Attachment H - Drawings 13 of 18 MECHANICAL.pdf

PDF 18 MB Posted

Attached to
P-332/P-334, Design-Bid-Build, Electrical Power Plant at Camp Lemonnier, Djibouti
Solicitation number
N6247023R0001
Issued by

About this file

This document provides details for a federal contract opportunity for design and construction services. The Naval Facilities Engineering Command is soliciting proposals for Project Number N6247023R0001 to design and build a new electrical power plant at Camp Lemonnier in Djibouti. Offerors should review Attachment H, which contains mechanical drawings related to the project. Proposals are due by the date specified in the solicitation document. The awarded firm will be responsible for designing and constructing a turnkey electrical power plant to support operations at the base in Djibouti. This represents a significant infrastructure investment to modernize energy facilities for the Navy in the Horn of Africa region.

View the file

Other files

File Type Posted
N6247023R0001 Amendment 0009.pdf PDF
N6247023R0001 Amend 0008.pdf PDF
Attachment T - CE18 Electrical.pdf PDF
Attachment S - Electrical ES401 ES601.pdf PDF
N6247023R0001 Amend 0007.pdf PDF
Attachment R - P332 Elect Pwr Plnt FDA - MECH.pdf PDF
N6247023R0001 Amend 0006.pdf PDF
Revised Attachment E - Price Proposal Form_11OCT2023.pdf PDF
Attachment L - P332 Elect Pwr Plnt FDA - AE105 - ROOF PLAN.pdf PDF
Attachment K - P332 Elect Pwr Plnt FDA - AE103 - PARTIAL GROUND FLOOR PLAN - B.pdf PDF
N6247023R0001 Amend 0005.pdf PDF
Attachment N - P332 Elect Pwr Plnt FDA - AE402 - STAIR PLANS.pdf PDF
Attachment P - P332 Elect Pwr Plnt FDA - AF102 - GROUND LEVEL FINISH AND SIGNAGE PLAN - PARTIAL B.pdf PDF
Attachment Q - P332 Elect Pwr Plnt FDA - AG601 - SIGNAGE DETAILS AND SCHEDULE.pdf PDF
Attachment M - P332 Elect Pwr Plnt FDA - AE201 - EXTERIOR ELEVATIONS.pdf PDF
Attachment O - P332 Elect Pwr Plnt FDA - AF101 - GROUND LEVEL FINISH AND SIGNAGE PLAN - PARTIAL A.pdf PDF
N6247023R0001 Amend 0004.pdf PDF
N6247023R0001 Amend 0003.pdf PDF
N6247023R0001 Amend 0002.pdf PDF
Attachment J - Site Visit Log.pdf PDF
N6247023R0001 Amend 0001.pdf PDF
N6247023R0001.pdf PDF
Attachment A - Pre-Proposal Inquiry Form.xls XLS spreadsheet
Attachment H - Drawings 3 of 18 GEOTECH.pdf PDF
Attachment H - Drawings 10 of 18 FIRE PROTECTION.pdf PDF
Attachment H - Drawings 11 of 18 PLUMBING.pdf PDF
Attachment I Base Access Request Form.pdf PDF
Attachment H - Drawings 1 of 18 GENERAL.pdf PDF
Attachment B - SEC-NAV_5512_1_11787 Form.pdf PDF
Attachment H - Drawings 17 of 18 ELECTRICAL.pdf PDF
Attachment C - Construction Experience Project Data Sheet.pdf PDF
Attachment E - Price Proposal Form.pdf PDF
Attachment F - LRA Commercial Vehicle Inspection Procedures.pdf PDF
Attachment H - Specifications 1 of 3.pdf PDF
Attachment H - Drawings 7 of 18 STRUCTURAL.pdf PDF
Attachment H - Drawings 16 of 18 ELECTRICAL.pdf PDF
Attachment H - Drawings 14 of 18 MECHANICAL.pdf PDF
Attachment H - Drawings 2 of 18 LIFE SAFETY.pdf PDF
Attachment H - Drawings 18 of 18 TELECOM.pdf PDF
Attachment H - Specifications 3 of 3.pdf PDF
Attachment H - Specifications 2 of 3.pdf PDF
Attachment D - Past Performance Questionnaire (PPQ).pdf PDF
Attachment H - Drawings 12 of 18 MECHANICAL.pdf PDF
Attachment H - Drawings 9 of 18 INTERIORS.pdf PDF
Attachment H - Drawings 8 of 18 ARCHITECTURAL.pdf PDF
Attachment H - Drawings 6 of 18 CIVIL.pdf PDF
Attachment H - Drawings 5 of 18 CATHODIC PROTECTION.pdf PDF
Attachment H - Drawings 15 of 18 ELECTRICAL.pdf PDF
Attachment H - Drawings 4 of 18 CIVIL.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ONE HALF HOUR FIRE RATING

ONE HOUR FIRE RATING

TWO HOUR FIRE RATING

THREE HOUR FIRE RATING

FOUR HOUR FIRE RATING

SMOKE BARRIER (SB), SMOKE

PARTITION (SP), OR PARTITION

CAPABLE OF RESISTING THE

PASSAGE OF SMOKE (S), AS NOTED

(SB)

ABBREVIATIONS

DIAMETER

PRV POWER ROOF VENTILATOR

PVC POLYVINYL CHLORIDE

RA RETURN AIR

RD ROOF DRAIN

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

REH RELIEF HOOD

RL REFRIGERANT LIQUID

RPM REVOLUTIONS PER MINUTE

RT RECEIVER TANK

SA SUPPLY AIR

SAN SANITARY

SCH SCHEDULE

SCR SELECTIVE CATALYTIC REDUCTION

SCV STEAM CONTROL VALVE

SF SUPPLY FAN

SFU SUPPLY FIXTURE UNITS

SG SUPPLY GRILLE

SHT SHEET

SP STATIC PRESSURE

SPEC SPECIFICATION

SR SUPPLY REGISTER

SS STAINLESS STEEL

SD SMOKE DAMPER

TEMP TEMPERATURE

TF TRANSFER FAN

TG TRANSFER GRILLE

TO TRANSFER OPENING

TP TRAP PRIMER

TSP TOTAL STATIC PRESSURE

TYP TYPICAL

UH UNIT HEATER

V VENT

VAC VACUUM

VCO VERTICAL CLEANOUT

VD VOLUME DAMPER

VERT VERTICAL

VFD VARIABLE FREQUENCY DRIVE

VTR VENT THRU ROOF

WB WET BULB

WC WATER CLOSET

WH WATER HEATER

WPD WATER PRESSURE DROP

WW WASTE WATER

FOT FUEL OIL DAY TANK

FPM FEET PER MINUTE

FPS FUEL OIL POLISHING SYSTEM

FRP FIBERGLASS REINFORCED PLASTIC

FT FEET

FTR FIN TUBE RADIATION

FV FLUSH VALVE

G GAS/GRILLE

GAL GALLONS

GBDD GRAVITY BACKDRAFT DAMPER

GC GENERAL CONTRACTOR

GEN GENERATOR OR GENERAL

GL GEAR LUBE

GRD GROUND

HB HOSE BIBB

HWR HEATING WATER RETURN

HWS HEATING WATER SUPPLY

HOA HAND OFF AUTO SWITCH

HORIZ HORIZONTAL

HP HORSEPOWER

HUH HORIZONTAL UNIT HEATER

HW HOT WATER

HWHC HOT WATER HEATING COIL

HZ FREQUENCY

IH INTAKE HOOD

INV EL INVERT ELEVATION

KW KILOWATTS

LBS POUNDS

LDB LEAVING DRY BULB TEMPERATURE

LLG TANK LIQUID LEVEL GAUGE LINE

LM TANK LEAKAGE MONITORING LINE

LPG LIQUEFIED PETROLEUM GAS

LPR LOW PRESSURE RETURN

LPS LOW PRESSURE STEAM

LRA LOCKED ROTOR AMPS

LWB LEAVING WET BULB TEMPERATURE

LWT LEAVING WATER TEMPERATURE

MAU MAKE UP AIR UNIT

MAX MAXIMUM

MBH 1000 BTUH

MC MECHANICAL CONTRACTOR

MCC MOTOR CONTROL CENTER

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MO MOTOR OIL

MOD MOTOR OPERATED DAMPER

MPR MEDIUM PRESSURE RETURN

MPS MEDIUM PRESSURE STEAM

N/A NOT APPLICABLE

NC NORMALLY CLOSED / NOISE CRITERIA

NG NATURAL GAS

NIC NOT IN CONTRACT

NO NORMALLY OPEN

NPT NATIONAL PIPE THREAD (TAPERED)

NTS NOT TO SCALE

OA OUTSIDE AIR

OVH OVERHEAD

PC PLUMBING CONTRACTOR

PCR PUMPED CONDENSATE RETURN

PD PRESSURE DROP

PIP PRE-INSULATED PIPE

PRS PRESSURE REDUCING STATION

PRV PRESSURE RELIEF VALVE

ABV ABOVE

ACCU AIR COOLED CONDENSING UNIT

AC AIR CONDITIONING UNIT

AD

AF ANTI-FREEZE

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

APD AIR PRESSURE DROP

APPROX APPROXIMATE

AST ABOVE GROUND STORAGE TANK

ATC AUTOMATIC TEMPERATURE CONTROL

ATF AUTOMATIC TRANSMISSION FLUID

AUTO AUTOMATIC

AVG AVERAGE

BBD BOILER BLOW DOWN

BFP BACKFLOW PREVENTER

BTU BRITISH THERMAL UNITS

BTUH BRITISH THERMAL UNITS PER HOUR

C CONVERTER

CA COMPRESSED AIR

CFM CUBIC FEET PER MINUTE

CI CAST IRON

CLG CEILING OR COOLING

CO CLEANOUT OR CARBON MONOXIDE

CONC CONCRETE

CONN CONNECTION

CONTD CONTINUED

CONTR CONTRACT

CW COLD WATER

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

dB DECIBEL

DEF DIESEL EXHAUST FLUID

DFU DRAINAGE FIXTURE UNITS

DFV DIESEL FUEL VENT

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DIA DIAMETER

DL DOOR LOUVER

DN DOWN

DWG DRAWING

DX DIRECT EXPANSION

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EDB ENTERING DRY BULB TEMPERATURE

