The submittal register is a comprehensive document for the Repair BEQ (Bachelor Enlisted Quarters) AS4212 project at Camp Lejeune, issued by the Department of the Navy Naval Facilities Engineering Command. The 74-page register details numerous required technical submittals across multiple construction disciplines, including preconstruction documents, shop drawings, product data, test reports, certificates, samples, design data, manufacturer's instructions, and operation and maintenance documentation.

The submittal register covers extensive technical sections ranging from site preparation and demolition (Sections 02) through architectural and structural elements (Sections 03-06), mechanical and electrical systems (Sections 21-33), telecommunications (Sections 27-33), and other critical infrastructure components. Each section specifies detailed submittal requirements with specific paragraph references, classification codes, and approval processes, indicating a complex renovation project with rigorous documentation and quality control standards. The register suggests a comprehensive renovation of bachelor enlisted quarters with multiple system upgrades and replacements.

View the file

Other files

File Type Posted
Amend 0021.pdf PDF
Amend 0020.pdf PDF
Amend 0019.pdf PDF
Amend 0018.pdf PDF
Amend 0017.pdf PDF
Amend 0016.pdf PDF
Amend 0015.pdf PDF
Amend 0013.pdf PDF
Amend 0014.pdf PDF
60040177.pdf PDF
60040178.pdf PDF
60040167.pdf PDF
60040172.pdf PDF
60040137.pdf PDF
Updated List of Drawings.pdf PDF
60040262.pdf PDF
60040179.pdf PDF
60040268.pdf PDF
Updated PROJECT TABLE OF CONTENTS.pdf PDF
60040164.pdf PDF
11 81 00.pdf PDF
60040186.pdf PDF
60040187.pdf PDF
60040189.pdf PDF
60040299.pdf PDF
07 60 00.pdf PDF
07 61 15.00 20.pdf PDF
60040174A.pdf PDF
60040250.pdf PDF
60040188.pdf PDF
05 51 33.pdf PDF
Amend 12 and spec combined.pdf PDF
Amend 0012.pdf PDF
Amend 0011.pdf PDF
Amend 0010.pdf PDF
Amend 0009.pdf PDF
60040202_PPI.pdf PDF
60040196_PPI.pdf PDF
60040201_PPI.pdf PDF
PROJECT.pdf PDF
60040198_PPI.pdf PDF
60040197_PPI.pdf PDF
SECTION 33 61 14.pdf PDF
60040199_PPI.pdf PDF
60040210_PPI.pdf PDF
Amend and cont sheet combined.pdf PDF
60040195_PPI.pdf PDF
60040290_PPI.pdf PDF
REGISTER.pdf PDF
60040194_PPI.pdf PDF
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 74 PAGES

REPAIR BEQ AS4212

01 14 00 SD-01 Preconstruction Submittals

1.3.1.1List of Contact Personnel

01 20 00 SD-01 Preconstruction Submittals

1.3Schedule of Prices

01 30 00 SD-01 Preconstruction Submittals

1.3View Location Map

1.4Progress and Completion

Pictures

01 31 23.13 20 SD-01 Preconstruction Submittals

1.4.2 GList of Contractor's Personnel

01 31 50 SD-11 Closeout Submittals

1.2Interim DD-1354, Transfer &

Acceptance of Military Real

Property

01 32 16.00 20 SD-01 Preconstruction Submittals

1.2 GBaseline Construction Schedule

SD-07 Certificates

1.4Monthly Updates

01 33 00 SD-11 Closeout Submittals

1.4.1Submittal register

1.6.1Complete Submittal Package

01 33 29 SD-01 Preconstruction Submittals

1.4.1 GSustainability Action Plan

1.5.2.2 GPreliminary Sustainability

eNotebook

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 74 PAGES

01 33 29 1.5.2.2 GFinal Sustainability eNotebook

1.5.2.2 GAmended Final Sustainability

eNotebook

01 35 26 SD-01 Preconstruction Submittals

1.8.1 GAPP - Construction

1.17 GDive Operations Plan

1.8 GAccident Prevention Plan (APP)

SD-06 Test Reports

1.4Monthly Exposure Reports

1.13Notifications and Reports

1.13.2 GAccident Reports

1.13.3LHE Inspection Reports

SD-07 Certificates

1.5Contractor Safety Self-Evaluation

Checklist

1.7.1.5Crane Operators/Riggers

1.8.3.2 GStandard Lift Plan

1.8.3.3 GCritical Lift Plan

1.8.3.4 GNaval Architecture Analysis

1.9Activity Hazard Analysis (AHA)

