Attachment H - Specifications 1 of 3.pdf

PDF 8 MB Posted

Attached to
P-332/P-334, Design-Bid-Build, Electrical Power Plant at Camp Lemonnier, Djibouti
Solicitation number
N6247023R0001
Issued by

About this file

This document provides specifications for the design and construction of a new electrical power plant at Camp Lemonnier, Djibouti. The project includes construction of a new engine hall to house ten diesel generators along with support facilities. Site work will include demolition, earthwork, paving and installation of security fencing. Utilities to be constructed include electrical distribution, site lighting, communications, water supply, sanitary sewer and fuel distribution systems. The specifications establish requirements for submittals, scheduling, site access, security, vehicle access, archaeological monitoring and other general construction criteria. The Navy solicitation number for this project is N6247023R0001 and involves the Naval Facilities Engineering Command.

View the file

Other files

File Type Posted
N6247023R0001 Amendment 0009.pdf PDF
N6247023R0001 Amend 0008.pdf PDF
Attachment T - CE18 Electrical.pdf PDF
Attachment S - Electrical ES401 ES601.pdf PDF
N6247023R0001 Amend 0007.pdf PDF
Attachment R - P332 Elect Pwr Plnt FDA - MECH.pdf PDF
N6247023R0001 Amend 0006.pdf PDF
Revised Attachment E - Price Proposal Form_11OCT2023.pdf PDF
Attachment L - P332 Elect Pwr Plnt FDA - AE105 - ROOF PLAN.pdf PDF
Attachment K - P332 Elect Pwr Plnt FDA - AE103 - PARTIAL GROUND FLOOR PLAN - B.pdf PDF
N6247023R0001 Amend 0005.pdf PDF
Attachment N - P332 Elect Pwr Plnt FDA - AE402 - STAIR PLANS.pdf PDF
Attachment P - P332 Elect Pwr Plnt FDA - AF102 - GROUND LEVEL FINISH AND SIGNAGE PLAN - PARTIAL B.pdf PDF
Attachment Q - P332 Elect Pwr Plnt FDA - AG601 - SIGNAGE DETAILS AND SCHEDULE.pdf PDF
Attachment M - P332 Elect Pwr Plnt FDA - AE201 - EXTERIOR ELEVATIONS.pdf PDF
Attachment O - P332 Elect Pwr Plnt FDA - AF101 - GROUND LEVEL FINISH AND SIGNAGE PLAN - PARTIAL A.pdf PDF
N6247023R0001 Amend 0004.pdf PDF
N6247023R0001 Amend 0003.pdf PDF
N6247023R0001 Amend 0002.pdf PDF
Attachment J - Site Visit Log.pdf PDF
N6247023R0001 Amend 0001.pdf PDF
N6247023R0001.pdf PDF
Attachment A - Pre-Proposal Inquiry Form.xls XLS spreadsheet
Attachment H - Drawings 3 of 18 GEOTECH.pdf PDF
Attachment H - Drawings 10 of 18 FIRE PROTECTION.pdf PDF
Attachment H - Drawings 11 of 18 PLUMBING.pdf PDF
Attachment I Base Access Request Form.pdf PDF
Attachment H - Drawings 1 of 18 GENERAL.pdf PDF
Attachment B - SEC-NAV_5512_1_11787 Form.pdf PDF
Attachment H - Drawings 17 of 18 ELECTRICAL.pdf PDF
Attachment C - Construction Experience Project Data Sheet.pdf PDF
Attachment E - Price Proposal Form.pdf PDF
Attachment F - LRA Commercial Vehicle Inspection Procedures.pdf PDF
Attachment H - Drawings 7 of 18 STRUCTURAL.pdf PDF
Attachment H - Drawings 16 of 18 ELECTRICAL.pdf PDF
Attachment H - Drawings 14 of 18 MECHANICAL.pdf PDF
Attachment H - Drawings 2 of 18 LIFE SAFETY.pdf PDF
Attachment H - Drawings 18 of 18 TELECOM.pdf PDF
Attachment H - Specifications 3 of 3.pdf PDF
Attachment H - Specifications 2 of 3.pdf PDF
Attachment D - Past Performance Questionnaire (PPQ).pdf PDF
Attachment H - Drawings 12 of 18 MECHANICAL.pdf PDF
Attachment H - Drawings 9 of 18 INTERIORS.pdf PDF
Attachment H - Drawings 8 of 18 ARCHITECTURAL.pdf PDF
Attachment H - Drawings 6 of 18 CIVIL.pdf PDF
Attachment H - Drawings 5 of 18 CATHODIC PROTECTION.pdf PDF
Attachment H - Drawings 15 of 18 ELECTRICAL.pdf PDF
Attachment H - Drawings 13 of 18 MECHANICAL.pdf PDF
Attachment H - Drawings 4 of 18 CIVIL.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WORK ORDER NO.

At the

PREPARED BY:

Architectural:

Civil:

Mechanical:

Electrical:

Structural:

APPROVED BY:

Specifications:

For Commander, NAVFAC:

Date:

Submitted By: Date:

UNCLASSIFIED/FOR OFFICIAL USE ONLY

Mechanical:

Electrical:

Scott Almond, PE Nathan Broach, PE

Help Note All fields can be edited. If you have trouble selecting a field, either use the tab key or click "highlight fields" in Acrobat 7. Fields that are not needed can be selected and deleted. Tool tips with "additional field" can be deleted or changed. The contract number can also be deleted or changed.

clacross Image

P-332/P-334 Electrical Power Plant eProjects Work Order No.: 1643338 Camp Lemonnier, Djibouti, Djibouti

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 01 15 02/11, CHG 1: 08/14 LIST OF DRAWINGS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 08/15, CHG 2: 08/21 SUMMARY OF WORK

01 13 00.20 08/08 SUPPLEMENTARY CONDITIONS FOR PROJECTS

IN DJIBOUTI AREA

01 14 00 11/11, CHG 13: 08/21 WORK RESTRICTIONS

01 20 00 11/20, CHG 2: 08/21 PRICE AND PAYMENT PROCEDURES

01 30 00 11/20, CHG 1: 08/21 ADMINISTRATIVE REQUIREMENTS

01 31 23.13 20 05/17, CHG 7: 11/21 ELECTRONIC CONSTRUCTION AND FACILITY

SUPPORT CONTRACT MANAGEMENT SYSTEM

01 32 17.00 20 05/18, CHG 3: 08/20 COST-LOADED NETWORK ANALYSIS SCHEDULES

(NAS)

01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES

01 33 29 02/21 SUSTAINABILITY REQUIREMENTS AND

REPORTING

01 35 26 11/20, CHG 2: 11/21 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS

01 42 15 02/14 METRIC MEASUREMENTS

01 45 00.00 20 11/11, CHG 8: 02/21 QUALITY CONTROL

01 45 35 11/20 SPECIAL INSPECTIONS

01 50 00 11/20, CHG 1: 08/21 TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

01 57 19 11/15, CHG 5: 08/21 TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 08/19, CHG 3: 11/21 PROJECT IDENTIFICATION

01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS

01 78 23 08/15, CHG 2: 08/21 OPERATION AND MAINTENANCE DATA

01 78 24.00 20 02/15, CHG 3: 08/21 FACILITY ELECTRONIC OPERATION AND

MAINTENANCE SUPPORT INFORMATION (eOMSI)

01 91 00.15 20 02/21, CHG 1: 05/21 TOTAL BUILDING COMMISSIONING

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 05/10, CHG 2: 02/19 DEMOLITION AND DECONSTRUCTION

02 81 00 11/18 TRANSPORTATION AND DISPOSAL OF

HAZARDOUS MATERIALS

02 83 00 11/18 LEAD REMEDIATION

02 84 16 05/20 HANDLING OF LIGHTING BALLASTS AND

LAMPS CONTAINING PCBs AND MERCURY

DI VI SI ON 03 - CONCRETE

03 30 00 02/19, CHG 3: 11/21 CAST-IN-PLACE CONCRETE

03 42 13.00 10 05/16 PLANT-PRECAST CONCRETE PRODUCTS FOR

BELOW GRADE CONSTRUCTION

DI VI SI ON 05 - METALS

05 05 20 05/22 POST-INSTALLED CONCRETE AND MASONRY

ANCHORS

05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL

05 30 00 05/15, CHG 2: 08/18 STEEL DECKS

PROJECT TABLE OF CONTENTS Page 1

05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS

05 51 00 02/17, CHG 1: 05/17 METAL STAIRS

05 51 33 02/16, CHG 2: 02/18 METAL LADDERS

05 52 00 02/18, CHG 1: 02/20 METAL RAILINGS

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY

06 61 16 08/20 SOLID SURFACING FABRICATIONS

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 05 23 08/19 PRESSURE TESTING AN AIR BARRIER SYSTEM

FOR AIR TIGHTNESS

07 13 53 02/16, CHG 1: 08/17 ELASTOMERIC SHEET WATERPROOFING

07 14 00 02/12, CHG 2: 02/18 FLUID-APPLIED WATERPROOFING

07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION

07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION

07 24 00 05/11, CHG 4: 08/18 DIRECT APPLIED EXTERIOR FINISH SYSTEMS

07 27 10.00 10 08/19, CHG 1: 02/20 BUILDING AIR BARRIER SYSTEM

07 27 19.01 05/17, CHG 2: 08/20 SELF-ADHERING AIR BARRIERS

07 54 19 02/13, CHG 3: 02/21 POLYVINYL-CHLORIDE ROOFING

07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL

07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING

07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS

DI VI SI ON 08 - OPENI NGS

08 11 13 08/20 STEEL DOORS AND FRAMES

08 11 16 05/17, CHG 2: 11/18 ALUMINUM DOORS AND FRAMES

08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS

08 33 23 08/20 OVERHEAD COILING DOORS

08 51 13 05/19 ALUMINUM WINDOWS

08 71 00 02/16, CHG 3: 08/20 DOOR HARDWARE

08 81 00 05/19 GLAZING

08 91 00 08/20 METAL WALL LOUVERS

DI VI SI ON 09 - FI NI SHES

09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD

09 30 10 08/20 CERAMIC TILING

09 51 00 08/20 ACOUSTICAL CEILINGS

09 62 38 08/17, CHG 1: 08/18 STATIC-CONTROL FLOORING

09 67 23.13 11/19 STANDARD RESINOUS FLOORING

09 67 23.15 02/21 FUEL RESISTIVE RESINOUS FLOORING,

3-COAT SYSTEM

09 90 00 02/21 PAINTS AND COATINGS

09 97 13.17 05/22 THREE COAT EPOXY INTERIOR COATING OF

WELDED STEEL PETROLEUM FUEL TANKS

09 97 13.27 02/21 HIGH PERFORMANCE COATING FOR STEEL

STRUCTURES

DI VI SI ON 10 - SPECI ALTI ES

10 14 00.20 08/20 INTERIOR SIGNAGE

10 26 00 08/20 WALL PROTECTION

10 28 13 08/20 TOILET ACCESSORIES

10 44 16 11/19 FIRE EXTINGUISHERS

PROJECT TABLE OF CONTENTS Page 2

DI VI SI ON 12 - FURNI SHI NGS

12 00 01.00 20 014/22 FURNITURE, FIXTURES AND EQUIPMENT

PACKAGE

12 24 13 08/20 ROLLER WINDOW SHADES

DI VI SI ON 13 - SPECI AL CONSTRUCTI ON

13 34 19 08/20, CHG 1: 02/21 METAL BUILDING SYSTEMS

13 48 73 05/20, CHG 1: 08/20 SEISMIC CONTROL FOR MECHANICAL

EQUIPMENT

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE

PROTECTION

DI VI SI ON 22 - PLUMBI NG

22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE

22 05 48.00 20 04/06, CHG 1: 05/15 MECHANICAL SOUND, VIBRATION, AND

SEISMIC CONTROL

22 15 26.00 20 04/06 GENERATOR COMPRESSED AIR SYSTEM AND

PIPING

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS

23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR

HVAC

23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL

SYSTEMS

23 08 00.00 20 02/21, CHG 1: 05/21 COMMISSIONING OF MECHANICAL AND

PLUMBING SYSTEMS

23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES

FOR HVAC

23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC

AND OTHER BUILDING CONTROL SYSTEMS

23 21 23 08/17 HVAC CHILLED WATER PUMPS

23 25 00 11/08 CHEMICAL TREATMENT OF WATER FOR

MECHANICAL SYSTEMS

23 30 00 05/20 HVAC AIR DISTRIBUTION

23 64 10 11/16, CHG 2: 08/18 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 08/09, CHG 5: 11/19 CHILLED, AND COOLING WATER PIPING

SYSTEMS

DI VI SI ON 25 - I NTEGRATED AUTOMATI ON

25 05 11.23 05/21 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS BUILDING CONTROL

SYSTEM AND ADVANCED METER

INFRASTRUCTURE (AMI)

25 05 11.26 05/21 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS UTILITY CONTROL SYSTEMS

25 08 11.00 20 11/20 RISK MANAGEMENT FRAMEWORK FOR

FACILITY-RELATED CONTROL SYSTEMS

25 10 11 10/22 SUPERVISORY CONTROL AND DATA

PROJECT TABLE OF CONTENTS Page 3

ACQUISITION (SCADA) SYSTEM FRONT END

AND INTEGRATION

DI VI SI ON 26 - ELECTRI CAL

26 05 48.00 10 10/07 SEISMIC PROTECTION FOR ELECTRICAL

EQUIPMENT

26 08 00 11/21 APPARATUS INSPECTION AND TESTING

26 11 13.13 10/22 PACKAGED ADJUSTABLE SPEED DRIVE (ASD)

BUILDING

26 11 16 11/21 SECONDARY UNIT SUBSTATIONS

26 11 20 05/19 UTILITY TRANSFORMERS (ISOLATION)

26 12 19.10 05/19, CHG 1: 11/19 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED

TRANSFORMERS

26 13 13 11/21 METAL-CLAD SWITCHGEAR

26 20 00 08/19, CHG 3: 11/21 INTERIOR DISTRIBUTION SYSTEM

26 23 00 05/15, CHG 2: 11/19 LOW-VOLTAGE SWITCHGEAR

26 27 14.00 20 02/21, CHG 1: 05/21 ELECTRICITY METERING

26 28 01.00 10 08/21 COORDINATED POWER SYSTEM PROTECTION

26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS

UNDER 600 VOLTS

26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY 4500

KW, WITH AUXILIARIES

26 36 23 05/20, CHG 1: 08/21 AUTOMATIC TRANSFER SWITCHES AND

BY-PASS/ISOLATION SWITCH

26 41 00 11/13 LIGHTNING PROTECTION SYSTEM

26 42 13 05/21 CATHODIC PROTECTION SYSTEM

26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING

26 56 00 08/21 EXTERIOR LIGHTING

DI VI SI ON 27 - COMMUNI CATI ONS

27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING

SYSTEM

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 08 10 05/16 ELECTRONIC SECURITY SYSTEM ACCEPTANCE

TESTING

28 10 05 05/16 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 76 08/20 INTERIOR FIRE ALARM AND MASS

NOTIFICATION SYSTEM, ADDRESSABLE

DI VI SI ON 31 - EARTHWORK

31 23 00.00 20 02/11, CHG 2: 08/15 EXCAVATION AND FILL

31 31 16.13 08/16 CHEMICAL TERMITE CONTROL

31 35 19.99 05/22 TRIAXIAL GEOGRID

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT

32 11 23 08/17 AGGREGATE BASE COURSES

32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS

32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING

32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR

ROADS AND SITE FACILITIES

32 13 15.20 11/10, CHG 1: 05/21 CONCRETE PAVEMENT FOR CONTAINMENT DIKES

32 15 00 05/17 AGGREGATE SURFACING

PROJECT TABLE OF CONTENTS Page 4

32 16 19 05/18 CONCRETE SIDEWALKS

32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS

32 31 13.53 11/21 HIGH-SECURITY FENCES AND GATES

32 35 16 09/22 SOUND BARRIER

DI VI SI ON 33 - UTI LI TI ES

33 01 50.31 02/20 LEAK DETECTION FOR FUELING SYSTEMS

33 01 50.55 02/21 CLEANING OF PETROLEUM STORAGE TANKS

AFTER INSTALLATION

33 08 55 08/19 FUEL DISTRIBUTION SYSTEM START-UP

33 09 52 11/18 PLANT CONTROL SYSTEM

33 11 00 02/18 WATER UTILITY DISTRIBUTION PIPING

33 30 00 05/18 SANITARY SEWERAGE

33 40 00 11/21 STORMWATER UTILITIES

33 52 10 11/18, CHG 1: 11/20 FUEL SYSTEMS PIPING (SERVICE STATION)

33 52 23.15 11/18 POL SERVICE PIPING WELDING

33 52 40 11/18, CHG 2: 11/20 FUEL AND DIESEL EXHAUST FLUID SYSTEMS

PIPING

33 52 43.23 08/18, CHG 1: 02/21 FUEL, DEF, LUBE OIL, AND GENERATOR

COOLING PUMPS

33 52 43.28 08/18 FILTER SEPARATOR

33 52 80 02/10 LIQUID FUELS PIPELINE COATING SYSTEMS

33 56 10 05/19, CHG 1: 11/20 FACTORY-FABRICATED FUEL AND DIESEL

EXHAUST FLUID (DEF) STORAGE TANKS

33 56 19 05/15, CHG 1: 11/20 FUEL IMPERMEABLE LINER SYSTEM

33 57 55 11/18, CHG 1: 11/20 FUEL AND DIESEL EXHAUST FLUID SYSTEM

COMPONENTS

33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DI VI SI ON 41 - MATERI AL PROCESSI NG AND HANDLI NG EQUI PMENT

41 22 13.14 11/19, CHG 1: 02/21 BRIDGE CRANES, OVERHEAD ELECTRIC, TOP

RUNNING

DI VI SI ON 44 - POLLUTI ON AND WASTE CONTROL EQUI PMENT

44 41 00 08/20 WATER POLLUTION CONTAINMENT AND

CLEANUP EQUIPMENT

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 5

THIS PAGE INTENTIONALLY LEFT BLANK

PROJECT TABLE OF CONTENTS Page 6

DOCUMENT 00 01 15

LIST OF DRAWINGS

02/ 11, CHG 1: 08/ 14

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."

1.2 CONTRACT DRAWINGS

Contract drawings are as follows:

SHEET NUMBER NAVFAC_NO SHEET NAME

GENERAL

GI001 14124376 TITLE SHEET

GI002 14124377 SHEET INDEX

GI003 14124378 P332 & P334 MILCON SITE PLAN

GI010 14124379 BUILDING CODE SUMMARY

GI011 14124380 GROUND LEVEL LIFE SAFETY PLAN

GI101 14124381 SITE LIFE SAFETY PLAN

GEOTECHNICAL

BB101 14124382 BORING LOCATION PLAN

BB501 14124383 BORING LOGS

BB502 14124384 BORING LOGS

BB503 14124385 BORING LOGS

BB504 14124386 BORING LOGS

CIVIL

C-001 14124387 GENERAL NOTES, LEGEND AND ABBREVIATIONS

C-002 14124388 SURVEY CONTROL POINTS

CE101 14124389 EROSION AND SEDIMENT CONTROL PLAN

CD101 14124390 DEMOLITION PLAN

CD102 14124391 DEMOLITION PLAN

CS101 14124392 SITE LAYOUT PLAN

CS102 14124393 SITE LAYOUT PLAN

CS401 14124394 JOINT LAYOUT PLAN

CG101 14124395 GRADING PLAN

CG102 14124396 GRADING PLAN

CG201 14124397 STORM DRAIN PROFILES

CU101 14124398 UTILITY PLAN

CU102 14124399 UTILITY AND STORM ALIGNMENT LAYOUT PLAN

CU201 14124400 UTILITY PROFILES

CU202 14124401 UTILITY PROFILES

CP101 14124402 CATHODIC PROTECTION PLAN

C-501 14124403 DETAILS

C-502 14124404 DETAILS

C-503 14124405 DETAILS

C-504 14124406 DETAILS

C-505 14124407 DETAILS

C-506 14124408 DETAILS

C-507 14124409 DETAILS

C-508 14124410 DETAILS

DOCUMENT 00 01 15 Page 1

C-509 14124411 DETAILS

STRUCTURAL

S-001 14124412 STRUCTURAL NOTES AND ABBREVIATIONS

S-002 14124413 STRUCTURAL NOTES AND LEGEND

S-003 14124414 STRUCTURAL NOTES

SB100 14124415 FOUNDATION UNDERCUT PLAN

SB101 14124416 FOUNDATION PLAN - OVERALL

SB102 14124417 FOUNDATION PLAN - AREA A

SB103 14124418 FOUNDATION PLAN - AREA B

SB104 14124419 SLAB-ON-GRADE PLAN - OVERALL

SB105 14124420 SLAB-ON-GRADE PLAN - AREA A

SB106 14124421 SLAB-ON-GRADE PLAN - AREA B

SB301 14124422 FOUNDATION SECTIONS

SB501 14124423 TYPICAL FOUNDATION DETAILS

SB502 14124424 TYPICAL FOUNDATION DETAILS

SB701 14124425 FUEL STORAGE TANK FOUNDATION PLAN

SB702 14124426 SITE INFRASTRUCTURE PLANS

SB703 14124427 SITE INFRASTRUCTURE DETAILS

SF101 14124428 LOW ROOF FRAMING PLAN - OVERALL

SF102 14124429 LOW ROOF FRAMING PLAN - AREA A

SF103 14124430 LOW ROOF FRAMING PLAN - AREA B

SF104 14124431 MECHANICAL PLATFORM FRAMING PLAN - OVERALL

SF105 14124432 MECHANICAL PLATFORM FRAMING PLAN - AREA A

SF106 14124433 MECHANICAL PLATFORM FRAMING PLAN - AREA B

SF107 14124434 ROOF FRAMING PLAN - OVERALL

SF108 14124435 ROOF FRAMING PLAN - AREA A

SF109 14124436 ROOF FRAMING PLAN - AREA B

SF110 14124437 FILTER PLATFORM FRAMING PLANS

SF111 14124438 EXHAUST PLATFORM FRAMING PLANS

SF301 14124439 FRAMING SECTIONS

SF302 14124440 FRAMING SECTIONS

SF303 14124441 FRAMING SECTIONS

SF501 14124442 TYPICAL FRAMING DETAILS

SF502 14124443 TYPICAL FRAMING DETAILS

SF503 14124444 TYPICAL FRAMING DETAILS

SF601 14124445 TRUSS T-1 ELEVATION AND DETAILS

SF602 14124446 TRUSS T-2 AND TRUSS T-3 ELEVATION AND DETAILS

SF603 14124447 TRUSS T-4 AND TRUSS T-5 ELEVATION AND DETAILS

ARCHITECTURAL

A-001 14124448 ARCHITECTURAL LEGENDS AND NOTES

A-002 14124449 AIR BARRIER KEY PLAN AND SECTION

AE101 14124450 OVERALL GROUND LEVEL PLAN

AE102 14124451 PARTIAL GROUND FLOOR PLAN - A

AE103 14124452 PARTIAL GROUND FLOOR PLAN - B

AE104 14124453 MECHANICAL PLATFORM LEVEL PLAN

AE105 14124454 ROOF PLAN

AE111 14124455 GROUND LEVEL REFLECTED CEILING PLAN

AE201 14124456 EXTERIOR ELEVATIONS

AE202 14124457 CONCRETE REVEAL ELEVATIONS

AE301 14124458 BUILDING SECTIONS

AE311 14124459 WALL SECTIONS

AE401 14124460 ENLARGED PLAN, ELEVATIONS & TOILET ACCESSORY SCHEDULE

AE402 14124461 STAIR PLANS

AE403 14124462 STAIR SECTIONS

AE404 14124463 STAIR DETAILS

AE501 14124464 DETAILS

AE502 14124465 DETAILS

DOCUMENT 00 01 15 Page 2

AE503 14124466 DETAILS

AE601 14124467 DOOR/WINDOW/LOUVER SCHEDULE AND ELEVATIONS

AE701 14124468 DOOR DETAILS

AE702 14124469 DOOR DETAILS

AE703 14124470 DOOR DETAILS

AE704 14124471 WINDOW & LOUVER DETAILS

INTERIORS

AF101 14124472 GROUND LEVEL FINISH AND SIGNAGE PLAN - PARTIAL A

AF102 14124473 GROUND LEVEL FINISH AND SIGNAGE PLAN - PARTIAL B

AF601 14124474 FINISH SCHEDULE, LEGEND, AND NOTES

AG601 14124475 SIGNAGE DETAILS AND SCHEDULE

IF101 14124476 GROUND FLOOR FURNISHINGS AND EQUIPMENT FOOTPRINT PLAN -

PARTIAL A

FIRE PROTECTION

FA001 14124477 FIRE ALARM LEGEND

FA101 14124478 FIRE ALARM GROUND LEVEL - AREA A

FA102 14124479 FIRE ALARM GROUND LEVEL - AREA B

FX001 14124480 FIRE SUPPRESSION LEGEND

FX101 14124481 FIRE SUPPRESSION GROUND LEVEL - AREA A

FX102 14124482 FIRE SUPPRESSION GROUND LEVEL - AREA B

PLUMBING

P-001 14124483 PLUMBING LEGEND

PF101 14124484 FOUNDATION PLAN - AREA A

PF102 14124485 FOUNDATION PLAN - AREA B

PL101 14124486 PARTIAL FLOOR PLAN - AREA A

PL102 14124487 PARTIAL FLOOR PLAN - AREA B

PL103 14124488 MECHANICAL PLATFORM PLANS

P-501 14124489 DETAILS

P-601 14124490 SCHEDULES

P-701 14124491 ISOMETRIC PIPING DIAGRAMS - SEWER & PARTIAL WATER

P-702 14124492 ISOMETRIC PIPING DIAGRAM - WATER

MECHANICAL

MH001 14124493 MECHANICAL LEGEND

MH301 14124494 SECTIONS

MH401 14124495 MECHANICAL ROOM ENLARGED PLAN

MH402 14124496 MECHANICAL GROUND FLOOR PLAN - AREA A

MH403 14124497 MECHANICAL GROUND FLOOR PLAN - AREA B

MH501 14124498 DETAILS

MH502 14124499 DETAILS

MH601 14124500 SCHEDULE

MH801 14124501 CONTROLS

MH802 14124502 CONTROLS

MP001 14124503 MECHANICAL ABBREVIATIONS

MP002 14124504 MECHANICAL SYMBOLS

MP003 14124505 INSTRUMENTATION SYMBOLS AND DESCRIPTIONS

MP004 14124506 MECHANICAL SEQUENCES OF OPERATION

MP005 14124507 MECHANICAL SEQUENCES OF OPERATION

MP101 14124508 MECHANICAL OVERALL FLOOR PLAN

MP301 14124509 DG-01 SECTION

MP302 14124510 MECHANICAL SECTIONS

MP303 14124511 MECHANICAL SECTIONS

MP304 14124512 MECHANICAL SECTIONS

MP401A 14124513 MECHANICAL FLOOR PLAN - NORTH AT 1200MM AFF - SCR OPTION

MP401B 14124514 MECHANICAL FLOOR PLAN - NORTH AT 1200MM AFF - EGR OPTION

MP402A 14124515 MECHANICAL FLOOR PLAN - SOUTH AT 1200MM AFF - SCR OPTION

DOCUMENT 00 01 15 Page 3

MP402B 14124516 MECHANICAL FLOOR PLAN - SOUTH AT 1200MM AFF - EGR OPTION

MP403A 14124517 MECHANICAL FLOOR PLAN - NORTH AT 3048MM AFF - SCR OPTION

MP403B 14124518 MECHANICAL FLOOR PLAN - NORTH AT 3048MM AFF - EGR OPTION

MP404A 14124519 MECHANICAL FLOOR PLAN - SOUTH AT 3048MM AFF - SCR OPTION

MP404B 14124520 MECHANICAL FLOOR PLAN - SOUTH AT 3048MM AFF - EGR OPTION

MP405A 14124521 MECHANICAL LOW ROOF PLAN - NORTH - SCR OPTION

MP405B 14124522 MECHANICAL LOW ROOF PLAN - NORTH - EGR OPTION

MP406A 14124523 MECHANICAL LOW ROOF PLAN - SOUTH - SCR OPTION

MP406B 14124524 MECHANICAL LOW ROOF PLAN - SOUTH - EGR OPTION

MP407 14124525 MECHANICAL ENGINE HALL HIGH ROOF PLAN - NORTH

MP408 14124526 MECHANICAL ENGINE HALL HIGH ROOF PLAN - SOUTH

MP409 14124527 MECHANICAL ENLARGED PLANS

MP410 14124528 MECHANICAL ENLARGED PLANS

MP411 14124529 MECHANICAL ENLARGED PLANS

MP412 14124530 MECHANICAL ENLARGED PLANS

MP501 14124531 MECHANICAL DETAILS

MP502 14124532 MECHANICAL DETAILS

MP503 14124533 MECHANICAL DETAILS

MP504 14124534 MECHANICAL DETAILS

MP505 14124535 MECHANICAL DETAILS

MP506 14124536 MECHANICAL DETAILS

MP507 14124537 MECHANICAL DETAILS

MP508 14124538 MECHANICAL DETAILS

MP509 14124539 MECHANICAL DETAILS

MP510 14124540 MECHANICAL DETAILS

MP511 14124541 MECHANICAL DETAILS

MP601 14124542 MECHANICAL SCHEDULES

MP602 14124543 MECHANICAL SCHEDULES

MP603 14124544 MECHANICAL SCHDEULES

MP604 14124545 MECHANICAL SCHEDULES

MP701 14124546 FUEL SYSTEM P&ID - NORTH

MP702 14124547 FUEL SYSTEM P&ID - SOUTH

MP703 14124548 CHILLED WATER SYSTEM P&ID - NORTH

MP704 14124549 CHILLED WATER SYSTEM P&ID - NORTH CONTD

MP705 14124550 CHILLED WATER SYSTEM P&ID - SOUTH

MP706 14124551 LUBE OIL SYSTEM/COMPRESSED AIR SYSTEM P&ID

MP707 14124552 DIESEL EXHAUST FLUID SYSTEM P&ID

MP708 14124553 DIESEL EXHAUST FLUID SYSTEM P&ID

MP709 14124554 GENERATOR VENTILATION SYSTEM P&ID - NORTH

MP710 14124555 GENERATOR VENTILATION SYSTEM P&ID - SOUTH

MP711 14124556 COOLING WATER SYSTEM P&ID - NORTH

MP712 14124557 COOLING WATER SYSTEM P&ID - NORTH CONTD

MP713 14124558 COOLING WATER SYSTEM P&ID - SOUTH

MP714 14124559 COOLING WATER SYSTEM P&ID - SOUTH CONTD

MF001 14124560 GENERAL NOTES, LEGEND AND ABBREVIATIONS

MF002 14124561 LEGEND AND ABBREVIATIONS

MF100 14124562 SITE LAYOUT PLAN

MF101 14124563 FUEL STORAGE TANK LAYOUT PLAN

MF501 14124564 TYPICAL 200,000L (50,000 GALLON) STORAGE TANK DETAILS

MF502 14124565 PACKAGED OFF-LOADING SYSTEM EQUIPMENT DETAIL

MF503 14124566 STAIRWAY AND CATWALK DETAILS

MF504 14124567 USED OIL TANK AND MISCELLANEOUS DETAILS

MF505 14124568 DIESEL FUEL DUPLEX PUMP TRANSFER SKID DETAIL

MF506 14124569 MISCELLANEOUS PIPING DETAILS

MF507 14124570 TANK AND PIPING SIGNAGE AND MARKING

MF601 14124571 SCHEMATIC FLOW DIAGRAM

MF701 14124572 FLOW DIAGRAMS

MF801 14124573 FUEL FARM SEQUENCE OF OPERATIONS

MF802 14124574 FUEL TANK P&IDS

DOCUMENT 00 01 15 Page 4

MF803 14124575 FUEL SYSTEM P&IDS

ELECTRICAL

E-001 14124576 ELECTRICAL LEGEND

E-002 14124577 ELECTRICAL LEGEND

E-003 14124578 ABBREVIATIONS

E-004 14124579 OVERALL SITE KEYPLAN

ED101 14124580 SITE PLAN - DEMO

ED401 14124581 ENLARGED PP2B SITE DEMO

ED402 14124582 ENLARGED PARTIAL PP2 SITE DEMO

ED403 14124583 ENLARGED BLDG 601 & 602 DEMO

ES101 14124584 SITE PLAN - PP2A AND P-332

ES401 14124585 ENLARGED SITE PLAN - P-332 - RADIATORS

ES402 14124586 ENLARGED SITE PLAN - P-332

ES403 14124587 ENLARGED SITE PLAN - PP2A

ES501 14124588 SITE DETAILS

ES502 14124589 SITE DETAILS

ES503 14124590 SITE DETAILS

ES504 14124591 SITE DETAILS

ES505 14124592 SITE DETAILS

ES506 14124593 FUEL FARM HAZARDOUS CLASSIFICATION DETAILS

ES601 14124594 DUCTBANK SCHEDULE

ES701 14124595 OVERALL SITE MV SINGLE-LINE DIAGRAM - DEMO

ES702 14124596 OVERALL SITE MV SINGLE-LINE DIAGRAM

EG101A 14124597 LIGHTNING PROTECTION PLAN - AREA A

EG101B 14124598 LIGHTNING PROTECTION PLAN - AREA B

EG102A 14124599 FIRST FLOOR GROUNDING PLAN - AREA A

EG102B 14124600 FIRST FLOOR GROUNDING PLAN - AREA B

EG501 14124601 GROUNDING DETAILS

EG502 14124602 GROUNDING DETAILS

EG503 14124603 GROUNDING DETAILS

EG504 14124604 GROUNDING DETAILS

EL101A 14124605 FIRST FLOOR LIGHTING PLAN - AREA A

EL101B 14124606 FIRST FLOOR LIGHTING PLAN - AREA B

EL102A 14124607 MEZZANINE LIGHTING PLAN - AREA A

EL102B 14124608 MEZZANINE LIGHTING PLAN - AREA B

EL501 14124609 LIGHTING FIXTURE DETAILS

EL502 14124610 LIGHTING FIXTURE DETAILS

EL601 14124611 LIGHTING FIXTURE SCHEDULE

EL602 14124612 LIGHTING CONTROL SCHEDULE

EP101A 14124613 FIRST FLOOR POWER PLAN - AREA A

EP101B 14124614 FIRST FLOOR POWER PLAN - AREA B

EP102A 14124615 FIRST FLOOR EQUIPMENT CONNECTION PLAN - AREA A

EP102B 14124616 FIRST FLOOR EQUIPMENT CONNECTION PLAN - AREA B

EP103A 14124617 MEZZANINE POWER PLAN - AREA A

EP103B 14124618 MEZZANINE POWER PLAN - AREA B

EP401 14124619 ENLARGED POWER PLANS

EP601 14124620 EQUIPMENT CONNECTION SCHEDULE

EP602 14124621 PANELBOARD SCHEDULES

EP603 14124622 PANELBOARD SCHEDULES

EP701 14124623 BLDG POWER SINGLE LINE DIAGRAM - 400V SYSTEM

EW101A 14124624 FIRST FLOOR MV POWER PLAN - AREA A

EW101B 14124625 FIRST FLOOR MV POWER PLAN - AREA B

EW102 14124626 MEZZANINE POWER PLAN - AREA A

EW103 14124627 MEZZANINE POWER PLAN - AREA B

EW104 14124628 ASD-PREFAB FLOOR PLAN

EW110 14124629 UNDERFLOOR RACEWAY - AREA A

EW111 14124630 UNDERFLOOR RACEWAY - AREA B

EW112 14124631 UNDERFLOOR RACEWAY SECTION VIEWS

DOCUMENT 00 01 15 Page 5

EW181 14124632 HAZARDOUS AREA CLASSIFICATION PLAN - AREA A

EW182 14124633 HAZARDOUS AREA CLASSIFICATION PLAN - AREA B

EW201 14124634 MV SWITCHGEAR ELEVATION

EW202 14124635 LOAD CENTER ELEVATION

EW204 14124636 MCC ELEVATIONS

EW503 14124637 HAZARDOUS AREA CLASSIFICATION DETAILS

EW509 14124638 CABLE TRAY DETAILS

EW510 14124639 TYPICAL RACEWAY DETAILS

EW520 14124640 MOTOR ELEMENTARY DIAGRAM SCHEDULE

EW521 14124641 MOTOR ELEMENTARY DIAGRAM

EW525 14124642 MOTOR ELEMENTARY ASD

EW601 14124643 ONE LINE DIAGRAM - MEDIUM VOLTAGE

EW602 14124644 ONE LINE DIAGRAM - LOAD CENTER

EW603 14124645 ONE LINE DIAGRAM - MOTOR CONTROL CENTERS (SHEET 1 OF 4)

EW604 14124646 ONE LINE DIAGRAM - MOTOR CONTROL CENTERS (SHEET 2 OF 4)

EW605 14124647 ONE LINE DIAGRAM - MOTOR CONTROL CENTERS (SHEET 3 OF 4)

EW606 14124648 ONE LINE DIAGRAM - MOTOR CONTROL CENTERS (SHEET 4 OF 4)

EW611 14124649 ONE LINE DIAGRAM 125 VDC SYSTEM

EW620 14124650 DETAILED ONE LINE DIAGRAM MVS-PP4-M1

EW621 14124651 DETAILED ONE LINE DIAGRAM MVS-PP4-G1A

EW622 14124652 DETAILED ONE LINE DIAGRAM MVS-PP4-G1B

EW623 14124653 DETAILED ONE LINE DIAGRAM MVS-PP4-G2A

EW624 14124654 DETAILED ONE LINE DIAGRAM MVS-PP4-G2B

EW625 14124655 BREAKER ONE LINE DIAGRAM - FEEDER BREAKER

EW626 14124656 BREAKER ONE LINE DIAGRAM - GENERATOR BREAKER

EW627 14124657 BREAKER ONE LINE DIAGRAM - TIE BREAKER

EW630 14124658 SCADA AND CONTROLS NETWORK DIAGRAM 1 OF 2

EW631 14124659 SCADA AND CONTROLS NETWORK DIAGRAM 2 OF 2

EW632 14124660 SCADA AND CONTROLS SEQUENCE OF OPERATIONS

EW711 14124661 FEEDER AND RACEWAY SCHEDULES

EW712 14124662 FEEDER AND RACEWAY SCHEDULES

EW713 14124663 DC PANEL SCHEDULES

TELECOM

T-001 14124664 TELECOM LEGEND ABBREVIATIONS & NOTES

TS101 14124665 TELECOM SITE PLAN - PP2A AND P-332

TS701 14124666 TELECOM SINGLE LINE DIAGRAM

TN101A 14124667 FIRST FLOOR TELECOM PLAN - AREA A

TN101B 14124668 FIRST FLOOR TELECOM PLAN - AREA B

TN401 14124669 ENLARGED TELECOM PLANS

TN501 14124670 TELECOM DETAILS

TN701 14124671 TELECOM RISER DIAGRAM

TY101A 14124672 FIRST FLOOR SECURITY PLAN - AREA A

TY101B 14124673 FIRST FLOOR SECURITY PLAN - AREA B

TY102A 14124674 SECOND FLOOR SECURITY PLAN - AREA A

TY102B 14124675 SECOND FLOOR SECURITY PLAN - AREA B

TY501 14124676 SECURITY DETAILS

TY701 14124677 SECURITY RISER DIAGRAMS

-- End of Document --

DOCUMENT 00 01 15 Page 6

SECTION 01 11 00

SUMMARY OF WORK

08/ 15, CHG 2: 08/ 21

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Utility Outage Requests

Utility Connection Requests

Excavation Permits

Salvage Plan; G

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

This project constructs a new electrical Power Plant with ancillary support facilities, fuel storage, and connections to the existing distribution system for Camp Lemonnier, Djibouti (CLDJ). The complete project consists of a Base Bid (MILCON P332) with an Option (MILCON P332). Construction of the Base and Option will meet the Camp's future, anticipated power demand and consumption needs.

Base Bid - MILCON P332

Then Base (P332) scope of work includes construction of an Engine Hall (approximately 2,471 gross square meters) sized to house ten (10) new power plant diesel generators and supporting electrical and mechanical systems and equipment. The new Power Plant building will be configured with a high bay Engine Hall and single-story support facilities. The Engine Hall will consist of two (2) rooms to house five (5) diesel generators each. The Engine Hall will include ancillary space for power generation support systems, day tanks, storage and a small workshop. The single-story support facilities include administrative open office space, a Control Room, two (2) private offices, office storage, communications rooms, mechanical and electrical rooms, battery storage, and (2) ADA/ABA compliant unisex restrooms.

Site preparation for the Base (P332) scope of work includes site demolition, clean up and site earthwork. Paving and site improvements include site access from Fourth Avenue, a parking lot, sidewalks and physical security fencing and gates. Electrical utilities include electrical distribution, site lighting and site communications and security. Mechanical utilities include water supply system, sanitary sewer system, and fuel distribution system.

SECTION 01 11 00 Page 1

The first set of five diesel generators as well as the associated ancillary systems and equipment for all ten generators is included in the Base (P332) scope of work. Remote cooling equipment for the first five generators will be provided on site to the west of the new Power Plant.

The new power plant will be connected to the existing Prime Power 3 (PP3) and Prime Power 2A (PP2A) switchgear equipment, maintaining the existing feeder connections as applicable. The work includes providing a new control system to operate the new power plant and to integrate controls from 12 existing-to-remain generators at PP3.

Fuel supply for the five generators will be fed from the existing PP3 fuel farm by tapping into the existing PP2-PP3 fuel cross connect pipeline to feed the first set of Power Plant generators and day tanks.

Option - MILCON P334

The Option (P334) scope of work include construction of the second set of five (5) generators within the Base (P332) Engine Hall. Remote cooling equipment for the second five generators will be provided on site to the west of the new Power Plant.

Site preparation for the Option (P334) scope of work includes additional site demolition, clean up and site earthwork. Demolition work includes removal of the existing PP2 diesel generators and the PP2 fuel farm and motor gas (MOGAS) facility.

Site improvements include a new Power Plant fuel farm, containment dike and an emergency fuel tank truck off-load facility. Primary fuel tank filling will be made via a new extension of the PP2-PP3 fuel cross connect pipeline to the new Power Plant's fuel farm.

1.2.2 Location

The work is located at Camp Lemonnier, Djibouti, approximately as indicated. The exact location will be shown by the Contracting Officer.

1.3 OCCUPANCY OF PREMISES

Building(s) will be occupied during performance of work under this Contract.

Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.

1.4 EXISTING WORK

In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that

SECTION 01 11 00 Page 2 which existed before new work started.

1.5 ON-SITE PERMITS

1.5.1 Utility Outage Requests and Utility Connection Requests

Schedule work to minimize outages. For utility outages and connections required during the execution of work that affect existing systems, schedule outside the regular working hours or on weekends, as approved by the Contracting Officer. Schedule utility outages and connections to minimize disruptions tothe Government. No additional payment will be provided for utility outages and connections required to be performed outside the regular work hours.

Submit requests for utility outages and connections in writing to the Contracting Officer for approval at least 30 calendar days in advance of the time required. In each request, state the system involved, area involved, approximate duration of outage, and the nature of work involved.

1.5.2 Borrow, Excavation, Welding, and Burning Permits

ACTIVITY SUBMISSION DATE SUBMISSION FORM

Excavation Permits 15 calendar days prior to work

1.6 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.

Verify existing utility locations indicated on contract drawings, within area of work.

Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities,and any type of underground or encased obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.

1.6.1 Notification Prior to Excavation

Notify the Contracting Officer at least 48 hours prior to starting excavation work.

1.7 SALVAGE MATERIAL AND EQUIPMENT

Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area located within the base perimeter.

Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Provide a system for property control in the salvage plan. Store and protect salvaged materials and equipment

SECTION 01 11 00 Page 3 until disposition by the Contracting Officer.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 11 00 Page 4

SECTION 01 13 00.20

SUPPLEMENTARY CONDITIONS FOR PROJECTS IN DJIBOUTI AREA

08/08

PART 1 GENERAL

1.1 PUBLIC RELEASE OF INFORMATION

1.1.1 Prohibition

There shall be no public release of information or photographs concerning any aspect of the materials or services relating to this bid, contract, or purchase order or other documents resulting therefrom without the prior written approval of the Contracting Officer.

1.2 ENGLISH SPEAKING REPRESENTATIVE

A representative of the contractor who is capable of explaining the work operations and receiving instructions in the English language must be present at all times when any performance of the work at the site is being conducted by any employee of the Contractor of his subcontractors. The Contracting Officer shall have the right to determine without appeal of such decision, whether the proposed representative has sufficient technical and English language capabilities and the Contractor shall immediately replace any individual not acceptable to the Contracting Officer. The Construction Contractor's Project Manager, on-site Superintendent, Quality Control Manager, and Quality Control Specialist shall be fluent (can read, speak, and write) in the English language.

1.3 NORMS AND LAWS

In case of differences between project specifications or the accompanying drawings and referenced norms and laws, norms and laws shall govern.

1.4 INDUSTRY STANDARDS

When both U.S. and European, or local, Industry Standards are applicable to this project and the standards are in conflict with each other, the most stringent of the industry shall govern.

1.5 PROHIBITED ITEMS

Use of the following items in this construction project is prohibited:

a. Use of aluminum for electrical conductors.

b. Use of embedded aluminum conduit in concrete.

c. Use of fluorescent light ballasts and other products containing PCB's.

d. Use of urea-formaldehyde foam insulation products.

e. Use of any paint/coatings having a lead content of over 0.06 percent by weight of non-volatile content. The use of ozone depleting chemicals is prohibited. The use of zinc-chromate is prohibited.

f. The use of materials containing asbestos is prohibited.

SECTION 01 13 00.20 Page 1

1.6 PROPRIETARY NAMES

Manufacturer's proprietary names indicated for colors, textures and patterns of materials are for the purpose of color, texture and pattern selection only. Other manufacturers materials are acceptable and provided they closely approximate colors, textures and patterns indicated and provided they conform to all other requirements subject to Contracting Officer's approval.

1.7 SUBMITTAL OF PROOF OF QUALIFICATIONS AND EXPERIENCE

Where qualifications or experience requirements are set forth in the specifications with respect to equipment and equipment installers, written proof of such qualifications or experience must be provided within thirty

(30) calendar days after Contract award, and before placing any order for such equipment or before dispatching equipment installers to the project site.

1.8 PRODUCTS SPECIFIED USING USA STANDARDS

1.8.1 Local Products Specified Using United States of America (USA) Standards

There are locally available products specified in this contract that meet USA standards. "Locally available products that meet USA standards" are defined as:

a. "Products that meet the referenced USA standards, and are manufactured and distributed in-country, or manufactured and distributed in the European Union, and are readily available locally from in-country sources or from the European Union sources"; or

b. "Products manufactured in the USA and distributed in-country or in the European Union or in the USA, and are readily available locally from in-country sources or from the European Union sources, or from USA sources."

1.8.2 USA Manufactured Products Specified Using USA Standards

There are products to be provided in this contract that are not readily available locally and must be manufactured in the United States of America (USA) and in compliance with USA standards. Products manufactured in another country are considered USA manufactured if the manufacturers or suppliers are under license by USA manufacturers and the products meet the same applicable specifications and standards.

1.8.3 Consignment, Marking, and Customs Clearance

In order for the Contractor to be exempt from paying duty on material or equipment to be imported for incorporation into the contract work, all shipments shall be consigned to the Facilities Engineering and Acquisition Department (FEAD) and marked for the contract by contract number.

Additionally, supply certified copies of the confirmed material/equipment orders and invoices to the FEAD in order that the duty-free customs clearance may be accomplished. Failure on the part of the Contractor to comply with the requirements herein will not be grounds for non-enforcement of the provisions of the Clause, "Taxes" of the Contract Clauses.

SECTION 01 13 00.20 Page 2

1.8.4 Excess

The Contractor shall furnish to the Contracting Officer, just prior to completion of this contract, a consolidated inventory of all excess supplies, materials, and equipment imported duty-free for use under this contract. The Contract shall either pay required duties on the excesses or re-export the excesses.

1.9 GOVERNMENT FURNISHED SUPPLIES AND SERVICES

The Government will assign a Contracting Officer located at the Camp as point of contact and to administer this contract. Public Works Officer (PWO)/Facilities Engineering and Acquisition Department (FEAD) Djibouti, located at the Camp, will assign a Construction Manager (CM) to oversee the performance of this contract. The term "Contractor" means the prime contractor and all subcontractors at all tiers responsible for work associated with this contract. The term "contractor personnel" means employees of the prime contractor and employees of the subcontractors at all tiers responsible for work associated with this contract. The term "Camp" means Camp Lemonnier, Republic of Djibouti, Africa.

The Contractor shall coordinate with the CM for all required government-furnished supplies and services, including resources available through interservice support or provided to the government under other contracts. The Contractor shall furnish all vehicles and equipment required to complete the work included in this contract. The Contractor is responsible for all costs associated with vehicles and construction equipment. The Contractor will not be permitted to purchase fuel for vehicles and construction equipment from the Camp. The Government will furnish the property, supplies and services listed below to the Contractor.

a. Assistance in timely processing of identification badges and passes for contractor personnel. For identification badge requirements, refer to Section 01 14 00 WORK RESTRICTIONS.

b. Copies of all relevant orders, directives, and instructions issued by the Combatant Commander relating to force protection, security, health, and safety.

c. Use of military postal system is not authorized for use by contractor personnel.

d. Food service for contractor personnel will not be provided at the Camp. Contractor personnel are not authorized to eat at the CLDJ Galley or any other food vendor on the Camp.

e. Access to religious services provided by military chaplains.

f. Use of the Camp Clinic and the Camp Exchange is not authorized for contractor personnel.

g. Camp Lemonnier base services will not be available to contractor personnel in accordance with camp policy.

h. Arrange right-of-entry and/or easement to worksites, facilities, and areas necessary for the Contractor to execute work.

i. Laydown Area: The Government will provide a designated area of up to

SECTION 01 13 00.20 Page 3

50 meters x 50 meters within the fenced area of the Camp for construction operations and laydown. At the Government's option the Construction Offices and Laydown Area may be provided at two or more locations, with no increase in total provided area. The Contractor may have to obtain additional areas off Camp at Contractor's expense to provide additional laydown. The Contractor shall provide fencing and security as required to secure all laydown areas whether inside or outside the fenced limits of the Camp.

j. Gasoline and diesel fuels, required for the completion of this construction contract, will not be available for purchase by the Contractor on the Camp.

k. Land on Camp property for the Contractor to develop an additional laydown area is not available. The Camp infrastructure cannot support the utility loads generated by the number of contractor personnel required for this construction contract. The Contractor may provide additional laydown area off Camp property in order to meet their requirement. The Contractor is responsible for all costs and arrangements associated with obtaining and providing the additional laydown area off the Camp property.

The government will not provide an area on the Camp for berthing of contractor personnel. The Contractor is responsible for all costs and arrangements associated with the required berthing of contractor personnel outside of the Camp.

1.10 CONTRACTOR RESPONSIBILITY FOR CONTRACTOR'S PERSONNEL

The Contractor will be required to coordinate with the State Department and/or Embassy in order to provide personnel clearances, either theatre or country, for travel of contractor personnel (except Djiboutian nationals) to Djibouti. The Government makes no representations or warranties regarding the viability of any particular staffing strategy employed by the Contractor.

The Contractor is responsible for providing their own security for contractor personnel (except Djiboutian nationals), property and materials while on and off the Camp, as well as securing worksites, laydown areas, berthing areas and other locations necessary for the performance of this contract. The contractor shall follow all applicable orders and instruction from U.S. military officials in regard to force protection and security.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 13 00.20 Page 4

SECTION 01 14 00

WORK RESTRICTIONS

11/ 11, CHG 13: 08/ 21

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

List of Contact Personnel; G

Escort Plan; G

1.2 SPECIAL SCHEDULING REQUIREMENTS

a. Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.

b. The adjacent facilites will remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.

c. Permission to interrupt any Activity roads, railroads, or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.

d. The work under this contract requires special attention to the scheduling and conduct of the work in connection with existing operations. Identify on the construction schedule each factor which constitutes a potential interruption to operations.

e. Contractor shall develop the Network Analysis Schedule required by UFGS 01 32 17.00 20, Cost-Loaded Network Analysis Schedules (NAS), to consider and include the MILCON P332 & P334 Construction Scope and Sequencing requirements included as an attachment to this specification.

1.3 CONTRACTOR ACCESS AND USE OF PREMISES

1.3.1 Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. To minimize traffic congestion, delivery of materials must be outside of peak traffic hours (6:30 to 8:00 a.m. and 3:30 to 5:00 p.m.) unless otherwise approved by the Contracting Officer. Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Ensure all Contractor equipment, include delivery

SECTION 01 14 00 Page 1 vehicles, are clearly identified with their company name.

1.3.1.1 Subcontractors and Personnel Contacts

Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.3.1.2 No Smoking Policy

Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

1.3.2 Working Hours

Regular working hours are between 0700 and 1700 Saturday through Thursday, excluding Government holidays.

1.3.3 Work Outside Regular Hours

Work outside regular working hours requires Contracting Officer approval.

Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.

1.3.4 Occupied and Existing Building

The Contractor shall be working in an existing building and around existing buildings which are occupied. Do not enter the building without prior approval of the Contracting Officer.

The existing buildings and their contents must be kept secure at all times. Provide temporary closures as required to maintain security as directed by the Contracting Officer.

Provide dust covers or protective enclosures to protect existing work that remains, and Government material located in the Power Plant during the construction period.

Relocate movable furniture as required to perform the work, protect the furniture, and replace the furniture in its original location upon completion of the work. Leave attached equipment in place, and protect it against damage, or temporarily disconnect, relocate, protect, and reinstall it at the completion of the work.

1.3.5 Utility Cutovers and Interruptions

a. Make utility cutovers and interruptions after normal working hours or

SECTION 01 14 00 Page 2 on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.

b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, and compressed air are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS.

d. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.

1.4 SECURITY REQUIREMENTS

Contract Clause "FAR 52.204-2, Security Requirements and Alternate II," "FAC 5252.236-9301, Special Working Conditions and Entry to Work Area," and the following apply:

1.4.1 Camp Lemonnier Security Requirements

Camp Lemonnier employs a specific base access, badging, and security screening policy for all Contractors working aboard the Camp. Upon award of the contract, specific requirements and details for submission of personnel into the Camp Lemonnier security system will be provided by the Contracting Officer.

a.No employee or representative of the Contractor including subcontractors will be admitted to Camp Lemonnier and other U.S.

military installations until all security requirements in accordance with CAMPLEMDJINST 5520.1K are met. This station is a secured facility.

b. All Contractor employees are subject to a background check and security screening interview administered by the Camp Lemonnier Security Officer.

c. Screening Interviews - Screening interviews will be conducted for each employee prior to engaging in the performance of work on Camp Lemonnier. A list of all employees and who require unescorted access, escorted access or restricted access (Class I, II or III as defined in CAMPLEMDJINST 5520.1K) shall be furnished to the Security Department via the Contracting Officer with completed employment questionnaires and clear copy of national ID, birth certificate, or passport with all the relevant pages. Periodic re-interviews will be conducted on an annual basis and at the discretion of the Security manager. In the event employees are hired or discharged, a corrected list of employees shall be furnished reflecting the change in personnel.

d. A security check by the Djibouti National Security Service is required for Djiboutian nationals

SECTION 01 14 00 Page 3

1.4.2 Identification Badges

The Government will provide identification badges to all contractor personnel, including Djiboutian nationals, in accordance with the current base access policy. Identification badges will be color coded for this contract.

a. Identification badges are required for access to Camp Lemonnier and other U.S. military installations and will be furnished by the Security Department only upon successful security screening.

b. Identification badges shall be worn by all contractor personnel in a visible location at all times while on the Camp.

c. Identification badges shall be immediately delivered to the Contracting Officer for cancellation upon termination or release of any employee.

d. All identification shall be delivered to the Contracting Officer for cancellation upon termination or completion of contract. Failure to return badges will hold up Contractor's final payment.

e. Immediately report instances of lost or stolen badges to the Contracting Officer. Replacement of a lost or stolen badge may be granted after the applicant completes a signed statement outlining the circumstances subject to Base Security's…