EF EXHAUST FAN

EG EXHAUST GRILLE

EL ELEVATION

ER EXHAUST REGISTER

ESP EXTERNAL STATIC PRESSURE

EUH ELECTRIC UNIT HEATER

EWB ENTERING WET BULB TEMPERATURE

EWC ELECTRIC WATER COOLER

EWT ENTERING WATER TEMPERATURE

EXIST EXISTING

FC FLEXIBLE CONNECTION

FD FIRE DAMPER OR FLOOR DRAIN

FLA FULL LOAD AMPS

FLR FLOOR

FLTK FLASH TANK

FOR FUEL OIL RETURN

FACILITY MANAGEMENT SYSTEM (HVAC)FMS XX NUMERICAL VALUE VARIABLE

DISC DISCONNECT

SW SWITCH

HLS HIGH/LOW DUCT SPLIT

INFO INFORMATION

IN WC INCHES IN WATER COLUMN

(X) REMOVE, DEMOLISH

AA ALPHANUMERICAL VALUE VARIABLE

2-POS TWO POSITION

ET EXPANSION TANK

HPS HIGH PRESSURE STEAM

DB DRY BULB

HVAC HEATING, VENTILATING & AIR CONDITIONING

LPC LOW PRESSURE CONDENSATE

HPC HIGH PRESSURE CONDENSATE

BDD BACKDRAFT DAMPER

PSC PUMPED STEAM CONDENSATE

ETR, (E) EXISTING TO REMAIN

MV MANUAL VENT

AFM AIR FLOW MEASURING STATION

MCA MINIMUM CIRCUIT AMPS

MOCP MAXIMUM OVER CURRENT PROTECTION

OC OFF CENTER

VEF VENTILATED EXHAUST FAN

VSF VENTILATED SUPPLY FAN

ID INSIDE DIAMETER

HVLS HIGH VOLUME LOW SPEED

HVU HEATING AND VENTILATING UNIT

OSD OPEN SITE DRAIN

PSIG POUNDS PER SQUARE INCH GAUGE

STM STEAM

SAR SUPPLY AIR REGISTER

WTR WATER

XR REMOVE & RELOCATE

EMCS ENERGY MGMT & CONTROL SYSTEM

PIPING SHALL BE FIELD ROUTED IN ACCORDANCE WITH APPROPRIATE

ENGINEERING PRACTICES, INDUSTRY STANDARDS, AND GOVERNING

CODES/REGULATIONS. ROUTE OF PIPE, INCLUDING CLEARANCE, IS THE

RESPONSIBILITY OF THE CONTRACTOR. UNIONS, BUSHINGS, AND REDUCING

INSERTS, NOT SHOWN ON THE DRAWINGS, BUT REQUIRED FOR INSTALLATION

SHALL BE PROVIDED.

INDICATED EXISTING CONDITIONS (E.G. SIZE/LOCATION OF PIPING,

DUCTWORK, EQUIPMENT, AND BUILDING ELEMENTS) ARE BASED ON

INFORMATION OBTAINED FROM AVAILABLE RECORD DRAWINGS AND/OR FIELD

SURVEYS. EXISTING CONDITIONS NOT RELATED TO THE WORK MAY NOT BE

SHOWN. EXISTING CONDITIONS ARE PROVIDED FOR THE CONVENIENCE OF

THE CONTRACTOR ONLY AND ARE NOT GUARANTEED COMPLETE OR

CORRECT. PLANNING AND CHECKING HAS BEEN DONE BY THE ENGINEER TO

MINIMIZE INTERFERENCES. PRIOR TO START OF CONSTRUCTION,

CONTRACTOR SHALL FIELD VERIFY LOCATION AND SIZES OF ELEMENTS

RELATED TO THE WORK. ROUTING OF PIPING AND DUCTWORK SHOWN ON

DRAWINGS IS DIAGRAMMATIC. CONTRACTOR SHALL ASCERTAIN THAT

INTERFERENCES WILL NOT BE ENCOUNTERED, PREVENTING THE DISASSEMBLY

OF PARTIALLY OR COMPLETELY ERECTED SYSTEMS FOR RE-ROUTING TO

CLEAR OBSTRUCTIONS WHICH MAY EXIST.

EXISTING VALVES SHALL NOT BE ASSUMED TO PROVIDE POSITIVE SHUT-OFF.

COORDINATE REQUIRED OPERATION OF VALVES WITH GOVERNMENT

PERSONNEL. VALVES REQUIRED FOR SYSTEM ISOLATION SHALL BE TESTED

PRIOR TO THE WORK SUCH THAT PROPER PLANNING AND WORK

SEQUENCING CAN BE PERFORMED. COORDINATE VALVE TESTING WITH

CONTRACTING OFFICER. IMMEDIATELY NOTIFY CONTRACTING OFFICER'S

TECHNICAL REPRESENTATIVE OF VALVES THAT FAIL TO PROVIDE POSITIVE

SHUT-OFF.

CONTRACTOR SHALL PROVIDE LOW POINT HOSE END PIPE DRAINS WITH

CAPS AS REQUIRED TO COMPLETELY DRAIN SYSTEMS INSTALLED UNDER THIS

WORK. PROVIDE MANUAL AIR VENTS WITH CAPS AT HIGH POINTS IN

SYSTEMS INSTALLED UNDER THIS WORK.

PROVIDE AN EMERGENCY SHUTOFF SWITCH FOR THE PLANT CONTROL THAT WILL IMMEDIATELY SHUT DOWN ALL ROTATING GENERATORS, AUXILLARY SYSTEMS, HVAC SYSTEMS, AND EXHAUST FANS. ALL

OUTSIDE DAMPERS WILL CLOSE AFTER CONFIRMATIONS OF ALL FANS OR SHUTDOWN.

GENERAL MECHANICAL NOTES

1.

2.

3.

4.

5.

(E) EXISTING

SEISMIC AND WIND REQUIREMENTS

FOR MECHANICAL SYSTEMS

INFORMATION FOR 2018 IBC-2015/ASCE 7-10

PER 2015 INTERNATIONAL BUILDING CODE, MECHANICAL EQUIPMENT AND COMPONENTS, INCLUDING THEIR SUPPORTS AND ATTACHMENTS, SHALL BE DESIGNED FOR SEISMIC FORCES IN ACCORDANCE WITH

CHAPTER 13 OF ASCE 7-10.

EXTERIOR EQUIPMENT (INCLUDING ROOF CURBS AND ROOF RAILS) EXPOSED TO WIND SHALL BE DESIGNED AND INSTALLED TO RESIST THE WIND PRESSURES DETERMINED IN ACCORDANCE WITH CHAPTERS 26

THROUGH 29 OF ASCE 7-10.

REFERENCE THE STRUCTURAL DRAWINGS FOR SITE SPECIFIC INFORMATION ON SEISMIC DESIGN

CATEGORY, WIND SPEED, ETC.

REFER TO SPECIFICATIONS TO DETERMINE SEISMIC RESTRAINT REQUIREMENTS FOR EACH COMPONENT.

FOR COMPONENTS REQUIRING SEISMIC RESTRAINT, THE COMPONENTS SUPPORTS AND ATTACHMENTS

SHALL BE DESIGNED BY A REGISTERED DESIGN PROFESSIONAL.

WHERE SEISMIC RESTRAINT IS REQUIRED, HOUSEKEEPING PADS NEEDED FOR THE INSTALLATION OF EQUIPMENT UNDER THIS CONTRACT SHALL BE DESIGNED BY THE SEISMIC ENGINEER. DO NOT POUR

HOUSEKEEPING PADS PRIOR TO THE RECEIPT OF APPROVED SEISMIC SUBMITTAL.

SEISMIC RESTRAINTS FOR GENERATOR EXHAUST, SCR, PIPING AND CONDUIT SHALL BE SHOWN ON SEISMIC SUBMITTAL LAYOUT DRAWINGS SHOWING SPECIFIC RESTRAINT LOCATIONS ALONG WITH ACCOMPANYING

DETAILS AND CALCULATIONS.

NOTES:

EQUIPMENT 20 LBS. OR LESS IS EXEMPT IF FLEXIBLE CONNECTIONS ARE PROVIDED BETWEEN THE

COMPONENT AND ASSOCIATED PIPING AND CONDUIT.

RESTRAINTS ARE NOT REQUIRED IF THE COMPONENT WEIGHS 400 LBS. OR LESS, IS MOUNTED AT 4 FT. OR LESS ABOVE A FLOOR, AND HAS FLEXIBLE CONNECTIONS BETWEEN THE COMPONENT AND ASSOCIATED

PIPING AND CONDUIT.

FLEXIBLE CONNECTIONS REQUIRED FOR PIPE CONNECTIONS ONLY.

RESTRAINT IS NOT REQUIRED IF THE PIPING IS SUPPORTED BY HANGERS AND EACH HANGER IN THE PIPING RUN IS 12 IN. OR LESS IN LENGTH FROM THE TOP OF THE PIPE TO THE SUPPORTING STRUCTURE. WHERE PIPES ARE SUPPORTED ON A TRAPEZE, THE TRAPEZE SHALL BE SUPPORTED BY HANGERS HAVING A LENGTH OF 12 IN. OR LESS. WHERE ROD HANGERS ARE USED, THEY SHALL BE EQUIPPED WITH SWIVELS, EYE NUTS OR

OTHER DEVICES TO PREVENT BENDING IN THE ROD.

GENERATOR EXHAUST, REGARDLESS OF SIZE, DESIGNED TO CARRY TOXIC, HIGHLY TOXIC OR EXPLOSIVE

GASES OR USED FOR SMOKE CONTROL SHALL BE RESTRAINED.

COMPONENT CERTIFICATION SHALL BE SUPPLIED BY THE EQUIPMENT MANUFACTURERS AT TIME OF

SUBMITTAL FOR REVIEW BY ENGINEER OF RECORD.

REFER TO STRUCTURAL DRAWINGS FOR ADDITIONAL GUIDANCE AS RELATED TO SEISMIC DESIGN RISK

CATEGORIES.

1.

2.

3.

4.

5.

6.

1.

2.

3.

4.

5.

6.

DIESEL GENERATOR

FAN

FILTER-SEPARATOR

HEAT EXCHANGER

SILENCER

DG

FL

HX

SI

F

PRESSURE CONTROL VALVEPCV

AIR DRYER

TANKT

STRAINERSTR

FUEL OIL PUMPFOP

CLEAN GLYCOL PUMPGP

LUBE OIL SUPPLYLOS

UREA PUMPUP

USED GLYCOL PUMPUGP

USED LUBE OIL PUMPULOP

FUEL OIL OVERFLOW PUMPFOOP

UNDERGROUND FUEL OIL TANKUST

FUEL OIL OVERFLOW TANKFOOT

CLEAN LUBE OIL TANKLOT

CLEAN GLYCOL TANKGT

UREA TANKUT

LOUVERL

SERVICE AIR COMPRESSORSAC

UCA UREA COMPRESSED AIR

SCA SERVICE/SHOP COMPRESSED AIR

BV BYPASS VALVE

FUEL OIL FILLFOF

7.

FCS FUEL CONTROL SYSTEM

FICS FUEL IGNITION CONTROL SYSTEM

CWR COOLING WATER RETURN

CWS COOLING WATER SUPPLY

GRAVITY VENTILATORGV

LUBE OIL RETURNLOR

CLEAN LUBE OIL PUMPLOP

LUBE OIL FILLLOF

7.