1.10.1Confined Space Entry Permit

1.10.1Hot Work Permit

1.13.4Certificate of Compliance

1.13.5Third Party Certification of

Floating Cranes and

Barge-Mounted Mobile Cranes

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 74 PAGES

01 35 26 1.15License Certificates

1.15.1 GRadiography Operation Planning

Work Sheet

1.15.1 GPortable Gauge Operations

Planning Worksheet

01 45 00 SD-01 Preconstruction Submittals

1.5.2 GContractor Quality Control (CQC)

Plan

SD-06 Test Reports

1.12.3Verification Statement

SD-07 Certificates

1.6.4.1 GCertificate Of Readiness

01 50 00 SD-01 Preconstruction Submittals

3.4.1Traffic Control Plan

SD-03 Product Data

1.3 GBackflow Preventers

SD-06 Test Reports

3.5Backflow Preventer Tests

SD-07 Certificates

1.3.1Backflow Tester

1.3Backflow Preventers

01 57 19 SD-01 Preconstruction Submittals

1.6.1Environmental Protection Plan

SD-06 Test Reports

3.7.1Abrasive blasting

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 74 PAGES

01 57 19 1.4.1Solid waste disposal permit

1.4.2Disposal permit for hazardous waste

1.2Environmental training documentation

1.4.3Permit to transport hazardous waste

1.4.4Hazardous waste certification

1.6.3Environmental Plan Review

2.1Annual Report of Products

Containing Recovered Materials

01 74 19 SD-01 Preconstruction Submittals

1.7 GConstruction Waste Management

Plan

SD-11 Closeout Submittals

1.9 SFinal Construction Waste

Diversion Report

01 78 00 SD-03 Product Data

1.6.1Warranty Management Plan

1.6.4Warranty Tags

3.4Final Cleaning

1.5Spare Parts Data

SD-08 Manufacturer’s Instructions

1.6.1Instructions

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 74 PAGES

01 78 00 3.3 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

3.2 GRecord Drawings

1.6.1As-Built Record of Equipment and Materials

3.6Final Approved Shop Drawings

2.1 GCertification of EPA Designated

Items

2.2 GCertification Of USDA Designated

Items

3.5 GInterim DD FORM 1354

3.5 GChecklist for DD FORM 1354

3.5 GHigh Performance and

Sustainable Building (HPSB)

