_J-1606000-03.1_ISA_Bahrain_WTP_Schematics_20130610_(Amendment_0014).pdf

PDF 111 KB Posted

Attached to
N62470-18-R-3004 BASE OPERATIONS SUPPORT (BOS) SERVICES FOR ISA AIR BASE, BAHRAIN, AND ITS OUTLYING SUPPORT SITE, INCLUDING THE PATRIOT BATTERY SITE IN RIFFA, BAHRAIN
Solicitation number
N6247018R3004
Issued by

About this file

This document package includes schematic drawings and specifications for an existing water treatment facility and related federal contract opportunity. The schematic drawings depict the layout and components of water purification units, storage tanks, and piping systems for a facility in Isa Air Base, Bahrain. A related pre-solicitation notice seeks proposals for base operations support services at Isa Air Base and its outlying support site in Riffa, Bahrain. The support services are to be provided under solicitation number N62470-18-R-3004 for the Department of the Navy Naval Facilities Engineering Command. Proposals are due based on the date specified in the full pre-solicitation notice attached to the opportunity. The notice does not constitute a formal solicitation and interested parties should monitor the Federal Business Opportunities website for additional information and release of a formal solicitation.

J-1606000-03.1

View the file

Other files

File Type Posted
_ISA BOS Amendment 0020.pdf PDF
_J-1700000-03 Transportation Inventory (Amendment 0020).xlsx XLSX spreadsheet
_J-6 Section F Deliverables Amendment 0019.xlsx XLSX spreadsheet
_ISA BOS Amendment 0019.pdf PDF
_J-1502000-03 Facilities Property Inventory (Amendment 0019).xlsx XLSX spreadsheet
_J-1503020 Pest Control (Amendment 0019).pdf PDF
_J-0200000-10 FP IDIQ ELINS (Amendment 0019).xlsx XLSX spreadsheet
_J-0200000 Mgmt and Admin (Amendment 0019).pdf PDF
_J-1700000-03 Transportation Inventory (Amendment 0019).xlsx XLSX spreadsheet
_J-1502000-04 Facility Investment Sys & Equip Inv (Amendment 0019).xlsx XLSX spreadsheet
_J-0200000-09 DETISAABINST 5512.1 - ACCESS AND BADGE PROCEDURES (Amendment 0019).pdf PDF
_ISA BOS Amendment 0018.pdf PDF
_J-0401000 Force Protection (Amendment 0017).pdf PDF
_J-0200000-04, 05 GFF, GFE Inventory (Amendment 0017).xlsx XLSX spreadsheet
_J-1300000 Galley (Amendment 0017).pdf PDF
_J-1002000 Supply (Amendment 0017).pdf PDF
_J-0402000 Fire & Emergency Services (Amendment 0017).pdf PDF
_J-1503030-04 Container Location Collection Frequency (Amendment 0017).xlsx XLSX spreadsheet
_J-0200000-10 FP IDIQ ELINS (Amendment 0017).xlsx XLSX spreadsheet
_J-1602000 Electrical (Amendment 0017).pdf PDF
_J-1700000 Transportation (Amendment 0017).pdf PDF
_J-1503010-03, 04, 05 Custodial Inventory and Freq (Amendment 0017).xlsx XLSX spreadsheet
_J-0402000-05 F&ES GFE (Amendment 0017).xlsx XLSX spreadsheet
_J-5 Section B CLINS (Amendment 0017).docx DOCX document
_J-1604000-04 Tank Inv and Frequency (Amendment 0017).xlsx XLSX spreadsheet
_J-1606000 Water (Amendment 0017).pdf PDF
_J-1604000 Wastewater (Amendment 0017).pdf PDF
_J-1502000-04 Facility Investment Sys & Equip Inv (Amendment 0017).xlsx XLSX spreadsheet
_J-1502000 Facility Investment (Amendment 0017).pdf PDF
_J-6 Section F Deliverables (Amendment 0017).xlsx XLSX spreadsheet
_J-1503020-05 Pest Control Frequencies (Amendment 0017).xlsx XLSX spreadsheet
_J-1402000 UH and Laundry Services (Amendment 0017).pdf PDF
_J-1502000-03 Facilities Property Inventory (Amendment 0017).xlsx XLSX spreadsheet
_J-1503030 Waste Management (Amendment 0017).pdf PDF
_J-1503050-03, 04 Container Inventory and Frequency (Amendment 0017).xlsx XLSX spreadsheet
_ISA BOS Amendment 0017.pdf PDF
_J-2 FTE Worksheet (Amendment 0017).xlsx XLSX spreadsheet
_J-1300000-07 Galley Mess Gear Inventory (Amendment 0017).xlsx XLSX spreadsheet
_ISA BOS Amendment 0016.pdf PDF
_ISA_BOS_Amendment_0015.pdf PDF
_J-10_03_NOV_Site_Visit_Presentation.pdf PDF
_J-11_03_NOV_Site_Visit_Sign_in_Sheet.pdf PDF
_J-0402000_Fire_&_Emergency_Services_(Amendment_0014).pdf PDF
_J-1602000-07_Power_Generation_Distribution_System_Flight_Line_(Amendment_0014).pdf PDF
_J-1503010_Custodial_(Amendment_0014).pdf PDF
_J-1503050_Grounds_(Amendment_0014).pdf PDF
_J-1606000-03.2_Existing_Water_System_Pressure_Zones_Map_(Amendment_0014).pdf PDF
_J-1606000_Water_(Amendment_0014).pdf PDF
_J-1501000-04_Meter_Group_Descriptions_Condition_Rating_(Amendment_0014).xlsx XLSX spreadsheet
_J-1503030-04_Container_Location_and_Collection_Frequencies_(Amendment_0014).xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 111 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Existing Water Treatment Facility Water System Sanitary Survey

Isa Air Base, Bahrain

RAW WATER

M From RBAF Water System

Transfer Pump

ROWPU Product (finished) Water to 8 - 75,000 L (20,000 gal) ASTs in Parallel (See Fig. 4 for detail.)

WTP Process Waste To RBAF Sanitary Sewer Storage Tank

North Road

To Low Pressure Zone (6-inch)

R O

W P

U

(U nd er C on st

R O

W P

U

Tank Overflow (4-inch) Screened Outlet

8-inch 6-inch 6-inch

6-in ch

4 - 130,000 L (35,000 gal) ASTs (raw water) Corrugated Galvanized Steel, Covered and Vented

LEGEND

M Finished Water Meter

Pump Raw Water Wastewater Overflow

Valve (Normally Open) Valve (Normally Closed)

Hose Bibb

Tank Drain (typ. of 4)

2 - 75,000 L (20,000 gal) USTs (raw water) FRP, Vented

4-inch

4-inch

4-inch

4-

4-inch

4-inch

4-inch

4-

4-

4-

4-inch ROWPU Feed (typ. of 4)

See Fig 3 for detail.

4-inch ROWPU Concentrate (typ. of 2)

1 1

Note 1: 2-inch Filter to Waste Note 2: 8-inch = 200 mm 6-inch = 150 mm 4-inch = 100 mm 2-inch = 50 mm

See Fig 2 for detail.

1 2 3 4

Fig. 1 06/10/2013 Version

Isa Air Base, Bahrain

Antiscalant 2 - Low

Pressure Pumps

1 - 5.0 µm Bag Filter

1 - 5.0 µm Cartridge Filter

REVERSE OSMOSIS WATER PURIFICATION UNIT # 4

Feed Water (See Fig. 1 for detail.)

R O

W P

U C on ce nt ra te t o W as te

(r ep or te dl y ap pr ox g pm

Finished Water to Storage reportedly approx. 175 gpm

(See Fig. 4 for detail.)

La rg e H ig h

P re ss ur e

P um p (n or m al ly o ff)

M

Caustic (off)

Sodium Hypochlorite

(Off)

#2

#1

(On)

4-in ch P

V C

4-inch PVC

4-inch P

4-inch SS

3-in ch P ch S

3-inch PVC

LEGEND

M

Finished Water

Meter

Pump

Raw Water Wastewater Chemical Addition

Valve (Normally Open) Valve (Normally Closed)

Filter M

Pressure Gauge Sample Tap Conductivity Probe

SS PVC

S m al l H ig h

P re ss p (n or m al ly n) er m ea

Permeate Sample Tap

(ea. press.

vessel)

SS PVC

Check Valve

4-inch PVC

2-inch PVC Filter to Waste

3-inch 4-inch

Note 1: ROWPU # 4 is under construction.

Note 2: All PVC is Sch. 80.

Note 3: 4-inch = 100 mm 3-inch = 75 mm 2-inch = 50 mm Note 4: 30 gpm = 110 Lpm 175 gpm = 660 Lpm Note 5: Acid and caustic are reported to be proposed to clean membranes but cleaning system is not yet in place.

Single Stage Brackish Water RO Skid

Pump No. 1 appears to be too small.

Fig. 2

WTP Process Waste To RBAF Sanitary Sewer Storage Tank interior exterior interior exterior

Building Wall

Isa Air Base, Bahrain

Antiscalant 2 - Low

Pressure Pumps

2 - 5.0 µm Bag Filters w/ 2-inch piping

2 - 5.0 µm Cartridge Filters w/ 2-inch piping

REVERSE OSMOSIS WATER PURIFICATION UNIT # 5

Feed Water (See Fig. 1 for detail.)

R O

W P

U C on ce nt ra te t o W as

(r ep or te dl y ap pr ox g pm

Finished Water to Storage reportedly approx. 175 gpm

(See Fig. 4 for detail.)

La rg e H ig h

P re ss p (n or m al ly ff)

M

Caustic (off)

Sodium Hypochlorite

(Off)

#2

#1 (On)

4-in ch P

4-inch PVC

4-inch P

4-inch SS in ch P ch

3-inch PVC

Conductivity Probe (not functioning)

M

SS PVC

S m al l H ig h

P re ss p (n or m al ly n) er m ea

Permeate Sample Tap

(ea. press.

vessel)

SS PVC

4-inch PVC

2-inch PVC Filter to Waste

3-inch 4-inch

Note 1: All PVC is Sch. 80.

Note 2: 4-inch = 100 mm 3-inch = 75 mm 2-inch = 50 mm Note 3: 30 gpm = 110 Lpm 175 gpm = 660 Lpm Note 4: Acid and caustic are reported to be proposed to clean membranes but cleaning system is not yet in place.

Single Stage Brackish Water RO Skid

Fig. 3

WTP Process Waste To RBAF Sanitary Sewer Storage Tank

LEGEND

M

Finished Water

Meter

Pump

Raw Water Wastewater Chemical Addition

Valve (Normally Open) Valve (Normally Closed)

Filter

Pressure Gauge Sample Tap Conductivity Probe

Check Valve interior exterior interior exterior

Building Wall

Isa Air Base, Bahrain

R O

W P

U

(U nd er C on st

R O

W P

U

4-inch ROWPU Concentrate (Typ. of 2)

Feed Water (See Fig. 1 for detail.)

M

8 - 75,000 L (20,000 gal) ASTs in parallel (Finished Water) FRP, Covered and Vented

Labeled “Potable” (for future use)

Labeled “Nonpotable”

High Pressure Zone Jockey Pump Station

(one pair small pumps and one pair large pumps

To High Pressure

Zone

LEGEND

M

Finished Water

Meter Pump

Raw Water Wastewater

Valve (Normally Open) Valve (Normally Closed)

See Fig. 3 for ROWPU detail.

See Fig. 2 for ROWPU detail.

Note 1: All piping shown is 4-inch Sch. 80 PVC Note 2: 4-inch = 100 mm

Check Valve

Quick Connect for Tanker Truck

Quick Connect for Tanker Truck

Hose Bibb

FINISHED WATER STORAGE AND HPZ JOCKEY PUMP STATION

A

B

C

D

E

F

G

H

Fig. 4

Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4

File details come from the government source that posted it. Updated .