_J-0200000-10 FP IDIQ ELINS (Amendment 0017).xlsx
XLSX spreadsheet 340 KB Posted
- Solicitation number
- N6247018R3004
About this file
This document is a pre-solicitation notice for base operations support services for Isa Air Base and its outlying sites in Bahrain. Services include security operations, fire and emergency services, safety, supply services, galley services, utilities housing, facility management, facility investment, custodial services, pest control, waste management, grounds maintenance, utilities management, electrical, wastewater, water, and transportation. The notice does not constitute a request for proposal or invitation to bid, but rather provides advance notice of an upcoming solicitation for these services. The solicitation number is N6247018R3004 and will be issued by the Naval Facilities Engineering Command. Pricing is to be provided on a firm fixed price basis.
View the file
Other files
Show 40 more
Latest 50 of 111 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rec Base
| EXHIBIT LINE ITEM NUMBERS | |||||
| SOLICITATION N62470-18-R-3004 | |||||
| EXHIBIT A - CLIN 0001 | |||||
| Firm Fixed Price - Base Period | |||||
| PROVIDE PRICES FOR FUNCTION SPECIFICATIONS - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C | |||||
| ELIN/Sub | |||||
| ELIN | Quantity | Unit of Issue | Unit Price | Total |
| A001 | 0401000 Security Operations (SIC CT) | ||||
| A001AA | Entry Control Point Services Riffa (Spec Item 3.1) | 12 | MO | $ - 0 | |
| A001AB | Entry Control Point Services ISA (Spec Item 3.1) | 12 | MO | $ - 0 | |
| A001 | Total 0401000 Security Operations | TOTAL | $ - 0 |
| A002 | 0402000 Fire and Emergency Services | ||||
| A002AA | All Hazards Response (Spec item 3.1) | 12 | MO | $ - 0 | |
| A002AB | Fire Prevention Services (Spec Item 3.2) | 12 | Mo | $ - 0 | |
| A002AC | Emergecy Medical Services (Spec Item 3.3) | 12 | MO | $ - 0 | |
| A002AD | Emergecy Medical Services Response (Spec Item 3.4) | 13 | MO | $ - 0 | |
| A002AE | Dispatch (Spec Item 3.5) | 14 | MO | $ - 0 | |
| A002 | Total 0402000 Fire and Emergency Services | TOTAL | $ - 0 |
| A003 | 0404000 Safety | ||||
| A003AA | Provide Explosive Safety Officer (ESO) (Spec Item 3.1) | 12 | MO | $ - 0 | |
| A003 | Total 0404000 Safety | TOTAL | $ - 0 |
| A004 | Supply Services | ||||
| A004AB | POL Management Services (Spec Item 3.1) | 12 | MO | $ - 0 | |
| A004AA | Ground Fuel Operations(Spec Item 3.2) | 12 | MO | $ - 0 | |
| A004 | Total 1000000 Supply Services | TOTAL | $ - 0 |
| A005 | 1300000 Galley (SIC GL) | ||||
| A005AA | Galley Services LSA (Spec Item 3.1 - 3.5) | 12 | MO | $ - 0 | |
| A005AB | Galley Services Flight Line (Spec Item 3.1 - 3.5) | 12 | MO | $ - 0 | |
| A005AC | Galley Services ISA PAT Site (Spec Item 3.1 - 3.5) | 12 | MO | $ - 0 | |
| A005AD | Galley Services Riffa (Spec Item 3.1 - 3.5) | 12 | MO | $ - 0 | |
| A005AE | Galley Equipment Maintenance (Spec Item 3.6) | 12 | MO | $ - 0 | |
| A004 | Total 1300000 Galley | TOTAL | $ - 0 |
| A006 | 1400000 UH | ||||
| A006AA | Operations Management (Spec Item 3.1) | 12 | MO | $ - 0 | |
| A006AB | Personnel Laundry (Spec Item 3.2.1) | 12 | MO | $ - 0 | |
| A006AC | Self Service Laundry (Spec Item 3.2.2) | 12 | MO | $ - 0 | |
| A006AD | AFN | 12 | MO | $ - 0 | |
| A006 | Total 1400000 UH | TOTAL | $ - 0 |
| A007 | 1501000 Facility Management | ||||
| A007AA | Work Control (Spec Item 3.1) | 12 | MO | $ - 0 | |
| A007AB | ICAP Services (Spec Item 3.2) | 12 | MO | $ - 0 | |
| A007AC | Asset Mangement Services (Spec Item 3.3) | 12 | MO | $ - 0 | |
| A007AD | Technical Support Services (Spec Item 3.4) | 12 | MO | $ - 0 | |
| A007 | Total 1501000 Facility Management | TOTAL | $ - 0 |
| A008 | 1502000 Facility Investment (SIC ST) | ||||
| Service Requests | |||||
| A008AA | Emergency Service Orders (Spec Item 3.1.1) | 12 | MO | $ - 0 | |
| A008AB | Urgent Service Orders (Spec Item 3.1.2) | 12 | MO | $ - 0 | |
| A008AC | Routine Service Orders (Spec Item 3.1.3) | 12 | MO | $ - 0 | |
| A008AD | Project Work Order Level 1 (Spec Item 3.2.1) | 12 | MO | $ - 0 | |
| A008AE | Project Work Order Level 2 (Spec Item 3.2.2) | 12 | MO | $ - 0 | |
| A008AF | Project Work Order Level 3 (Spec Item 3.2.3) | 12 | MO | $ - 0 | |
| Preventive Maintenance (PM) Program | |||||
| A008AG | HVAC and Refrigeration Systems LSA (Spec Item 3.3.1) | 12 | MO | $ - 0 | |
| A008AH | HVAC and Refrigeration Systems Flightline (Spec Item 3.3.1) | 12 | MO | $ - 0 | |
| A008AJ | HVAC and Refrigeration Systems ISA Pat Site (Spec Item 3.3.1) | 12 | MO | $ - 0 | |
| A008AK | HVAC and Refrigeration Systems Riffa (Spec Item 3.3.1) | 12 | MO | $ - 0 | |
| A008AL | Interior and Exterior Lighting Systems (Spec Item 3.3.2) | 12 | MO | $ - 0 | |
| A008AM | Fire Protection Systems (Spec Item 3.3.3) | 12 | MO | $ - 0 | |
| A008AN | Compressed Air Systems (Spec Item 3.3.4) | 12 | MO | $ - 0 | |
| A008AP | Emergency Generator Systems ISA Air Base (Spec Item 3.3.5) | 12 | MO | $ - 0 | |
| A008AR | Emergency Generator Systems Isa Flightline (Spec Item 3.3.5) | 12 | MO | $ - 0 | |
| A008AS | Emergency Generator Systems Flightline PAT Site (Spec Item 3.3.5) | 12 | MO | $ - 0 | |
| A008AT | Emergency Generator Systems Riffa (Spec Item 3.3.5) | 12 | MO | $ - 0 | |
| A008AU | POL System Facilities and Distribution Systems (Spec Item 3.3.6) | 12 | MO | $ - 0 | |
| A008AV | UPS (Spec Item 3.3.7) | 12 | MO | $ - 0 | |
| A008AW | Security Lighting Systems (Spec item 3.3.8) | 12 | MO | $ - 0 | |
| A008AX | Solar Ligtht Systems (Spec Item 3.3.9) | 12 | MO | $ - 0 | |
| A008AY | Solar Light Poles (Spec Item 3.3.9) | 12 | MO | $ - 0 | |
| A008AZ | Aboveground (AST) Storage Tanks (Spec Item 3.3.10) | 12 | MO | $ - 0 | |
| A008BA | Emergency Call Box Maintenance (Spec Item 3.3.11) | 12 | MO | $ - 0 | |
| A008BB | ELMR Tower Hydraulic Systems (Spec Item 3.3.12) | 12 | MO | $ - 0 | |
| A008BC | Vehicle Barrier Systems (Spec Item 3.3.13) | 12 | MO | $ - 0 | |
| A008BD | Security Alarm Systems (Spec Item 3.3.14) | 12 | MO | $ - 0 | |
| Inspection Testing and Certification Program | |||||
| A008BE | Backflow Protection Devices (Spec Item 3.4.1) | 12 | MO | $ - 0 | |
| Other Recurring Services | |||||
| A008BF | Grease Traps (Spec Item 3.5.1) | 12 | MO | $ - 0 | |
| A008BG | Exhaust Hoods and Ducts (Spec Item 3.5.2) | 12 | MO | $ - 0 | |
| A008BH | Fence Line Maintenance (Spec Item 3.5.3) | 12 | MO | $ - 0 | |
| A008BJ | Locksmith Services (Spec Item 3.5.4) | 12 | MO | $ - 0 | |
| A008BK | Overhead Doors (Spec Item 3.5.5) | 12 | MO | $ - 0 | |
| A008BL | Oil Water Separators (Spec Item 3.5.6) | 12 | MO | $ - 0 | |
| A008BM | RLB Condition Assessment (Spec Item 3.5.7) | 12 | MO | $ - 0 | |
| A008BN | Facility Duct Cleaning (Spec Item 3.5.8) | 12 | MO | $ - 0 | |
| A008 | Total 1502000 Facility Investment | TOTAL | $ - 0 |
| A009 | 1503010 Custodial Services (SIC FX) | ||||
| A009AA | Scheduled Services LSA (Spec Item 3.1) | 12 | MO | $ - 0 | |
| A009AB | Scheduled Services Flight Line (Spec Item 3.1) | 12 | MO | $ - 0 | |
| A009AC | Scheduled Services Flight Line LSA Pat Site (Spec Item 3.1) | 12 | MO | $ - 0 | |