Checklist

01 78 23 SD-10 Operation and Maintenance

Data

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

SD-11 Closeout Submittals

3.1.4 GTraining Video Recording

3.1.6 GValidation of Training Completion

01 78 24.00 20 SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 74 PAGES

01 78 24.00 20 1.4.1 GeOMSI, Progress Submittal

1.4.2 GeOMSI, Prefinal Submittal

1.4.3 GeOMSI, Final Submittal

01 78 30.00 22 SD-11 Closeout Submittals

1.3.9 GGIS Data Deliverables

01 91 00.15 20 SD-06 Test Reports

3.1 GDesign Review Report

3.5 GInterim Construction Phase

Commissioning Plan

3.5 GFinal Construction Phase

Commissioning Plan

3.9 GInitial Commissioning Report

1.11 GIssues Log

3.6 GCompleted Pre-Functional

Checklists

SD-07 Certificates

1.9 GCommissioning Firm

1.12 GCertificate Of Readiness

SD-11 Closeout Submittals

3.9 GFinal Commissioning Report

3.10 GUpdated Final Commissioning

Report

02 41 00 SD-01 Preconstruction Submittals

1.2.2 GDemolition Plan

1.9Existing Conditions

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 74 PAGES

02 41 00 1.6 GNotification

SD-11 Closeout Submittals

3.3.2Receipts

02 41 01 SD-01 Preconstruction Submittals

1.2.2 GDeconstruction Plan

1.8Existing Conditions

SD-07 Certificates

1.6 GNotification

02 83 00 SD-01 Preconstruction Submittals

1.5.1.1 GCompetent Person

1.5.1.2 GTraining Certification

1.5.2.3 GOccupational and Environmental

Assessment Data Report

1.5.2.4 GMedical Examinations

1.5.2.8 GLead Waste Management Plan

1.5.3 GLicenses, Permits and

Notifications

1.5.4 GOccupant Protection Plan

1.5.2.2 GLead Compliance Plan

3.1.1.6 GLead Compliance Plan

3.4.1.1Initial Sample Results

3.5.2.1 GWritten Evidence of TSD

Approval

SD-03 Product Data

1.6.1Respirators

1.6.4Vacuum Filters

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 74 PAGES

02 83 00 1.6.7Negative Air Pressure System

2.1Materials and Equipment

2.1.1Expendable Supplies

3.1.1.5Local Exhaust Equipment

3.1.1.5 GPressure Differential Automatic

Recording Instrument

3.1.1.6Pressure Differential Log

SD-06 Test Reports

1.5.2.3 GOccupational and Environmental

Assessment Data Report

1.5.2.3Sampling Results

SD-07 Certificates

1.5.1.3 GTesting Laboratory

1.5.1.4 GThird Party Consultant

Qualifications

3.1.1.1 GOccupant Notification

3.1.1.1Notification of the

Commencement of Lead

Containing Paint Hazard

Abatement

3.5.1.1Clearance Certification

SD-11 Closeout Submittals

3.5.2.1 GHazardous Waste Manifest

03 30 00 SD-01 Preconstruction Submittals

1.6.5 GQuality Control Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 74 PAGES

03 30 00 1.6.6 GQuality Control Personnel

Certifications

1.6.6Quality Control Organizational

Chart

1.6.8 GLaboratory Accreditation

3.3.10Maturity Method Data

SD-02 Shop Drawings

1.6.2.1 GReinforcing Steel

SD-03 Product Data

2.4.5Joint Sealants

2.4.4Joint Filler

2.1Formwork Materials

2.3.3.2Recycled Aggregate Materials

2.3.1Cementitious Materials

2.4.6Vapor Retarder

2.4.1Concrete Curing Materials

2.6Reinforcement

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.3.4Admixtures

2.6.2Mechanical Reinforcing Bar

Connectors

2.2.2Waterstops

2.2.3Biodegradable Form Release

Agent

2.4.2Nonshrink Grout

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 74 PAGES

03 30 00 SD-05 Design Data

1.6.1.1 GConcrete Mix Design

SD-06 Test Reports

1.6.1.1 GConcrete Mix Design

1.6.3.1Fly Ash

1.6.3.1Pozzolan

1.6.3.2Slag Cement

1.6.3.3Aggregates

3.10.2.1Tolerance Report

3.14.3.3 GCompressive Strength Tests

3.14.3.5Unit Weight of Structural

Concrete

3.14.3.4Air Content

3.14.3.1Slump Tests

2.3.2Water

SD-07 Certificates

2.6.1Reinforcing Bars

1.8Welder Qualifications

1.6.6.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

2.4.5Joint Sealants

2.4.1Curing Compound

03 30 53 SD-03 Product Data

2.2.3.1Air-Entraining Admixture

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 74 PAGES

03 30 53 2.2.3.2Water-Reducing or Retarding

Admixture

2.2.10Curing Materials

2.2.6Expansion Joint Filler Strips, Premolded

3.2Conveying and Placing Concrete

2.2.7Formwork

2.3 GMix Design Data

2.3Ready-Mix Concrete

2.2.5Mechanical Reinforcing Bar

Connectors

SD-06 Test Reports

2.2.2Aggregates

2.1.3 GConcrete Mixture Proportions

3.8.3 GCompressive Strength Testing

3.8.3 GSlump

3.8.3Air Content

2.2.4Water

SD-07 Certificates

2.2.1Cementitious Materials

2.2.1.2Pozzolan

2.2.2Aggregates

2.3Delivery Tickets

04 20 00 SD-02 Shop Drawings

3.4.1.1 GDetail Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 74 PAGES

04 20 00 1.5.1 GHot Weather Procedures

1.5.2 GCold Weather Procedures

2.2.2 GClay or Shale Brick

2.6.7 GInsulation

SD-04 Samples

1.3.1.1 GMock-Up Panel

2.2.2 GClay or Shale Brick

2.6.5 GClay Masonry Expansion-Joint

Materials

SD-05 Design Data

2.1.2 GMasonry Compressive Strength

3.2.4 GBracing Calculations

SD-06 Test Reports

2.2.2.1.4Efflorescence Test

2.2.3.3Fire-Rated Concrete Masonry

Units

3.6.1.1Field Testing of Mortar

3.6.1.2Field Testing of Grout

3.6.1.4Prism Tests

SD-07 Certificates

2.2.2Clay or Shale Brick

2.2.3.2Concrete Masonry Units (CMU)

2.4.1.1Cementitious Materials

2.4.1.4Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 74 PAGES

04 20 00 2.6.2Anchors, Ties, and Bar

Positioners

2.6.3Joint Reinforcement

2.6.7Insulation

SD-08 Manufacturer’s Instructions

2.4.1.4Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

SD-10 Operation and Maintenance

Data

3.8Take-Back Program

SD-11 Closeout Submittals

2.2.2.1.3 SClay Units

2.2.3.2.1 SRecycled Content

05 30 00 SD-02 Shop Drawings

1.3.5 GFabrication Drawings

SD-03 Product Data

2.2Accessories

2.1Deck Units

2.2.15Mechanical Fasteners

2.1.3Touch-Up Paint

1.3.3Welding Equipment

1.3.3Welding Rods and Accessories

2.1 SRecycled Content of Steel

Products

SD-04 Samples

2.2.4Flexible Closure Strips

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 74 PAGES

05 30 00 SD-05 Design Data

2.1 GDeck Units

SD-07 Certificates

1.3.2Powder-Actuated Tool Operator

1.3.3Welder Qualifications

1.3.3Welding Procedures

1.3.4.1Fire Safety

1.3.4.2Wind Storm Resistance

1.3.1Manufacturer's Certificate

2.2.10Stud Manufacture's Certification

2.2.10Stud Manufacture's Test Reports

05 40 00 SD-02 Shop Drawings

1.5.1 GFraming Components

SD-03 Product Data

2.1Studs, Joists

2.1Recycled Content of Steel

Products

SD-05 Design Data

1.5.2 GMetal Framing Calculations

SD-07 Certificates

3.2.1Welds

05 50 13 SD-02 Shop Drawings

2.4 GExpansion Joint Covers

2.5 GBollards/Pipe Guards

2.8 GRetrofit Treads

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 74 PAGES

05 50 13 2.4 GExpansion Joint Covers

2.8 GRetrofit Treads

2.6 GDownspouts

2.1 SRecycled Content

SD-04 Samples

2.4Expansion Joint Covers

05 51 33 SD-02 Shop Drawings

2.3Ladders

SD-03 Product Data

2.3Ladders

SD-07 Certificates

1.3Fabricator Certification for Ladder

Assembly

05 52 00 SD-02 Shop Drawings

3.2 GHardware

3.2 GShapes, Plates, Bars and Strips

2.2.1 GConcrete Inserts

2.2.2 GMasonry Anchorage Devices

2.1.2 GProtective Coating

2.2.4 GAluminum Railings and Handrails

SD-07 Certificates

1.3.1 GWelding Procedures

1.3.2 GWelder Qualification

06 10 00 SD-06 Test Reports

1.4.2Preservative-treated

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 74 PAGES

06 10 00 1.9.1Certificates of Grade

06 41 16.00 10 SD-02 Shop Drawings

2.7Shop Drawings

3.1Installation

SD-03 Product Data

2.1Wood Materials

2.7.7.3Finish Schedule

SD-04 Samples

2.2Plastic Laminates

2.4Cabinet Hardware

SD-07 Certificates

1.5Quality Assurance

3.1Laminate Clad Casework

1.5.2Certification

06 61 16 SD-02 Shop Drawings

1.4.2 GDetail Drawings

3.1 GInstallation

SD-03 Product Data

2.1Solid Polymer Material

1.4.1Qualifications

2.3Fabrications

2.2.4 SIndoor air quality for solid surface

seam and sealant products

SD-04 Samples

2.1 GMaterial

2.3.5 GCounter and Vanity Tops

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 74 PAGES

06 61 16 SD-06 Test Reports

2.1Solid Polymer Material

SD-07 Certificates

2.3Fabrications

1.4.1Qualifications

2.1 SIndoor Air Quality for solid

surface fabrication products

SD-10 Operation and Maintenance

Data

3.2Clean-up

07 19 00 SD-03 Product Data

2.2Water Repellents

SD-06 Test Reports

1.3.2Water Absorption

2.3.1Accelerated Weathering

2.3.1Resistance to Chloride Ion

Penetration

1.3.2Moisture Vapor Transmission

2.3.1Moisture Vapor Transmission

2.3.1Scaling Resistance

1.3.2Water Penetration and Leakage

SD-07 Certificates

1.3.1Manufacturer's Qualifications

1.3.1Applicator's Qualifications

1.3.3Evidence of Acceptable Variation

1.12Warranty

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 74 PAGES

07 19 00 SD-08 Manufacturer’s Instructions

3.4Application

1.7.1Safety Data Sheets

07 27 19.01 SD-01 Preconstruction Submittals

1.7.1 GQualifications of Manufacturer

1.7.2 GQualifications of Installer

SD-02 Shop Drawings

1.4 GSelf-adhering Air Barrier

SD-03 Product Data

1.4 GSelf-adhering Air Barrier

2.2 GPrimers, Adhesives, and Mastics

1.4.2 GSafety Data Sheets

SD-06 Test Reports

1.6 GField Peel Adhesion Test

1.4.3 GFlame Propagation of Wall

Assemblies

1.4.3 GFlame Spread and Smoke

Developed Index Ratings

3.4.1 GSite Inspections and Testing

SD-07 Certificates

1.4 GSelf-adhering Air Barrier

SD-08 Manufacturer’s Instructions

1.4 GSelf-adhering Air Barrier

2.2 GPrimers, Adhesives, and Mastics

07 27 26 SD-01 Preconstruction Submittals

1.8.1 GQualifications of Manufacturer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 74 PAGES

07 27 26 SD-02 Shop Drawings

1.4 GFluid-Applied Membrane Air

Barrier

SD-03 Product Data

1.4 GFluid-Applied Membrane Air

Barrier

2.3 GTransition Membrane

2.2 GPrimers, Adhesives, and Mastics

2.6 GReinforcement

1.4.2 GSafety Data Sheets

SD-06 Test Reports

1.6 GCapillary Moisture Test

1.4.3 GField Peel Adhesion Test

1.4.3 GFlame Propagation of Wall

Assemblies

1.4.3 GFlame Spread and Smoke

Developed Index Ratings

3.4.1 GSite Inspections

SD-07 Certificates

1.4 GFluid-Applied Membrane Air

Barrier

2.3 GTransition Membrane

SD-08 Manufacturer’s Instructions

1.4 GFluid-Applied Membrane Air

Barrier

2.3 GTransition Membrane

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 74 PAGES

07 27 26 2.2 GPrimers, Adhesives, and Mastics

07 27 36 SD-01 Preconstruction Submittals

1.10 GQuality Control Plan

1.10 GSafety Plan

1.8.1 GFire Prevention Plan

1.8.2 GRespirator Plan

SD-02 Shop Drawings

1.5Spray Foam Air Barrier

1.10 GFoam Air Barrier System

1.5.1 GFire-Rated Assemblies

SD-03 Product Data

2.1.2 GClosed Cell

2.2 GTransition Membrane

2.3 GPrimers, Adhesives, and Mastics

2.5 GSealants

1.5.2 GSafety Data Sheets

2.1.1 GIgnition Barrier Coatings

2.1.1 GAccessories

2.1.2 SRecycled Content for Closed Cell

Spray Foam Air Barrier

2.1.5Blowing Agent

SD-06 Test Reports

1.5.3 GField Peel Adhesion Test

3.4.5.1 GThermographic Test

1.5.3 GFire-Ratings Of Ignition Barrier

Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 74 PAGES

07 27 36 1.5.3 GFlame Spread And Smoke

Developed Index Ratings Of SPF

Products

1.5.3 GFlame Propagation Of Wall

Assemblies

3.4.1 GSite Inspections

SD-07 Certificates

2.1.2 GClosed cell

2.2 GTransition Membrane

2.1.5 SIndoor Air Quality for Spray Foam

Air Barrier

SD-08 Manufacturer’s Instructions

1.6.1 GSPF Handling, Storage, and

Spray Procedures

3.2.1 GSubstrate Preparation

1.5.1 GIgnition Barrier

2.2 GTransition Membrane

2.3 GPrimers, Adhesives, and Mastics

SD-09 Manufacturer’s Field

Reports

1.10Core Samples

3.3.4Daily Work Record

3.4.5Visual Inspection and Thermal

Scanning

07 60 00 SD-02 Shop Drawings

2.2.1 GExposed Sheet Metal

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 74 PAGES

07 60 00 3.1.12 GGutters

3.1.13 GDownspouts

3.1.15 GCopings

2.1 SRecycled Content

SD-04 Samples

1.4.2 GFinish Samples

SD-08 Manufacturer’s Instructions

1.4.3 GInstructions for Installation

3.5 GQuality Control Plan

SD-10 Operation and Maintenance

Data

1.4.3 GCleaning and Maintenance

07 61 15.00 20 SD-02 Shop Drawings

2.1 GRoofing panels

2.3 GGutters

2.3 GDown spouts

SD-03 Product Data

2.1 GRoofing panels

2.2 GAttachment clips

2.3.1Closures

2.3Accessories

2.3.2Fasteners

1.8 Gwarranty

SD-04 Samples

2.1Roofing panels

2.1.2INTERMEDIATE SUPPORT

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 74 PAGES

07 61 15.00 20 2.3Accessories

SD-05 Design Data

1.5 GLoad calculations

SD-06 Test Reports

2.4 GPanel Finish

1.3.2.9Wind Uplift Test Report

3.5 GManufacturer's field inspection

SD-07 Certificates

1.6.2Technical representative

1.6.3Qualification of Installer

2.1.1.5Coil stock

SD-08 Manufacturer’s Instructions

2.3.3Sealant

3.3Installation

SD-11 Closeout Submittals

3.7Information card

07 84 00.00 22 SD-02 Shop Drawings

2.1 GFirestopping System

SD-03 Product Data

2.2 GFirestopping Materials

3.1 GFirestopping Materials

SD-06 Test Reports

3.3.1 GInspection Forms

3.3.2 GInspection Report

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 74 PAGES

07 84 00.00 22 1.5.2Firestopping Inspector

Qualifications

2.2Firestopping Materials

3.1Firestopping Materials

1.5.1Firestopping Installer

Qualifications

07 92 00 SD-03 Product Data

2.1 GSealants

2.2 GPrimers

2.3 GBond Breakers

2.4 GBackstops

3.1 GField Adhesion

SD-07 Certificates

2.1.1 SIndoor Air Quality For Interior

Sealants

2.1.3 SIndoor Air Quality For Interior

Floor Joint Sealants

2.1.4 SIndoor Air Quality For Interior

Acoustical Sealants

08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.1 GDoors

2.4 GFrames

2.4 GFrames

2.2Accessories

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 74 PAGES

08 11 13 2.1 GDoors

2.1 SRecycled Content for Steel Door

Product

2.4 GFrames

2.4 SRecycled Content for Steel Frame

Product

2.2Accessories

08 31 00 SD-02 Shop Drawings

1.3 GAccess Doors And Panels

SD-03 Product Data

1.3 GAccess Doors And Panels

1.3.2 GHardware

2.2.8 GAccessories

2.1 SRecycled Content

SD-04 Samples

2.5 GFinishes

SD-06 Test Reports

1.3.1 GFire-rating(s) of Assemblies

08 33 23 SD-02 Shop Drawings

2.2.1 GOverhead Coiling Doors

2.2.3 GCounterbalancing Mechanism

2.2.1.3Bottom Bars

2.1.1.1 GGuides

2.2.3.1 GMounting Brackets

2.2.2.2 GHood

2.1.1.1 GInstallation Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 74 PAGES

08 33 23 SD-03 Product Data

2.2.1 GOverhead Coiling Doors

2.2.2 GHardware

2.2.3 GCounterbalancing Mechanism

SD-05 Design Data

2.2.1 GOverhead Coiling Doors

2.2.2 GHardware

2.2.3 GCounterbalancing Mechanism

SD-10 Operation and Maintenance

Data

1.3.2 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

1.3.1 GWarranty

08 51 13 SD-02 Shop Drawings

2.1 GWindows

1.6Fabrication Drawings

SD-03 Product Data

2.1 GWindows

2.1 SRecycled Content of Aluminum

Windows

2.2.8.1 GHardware

2.2.3 GFasteners

1.7 GWindow Performance

2.3 GThermal-Barrier Windows

2.4 GMullions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 74 PAGES

08 51 13 2.2.10 GScreens

2.1.4 GWeatherstripping

2.2.8 GAccessories

2.2.4Adhesives

1.7.4 GThermal Performance

SD-04 Samples

1.3.4.1Finish Sample

1.3.4.2Window Sample

SD-05 Design Data

2.1 GStructural Calculations for

Deflection

1.3.5 GDesign Analysis

SD-06 Test Reports

1.3.6Minimum Condensation

Resistance Factor

SD-07 Certificates

1.3.5Engineer's Qualifications

SD-10 Operation and Maintenance

Data

2.1 GWindows

08 71 00 SD-02 Shop Drawings

1.3 GManufacturer's Detail Drawings

1.3 GVerification of Existing Conditions

1.5 GHardware Schedule

2.3.5 GKeying System

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 74 PAGES

08 71 00 2.3 GHardware Items

2.3.2.3 GLodging RFID Electronic Lock

Systems

SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.5 GHardware Schedule

SD-11 Closeout Submittals

1.6.1Key Bitting

08 81 00 SD-03 Product Data

2.3 GInsulating Glass

1.3Glazing Accessories

2.4.1.1Sealants

2.4.2Joint Backer

SD-04 Samples

2.3 GInsulating Glass

2.4.4Tape

2.4.4Sealing Tapes

SD-08 Manufacturer’s Instructions

2.4Setting and Sealing Materials

3.2Glass Setting

SD-11 Closeout Submittals

1.7.1Insulated Glass Units

08 91 00 SD-02 Shop Drawings

1.4Wall Louvers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 74 PAGES

08 91 00 SD-03 Product Data

2.2Metal Wall Louvers

SD-04 Samples

1.5 GWall Louver Samples

09 03 00 SD-02 Shop Drawings

1.3Work Plan

SD-03 Product Data

2.1Cleaning Solution

09 22 00 SD-03 Product Data

2.1Metal Support Systems

2.1 SRecycled Content for Metal

Support Systems

09 29 00 SD-03 Product Data

2.1.2Abuse Resistant Gypsum Board

2.1.5Accessories

2.1.1Gypsum Board

2.1.1 SRecycled Content for Gypsum

Board

2.1.1 SRecycled Content for Paper

Facing and Gypsum Cores

2.1.3 SVOC Content of Joint Compound

SD-07 Certificates

2.1Asbestos Free Materials

2.1.1 SIndoor Air Quality for Gypsum

Board

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 74 PAGES

09 29 00 2.1Safety Data Sheets

SD-10 Operation and Maintenance

Data

2.1Manufacturer Maintenance

Instructions

09 30 10 SD-02 Shop Drawings

3.2 GDetail Drawings

SD-03 Product Data

2.1.1 GPorcelain Tile

2.2 GSetting-Bed

2.4 GMortar, Grout, and Adhesive

SD-04 Samples

2.1 GTile

2.1 GAccessories

2.1 GTransition Strips

2.5 GTransition Strips

2.4 GGrout

SD-07 Certificates

2.4 SIndoor Air Quality for Adhesives

2.4.4 SIndoor Air Quality for Sealants

SD-08 Manufacturer’s Instructions

3.7Maintenance Instructions

SD-10 Operation and Maintenance

Data

3.2 GInstallation

09 51 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 74 PAGES

09 51 00 2.1Approved Detail Drawings

SD-03 Product Data

2.2.1.1 SRecycled Content for Type IV

Ceiling Tiles

2.3 SRecycled Content for Suspension

Systems

2.1.1Acoustical Performance

SD-04 Samples

2.2Acoustical Units

SD-07 Certificates

2.2.1.1 SIndoor Air Quality for Type IV

Ceiling Tiles

09 65 00 SD-02 Shop Drawings

2.7 GResilient Flooring and

Accessories

SD-03 Product Data

2.7 GResilient Flooring and

Accessories

2.3Adhesives

2.1Luxury Vinyl Tile

2.1.1Wall Base

SD-04 Samples

2.7 GResilient Flooring and

Accessories

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 74 PAGES

09 65 00 3.3 GMoisture, Alkalinity and Bond

Tests

SD-07 Certificates

2.1.1Indoor Air Quality for Wall Base

2.3Indoor Air Quality for Adhesives

SD-08 Manufacturer’s Instructions

3.2 GSurface Preparation

3.1 GInstallation

SD-10 Operation and Maintenance

Data

2.7 GResilient Flooring and

Accessories

09 67 23.13 SD-03 Product Data

1.2.1 GManufacturer's Catalog Data

SD-04 Samples

1.5.2 GHardboard Mounted Epoxy

Flooring

SD-05 Design Data

1.2.2 GDesign Mix Data

SD-07 Certificates

1.5.1 GListing of Product Installations

1.5 GReferenced Standards

Certificates

SD-11 Closeout Submittals

1.6 GWarranty

09 72 00 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 74 PAGES

09 72 00 2.1 GWallcoverings and Accessories

2.3Primer and Adhesive

2.2Recycled Content for vinyl wallcovering

SD-04 Samples

2.1 GWallcoverings and Accessories

SD-07 Certificates

1.3.1Indoor Air Quality

SD-08 Manufacturer’s Instructions

2.1Wallcoverings and Accessories

SD-10 Operation and Maintenance

Data

2.1 GWallcoverings and Accessories

09 90 00 SD-03 Product Data

2.1 GCoating

2.1Product Data Sheets

SD-04 Samples

2.2 GColor

SD-07 Certificates

1.6.4Indoor Air Quality for Paints and

Primers

SD-08 Manufacturer’s Instructions

2.1Mixing

1.8.1Manufacturer's Safety Data

Sheets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 74 PAGES

09 90 00 SD-10 Operation and Maintenance

Data

2.1 GCoatings

09 96 60 SD-03 Product Data

2.4Corner Bead

2.3High Performance Filling

Compound

SD-04 Samples

2.1 GTextured Acrylic Coating

2.3High Performance Filling

Compound

SD-07 Certificates

2.4Corner Bead

SD-08 Manufacturer’s Instructions

2.1Textured Acrylic Coating

2.3High Performance Filling

Compound

09 97 11 SD-03 Product Data

2.1 GCOATINGS

SD-04 Samples

2.1 GCOATINGS

SD-10 Operation and Maintenance

Data

3.2 GMaintenance

10 14 00.20 SD-02 Shop Drawings

1.4.2 GDetail Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 74 PAGES

10 14 00.20 SD-03 Product Data

3.1 GInstallation

1.6 GWarranty

SD-04 Samples

1.4.1 GInterior Signage

1.3 GSoftware

SD-10 Operation and Maintenance

Data

3.1 GApproved Manufacturer's

Instructions

3.1.2 GProtection and Cleaning

10 26 00 SD-02 Shop Drawings

2.2 GCorner Guards

SD-03 Product Data

2.2 GCorner Guards

SD-04 Samples

2.4 GFinish

SD-06 Test Reports

2.2Corner Guards

SD-07 Certificates

2.2Corner Guards

2.5 SIndoor air quality for adhesives

10 28 13 SD-02 Shop Drawings

2.1Product Schedule

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 74 PAGES

10 28 13 2.1Recycled content for stainless steel toilet accessories

2.1.3 GSanitary Napkin Disposal (SND)

2.1.4 GShelf, Mop and Broom Holder

(MHS)

