This package includes engineering drawings and one-line diagrams for an electrical power plant project at Camp Lemonnier, Djibouti. The drawings depict site plans, building layouts, underground duct banks, switchgear, motor control centers, generators, transformers, medium and low voltage systems, SCADA controls, DC power, and cable and raceway schedules. The project involves designing and constructing upgrades and replacements to the base's existing electrical infrastructure to support current and future needs.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R-111 R-110
R-107 R-106
FOOTER TOP
-1600
FOOTER BOTTOM
-2100
150250250250150
E E
EE
SP SP
SPSP
TRENCH
-900
GROUND LEVEL
COMPACTED BACKFILL
TO 90%
CLEAN FINE BACKFILL
MATERIAL
CONCRETE
R-238R-237
R-231
R-232
R-240 R-241
R-233
R-234
R-235
R-236
R-221
R-220
R-223R-222
R-219
R-218R-224
R-225
GROUND LEVEL
TRENCH B
-900
GENERATOR PAD B
-1200
CLEAN, FINE
BACKFILL MATERIAL
COMPACTED
BACKFILL TO 90%
CONCRETE
105190190190190190190190190190190190105
R-271 R-261 R-262 R-263 R-264R-272
R-273
R-265R-250 R-251R-255
R-253
R-266
R-269 R-268 R-267
GROUND LEVEL
105 190 190 190 190 190 190 190 190 105
COMPACTED
BACKILL TO 90%
CLEAN, FINE
BACKFILL
MATERIAL
CONCRETE
E
SP SP
C
TRENCH
-900
GROUND LEVEL
TOP OF FOOTER
-1600
105190105
COMPACTED
BACKFILL TO
90%
CLEAN, FINE
BACKFILL
MATERIAL
CONCRETE
BOTTOM OF TRENCH
-1200
GROUND LEVEL
COMPACTED BACKFILL
TO 90%
CLEAN FINE BACKFILL
MATERIAL
CONCRETE
R-100
R-101
1502302301064230230150
GROUND LEVEL
TOP OF FOOTER
-1600
BOTTOM OF FOOTER
-2100
105 190 190 165
250 250 150
E C E
SP SP
E SP
REFER TO SB301 FOR
TRENCH DETAILS
CLEAN, FINE
BACKFILL MATERIAL
2" SCHED 80
CONDUIT (TYP)
6" SCHED 80
CONDUIT (TYP)
COMMUNICATIONS
GROUP
BOTTOM OF TRENCH
-1200
FIRST FLOOR
[0]
TOF
[-1100]
TRANSFORMER FOUNDATION
[-1100]
TRANSFORMER FRAMING
[-250]
150 230 230 230 732 230 230 230
R-137 R-136 R-127 R-126
CONCRETE
CLEAN, FINE
BACKFILL MATERIAL
520 230
1676 230
R-123
R-122
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
A T
L A
N T
IC
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
1643338
A T
LA
N
T
IC
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N
DPS
/1 /2
:0 :1
A
M B
IM
/P
E le c tr ic a l P o w e r
P la n t F
D A
/8
P
E le c t P w r
P ln t F
D A
C E
.r v t
EW112
P -3
/P
-3 E
L E
C T
R
IC
A L P
O W
E R
P L A
N T
U N
D E
R
FL
O O
R R
A C
E W
A Y
S E
C
TI
O N
V
IE
W S
MHW
14124631
NTB JSD
JWH/SCN
D
JI
B O
U T
I, D
JI
B
O U
T I
C A
M P
L E
M O
N N
IE
R
RICHARD STEPHENS
SEK
1 : 20 C3
GENERATOR POWER GROUP - DIRECT BURIED DUCTBANK SECTION
1 : 20 C1
NORTH MCC - DIRECT BURIED DUCTBANK SECTION
1 : 20 A1
SOUTH MCC - DIRECT BURIED DUCTBANK SECTION
1 : 20 A2
COMMUNICATIONS - DIRECT BURIED DUCTBANK SECTION
1 : 20 C2
ISOLATION TRANSFORMER - DIRECT BURIED DUCTBANK SECTION
1 : 20 A3
GENERATOR POWER AND CONTROLS - DIRECT BURIED DUCTBANK SECTION
1 : 20 B1
ELECTRICAL ROOM - DIRECT BURIED SECTION
DPS
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
P
P I R
E S
P O
N S
E S
/2
0/
MAIN SWITCHGEAR
MVS-PP4-M1
2000A, 11kV, 3PH, 3W+GND, 50 HZ
TO
LVS-PP4-L1A
N.O. N.C.
CB-M1-T2
2000AF
2000AT
TO
PP2A
MVS-PP4-M1A
CB-M1-04
1200AF
200AT
N.C.
CB-M1-01
2000AF
2000AT
N.C.
TO
PP2A
CB-M1-08
2000AF
2000AT
N.C.
CB-G2-M
2000AF
2000AT
N.C.
CB-G2-01
1200AF
400AT
N.C.
CB-G2-02
1200AF
400AT
N.C.
CB-G2-T2
2000AF
2000AT
CB-G2-T3
2000AF
2000AT
CB-G2-06
1200AF
400AT
N.C.
CB-G2-07
1200AF
400AT
N.C.
CB-G2-05
1200AF
400AT
N.C.
4.5MW
DG-06
4.5MW
DG-07
4.5MW
DG-08
4.5MW
DG-09
4.5MW
DG-10
N.C.
CB-G1-T2
2000AF
2000AT
CB-G1-T3
2000AF
2000AT
CB-M1-M1
2000AF
2000AT
N.C.
CB-M1-M2
2000AF
2000AT
N.C.
CB-G1-01
1200AF
400AT
N.C.
CB-G1-02
1200AF
400AT
N.C.
4.5MW
DG-01
4.5MW
DG-02
4.5MW
DG-03
4.5MW
DG-04
4.5MW
DG-05
CB-M1-02
1200AF
1200AT
(SPARE)
CB-M1-03
1200AF
400AT
(SPARE)
CB-M1-06
1200AF
400AT
(SPARE)
CB-M1-07
1200AF
1200AT
(SPARE)
CB-G2-T1
2000AF
2000AT
N.C.
GENERATOR BUS 1
MVS-PP4-G1
2000A, 11kV, 3PH, 3W+GND, 50 HZ
GENERATOR BUS 2
MVS-PP4-G2
2000A, 11kV, 3PH, 3W+GND, 50 HZ
CB-M1-05
1200AF
200AT
N.C.
CB-G1-T1
2000AF
2000AT
N.C.
CB-G2-T4
2000AF
2000AT
N.O.
CB-G1-T4
2000AF
2000AT
N.O.
XFMR-PP4-1B
11kV-11kV
34MVA
5.75 %Z
XFMR-PP4-1A
11kV-11kV
34MVA
5.75 %Z
CB-G1-M
2000AF
2000AT
N.C.
N.C.
N.C. N.C.
CB-G1-03
1200AF
400AT
(SPARE)
CB-G1-04
1200AF
400AT
N.C.
CB-G2-03
1200AF
400AT
(SPARE)
TO
MCC-PP4-01
TO
MCC-PP4-02
52 52
52 52 52 52 52 52 52 52 52 52
525252525252525252
CB-M1-T1
2000AF
2000AT
MVS-PP4-G1A MVS-PP4-G1B
MVS-PP4-G2A MVS-PP4-G2B
MVS-PP4-M1B
M-100 R-100
M-101 R-101
M-102 R-102
M-103 R-103
M-105 R-105
M-106 R-106
M-107 R-107
M-108 R-108
M-110 R-110
M-111 R-111
M-112 R-112
M-104 R-104
M-113 R-113
M-114 R-114
M-118 R-118
M-119 R-119
M-120 R-120
M-122 R-122
M-123 R-123
M-124
R-124TO
LVS-PP4-L1B
CB-G1-05
1200AF
400AT
N.C.
CB-G1-06
1200AF
400AT
N.C.
CB-G1-07
1200AF
400AT
N.C.
CB-G2-04
1200AF
400AT
N.C.
M-115 R-115
M-109 R-109
3 4
52 52 52 52 52 52 52
7 7
52 52
7 7
1 1
3 4
3 4
6 6 6
2 2 2 2
2 2 22 23
56665
6 6
6 6
1 1
1 1 1 1
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
A T
L A
N T
IC
N
O R
F O
L K
V
A
AS NOTED
1643338
A T
LA
N
T
IC
D E
S
IG
N A
N D
C O
N S
T R
U C
T
/1 /2
:0 :3
A
M B
IM
/P
E le c tr ic a l P o w e r
P la n t F
D A
/8
P
E le c t P w r
P ln t F
D A
C E
.r v t
EW601
P -3
/P
-3 E
L E
C T
R
IC
A L P
O W
E R
P L A
N T
O N
E L
IN
E
D
IA
G R
A M
M
E D
IU
M
V O
LT
A
G E
MHW
14124643
NTB JSD
JWH/SCN
D
JI
B O
U T
I, D
JI
B
O U
T I
C A
M P
L E
M O
N N
IE
R
RICHARD STEPHENS
SEK
GENERAL NOTES
# KEY NOTES
1 PROVIDE ADVANCED METERING INFRASTRUCTURE (AMI) METER AT THIS
LOCATION.
2 GENERATOR BREAKER SECTION - REFER TO EW626 FOR DETAILED BREAKER
ONE LINE DIAGRAM.
3 SYNCHRONOUS TIE BREAKER SECTION - CONTAINS SYNCHRONIZER
COMPONENT OF GENERATOR PARALLELING SYSTEM - REFER TO EW627 FOR
DETAILED BREAKER ONE LINE DIAGRAM.
4 ASYNCHRONOUS TIE BREAKER SECTION - REFER TO EW627 FOR DETAILED
BREAKER ONE LINE DIAGRAM.
5 SYNCHRONOUS FEEDER BREAKER SECTION - CONTAINS SYNCHRONIZER
COMPONENT OF GENERATOR PARALLELING SYSTEM - REFER TO EW625 FOR
DETAILED BREAKER ONE LINE DIAGRAM.
6 ASYNCHRONOUS FEEDER BREAKER SECTION - REFER TO EW625 FOR
DETAILED BREAKER ONE LINE DIAGRAM.
7 PROVIDE 4 SPARE 160mm CONDUITS TO MANHOLE.
8 PROVIDE TRANSFORMER DIFFERENTIAL PROTECTION AT THIS LOCATION.
A. REFER TO SHEET E-001 AND E-002 FOR ELECTRICAL SYMBOLS AND
ABBREVIATIONS.
B. REFER TO SHEET EW711 AND EW712 FOR FEEDER AND RACEWAY SCHEDULE.
C. 4,469 EKW GENERATOR RATING AT 50C IS ACCEPTABLE.
DPS
NO SCALE
A1
ONE LINE DIAGRAM - MEDIUM VOLTAGE SWITCHGEAR
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
P
P I R
E S
P O
N S
E S
/2
0/
TR-PP4-01A
11KV/400Y/230V
2.5 MVA
5.75 %Z
LVS-PP4-L1BLVS-PP4-L1A
400V, 3PH, 4W, 4000A, 100KAIC
FROM
MVS-PP4-M1A
SWITCHGEAR
400AP
800AF
LSIG
800AP
800AF
LSIG
600AP
800AF
LSIG
600AP
800AF
LSIG
800AP
800AF
LSIG
600AP
800AF
LSIG
600AP
800AF
LSIG
800AP
800AF
LSIG
T O
M C
C -P
P -0
400V, 3PH, 4W, 4000A, 100KAIC
TR-PP4-01B
11KV/400Y/230V
2.5 MVA
5.75 %Z
M-122 R-122
FROM
MVS-PP4-M1B
SWITCHGEAR
M-123 R-123
400AP
800AF
LSIG
N.O.
S P
A R
E
400AP
800AF
LSIG
N.O.
S P
A R
E
T O
M C
C -P
P -0
T O
M C
C -P
P -0
T O
M C
C -P
P -0
T O
M C
C -P
P -0
NDP
T O
B C
-P P
-0
B
600AP
800AF
LSIG
CB-L1-M1
3200AF
3200AP
4-POLE
LSIG
CB-L1-05 CB-L1-T2
3200AF
3200AP
4-POLE
LSIG
N.C.
CB-L1-07 CB-L1-08 CB-L1-10
1200AP
1600AF
LSIG
CH-01
CB-L1-04
T O
M C
C -P
P -0
CB-L1-13 CB-L1-15 CB-L1-16 CB-L1-17CB-L1-11
CH-02
1200AP
1600AF
LSIG
CB-L1-18
600AP
800AF
LSIG
T O
B C
-P P
-0
A
CB-L1-03
M-132 R-132
M-130 R-130
M-126 R-126
M-131 R-131
M-127 R-127
M-137 R-137
M-136 R-136
M-138 R-138
M-139 R-139
M-140 R-140
M-133 R-133
M-141 R-141
1000AP
1600AF
LSIG
N.O.
ROLL-UP
GEN
TAP BOX
M-125 R-125
CB-L1-01 CB-L1-02 CB-L1-12
3P NF
NDP
3P NF
1 1
CB-L1-M2
3200AF
3200AP
4-POLE
LSIG
CB-L1-T1
3200AF
3200AP
4-POLE
LSIG
N.O.
1 1
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
A T
L A
N T
IC
N
O R
F O
L K
V
A
AS NOTED
1643338
A T
LA
N
T
IC
D E
S
IG
N A
N D
C O
N S
T R
U C
T
/1 /2
:0 :3
A
M B
IM
/P
E le c tr ic a l P o w e r
P la n t F
D A
/8
P
E le c t P w r
P ln t F
D A
C E
.r v t
EW602
P -3
/P
-3 E
L E
C T
R
IC
A L P
O W
E R
P L A
N T
O N
E L
IN
E
D
IA
G R
A M
LO
A D
C E
N
TE
R
MHW
14124644
NTB JSD
JWH/SCN
D
JI
B O
U T
I, D
JI
B
O U
T I
C A
M P
L E
M O
N N
IE
R
RICHARD STEPHENS
SEK
GENERAL NOTES
# KEY NOTES 1
A. REFER TO SHEET E-001 AND E-002 FOR ELECTRICAL
SYMBOLS AND ABBREVIATIONS.
B. REFER TO SHEET EW711 FOR FEEDER AND RACEWAY
SCHEDULE.
DPS
NO SCALE
B1
ONE LINE DIAGRAM - LOAD CENTER
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
P
P I R
E S
P O
N S
E S
/2
0/
1. MAIN AND TIE BREAKERS MUST BE 4-POLE BREAKERS.
PROVIDE INTERLOCKS OT PREVENT PARALLELING OF
SOURCES. OPEN TRANSITION MANUAL THROW-OVER.
FROM
MVS-PP4-G1B
(SHEET EW601)
HMCP
150A
2000AF
2000AT
MCC-PP4-01
400V, 2000A, 3PH, 3W, 50HZ, 65 KAIC
M-108 R-108
XFMR-PP4-01
1500 KVA
11kV-400Y/230V Z=5.75%
HMCP
150A
HMCP
150A
HMCP
150A
HMCP
150A
HMCP
150A
M-142 R-142
M-143 R-143
M-144 R-144
M-149 R-149
M-150 R-150
M-151 R-151
ACR-01A
37.3KW
ACR-01B
37.3KW
ACR-01C
37.3KW
ACR-02A
37.3KW
ACR-02B
37.3KW
ACR-02C
37.3KW
HMCP
150A
ACR-03A
37.3KW
HMCP
150A
HMCP
150A
HMCP
150A
HMCP
150A
HMCP
150A
HMCP
150A
HMCP
150A
HMCP
150A
M-156 R-156
M-157 R-157
M-158 R-158
M-163 R-163
M-164 R-164
M-165 R-165
M-170 R-170
M-171 R-171
M-172 R-172
ACR-03B
37.3KW
ACR-03C
37.3KW
ACR-04A
37.3KW
ACR-04B
37.3KW
ACR-04C
37.3KW
ACR-05A
37.3KW
ACR-05B
37.3KW
ACR-05C
37.3KW
ASD ASD ASD ASD ASD ASD ASD ASD ASD ASD ASD ASD ASD ASD ASD
M-355 R-355
2000AF
2000AT
TO
MCC-PP4-02
1 1
150A
ASD
BLDG
PANEL
HMCP
150A
2000AF
2000AT
MCC-PP4-02
400V, 2000A, 3PH, 3W, 50HZ, 65 KAIC
XFMR-PP4-02
1500 KVA
11kV-400Y/230V Z=5.75%
ACR-06A
37.3KW
HMCP
150A
HMCP
150A
HMCP
150A
HMCP
150A
HMCP
150A
FROM
MVS-PP4-G2B
(SHEET EW601)
M-109 R-109
M-177 R-177
M-178 R-178
M-179 R-179
M-184 R-184
M-185 R-185
M-186 R-186
ACR-06B
37.3KW
ACR-06C
37.3KW
ACR-07A
37.3KW
ACR-07B
37.3KW
ACR-07C
37.3KW
HMCP
150A
ACR-08A
37.3KW
HMCP
150A
HMCP
150A
HMCP
150A
HMCP
150A
HMCP
150A
HMCP
150A
HMCP
150A
HMCP
150A
M-191 R-191
M-192 R-192
M-193 R-193
M-198 R-198
M-199 R-199
M-200 R-200
M-205 R-205
M-206 R-206
M-207 R-207
ACR-08B
37.3KW
ACR-08C
37.3KW
ACR-09A
37.3KW
ACR-09B
37.3KW
ACR-09C
37.3KW
ACR-10A
37.3KW
ACR-10B
37.3KW
ACR-10C
37.3KW
ASD ASD ASD ASD ASD ASD ASD ASD ASD ASD ASD ASD ASD ASD ASD
M-356 R-356
MDP
600A
2000AF
2000AT
TO
MCC-PP4-01
1 1
ASD
BLDG
PANEL
150A
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
A T
L A
N T
IC
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
1643338
A T
LA
N
T
IC
D E
S
IG
N A
N D
C O
N S
T R
U C
T
/1 /2
:0 :4
A
M B
IM
/P
E le c tr ic a l P o w e r
P la n t F
D A
/8
P
E le c t P w r
P ln t F
D A
C E
.r v t
EW603
P -3
/P
-3 E
L E
C T
R
IC
A L P
O W
E R
P L A
N T
O N
E L
IN
E
D
IA
G R
A M
M
O
TO
R C
O N
TR
O
L C
E N
TE
R
S
S H
E E
T
O F
4)
MHW
14124645
NTB JSD
JWH/SCN
D
JI
B O
U T
I, D
JI
B
O U
T I
C A
M P
L E
M O
N N
IE
R
RICHARD STEPHENS
SEK
NO SCALE
C1
ONE LINE DIAGRAM - MOTOR CONTROL CENTER - MCC-PP4-01
NO SCALE
A1
ONE LINE DIAGRAM - MOTOR CONTROL CENTER - MCC-PP4-02
GENERAL NOTES
# KEY NOTES
A. REFER TO SHEET E-001 AND E-002 FOR ELECTRICAL
SYMBOLS AND ABBREVIATIONS.
B. REFER TO SHEETS EW711 AND EW712 FOR FEEDER AND
RACEWAY SCHEDULE.
C. REFER TO SHEET EW520 FOR MOTOR SCHEDULE.
D. FEEDER BREAKERS SHOULD BE BUCKET CONSTRUCTION
AND HAVE THE ABILITY TO BE WITHDRAWN. MAINS AND
TIES SHOULD BE FIXED MOUNTED.
DPS
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
P
P I R
E S
P O
N S
E S
/2
0/
1. MCC-PP4-01 AND MCC-PP4-02 BREAKERS SHOULD BE
MANUALLY OPERATED. PROVIDE KIRK-KEY INTERLOCKS TO
PREVENT TRANSFORMER PARALLELING. OPEN TRANSITION
ONLY. TIE BREAKERS ON MCC-PP4-01 SHOULD BE KEYED
NORMALLY OPEN. TIE BREAKERS ON MCC-PP4-02 SHOULD
BE UNKEYED AND NORMALLY CLOSED.
LVS-PP4-L1A
(SHEET EW602)
MCC-PP4-03
400V, 1200A, 3PH, 3W+GND, 50HZ, 65 KAIC
AHU-01
M-274 R-274
M-275 R-275
M-276 R-276
M-130 R-130
HMCP
250A
EF-01
75 KW
EF-02
75 KW
EF-03
75 KW
HMCP
7A
EF-07
0.25 KW
EF-08
0.25 KW
EF-09
0.25 KW
HMCP
15A
PF-01
2.24 KW
HMCP
15A
PF-02
2.24 KW
HMCP
150A
EF-14
30 KW
AHU-02 AHU-03
250A
SSOL SSOL SSOL SSOL SSOL SSOL SSOL SSOL SSOL
5 5
HMCP
7A
HMCP
7A
EF-16
0.25 KW
SSOL
HMCP
7A
250A250A HMCP
250A
HMCP
250A
M-331 R-331
M-332 R-332
M-333 R-333
M-337 R-337
M-338 R-338
M-339 R-339
M-344 R-344
M-346 R-346
M-351 R-351
M-352 R-352
3P NF 3P NF 3P NF 3P NF 3P NF 3P NF 3P NF 3P NF 3P NF 3P NF 3P NF 3P NF 3P NF
FROM
LVS-PP4-L1B
(SHEET EW602)
M-278 R-278
M-279 R-279
M-138 R-138
MCC-PP4-04
400V, 1200A, 3PH, 3W+GND, 50HZ, 65 KAIC
HMCP
250A
EF-04
75 KW
HMCP
250A
EF-05
75 KW
HMCP
250A
EF-06
75 KW
HMCP
7A
EF-10
0.25 KW
HMCP
7A
EF-11
0.25 KW
HMCP
7A
EF-12
0.25 KW
HMCP
7A
EF-13
0.25 KW
HMCP
15A
PF-03
2.24 KW
HMCP
15A
PF-04
2.24 KW
M-277 R-277
HMCP
150A
EF-15
30 KW
AHU-04 AHU-05 AHU-06
250A
SSOL SSOL SSOL SSOL SSOL SSOL SSOL SSOL SSOL SSOL
250A250A
M-334 R-334
M-335 R-335
M-336 R-336
M-340 R-340
M-341 R-341
M-342 R-342
M-343 R-343
M-345 R-345
M-353 R-353
M-354 R-354
3P NF 3P NF 3P NF 3P NF 3P NF 3P NF 3P NF 3P NF 3P NF 3P NF 3P NF 3P NF 3P NF
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
A T
L A
N T
IC
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
1643338
A T
LA
N
T
IC
D E
S
IG
N A
N D
C O
N S
T R
U C
T
/1 /2
:0 :4
A
M B
IM
/P
E le c tr ic a l P o w e r
P la n t F
D A
/8
P
E le c t P w r
P ln t F
D A
C E
.r v t
EW604
P -3
/P
-3 E
L E
C T
R
IC
A L P
O W
E R
P L A
N T
O N
E L
IN
E
D
IA
G R
A M
M
O
TO
R C
O N
TR
O
L C
E N
TE
R
S
S H
E E
T
O F
4)
MHW
14124646
NTB JSD
JWH/SCN
D
JI
B O
U T
I, D
JI
B
O U
T I
C A
M P
L E
M O
N N
IE
R
RICHARD STEPHENS
SEK
GENERAL NOTES
# KEY NOTES
NO SCALE
C1
ONE LINE DIAGRAM - MOTOR CONTROL CENTER - MCC-PP4-03
A. REFER TO SHEET E-001 AND E-002 FOR ELECTRICAL
SYMBOLS AND ABBREVIATIONS.
B. REFER TO SHEETS EW711 AND EW712 FOR FEEDER AND
RACEWAY SCHEDULE.
C. REFER TO SHEET EW520 FOR MOTOR SCHEDULE
D. FEEDERS SHOULD BE BUCKET CONSTRUCTION AND HAVE
THE ABILITY TO BE WITHDRAWN. MAINS AND TIES SHOULD
BE FIXED AND MOUNTED
NO SCALE
A1
ONE LINE DIAGRAM - MOTOR CONTROL CENTER - MCC-PP4-04
DPS
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
P
P I R
E S
P O
N S
E S
/2
0/
LVS-PP4-L1A
(SHEET EW602)
MCC-PP4-05
400V, 600A, 3PH, 3W+GND, 50HZ, 65 KAIC
HMCP
7A
FOCP-01
HMCP
7A
DEFP-01
HMCP
15A
FOOP-01 ULOP-11
HMCP
70A
CWP-01 CWP-02 CWP-03 CWP-04
HMCP
7A
ULOP-01
HMCP
7A
ULOP-02
HMCP
30A
AC-01
1 1 1 1
HMCP
30A
AC-02
11 1
M-126 R-126
M-214 R-214
M-215 R-215
M-216 R-216
M-217 R-217
M-218 R-218
M-219 R-219
M-220 R-220
M-221 R-221
M-222 R-222
M-223 R-223
M-224 R-224
M-225 R-225
HMCP
7A
HMCP
30A
CHWP-01
HMCP
30A
CHWP-02
M-289 R-289
M-290 R-290
ASDSSOL SSOL SSOL SSOL SSOL SSOL SSOL SSOL SSOL SSOL
5.6KW 5.6KW1.5KW 1.5KW15KW2.2KW 1.5KW1.9KW 1.5KW3.7KW 3.7KW
HMCP
70A
HMCP
70A
HMCP
70A
15KW 15KW 15KW
ASD ASD ASD
HMCP
7A
AFU-01
0.37KW
1 1
M-357 R-357
M-358 R-358
SSOL SSOL
AFU-02
0.37KW
HMCP
7A
FROM
LVS-PP4-L1A
(SHEET EW602)
MCC-PP4-06
400V, 600A, 3PH, 3W+GND, 50HZ, 65 KAIC
HMCP
15A
FOCP-02
HMCP
15A
FOOP-02
HMCP
70A
CWP-05 CWP-06 CWP-07 CWP-08
HMCP
7A
ULOP-03
HMCP
7A
ULOP-04
HMCP
30A
AC-03
1 1 1
HMCP
30A
AC-04
CWP-09 CWP-10
HMCP
7A
ULOP-05
HMCP
30A
AC-05
M-127 R-127
M-229 R-229
M-230 R-230
M-231 R-231
M-232 R-232
M-233 R-233
M-234 R-234
M-235 R-235
M-236 R-236
M-237 R-237
M-238 R-238
M-239 R-239
M-240 R-240
M-241 R-241
M-242 R-242
HMCP
30A
CHWP-03
HMCP
30A
CHWP-04
M-291 R-291
M-292 R-292
ASD
1.5KW 5.6KW1.5KW 1.5KW15KW1.8KW 2.24KW3.7KW 3.7KW 5.6KW 5.6KW
SSOL SSOL SSOL SSOL SSOL SSOL SSOL SSOL SSOL SSOL
HMCP
70A
HMCP
70A
HMCP
70A
HMCP
70A
HMCP
70A
15KW 15KW 15KW 15KW 15KW
ASD ASD ASD ASD ASD
HMCP
7A
AFU-03
HMCP
7A
1 1
HMCP
7A
M-359 R-359
M-360 R-360
M-361 R-361
0.37KW
SSOL SSOL SSOL
AFU-04
0.37KW
AFU-05
0.37KW
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
A T
L A
N T
IC
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
1643338
A T
LA
N
T
IC
D E
S
IG
N A
N D
C O
N S
T R
U C
T
/1 /2
:0 :4
A
M B
IM
/P
E le c tr ic a l P o w e r
P la n t F
D A
/8
P
E le c t P w r
P ln t F
D A
C E
.r v t
EW605
P -3
/P
-3 E
L E
C T
R
IC
A L P
O W
E R
P L A
N T
O N
E L
IN
E
D
IA
G R
A M
M
O
TO
R C
O N
TR
O
L C
E N
TE
R
S
S H
E E
T
O F
4)
MHW
14124647
NTB JSD
JWH/SCN
D
JI
B O
U T
I, D
JI
B
O U
T I
C A
M P
L E
M O
N N
IE
R
RICHARD STEPHENS
SEK
GENERAL NOTES
NO SCALE
C1
ONE LINE DIAGRAM - MOTOR CONTROL CENTERS - MCC-PP4-05
NO SCALE
A1
ONE LINE DIAGRAM - MOTOR CONTROL CENTERS - MCC-PP4-06
A. REFER TO SHEET E-001 AND E-002 FOR ELECTRICAL
SYMBOLS AND ABBREVIATIONS.
B. REFER TO SHEETS EW711 AND EW712 FOR FEEDER AND
RACEWAY SCHEDULE.
C. REFER TO SHEET EW520 FOR MOTOR SCHEDULE
D. FEEDERS SHOULD BE BUCKET CONSTRUCTION AND HAVE
THE ABILITY TO BE WITHDRAWN. MAINS AND TIES SHOULD
BE FIXED AND MOUNTED
DPS
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
P
P I R
E S
P O
N S
E S
/2
0/
MCC-PP4-07
400V, 600A, 3PH, 3W+GND, 50HZ, 65 KAIC
HMCP
15A
FOCP-03
HMCP
7A
DEFP-02
HMCP
15A
FOOP-03 CWP-11
HMCP
70A
CWP-12 CWP-13 CWP-14
HMCP
7A
ULOP-06
HMCP
7A
ULOP-07
HMCP
30A
AC-06
1 1 1 1
FROM
LVS-PP4-L1B
(SHEET EW602)
HMCP
30A
AC-07
M-136 R-136
M-245 R-245
M-246 R-246
M-247 R-247
M-248 R-248
M-249 R-249
M-250 R-250
M-251 R-251
M-252 R-252
M-253 R-253
M-254 R-254
M-255 R-255
HMCP
30A
DEFP-03
M-288 R-288
HMCP
150A
CHWP-06
M-294 R-294
HMCP
150A
CHWP-05
M-293 R-293
ASDSSOL SSOL SSOL SSOL SSOL
1.9KW 1.5KW 2.2KW 15KW 1.5KW 1.5KW 5.6KW 5.6KW 7.5KW30KW30KW
SSOL SSOL SSOL SSOL SSOL
HMCP
70A
HMCP
70A
HMCP
70A
15KW 15KW 15KW
ASD ASD ASD
HMCP
7A
AFU-06 AFU-07
1 1
M-362 R-362
M-363 R-363
0.37KW 0.37KW
SSOL SSOL
HMCP
7A
MCC-PP4-08
400V, 600A, 3PH, 3W+GND, 50HZ, 65 KAIC
HMCP
15A
FOCP-04
HMCP
15A
FOOP-04
HMCP
70A
CWP-15 CWP-16 CWP-17 CWP-18
HMCP
7A
ULOP-08
HMCP
7A
ULOP-09
HMCP
30A
AC-08
1 1 1
FROM
LVS-PP4-L1B
(SHEET EW602)
HMCP
30A
AC-09
CWP-19 CWP-20
HMCP
7A
ULOP-10
HMCP
30A
AC-10
LOP-01
M-137 R-137
M-259 R-259
M-260 R-260
M-261 R-261
M-262 R-262
M-263 R-263
M-264 R-264
M-265 R-265
M-266 R-266
M-267 R-267
M-268 R-268
M-269 R-269
M-270 R-270
M-271 R-271
M-272 R-272
M-273 R-273
HMCP
15A
ASDSSOL SSOL SSOL SSOL SSOL SSOL SSOL SSOL SSOL
1.8KW 2.2KW 15KW 1.5KW 5.6KW2.2KW 5.6KW 5.6KW1.5KW 1.5KW
HMCP
70A
HMCP
70A
HMCP
70A
HMCP
70A
HMCP
70A
15KW 15KW 15KW 15KW 15KW
ASD ASD ASD ASD ASD
HMCP
7A
AFU-08
HMCP
7A
AFU-09
1 1
HMCP
7A
AFU-10
M-364 R-364
M-365 R-365
M-366 R-366
SSOL SSOL SSOL
0.37KW 0.37KW 0.37KW
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
A T
L A
N T
IC
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
1643338
A T
LA
N
T
IC
D E
S
IG
N A
N D
C O
N S
T R
U C
T
/1 /2
:0 :4
A
M B
IM
/P
E le c tr ic a l P o w e r
P la n t F
D A
/8
P
E le c t P w r
P ln t F
D A
C E
.r v t
EW606
P -3
/P
-3 E
L E
C T
R
IC
A L P
O W
E R
P L A
N T
O N
E L
IN
E
D
IA
G R
A M
M
O
TO
R C
O N
TR
O
L C
E N
TE
R
S
S H
E E
T
O F
4)
MHW
14124648
NTB JSD
JWH/SCN
D
JI
B O
U T
I, D
JI
B
O U
T I
C A
M P
L E
M O
N N
IE
R
RICHARD STEPHENS
SEK
NO SCALE
C1
ONE LINE DIAGRAM - MOTOR CONTROL CENTERS - MCC-PP4-07
NO SCALE
A1
ONE LINE DIAGRAM - MOTOR CONTROL CENTERS - MCC-PP4-08
GENERAL NOTES
# KEY NOTES
A. REFER TO SHEET E-001 AND E-002 FOR ELECTRICAL
SYMBOLS AND ABBREVIATIONS.
B. REFER TO SHEETS EW711 AND EW712 FOR FEEDER AND
RACEWAY SCHEDULE.
C. REFER TO SHEET EW520 FOR MOTOR SCHEDULE
D. FEEDERS SHOULD BE BUCKET CONSTRUCTION AND HAVE
THE ABILITY TO BE WITHDRAWN. MAINS AND TIES SHOULD
BE FIXED AND MOUNTED
DPS
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
P
P I R
E S
P O
N S
E S
/2
0/
400A
BATTERY
CHARGER
400V
FROM
LVS-PP4-L1A
125 VDC
BATTERY
1660AH
NO
BC-PP4-01A
DCP-PP4-01A
DC PANEL
BAT-PP4-01A
400A
BATTERY
CHARGER
400V
FROM
LVS-PP4-L1B
BC-PP4-01B
BAT-PP4-01B
NO
DCP-PP4-01B
DC PANEL
125 VDC
BATTERY
1660AH
M-133 R-133
M-141 R-141
NO
ACP-PP4-01A
AC PANEL
T O
G A
U X
-P P
-0
T O
M V
S -P
P -G
A
T O
M V
S -P
P -G
A
T O
M V
S -P
P -M
A
T O
C O
N T
R O
L S
E R
V E
R A
NO
ACP-PP4-01B
AC PANEL
T O
M V
S -P
P -G
B
T O
M V
S -P
P -G
B
T O
M V
S -P
P -M
B
T O
C O
N T
R O
L S
E R
V E
R B
INV-PP4-01A
100A
INV-PP4-01B
100A
T O
G A
U X
-P P
-0
T O
G A
U X
-P P
-0
T O
G A
U X
-P P
-0
T O
G A
U X
-P P
-0
T O
M A
U X
-P P
-0
T O
M A
U X
-P P
-0
T O
M A
U X
-P P
-0
T O
M A
U X
-P P
-0
T O
M A
U X
-P P
-0
T O
G A
U X
-P P
-0
T O
G A
U X
-P P
-0
T O
G A
U X
-P P
-0
T O
G A
U X
-P P
-0
T O
G A
U X
-P P
-1
T O
M A
U X
-P P
-0
T O
M A
U X
-P P
-0
T O
M A
U X
-P P
-0
T O
M A
U X
-P P
-1
T O
M A
U X
-P P
-0
400/230V
FROM NDP
400/230V
FROM NDP
M-307 R-307
M-308 R-308
M-212 R-212
M-213 R-213
M-226 R-226
M-227 R-227
M-228 R-228
M-321 R-321
M-243 R-243
M-244 R-244
M-256 R-256
M-257 R-257
M-258 R-258
M-309 R-309
M-325 R-325
M-324 R-324
M-323 R-323
M-322 R-322
M-330 R-330
M-329 R-329
M-328 R-328
M-327 R-327
M-326 R-326
M-311 R-311
M-301 R-301M-286
R-286
M-287 R-287
M-300 R-300
M-300 R-300
M-297 R-297
M-298 R-298
M-299 R-299
M-302 R-302
M-303 R-303
M-304 R-304
M-310 R-310
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
A T
L A
N T
IC
N
O R
F O
L K
V
A
AS NOTED
1643338
A T
LA
N
T
IC
D E
S
IG
N A
N D
C O
N S
T R
U C
T
/1 /2
:0 :4
A
M B
IM
/P
E le c tr ic a l P o w e r
P la n t F
D A
/8
P
E le c t P w r
P ln t F
D A
C E
.r v t
EW611
P -3
/P
-3 E
L E
C T
R
IC
A L P
O W
E R
P L A
N T
O N
E L
IN
E
D
IA
G R
A M
V D
C S
Y S
TE
M
MHW
14124649
NTB JSD
JWH/SCN
D
JI
B O
U T
I, D
JI
B
O U
T I
C A
M P
L E
M O
N N
IE
R
RICHARD STEPHENS
SEK
NO SCALE
A1
ONE LINE DIAGRAM 125 VDC SYSTEM
GENERAL NOTES
# KEY NOTES
A. REFER TO SHEET E-001 AND E-002 FOR ELECTRICAL
SYMBOLS AND ABBREVIATIONS.
B. REFER TO PANEL SCHDULE IN BASIS OF DESIGN FOR
BREAKER AND CABLE SIZES.
C. REFER TO SHEET EW712 FOR FEEDER AND RACEWAY
SCHEDULE.
D. PROVIDE A MINIMUM OF 24 SPACES ON ALL DCP AND ACP
PANELS.
DPS
FEEDER SCHEDULE DC
CIRCUIT FROM TO SETS PHASES PHASE CONDUCTOR
NEUTRAL
CONDUCTOR GROUND CONDUCTOR
M-286 BC-PP4-01A DCP-PP4-01A 2 - 300KCMIL / 185mm2 - 3AWG / 35mm2
M-286 DCP-PP4-01A BC-PP4-01A *
M-287 BC-PP4-01B DCP-PP4-01B 2 - 300KCMIL / 185mm2 - 3AWG / 35mm2
M-287 DCP-PP4-01B BC-PP4-01B *
M-295 BC-PP4-01A BAT-PP4-01A 2 - 300KCMIL / 185mm2 - 3AWG / 35mm2
M-296 BC-PP4-01B BAT-PP4-01B 2 - 300KCMIL / 185mm2 - 3AWG / 35mm2
M-297 DCP-PP4-01A MVS-PP4-M1A DC 1 - 4AWG / 25mm2 - 8AWG / 10mm2
M-298 DCP-PP4-01A MVS-PP4-G1A DC 1 - 3AWG / 35mm2 - 8AWG / 10mm2
M-299 DCP-PP4-01A MVS-PP4-G2A DC 1 - 3AWG / 35mm2 - 8AWG / 10mm2
M-300 DCP-PP4-01A INV-PP4-01A 1 - 3/0AWG / 95mm2 - 6AWG / 16mm2
M-301 DCP-PP4-01A DCP-PP4-01B 1 - 3/0AWG / 95mm2 - 6AWG / 16mm2
M-302 DCP-PP4-01B MVS-PP4-M1B DC 1 - 4AWG / 25mm2 - 8AWG / 10mm2
M-303 DCP-PP4-01B MVS-PP4-G1B DC 1 - 4AWG / 25mm2 - 8AWG / 10mm2
M-304 DCP-PP4-01B MVS-PP4-G2B DC 1 - 4AWG / 25mm2 - 8AWG / 10mm2
M-305 DCP-PP4-01B INV-PP4-01B 1 - 3/0AWG / 95mm2 - 6AWG / 16mm2
RACEWAY SCHEDULE DC
CIRCUIT FROM TO TYPE SETS
SIZE
(INCHES) SIZE (mm) QUANTITY NOTES
R-286 BC-PP4-01A DCP-PP4-01A RGS 2 4 101.6 2
DCP-PP4-01A BC-PP4-01A
R-287 BC-PP4-01B DCP-PP4-01B RGS 2 4 101.6 2
DCP-PP4-01B BC-PP4-01B
R-295 BC-PP4-01A BAT-PP4-01A RGS 2 4 101.6 2
R-296 BC-PP4-01B BAT-PP4-01B RGS 2 4 101.6 2
R-297 DCP-PP4-01A MVS-PP4-M1A DC RGS 1 2 50.8 1
R-298 DCP-PP4-01A MVS-PP4-G1A DC RGS 1 2 50.8 1
R-299 DCP-PP4-01A MVS-PP4-G2A DC RGS 1 2 50.8 1
R-300 DCP-PP4-01A INV-PP4-01A RGS 1 3 76.2 1
R-301 DCP-PP4-01A DCP-PP4-01B RGS 1 3 76.2 1
R-302 DCP-PP4-01B MVS-PP4-M1B DC RGS 1 2 50.8 1
R-303 DCP-PP4-01B MVS-PP4-G1B DC RGS 1 2 50.8 1
R-304 DCP-PP4-01B MVS-PP4-G2B DC RGS 1 2 50.8 1
R-305 DCP-PP4-01B INV-PP4-01B RGS 1 3 76.2 1
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
P
P I R
E S
P O
N S
E S
/2
0/
MVS-PP4-M1A
11 KV, 2000A, 3PH, 3W+GND, 50HZ
MVS-PP4-M1B
11 KV, 2000A, 3PH, 3W+GND, 50HZ
.8
K V
/1 V
.8
K V
/1 V
S P
A R
E
L V
S -P
P -L
B
1200AF52 1200AF52
FPRFPR
1200AF52
FPR
2000AF52
FPR
2000AF52
FPR
2000AF52
S P
A R
E
2000:5 C400
1200:5 C400
1200:5 C400400:5
C400
2000:5 C400
2000:5 C400
2000:5 C400
2000:5 C400
2000:5 C400
2000:5 C400
1200:5 C400
2000:5 C400
FROM
XFMR-PP4-A
TRANSFORMER
FROM
XFMR-PP4-A
TRANSFORMER
2000:5 C400
FROM
MVS-PP4-G1A
SYNC CHECK PT
(B-PHASE ONLY)
(EW621)
FROM
MVS-PP4-G2A
SYNC CHECK PT
(B-PHASE ONLY)
(EW622)
7.65 KV
87B86B 87B 86B
2000AF
CB-M1-M1
2000AF
CB-M1-M2
2000:5 C400
2000:5 C400
2000:5 C400
FPR
86F
86F 86F 86F 86F 86F 86F
FPR
S P
A R
E
S P
A R
E
L V
S -P
P -L
A
2000AF52
FPR
2000:5 C400
2000:5 C400
86F
P P
A
52 522000AF 2000AF
FPR
86F
FPR
2000:5 C400
86F
TA
2000AF52
FPR
86F
TB
P P
A
2000:5 C400
2000:5 C400
2000:5 C400
2000:5 C400
AMI
FPR
86F
AMI
AMI AMI
2000:5 C400
7.65 KV
87T
FROM
MVS-PP4-G1A
CB-G1-M
CTs
(EW621)
87T
FROM
MVS-PP4-G2A
CB-G2-M
CTs
(EW622)
.8
K V
/1 V
.8
K V
/1 V
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
A T
L A
N T
IC
N
O R
F O
L K
V
A
AS NOTED
1643338
A T
LA
N
T
IC
D E
S
IG
N A
N D
C O
N S
T R
U C
T
/1 /2
:0 :4
A
M B
IM
/P
E le c tr ic a l P o w e r
P la n t F
D A
/8
P
E le c t P w r
P ln t F
D A
C E
.r v t
EW620
P -3
/P
-3 E
L E
C T
R
IC
A L P
O W
E R
P L A
N T
D E
TA
IL
E D
O N
E L
IN
E
D
IA
G R
A M
M V
S -P
P 4-
M
MHW
14124650
NTB JSD
JWH/SCN
D
JI
B O
U T
I, D
JI
B
O U
T I
C A
M P
L E
M O
N N
IE
R
RICHARD STEPHENS
SEK
NO SCALE
A1
MVS-PP4-M1
DPS
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
P
P I R
E S
P O
N S
E S
/2
0/
87B
52 52
86B
FPR
FPR
B-PHASE ONLY
(SYNC CHECK)
TO
XFMR-PP4-A
TRANSFORMER
2000:5 C400
2000:5 C400
10.8 KV/120V (3)10.8 KV/120V (3)
10.8 KV/120V (3)
400:5 C50
2000:5 C400
FROM MVS-PP4-M1A
SYNC CHECK PT
(B-PHASE ONLY)
M
2000AF
400:5 C50
400:5 C50
CONTINUED ON
SHEET EW622
GPR GPR
TO
GENERATOR
PARALLELING
CONTROLLER
400:5 C50
2000:5 C400
TO
CONTROLLERS
AND RELAYS
TO GENERATOR
PARALLELING
CONTROLLER
AND GENSET
CONTROLLER
2000:5 C400
2000:5 C400
TO
SYNCHRONIZER
2000:5 C400
200:5 C50
400:5 C50
DG-01
4.5 MW
11 KV, 0.8 PF
3 PH, 50 HZ
TO GENSET
CONTROLLER
2000:5 C400
200:5 C50
400:5 C50
86F 86G 86G
86F
DG-02
4.5 MW
11 KV, 0.8 PF
3 PH, 50 HZ
G1-01
1200AF
N.C.
G1-02
1200AF
N.C.
T2
2000AF
N.C.52
FPR
MVS-PP4-G1A
11 KV, 2000A, 63kA
TO
MVS-PP4-G2B
SWITCHGEAR
2000:5 C400
2000:5 C400
T1
2000AF
2000:5 C400
86F
FROM MVS-PP4-G2B
SYNC CHECK PT
(B-PHASE ONLY)
FPR
2000:5 C400
2000:5 C400
SPARE
1200AF
86F
TO
GENERATOR
PARALLELING
CONTROLLER
TO GENERATOR
PARALLELING
CONTROLLER
AND GENSET
CONTROLLER
TO GENSET
CONTROLLER
TO
SYNCHRONIZER
TO
SYNCHRONIZER2000:5
C400 TO
SYNCHRONIZER
1 1
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
A T
L A
N T
IC
N
O R
F O
L K
V
A
AS NOTED
1643338
A T
LA
N
T
IC
D E
S
IG
N A
N D
C O
N S
T R
U C
T
/1 /2
:0 :5
A
M B
IM
/P
E le c tr ic a l P o w e r
P la n t F
D A
/8
P
E le c t P w r
P ln t F
D A
C E
.r v t
EW621
P -3
/P
-3 E
L E
C T
R
IC
A L P
O W
E R
P L A
N T
D E
TA
IL
E D
O N
E L
IN
E
D
IA
G R
A M
M V
S -P
P 4-
G 1A
MHW
14124651
NTB JSD
JWH/SCN
D
JI
B O
U T
I, D
JI
B
O U
T I
C A
M P
L E
M O
N N
IE
R
RICHARD STEPHENS
SEK
NO SCALE
A1
MVS-PP4-G1A
DPS
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
P
P I R
E S
P O
N S
E S
/2
0/
86B
FPR
B-PHASE ONLY
(SYNC CHECK)
2000:5 C400
10.8 KV/120V (3) 11 KV/120V (3)
10.8 KV/120V (3)
400:5 C50
400:5 C50
400:5 C50
FROM SHEET
EW621
GPRGPR
400:5 C50
2000:5 C400
TO
CONTROLLERS
AND RELAYS
2000:5
C400TO
SYNCHRONIZER
2000:5 C400
200:5 C50
400:5 C50
DG-05
4.5 MW
11 KV, 0.8 PF
3 PH, 50 HZ
2000:5 C400
200:5 C50
400:5 C50
86G86G
86F
DG-04
4.5 MW
11 KV, 0.8 PF
3 PH, 50 HZ
G1-07
1200AF
N.C.
G1-06
1200AF
N.C.
T3
2000AF
N.C.
TO
MCC-PP4-01
FPR
MVS-PP4-G1B
11 KV, 2000A, 63kA
TO
MVS-PP4-G2A
SWITCHGEAR
2000:5 C400
2000:5 C400
T5
2000AF
2000:5 C400
86F
FROM MVS-PP4-G2A
SYNC CHECK PT
(B-PHASE ONLY)
FPR
2000:5 C400
2000:5 C400
FROM MCC-PP4-01
G1-04
2000AF
2000:5 C400
86F
10.8 KV/120V (3)
400:5
C50GPR
400:5 C50
TO GENERATOR
PARALLELING
CONTROLLER
TO GENERATOR
PARALLELING
CONTROLLER
AND GENSET
CONTROLLER
2000:5 C400
200:5 C50
400:5 C50
TO GENSET
CONTROLLER
86G
DG-03
4.5 MW
11 KV, 0.8 PF
3 PH, 50 HZ
G1-05
1200AF
N.C.
TO GENSET
CONTROLLER
TO GENSET
CONTROLLER
TO GENERATOR
PARALLELING
CONTROLLER
TO GENERATOR
PARALLELING
CONTROLLER
TO
SYNCHRONIZER
TO
SYNCHRONIZER
TO GENERATOR
PARALLELING
CONTROLLER
AND GENSET
CONTROLLER
TO GENERATOR
PARALLELING
CONTROLLER
AND GENSET
CONTROLLER
1 1 1
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
A T
L A
N T
IC
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
1643338
A T
LA
N
T
IC
D E
S
IG
N A
N D
C O
N S
T R
U C
T
/1 /2
:0 :5
A
M B
IM
/P
E le c tr ic a l P o w e r
P la n t F
D A
/8
P
E le c t P w r
P ln t F
D A
C E
.r v t
EW622
P -3
/P
-3 E
L E
C T
R
IC
A L P
O W
E R
P L A
N T
D E
TA
IL
E D
O N
E L
IN
E
D
IA
G R
A M
M V
S -P
P 4-
G 1B
MHW
14124652
NTB JSD
JWH/SCN
D
JI
B O
U T
I, D
JI
B
O U
T I
C A
M P
L E
M O
N N
IE
R
RICHARD STEPHENS
SEK
NO SCALE
A1
MVS-PP4-G1B
DPS
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
P
P I R
E S
P O
N S
E S
/2
0/
52 52
86B
FPR
FPR
B-PHASE ONLY
(SYNC CHECK)
TO
XFMR-PP4-B
TRANSFORMER
2000:5 C400
2000:5 C400
10.8 KV/120V (3)10.8 KV/120V (3)
10.8 KV/120V (3)
200:5 C50
2000:5 C400
FROM MVS-PP4-M1B
SYNC CHECK PT
(B-PHASE ONLY)
G2-M
2000AF
400:5 C50
200:5 C50
CONTINUED ON
SHEET EW624
GPR GPR
400:5 C50
1200:5 C400
TO
CONTROLLERS
AND RELAYS
2000:5 C400
1200:5 C400
2000:5 C400
(1) 400:5 C100
200:5 C50
400:5 C50
DG-06
4.5 MW
11 KV, 0.8 PF
3 PH, 50 HZ
2000:5 C400
(1) 400:5 C100
200:5 C50
400:5 C50
86F 86G 86G
86F
DG-07
4.5 MW
11 KV, 0.8 PF
3 PH, 50 HZ
G2-01
1200AF
N.C.
G2-02
1200AF
N.C.
G2-T2
2000AF
N.C.52
FPR
MVS-PP4-G2A
11 KV, 2000A, 63kA
TO
MVS-PP4-G1B
SWITCHGEAR
2000:5 C400
2000:5 C400
G2-T1
2000AF
2000:5 C400
86F
FROM MVS-PP4-G1B
SYNC CHECK PT
(B-PHASE ONLY)
FPR
2000:5 C400
2000:5 C400
SPARE
1200AF
86F
TO GENERATOR
PARALLELING
CONTROLLER
AND GENSET
CONTROLLER
TO GENERATOR
PARALLELING
CONTROLLER
AND GENSET
CONTROLLER
TO
SYNCHRONIZER
TO
SYNCHRONIZER
TO
SYNCHRONIZER
TO GENERATOR
PARALLELING
CONTROLLER
TO GENERATOR
PARALLELING
CONTROLLER
TO GENSET
CONTROLLER
TO GENSET
CONTROLLER
1 1
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
A T
L A
N T
IC
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
1643338
A T
LA
N
T
IC
D E
S
IG
N A
N D
C O
N S
T R
U C
T
/1 /2
:0 :5
A
M B
IM
/P
E le c tr ic a l P o w e r
P la n t F
D A
/8
P
E le c t P w r
P ln t F
D A
C E
.r v t
EW623
P -3
/P
-3 E
L E
C T
R
IC
A L P
O W
E R
P L A
N T
D E
TA
IL
E D
O N
E L
IN
E
D
IA
G R
A M
M V
S -P
P 4-
G 2A
MHW
14124653
NTB JSD
JWH/SCN
D
JI
B O
U T
I, D
JI
B
O U
T I
C A
M P
L E
M O
N N
IE
R
RICHARD STEPHENS
SEK
NO SCALE
A1
MVS-PP4-G2A
DPS
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
P
P I R
E S
P O
N S
E S
/2
0/
86B
FPR
B-PHASE ONLY
(SYNC CHECK)
2000:5 C400
10.8 KV/120V (3) 10.8 KV/120V (3)
10.8 KV/120V (3)
200:5 C50
400:5 C50
200:5 C50
CONTINUED ON
SHEET EW623
GPRGPR
400:5 C50
1200:5 C400
TO
CONTROLLERS
AND RELAYS
2000:5
C400TO LS6
2000:5 C400
200:5 C50
400:5 C50
DG-10
4.5 MW
11 KV, 0.8 PF
3 PH, 50 HZ
2000:5 C400
200:5 C50
400:5 C50
86G86G
86F
DG-09
4.5 MW
11 KV, 0.8 PF
3 PH, 50 HZ
G2-07
1200AF
N.C.
G2-06
1200AF
N.C.
G2-T3
2000AF
N.C.
TO
MCC-PP4-02
FPR
MVS-PP4-G2B
11 KV, 2000A, 63kA
TO
MVS-PP4-G1A
SWITCHGEAR
2000:5 C400
2000:5 C400
G2-T2D
2000AF
2000:5
C400TO LS6
86F
FROM MVS-PP4-G1A
SYNC CHECK PT
(B-PHASE ONLY)
FPR
2000:5 C400
2000:5 C400
FROM MCC-PP4-02
G2-04
2000AF
2000:5
C400TO LS6
86F
10.8 KV/120V (3)
200:5
C50GPR
400:5 C50
2000:5 C400
200:5 C50
400:5 C50
86G
DG-08
4.5 MW
11 KV, 0.8 PF
3 PH, 50 HZ
G2-05
1200AF
N.C.
TO GENERATOR
PARALLELING
CONTROLLER
AND GENSET
CONTROLLER
TO GENERATOR
PARALLELING
CONTROLLER
AND GENSET
CONTROLLER
TO GENERATOR
PARALLELING
CONTROLLER
AND GENSET
CONTROLLER
TO GENERATOR
PARALLELING
CONTROLLER
TO GENERATOR
PARALLELING
CONTROLLER
TO GENERATOR
PARALLELING
CONTROLLER
TO GENSET
CONTROLLER
TO GENSET
CONTROLLER
TO GENSET
CONTROLLER
1 1 1
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
A T
L A
N T
IC
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
1643338
A T
LA
N
T
IC
D E
S
IG
N A
N D
C O
N S
T R
U C
T
/1 /2
:0 :5
A
M B
IM
/P
E le c tr ic a l P o w e r
P la n t F
D A
/8
P
E le c t P w r
P ln t F
D A
C E
.r v t
EW624
P -3
/P
-3 E
L E
C T
R
IC
A L P
O W
E R
P L A
N T
D E
TA
IL
E D
O N
E L
IN
E
D
IA
G R
A M
M V
S -P
P 4-
G 2B
MHW
14124654
NTB JSD
JWH/SCN
D
JI
B O
U T
I, D
JI
B
O U
T I
C A
M P
L E
M O
N N
IE
R
RICHARD STEPHENS
SEK
NO SCALE
A1
MVS-PP4-G2B
DPS
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
P
P I R
E S
P O
N S
E S
/2
0/
MAIN SWITCHGEAR
MVS-PP4-M1
(ROOM 114)
MAIN/FEEDER SECTION
(TYP OF 4)
SYNCHRONIZER
MAIN/FEEDER
PROTECTION
RELAY
TO
BUS
PTS
STATUS
TRIP/CLOSE
STATUS
TRIP/CLOSE
TO
M/F
PTS
SCADA PLC A
IRIG-B DISTRIBUTION
MODULE
(SEL 3400)
SATTELITE-
SYNCHRONIZED
CLOCK
(SEL 2404)
1 2
SCADA
NETWORK SWITCH
SCADA
NETWORK SWITCH
FIBER PATCH PANEL
INTERCONNECT WITH
EXISTING
CONTROL SYSTEM AT
PP2A
SCADA PLC B
1 2
SCADA
WORKSTATION 1
SCADA
WORKSTATION 3
BUS
TO
M/F
HIGH-
IMPEDANCE
DIFFERENTIAL
RELAY
(TYP OF 2)
SCADA
NETWORK SWITCH
SCADA
NETWORK SWITCH
GENERATOR
NETWORK SWITCH
GENERATOR
NETWORK SWITCH
SCADA CONTROL
ROOM
(ROOM 110)
SCADA
WORKSTATION 2
TIE A SECTION TIE B
SECTION
TO
TIE B
TO
BUS PTS
TO
BUS
TO
BUS PTS
INTERTIE
PROTECTION
RELAY
SYNCHRONIZERSTATUS
TRIP/CLOSE
STATUS
TRIP/CLOSE
STATUS INTERTIE
PROTECTION
RELAY
STATUS
TRIP/CLOSE
TO
BUS
TO
BUS PTS
TO
TIE A
TO
BUS PTS
BUS
PLANT/LOAD SPARE SECTION
(TYP OF 4)
TO
LOAD
FEEDER
PROTECTION
RELAY
STATUS
TRIP/CLOSE
TO
BUS PTS
GENERATOR
NETWORK SWITCH
GENERATOR
NETWORK SWITCH
CONTINUE
ON
EW631
CONTINUE
ON
EW631HARDWIRED CONNECTION
SHIELDED TWISTED PAIR (STP) ETHERNET (SCADA)
SHIELDED TWISTED PAIR (STP) ETHERNET (GENERATOR)
SINGLE- MODE FIBER - ETHERNET
LEGEND
SCADA
WORKSTATION 1
WALL MONITOR
SCADA
WORKSTATION 3
WALL MONITOR
SCADA
WORKSTATION 2
WALL MONITOR
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
A T
L A
N T
IC
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
1643338
A T
LA
N
T
IC
D E
S
IG
N A
N D
C O
N S
T R
U C
T
/1 /2
:0 :5
A
M B
IM
/P
E le c tr ic a l P o w e r
P la n t F
D A
/8
P
E le c t P w r
P ln t F
D A
C E
.r v t
EW630
P -3
/P
-3 E
L E
C T
R
IC
A L P
O W
E R
P L A
N T
S C
A D
A A
N D
C O
N
TR
O
LS
N E
TW
O
R K
D
IA
G R
A M
O
F
MHW
14124658
NTB JSD
JWH/SCN
D
JI
B O
U T
I, D
JI
B
O U
T I
C A
M P
L E
M O
N N
IE
R
RICHARD STEPHENS
SEK
DPS
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
P
P I R
E S
P O
N S
E S
/2
0/
GENERATOR SWITCHGEAR
MVS-PP4-G1 & MVS-PP4-G2
(ROOM 114)
GENERATOR
NETWORK SWITCH
GENERATOR
NETWORK SWITCH
SCADA
NETWORK SWITCH
SCADA
NETWORK SWITCH
GENERATOR SECTION
(TYP OF 10)
BUS
HIGH-
IMPEDANCE
DIFFERENTIAL
RELAY
(TYP OF 4)
TO
GEN
TRIP/CLOSE
STATUS
TO
BUS PTS
GENERATOR
PROTECTION
RELAY
TRIP/CLOSE
STATUS
GENERATOR
SET
CONTROLLER
TIE A SECTION
(TYP OF 4)
TO
TIE B
TO
BUS
TO
BUS PTS
TO
BUS PTS
TRIP/CLOSE
STATUS
INTERTIE
PROTECTION
RELAY
TRIP/CLOSE
STATUS
SYNCHRONIZER
STATUS TRIP/CLOSE
STATUS 52
TO
TIE A
TO
BUS PTS
TO BUSTO
BUS PTS
INTERTIE
PROTECTION
RELAY
TIE B
SECTION
(TYP OF 4)
BUS
TO
M/F
TO
M/F PTS
TO
BUS PTS
TRIP/CLOSE
STATUS
MAIN/FEEDER
PROTECTION
RELAY
TRIP/CLOSE
STATUS SYNCHRONIZER
MAIN/FEEDER SECTION
(TYP OF 4)
PLANT LOAD / SPARE SECTION
(TYP OF 4)
BUS
TO
LOAD
TRIP/CLOSE
STATUS FEEDER
PROTECTION
RELAY
TO
BUS PTS
CONTINUE
ON
EW630
CONTINUE
ON
EW630
ENGINE HALL
(ROOM 123)
MECH.
EQUIP.
MECH. PLC
(MAUX)
MECH.
HMI
MECHANICAL AUXILIARY PANEL (MAUX)
(TYP OF 10)
MECHANICAL AUXILIARY
PANEL
(GAUX)
(TYP OF 10)
GENERATOR
CONTROLLER/
ECU/MPU
TO
GEN
SECTION
G
SHIELDED TWISTED PAIR (STP) MODBUS
SHIELDED TWISTED PAIR (STP) ETHERNET (SCADA)
SHIELDED TWISTED PAIR (STP) ETHERNET (GENERATOR)
SINGLE-MODE FIBER - ETHERNET
HARDWIRED CONNECTION
LEGEND
MECHANICAL ROOM
(ROOM 113)
MECH.
EQUIP.
MECH. PLC
(MAUX)
MECH.
HMI
ASD BUILDING
(SITE)
MECH.
EQUIP.
MECH. PLC
(MAUX)
MECH.
HMI
MECH.
HMI
CONTROL PANEL
FOR CLEAN LUBE
OIL PUMP (LOCATED
NEXT TO CAMLOCK
ON NORTHEAST
EXTERIOR BUILDING
WALL)
EPO
BUTTON
(TYP)
SERIAL BUS (PCS)
1 1
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
A T
L A
N T
IC
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
1643338
A T
LA
N
T
IC
D E
S
IG
N A
N D
C O
N S
T R
U C
T
/1 /2
:0 :5
A
M B
IM
/P
E le c tr ic a l P o w e r
P la n t F
D A
/8
P
E le c t P w r
P ln t F
D A
C E
.r v t
EW631
P -3
/P
-3 E
L E
C T
R
IC
A L P
O W
E R
P L A
N T
S C
A D
A A
N D
C O
N
TR
O
LS
N E
TW
O
R K
D
IA
G R
A M
O
F
MHW
14124659
NTB JSD
JWH/SCN
D
JI
B O
U T
I, D
JI
B
O U
T I
C A
M P
L E
M O
N N
IE
R
RICHARD STEPHENS
SEK
DPS
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
P
P I R
E S
P O
N S
E S
/2
0/
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
A T
L A
N T
IC
N
O R
F O
L K
V
A
AS NOTED
1643338
A T
LA
N
T
IC
D E
S
IG
N A
N D
C O
N S
T R
U C
T
/1 /2
:0 :0
A
M B
IM
/P
E le c tr ic a l P o w e r
P la n t F
D A
/8
P
E le c t P w r
P ln t F
D A
C E
.r v t
EW711
P -3
/P
-3 E
L E
C T
R
IC
A L P
O W
E R
P L A
N T
FE
E
D E
R A
N D
R A
C E
W A
Y S
C H
E D
U
LE
S
MHW
14124661
NTB JSD
JWH/SCN
D
JI
B O
U T
I, D
JI
B
O U
T I
C A
M P
L E
M O
N N
IE
R
RICHARD STEPHENS
SEK
R-242 MCC-PP4-06 AC-05 PVC SCH 80 2 50.8 1
R-241 MCC-PP4-06 AC-04 PVC SCH 80 2 50.8 1
R-240 MCC-PP4-06 AC-03 PVC SCH 80 2 50.8 1
R-239 MCC-PP4-06 ULOP-05 PVC SCH 80 2 50.8 1
R-238 MCC-PP4-06 ULOP-04 PVC SCH 80 2 50.8 1
R-237 MCC-PP4-06 ULOP-03 PVC SCH 80 2 50.8 1
R-236 MCC-PP4-06 CWP-10 PVC SCH 80 2 50.8 1
R-235 MCC-PP4-06 CWP-09 PVC SCH 80 2 50.8 1
R-234 MCC-PP4-06 CWP-08 PVC SCH 80 2 50.8 1
R-233 MCC-PP4-06 CWP-07 PVC SCH 80 2 50.8 1
R-232 MCC-PP4-06 CWP-06 PVC SCH 80 2 50.8 1
R-231 MCC-PP4-06 CWP-05 PVC SCH 80 2 50.8 1
R-230 MCC-PP4-06 FOOP-02 RGS 3/4 19.1 1
R-229 MCC-PP4-06 FOCP-02 RGS 3/4 19.1 1
R-228 MAUX-05 GAUX-05 PVC SCH 80 2 50.8 4
R-227 MAUX-04 GAUX-04 PVC SCH 80 2 50.8 4
R-226 MAUX-03 GAUX-03 PVC SCH 80 2 50.8 4
R-225 MCC-PP4-05 AC-02 PVC SCH 80 2 50.8 1
R-224 MCC-PP4-05 AC-01 PVC SCH 80 2 50.8 1
R-223 MCC-PP4-05 ULOP-02 PVC SCH 80 2 50.8 1
R-222 MCC-PP4-05 ULOP-01 PVC SCH 80 2 50.8 1
R-221 MCC-PP4-05 CWP-04 PVC SCH 80 2 50.8 1
R-220 MCC-PP4-05 CWP-03 PVC SCH 80 2 50.8 1
R-219 MCC-PP4-05 CWP-02 PVC SCH 80 2 50.8 1
R-218 MCC-PP4-05 CWP-01 PVC SCH 80 2 50.8 1
R-217 MCC-PP4-05 ULOP-11 RGS 3/4 19.1 1
R-216 MCC-PP4-05 FOOP-01 RGS 3/4 19.1 1
R-215 MCC-PP4-05 DEFP-01 RGS 3/4 19.1 1
R-214 MCC-PP4-05 FOCP-01 RGS 3/4 19.1 1
R-213 MAUX-02 GAUX-02 PVC SCH 80 2 50.8 4
R-212 MAUX-01 GAUX-01 PVC SCH 80 2 50.8 4
R-207 MCC-PP4-02 ACR-10C PVC SCH 80 3 76.2 1
R-206 MCC-PP4-02 ACR-10B PVC SCH 80 3 76.2 1
R-205 MCC-PP4-02 ACR-10A PVC SCH 80 3 76.2 1
R-200 MCC-PP4-02 ACR-09C PVC SCH 80 3 76.2 1
R-199 MCC-PP4-02 ACR-09B PVC SCH 80 3 76.2 1
R-198 MCC-PP4-02 ACR-09A PVC SCH 80 3 76.2 1
R-193 MCC-PP4-02 ACR-08C PVC SCH 80 3 76.2 1
R-192 MCC-PP4-02 ACR-08B PVC SCH 80 3 76.2 1
R-191 MCC-PP4-02 ACR-08A PVC SCH 80 3 76.2 1
R-186 MCC-PP4-02 ACR-07C PVC SCH 80 3 76.2 1
R-185 MCC-PP4-02 ACR-07B PVC SCH 80 3 76.2 1
R-184 MCC-PP4-02 ACR-07A PVC SCH 80 3 76.2 1
R-179 MCC-PP4-02 ACR-06C PVC SCH 80 3 76.2 1
R-178 MCC-PP4-02 ACR-06B PVC SCH 80 3 76.2 1
R-177 MCC-PP4-02 ACR-06A PVC SCH 80 3 76.2 1
R-172 MCC-PP4-01 ACR-05C PVC SCH 80 3 76.2 1
R-171 MCC-PP4-01 ACR-05B PVC SCH 80 3 76.2 1
R-170 MCC-PP4-01 ACR-05A PVC SCH 80 3 76.2 1
R-165 MCC-PP4-01 ACR-04C PVC SCH 80 3 76.2 1
R-164 MCC-PP4-01 ACR-04B PVC SCH 80 3 76.2 1
R-163 MCC-PP4-01 ACR-04A PVC SCH 80 3 76.2 1
R-158 MCC-PP4-01 ACR-03C PVC SCH 80 3 76.2 1
R-157 MCC-PP4-01 ACR-03B PVC SCH 80 3 76.2 1
R-156 MCC-PP4-01 ACR-03A PVC SCH 80 3 76.2 1
R-151 MCC-PP4-01 ACR-02C PVC SCH 80 3 76.2 1
R-150 MCC-PP4-01 ACR-02B PVC SCH 80 3 76.2 1
R-149 MCC-PP4-01 ACR-02A PVC SCH 80 3 76.2 1
R-144 MCC-PP4-01 ACR-01C PVC SCH 80 3 76.2 1
R-143 MCC-PP4-01 ACR-01B PVC SCH 80 3 76.2 1
R-142 MCC-PP4-01 ACR-01A PVC SCH 80 3 76.2 1
R-141 LVS-PP4-L1B BC-PP4-01B RGS 6 152.4 2
R-140 LVS-PP4-L1B CH-02 RGS 6 152.4 4
R-139 LVS-PP4-L1B NDP RGS 6 152.4 4
R-138 LVS-PP4-L1B MCC-PP4-04 RGS 6 152.4 2
R-137 LVS-PP4-L1B MCC-PP4-08 PVC SCH 80 6 152.4 2
R-136 LVS-PP4-L1B MCC-PP4-07 PVC SCH 80 6 152.4 2
R-133 LVS-PP4-L1A BC-PP4-01A RGS 6 152.4 2
R-132 LVS-PP4-L1A CH-01 RGS 6 152.4 4
R-131 LVS-PP4-L1A NDP RGS 6 152.4 4
R-130 LVS-PP4-L1A MCC-PP4-03 RGS 6 152.4 2
R-127 LVS-PP4-L1A MCC-PP4-06 PVC SCH 80 6 152.4 2
R-126 LVS-PP4-L1A MCC-PP4-05 PVC SCH 80 6 152.4 2
R-125 LVS-PP4-L1A GEN TAP BOX RGS 6 152.4 4
R-124 MVS-PP4-M1B PP2A DUCT BANK 6 152.4 6 PLUS 10 SPARE
R-123 MVS-PP4-M1B LVS-PP4-L1B PVC SCH 80 6 152.4 2
R-122 MVS-PP4-M1A LVS-PP4-L1A PVC SCH 80 6 152.4 2
R-120 MVS-PP4-M1A PP2A DUCT BANK 6 152.4 6 PLUS 10 SPARE
R-119 MVS-GEN-02B DG-10 PVC SCH 80 6 152.4 2 PLUS SPARE
R-118 MVS-PP4-G2B DG-09 PVC SCH 80 6 152.4 2 PLUS SPARE
R-115 MVS-PP4-G2B DG-08 PVC SCH 80 6 152.4 2 PLUS SPARE
R-114 MVS-PP4-G2A DG-07 PVC SCH 80 6 152.4 2 PLUS SPARE
R-113 MVS-PP4-G2A DG-06 PVC SCH 80 6 152.4 2 PLUS SPARE
R-112 MVS-PP4-G1B DG-05 PVC SCH 80 6 152.4 2 PLUS SPARE
R-111 MVS-PP4-G1B DG-04 PVC SCH 80 6 152.4 2 PLUS SPARE
R-110 MVS-PP4-G1B DG-03 PVC SCH 80 6 152.4 2 PLUS SPARE
R-109 MVS-PP4-G2B XFMR-PP4-02 DUCT BANK 6 152.4 1
R-108 MVS-PP4-G1B XFMR-PP4-01 DUCT BANK 6 152.4 1
R-107 MVS-PP4-G1A DG-02 PVC SCH 80 6 152.4 2 PLUS SPARE
R-106 MVS-PP4-G1A DG-01 PVC SCH 80 6 152.4 2 PLUS SPARE
R-105 XFMR-PP4-B MVS-PP4-M1B CABLE TRAY 24 609.6 1 SEE B1 ON EW509
R-104 MVS-PP4-G2B XFMR-PP4-B CABLE TRAY 24 609.6 1 SEE B1 ON EW509
R-103 XFMR-PP4-A MVS-PP4-M1A CABLE TRAY 24 609.6 1 SEE B1 ON EW509
R-102 MVS-PP4-G1A XFMR-PP4-A CABLE TRAY 24 609.6 1 SEE B1 ON EW509
R-101 MVS-PP4-G1B MVS-PP4-G2A PVC SCH 80 6 152.4 6
R-100 MVS-PP4-G1A MVS-PP4-G2B PVC SCH 80 6 152.4 6
CIRCUIT FROM TO TYPE SIZE (INCHES) SIZE (mm) QUANTITY NOTES
RACEWAY SCHEDULE
DPS
M-242 MCC-PP4-06 AC-05 1 3 8AWG / 10mm2 - 10AWG / 6mm2
M-241 MCC-PP4-06 AC-04 1 3 8AWG / 10mm2 - 10AWG / 6mm2
M-240 MCC-PP4-06 AC-03 1 3 8AWG / 10mm2 - 10AWG / 6mm2
M-239 MCC-PP4-06 ULOP-05 1 3 12AWG / 4mm2 - 12AWG / 4mm2
M-238 MCC-PP4-06 ULOP-04 1 3 12AWG / 4mm2 - 12AWG / 4mm2
M-237 MCC-PP4-06 ULOP-03 1 3 12AWG / 4mm2 - 12AWG / 4mm2
M-236 MCC-PP4-06 CWP-10 1 3 3AWG / 35 mm2 - 8AWG / 10mm2 ASD CABLE
M-235 MCC-PP4-06 CWP-09 1 3 3AWG / 35 mm2 - 8AWG / 10mm2 ASD CABLE
M-234 MCC-PP4-06 CWP-08 1 3 3AWG / 35 mm2 - 8AWG / 10mm2 ASD CABLE
M-233 MCC-PP4-06 CWP-07 1 3 3AWG / 35 mm2 - 8AWG / 10mm2 ASD CABLE
M-232 MCC-PP4-06 CWP-06 1 3 3AWG / 35 mm2 - 8AWG / 10mm2 ASD CABLE
M-231 MCC-PP4-06 CWP-05 1 3 3AWG / 35 mm2 - 8AWG / 10mm2 ASD CABLE
M-230 MCC-PP4-06 FOOP-02 1 3 12AWG / 4mm2 - 12AWG / 4mm2
M-229 MCC-PP4-06 FOCP-02 1 3 12AWG / 4mm2 - 12AWG / 4mm2
M-228 ACP-PP4-01A GAUX-05 1 3 10AWG / 6mm2 - 10AWG / 6mm2
M-227 ACP-PP4-01A GAUX-04 1 3 10AWG / 6mm2 - 10AWG / 6mm2
M-226 ACP-PP4-01A GAUX-03 1 3 10AWG / 6mm2 - 10AWG / 6mm2
M-225 MCC-PP4-05 AC-02 1 3 8AWG / 10mm2 - 10AWG / 6mm2
M-224 MCC-PP4-05 AC-01 1 3 8AWG / 10mm2 - 10AWG / 6mm2
M-223 MCC-PP4-05 ULOP-02 1 3 12AWG / 4mm2 - 12AWG / 4mm2
M-222 MCC-PP4-05 ULOP-01 1 3 12AWG / 4mm2 - 12AWG / 4mm2
M-221 MCC-PP4-05 CWP-04 1 3 3AWG / 35 mm2 - 8AWG / 10mm2 ASD CABLE
M-220 MCC-PP4-05 CWP-03 1 3 3AWG / 35 mm2 - 8AWG / 10mm2 ASD CABLE
M-219 MCC-PP4-05 CWP-02 1 3 3AWG / 35 mm2 - 8AWG / 10mm2 ASD CABLE
M-218 MCC-PP4-05 CWP-01 1 3 3AWG / 35 mm2 - 8AWG / 10mm2 ASD CABLE
M-217 MCC-PP4-05 ULOP-11 1 3 12AWG / 4mm2 - 12AWG / 4mm2
M-216 MCC-PP4-05 FOOP-01 1 3 12AWG / 4mm2 - 12AWG / 4mm2
M-215 MCC-PP4-05 DEFP-01 1 3 12AWG / 4mm2 - 12AWG / 4mm2
M-214 MCC-PP4-05 FOCP-01 1 3 12AWG / 4mm2 - 12AWG / 4mm2
M-213 ACP-PP4-01A GAUX-02 1 3 10AWG / 6mm2 - 10AWG / 6mm2
M-212 ACP-PP4-01A GAUX-01 1 3 10AWG / 6mm2 - 10AWG / 6mm2
M-207 MCC-PP4-02 ACR-10C 1 3 3/0AWG / 95mm2 - 6AWG / 16 mm2 ASD CABLE
M-206 MCC-PP4-02 ACR-10B 1 3 3/0AWG / 95mm2 - 6AWG / 16 mm2 ASD CABLE
M-205 MCC-PP4-02 ACR-10A 1 3 3/0AWG / 95mm2 - 6AWG / 16 mm2 ASD CABLE
M-200 MCC-PP4-02 ACR-09C 1 3 3/0AWG / 95mm2 - 6AWG / 16 mm2 ASD CABLE
M-199 MCC-PP4-02 ACR-09B 1 3 3/0AWG / 95mm2 - 6AWG / 16 mm2 ASD CABLE
M-198 MCC-PP4-02 ACR-09A 1 3 3/0AWG / 95mm2 - 6AWG / 16 mm2 ASD CABLE
M-193 MCC-PP4-02 ACR-08C 1 3 3/0AWG / 95mm2 - 6AWG / 16 mm2 ASD CABLE
M-192 MCC-PP4-02 ACR-08B 1 3 3/0AWG / 95mm2 - 6AWG / 16 mm2 ASD CABLE
M-191 MCC-PP4-02 ACR-08A 1 3 3/0AWG / 95mm2 - 6AWG / 16 mm2 ASD CABLE
M-186 MCC-PP4-02 ACR-07C 1 3 3/0AWG / 95mm2 - 6AWG / 16 mm2 ASD CABLE
M-185 MCC-PP4-02 ACR-07B 1 3 3/0AWG / 95mm2 - 6AWG / 16 mm2 ASD CABLE
M-184 MCC-PP4-02 ACR-07A 1 3 3/0AWG / 95mm2 - 6AWG / 16 mm2 ASD CABLE
M-179 MCC-PP4-02 ACR-06C 1 3 3/0AWG / 95mm2 - 6AWG / 16 mm2 ASD CABLE
M-178 MCC-PP4-02 ACR-06B 1 3 3/0AWG / 95mm2 - 6AWG / 16 mm2 ASD CABLE
M-177 MCC-PP4-02 ACR-06A 1 3 3/0AWG / 95mm2 - 6AWG / 16 mm2 ASD CABLE
M-172 MCC-PP4-01 ACR-05C 1 3 3/0AWG / 95mm2 - 6AWG / 16 mm2 ASD CABLE
M-171 MCC-PP4-01 ACR-05B 1 3 3/0AWG / 95mm2 - 6AWG / 16 mm2 ASD CABLE
M-170 MCC-PP4-01 ACR-05A 1 3 3/0AWG / 95mm2 - 6AWG / 16 mm2 ASD CABLE
M-165 MCC-PP4-01 ACR-04C 1 3 3/0AWG / 95mm2 - 6AWG / 16 mm2 ASD CABLE
M-164 MCC-PP4-01 ACR-04B 1 3 3/0AWG / 95mm2 - 6AWG / 16 mm2 ASD CABLE
M-163 MCC-PP4-01 ACR-04A 1 3 3/0AWG / 95mm2 - 6AWG / 16 mm2 ASD CABLE
M-158 MCC-PP4-01 ACR-03C 1 3 3/0AWG / 95mm2 - 6AWG / 16 mm2 ASD CABLE
M-157 MCC-PP4-01 ACR-03B 1 3 3/0AWG / 95mm2 - 6AWG / 16 mm2 ASD CABLE
M-156 MCC-PP4-01 ACR-03A 1 3 3/0AWG / 95mm2 - 6AWG / 16 mm2 ASD CABLE
M-151 MCC-PP4-01 ACR-02C 1 3 3/0AWG / 95mm2 - 6AWG / 16 mm2 ASD CABLE
M-150 MCC-PP4-01 ACR-02B 1 3 3/0AWG / 95mm2 - 6AWG / 16 mm2 ASD CABLE
M-149 MCC-PP4-01 ACR-02A 1 3 3/0AWG / 95mm2 - 6AWG / 16 mm2 ASD CABLE
M-144 MCC-PP4-01 ACR-01C 1 3 3/0AWG / 95mm2 - 6AWG / 16 mm2 ASD CABLE
M-143 MCC-PP4-01 ACR-01B 1 3 3/0AWG / 95mm2 - 6AWG / 16 mm2 ASD CABLE
M-142 MCC-PP4-01 ACR-01A 1 3 3/0AWG / 95mm2 - 6AWG / 16 mm2 ASD CABLE
M-141 LVS-PP4-L1B BC-PP4-01B 2 3 600KCMIL / 400mm2 - 1AWG /50 mm2
M-140 LVS-PP4-L1B CH-02 4 3 600KCMIL / 400mm2 - 3/0AWG / 95mm2
M-139 LVS-PP4-L1B NDP 3 3 500KCMIL / 300mm2 500KCMIL / 300mm2 1/0AWG / 70mm2
M-138 LVS-PP4-L1B MCC-PP4-04 4 3 600KCMIL / 400mm2 - 3/0AWG / 95mm2
M-137 LVS-PP4-L1B MCC-PP4-08 2 3 600KCMIL / 400mm2 - 1AWG /50 mm2
M-136 LVS-PP4-L1B MCC-PP4-07 2 3 600KCMIL / 400mm2 - 1AWG /50 mm2
M-133 LVS-PP4-L1A BC-PP4-01A 2 3 600KCMIL / 400mm2 - 1AWG /50 mm2
M-132 LVS-PP4-L1A CH-01 4 3 600KCMIL / 400mm2 - 3/0AWG / 95mm2
M-131 LVS-PP4-L1A NDP 3 3 500KCMIL / 300mm2 500KCMIL / 300mm2 1/0AWG / 70mm2
M-130 LVS-PP4-L1A MCC-PP4-03 4 3 600KCMIL / 400mm2 - 3/0AWG / 95mm2
M-127 LVS-PP4-L1A MCC-PP4-06 2 3 600KCMIL / 400mm2 - 1AWG /50 mm2
M-126 LVS-PP4-L1A MCC-PP4-05 2 3 600KCMIL / 400mm2 - 1AWG /50 mm2
M-125 LVS-PP4-L1A GEN TAP BOX 3 3 700KCMIL / 400mm2 700KCMIL / 400mm2 2/0AWG / 70mm2
M-124 MVS-PP4-M1B PP2A 6 3 500KCMIL / 300mm2 - 4/0AWG / 120 mm2
M-123 MVS-PP4-M1B LVS-PP4-L1B 1 3 2/0AWG / 70mm2 - 6AWG / 16 mm2
M-122 MVS-PP4-M1A LVS-PP4-L1A 1 3 2/0AWG / 70mm2 - 6AWG / 16 mm2
M-120 MVS-PP4-M1A PP2A 6 3 500KCMIL / 300mm2 - 4/0 AWG / 120mm2
M-119 MVS-PP4-G2B DG-10 1 3 750KCMIL / 400mm2 - 3AWG / 35mm2
M-118 MVS-PP4-G2B DG-09 1 3 750KCMIL / 400mm2 - 3AWG / 35mm2
M-115 MVS-PP4-G2B DG-08 1 3 750KCMIL / 400mm2 - 3AWG / 35mm2
M-114 MVS-PP4-G2A DG-07 1 3 750KCMIL / 400mm2 - 3AWG / 35mm2
M-113 MVS-PP4-G2A DG-06 1 3 750KCMIL / 400mm2 - 3AWG / 35mm2
M-112 MVS-PP4-G1B DG-05 1 3 750KCMIL / 400mm2 - 3AWG / 35mm2
M-111 MVS-PP4-G1B DG-04 1 3 750KCMIL / 400mm2 - 3AWG / 35mm2
M-110 MVS-PP4-G1B DG-03 1 3 750KCMIL / 400mm2 - 3AWG / 35mm2
M-109 MVS-PP4-G2B XFMR-PP4-02 1 3 500KCMIL / 300mm2 - 3AWG / 35mm2
M-108 MVS-PP4-G1B XFMR-PP4-01 1 3 500KCMIL / 300mm2 - 3AWG / 35mm2
M-107 MVS-PP4-G1A DG-02 1 3 750KCMIL / 400mm2 - 3AWG / 35mm2
M-106 MVS-PP4-G1A DG-01 1 3 750KCMIL / 400mm2 - 3AWG / 35mm2
M-105 XFMR-PP4-B MVS-PP4-M1B 4 3 500KCMIL / 300mm2 500KCMIL / 300mm2 250KCMIL / 150mm2
M-104 MVS-PP4-G2A XFMR-PP4-B 4 3 500KCMIL / 300mm2 - 250KCMIL / 150mm2
M-103 XFMR-PP4-A MVS-PP4-M1A 4 3 500KCMIL / 300mm2 500KCMIL / 300mm2 250KCMIL / 150mm2
M-102 MVS-PP4-G1A XFMR-PP4-A 4 3 500KCMIL / 300mm2 - 250KCMIL / 150mm2
M-101 MVS-PP4-G1B MVS-PP4-G2A 6 3 750KCMIL / 400mm2 - 250KCMIL / 150mm2
M-100 MVS-PP4-G1A MVS-PP4-G2B 6 3 750KCMIL / 400mm2 - 250KCMIL / 150mm2
CIRCUIT FROM TO SETS PHASES PHASE CONDUCTOR NEUTRAL CONDUCTOR GROUND CONDUCTOR TYPE
FEEDER SCHEDULE
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
P
P I R
E S
P O
N S
E S
/2
0/
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
DESIGN DIRECTOR
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
A T
L A
N T
IC
N
O R
F O
L K
V
A
AS NOTED
UNCLASSIFIED
UNCLASSIFIED
U N
C
LA
S S
IF
IE
D
1643338
A T
LA
N
T
IC
D E
S
IG
N A
N D
C O
N S
T R
U C
T
/1 /2
:0 :0
A
M B
IM
/P
E le c tr ic a l P o w e r
P la n t F
D A
/8
P
E le c t P w r
P ln t F
D A
C E
.r v t
EW713
P -3
/P
-3 E
L E
C T
R
IC
A L P
O W
E R
P L A
N T
D C
P A
N E
L S
C H
E D
U
LE
S
MHW
14124663
NTB JSD
JWH/SCN
D
JI
B O
U T
I, D
JI
B
O U
T I
C A
M P
L E
M O
N N
IE
R
RICHARD STEPHENS
SEK
* SEE SCHEDULE EW712 FOR CABLE SIZES
Notes:
Total Est. Demand: 21 A
Total Conn.: 21 A
Total Est. Demand: 14 kVA
Total Conn. Load: 14 kVA
Controls 14450 VA 100.00% 14450 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 39 A 9 A 17 A
Total Load: 8700 VA 2150 VA 3600 VA
41 42
39 40
37 38
35 36
33 34
31 32
29 30
27 28
25 26
23 24
21 22
19 20
17 18
15 16
13 14
11 GENCONSERVER-A M-309 Controls 30 A * 1 8.7 A 2000... 500 VA 2.2 A 1 * 20 A Controls M-324 MAUX-04 12
9 GAUX-03 M-226 Controls 20 A * 1 2.4 A 550 VA 500 VA 2.2 A 1 * 20 A Controls M-323 MAUX-03 10
7 ACP-PP4-01B M-310 Controls 60 A * 1 31.3 A 7200... 500 VA 2.2 A 1 * 20 A Controls M-322 MAUX-02 8
5 GAUX-04 M-227 Controls 20 A * 1 2.4 A 550 VA 550 VA 2.4 A 1 * 20 A Controls M-325 MAUX-05 6
3 GAUX-01 M-212 Controls 20 A * 1 2.4 A 550 VA 550 VA 2.4 A 1 * 20 A Controls M-213 GAUX-02 4
1 GAUX-05 M-228 Controls 20 A * 1 2.2 A 500 VA 500 VA 2.2 A 1 * 20 A Controls M-321 MAUX-01 2
CKT Load Name ID # Load Class Trip
Wire Size Poles FLA A B C FLA Poles
Wire Size Trip
Load Class ID # Load Name CKT
Wires: 4 MCB Rating: 100 A
Supply From: INV-PP4-01A Phases: 3 Available Fault Current:
Location: ELECTRICAL 114 Voltage: 400/230 Wye A.I.C. Rating:
Branch Panel: ACP-PP4-01A
* SEE SCHEDULE EW712 FOR CABLE SIZES
Notes:
Total Est. Demand: 21 A
Total Conn.: 21 A
Total Est. Demand: 14 kVA
Total Conn. Load: 14 kVA
Controls 14450 VA 100.00% 14450 VA
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
Legend:
Total Amps: 39 A 16 A 9 A
Total Load: 8750 VA 3550 VA 2150 VA
41 42
39 40
37 38
35 36
33 34
31 32
29 30
27 28
25 26
23 24
21 22
19 20
17 18
15 16
13 14
11 GAUX-10 M-258 Controls 20 A * 1 2.4 A 550 VA 500 VA 2.2 A 1 * 7 A Controls M-330 MAUX-10 12
9 GENCONSERVER-B M-311 Controls 30 A *…