| A009AD | Scheduled Services Riffa (Spec Item 3.1) | 12 | MO | $ - 0 | |
| A009AE | Restroom Services LSA (Spec Item 3.2) | 12 | MO | $ - 0 | |
| A009AF | Restroom Services Flight Line (Spec Item 3.2) | 12 | MO | $ - 0 | |
| A009AG | Restroom Services Flight Line LSA Pat Site (Spec Item 3.2) | 12 | MO | $ - 0 | |
| A009AH | Restroom Services Riffa (Spec Item 3.2) | 12 | MO | $ - 0 | |
| A009AJ | Building Perimeter Servces (Spec Item 3.3) | 12 | MO | $ - 0 | |
| A009AK | Unscheduled Services (Spec Item 3.4) | 12 | MO | $ - 0 | |
| A009 | Total 1503010 Custodial Services | TOTAL | $ - 0 |
| A010 | 1503020 Pest Control (SIC FX) | ||||
| A010AA | Pest Control Services LSA (Spec Item 3.1) | 12 | MO | $ - 0 | |
| A010AB | Pest Control Services Flight Line (Spec Item 3.1) | 12 | MO | $ - 0 | |
| A010AC | Pest Control Services Flight Line Pat Site (Spec Item 3.1) | 12 | MO | $ - 0 | |
| A010AD | Pest Control Services Riffa (Spec Item 3.1) | 12 | MO | $ - 0 | |
| A010AE | Unscheduled Pest Control Services (Spec Item 3.2) | 12 | MO | $ - 0 | |
| A010AF | Pest Management Reporting (Spec Item 3.3) | 12 | MO | $ - 0 | |
| A010 | Total 1503020 Pest Control | TOTAL | $ - 0 |
| A011 | 1503030 Integrated Solid Waste Management (ISWM) (SIC FX) | ||||
| A011AA | ISWM Isa Air Base (Spec Item 3.1) | 12 | MO | $ - 0 | |
| A011AB | ISWM Flight Line (Spec Item 3.1) | 12 | MO | $ - 0 | |
| A011AC | ISWM LSA PAT Site (Spec Item 3.1) | 12 | MO | $ - 0 | |
| A011AD | ISWM Riffa (Spec Item 3.1) | 12 | MO | $ - 0 | |
| A011AE | Operation of Collection Sites (Spec Item 3.2) | 12 | MO | $ - 0 | |
| A011 | Total 1503030 ISWM | TOTAL | $ - 0 |
| A012 | 1503050 Grounds Maintenance and Landscaping (SIC FX) | ||||
| A012AA | Concrete Planter Services (Spec Item 3.1) | 12 | MO | $ - 0 | $ - 0 |
| A012AB | Tree Maintenance Services (Spec Item 3.2) | 12 | MO | $ - 0 | $ - 0 |
| A012AC | Outdoor Trash Collection (Spec Item 3.3) | 12 | MO | $ - 0 | $ - 0 |
| A012AD | Grounds (Policing) Cleaning Services (Spec Item 3.4) | 12 | MO | $ - 0 | $ - 0 |
| A012 | Total 1503050 Grounds Maintenance and Landscaping | TOTAL | $ - 0 |
| A013 | 1601000 Utility Management (SIC UT) | ||||
| A013AA | Utility Operations Mangement (Spec Item 3.1) | 12 | MO | $ - 0 | |
| A013AB | Utility Infrastructure Condition Assessment (UICAP) Support | 12 | MO | $ - 0 | |
| A013 | Total 1601000 Utilities Management | TOTAL | $ - 0 |
| A014 | 1602000 Electrical (SIC UT) | ||||
| A014AA | Electrical Power Generator Operation (Spec Item 3.1) | 12 | MO | $ - 0 | |
| A014AB | Operate Electrical Power Distribution Systems (Spec Item 3.2) | 12 | MO | $ - 0 | |
| A014AC | PM Electrical Power Distribution System (Spec Item 3.3.1) | 12 | MO | $ - 0 | |
| A014AD | PM Electrical 400Hz Distribution System (Spec Item 3.3.2) | 12 | MO | $ - 0 | |
| A014AE | Flight Line Power Generator and Distribution System (Spec Item 3.4) | 12 | MO | $ - 0 | |
| A014AF | 350 KVA Generators (Spec 3.4) | 12 | MO | $ - 0 | |
| A014 | Total 1602000 Electrical | TOTAL | $ - 0 |
| A015 | 1604000 Wastewater (SIC UT) | ||||
| A015AA | Sewage Collection and Disposal Isa Air Base (Spec Item 3.1) | 12 | MO | $ - 0 | |
| A015AB | Sewage Collection and Disposal USMC LSA (Spec Item 3.1) | 12 | MO | $ - 0 | |
| A015AC | Sewage Collection and Disposal USMC Flight Line (Spec Item 3.1) | 12 | MO | $ - 0 | |
| A015AD | Sewage Collection and DisposalFlight Line & Fuel Farm (Spec Item 3.1) | 12 | MO | $ - 0 | |
| A015AE | Sewage Collection and Disposal Isa PAT Site (Spec Item 3.1) | 12 | MO | $ - 0 | |
| A015AF | Sewage Collection and Disposal Riffa (Spec Item 3.1) | 12 | MO | $ - 0 | |
| A015AG | Portable Toilets (Spec Item 3.2) | 12 | MO | $ - 0 | |
| A015 | Total 1604000 Wastewater | TOTAL | $ - 0 |
| A016 | 1606000 Water (SIC UT) | ||||
| A016AA | O&M RO Water Plant (Spec Item 3.1) | 12 | MO | $ - 0 | |
| A016AB | Integrated Maintenance Plan (IMP) (Spec Item 3.2) | 12 | MO | $ - 0 | |
| A016AC | Operation of Ice Plant (Spec Item 3.3.1) | 12 | MO | $ - 0 | |
| A016AD | Bottled Water Delivery (Spec Item 3.3.2) | 12 | MO | $ - 0 | |
| A016AE | Special Event Water and Ice Deliver (Spec Item 3.3.4) | 12 | MO | $ - 0 | |
| A016 | Total 1606000 Water | TOTAL | $ - 0 |
| A017 | 1700000 Transportation (SIC TR) | ||||
| A017AA | Scheduled Shuttle Bus Services LSA - Flightline (Spec Item 3.1.1) | 12 | MO | $ - 0 | |
| A017AB | Scheduled Bus Services LSA - Riffa (Spec Item 3.1.1) | 12 | MO | $ - 0 | |
| A017AC | Scheduled Bus Services LSA - NSA (Spec Item 3.1.1) | 12 | MO | $ - 0 | |
| A017AD | Unscheduled Bus Services, All Sites (Spec Item 3.1.2) | 12 | MO | $ - 0 | |
| A017AE | WHE Services (Spec Item 3.1.3) | 12 | MO | $ - 0 | |
| A017AF | MHE Services(Spec Itme 3.1.4) | 12 | MO | $ - 0 | |
| A017AG | Inspection and Load Test Certification of WHE, MHE (Spec Item 3.2.1) | 12 | MO | $ - 0 | |
| A017AH | Preventive Maintenance Inspections (Spec Item 3.2.2) | 12 | MO | $ - 0 | |
| A017AJ | Mobile Fuel Farm Equipment (Spec Item 3.2.3) | 12 | MO | $ - 0 | |
| A017AK | Repair (Spec Item 3.2.4) | 12 | MO | $ - 0 | |
| A017AL | Trouble Calls, All Sites (Spec Item 3.2.5) | 12 | MO | $ - 0 | |
| A017AM | Light Carts (Spec Item 3.2.6) | 12 | MO | $ - 0 | |
| A017AN | Vehicle Wash Rack (Spec Item 3.3.1) | 12 | MO | $ - 0 | |
| A017AP | On-Site Fuel Delivery (Spec Item 3.3.2) | 12 | MO | $ - 0 | |
| A017AQ | Contractor-Provided Non-Tactical Vehicles (NTV) (Spec Item 3.4) | 12 | MO | $ - 0 | |
| A017 | Total 1700000 BSVE | TOTAL | $ - 0 |
| A018 | 1800000 Environmental (EV) | ||||
| A017AA | Drain and Purge Services (Spec Item 3.1) | 12 | MO | $ - 0 | |
| A017AB | Unscheduled Services (Spec Item 3.2) | 12 | MO | $ - 0 | |
| A018 | Total 1800000 Environmental | TOTAL | $ - 0 |
TOTAL FFP LINE ITEMS A001 - A018 TOTAL $ - 0
&9
NR Base
| EXHIBIT LINE ITEM NUMBERS | |||||||
| N62470-14-D-6012 | |||||||
| CLIN 0002 | |||||||
| Indefinite Delivery/Indefinite Quantity - Base Year | |||||||
| ELIN/Sub- | |||||||
| ELIN | Short Description | Full Description | Est. Quantity | Unit | Unit Price | Est. Amount | |
| A700 | Unit Priced Labor | The composite labor price shall include all direct and indirect costs associated with performing an hour of work.The Composite Labor Rate shall include all costs for preparation of the cost proposal, job reparation, travel, pre expended bin materials and supplies, ordering and stockpiling job material, additional material handling, items of equipment necessary to perform work (i.e. bucket truck, lifting equipment, staging, etc.), equipment set up time, lift time, craft delay allowance, profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, bonds, permits, insurance, etc. There are no additional markups for unit priced labor on the task order. | |||||
| A700AA | Composite Skilled Labor | HVAC, Electrician, Fire Alarm Technican, High Voltage Electrician, General Mechanic, Pest Control, Vehicle Operator, Generator Mechanic, EVT | 100,000 | LH | $ - 0 | ||
| A700AB | Composite Unskilled Labor | Laborer, Grounds Maintenance Worker, Custodial | 100,000 | LH | $ - 0 | ||
| A700AC | Direct Material Cost | LS | $ 6,000,000.00 | ||||
| A700AD | Special Equipment Rental | Work requiring the use of special equipment e.g. Cranes, graders,compactors, tractors, bucket trucks, and other heavy equipment. Special equipment rental cost, includes operator where applicable. Cost will be actual cost for rental. | LS | $ 500,000.00 | |||
| A701AG | Auto Cadd services | Price to provide Auto Cadd operator for updating, creating CAD drawings. Work can be accomplished on contractor computer and software and forwarded to the Government. Complete all work with in 10 working days after receipt of order. | 300 | LH | $ - 0 | ||
| A702 | Facility Investment | ||||||
| A702AA | A/C Replacement up to 2 Ton Split Unit | Includes removal of the old AC, supply and installation of the new AC, and all necessary materials, labor, transportation and testing to ensure new unit is operational. Complete all work with in 4 working days after receipt of order. | 200 | Ea | $ - 0 | ||
| A702AB | A/C Replacement < 5T Package Unit | Includes removal of the old AC, supply and installation of the new AC, up to 50 meters of duct work and all necessary materials, labor, transportation and testing to ensure new unit is operational. Complete all work with in 8 working days after receipt of order. | 7 | Ea | $ - 0 | ||
| A702AC | A/C Replacement > 5T < 10T Package Unit | Includes removal of the old AC, supply and installation of the new AC, up to 50 meters of duct work and all necessary materials, labor, transportation and testing to ensure new unit is operational. Complete all work with in 11 working days after receipt of order. | 5 | Ea | $ - 0 | ||
| A702AD | A/C Replacement > 10T Package Unit | Includes removal of the old AC, supply and installation of the new AC, up to 50 meters of duct work and all necessary materials, labor, transportation and testing to ensure new unit is operational. Complete all work with in 14 working days after receipt of order. | 3 | EA | $ - 0 | ||
| A702AE | RLB Relocation | Relocation and installation of existing RLBs includng related material and furnished equipment from one location to another location. The work includes cleaning the area,levelling the ground surface,disconnection and connection of all utilities, verification of functionality by performing operational checks and tests. All necessary materials, labor,equipment and transportation shall be provided. Complete all works within 18 working days after receipt of order. | 10 | EA | $ - 0 | ||
| A702AF | Chain Link Fencing | Removal and Disposal of 10 foot high chain link fence including bottom rails, intermediate horizontal rails, steel post tubing and concrete footing. Complete all work within 1 working days after receipt of order. | 50 | LM | $ - 0 | ||
| A702AG | Chain Link Fencing | Provision and Installation 10 foot high chain link fence, galvanized steel wire and 11 gauge or approved equal, bottom rails or tension wire as appropriate, intermediate horizontal rails as appropriate, the posts will be steel tubing, the post sites will be excavated, the post sites will be poured with concrete. Complete all work within 10 working days after receipt of order. | 350 | LM | $ - 0 | ||
| A702AH | Privacy fence screen | Provide and install 10 foot high green colored privacy fence screen with hog rings or similar clamps to secure screen material to chain link fencing. Complete all work within 14 days after receipt of order. | 350 | LM | |||
| A703 | Custodial Services | ||||||
| A703AA | Additional Floor Care | IAW Annex 1503010 Spec Item 3.1.1 Complete all work with in 1 working days after receipt of order. | 2500 | SM | $ - 0 | ||
| A703AB | Additional Ablution Unit Cleaning | IAW Annex 1503010 Spec Item 3.1.2 Complete all work with in 1 working day after receipt of order. | 2500 | SM | $ - 0 | ||
| A703AC | RLB Cleaning for VIP Berthing Rooms | IAW Annex 1503010 Annex 1503010 Annex 1503010 Spec Item 3.2.1 Complete all work with in 1 working days after receipt of order. | 10000 | SM | $ - 0 | ||
| A703AD | Berthing RLB Cleaning | IAW Annex 1503010 Includes wiping and dusting all walls and furnishings, dusting shelves, cleaning the window sills, sweep and mop floors, cleaning rest room and leaving the linens on the bed. Complete all work with in 2 working days after receipt of order. | |||||
| 24 | Ea | $ - 0 | |||||
| A703AE | P-8 Hangar Bay Cleaning | Hangar Bay cleaning shall be done in IAW Annex 1503010, OEM and SDS of flooring material. . Collect, dispose or recycle items marked or designated as trash or recyclable. Work shall begin within 2 days of receipt of order. | 12 | Ea | $ - 0 | ||
| A704 | ISWM | ||||||
| A704AA | Provide Additional Dumpster | Price per calendar day to provide 1 ea. 8 cubic meter dumpster. Price includes delivery, set up, disposal, and removal. Complete all work within 3 working days after receipt of order. | 60 | Day | $ - 0 | ||
| A704AB | Provide Additional Dumpster Pick-up | Price to provide additional pick-up of a 8 cubic meter dumpster. Complete all work within 4 working days after receipt of order. | 60 | Ea | $ - 0 | ||
| 705 | Grounds Maintenance and Landscaping | ||||||
| A705AA | Tree Pruning | Trees are pruned according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. All debris resulting from Contract's work is disposed of off Government property within one working day following performance. Complete all work within 7 working days after receipt of order. | 20 | EA | $ - 0 | ||
| A705AB | Tree Removal | Price includes tree removal, and disposal off site. Complete all work within 15 working days after receipt of order. | 20 | EA | $ - 0 | ||
| A705AC | Gravel filling | All gravel shall be less than 3/4 in. Complete all work within 6 working days after notice to proceed. | 1,000 | M3. | $ - 0 | ||
| A705AD | Provide and Install reflective signs | Provide and install reflective signage complete with metal pole and levelled concrete base. Signs shall have optimal visibility upto 20 ft away. Complete all work within 20 working days after receipt of order. | 10 | EA | $ - 0 | ||
| A706 | Electrical | ||||||
| A706AA | Generator Rental | Price per calendar day to include delivery, setup, removal, required cables, distribution panels, all connections to the faciltiy, fuel tank, operation, maintenance. The Contractor is responsible for all fuel and refueling. | |||||
| A706AC | Generator Rental 350KVA Generator | Complete all work within 6 working days after receipt of order. | 50 | Day | $ - 0 | ||
| A706AD | Generator Rental 500KVA Generator | Complete all work within 6 working days after receipt of order. | 50 | Day | $ - 0 | ||
| A707 | Wastewater | ||||||
| A707AA | Provide Sewage Removal | Price per pickup per gallon, including disposal. Complete all work within 2 working days after receipt of order. | 50,000 | Gal | $ - 0 | ||
| A707AB | Provide Portable Toilets | Price includes delivery, set up, cleaning, sewage removal and disposal, and removal. Complete all work within 3 working days after receipt of order. | 50 | Ea | $ - 0 | ||
| A707AC | Provide Sewage Truck | Price per calendar day to include licensed operator with labor to collect and properly dispose wastewater, sewage, sludge, rainwater etc. Sewage Truck shall be dcapacity of 5,000 gallon. Truck shall not be older than three years. Tires shall be maintained in good condition with no visible bald spots or worn treads. The contractor shall be responsible for all maintenance and emergency servicing of the vehicle. Emergency down time shall not exceed four hours. Drivers shall meet ISA Air Base access requirements. Complete all work within 3 working days after receipt of order. | 15 | Days | $ - 0 | ||
| A708 | Water | ||||||
| A708AA | Deliver Potable Water Isa Air Base | Price per gallon delivered. Complete all work within 3 working days after receipt of order. | 1,000,000 | Liter | $ - 0 | ||
| A708AB | Install Up to 1" Backflow Preventer | Provide, install and test backflow preventer according to specifications under Annex 1606000 Water. Complete all work within 07 days of receipt of order. | 5 | EA | |||
| A708AC | Install Up to 2" Backflow Preventer | Provide, install and test backflow preventer according to specifications under Annex 1606000 Water. Complete all work within 07 days of receipt of order. | 5 | EA | |||
| A708AD | Install Up to 3" Backflow Preventer | Provide, install and test backflow preventer according to specifications under Annex 1606000 Water. Complete all work within 07 days of receipt of order. | 5 | EA | |||
| A708AD | Install Up to 4" Backflow Preventer | Provide, install and test backflow preventer according to specifications under Annex 1606000 Water. Complete all work within 07 days of receipt of order. | 3 | EA | |||
| A709 | Transportation | ||||||
| A709AA | Provide 26 Passenger Bus | Price to provide 26 passenger bus with driver up to 8 hours. Complete all work within 3 working days after receipt of order. | 50 | Ea | $ - 0 | ||
| A709AB | Provide 52 Passenger Bus for ISA to AV Unit or AV unit to ISA | Price to provide 52 passenger bus with driver. Service from Isa Air Base to AV Unit at International Airport or AV Unit to ISA Air Base. Bus shall have space for incoming or departing passengers luggage. Bus shall be available within 24 hours of notification. Maximum travel distance 55 kms one way. Complete all work within 3 working days after notice receipt of order. | 24 | Ea | $ - 0 | ||
| A709AC | Provide 26 Passenger Bus | Price to provide 26 passenger bus with driver up to 16 hours. Complete all work within 3 working days after receipt of order. | 50 | EA | $ - 0 | ||
| A709AD | Provide 60 Passenger Bus | Price to provide 60 passenger bus with driver up to 12 hours. Complete all work within 3 working days after receipt of order. | 50 | EA | $ - 0 | ||
| A709AE | Provide60 Passenger Bus | Price to provide 60 passenger bus with driver up to 16 hours. Complete all work within 3 working days after receipt of order. | 50 | EA | $ - 0 | ||
| A709AF | Crane Rental | Price per calendar day to include delivery/removal of crane to/from the site, driver/equipment operator, rigger, rigging gear, fuel and maintenance. The equipment, driver/equipment operator, riggers and rigging gear shall meet all regulations, licensing and certification requirements listed in the FFP equipment operations. Equipment rental may be for the following locations, ISA LSA, ISA Flightline, Riffa and Pat site at Flight Line. Delivery within 72 hours of notification. Must meet all requirements in the NAVFAC P-307 and all RBAF requirements for base access | |||||
| A709AF | Crane Rental 70 Ton Crane | Complete all work within 3 working days after receipt of order. | 50 | Day | $ - 0 | ||
| A709AF | Crane Rental 90 Ton Crane | Complete all work within 3 working days after receipt of order. | 50 | Day | $ - 0 | ||
| A709AF | Truck and Trailer Rental | ||||||
| A709AF | Tractor Trailer with Driver | Price per calendar day to include licensed driver. Trailer shall be double axle and 40 feet long complete with straps and tie down chains and standard ISO container locking devices with removal fence sides with a carrying capacity of 40,000 kgs. Tractor shall not be older than three years. Ties shall be maintained in good condition with no visible bald spots or worn treads. The contractor shall be responsible for all maintenance and emergency servicing of the vehicle. Emergency down time shall not exceed four hours. Drivers shall meet ISA Air Base access requirements. Complete all work within 3 working days after receipt of order. | 100 | Day | $ - 0 | ||
| A709AF | Tractor Trailer(Low Boy) with driver | Price per calendar day to include licensed driver. Trailer shall be double axle and 40 feet long complete with straps and tie down chains and standard ISO container locking devices with removal fence sides with a carrying capacity of 40,000 kgs. Tractor shall not be older than three years. Ties shall be maintained in good condition with no visible bald spots or worn treads. The contractor shall be responsible for all maintenance and emergency servicing of the vehicle. Emergency down time shall not exceed four hours. Drivers shall meet ISA Air Base access requirements. Complete all work within 3 working days after receipt of order. | 50 | Day | $ - 0 | ||
| A709AF | Solar Light | Provide/Install SL01 Solar High-Lux Street Light/Parking Lot Light. Operating voltage, operating temperature -40 deg.F to 125 deg F., Special control to prevent over-charging and over-discharging, power consumption 552 SMD/LED system is 24V/1.6A/38W, 5 hours of strong direct sunshine will enable a full charge, Illumination time is up to 12 hours or more, generally dusk to dawn, up to 5 days reserve power to allow successive cloudy weather and days without sunshine, several successive cloudy or alternating overcast days typically should not affect illumination time. Complete all work within working days after receipt of order. | 3 | EA. | $ - 0 | ||
| A709AG | Barrier Relocation | Move Barrier up to 6000 lbs. Complete all work within 3 working days after receipt of order. | 50 | EA | $ - 0 | ||
| A709AH | Barrier Relocation | Move Barrier > 6000 lbs up to 17000lbs. Complete all work within 3 working days after receipt of order. | 50 | EA | $ - 0 | ||
| A710 | Environmental | ||||||
| Drain and Purge | Drain, purge and certify equipment is free of hazardous fluids and hazardous materials. Complete services for disposal, transportation and reutilization purposes. | ||||||
| A710AA | Refrigerators | Complete all work within 10 working days after receipt of order. | 50 | EA | $ - 0 | ||
| A710AB | Aboveground Storage Tanks (AST) | Complete all work within 10 working days after receipt of order. | 10 | EA | $ - 0 |
| A711AB | Airfield Pavement Repair | IAW UFC 3-270-07, complete work based on task order. | 100 | SM | $ - 0 |
| A711AA | Airfield Lighting Repair | Contractor shall repair/replace airfield light. | 10 | EA | $ - 0 |
Total IDIQ ELINs A700 - A711 $ 6,500,000.00
Page &P of &N
Rec Opt 1
| EXHIBIT LINE ITEM NUMBERS | |||||
| SOLICITATION N62470-18-R-3004 | |||||
| EXHIBIT A - CLIN 0003 | |||||
| Firm Fixed Price - First Option Period | |||||
| PROVIDE PRICES FOR FUNCTION SPECIFICATIONS - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C | |||||
| ELIN/Sub | |||||
| ELIN | Quantity | Unit of Issue | Unit Price | Total |
| B001 | 0401000 Security Operations (SIC CT) | ||||
| B001AA | Entry Control Point Services Riffa (Spec Item 3.1) | 12 | MO | $ - 0 | |
| B001AB | Entry Control Point Services ISA (Spec Item 3.1) | 12 | MO | $ - 0 | |
| B001 | Total 0401000 Security Operations | TOTAL | $ - 0 |
| B002 | 0402000 Fire and Emergency Services | ||||
| B002AA | All Hazards Response (Spec item 3.1) | 12 | MO | $ - 0 | |
| B002AB | Fire Prevention Services (Spec Item 3.2) | 12 | Mo | $ - 0 | |
| B002AC | Emergecy Medical Services (Spec Item 3.3) | 12 | MO | $ - 0 | |
| B002AD | Emergecy Medical Services Response (Spec Item 3.4) | 13 | MO | $ - 0 | |
| B002AE | Dispatch (Spec Item 3.5) | 14 | MO | $ - 0 | |
| B002 | Total 0402000 Fire and Emergency Services | TOTAL | $ - 0 |
| B003 | 0404000 Safety | ||||
| B003AA | Provide Explosive Safety Officer (ESO) (Spec Item 3.1) | 12 | MO | $ - 0 | |
| B003 | Total 0404000 Safety | TOTAL | $ - 0 |
| B004 | Supply Services | ||||
| B004AB | POL Management Services (Spec Item 3.1) | 12 | MO | $ - 0 | |
| B004AA | Ground Fuel Operations(Spec Item 3.2) | 12 | MO | $ - 0 | |
| B004 | Total 1000000 Supply Services | TOTAL | $ - 0 |
| B005 | 1300000 Galley (SIC GL) | ||||
| B005AA | Galley Services LSA (Spec Item 3.1 - 3.5) | 12 | MO | $ - 0 | |
| B005AB | Galley Services Flight Line (Spec Item 3.1 - 3.5) | 12 | MO | $ - 0 | |
| B005AC | Galley Services ISA PAT Site (Spec Item 3.1 - 3.5) | 12 | MO | $ - 0 | |
| B005AD | Galley Services Riffa (Spec Item 3.1 - 3.5) | 12 | MO | $ - 0 | |
| B005AE | Galley Equipment Maintenance (Spec Item 3.6) | 12 | MO | $ - 0 | |
| B004 | Total 1300000 Galley | TOTAL | $ - 0 |
| B006 | 1400000 UH | ||||
| B006AA | Operations Management (Spec Item 3.1) | 12 | MO | $ - 0 | |
| B006AB | Personnel Laundry (Spec Item 3.2.1) | 12 | MO | $ - 0 | |
| B006AC | Self Service Laundry (Spec Item 3.2.2) | 12 | MO | $ - 0 | |
| B006AD | AFN | 12 | MO | $ - 0 | |
| B006 | Total 1400000 UH | TOTAL | $ - 0 |
| B007 | 1501000 Facility Management | ||||
| B007AA | Work Control (Spec Item 3.1) | 12 | MO | $ - 0 | |
| B007AB | ICAP Services (Spec Item 3.2) | 12 | MO | $ - 0 | |
| B007AC | Asset Mangement Services (Spec Item 3.3) | 12 | MO | $ - 0 | |
| B007AD | Technical Support Services (Spec Item 3.4) | 12 | MO | $ - 0 | |
| B007 | Total 1501000 Facility Management | TOTAL | $ - 0 |
| B008 | 1502000 Facility Investment (SIC ST) | ||||
| Service Requests | |||||
| B008AA | Emergency Service Orders (Spec Item 3.1.1) | 12 | MO | $ - 0 | |
| B008AB | Urgent Service Orders (Spec Item 3.1.2) | 12 | MO | $ - 0 | |
| B008AC | Routine Service Orders (Spec Item 3.1.3) | 12 | MO | $ - 0 | |
| B008AD | Project Work Order Level 1 (Spec Item 3.2.1) | 12 | MO | $ - 0 | |
| B008AE | Project Work Order Level 2 (Spec Item 3.2.2) | 12 | MO | $ - 0 | |
| B008AF | Project Work Order Level 3 (Spec Item 3.2.3) | 12 | MO | $ - 0 | |
| Preventive Maintenance (PM) Program | |||||
| B008AG | HVAC and Refrigeration Systems LSA (Spec Item 3.3.1) | 12 | MO | $ - 0 | |
| B008AH | HVAC and Refrigeration Systems Flightline (Spec Item 3.3.1) | 12 | MO | $ - 0 | |
| B008AJ | HVAC and Refrigeration Systems ISA Pat Site (Spec Item 3.3.1) | 12 | MO | $ - 0 | |
| B008AK | HVAC and Refrigeration Systems Riffa (Spec Item 3.3.1) | 12 | MO | $ - 0 | |
| B008AL | Interior and Exterior Lighting Systems (Spec Item 3.3.2) | 12 | MO | $ - 0 | |
| B008AM | Fire Protection Systems (Spec Item 3.3.3) | 12 | MO | $ - 0 | |
| B008AN | Compressed Air Systems (Spec Item 3.3.4) | 12 | MO | $ - 0 | |
| B008AP | Emergency Generator Systems ISA Air Base (Spec Item 3.3.5) | 12 | MO | $ - 0 | |
| B008AR | Emergency Generator Systems Isa Flightline (Spec Item 3.3.5) | 12 | MO | $ - 0 | |
| B008AS | Emergency Generator Systems Flightline PAT Site (Spec Item 3.3.5) | 12 | MO | $ - 0 | |
| B008AT | Emergency Generator Systems Riffa (Spec Item 3.3.5) | 12 | MO | $ - 0 | |
| B008AU | POL System Facilities and Distribution Systems (Spec Item 3.3.6) | 12 | MO | $ - 0 | |
| B008AV | UPS (Spec Item 3.3.7) | 12 | MO | $ - 0 | |
| B008AW | Security Lighting Systems (Spec item 3.3.8) | 12 | MO | $ - 0 | |
| B008AX | Solar Ligtht Systems (Spec Item 3.3.9) | 12 | MO | $ - 0 | |
| B008AY | Solar Light Poles (Spec Item 3.3.9) | 12 | MO | $ - 0 | |
| B008AZ | Aboveground (AST) Storage Tanks (Spec Item 3.3.10) | 12 | MO | $ - 0 | |
| B008BA | Emergency Call Box Maintenance (Spec Item 3.3.11) | 12 | MO | $ - 0 | |
| B008BB | ELMR Tower Hydraulic Systems (Spec Item 3.3.12) | 12 | MO | $ - 0 | |
| B008BC | Vehicle Barrier Systems (Spec Item 3.3.13) | 12 | MO | $ - 0 | |
| B008BD | Security Alarm Systems (Spec Item 3.3.14) | 12 | MO | $ - 0 | |
| Inspection Testing and Certification Program | |||||
| B008BE | Backflow Protection Devices (Spec Item 3.4.1) | 12 | MO | $ - 0 | |
| Other Recurring Services | |||||
| B008BF | Grease Traps (Spec Item 3.5.1) | 12 | MO | $ - 0 | |
| B008BG | Exhaust Hoods and Ducts (Spec Item 3.5.2) | 12 | MO | $ - 0 | |
| B008BH | Fence Line Maintenance (Spec Item 3.5.3) | 12 | MO | $ - 0 | |
| B008BJ | Locksmith Services (Spec Item 3.5.4) | 12 | MO | $ - 0 | |
| B008BK | Overhead Doors (Spec Item 3.5.5) | 12 | MO | $ - 0 | |
| B008BL | Oil Water Separators (Spec Item 3.5.6) | 12 | MO | $ - 0 | |
| B008BM | RLB Condition Assessment (Spec Item 3.5.7) | 12 | MO | $ - 0 | |
| B008BN | Facility Duct Cleaning (Spec Item 3.5.8) | 12 | MO | $ - 0 | |
| B008 | Total 1502000 Facility Investment | TOTAL | $ - 0 |
| B009 | 1503010 Custodial Services (SIC FX) | ||||
| B009AA | Scheduled Services LSA (Spec Item 3.1) | 12 | MO | $ - 0 | |
| B009AB | Scheduled Services Flight Line (Spec Item 3.1) | 12 | MO | $ - 0 | |
| B009AC | Scheduled Services Flight Line LSA Pat Site (Spec Item 3.1) | 12 | MO | $ - 0 | |
| B009AD | Scheduled Services Riffa (Spec Item 3.1) | 12 | MO | $ - 0 | |
| B009AE | Restroom Services LSA (Spec Item 3.2) | 12 | MO | $ - 0 | |
| B009AF | Restroom Services Flight Line (Spec Item 3.2) | 12 | MO | $ - 0 | |
| B009AG | Restroom Services Flight Line LSA Pat Site (Spec Item 3.2) | 12 | MO | $ - 0 | |
| B009AH | Restroom Services Riffa (Spec Item 3.2) | 12 | MO | $ - 0 | |
| B009AJ | Building Perimeter Servces (Spec Item 3.3) | 12 | MO | $ - 0 | |
| B009AK | Unscheduled Services (Spec Item 3.4) | 12 | MO | $ - 0 | |
| B009 | Total 1503010 Custodial Services | TOTAL | $ - 0 |
| B010 | 1503020 Pest Control (SIC FX) | ||||
| B010AA | Pest Control Services LSA (Spec Item 3.1) | 12 | MO | $ - 0 | |
| B010AB | Pest Control Services Flight Line (Spec Item 3.1) | 12 | MO | $ - 0 | |
| B010AC | Pest Control Services Flight Line Pat Site (Spec Item 3.1) | 12 | MO | $ - 0 | |
| B010AD | Pest Control Services Riffa (Spec Item 3.1) | 12 | MO | $ - 0 | |
| B010AE | Unscheduled Pest Control Services (Spec Item 3.2) | 12 | MO | $ - 0 | |
| B010AF | Pest Management Reporting (Spec Item 3.3) | 12 | MO | $ - 0 | |
| B010 | Total 1503020 Pest Control | TOTAL | $ - 0 |
| B011 | 1503030 Integrated Solid Waste Management (ISWM) (SIC FX) | ||||
| B011AA | ISWM Isa Air Base (Spec Item 3.1) | 12 | MO | $ - 0 | |
| B011AB | ISWM Flight Line (Spec Item 3.1) | 12 | MO | $ - 0 | |
| B011AC | ISWM LSA PAT Site (Spec Item 3.1) | 12 | MO | $ - 0 | |
| B011AD | ISWM Riffa (Spec Item 3.1) | 12 | MO | $ - 0 | |
| B011AE | Operation of Collection Sites (Spec Item 3.2) | 12 | MO | $ - 0 | |
| B011 | Total 1503030 ISWM | TOTAL | $ - 0 |
| B012 | 1503050 Grounds Maintenance and Landscaping (SIC FX) | ||||
| B012AA | Concrete Planter Services (Spec Item 3.1) | 12 | MO | $ - 0 | $ - 0 |
| B012AB | Tree Maintenance Services (Spec Item 3.2) | 12 | MO | $ - 0 | $ - 0 |
| B012AC | Outdoor Trash Collection (Spec Item 3.3) | 12 | MO | $ - 0 | $ - 0 |
| B012AD | Grounds (Policing) Cleaning Services (Spec Item 3.4) | 12 | MO | $ - 0 | $ - 0 |
| B012 | Total 1503050 Grounds Maintenance and Landscaping | TOTAL | $ - 0 |
| B013 | 1601000 Utility Management (SIC UT) | ||||
| B013AA | Utility Operations Mangement (Spec Item 3.1) | 12 | MO | $ - 0 | |
| B013AB | Utility Infrastructure Condition Assessment (UICAP) Support | 12 | MO | $ - 0 | |
| B013 | Total 1601000 Utilities Management | TOTAL | $ - 0 |
| B014 | 1602000 Electrical (SIC UT) | ||||
| B014AA | Electrical Power Generator Operation (Spec Item 3.1) | 12 | MO | $ - 0 | |
| B014AB | Operate Electrical Power Distribution Systems (Spec Item 3.2) | 12 | MO | $ - 0 | |
| B014AC | PM Electrical Power Distribution System (Spec Item 3.3.1) | 12 | MO | $ - 0 | |
| B014AD | PM Electrical 400Hz Distribution System (Spec Item 3.3.2) | 12 | MO | $ - 0 | |
| B014AE | Flight Line Power Generator and Distribution System (Spec Item 3.4) | 12 | MO | $ - 0 | |
| B014AF | 350 KVA Generators (Spec 3.4) | 12 | MO | $ - 0 | |
| B014 | Total 1602000 Electrical | TOTAL | $ - 0 |
| B015 | 1604000 Wastewater (SIC UT) | ||||
| B015AA | Sewage Collection and Disposal Isa Air Base (Spec Item 3.1) | 12 | MO | $ - 0 | |
| B015AB | Sewage Collection and Disposal USMC LSA (Spec Item 3.1) | 12 | MO | $ - 0 | |
| B015AC | Sewage Collection and Disposal USMC Flight Line (Spec Item 3.1) | 12 | MO | $ - 0 | |
| B015AD | Sewage Collection and DisposalFlight Line & Fuel Farm (Spec Item 3.1) | 12 | MO | $ - 0 | |
| B015AE | Sewage Collection and Disposal Isa PAT Site (Spec Item 3.1) | 12 | MO | $ - 0 | |
| B015AF | Sewage Collection and Disposal Riffa (Spec Item 3.1) | 12 | MO | $ - 0 | |
| B015AG | Portable Toilets (Spec Item 3.2) | 12 | MO | $ - 0 | |
| B015 | Total 1604000 Wastewater | TOTAL | $ - 0 |
| B016 | 1606000 Water (SIC UT) | ||||
| B016AA | O&M RO Water Plant (Spec Item 3.1) | 12 | MO | $ - 0 | |
| B016AB | Integrated Maintenance Plan (IMP) (Spec Item 3.2) | 12 | MO | $ - 0 | |
| B016AC | Operation of Ice Plant (Spec Item 3.3.1) | 12 | MO | $ - 0 | |
| B016AD | Bottled Water Delivery (Spec Item 3.3.2) | 12 | MO | $ - 0 | |
| B016AE | Special Event Water and Ice Deliver (Spec Item 3.3.4) | 12 | MO | $ - 0 | |
| B016 | Total 1606000 Water | TOTAL | $ - 0 |
| B017 | 1700000 Transportation (SIC TR) | ||||
| B017AA | Scheduled Shuttle Bus Services LSA - Flightline (Spec Item 3.1.1) | 12 | MO | $ - 0 | |
| B017AB | Scheduled Bus Services LSA - Riffa (Spec Item 3.1.1) | 12 | MO | $ - 0 | |
| B017AC | Scheduled Bus Services LSA - NSA (Spec Item 3.1.1) | 12 | MO | $ - 0 | |
| B017AD | Unscheduled Bus Services, All Sites (Spec Item 3.1.2) | 12 | MO | $ - 0 | |
| B017AE | WHE Services (Spec Item 3.1.3) | 12 | MO | $ - 0 | |
| B017AF | MHE Services(Spec Itme 3.1.4) | 12 | MO | $ - 0 | |
| B017AG | Inspection and Load Test Certification of WHE, MHE (Spec Item 3.2.1) | 12 | MO | $ - 0 | |
| B017AH | Preventive Maintenance Inspections (Spec Item 3.2.2) | 12 | MO | $ - 0 | |
| B017AJ | Mobile Fuel Farm Equipment (Spec Item 3.2.3) | 12 | MO | $ - 0 | |
| B017AK | Repair (Spec Item 3.2.4) | 12 | MO | $ - 0 | |
| B017AL | Trouble Calls, All Sites (Spec Item 3.2.5) | 12 | MO | $ - 0 | |
| B017AM | Light Carts (Spec Item 3.2.6) | 12 | MO | $ - 0 | |
| B017AN | Vehicle Wash Rack (Spec Item 3.3.1) | 12 | MO | $ - 0 | |
| B017AP | On-Site Fuel Delivery (Spec Item 3.3.2) | 12 | MO | $ - 0 | |
| B017AQ | Contractor-Provided Non-Tactical Vehicles (NTV) (Spec Item 3.4) | 12 | MO | $ - 0 | |
| B017 | Total 1700000 BSVE | TOTAL | $ - 0 |
| B018 | 1800000 Environmental (EV) | ||||
| B017AA | Drain and Purge Services (Spec Item 3.1) | 12 | MO | $ - 0 | |
| B017AB | Unscheduled Services (Spec Item 3.2) | 12 | MO | $ - 0 | |
| B018 | Total 1800000 Environmental | TOTAL | $ - 0 |
TOTAL FFP LINE ITEMS B001 - B018 TOTAL $ - 0
NR Opt 1
| EXHIBIT LINE ITEM NUMBERS | |||||||
| N62470-18-R-3004 | |||||||
| CLIN 0004 | |||||||
| Non Recurring Work - Option 1 | |||||||
| ELIN/Sub- | |||||||
| ELIN | Short Description | Full Description | Est. Quantity | Unit | Unit Price | Est. Amount | |
| B700 | Unit Priced Labor | The composite labor price shall include all direct and indirect costs associated with performing an hour of work.The Composite Labor Rate shall include all costs for preparation of the cost proposal, job reparation, travel, pre expended bin materials and supplies, ordering and stockpiling job material, additional material handling, items of equipment necessary to perform work (i.e. bucket truck, lifting equipment, staging, etc.), equipment set up time, lift time, craft delay allowance, profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, bonds, permits, insurance, etc. There are no additional markups for unit priced labor on the task order. | |||||
| B700AA | Composite Skilled Labor | HVAC, Electrician, Fire Alarm Technican, High Voltage Electrician, General Mechanic, Pest Control, Vehicle Operator, Generator Mechanic, EVT | 100,000 | LH | $ - 0 | ||
| B700AB | Composite Unskilled Labor | Laborer, Grounds Maintenance Worker, Custodial | 100,000 | LH | $ - 0 | ||
| B700AC | Direct Material Cost | LS | $ 6,000,000.00 | ||||
| B700AD | Special Equipment Rental | Work requiring the use of special equipment e.g. Cranes, graders,compactors, tractors, bucket trucks, and other heavy equipment. Special equipment rental cost, includes operator where applicable. Cost will be actual cost for rental. | LS | $ 500,000.00 | |||
| B701AG | Auto Cadd services | Price to provide Auto Cadd operator for updating, creating CAD drawings. Work can be accomplished on contractor computer and software and forwarded to the Government. Complete all work with in 10 working days after receipt of order. | 300 | LH | $ - 0 | ||
| B702 | Facility Investment | ||||||
| B702AA | A/C Replacement up to 2 Ton Split Unit | Includes removal of the old AC, supply and installation of the new AC, and all necessary materials, labor, transportation and testing to ensure new unit is operational. Complete all work with in 4 working days after receipt of order. | 200 | Ea | $ - 0 | ||
| B702AB | A/C Replacement < 5T Package Unit | Includes removal of the old AC, supply and installation of the new AC, up to 50 meters of duct work and all necessary materials, labor, transportation and testing to ensure new unit is operational. Complete all work with in 8 working days after receipt of order. | 7 | Ea | $ - 0 | ||
| B702AC | A/C Replacement > 5T < 10T Package Unit | Includes removal of the old AC, supply and installation of the new AC, up to 50 meters of duct work and all necessary materials, labor, transportation and testing to ensure new unit is operational. Complete all work with in 11 working days after receipt of order. | 5 | Ea | $ - 0 | ||
| B702AD | A/C Replacement > 10T Package Unit | Includes removal of the old AC, supply and installation of the new AC, up to 50 meters of duct work and all necessary materials, labor, transportation and testing to ensure new unit is operational. Complete all work with in 14 working days after receipt of order. | 3 | EA | $ - 0 | ||
| B702AE | RLB Relocation | Relocation and installation of existing RLBs includng related material and furnished equipment from one location to another location. The work includes cleaning the area,levelling the ground surface,disconnection and connection of all utilities, verification of functionality by performing operational checks and tests. All necessary materials, labor,equipment and transportation shall be provided. Complete all works within 18 working days after receipt of order. | 10 | EA | $ - 0 | ||
| B702AF | Chain Link Fencing | Removal and Disposal of 10 foot high chain link fence including bottom rails, intermediate horizontal rails, steel post tubing and concrete footing. Complete all work within 1 working days after receipt of order. | 50 | LM | $ - 0 | ||
| B702AG | Chain Link Fencing | Provision and Installation 10 foot high chain link fence, galvanized steel wire and 11 gauge or approved equal, bottom rails or tension wire as appropriate, intermediate horizontal rails as appropriate, the posts will be steel tubing, the post sites will be excavated, the post sites will be poured with concrete. Complete all work within 10 working days after receipt of order. | 350 | LM | $ - 0 | ||
| B702AH | Privacy fence screen | Provide and install 10 foot high green colored privacy fence screen with hog rings or similar clamps to secure screen material to chain link fencing. Complete all work within 14 days after receipt of order. | 350 | LM | |||
| B703 | Custodial Services | ||||||
| B703AA | Additional Floor Care | IAW Annex 1503010 Spec Item 3.1.1 Complete all work with in 1 working days after receipt of order. | 2500 | SM | $ - 0 | ||
| B703AB | Additional Ablution Unit Cleaning | IAW Annex 1503010 Spec Item 3.1.2 Complete all work with in 1 working day after receipt of order. | 2500 | SM | $ - 0 | ||
| B703AC | RLB Cleaning for VIP Berthing Rooms | IAW Annex 1503010 Annex 1503010 Annex 1503010 Spec Item 3.2.1 Complete all work with in 1 working days after receipt of order. | 10000 | SM | $ - 0 | ||
| B703AD | Berthing RLB Cleaning | IAW Annex 1503010 Includes wiping and dusting all walls and furnishings, dusting shelves, cleaning the window sills, sweep and mop floors, cleaning rest room and leaving the linens on the bed. Complete all work with in 2 working days after receipt of order. | |||||
| 24 | Ea | $ - 0 | |||||
| B703AE | P-8 Hangar Bay Cleaning | Hangar Bay cleaning shall be done in IAW Annex 1503010, OEM and SDS of flooring material. . Collect, dispose or recycle items marked or designated as trash or recyclable. Work shall begin within 2 days of receipt of order. | 12 | Ea | $ - 0 | ||
| B704 | ISWM | ||||||
| B704AA | Provide Additional Dumpster | Price per calendar day to provide 1 ea. 8 cubic meter dumpster. Price includes delivery, set up, disposal, and removal. Complete all work within 3 working days after receipt of order. | 60 | Day | $ - 0 | ||
| B704AB | Provide Additional Dumpster Pick-up | Price to provide additional pick-up of a 8 cubic meter dumpster. Complete all work within 4 working days after receipt of order. | 60 | Ea | $ - 0 | ||
| 705 | Grounds Maintenance and Landscaping | ||||||
| B705AA | Tree Pruning | Trees are pruned according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. All debris resulting from Contract's work is disposed of off Government property within one working day following performance. Complete all work within 7 working days after receipt of order. | 20 | EA | $ - 0 | ||
| B705AB | Tree Removal | Price includes tree removal, and disposal off site. Complete all work within 15 working days after receipt of order. | 20 | EA | $ - 0 | ||
| B705AC | Gravel filling | All gravel shall be less than 3/4 in. Complete all work within 6 working days after notice to proceed. | 1,000 | M3. | $ - 0 | ||
| B705AD | Provide and Install reflective signs | Provide and install reflective signage complete with metal pole and levelled concrete base. Signs shall have optimal visibility upto 20 ft away. Complete all work within 20 working days after receipt of order. | 10 | EA | $ - 0 | ||
| B706 | Electrical | ||||||
| B706AA | Generator Rental | Price per calendar day to include delivery, setup, removal, required cables, distribution panels, all connections to the faciltiy, fuel tank, operation, maintenance. The Contractor is responsible for all fuel and refueling. | |||||
| B706AC | Generator Rental 350KVA Generator | Complete all work within 6 working days after receipt of order. | 50 | Day | $ - 0 | ||
| B706AD | Generator Rental 500KVA Generator | Complete all work within 6 working days after receipt of order. | 50 | Day | $ - 0 | ||
| B707 | Wastewater | ||||||
| B707AA | Provide Sewage Removal | Price per pickup per gallon, including disposal. Complete all work within 2 working days after receipt of order. | 50,000 | Gal | $ - 0 | ||
| B707AB | Provide Portable Toilets | Price includes delivery, set up, cleaning, sewage removal and disposal, and removal. Complete all work within 3 working days after receipt of order. | 50 | Ea | $ - 0 | ||
| B707AC | Provide Sewage Truck | Price per calendar day to include licensed operator with labor to collect and properly dispose wastewater, sewage, sludge, rainwater etc. Sewage Truck shall be dcapacity of 5,000 gallon. Truck shall not be older than three years. Tires shall be maintained in good condition with no visible bald spots or worn treads. The contractor shall be responsible for all maintenance and emergency servicing of the vehicle. Emergency down time shall not exceed four hours. Drivers shall meet ISA Air Base access requirements. Complete all work within 3 working days after receipt of order. | 15 | Days | $ - 0 | ||
| B708 | Water | ||||||
| B708AA | Deliver Potable Water Isa Air Base | Price per gallon delivered. Complete all work within 3 working days after receipt of order. | 1,000,000 | Liter | $ - 0 | ||
| B708AB | Install Up to 1" Backflow Preventer | Provide, install and test backflow preventer according to specifications under Annex 1606000 Water. Complete all work within 07 days of receipt of order. | 5 | EA | |||
| B708AC | Install Up to 2" Backflow Preventer | Provide, install and test backflow preventer according to specifications under Annex 1606000 Water. Complete all work within 07 days of receipt of order. | 5 | EA | |||
| B708AD | Install Up to 3" Backflow Preventer | Provide, install and test backflow preventer according to specifications under Annex 1606000 Water. Complete all work within 07 days of receipt of order. | 5 | EA | |||
| B708AD | Install Up to 4" Backflow Preventer | Provide, install and test backflow preventer according to specifications under Annex 1606000 Water. Complete all work within 07 days of receipt of order. | 3 | EA | |||
| B709 | Transportation | ||||||
| B709AA | Provide 26 Passenger Bus | Price to provide 26 passenger bus with driver up to 8 hours. Complete all work within 3 working days after receipt of order. | 50 | Ea | $ - 0 | ||
| B709AB | Provide 52 Passenger Bus for ISA to AV Unit or AV unit to ISA | Price to provide 52 passenger bus with driver. Service from Isa Air Base to AV Unit at International Airport or AV Unit to ISA Air Base. Bus shall have space for incoming or departing passengers luggage. Bus shall be available within 24 hours of notification. Maximum travel distance 55 kms one way. Complete all work within 3 working days after notice receipt of order. | 24 | Ea | $ - 0 | ||
| B709AC | Provide 26 Passenger Bus | Price to provide 26 passenger bus with driver up to 16 hours. Complete all work within 3 working days after receipt of order. | 50 | EA | $ - 0 | ||
| B709AD | Provide 60 Passenger Bus | Price to provide 60 passenger bus with driver up to 12 hours. Complete all work within 3 working days after receipt of order. | 50 | EA | $ - 0 | ||
| B709AE | Provide60 Passenger Bus | Price to provide 60 passenger bus with driver up to 16 hours. Complete all work within 3 working days after receipt of order. | 50 | EA | $ - 0 | ||
| B709AF | Crane Rental | Price per calendar day to include delivery/removal of crane to/from the site, driver/equipment operator, rigger, rigging gear, fuel and maintenance. The equipment, driver/equipment operator, riggers and rigging gear shall meet all regulations, licensing and certification requirements listed in the FFP equipment operations. Equipment rental may be for the following locations, ISA LSA, ISA Flightline, Riffa and Pat site at Flight Line. Delivery within 72 hours of notification. Must meet all requirements in the NAVFAC P-307 and all RBAF requirements for base access | |||||
| B709AF | Crane Rental 70 Ton Crane | Complete all work within 3 working days after receipt of order. | 50 | Day | $ - 0 | ||
| B709AF | Crane Rental 90 Ton Crane | Complete all work within 3 working days after receipt of order. | 50 | Day | $ - 0 | ||
| B709AF | Truck and Trailer Rental | ||||||
| B709AF | Tractor Trailer with Driver | Price per calendar day to include licensed driver. Trailer shall be double axle and 40 feet long complete with straps and tie down chains and standard ISO container locking devices with removal fence sides with a carrying capacity of 40,000 kgs. Tractor shall not be older than three years. Ties shall be maintained in good condition with no visible bald spots or worn treads. The contractor shall be responsible for all maintenance and emergency servicing of the vehicle. Emergency down time shall not exceed four hours. Drivers shall meet ISA Air Base access requirements. Complete all work within 3 working days after receipt of order. | 100 | Day | $ - 0 | ||
| B709AF | Tractor Trailer(Low Boy) with driver | Price per calendar day to include licensed driver. Trailer shall be double axle and 40 feet long complete with straps and tie down chains and standard ISO container locking devices with removal fence sides with a carrying capacity of 40,000 kgs. Tractor shall not be older than three years. Ties shall be maintained in good condition with no visible bald spots or worn treads. The contractor shall be responsible for all maintenance and emergency servicing of the vehicle. Emergency down time shall not exceed four hours. Drivers shall meet ISA Air Base access requirements. Complete all work within 3 working days after receipt of order. | 50 | Day | $ - 0 | ||
| B709AF | Solar Light | Provide/Install SL01 Solar High-Lux Street Light/Parking Lot Light. Operating voltage, operating temperature -40 deg.F to 125 deg F., Special control to prevent over-charging and over-discharging, power consumption 552 SMD/LED system is 24V/1.6A/38W, 5 hours of strong direct sunshine will enable a full charge, Illumination time is up to 12 hours or more, generally dusk to dawn, up to 5 days reserve power to allow successive cloudy weather and days without sunshine, several successive cloudy or alternating overcast days typically should not affect illumination time. Complete all work within working days after receipt of order. | 3 | EA. | $ - 0 | ||
| B709AG | Barrier Relocation | Move Barrier up to 6000 lbs. Complete all work within 3 working days after receipt of order. | 50 | EA | $ - 0 | ||
| B709AH | Barrier Relocation | Move Barrier > 6000 lbs up to 17000lbs. Complete all work within 3 working days after receipt of order. | 50 | EA | $ - 0 | ||
| B710 | Environmental | ||||||
| Drain and Purge | Drain, purge and certify equipment is free of hazardous fluids and hazardous materials. Complete services for disposal, transportation and reutilization purposes. | ||||||
| B710AA | Refrigerators | Complete all work within 10 working days after receipt of order. | 50 | EA | $ - 0 | ||
| B710AB | Aboveground Storage Tanks (AST) | Complete all work within 10 working days after receipt of order. | 10 | EA | $ - 0 |
| B711AB | Airfield Pavement Repair | IAW UFC 3-270-07, complete work based on task order. | 100 | SM | $ - 0 |
| B711AA | Airfield Lighting Repair | Contractor shall repair/replace airfield light. | 10 | EA | $ - 0 |
Total IDIQ ELINs B700 - B711 $ 6,500,000.00
Rec Opt 2
| EXHIBIT LINE ITEM NUMBERS | |||||
| SOLICITATION N62470-18-R-3004 | |||||
| EXHIBIT A - CLIN 0005 | |||||
| Firm Fixed Price - Second Option Period | |||||
| PROVIDE PRICES FOR FUNCTION SPECIFICATIONS - FIRM FIXED PRICE - IN ACCORDANCE WITH SECTION C | |||||
| ELIN/Sub | |||||
| ELIN | Quantity | Unit of Issue | Unit Price | Total |
| C001 | 0401000 Security Operations (SIC CT) | ||||
| C001AA | Entry Control Point Services Riffa (Spec Item 3.1) | 12 | MO | $ - 0 | |
| C001AB | Entry Control Point Services ISA (Spec Item 3.1) | 12 | MO | $ - 0 | |
| C001 | Total 0401000 Security Operations | TOTAL | $ - 0 |
| C002 | 0402000 Fire and Emergency Services | ||||
| C002AA | All Hazards Response (Spec item 3.1) | 12 | MO | $ - 0 | |
| C002AB | Fire Prevention Services (Spec Item 3.2) | 12 | Mo | $ - 0 | |
| C002AC | Emergecy Medical Services (Spec Item 3.3) | 12 | MO | $ - 0 | |
| C002AD | Emergecy Medical Services Response (Spec Item 3.4) | 13 | MO | $ - 0 | |
| C002AE | Dispatch (Spec Item 3.5) | 14 | MO | $ - 0 | |
| C002 | Total 0402000 Fire and Emergency Services | TOTAL | $ - 0 |
| C003 | 0404000 Safety | ||||
| C003AA | Provide Explosive Safety Officer (ESO) (Spec Item 3.1) | 12 | MO | $ - 0 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .