Attachment E - Price Proposal Form.pdf
PDF 307 KB Posted
- Solicitation number
- N6247023R0001
About this file
This document contains a price proposal form for a federal contract solicitation to provide electrical power plant services at Camp Lemonnier in Djibouti. The solicitation seeks pricing for a base scope of work to deliver a new electrical power plant under project P332, including demolition, new engine hall and dry coolers, emissions controls, site work, utilities, fuel supply, startup and commissioning. Additional line items provide pricing for optional generators that could be added under projects P332 or P334. The solicitation also requests pricing for electronic security systems, furniture fixtures and equipment, and a HAR subtotal and total. The related opportunity listing identifies this as a design-bid-build solicitation from the Naval Facilities Engineering Command for projects P-332 and P-334 to develop a new electrical power plant at Camp Lemonnier, Djibouti. Pricing is due based on the details in the price proposal form.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE SCHEDULE
Provide line item prices, where indicated by blank underlines, for the following items:
Line
Item
Description Quantity Unit Unit
Price
Sub-
Total
Total
Price
1 BASE PRICE: Total Price for the entire work for Project
P332 – Electrical Power Plant complete to the 1.5 meterline outside the building. Include demolition; new engine hall and associated dry coolers, exhaust and emissions control systems; facility related control systems; cybersecurity; site work; utilities; temporary fuel supply; startup, testing and commissioning; power plant control system integration to include new power plant and existing Prime Power 3 in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line Item.
1 EA $_____
1A Subtotal of Base Price for the entire work for P332 Electric
Power Plant Facility including diesel generators DG-10 and
DG-09 and associated controls and subsystems complete to the
1.5-meter line outside of the building in accordance with the drawings and specifications, but excluding work provided in another Priced line item.
1 EA $_____
1B Subtotal of Base Price for the entire project sitework, outside the facility 1.5-meterline, for
Project P-332 Site Work, complete in accordance with the drawings and specifications, but excluding work described in another
Priced line Item.
1 EA $____
2 Option Item No. 1: Price for providing work in connection
P332 – Electrical Power Plant diesel generator DG-08 and associated dry coolers, exhaust and emissions control systems;
1 EA $____
startup, testing and commissioning; power plant control system integration, complete in accordance with the drawings and specifications, but excluding work provided in another
Priced line item.
3 Option Item No. 2: Price for providing work in connection
P332 – Electrical Power Plant diesel generator DG-07 and associated dry coolers, exhaust and emissions control systems;
startup, testing and commissioning; power plant control system integration, complete in accordance with the drawings and specifications, but excluding work provided in another
Priced line item.
1 EA $____
4 Option Item No. 3: Price for providing work in connection
P332 – Electrical Power Plant diesel generator DG-06 and associated dry coolers, exhaust and emissions control systems;
startup, testing and commissioning; power plant control system integration, complete in accordance with the drawings and specifications, but excluding work provided in another
Priced line item.
1 EA ____
5 Option Item No. 4: Price for providing all work in connection with MILCON
P334 to include diesel generators DG-05, DG-04, DG-
03, and associated dry coolers, exhaust and emissions control systems; facility related control systems; cybersecurity; site work; utilities; new fuel tank farm; new backup fuel offload station; startup, testing and commissioning; power plant control system integration to include new power plant; and demolition of existing Prime
Power 2 complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item.
6 Option Item No. 5: Price for providing work in connection
P334 – Electrical Power Plant diesel generator DG-02 and associated dry coolers, exhaust and emissions control systems;
startup, testing and commissioning; power plant control system integration, complete in accordance with the drawings and specifications, but excluding work provided in another
Priced line item.
1 EA $____
7 Option Item No. 6: Price for providing work in connection
P334 – Electrical Power Plant diesel generator DG-01 and associated dry coolers, exhaust and emissions control systems;
startup, testing and commissioning; power plant control system integration, complete in accordance with the drawings and specifications, but excluding work provided in another
Priced line item.
1 EA $____
8 Option Item No. 7: Price for providing Electronic Security
System (ESS) equipment, testing, and associated training, but excluding work provided in another Priced line item. The
ESS includes, but is not limited to, Intrusion Detection System
(IDS), Access Control System
(ACS), and Video Systems complete in accordance with the drawings and specifications. Equipment includes items such as Premise
Control Units (PCU), central processing units, field panels, sensors, card readers, keypads, cameras, switches, video
TOTAL OF ALL CLINS $
recorders, workstations, and the communication cabling connecting these devices together.
Include the price for supporting, permanent infrastructure under the Base
Price. Interior supporting infrastructure includes items such as conduit, junction boxes, electronic door strikes, door-hardware, mounting hardware, and power connections.
Exterior supporting infrastructure includes items such as exterior duct banks, manholes, utility poles, utility connections, and power connections.
9 Option Item No. 8: Price for providing work in connection with labor, material, equipment, transportation and supervision required for the
Furniture, Fixtures, and
Equipment (FF&E), complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item.
Government
Estimated
Price:
[$86,735]
HAR
Percent
(NTE
5%)
HAR
Subtotal
Total
FF&E
Estimated
Price
File details come from the government source that posted it. Updated .