENT DIKE.

SEE STRUCTURAL.

DIRECT APPLIED EXTERIOR

FINISH SYSTEM (DAEFS) WITH

WATER RESISTIVE MEMBRANE /

AIR BARRIER (PAREX USA OR

EQUAL) ON CONCRETE

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .