Attachment H - Drawings 11 of 18 PLUMBING.pdf
PDF 1 MB Posted
- Solicitation number
- N6247023R0001
About this file
This package includes construction drawings and specifications for a plumbing system for a new electrical power plant at Camp Lemonnier, Djibouti. The drawings show the site utilities, foundation plans, floor plans, details and schedules for domestic water, sanitary sewer and vent piping. Key details include cast iron soil and waste piping with floor drains in mechanical spaces; plumbing fixtures for restrooms and mop sinks; backflow preventers and water meters; and hot water provided by point-of-use electric water heaters. The related federal contract opportunity is solicitation number N6247023R0001 for the design and construction of the P-332/P-334 electrical power plant project according to the drawings and specifications provided. The solicitation is issued by the Naval Facilities Engineering Command for a design-bid-build project.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DOMESTIC COLD WATER PIPE
SOIL, WASTE OR SANITARY SEWER PIPE
LITERS PER MINUTELPM
UNION
WALL HYDRANT (WH)
HOSE BIBB (HB)
VENT PIPE
PIPE TURNING DOWN
PIPE TURNING UP
PITCH PIPE DOWN IN DIRECTION OF ARROW
AMERICAN BARRIERS ACT
REDUCED PRESSURE ZONE
ABA
RPZ
ACCESS PANEL
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
AP
AFF
AFG
WATER HAMMER ARRESTOR AND SIZEWHA 'A'
WALL CLEANOUTWCO
WASTE RISER DESIGNATION
WATER RISER DESIGNATION
VALVES AND ACCESSORIES
BACKFLOW PREVENTER (BFD)
BALL VALVE
DIRECTION OF FLOW
ABBREVIATIONSGENERAL
LEGEND
ACCESS DOORAD
ARCHITECTURALARCH
DIAMETERDIA
DRAWINGDWG
GAUGEGA
TYPICALTYP
UNLESS OTHERWISE NOTEDUON
GALVANIZEDGALV
FLOOR DRAIN WITH DEEP SEAL P-TRAPFD
GRADE CLEANOUT
GCO
FLOOR CLEANOUTFCO
BRANCH SIDE CONNECTION
BRANCH TOP CONNECTION
BRANCH BOTTOM CONNECTION
GENERAL NOTES
PROVIDE LABOR MATERIAL AND EQUIPMENT REQUIRED FOR THE COMPLETION AND OPERATION OF SYSTEMS IN THIS SECTION OF WORK IN ACCORDANCE WITH CONTRACT PLANS, SPECIFICATIONS AND ALL UFC'S AND
GOVERNING CODES.
1.
PROTECT COPPER PIPING AGAINST CONTACT WITH MASONRY OR DISSIMILAR METALS. HANGERS, SUPPORTS, ANCHORS AND CLIPS MUST BE COPPER OR COPPER PLATED.
PROVIDE A COMPLETE SYSTEM OF HOT, COLD, WASTE AND VENT PIPING TO FIXTURES WITHIN THE BUILDING.2.
WATER, SOIL, WASTE, AND VENT PIPING LINES WILL BE CONCEALED IN THE BUILDING CONSTRUCTION, EXCEPT
WHERE INDICATED OTHERWISE.
3.
PIPING RUN IN RETURN AIR CEILING PLENUM SPACE MUST BE CAST IRON OR OTHER CODE APPROVED METAL.
PLASTIC WILL NOT BE PERMITTED.
4.
MAKE PROPER PIPING CONNECTIONS TO FIXTURES AND EQUIPMENT EVEN THOUGH ALL BRANCH MAINS, ELBOWS
AND CONNECTIONS ARE NOT SHOWN.
5.
COORDINATE WITH ARCHITECTURAL DRAWINGS BEFORE ROUGHING-IN PLUMBING FIXTURES.6.
ROUTING OF PIPING MUST BE COORDINATED WITH OTHER TRADES.7.
FIXTURES AND EQUIPMENT ARE INDICATED IN THE PLUMBING FIXTURE SCHEDULE, AND SPECIALTIES SCHEDULE AS A GUIDE FOR GENERAL QUALITY AND PERFORMANCE DESIRED. FIXTURES AND EQUIPMENT BY OTHERS ARE
ACCEPTABLE PROVIDED THEY ARE OF THE SAME TYPE, QUALITY AND OPERATION.
8.
PLUMBING VENTS WITHIN A 4.5M RADIUS OF ANY ROOF TOP UNIT OR FRESH AIR INTAKE MUST BE OFFSET TO CLEAR
OUTSIDE THE RADIUS.
9.
FINISHED FLOORFF
10.
A
ROOM NUMBER IDENTIFICATION007
# KEY NOTE IDENTIFICATION
FUEL OIL TRENCH SYSTEM DRAINAGE PIPETD
ALL DIMENSIONS NOTED ARE IN MILLIMETERS UNLESS OTHERWISE NOTED.11.
SAN
DOMESTIC HOT WATER PIPE
HUB DRAINHD
CONDENSATE DRAINAGE PIPECD
WATER SUPPLY FIXTURE UNITSWSFU
VENT THROUGH ROOFVTR
REFER TO ARCHITECTURAL ROOF PLAN DRAWINGS FOR VENT THROUGH ROOF LOCATIONS.12.
CLEANOUT PLUGCOP
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
A T
L A
N T
IC
N
O R
F O
L K
V
A
AS NOTED
1643338
A T
LA
N
T
IC
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N
DPS
/1 /2
:0 :4
A
M B
IM
/P
E le c tr ic a l P o w e r
P la n t F
D A
/8
P
E le c t P w r
P ln t F
D A
P
.r v t
P-001
P -3
/P
-3 E
L E
C T
R
IC
A L P
O W
E R
P L A
N T
P
LU
M B
IN
G
L E
G E
N D
BAT
14124483
JBW JBW
JWH/SCN
D
JI
B O
U T
I, D
JI
B
O U
T I
C A
M P
L E
M O
N N
IE
R
RICHARD STEPHENS
SCE
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DCBA
SAN
S A
N
SAN
S A
N
S A
N
100100
2 3
6 6
77 8
MATCHLINE
PF102
16 TD TD
CD
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
A T
L A
N T
IC
N
O R
F O
L K
V
A
AS NOTED
1643338
A T
LA
N
T
IC
D E
S
IG
N A
N D
C O
N S
T R
U C
T
/1 /2
:0 :4
A
M B
IM
/P
E le c tr ic a l P o w e r
P la n t F
D A
/8
P
E le c t P w r
P ln t F
D A
P
.r v t
PF101
P -3
/P
-3 E
L E
C T
R
IC
A L P
O W
E R
P L A
N T
FO
U
N D
A
TI
O N
P
LA
N
A R
E A
A
BAT
14124484
JBW JBW
JWH/SCN
D
JI
B O
U T
I, D
JI
B
O U
T I
C A
M P
L E
M O
N N
IE
R
RICHARD STEPHENS
SCE
A
B
1:100 0 9 10m87654321
GRAPHIC SCALE(S)
GENERAL NOTES
KEY PLAN
# KEY NOTES
1 : 100 A1
FOUNDATION PLAN - AREA A
1 REFER TO CIVIL DRAWINGS FOR CONTINUATION.
2 100 WASTE PIPE FROM FLOOR DRAIN (FD) ABOVE.
3 65 DOMESTIC WATER SERVICE PIPE UP.
4 100 WASTE PIPE FROM GRADE CLEANOUT (GCO) ABOVE.
5 100 WASTE PIPE FROM FLOOR CLEANOUT (FCO) ABOVE.
6 50 WASTE PIPE FROM FLOOR DRAIN (FD) ABOVE.
7 40 WASTE PIPE FROM ABOVE.
8 100 WASTE PIPE FROM ABOVE, 50 VENT PIPE UP.
9 50 WASTE PIPE DOWN, 40 VENT PIPE UP.
10 80 WASTE PIPE DOWN, 80 VENT PIPE UP.
11 INVERT ELEVATION OF 100 SEWER PIPE AT 1500 OFF EXTERIOR WALL =
9.875 METERS (0.88 METER BELOW FINISHED FLOOR).
12 50 VENT PIPE UP.
13 80 PIPE FROM HUB DRAIN ABOVE.
14 INVERT ELEVATION OF 80 PIPE AT 1500 OFF EXTERIOR WALL = 10.30
METERS (0.45 METERS BELOW FINISHED FLOOR).
15 HIGH DENSITY POLYETHENE PIPE (HDPE), PITCH AT 0.5%.
16 INVERT ELEVATION OF 350 PIPE AT 1500 OFF EXTERIOR WALL = 9.17
METERS (1.58 METERS BELOW FINISHED FLOOR).
17 COORDINATE WITH STRUCTURAL DRAWINGS THE EXACT INVERT
ELEVATION OF THE 350 HDPE PIPE WITH THE LOWEST ELEVATION OF THE
FLOOR TRENCH AT THIS LOCATION. INVERT OF 350 HDPE PIPE MUST BE
EQUAL/EVEN WITH THE BOTTOM OF THE TRENCH ELEVATION.
18 UNDERGROUND DOMESTIC WATER PIPE TO A POINT 305 ABOVE FINISHED
FLOOR MUST BE AS NOTED IN SPEC SECTION 33 11 00.
1. FINISHED FLOOR ELEVATION = 10.75 METERS.
2. REFER TO DRAWING P-001 FOR LEGEND, ABBREVATIONS, AND ADDITIONAL
GENERAL NOTES.
3. REFER TO HAZARDOUS AREA CLASSIFICATION PLANS IN ELECTRICAL
DRAWINGS.
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
DCBA
S A
N
1 2
MATCHLINE
PF101
4 TD TD
350 5
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
A T
L A
N T
IC
N
O R
F O
L K
V
A
AS NOTED
1643338
A T
LA
N
T
IC
D E
S
IG
N A
N D
C O
N S
T R
U C
T
/1 /2
:0 :4
A
M B
IM
/P
E le c tr ic a l P o w e r
P la n t F
D A
/8
P
E le c t P w r
P ln t F
D A
P
.r v t
PF102
P -3
/P
-3 E
L E
C T
R
IC
A L P
O W
E R
P L A
N T
FO
U
N D
A
TI
O N
P
LA
N
A R
E A
B
BAT
14124485
JBW JBW
JWH/SCN
D
JI
B O
U T
I, D
JI
B
O U
T I
C A
M P
L E
M O
N N
IE
R
RICHARD STEPHENS
SCE
A
B
1:100 0 9 10m87654321
GRAPHIC SCALE(S)
GENERAL NOTES
KEY PLAN
# KEY NOTES
1 : 100 A1
FOUNDATION PLAN - AREA B
1 50 WASTE PIPE FROM FLOOR DRAIN (FD) ABOVE.
2 80 WASTE PIPE FROM ABOVE.
3 HIGH DENSITY POLYETHENE PIPE (HDPE), PITCH AT 0.5%.
4 INVERT ELEVATION OF 350 PIPE AT 1500 OFF EXTERIOR WALL = 9.17
METERS (1.58 METERS BELOW FINISHED FLOOR).
5 40 WASTE PIPE FROM ABOVE.
6 50 VENT PIPE UP.
7 40 VENT PIPE UP.
8 REFER TO CIVIL DRAWINGS FOR CONTINUATION.
9 COORDINATE WITH STRUCTURAL DRAWINGS THE EXACT INVERT
ELEVATION OF THE 350 HDPE PIPE WITH THE LOWEST ELEVATION OF THE
FLOOR TRENCH AT THIS LOCATION. INVERT OF 350 HDPE PIPE MUST BE
EQUAL/EVEN WITH THE BOTTOM OF THE TRENCH ELEVATION.
1. FINISHED FLOOR ELEVATION = 10.75 METERS.
2. REFER TO DRAWING P-001 FOR LEGEND, ABBREVATIONS, AND ADDITIONAL
GENERAL NOTES.
3. REFER TO HAZARDOUS AREA CLASSIFICATION PLANS IN ELECTRICAL
DRAWINGS.
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
P-1
P-3 P-3 P-1
FD-1 FD-1
FD-2
P-11
P-11
DCBA
MECHANICAL
RISER
ROOM
STORAGE
SCADA
OFFICE
VESTIBULE
DAY TANK
GCO
WH-1
HB-1
BFP-1
MATCHLINE
PL102
FCO
A
A
A1
WCO
32 32
OFFICE
CONTROL
COMM
WORKSHOP
FUEL OIL
OVERFLOW
TANK
DAY TANK
TOILET
TOILET
WM-1
BFP-2
FD-2
WHA-A WHA-A
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
A T
L A
N T
IC
N
O R
F O
L K
V
A
AS NOTED
1643338
A T
LA
N
T
IC
D E
S
IG
N A
N D
C O
N S
T R
U C
T
/1 /2
:0 :4
A
M B
IM
/P
E le c tr ic a l P o w e r
P la n t F
D A
/8
P
E le c t P w r
P ln t F
D A
P
.r v t
PL101
P -3
/P
-3 E
L E
C T
R
IC
A L P
O W
E R
P L A
N T
P A
R
TI
A L
FL
O
O R
P
LA
N
A R
E A
A
BAT
14124486
JBW JBW
JWH/SCN
D
JI
B O
U T
I, D
JI
B
O U
T I
C A
M P
L E
M O
N N
IE
R
RICHARD STEPHENS
SCE
A
B
1:100 0 9 10m87654321
GRAPHIC SCALE(S)
GENERAL NOTES
KEY PLAN
# KEY NOTES
1 : 100 A1
PARTIAL FLOOR PLAN - AREA A
1 65 DOMESTIC WATER SERVICE PIPE FROM BELOW.
2 20 COLD WATER PIPE UP.
3 80 VENT PIPE FROM BELOW UP TO 80 VENT PIPE THROUGH ROOF.
4 ISOLATION VALVE IN EXPOSED VERTICAL PIPE DROP/RISE.
5 50 VENT PIPE FROM BELOW.
6 PIPING RUN BETWEEN 3660 AND 4260 ABOVE FINISHED FLOOR.
7 EWH-1 MOUNTED EXPOSED ON WALL BELOW LAVATORY, COORDINATE
LOCATION AND PIPING WITH ADA REQUIREMENTS.
8 80 HUB DRAIN, HUB DRAIN TO EXTEND TO 100 ABOVE FINISHED FLOOR
ELEVATION, COORDINATE EXACT LOCATION WITH CONDENSATE DRAIN OF
HVAC UNIT AND EQUIPMENT HOUSE KEEPING PAD.
9 50 VENT PIPE UP, OFFSET, 50 VENT PIPE THROUGH ROOF.
10 80 VENT PIPE UP.
1. FINISHED FLOOR ELEVATION = 10.75 METERS.
2. REFER TO DRAWING P-001 FOR LEGEND, ABBREVATIONS, AND ADDITIONAL
GENERAL NOTES.
3. REFER TO DRAWING P-601 FOR EQUIPMENT SCHEDULES.
4. REFER TO HAZARDOUS AREA CLASSIFICATION PLANS IN ELECTRICAL
DRAWINGS.
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
P-8
P-5
P-11
P-11
P-11
FD-1
LUBE OIL
DAY TANK
DAY TANK
ELECTRICAL
DAY TANK
CORRIDOR
VESTIBULE
DCBA
BATTERY
WH-1
MATCHLINE
PL101
P-11 32
B
B
B
JANITOR
ENGINE
HALL
P-11A
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
A T
L A
N T
IC
N
O R
F O
L K
V
A
AS NOTED
1643338
A T
LA
N
T
IC
D E
S
IG
N A
N D
C O
N S
T R
U C
T
/1 /2
:0 :5
A
M B
IM
/P
E le c tr ic a l P o w e r
P la n t F
D A
/8
P
E le c t P w r
P ln t F
D A
P
.r v t
PL102
P -3
/P
-3 E
L E
C T
R
IC
A L P
O W
E R
P L A
N T
P A
R
TI
A L
FL
O
O R
P
LA
N
A R
E A
B
BAT
14124487
JBW JBW
JWH/SCN
D
JI
B O
U T
I, D
JI
B
O U
T I
C A
M P
L E
M O
N N
IE
R
RICHARD STEPHENS
SCE
1 : 100 A1
PARTIAL FLOOR PLAN - AREA B
A
B
1:100 0 9 10m87654321
GRAPHIC SCALE(S)
GENERAL NOTES
KEY PLAN
# KEY NOTES
1 EWH-2 MOUNTED EXPOSED ON WALL AT 2450 ABOVE FINISHED FLOOR.
2 20 COLD WATER PIPE UP.
3 ISOLATION VALVE IN EXPOSED VERTICAL PIPE DROP/RISE.
4 PIPING RUN BETWEEN 3660 AND 4260 ABOVE FINISHED FLOOR.
5 32 COLD WATER PIPE UP.
6 PIPING RUN AT 6440 ABOVE FINISHED FLOOR.
7 32 COLD WATER PIPE DOWN.
8 50 VENT PIPE UP.
9 40 VENT PIPE FROM BELOW.
1. FINISHED FLOOR ELEVATION = 10.75 METERS.
2. REFER TO DRAWING P-001 FOR LEGEND, ABBREVATIONS, AND ADDITIONAL
GENERAL NOTES.
3. REFER TO DRAWING P-601 FOR EQUIPMENT SCHEDULES.
4. REFER TO HAZARDOUS AREA CLASSIFICATION PLANS IN ELECTRICAL
DRAWINGS.
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
DCB
WH-1
WH-1
80 VTR
50 VTR
50 VTR
MATCHLINE
PL103
DCB
WH-1
WH-1
50 VTR
MATCHLINE
PL103
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
A T
L A
N T
IC
N
O R
F O
L K
V
A
AS NOTED
1643338
A T
LA
N
T
IC
D E
S
IG
N A
N D
C O
N S
T R
U C
T
/1 /2
:0 :5
A
M B
IM
/P
E le c tr ic a l P o w e r
P la n t F
D A
/8
P
E le c t P w r
P ln t F
D A
P
.r v t
PL103
P -3
/P
-3 E
L E
C T
R
IC
A L P
O W
E R
P L A
N T
M E
C H
A N
IC
A
L P
LA
TF
O R
M P
LA
N
S
BAT
14124488
JBW JBW
JWH/SCN
D
JI
B O
U T
I, D
JI
B
O U
T I
C A
M P
L E
M O
N N
IE
R
RICHARD STEPHENS
SCE
1 : 100 A1
PARTIAL MECHANICAL PLATFORM PLAN AREA A
1 : 100
A3
PARTIAL MECHANICAL PLATFORM AREA B
A
B
1:100 0 9 10m87654321
GRAPHIC SCALE(S)
GENERAL NOTES
KEY PLAN
# KEY NOTES
1 20 COLD WATER PIPE FROM BELOW.
2 WH-1, MOUNT 600 ABOVE MECHANICAL EQUIPMENT PLATFORM.
1. FINISHED FLOOR ELEVATION = 10.75 METERS.
2. REFER TO DRAWING P-001 FOR LEGEND, ABBREVATIONS, AND ADDITIONAL
GENERAL NOTES.
3. REFER TO DRAWING P-601 FOR EQUIPMENT SCHEDULES.
4. REFER TO HAZARDOUS AREA CLASSIFICATION PLANS IN ELECTRICAL
DRAWINGS.
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
PIPE SLEEVE
AIR
GAP
M
IN
M A
X
PIPE STANCHION
SUPPORT
PIPE TO LOCAL FLOOR
DRAIN
BFP-1
NOTES:
1. 100 MIN. CLEARANCE BACK OF BACKFLOW PREVENTER.
2. 600 MIN. CLEARANCE IN FRONT OF THE BACKFLOW PREVENTER.
INCOMING DOMESTIC WATER
SERVICE ISOLATION VALVE
FINISHED FLOOR
WM-1
FINISHED FLOOR
15 ANGLE STOP VALVE
P-TRAP
FAUCET
LAVATORY
INSTANTANEOUS ELECTRIC HOT
WATER HEATER (EWH-1) (MOUNT
UNDER LAVATORY AS HIGH AS
POSSIBLE)
JUNCTION BOX
NOTES:
1. DIMENSIONS MAY VARY BY ± 13mm.
2. UNIT MUST COMPLY WITH ANSI Z358.1-2014 FOR EMERGENCY EYEWASH OR EYE/FACE WASH AND SHOWER EQUIPMENT:
UNIT MUST BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND ACCEPTABLE PLUMBING PRACTICES.
FINISHED FLOOR
10Ø
200Ø
230Ø 30°
MOUNTING DETAIL
TOP VIEW
32 COLD WATER SUPPLY
1200 MAXIMUM
HEIGHT TO
PULL HANDLE
900 MAXIMUM
HEIGHT TO
SPRAY HEADS
2080 - 2340
CLEAR HEADROOM
685 MIN. KNEE
CLEARANCE
BELOW UNIT
SPRAY HEADS 175 - 480 FROM
WALL OR OBSTRUCTION
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
A T
L A
N T
IC
N
O R
F O
L K
V
A
AS NOTED
1643338
A T
LA
N
T
IC
D E
S
IG
N A
N D
C O
N S
T R
U C
T
/1 /2
:0 :4
A
M B
IM
/P
E le c tr ic a l P o w e r
P la n t F
D A
/8
P
E le c t P w r
P ln t F
D A
P
.r v t
P-501
P -3
/P
-3 E
L E
C T
R
IC
A L P
O W
E R
P L A
N T
D E
TA
IL
S
BAT
14124489
JBW JBW
JWH/SCN
D
JI
B O
U T
I, D
JI
B
O U
T I
C A
M P
L E
M O
N N
IE
R
RICHARD STEPHENS
SCE
NO SCALE
A1
BACKFLOW PREVENTER (BFP-1) DETAIL
NO SCALE
C1
INSTANTANEOUS WATER HEATER (EWH-1)DETAIL
NO SCALE
A3
EMERGENCY EYEWASH (P-11)
PL101, PL102, P-701, P-702
PL101, PL102, P-701, P-702PL101,P-701
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
A T
L A
N T
IC
N
O R
F O
L K
V
A
AS NOTED
1643338
A T
LA
N
T
IC
D E
S
IG
N A
N D
C O
N S
T R
U C
T
/1 /2
:0 :4
A
M B
IM
/P
E le c tr ic a l P o w e r
P la n t F
D A
/8
P
E le c t P w r
P ln t F
D A
P
.r v t
P-601
P -3
/P
-3 E
L E
C T
R
IC
A L P
O W
E R
P L A
N T
S C
H E
D U
LE
S
BAT
14124490
JBW JBW
JWH/SCN
D
JI
B O
U T
I, D
JI
B
O U
T I
C A
M P
L E
M O
N N
IE
R
RICHARD STEPHENS
SCE
PLUMBING FIXTURE SCHEDULE
FIXTURE CONNECTIONS
BASIS OF DESIGN FIXTURES AND ACCESSORIES NOTESMARK FIXTURE MOUNTING CW WASTE VENT (MIN)
MOUNTING
HEIGHT
P-1 WATER CLOSET (ABA) FLOOR 25 100 50 400 FIXTURE: VITREOUS CHINA, ELONGATED BOWL, SIPHON JET ACTION, TOP SPUD, RATED FOR 4.8 LPF, 450MM FLOOR TO RIM - ABA HEIGHT. FLUSH VALVE: 4.8 LPF, EXPOSED, CHROME PLATED, OSCILLATING HANDLE LOCATED ON WIDE SIDE OF ROOM, ESCUTCHEON, SEAT BUMPER, INTEGRAL SCREWDRIVER STOP AND VACUUM BREAKER. SEAT: ELONGATED, HEAVY DUTY OPEN FRONT PLASTIC LESS COVER, STAINLESS STEEL CHECK HINGE, INTEGRAL PLASTIC BUMPERS.
1,2
P-3 LAVATORY (ABA) WALL 15 40 40 850 FIXTURE: VITREOUS CHINA, BACK AND SIDE SPLASH SHIELDS, D-SHAPED BOWL 530 X 475, FRONT OVERFLOW, FAUCET LEDGE W/ FAUCET HOLES ON 100 CENTERS, CONCEALED ARM WALL SUPPORT. TRIM: LOOSE KEY, ANGLE STOPS, CHROME PLATED CAST BRASS, TRIM: SINGLE HANDLE CHROME FAUCET, BRASS CONSTRUCTION, 2
LPM FLOW. P-TRAP. PROVIDE WITH ABA EXPOSED PIPE INSULATION KIT.
P-5 MOP SINK FLOOR 15 80 40 - FIXTURE: 600 X 600 X 300 TERRAZZO CONSTRUCTION, TRIM: HEAVY DUTY CAST BRASS TWO HANDLE WALL MOUNTED FAUCET, INTEGRAL CHECK STOPS, ACCESSORIES:
PAIL HOOK, HOSE THREAD SPOUT, FURNISH 1500 VINYL HOSE WITH PAIL HOOK AND WALL BRACKET AND 3-STATION S.S. MOP HOLDER.
P-8 ELECTRIC WATER
COOLER/BOTTLE FILLER
(ABA)
WALL 15 40 40 900 FIXTURE: DUPLEX UNIT, 30L PER HOUR OF 10 DEGREE C. DRINKING WATER, PUSH PAD ACTIVATED, NO LEAD DESIGN; BARRIER-FREE ACCESS, WITH BOTTLE FILLER. 3
P-11 EMERGENCY SHOWER
AND EYEWASH (ABA)
FLOOR 32 - - - FIXTURE: BARRIER FREE COMBINATION SHOWER AND EYE/FACE WASH. SHOWER: 225 DIAMETER ABS PLASTIC SHOWERHEAD, 75 LPM FLOW CONTROL, STAY OPEN BALL VALVE. EYE/FACE WASH: 275 STAINLESS STEEL ROUND BOWL, DIRECTIONAL LAMINAR FLOW, POP-OFF DUST COVER. PROVIDED WITH SCHEDULE 40 HOT-DIPPED
GALVANIZED STEEL PIPE, 225 DIAMETER FLOOR FLANGE, VISUAL AND AUDIBLE ALARM.
P-11A EMERGENCY EYE/FACE
WASH (ABA)
FLOOR 15 - - - FIXTURE: BARRIER FREE FLOOR MOUNTED EYE/FACE WASH: 304 CORROSION-RESISTANT STAINLESS STEEL BOWL, 1/2" STAY-OPEN CHROME PLATED BALL VALVE, HINGED DUST COVER, DRENCH HOSE, BACKFLOW PREVENTION DEVICE, 3 GPM FLOW, AND VISUAL AND AUDIBLE ALARM.
PLUMBING SPECIALTIES SCHEDULE
MARK EQUIPMENT DESCRIPTION MANUFACTURERS BASIS OF DESIGN
BFP-1 BACKFLOW PREVENTER 65 DN LEAD FREE,REDUCED PRESSURE ZONE, TWO IN-LINE INDEPENDENT CHECK VALVES, CAPTURED SPRINGS, REPLACEABLE CHECK SEATS W/ INTERMEDIATE RELIEF VALVE, BALL VALVES TEST COCKS, FDA EPOXY COATED QUARTER TURN BALL VALVES, AIR GAP FITTING, PROVIDE WITH INLET STRAINER, SAME SIZE AS CONNECTING PIPE, MUST COMPLY WITH ASSE 1013. PROVIDE WITH FLOOD
PROTECTION CONTROL SYSTEM. ROUTE AIR GAP DRAIN TO LOCAL FLOOR DRAIN.
BFP-2 BACKFLOW PREVENTER 20 DN LEAD FREE,REDUCED PRESSURE ZONE, TWO IN-LINE INDEPENDENT CHECK VALVES, CAPTURED SPRINGS, REPLACEABLE CHECK SEATS W/ INTERMEDIATE RELIEF VALVE, BALL VALVES TEST COCKS, FDA EPOXY COATED QUARTER TURN BALL VALVES, AIR GAP FITTING, PROVIDE WITH INLET STRAINER, SAME SIZE AS CONNECTING PIPE, MUST COMPLY WITH ASSE 1013, PROVIDE WITH FLOOD
PROTECTION CONTROL SYSTEM. ROUTE AIR GAP DRAIN TO LOCAL FLOOR DRAIN.
FCO FLOOR CLEANOUT HEAVY DUTY CAST IRON BODY WITH HEAVY DUTY ADJUSTABLE NICKEL BRONZE TOP
FD-1 FLOOR DRAIN GENERAL SERVICE LIGHT DUTY ASME A112.6.3 STANDARD, CAST IRON BODY, FLASHING COLLAR, NICKEL BRONZE 200 ROUND STRAINER, HEEL PROOF GRATE. PROVIDE WITH INLINE FLOOR DRAIN TRAP
SEALER, ASSE 1072.
FD-2 FLOOR DRAIN MEDIUM DUTY, CAST IRON BODY, FLASHING COLLAR, BAR GRATE, SAFE-SET SEDIMENT BUCKET, 300 ROUND TOP. PROVIDE WITH INLINE FLOOR DRAIN TRAP SEALER, ASSE 1072.
GCO GRADE CLEANOUT CAST IRON BODY WITH ADJUSTABLE NICKEL BRONZE HEAVY DUTY TOP.
HB-1 HOSE BIBB CHROME FINISH, ANTI-SIPHON, VACUUM BREAKER PROTECTED, METAL WHEEL AND LOOSE KEY HANDLES, ASSE STANDARD 1011 APPROVED, 15 INLET.
WH-1 WALL HYDRANT CHROME FINISH, AUTOMATIC DRAINING, ANTI-SIPHON VACUUM BREAKER, TAMPER RESISTANT ONE PIECE BRASS BOX, LOOSE KEY OPERATION, NO LEAD CONSTRUCTION, ASSE STANDARD 1019-B
APPROVED, 20 INLET.
WHA-A WATER HAMMER ARRESTOR PDI APPROVED AND SIZED (1-11 WSFU), MOUNT IN ACCESSIBLE LOCATION OR PROVIDE ACCESS PANEL.
WM-1 WATER METER LEAD FREE, RATED FOR DOMESTIC WATER, PER BASE REQUIREMENTS, PROVIDE AMI COMPLIANT WATER METER WITH PULSE OUTPUT.
NOTES:
1. MOUNTING HEIGHT IS FROM FINISHED FLOOR TO FLOOD LEVEL RIM OF FIXTURE.
2. MOUNT FLUSH HANDLE ON WIDE SIDE OF COMPARTMENT
3. MOUNTING HEIGHT IS FROM FINISHED FLOOR TO CENTERLINE OF LOWER UNIT BUBBLER.
4. HOT WATER IS NOT PROVIDED.
POINT OF USE WATER HEATER SCHEDULE
MARK LOCATION TEMP RISE (CELSIUS) AT 7.5 LPM INPUT KW NOTES
EWH-1 UNDER LAVATORY P-3 6 3 1,3
EWH-2 ABOVE MOP BASIN P-5 28 15 2,3
NOTES:
1. COORDINATE LOCATION WITH ABA CLEARANCES.
2. MOUNT BOTTOM OF UNIT AT 2135 ABOVE FINISHED FLOOR.
3. SET OUTLET TEMPERATURE TO 43 DEGREE CELSIUS.
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
P-8
P-5
P-1 P-3
P-3
P-1
FD-1
FD-1
FD-1
50 VTR
80 VTR
FCO
SAN
SAN
SAN
50 VTR
50 VTR
FD-2
FD-2
WCO
SAN
SAN
SAN
GCO
REFER TO WATER RISER B, DRAWING
P-702 FOR CONTINUATION
P-1
P-3
P-3
P-1
P-11
WH-1
WH-1
BFP-1
WH-1
P-11
HB-1
20 20
EWH-1
EWH-1
WM-1
INCOMING WATER ISOLATION
VALVE (BOTTOM FLANGE AT 305 AFF)
BFP-2
HVAC SYSTEM DOMESTIC
WATER MAKE-UP
WHA-A
WHA-A
UNDERGROUND WATER PIPE TO A POINT
305 AFF MUST BE AS NOTED IN SPEC
SECTION 33 11 00
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
A T
L A
N T
IC
N
O R
F O
L K
V
A
AS NOTED
1643338
A T
LA
N
T
IC
D E
S
IG
N A
N D
C O
N S
T R
U C
T
/1 /2
:0 :4
A
M B
IM
/P
E le c tr ic a l P o w e r
P la n t F
D A
/8
P
E le c t P w r
P ln t F
D A
P
.r v t
P-701
P -3
/P
-3 E
L E
C T
R
IC
A L P
O W
E R
P L A
N T
IS
O
M E
TR
IC
P
IP
IN
G
D
IA
G R
A M
S
S E
W E
R
P A
R
TI
A L
W A
TE
R
BAT
14124491
JBW JBW
JWH/SCN
D
JI
B O
U T
I, D
JI
B
O U
T I
C A
M P
L E
M O
N N
IE
R
RICHARD STEPHENS
SCE
NO SCALE
SANITARY RISER 1
NO SCALE
WATER RISER A
A
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
REFER TO WATER RISER A, DRAWING
P-701 FOR CONTINUATION
P-11
WH-1
P-11
WH-1
P-5
P-8
WH-1
P-11 P-11
EWH-2
P-11A
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
A T
L A
N T
IC
N
O R
F O
L K
V
A
AS NOTED
1643338
A T
LA
N
T
IC
D E
S
IG
N A
N D
C O
N S
T R
U C
T
/1 /2
:0 :4
A
M B
IM
/P
E le c tr ic a l P o w e r
P la n t F
D A
/8
P
E le c t P w r
P ln t F
D A
P
.r v t
P-702
P -3
/P
-3 E
L E
C T
R
IC
A L P
O W
E R
P L A
N T
IS
O
M E
TR
IC
P
IP
IN
G
D
IA
G R
A M
W
A
TE
R
BAT
14124492
JBW JBW
JWH/SCN
D
JI
B O
U T
I, D
JI
B
O U
T I
C A
M P
L E
M O
N N
IE
R
RICHARD STEPHENS
SCE
NO SCALE
WATER RISER B
B
123 117
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
| Sheets |
| P-001 - PLUMBING LEGEND |
| PF101 - FOUNDATION PLAN - AREA A |
| PF102 - FOUNDATION PLAN - AREA B |
| PL101 - PARTIAL FLOOR PLAN - AREA A |
| PL102 - PARTIAL FLOOR PLAN - AREA B |
| PL103 - MECHANICAL PLATFORM PLANS |
| P-501 - DETAILS |
| P-601 - SCHEDULES |
| P-701 - ISOMETRIC PIPING DIAGRAMS - SEWER & PARTIAL WATER |
| P-702 - ISOMETRIC PIPING DIAGRAM - WATER |
| 2022-12-15T09:51:37-0500 | |
| Virginia Beach | |
| Michael R. Karcher | |
| I, Michael R. Karcher, am signing to approve this document. |
| 2022-12-15T09:52:00-0500 | |
| Virginia Beach | |
| Michael R. Karcher | |
| I, Michael R. Karcher, am signing to approve this document. |
| 2022-12-15T09:52:00-0500 | |
| Virginia Beach | |
| Michael R. Karcher | |
| I, Michael R. Karcher, am signing to approve this document. |
| 2022-12-15T09:52:01-0500 | |
| Virginia Beach | |
| Michael R. Karcher | |
| I, Michael R. Karcher, am signing to approve this document. |
| 2022-12-15T09:52:01-0500 | |
| Virginia Beach | |
| Michael R. Karcher | |
| I, Michael R. Karcher, am signing to approve this document. |
| 2022-12-15T09:52:01-0500 | |
| Virginia Beach | |
| Michael R. Karcher | |
| I, Michael R. Karcher, am signing to approve this document. |
| 2022-12-15T09:52:02-0500 | |
| Virginia Beach | |
| Michael R. Karcher | |
| I, Michael R. Karcher, am signing to approve this document. |
| 2022-12-15T09:52:02-0500 | |
| Virginia Beach | |
| Michael R. Karcher | |
| I, Michael R. Karcher, am signing to approve this document. |
| 2022-12-15T09:52:02-0500 | |
| Virginia Beach | |
| Michael R. Karcher | |
| I, Michael R. Karcher, am signing to approve this document. |
| 2022-12-15T09:52:03-0500 | |
| Virginia Beach | |
| Michael R. Karcher | |
| I, Michael R. Karcher, am signing to approve this document. |
| 2022-12-15T09:53:20-0500 | |
| Virginia Beach | |
| Michael R. Karcher | |
| I, Michael R. Karcher, am signing to approve this document. |
| 2022-12-15T09:54:00-0500 | |
| Virginia Beach | |
| Michael R. Karcher | |
| I, Michael R. Karcher, am signing to approve this document. |
| 2022-12-15T09:54:01-0500 | |
| Virginia Beach | |
| Michael R. Karcher | |
| I, Michael R. Karcher, am signing to approve this document. |
| 2022-12-15T09:54:01-0500 | |
| Virginia Beach | |
| Michael R. Karcher | |
| I, Michael R. Karcher, am signing to approve this document. |
| 2022-12-15T09:54:01-0500 | |
| Virginia Beach | |
| Michael R. Karcher | |
| I, Michael R. Karcher, am signing to approve this document. |
| 2022-12-15T09:54:02-0500 | |
| Virginia Beach | |
| Michael R. Karcher | |
| I, Michael R. Karcher, am signing to approve this document. |
| 2022-12-15T09:54:02-0500 | |
| Virginia Beach | |
| Michael R. Karcher | |
| I, Michael R. Karcher, am signing to approve this document. |
| 2022-12-15T09:54:02-0500 | |
| Virginia Beach | |
| Michael R. Karcher | |
| I, Michael R. Karcher, am signing to approve this document. |
| 2022-12-15T09:54:03-0500 | |
| Virginia Beach | |
| Michael R. Karcher | |
| I, Michael R. Karcher, am signing to approve this document. |
| 2022-12-15T09:54:03-0500 | |
| Virginia Beach | |
| Michael R. Karcher | |
| I, Michael R. Karcher, am signing to approve this document. |
| 2023-06-08T14:09:46-0400 | |
| CDR Sandranell Moerbe, PWO CLDJ | |
| by memo dated 7 June 2023 |
| 2023-06-08T14:09:50-0400 | |
| CDR Sandranell Moerbe, PWO CLDJ | |
| by memo dated 7 June 2023 |
| 2023-06-08T14:09:50-0400 | |
| CDR Sandranell Moerbe, PWO CLDJ | |
| by memo dated 7 June 2023 |
| 2023-06-08T14:09:51-0400 | |
| CDR Sandranell Moerbe, PWO CLDJ | |
| by memo dated 7 June 2023 |
| 2023-06-08T14:09:52-0400 | |
| CDR Sandranell Moerbe, PWO CLDJ | |
| by memo dated 7 June 2023 |
| 2023-06-08T14:09:52-0400 | |
| CDR Sandranell Moerbe, PWO CLDJ | |
| by memo dated 7 June 2023 |
| 2023-06-08T14:09:53-0400 | |
| CDR Sandranell Moerbe, PWO CLDJ | |
| by memo dated 7 June 2023 |
| 2023-06-08T14:09:53-0400 | |
| CDR Sandranell Moerbe, PWO CLDJ | |
| by memo dated 7 June 2023 |
| 2023-06-08T14:09:54-0400 | |
| CDR Sandranell Moerbe, PWO CLDJ | |
| by memo dated 7 June 2023 |
| 2023-06-08T14:09:54-0400 | |
| CDR Sandranell Moerbe, PWO CLDJ | |
| by memo dated 7 June 2023 |
| 2023-06-08T14:10:26-0400 | |
| Rick Stephens | |
| I, Rick Stephens, am signing to approve this document. |
| 2023-06-08T14:10:48-0400 | |
| Rick Stephens | |
| I, Rick Stephens, am signing to approve this document. |
| 2023-06-08T14:10:48-0400 | |
| Rick Stephens | |
| I, Rick Stephens, am signing to approve this document. |
| 2023-06-08T14:10:49-0400 | |
| Rick Stephens | |
| I, Rick Stephens, am signing to approve this document. |
| 2023-06-08T14:10:50-0400 | |
| Rick Stephens | |
| I, Rick Stephens, am signing to approve this document. |
| 2023-06-08T14:10:51-0400 | |
| Rick Stephens | |
| I, Rick Stephens, am signing to approve this document. |
| 2023-06-08T14:10:51-0400 | |
| Rick Stephens | |
| I, Rick Stephens, am signing to approve this document. |
| 2023-06-08T14:10:52-0400 | |
| Rick Stephens | |
| I, Rick Stephens, am signing to approve this document. |
| 2023-06-08T14:10:53-0400 | |
| Rick Stephens | |
| I, Rick Stephens, am signing to approve this document. |
| 2023-06-08T14:10:53-0400 | |
| Rick Stephens | |
| I, Rick Stephens, am signing to approve this document. |
File details come from the government source that posted it. Updated .