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

DESIGN DIRECTOR

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

A T

L A

N T

IC

N

O R

F O

L K

V

A

AS NOTED

1643338

A T

LA

N

T

IC

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N

DPS

/1 /2

:4

:5

A

M B

IM

/P

E le c tr ic a l P o w e r

P la n t F

D A

/8

P

E le c t P w r

P ln t F

D A

J M

.r v t

MP001

P -3

/P

-3 E

L E

C T

R

IC

A L P

O W

E R

P L A

N T

M E

C H

A N

IC

A

L A

B B

R E

V

IA

TI

O

N S

RU

14124503

SA LT

JWH/SCN

D

JI

B O

U T

I, D

JI

B

O U

T I

C A

M P

L E

M O

N N

IE

R

RICHARD STEPHENS

RST

RATED PARTITION LEGEND

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

S

M

AV

A

H

M

T

SYMBOLS

CAP/PLUG

AUTOMATIC AIR VENT

GAS COCK

PRESSURE REDUCING VALVE

RELIEF VALVE (HYDRONIC USE)

MANUAL AIR VENT

AUTOMATIC 3-WAY CONTROL VALVE

3-WAY VALVE, MANUAL

STOP COCK, PLUG VALVE

LOCK SHIELD VALVE

GLOBE VALVE

GATE VALVE

SOLENOID VALVE

AUTOMATIC 2-WAY CONTROL VALVE

SQUARE HEAD COCK

CALIBRATED BALANCING

VALVE

BALL VALVE

2-WAY MODULATING CONTROL VALVE

CHECK VALVE

BUTTERFLY VALVE

OS&Y VALVE

SHUTOFF VALVE (BALL, GATE, OR

BUTTERFLY)

CALIBRATED AUTOMATIC FLOW

VALVE

STEAM SAFETY VALVE

PIPING

TRIPLE DUTY VALVE

12X12

DL

COMBINATION LINE

STARTER

DOOR

LOUVER

DISCONNECT

SWITCH

DETECTOR,

SMOKE

EQUIPMENT OR

FLEXIBLE DUCT

SOUND TRAPST

ACCESS DOORS, VERTICAL

AUTOMATIC DAMPER

OR

12X20

MANUAL VOLUME

DAMPER

DUCT, FIRST VALUE

FIRE

DAMPER

FLEXIBLE

CONNECTION

VIBRATION

ISOLATOR

THERMOSTAT OR

HAND OFF AUTO

SWITCH

MOTOR OPERATOR,

ELECTRIC

AIR

DIRECTION

SMOKE

DAMPER

TAGS

HVAC COMPONENTS

FIRE/SMOKE

DAMPER

VD

MOTOR OPERATED DAMPER

BACKDRAFT

DAMPER

BDD OR GBDD

CONNECTION

TO EXISTING

PLAN

REMOVE TO

LIMIT

EXISTING

NEW

EXISTING EQUIPMENT

MARK

ELEMENTS TO

BE REMOVED

XX-#

AIR DEVICE TAG

AIRFLOW (CFM)

XX-XX NEW EQUIPMENT MARK ON

NEW WORK SHEETS

EQUIPMENT TO BE

DEMOLISHED MARK ON DEMO

SHEETS

M

OR HORIZONTAL

IS SIDE SHOWN

CONTROL PANEL

TEMPERATURE

SENSOR

SD

INDICATED

(E)XX-#

(X)XX-#

EXISTING ELEMENTS

TO REMAIN

(HEAVY DASHED LINE)

TEMPERATURE PRESSURE FITTING

(PETE'S PLUG)

LOF

LOR

EXHAUST DUCT

UP

EXHAUST DUCT

DOWN

(E) TO

REMAIN

LUBE OIL FILL

LUBE OIL RETURN

FOO FUEL OIL OVERFLOW

FOR FUEL OIL RETURN

FOF FUEL OIL FILL

LOS LUBE OIL SUPPLY

FOS FUEL OIL SUPPLY

DEFS DIESEL EXHAUST FLUID SUPPLY

DEFR

CA COMPRESSED AIR

TO HPS STEAM HEADER

MP401

DESCRIPTION

CONTINUATION DRAWING NUMBER

SAME-SHEET CONTROLS CONTINUATIONX

M

MOTORIZED CONTROL VALVE

VARIABLE FREQUENCY DRIVEVFD

HOSE REEL

F FILTER/SEPARATOR

VALVE ACTUATOR SYMBOLS

AIR OPERATED DIAPHRAM

MOTOR OPERATED

SOLENOID

PISTON OPERATED

ELECTROPNEUMATIC POSITIONERI/P

S

M

INSTRUMENT & CONTROL VALVE TAG NUMBERING

FOR- TCV - 11050A

SUFFIX - OPTIONAL

FUNCTION (REFER TO TABLE AT FAR RIGHT)

PROCESS LOOP NUMBER

(REFER TO TABLE AT FAR RIGHT)

SYSTEM

UNIT NUMBER (WHERE APPLICABLE)

INSTRUMENT TAG ABBREVIATIONSVALVES

DIESEL EXHAUST FLUID RETURN

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CWR COOLING WATER RETURN

CWS COOLING WATER SUPPLY

SYSTEM

INSTRUMENT AND CONTROL VALVE PROCESS LOOP NUMBERING RANGES BY SYSTEM

PREFIX TAG NUMBER SERIES

LUBE OIL SYSTEM, COMPRESSED AIR SYSTEM LOS/R, CA 000-199

DIESEL EXHAUST FLUID SYSTEM DEFS/R 200-399

COOLING WATER SYSTEM CWS/R 400-599

VENTILATION/EXHAUST SYSTEM EXH 600-799

FUEL SYSTEM FOS/R 800-899

CHILLED WATER SYSTEM CHWS/R 900-1099

1. FIRST LETTERS ARE A MEASURING/INITIATING VARIABLE AND, IF REQUIRED, A COMBINATION OF A MEASURED/INITIATING VARIABLE

AND A VARIABLE MODIFIER THAT SHALL BE REFERRRED TO BY THE COMBINED MEANING.

THE GRAMMATICAL FORM OF SUCCEEDING LETTER MEANINGS MUST BE MODIFIED AS REQUIRED; FOR EXAMPLE, 'INDICATE' [I] MAY BE READ AS 'INDICATOR' OR 'INDICATING' AND [T] MAY BE READ AS 'TRANSMITTER' OR 'TRANSMITTING'.

2.

SYSTEM ACRONYM - INSTRUMENT/COMPONENT CODE - IDENTIFICATION NUMBER / ALPHA CHARACTER [HPS-FT-01003A]

INSTRUMENT/COMPONENT CODE : SEE ISA 5.1 TABLE

IDENTIFICATION NUMBER : FOUR (4) DIGIT NUMBER WHERE THE FIRST DIGIT REPRESENTS THE PLANT NUMBER AND DIGIST 2- ARE SEQUENTIAL NUMBERS. FOLLOW ISA LOOP SCHEME WHEN NUMBERING COMPONENTS. EXAMPLE: HPS-PT-1001A AND HWS-TT-1801A

TAG NUMBERING

ALPHA CHARACTER : USE WHERE MULTIPLE COMPONENTS ARE PERFORMING THE SAME FUNCTION. EXAMPLES ARE REDUNDANT PRESSURE TRANSMITTERS OR DOUBLE ISOLATION VALVES (HPS-PT-01001A AND HPS-PT-01001B OR NG-PSV-09008A AND NG-PSV-09008B)

LSH LEVEL SWITCH HIGH

LST LEVEL SWITCH TRANSMITTER

LA LEVEL ALARM

LAHH LEVEL ALARM HIGH HIGH

LALL LEVEL ALARM LOW LOW

LSHH LEVEL SWITCH HIGH HIGH

LSLL LEVEL SWITCH LOW LOW

LC LEVEL CONTROL

LE LEVEL ELEMENT

LI LEVEL INDICATOR

LT LEVEL TRANSMITTER

TAH TEMPERATURE ALARM HIGH

TE TEMPERATURE ELEMENT

TI TEMPERATURE INDICATOR

TIT TEMPERATURE INDICATOR TRANSMITTER

ZI POSITION INDICATOR

QA QUANTITY ALARM

HHS HIGH HIGH SWITCH

ZIC POSITION INDICATOR CONTROL

ZIO POSITION INDICATOR ORIFICE

ZSC POSITION SWITCH CONTROL

ZSO POSITION SWITCH ORIFICE

FQI FLOW QUANTITY INDICATOR

LG LEVEL VIEWING DEVICE

LCC LEVEL CONTROL CLOSE

PT PRESSURE TRANSMITTER

PI PRESSURE INDICATOR

PD PRESSURE DIFFERENTIAL

PE PRESSURE ELEMENT

PDI PRESSURE DIFFERENTIAL INDICATOR

PDT PRESSURE DIFFERENTIAL TRANSMITTER

HOA HAND OFF AUTO

SC SPEED CONTROL

SCZ SPEED CONTROL POSITION

SI SPEED INDICATOR

SIT SPEED INDICATOR TRANSMITTER

FQT FLOW QUANTITY TRANSMITTER

FI FLOW INDICATOR

FQ FLOW QUANTITY

FC FLOW CONTROL

FE FLOW ELEMENT

TT TEMPERATURE TRANSMITTER

ZIT POSITION INDICATOR TRANSMITTER

YIA STATE/STATUS INDICATOR ALARM

YIT STATE/STATUS INDICATOR TRANSMITTER

YS STATE/STATUS SWITCH

YSS STATE/STATUS SAFETY SWITCH

ST SPEED TRANSMITTER

LHS LEVEL HIGH SWITCH

LSL LEVEL SWITCH LOW

FAT FLOW ALARM TRANSMITTER

FA FLOW ALARM

HHT HIGH HIGH TRANSMITTER

LLAS LEVEL LOW ALARM SWITCH

LLS LEVEL LOW SWITCH

KS TIME SWITCH

LAH LEVEL ALARM HIGH

LAL LEVEL ALARM LOW

LAT LEVEL ALARM TRANSMITTER

KST TIME SWITCH TRANSMITTER

TIA TEMPERATURE INDICATOR ALARM

YC STATE/STATUS CONTROL

YI STATE/STATUS INDICATOR

HIS HAND INDICATOR SWITCH

PCV PRESSURE CONTROL VALVE

LIH LEVEL INDICATOR HIGH

LIL LEVEL INDICATOR LOW

INSTRUMENT LINE TYPE INDENTIFICATION

PNEUMATIC SIGNAL

ELECTRICAL SIGNAL

CAPILLARY TUBING

HYDRAULIC

COMMUNICATIONS LINK / SOFTWARE

TEE

FLOW ARROW

PIPE GUIDE

PIPE ANCHOR

STEAM TRAP

STRAINER W/BLOW OFF

CONCENTRIC REDUCER

TEE, TURNED DOWN

STRAINER

GAUGE W/COCK

FLEXIBLE CONNECTOR

EXPANSION LOOP

ELBOW, TURNED DOWN

ELBOW, TURNEDUP

UNION OR FLANGE

TEE, TURNED UP

FLOW

SWITCH

THERMOMETER

VACUUM BREAKER

PRESSURE

SWITCH

SLEEVE

CENTRIFUGAL PUMP

V

X

PIPE PITCH

DOWN HOSE FITTING

ECCENTRIC REDUCER

IN THERMOWELL

FLOOR DRAINFLAME ARRESTOR

FD

PIPING SYMBOLS

BREAK FLANGES

CHANGE IN PIPE SIZE (CONCENTRIC)

SCREWED CAP

BUTTWELD CAP

BLIND FLANGE

HOSE CONNECTION

MALE CAM LOCK FITTING

UNION

CHANGE IN PIPE SIZE (ECCENTRIC)

SPECTACLE BLIND

CONNECTION NUMBER#

PIPING COMPONENTS

PS

FS

3-WAY THERMOSTATIC MIXING

VALVE WITH INTERNAL SENSING

BULB

M

GEAR PUMP

MOTORIZED VALVE WITH

HANDWHEEL

FD

M

M

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

DESIGN DIRECTOR

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

A T

L A

N T

IC

N

O R

F O

L K

V

A

AS NOTED

1643338

A T

LA

N

T

IC

D E

S

IG

N A

N D

C O

N S

T R

U C

T

/1 /2

:4

:5

A

M B

IM

/P

E le c tr ic a l P o w e r

P la n t F

D A

/8

P

E le c t P w r

P ln t F

D A

J M

.r v t

MP002

P -3

/P

-3 E

L E

C T

R

IC

A L P

O W

E R

P L A

N T

M E

C H

A N

IC

A

L S

Y M

B O

LS

RU

14124504

SA LT

JWH/SCN

D

JI

B O

U T

I, D

JI

B

O U

T I

C A

M P

L E

M O

N N

IE

R

RICHARD STEPHENS

RST

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P

INSTRUMENTATION DEVICE AND FUNCTION SYMBOLS

NOTE: NUMBERS IN PARENTHESES REFER TO EXPLANATORY NOTES IN CLAUSE 5.3.1 BELOW THE CHART

SHARED DISPLAY,

SHARED CONTROL (1)

A B

No.

LOCATION & ACCESSIBILITY (6)

C D

- LOCATED IN FIELD.

- NOT PANEL, CABINET, OR CONSOLE MOUNTED.

- VISIBLE AT FIELD LOCATION.

- NORMALLY OPERATOR ACCESSIBLE.

- LOCATED IN OR ON FRONT OF CENTRAL OR MAIN PANEL OR CONSOLE.

- VISIBLE ON FRONT OF PANEL OR ON VIDEO DISPLAY.

- NORMALLY OPERATOR ACCESSIBLE AT PANEL FRONT OR CONSOLE.

- LOCATED IN REAR OF CENTRAL OR MAIN PANEL.

- LOCATED IN CABINET BEHIND PANEL.

- NOT VISIBLE ON FRONT OF PANEL OR ON VIDEO DISPLAY.

- NOT NORMALLY OPERATOR ACCESSIBLE AT PANEL OR CONSOLE.

- LOCATED IN OR ON FRONT OF SECONDARY OR LOCAL PANEL OR CONSOLE.

- VISIBLE ON FRONT OF PANEL OR ON VIDEO DISPLAY.

- NORMALLY OPERATOR ACCESSIBLE AT PANEL FRONT OR CONSOLE.

- LOCATED IN REAR OF SECONDARY OR LOCAL PANEL.

- LOCATED IN FIELD CABINET.

- NOT VISIBLE ON FRONT OF PANEL OR ON VIDEO DISPLAY.

- NOT NORMALLY OPERATOR ACCESSIBLE AT PANEL OR CONSOLE.

ALTERNATE

CHOICE OR

SAFETY

INSTRUMENTED

SYSTEM (3)

COMPUTER

SYSTEMS AND

SOFTWARE (4)

DISCRETE (5)

PRIMARY

CHOICE OR

BASIC PROCESS

CONTROL

SYSTEM (2)

CLAUSE 5.3.1 - INSTRUMENTATION DEVICE AND FUNCTION SYMBOLS:

(1) DEVICES AND FUNCTIONS THAT ARE REPRESENTED BY THESE BUBBLES ARE:

(a) USED IN SHARED DISPLAY, SHARED CONTROL, CONFIGURABLE, MICROPROCESSOR-BASED, AND DATA LINKED INSTRUMENTATION WHERE

THE FUNCTIONS ARE ACCESSIBLE BY THE OPERATOR VIA A SHARED DISPLAY OR MONITOR.

(b) CONFIGURED IN CONTROL SYSTEMS THAT INCLUDE, BUT ARE NOT LIMITED TO, DISTRIBUTED CONTROL SYSTEMS (DCS), PROGRAMMABLE LOGIC CONTROLLERS (PLC), PERSONAL COMPUTERS (PC), AND INTELLIGENT TRANSMITTERS AND VALVE POSITIONERS.

(2) THE USER SHALL SELECT AND DOCUMENT ONE OF THE FOLLOWING FOR USE OF THESE SYMBOLS IN A:

(a) PRIMARY SHARED-DISPLAY, SHARED-CONTROL SYSTEM.

(b) BASIC PROCESS CONTROL SYSTEM (BPCS).

(3) THE USER SHALL SELECT AND DOCUMENT ONE OF THE FOLLOWING FOR USE OF THESE SYMBOLS IN AN:

(a) ALTERNATE SHARED-DISPLAY, SHARED-CONTROL SYSTEM.

(b) SAFETY INSTRUMENTED SYSTEM (SIS).

(4) DEVICES AND FUNCTIONS REPRESENTED BY THESE BUBBLE SYMBOLS ARE CONFIGURED IN COMPUTER SYSTEMS THAT INCLUDE, BUT ARE NOT LIMITED TO:

(a) PROCESS CONTROLLERS, PROCESS OPTIMIZERS, STATISTICAL PROCESS CONTROL, MODEL-PREDICTIVE PROCESS CONTROL, ANALYZER CONTROLLERS, BUSINESS COMPUTERS, MANUFACTURING EXECUTION SYSTEMS, AND OTHER SYSTEMS THAT INTERACT WITH THE PROCESS BY

MANIPULATING SETPOINTS IN THE BPCS.

(b) HIGH LEVEL CONTROL SYSTEM (HLCS)

(5) DISCRETE DEVICES OR FUNCTIONS THAT ARE HARDWARE-BASED AND ARE EITHER STAND-ALONE OR ARE CONNECTED TO OTHER INSTRUMENTS, DEVICES, OR SYSTEMS THAT INCLUDE, BUT ARE NOT LIMITED TO, TRANSMITTERS, SWITCHES, RELAYS, CONTROLLERS, AND CONTROL VALVES.

(6) ACCESSIBILITY INCLUDES VIEWING, SETPOINT ADJUSTMENTS, OPERATING MODE CHANGING, AND ANY OTHER OPERATOR ACTIONS REQUIRED TO

OPERATE THE INSTRUMENTATION.

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

DESIGN DIRECTOR

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

A T

L A

N T

IC

N

O R

F O

L K

V

A

AS NOTED

1643338

A T

LA

N

T

IC

D E

S

IG

N A

N D

C O

N S

T R

U C

T

/1 /2

:4

:5

A

M B

IM

/P

E le c tr ic a l P o w e r

P la n t F

D A

/8

P

E le c t P w r

P ln t F

D A

J M

.r v t

MP003

P -3

/P

-3 E

L E

C T

R

IC

A L P

O W

E R

P L A

N T

IN

S

TR

U

M E

N

TA

TI

O

N S

Y M

B O

LS

A

N D

D E

S C

R

IP

TI

O

N S

RU

14124505

SA LT

JWH/SCN

D

JI

B O

U T

I, D

JI

B

O U

T I

C A

M P

L E

M O

N N

IE

R

RICHARD STEPHENS

RST

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

DESIGN DIRECTOR

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

A T

L A

N T

IC

N

O R

F O

L K

V

A

AS NOTED

1643338

A T

LA

N

T

IC

D E

S

IG

N A

N D

C O

N S

T R

U C

T

/1 /2

:4

:0

A

M B

IM

/P

E le c tr ic a l P o w e r

P la n t F

D A

/8

P

E le c t P w r

P ln t F

D A

J M

.r v t

MP004

P -3

/P

-3 E

L E

C T

R

IC

A L P

O W

E R

P L A

N T

M E

C H

A N

IC

A

L S

E Q

U E

N C

E S

O F

O P

E R

A

TI

O N

RU

14124506

SA LT

JWH/SCN

D

JI

B O

U T

I, D

JI

B

O U

T I

C A

M P

L E

M O

N N

IE

R

RICHARD STEPHENS

RST

GENERATOR START SEQUENCE AND NOTES (MECHANICAL ONLY)

GENERAL NOTE: WHERE SEQUENCE INDICATES A VALVE TO OPEN OR CLOSE, INFER VALVE SHALL BE "COMMANDED AND VERIFIED" OPEN OR CLOSED.

NOTE: LEVEL AND TEMPERATURE SHUTDOWN ALARMS MUST ALL BE HARD WIRED AND PROGRAMMED IN THE PLANT CONTROL SYSTEM (PCS) IN THE

CONTROL SYSTEM CABINET.

THE GENERAL START SEQUENCE WILL DIFFER BETWEEN MANUFACTURERS BUT SHOULD BE CONSISTENT TO INCLUDE THE FOLLOWING:

ON INITIAL START COMMAND FROM THE PCS (LOSS OF POWER OR MANUAL START). EACH GENERATOR WILL GO THROUGH THE VITAL SYSTEMS

NEEDED TO START AND MUST BE VERIFY AND CHECK START PERMISSIVES DURING A BLACK START EVENT. (THE ORDER MIGHT BE DIFFERENT PER

MANUFACTURER AND MUST BE CONFIRMED WITH THE GENERATOR MANUFACTURER ACTUAL PERMISSIVES FOR A BLACK START.)

1. PCS WILL VERIFY COMPRESSED AIR PRESSURE IS ABOVE THE MINIMUM PRESSURE (REFER TO COMPRESSED AIR SEQUENCE FOR OPERATING

PRESSURES).

2. PCS WILL COMMAND COMPRESSED AIR INLET VALVE TO THE GENERATOR FULLY OPEN TO THE GENERATOR COMPRESSED AIR START

SOLENOIDS. COMPRESSED AIR INLET MUST HAVE FEEDBACK TO THE PCS THAT THE VALVE IS FULLY OPEN.

3. PCS MUST COMMAND THE INLET AND OUTLET VALVES FOR THE TWO ASSOCIATED COOLING WATER PUMPS FULLY OPEN. INLET AND OUTLET

PUMPS HAVE FEEDBACK TO THE PCS THAT THE VALVE IS FULLY OPEN.

4. PCS MUST VERIFY INTAKE AIR FILTER IS FUNCTIONAL AND READY FOR OPERATION.

a. THE PCS MUST VERIFY STATUS AND CONFIRM AIR INTAKE FILTER CONTROLLER IS NOT IN ALARM.

b. THE PCS MUST COMMAND AND VERIFY INTAKE AIR DAMPER IS FULLY OPEN. INTAKE AIR DAMPER MUST HAVE FEEDBACK TO THE PCS

THAT THE DAMPER IS FULLY OPEN.

c. THE PCS MUST COMMAND AND VERIFY COMPRESSED AIR INLET VALVE IS FULLY OPEN. INLET COMPRESSED AIR MUST HAVE FEEDBACK

TO THE PCS THAT THE VALVE IS FULLY OPEN.

5. PCS WILL VERIFY EXHAUST DIVERTER VALVE IS IN THE CORRECT POSITION FOR NORMAL GENERATOR OPERATION.

6. GENERATOR CONTROLLER WILL OPEN PRELUBE AIR MOTOR SOLENOID VALVE AND TURN OVER THE PRELUBE MOTOR. GENERATOR

CONTROLLER MUST VERIFY LUBE OIL FLOW THROUGH THE ENGINE.

7. GENERATOR CONTROLLER WILL OPEN THE MAIN SOLENOID VALVE TO THE AIR START MOTORS FOR ENGINE START.

8. WHEN GENERATOR STARTS AND IF READY TO ASSUME LOAD THE ELECTRICAL SEQUENCE MUST BE INITIALIZED AND CLOSE THE BREAKER TO THE

PLANT BUS.

9. AFTER GENERATOR START ALL SYSTEMS MUST BE STARTED AND VERIFIED AS DIRECTED IN THIS SEQUENCE OF OPERATIONS.

THESE PERMISSIVES FOR A BLACK OR NORMAL START MUST BE THE SAME FOR BOTH POSSIBLE SCENARIOS. CONFIRM WITH THE GENERATOR

MANUFACTURER ON THE ABOVE PERMISSIVES.

FUEL OIL SYSTEM OPERATING PROCEDURE

FUEL DISTRIBUTION SYSTEM AND OVERFLOW CONTROLS:

GENERAL NOTE: WHERE SEQUENCE INDICATES A VALVE TO OPEN OR CLOSE, INFER VALVE SHALL BE "COMMANDED AND VERIFIED" OPEN OR CLOSED.

NOTE: LEVEL AND TEMPERATURE SHUTDOWN ALARMS MUST ALL BE HARD WIRED AND PROGRAMMED IN THE PLANT CONTROL SYSTEM (PCS) IN THE

CONTROL SYSTEM CABINET.

THE LEVEL AND FUEL OIL TEMPERATURE OF THE GENERATOR DAY TANKS MUST BE MONITORED AND DISPLAYED AT THE PCS LOCATED IN THE CONTROL

ROOM FOR MONITORING DURING GENERATOR OPERATION. TEMPERATURE SENSORS MUST COMMUNICATE WITH THE PCS TO CONTROL THE

TEMPERATURE LEAVING THE RETURN FUEL OIL COOLER. IF FUEL TEMPERATURE IN THE DAY TANK OF THE AFFECTED GENERATOR EXCEEDS 65 DEGREES

C, THE PCS MUST GO INTO ALARM AND ALERT PERSONNEL OF AN ISSUE WITH THE TEMPERATURE OF THE FUEL IN THE DAY TANK. IF THE TEMPERATURE

CONTINUES TO CLIMB TO 76 DEGREES C, THE EFFECTED GENERATOR MUST BE TAKEN OFFLINE AND PLACED IN COOL DOWN MODE AND SHUT DOWN.

DURING PLANT OPERATION, THE INDIVIDUAL GENERATOR DAY TANK FILL VALVE OPENS WHEN THE TANK IS 50% OF CAPACITY (LOW NORMAL) AND

CLOSES WHEN THE DAY TANK IS 90% OF FULL CAPACITY (HIGH NORMAL) USING DAY TANK LEVEL TRANSMITTER. FILL VALVE MUST HAVE FEEDBACK ON

POSITION TO THE PCS. IF THE VALVE FEEDBACK IS NOT IN THE POSITION OF OPEN AN ALARM MUST BE SENT TO THE PCS AND APPROPRIATE ACTION

MUST BE REQUIRED SUCH AS MANUALLY OPEN THE FILL VALVE OR PLACE GENERATOR IN SHUTDOWN MODE.

IF THE FUEL LEVEL REACHES LOW-LOW LEVEL CONDITION OF 20% CAPACITY THE LOW-LOW-LEVEL ALARM MUST BE SENT TO THE PCS TO ALERT

PERSONNEL ABOUT THE LOW-LOW-LEVEL FUEL CONDITION BY THE LEVEL SWITCH. A GENERATOR IN STANDBY MODE MUST BE COMMANDED TO

INITIALIZE START SEQUENCE, AND THE EFFECTED LOW-LOW LEVEL GENERATOR/DAY TANK MUST INITIATE THE SHUTDOWN SEQUENCE AFTER THE

INITIALIZED GENERATOR IS IN OPERATION AND IS SUPPLYING POWER TO THE BUS. OPERATING PERSONNEL MUST COMMENCE INVESTIGATION OF THE

FUEL INLET VALVE AND ASSOCIATED CONTROLS AS TO THE REASON FOR THE FAILURE OF DAY TANK FUEL LEVEL CONTROL.

DURING PLANT OPERATION IF THE HIGH-HIGH-LEVEL CONDITION ALARM IS TRIGGERED AT 95% OF FULL DAY TANK CAPACITY, THE HIGH-HIGH LEVEL

ALARM SWITCH MUST SEND AN ALARM TO THE PCS TO ALERT PERSONNEL ABOUT THE HIGH-HIGH LEVEL CONDITION AND THE POSSIBLE OVERFILLING

OF THE DAY TANKS. THE OPERATING PERSONNEL MUST MANUALLY CLOSE THE MOTORIZED DAY TANK FILL VALVE TO STOP THE FLOW OF FUEL. IF THE

MOTORIZED FILL VALVE OR ASSOCIATED CONTROLS ARE NOT CORRECTED A MANUAL COMMAND AT THE HMI TO START A GENERATOR IN STANDBY

MODE MUST BE COMMANDED TO INITIALIZE START SEQUENCE. ONCE THE REPLACEMENT GENERATOR IS UP AND RUNNING AND ELECTRICALLY

CONNECTED TO THE BUS, STAFF MUST MANUALLY INITIATE SHUTDOWN OF THE EFFECTED HIGH-HIGH LEVEL GENERATOR/DAY TANK TO START

SHUTDOWN SEQUENCE.

IF FUEL FLOW IS SENSED AT THE ANY DAY TANK OVERFLOW METER FLOW, AN ALARM MUST BE INITIATED TO ALERT THE STAFF THAT A GENERATOR DAY

TANK IS OVERFILLING AND THE DAY TANK MOTORIZED FUEL FILL VALVE WILL NEED TO BE MANUALLY CLOSED AND INVESTIGATED ON THE CAUSE OF

FUEL ENTERING THE FUEL OVERFLOW TANK. IF NECESSARY, ANOTHER GENERATOR MAY NEED TO BE STARTED TO REPLACE THE EFFECTED GENERATOR

THROUGH THE HMI (PCS).

WHEN THE DAY TANK OVERFLOW METER REGISTERS FUEL FLOWING, A STOP COMMAND MUST BE INITIALIZED TO THE BULK STORAGE SUPPLY PUMPS

(FOSP- 01/02) AND REMAIN IN OFF POSITION AS LONG AS FUEL IS BEING SENSED COMING FROM A DAY TANK. THE TIME TO CORRECT THIS SITUATION

IS APPROXIMATELY 4 TO 5 HOURS DUE TO THE STORED FUEL IN THE DAY TANKS AND CIRCULATION SYSTEM. WHEN THE FLOW CONDITION AT THE

OVERFLOW METER SENSES “NO FLOW” A DELAY TIME PERIOD OF 15 MINUTES WILL BE INITIALIZED BEFORE THE STOP COMMAND AT THE BULK

STORAGE SUPPLY PUMPS WILL BE LIFTED. AFTER 15 MINUTES OF “NO FLOW CONDITION” AUTOMATIC CONTROL MUST BE TRANSFERRED TO THE

PRESSURE SENSOR ON THE BLADDER TANK INSIDE THE PLANT TO NORMALLY CONTROL THE BULK STORAGE SUPPLY PUMPS. THE INLET VALVE TO THE

PLANT MUST BE OPENED TO SUPPLY FUEL TO THE FUEL CIRCULATION SYSTEM. THE BULK STORAGE SUPPLY PUMPS WILL ONLY START WHEN FEED BACK

THAT THE INLET VALVE TO THE PLANT (NORTH OR SOUTH) IS OPENED AND THE PLANT CAN RESUME NORMAL OPERATIONS.

IF ANY GENERATOR IS COMMANDED TO START ON THE NORTH OR SOUTH SIDE OF THE PLANT, THE PCS MUST START A FUEL OIL CIRCULATION PUMP

(FOCP 1 THRU 4) ASSOCIATED WITH THE SIDE THE COMMANDED GENERATOR IS LOCATED. EACH SIDE OF THE PLANT HAS A SEPARATE FUEL OIL

CIRCULATION/SUPPLY SYSTEM AND DEPENDING ON WHICH GENERATOR RECEIVES A START COMMAND, THE ASSOCIATED FUEL OIL CIRCULATION PUMP

MUST START. WHEN NO OTHER GENERATORS ARE RUNNING EITHER ON THE NORTH OR THE SOUTH SIDE OF THE PLANT, THE PCS MUST

AUTOMATICALLY START A FUEL OIL CIRCULATION PUMP (FOCP 1 THRU 4) TO MAINTAIN CIRCULATION/PRESSURE ON THE FUEL HEADER (NORTH OR

SOUTH SIDE SYSTEM) USING A PRESET FUEL OIL BACKPRESSURE REGULATOR SET AT 140 kPa.

IF A FUEL OIL SYSTEM PUMP FAILS TO REGISTER A “START” CONDITION WHEN COMMANDED TO START, AN ALARM MUST BE SENT TO THE PCS AND

ALERT STAFF OF A FUEL OIL SYSTEM PUMP FAILURE. THE AFFECTED FUEL OIL SYSTEM PUMP INLET AND OUTLET VALVES MUST CLOSE AND THE

STANDBY FUEL OIL SYSTEM PUMP INLET AND OUTLET VALVES MUST OPEN. WHEN CONFIRMATION OF THE STANDBY PUMP INLET AND OUTLET VALVES

ARE OPEN, THE PCS MUST START THE STANDBY PUMP TO MAINTAIN CIRCULATION/PRESSURE IN THE FUEL HEADER (NORTH OR SOUTH) OF THE PLANT.

IF DURING PUMP CHANGE OVER ANY OF THE AUTOMATIC ISOLATION VALVES FAIL TO REGISTER “OPEN” OR “CLOSE” AN ALARM MUST BE SENT TO THE

PCS TO ALERT STAFF OF A POSSIBLE VALVE FAILURE. THE PCS MUST ALERT AND FLAG WHAT VALVE HAS FAILED AND OPERATION PERSONNEL MUST

HAVE TO EITHER MANUALLY OPERATE THE VALVE OR THE AFFECTED PUMP SYSTEM MUST BE PLACED IN “OUT OF SERVICE” IN THE PCS. WHEN THE PCS

REGISTERS VALVES ARE FULLY OPEN, THE PCS MUST START THE PUMP. STAFF MUST VISUALLY VERIFY IF ONE OF THE CIRCULATION PUMPS ARE IN

OPERATION AND CONFIRM IN THE PCS THAT THE PUMP IS IN OPERATION.

IF BOTH PRIMARY AND SECONDARY PUMPS ARE NOT IN OPERATION, THE DAY TANKS HAVE ABOUT 4 HOURS OF FUEL TO CORRECT THE ISSUE OR THE

AFFECTED SIDE OF THE PLANT (NORTH OR SOUTH) MUST BE PLACED IN SHUTDOWN MODE UNTIL FUEL CIRCULATION PUMPS ARE CORRECTED AND

PLACED BACK INTO SERVICE. IF THERE IS A CONTROL PROBLEM, THE CIRCULATION FUEL OIL PUMPS AND MOTORIZED ISOLATION VALVES CAN BE

OPERATED MANUALLY TO KEEP THE PLANT IN OPERATION. EACH ALARM MUST BE MANUALLY CLEARED THROUGH THE HMI (PCS).

THE PCS MUST CONTINUALLY MONITOR THE CONDITION OF THE FUEL IN THE HEADER AND THE DAY TANKS. IF THE FUEL TEMPERATURE GOES OVER

THE FLASH POINT OF THE NO. 2 DIESEL FUEL (51 DEG C), AN ALARM MUST BE SENT TO THE PCS AND IMMEDIATE CORRECTIVE ACTION MUST BE

NEEDED. IF THE SITUATION CAN NOT BE CORRECTED, THE SIDE OF THE PLANT (OR THE GENERATOR/DAY TANK) EFFECTED MUST NEED TO BE SHUT

DOWN UNTIL CORRECTED.

PCS MUST ALSO MONITOR IF SUPPLY PRESSURE IN THE FUEL OIL CIRCULATION SYSTEM AND IF THE PRESSURE GOES BELOW 50 kPa, AN ALARM MUST BE

SENT TO THE PCS AND THE SECONDARY FUEL OIL CIRCULATION PUMP MUST BE STARTED AND THE PRIMARY CIRCULATION PUMP MUST BE SHUT DOWN

FOR REPAIRS. IF PRESSURE IN THE FUEL OIL CIRCULATION HEADER IS NOT CORRECTED STAFF MUST NEED TO INVESTIGATE THE BACK PRESSURE

REGULATING VALVE TO VERIFY IF THERE IS AN ISSUE AND THE BYPASS VALVE MUST BE USED TO REGULATE BACK PRESSURE MANUALLY IF THE CAUSE IS

THE BACK PRESSURE REGULATOR.

WHEN PRESSURE IN THE FUEL OIL BLADDER TANK REDUCES TO 70 KPA (SUCTION SIDE OF THE FUEL OIL CIRCULATOR PUMPS) A SIGNAL MUST BE SENT

TO BULK STORAGE FUEL TRANSFER PUMPS TO ENERGIZE AND PUMP UP THE FUEL BLADDER TANKS TO 120 KPA (ADJUSTABLE) OR ¾ FULL. THE PUMPS

AT THE BULK STORAGE TANKS MUST START TO TRANSFER FUEL TO THE FUEL OIL CIRCULATION SYSTEM. WHEN THE FUEL BLADDER TANK PRESSURE

REACHES 120 KPA, THE TRANSFER PUMPS AT THE BULK STORAGE TANKS MUST STOP TRANSFERRING FUEL AND BE PLACED IN STANDBY POSITION. THE

INLET VALVES FOR THE NORTH AND THE SOUTH PLANTS MUST REMAIN OPEN DURING GENERATORS OPERATING ON THAT SIDE (NORTH OR SOUTH

PLANT) UNTIL THE LAST GENERATOR IS PLACED IN THE STANDBY MODE (NORTH OR SOUTH SIDE OF PLANT). IF THE PRESSURE SENSOR AT THE BLADDER

TANK SENSES A PRESSURE AT OR BELOW 30 KPA, AN ALARM OF “LOW SUPPLY PRESSURE” WILL ALERT STAFF TO DETERMINE WHY THE BULK STORAGE

FUEL PUMPS OR NOT MAINTAINING FUEL PRESSURE IN THE BLADDER TANK. IF THE FUEL HEADER PRESSURE REGISTERS 70 KPA, THE PLANT CONTROL

SYSTEM WILL ALARM “HEADER PRESSURE LOW”. IF THE HEADER PRESSURE CONTINUES TO DROP TO 40 KPA, AN ALARM WILL SOUND AND ALERT STAFF

THAT THE HEADER CIRCULATION PUMPS WILL BE SHUTTING DOWN TO AVOID DRY RUNNING THE PUMPS.

THE GENERATOR FUEL OIL DAY TANKS MUST HAVE FOUR LEVELS THAT THE PCS MUST MONITOR: HIGH-HIGH, HIGH, LOW, AND LOW-LOW FUEL LEVELS

AS WELL AS AN ACTIVE LEVEL TRANSMITTER SHOWING FUEL LEVEL IN MM AND LITERS. THE LOW AND HIGH LEVELS ARE OPERATIONAL LEVELS AND

MUST BE MONITORED BY THE LEVEL TRANSMITTER. THE LOW AND HIGH LEVELS MUST NOT BE ASSOCIATED WITH AN ALARM. THE LOW-LOW AND

HIGH-HIGH LEVELS MUST NICTITATE AN ALARM AND MUST BE MONITORED BY SEPARATE LEVEL SWITCHES.

HIGH-HIGH LEVEL ALARM:

WHEN AN INDIVIDUAL GENERATOR DAY TANK REGISTERS 95% (ADJ) FULL THE PCS MUST INITIATE AN HIGH-HIGH LEVEL CONDITION ALARM TO ALERT

STAFF OF A DAY TANK IN A POSSIBLE OVERFILL CONDITION.

HIGH-LEVEL (OPERATIONAL):

WHEN FUEL REACHES 90% FULL IN ANY GENERATOR DAY TANK THE PCS MUST CLOSE THE ASSOCIATED FILL VALVE TO MAINTAIN NORMAL OPERATING

LEVELS BETWEEN 50% (ADJ) AND 90% (ADJ) OF GENERATOR DAY TANK CAPACITY.

LOW-LEVEL (OPERATIONAL):

WHEN FUEL REACHES 50% FULL IN ANY GENERATOR DAY TANK THE PCS MUST OPEN THE ASSOCIATED FILL VALVE TO MAINTAIN NORMAL OPERATING

LEVELS BETWEEN 50% (ADJ) AND 90% (ADJ) OF GENERATOR DAY TANK CAPACITY.

LOW-LOW-LEVEL ALARM:

WHEN ANY GENERATOR DAY TANK REGISTERS A LOW-LOW LEVEL AT 20% (ADJ), THE PCS MUST INITIATE AN LOW-LOW LEVEL CONDITION ALARM AND

MUST ALERT PERSONNEL OF A LOW FUEL LEVEL IN AN INDIVIDUAL DAY TANK. THIS CONDITION MUST BE INVESTIGATED TO DETERMINE CAUSE OF THE

LOW-LOW LEVEL CONDITION BEFORE THE GENERATOR MUST GOES INTO SHUT DOWN MODE.

DIESEL EXHAUST FLUID (DEF) SEQUENCES OF OPERATION

DEF DELIVERY SYSTEM

GENERAL NOTE: WHERE SEQUENCE INDICATES A VALVE TO OPEN OR CLOSE, INFER VALVE MUST BE "COMMANDED AND VERIFIED" OPEN OR CLOSED.

NOTE: LEVEL AND TEMPERATURE SHUTDOWN ALARMS MUST ALL BE HARD WIRED AND PROGRAMMED IN THE PLANT CONTROL SYSTEM (PCS) IN THE

CONTROL SYSTEM CABINET.

ON START COMMAND FROM ANY GENERATOR, THE PCS MUST SELECT A DEF TANK TO ALIGN. GENERATOR/GENERATORS BEING STARTED MUST SIGNAL

THE PCS THRU THE DOSING CABINETS ASSOCIATED WITH EACH GENERATOR.

NOTE: THE ASSOCIATED COMPRESSED AIR SYSTEM SERVING THE DEF DOSING CABINET MUST OPERATE AUTONOMOUSLY AND MAINTAIN PRESSURE IN

THE COMPRESSED AIR RECEIVER CONTINUOUSLY. IF THERE IS A FAILURE OR A LOSS OF PRESSURE, THE PCS MUST RECEIVE AN ALARM AND THAT

GENERATOR MUST BE TAKEN OUT OF SERVICE. REFER TO COMPRESSED AIR SECTION FOR DETAILED SEQUENCE AND COMPRESSED AIR GENERATOR

START.

WHEN INITIALIZING THE DEF SYSTEM, THE PCS MUST SELECT THE BEST DEF TANK TO ALIGN TO THE DEF CIRCULATION SYSTEM. THE PCS MUST CHECK

ALL TANK LEVELS AND MUST SELECT A TANK WITH A LEVEL GREATER THAN 75% FULL (ADJ.). IF MORE THAN ONE TANK HAS OVER 75% CAPACITY OF

DEF, THEN THE NEXT SEQUENTIAL FULL DEF TANK (FROM THE LAST START) MUST BE SELECTED TO SUPPORT GENERATOR OPERATION. IF NO DEF TANK

IS OVER 75% THEN THE DEF TANK WITH THE HIGHEST LEVEL MUST BE SELECTED.

WHEN A DEF TANK IS SELECTED, THE DEF TANK OUTLET VALVE MUST BE COMMANDED OPEN. IF THE PCS REGISTERS A FEEDBACK ALARM FROM THE

DEF TANK OUTLET VALVE NOT FULLY OPEN, AN ALERT MESSAGE MUST BE DISPLAYED ON THE PCS HMI, " FAILURE OF CONFIRMATION OF DEF TANK ##

OUTLET VALVE OPENED TO SYSTEM". PCS MUST ATTEMPT TO CLOSE THE EFFECTED TANK OUTLET VALVE, PLACE THE AFFECTED DEF TANK IN “OUT OF

SERVICE” CONDITION UNTIL VALVE IS REPAIRED OR MANUALLY OPENED. IF THE VALVE IS MANUALLY OPENED, THE ALARM CAN BE CLEARED MANUALLY

AT THE HMI/PCS. WHEN THE REPAIRS ARE COMPLETE, THE ALARM CAN BE CLEARED AT AN HMI BY SELECTING “CLEAR ALARM”. THE PCS MUST

INITIALIZE THE NEXT SEQUENTIAL TANK FROM THE PREVIOUS TANK SELECTION SEQUENCE.

THE PCS MUST INITIATE A DEF CIRCULATION PUMP (DEFP-01, DEFP-02) TO START BY ROTATING THE START FROM THE LAST INITIALIZATION OF THE DEF

SYSTEM. THE PCS MUST DESIGNATE EACH PUMP AS LEAD AND LAG WHEN PLACED IN OPERATION. THE LEAD DEF PUMP INLET AND OUTLET VALVES

MUST BE COMMANDED OPEN WITH VERIFICATION FEEDBACK OF THE VALVE FULLY OPENED. ONCE THE INLET AND OUTLET VALVES ARE VERIFIED OPEN

THROUGH THE PCS, THE LEAD DEF PUMP MUST START. PCS MUST RECEIVE A VERIFICATION SIGNAL THAT THE PUMP HAS STARTED AND IS OPERATING

WITHIN PARAMETERS. VERIFICATION OF DEF FLOW MUST ALSO BE REGISTERED NEAR THE BACK PRESSURE REGULATOR BY THE FLOW SENSOR AND THE

DEF HEADER PRESSURE TRANSMITTER. A SIGNAL FROM THE PCS MUST BE SENT TO THE GENERATOR/GENERATORS THAT THE DEF SYSTEM IS

OPERATING AND MUST BE DESIGNATED AS ONE OF THE PERMISSIVES FOR STARTING THE GENERATOR/GENERATORS.

IF DURING START UP OF THE DEF PUMPS, THE LEAD PUMP VALVES DO NOT SHOW FULLY OPENED POSITION OR THE LEAD PUMP FAILS TO START, THE

LEAD PUMP VALVES MUST BE COMMANDED CLOSED AND THE LEAD DEF PUMP PLACED IN “OUT OF SERVICE” AND THE LAG DEF PUMP MUST BE

INITIALIZED AND FOLLOW THE SAME PREVIOUS DEF PUMP START SEQUENCE.

WHEN THE DEF CIRCULATION SYSTEM IS ACTIVATED, THE HEADER PRESSURE MUST BE MAINTAINED AT 35 KPA BY A MANUALLY SET BACK-PRESSURE

REGULATOR. THE PCS MUST RECEIVE FLOW AND PRESSURE VERIFICATION AND MUST RELEASE GENERATOR START COMMANDS AT THE MAIN

GENERATOR CONTROL SYSTEM AND MUST SEND A SIGNAL TO ALERT PERSONNEL THAT THE DEF SYSTEM IS ACTIVE AND OPERATING NORMALLY. AS

EACH GENERATOR IS COMMANDED TO START, THE DEF INLET VALVE TO THE DOSING STATION MUST BE COMMANDED OPEN.

AS EACH DEF STORAGE TANK IS DRAWN DOWN TO 10% (ADJ.) A SIGNAL BACK TO THE PCS THAT THE NEXT DEF BULK STORAGE TANK MUST BE

INITIALIZED AND ORIGINAL TANK BE PLACED IN “LOW CONDITION OUT OF SERVICE”. PCS CHECKS THE LEVEL OF THE NEXT HIGHEST LEVEL SEQUENTIAL

DEF BULK STORAGE TANK AND VERIFIES IT HAS ADEQUATE STORAGE CAPACITY TO BE PLACED INTO SERVICE (ABOVE 10% OF TANK CAPACITY). ONCE

THE PCS HAS SELECTED THE NEXT DEF BULK STORAGE TANK TO BE ALIGNED, THE DESIGNATED NEXT DEF TANK OUTLET VALVE MUST BE COMMANDED

OPEN. IF FAILURE TO OPEN THE NEXT DEF TANK OUTLET VALVE, THE PCS MUST PLACE THAT TANK IN “FAILURE OUT OF SERVICE” AND THE NEXT

SEQUENTIAL TANK MUST BE SELECTED AND THE OUTLET VALVE OPENED. ANY FAILURES MUST HAVE TO BE REPAIRED AND MANUALLY CLEARED AT THE

MAIN PCS HMI.

WHEN NEXT SEQUENTIAL TANK IS ALIGNED TO THE DEF CIRCULATION SYSTEM, THE DEPLETED DEF TANK OUTLET VALVE MUST BE COMMANDED TO

CLOSE. WHEN THE LAST GENERATOR IN THE PLANT (NORTH AND SOUTH) SHUT DOWN AND ALL GENERATOR OPERATIONS ARE OVER, A SIGNAL FROM

THE REMAINING ACTIVE GENERATOR CONTROLLER MUST SIGNAL THE PCS TO SHUTDOWN THE DEF SYSTEM. WHEN THE STOP COMMAND IS ISSUED TO

ANY GENERATOR THE INLET VALVE TO THE ASSOCIATED DOSING STATION MUST CLOSE AND SIGNAL THE PCS THAT IT IS IN THE CLOSED POSITION. IF

FEEDBACK IS NOT RECEIVED THAT THE VALVE IS IN THE CLOSED POSITION, AN ALARM MUST BE SENT TO THE PCS TO ALERT THE PERSONNEL OF A

POSSIBLE VALVE FAILURE AND MUST BE CLEARED AT THE MAIN PCS HMI.

THE PCS MUST KEEP THE DEF PUMP CIRCULATING FOR 1 HOUR (ADJ.) AFTER THE LAST GENERATOR IS STOPPED. AFTER 1 HOUR THE PCS MUST SEND A

COMMAND TO STOP THE ACTIVE DEF CIRCULATION PUMP AND CLOSE THE INLET AND OUTLET VALVES. THE PCS MUST ALSO CLOSE THE DEF TANK

OUTLET VALVE THAT WAS ALIGNED TO THE SYSTEM.

IF DURING GENERATOR OPERATIONS AND THE DEF SYSTEM IS ON THE LAST FULL STORAGE TANK, AN ALARM MUST BE SENT TO THE PCS TO ALERT

OPERATIONAL PERSONNEL THAT DEF STORAGE CAPACITY IS LOW AND DEF IS NEEDED FOR DELIVERY.

DURING GENERATOR OPERATIONS, IF THE FLOW METER IN THE DEF CIRCULATION HEADER REGISTERS “NO FLOW”AND THE LEAD DEF PUMP HAS

FEEDBACK SHOWING IT IS IN “ON” STATUS, THE PCS MUST SEND AN ALARM OF A “DEF CIRCULATION PUMP FAILURE”. THE PCS REMOVE POWER TO

THE LEAD PUMP AND CLOSE INLET AND OUTLET VALVES. THE PCS MUST COMMAND THE LAG PUMP INLET AND OUTLET VALVE OPEN AND FEEDBACK

MUST CONFIRM VALVE POSITION. WHEN POSITIVE FEEDBACK IS RECEIVED VALVES ARE IN THE COMMANDED POSITION, THE LAG DEF CIRCULATION

PUMP MUST BE STARTED. ALARM MUST BE CLEARED ONCE FLOW IS VERIFIED AT DEF CIRCULATION HEADER FLOW METER.

DEF FILL AND TRANSFER OPERATING PROCEDURE

DEF FILL SYSTEM

GENERAL NOTE: WHERE SEQUENCE INDICATES A VALVE TO OPEN OR CLOSE, INFER VALVE MUST BE "COMMANDED AND VERIFIED" OPEN OR CLOSED.

NOTE: LEVEL AND TEMPERATURE SHUTDOWN ALARMS MUST ALL BE HARD WIRED AND PROGRAMMED IN THE PLANT CONTROL SYSTEM (PCS) IN THE

CONTROL SYSTEM CABINET.

WHEN DEF IS NEEDED TO FILL DEF STORAGE TANK, THE EXTERIOR CONTROL CABINET MUST BE OPENED AND THE OPERATOR MUST THE TANKER HOSE

TO THE CAM LOCK FITTING. ON THE EXTERIOR DEF CONTROL PANEL, SELECT THE TANK TO BE FILLED. WHEN A DEF BULK STORAGE TANK IS SELECTED

TO FILL, SYSTEM FILL VALVE AND TANK INLET VALVE MUST BE COMMANDED OPEN WITH FEEDBACK POSITION SIGNAL TO THE PCS. THE EXTERIOR HMI

SCREEN MUST INDICATE A FEEDBACK VALVES ARE FULLY OPEN AND THE DEF BULK STORAGE TANK IS READY TO RECEIVE DIESEL EXHAUST FLUID BEFORE

FILLING OPERATIONS CAN BEGIN.

WHEN FILLING OPERATIONS ARE READY TO START, STAFF AT THE PCS/HMI MUST SELECT TO OPEN FILL/TRANSFER CROSS CONNECT VALVE, DEFP 03

PUMP INLET AND OUTLET VALVES. WHEN THE PCS REGISTERS THE VALVES ARE OPEN, THE TRANSFER PUMP MUST BE ALLOWED TO BE STARTED.

OPERATIONAL PERSONNEL MUST THEN START THE FILL/TRANSFER PUMP DEFP 03, TO FILL SELECTED TANK FROM THE DEF DELIVERY TRUCK. IF ANY OF

THE VALVES FAIL TO REGISTER OPEN, THE FILL/TRANSFER PUMP DEFP 03 MUST REMAIN IN THE “OFF” POSITION UNTIL MANUALLY OPENED OR REPAIRS

HAVE BEEN COMPLETED.

IF THERE IS A FAILURE (THE SYSTEM FILL VALVE OR INLET VALVE) OF FEEDBACK AN ALARM BACK TO THE EXTERIOR HMI AND THE PCS MUST

REGISTER,"FAILURE OF CONFIRMATION OF VALVE OPEN TO SYSTEM" MUST ALERT PERSONNEL AND ON THE HMI THE VALVE WITH THE FAILURE MUST

BE INDICATED. ANOTHER TANK SELECTION MUST BE MADE TO FILL, OR MANUAL MANIPULATION OF THE MOTORIZED VALVE USING THE HAND WHEEL

ON THE VALVE. WHEN THE LEVEL INDICATOR LOCALLY OR THRU THE PCS HAS ESTABLISHED THAT THE DEF TANK IS AT 90% FULL, A WARNING MESSAGE

MUST BE ON THE HMI TO ALERT THE STAFF TO STOP FILLING THE ALIGNED TANK AND SELECT ANOTHER TANK OR SHUT DOWN DEF FILLING

OPERATIONS.

IF ANOTHER TANK IN THE DEF TANK STORAGE ROOM REQUIRES DEF, THE FILL/TRANSFER PUMP MUST NEED TO BE MANUALLY STOPPED BY SELECTING

“OFF” ON THE PCS/HMI. STAFF MUST MAKE ANOTHER TANK SELECTION AND THE PCS MUST START ALIGNING THE NEXT TANK TO FILL.

WITH THE DEF SYSTEM FILL VALVE IN THE "OPEN" POSITION DUE TO THE FILLING OPERATIONS, THE NEXT TANK INLET VALVE MUST BE SWITCHED TO

THE "OPEN" POSITION. FEEDBACK THAT THE VALVE IS IN THE OPEN POSITION MUST REGISTER ON THE PCS/HMI BY SHOWING THAT THE VALVE IS

CONFIRMED IN THE OPEN POSITION. AFTER POSITIVE FEEDBACK THAT THE NEXT TANK INLET VALVE IS "OPEN", THE PREVIOUS TANK INLET VALVE MUST

BE CLOSED BY THE PCS. WHEN POSITIVE FEEDBACK VALVE IS "CLOSED" THROUGH THE PCS/HMI, STAFF MUST RESUME FILLING OPERATION TO THE

SELECTED TANK. SELECTION FOR ALL THE SUBSEQUENT TANKS MUST BE COMPLETED WITH THE SAME METHODOLOGY UNTIL ALL TANKS ARE AT THE

90% LEVEL.

WHEN DEF FILL OPERATIONS ARE COMPLETE, STAFF MUST STOP THE FILL/TRANSFER PUMP PLACE IT IN THE “OFF” POSITION. STAFF MUST SELECT TO

STOP FILLING OPERATIONS FROM THE PCS/HMI AND THE PCS MUST CLOSE THE DEF SYSTEM INLET VALVE AND PUMP DEFP 03 INLET AND OUTLET

VALVES. WITH CONFIRMATION THAT ALL VALVES ARE CLOSED THROUGH THE PCS/HMI THE HMI MUST DISPLAY A TIME CLOCK OF 2-MINUTE DELAY

(ADJ.) TO ALLOW ANY DEF TO DRAIN TO A TANK. WHEN THE TIME DELAY IS COMPLETE THE PCS MUST CLOSE THE LAST TANK INLET VALVE. THE

PCS/HMI MUST REGISTER POSITIVE FEEDBACK THAT THE TANK INLET VALVE IS CLOSED, PERSONNEL MUST CLOSE THE MANUAL CAM LOCK VALVE IN THE

FILL CABINET AND THE VALVE ON THE DELIVERY TRUCK. STAFF MUST REMOVE THE HOSE AND CAP THE HOSE AND THE CAM LOCK IN THE CABINET. ANY

RESIDUAL DEF MUST BE CAPTURED AND PROPERLY DISPOSED OF IN ACCORDANCE WITH DOD REQUIREMENTS.

IF FAILURE OF FEEDBACK POSITION “CLOSED” FROM SYSTEM FILL VALVE OR THE TANK INLET VALVE, THE FOLLOWING ALARMS WILL BE DISPLAYED ON

THE PCS/HMI, " FAILURE OF CONFIRMATION OF SYSTEM FILL VALVE FULLY CLOSED" OR “FAILURE OF CONFIRMATION OF TANK INLET VALVE CLOSED”. IF

THERE IS A FAILURE FEEDBACK FROM A VALVE WHEN SECURING FROM FILLING OPERATIONS, THE STAFF MUST HAVE TO MANUALLY CLOSE THE FAILED

VALVES AND CONFIRM VISUALLY AND/OR THRU THE PCS THAT THE VALVE IS POSITIVELY CLOSED BEFORE THE FILL HOSE IS REMOVED. THE FAILED

VALVE MUST NEED TO BE REPAIRED BEFORE THE NEXT FILL OPERATIONS CAN TAKE PLACE.

TO TRANSFER DEF FROM ONE TANK TO ANOTHER, THRU THE PCS/HMI, STAFF MUST SELECT “TRANSFER” AND THE PCS MUST DIRECT STAFF TO SELECT

THE TANK “TO AND FROM” TO TRANSFER DEF FROM ONE TANK TO ANOTHER. THE PCS MUST OPEN THE “FROM TANK” OUTLET VALVE AND THE “TO

TANK” FILL VALVE. ALSO, THE INLET AND OUTLET VALVES FOR PUMP DEFP 03 MUST OPEN BY THE PCS. ONCE POSITIVE FEEDBACK FROM ALL VALVES

ARE OPEN, THE DEFP 03 FILL/TRANSFER PUMP MUST BE ENABLED TO BE STARTED BY THE STAFF OPERATOR. THE STAFF MUST START THE PUMP FOR

TRANSFER.

WHEN TRANSFER OPERATIONS ARE COMPLETED, THE SELECTION TO STOP TRANSFER MUST BE INITIALIZED ON THE PCS/HMI AND THE PCS MUST STOP

THE PUMP DEFP 03. AFTER CONFIRMATION OF PUMP IN THE OFF POSITION, STAFF OPERATOR MUST SELECT TO “SECURE FROM TRANSFER” AND THE

PCS MUST CLOSE ALL OPEN VALVES EXCEPT FOR THE FILL TANK INLET. AFTER 2 MINUTE TIMER DELAY THE FILL VALVE MUST CLOSE. IF ANY VALVE DOES

NOT HAVE POSITIVE FEEDBACK OF VALVES CLOSED THE PCS MUST BE IN ALARM FOR VALVE FAILURE.

COMPRESSED AIR SYSTEM OPERATING PROCEDURE

GENERAL NOTE: WHERE SEQUENCE INDICATES A VALVE TO OPEN OR CLOSE, INFER VALVE SHALL BE "COMMANDED AND VERIFIED" OPEN OR CLOSED.

NOTE: LEVEL AND TEMPERATURE SHUTDOWN ALARMS MUST ALL BE HARD WIRED AND PROGRAMMED IN THE PLANT CONTROL SYSTEM (PCS) IN THE

CONTROL SYSTEM CABINET.

COMPRESSED AIR SYSTEM MUST BE AUTONOMOUS AND MUST MAINTAIN WORKING PRESSURE 1273 KPA THRU THE COMPRESSED AIR DRYER AND

STORED IN THE 1893 LITER RECEIVER. SEPARATE ENGINE START, AIR FILTER CLEANING, DIVERTER VALVE AND OTHER USERS MUST BE PROVIDED WITH

PRESSURE REGULATORS TO ENSURE APPROPRIATE PRESSURE AIR IS PROVIDED TO EACH PIECE OF EQUIPMENT USING COMPRESSED AIR.

DURING INITIAL START THE SELECTOR SWITCH MUST BE PUT INTO THE “AUTOMATIC” POSITION AND THE PCS MUST ONLY MONITOR THE COMPRESSED

AIR SKID FOR EACH GENERATOR. IF THE PRESSURE REGISTERS A MINIMUM PRESSURE OF 650 KPA A HORN/STROBE ALARM ACTIVATE AT THE

COMPRESSED AIR SKID AND MUST ALSO ALARM TO THE PCS TO ALERT PERSONNELTHAT “COMPRESSED AIR FOR START UP IS NOT AVAILABLE” FOR THIS

GENERATOR AND MUST BE PLACED OUT OF SERVICE. REPAIRS MUST HAVE TO BE COMPLETED AND MANUALLY RESET AT THE PCS/HMI IS REQUIRED TO

PLACE THIS EQUIPMENT/GENERATOR BACK INTO SERVICE.

A HIGH-PRESSURE ALARM VALUE OF 1250 KPA A HORN/STROBE ALARM MUST ACTIVATE AT THE COMPRESSED AIR SKID AND MUST ALSO SEND AN

ALARM TO THE PCS TO ALERT STAFF OF “OVER PRESSURIZATION IN RECEIVER”. THE PCS MUST DEACTIVATE THE COMPRESSOR AT THE COMPRESSED AIR

SKID. (RELIEF VALVE ON THE RECEIVER TANK MUST BE SET TO 1300 KPA). REPAIRS MUST HAVE TO BE COMPLETED AND A MANUAL RESET AT THE

PCS/HMI IS REQUIRED TO PLACE THIS EQUIPMENT/GENERATOR BACK INTO SERVICE.

STATUS AND CONDITION OF COMPRESSED AIR SKID MUST BE COMMUNICATED TO THE PCS AND MUST ACTIVATE A HORN/STROBE AND SEND THE

ALARM TO THE PCS TO ALERT STAFF THAT “COMPRESSED AIR EQUIPMENT IS IN TROUBLED ALARM” AND MUST NEED TO BE CORRECTED. MANUAL

RESET AT THE PCS/HMI IS REQUIRED TO PLACE THIS EQUIPMENT/GENERATOR BACK INTO SERVICE.

NORMAL OPERATING PROCEDURES: COMPRESSOR MUST ENGAGE WHEN PRESSURE GETS TO 690 KPA AND SHUT OFF AT 1170 KPA WITH PRESSURE

MONITORED BY THE PCS.

GENERATOR COOLING SYSTEM OPERATING PROCEDURE

GENERAL NOTE: WHERE SEQUENCE INDICATES A VALVE TO OPEN OR CLOSE, INFER VALVE SHALL BE "COMMANDED AND VERIFIED" OPEN OR CLOSED.

NOTE: LEVEL AND TEMPERATURE SHUTDOWN ALARMS MUST ALL BE HARD WIRED AND PROGRAMMED IN THE PLANT CONTROL SYSTEM (PCS) IN THE

CONTROL SYSTEM CABINET.

GENERATOR JACKET WATER AND GENERATOR AFTER COOLER/LUBE OIL COOLER COOLING WATER SYSTEM MUST BE ENERGIZED WHEN A MANUAL

START COMMAND IS SENT TO THE ASSOCIATED GENERATOR. THE COOLING WATER SYSTEM ASSOCIATED WITH A SPECIFIC GENERATOR MUST INITIATE

START UP OF THE COOLING PUMPS, RADIATOR FANS AND OPEN ASSOCIATED VALVES.

WHEN A GENERATOR RECEIVES A START COMMAND, THE PCS MUST OPEN INLET AND OUTLET VALVES FOR THE JACKET WATER AND AFTER

COOLER/LUBE OIL COOLER CIRCUIT PUMPS. WHEN CONFIRMATION IS RECEIVED BY THE PCS OF FULLY OPENED VALVES, THE PCS MUST START THE

COOLING WATER PUMPS. WITH THE COOLING WATER PUMPS RUNNING AND CONFIRMATION OF FULL FLOW OF AT LEAST 2800 LPM, THE FAN VFDS

MUST POWER UP TO MINIMUM SPEED OF 30%. ONCE A CONFIRMATION OF A GENERATOR START, THE TEMPERATURE SENSOR IN THE SUPPLY WATER

BACK TO THE GENERATOR MUST FIRST CONTROL THE THREE-WAY TEMPERATURE CONTROL VALVE ON EACH COOLING CIRCUIT. THE THREE-WAY

TEMPERATURE CONTROL VALVE WILL START TO OPEN TO THE REMOTE RADIATOR TO THE LIMIT OF FULLY OPEN FLOW. AS THE TEMPERATURE BEGINS

TO RISE TO SET POINT OF 57 DEGREE C ON THE AFTER-COOLER CIRCUIT ALL THREE FANS ON THE ASSOCIATED REMOTE RADIATOR WILL START TO RAMP

UP TO FULL SPEED. BOTH THREE-WAY TEMPERATURE CONTROL VALVES MUST TRACK TOGETHER AS THE VALVES OPEN TO THE RADIATOR. THE ALL

THREE FANS ON THE RADIATOR MUST ALSO TRACK TOGETHER AS THE FANS RAMP UP. THE AFTER COOLER/LUBE OIL COOLER MUST BE THE CONTROL

TEMPERATURE DUE TO THE CRITICALITY OF THIS CIRCUIT AND MUST MAINTAIN A MINIMUM SUPPLY TEMPERATURE OF 57 DEGREE C BACK TO THE

GENERATOR BY CONTROLLING THE SPEED OF THE FANS AND THE THREE-WAY CONTROL VALVE IN EACH COOLING CIRCUIT.

IN THE EVENT COOLING WATER SUPPLY TEMPERATURE REACHES 65 DEGREE C (ADJ), AN ALARM MUST BE SENT TO THE PCS TO ALERT STAFF, “REMOTE

RADIATORS ARE SUPPLYING COOLING WATER OUT OF TEMPERATURE REQUIREMENTS”. THE ISSUE MUST BE RESOLVED AND MANUALLY RESET THE

ALARM ON THE PCS/HMI. IF ISSUE REMAINS THE ENGINE AFFECTED MUST START TO REDUCE POWER OUTPUT AND THIS COMMAND MUST BE

INITIATED AT THE INDIVIDUAL GENERATOR CONTROLLER.

S Y

M D

E S

C R

IP

TI

O N

D A

TE

This is the start of the file's text. The full file is on GovTribe.