2.1.5 GShower Curtain Rod (SCR)

2.1.6 GToilet Tissue Dispenser (TTD)

2.1.7 GMirror (WM1)

2.1.8 GFoam Soap Dispenser (SD)

2.1.9 GTowel Bar (TB)

2.1.10 GAnti Ligature Robe Hook

SD-10 Operation and Maintenance

Data

2.1.4 GShelf, Mop and Broom Holder

(MHS)

2.1.5 GShower Curtain Rod (SCR)

2.1.6 GToilet Tissue Dispenser (TTD)

2.1.7 GMirror (WM1)

2.1.8 GFoam Soap Dispenser (SD)

2.1.9 GTowel Bar (TB)

2.1.10 GAnti Ligature Robe Hook

10 44 16 SD-02 Shop Drawings

2.1.1 GWall Brackets

SD-03 Product Data

2.1.1 GWall Brackets

3.2.1 GReplacement Parts List

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 74 PAGES

10 44 16 SD-04 Samples

1.2.1 GEquipment Samples

11 81 00 SD-02 Shop Drawings

3.1 GDELEGATED DESIGN

SD-03 Product Data

2.1 GROOF RAIL ASSEMBLIES

2.2 GROOF ANCHOR POSTS

2.3 GHARNESSES, LANYARDS AND

CABLES

1.6WARRANTY

SD-04 Samples

2.3.1 GComponents

SD-05 Design Data

3.1 GDELEGATED DESIGN

SD-10 Operation and Maintenance

Data

1.4Maintenance Practices

3.5 GFall Protection Assemblies

3.5Maintenance

12 00 01.00 20 SD-01 Preconstruction Submittals

3.1.1.3 GFF&E Schedule and Schedule

Updates

3.1.1.1 GContractor's Interior Designer's

Qualifications

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 74 PAGES

12 00 01.00 20 3.1.2.11 GInterior Finish Construction

Submittals

3.2.3 GPost Option Award FF&E Finish

Submittals

SD-05 Design Data

3.1.2.2.2 GFF&E Basis of Design Package

3.1.2.5 GFF&E BVD Request for Quotation

(RFQ) Package

3.1.2.6 GBVD Package

3.1.2.8 GPre-Final FF&E Package 'Over

the Shoulder'

3.1.2.9 GPre-Final FF&E Package

3.1.2.10 GFinal FF&E Package

SD-10 Operation and Maintenance

Data

3.5.1 GWarranty and Maintenance

Information

SD-11 Closeout Submittals

3.3.2 GPunch List(s) Submittal

3.5.2 GInterior Photography

12 24 13 SD-02 Shop Drawings

3.2 GInstallation

SD-03 Product Data

2.1 GWindow Shades

2.1Recycled Content for various fiber components

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 74 PAGES

12 24 13 SD-04 Samples

2.1 GWindow Shades

SD-06 Test Reports

2.1Window Shades

SD-07 Certificates

2.1Indoor Air Quality for roller window shades

SD-08 Manufacturer’s Instructions

2.1Window Shades

SD-10 Operation and Maintenance

Data

2.1Window Shades

SD-11 Closeout Submittals

1.7 GWarranty

14 24 13 SD-02 Shop Drawings

2.1 GElevator

1.2.2 GElevator Components

1.2.3 GElevator Components

1.2.2 GElevator Machine

1.2.2 GElevator Controller

1.3.4 GWiring Diagrams

SD-03 Product Data

2.1 GElevator

1.2.2 GElevator Components

1.2.3 GElevator Components

1.2.3 GData Sheets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 74 PAGES

14 24 13 2.5.2 GElevator Microprocessor

Controller

SD-05 Design Data

1.2.4.2Heat Loads

1.2.4.1Reaction Loads

SD-07 Certificates

1.3.2 Gprice lists

1.4Warranty

1.3.1.1Endorsement Letter

1.2.5Welders' Qualifications

2.5.2.3 GElevator Controller Certification

SD-10 Operation and Maintenance

Data

2.1 GElevator

1.2.6 GMaintenance Control Program

(MCP)

2.5.2.2 GSoftware and Documentation

21 13 13 SD-01 Preconstruction Submittals

1.2.3 GQualified Fire Protection Engineer

(QFPE)

1.4.2.1 GSprinkler System Designer

1.4.2.2 GSprinkler System Installer

SD-02 Shop Drawings

1.2.1.1 GShop Drawing

SD-03 Product Data

2.2.1 GPipe

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 74 PAGES

21 13 13 2.3.1.2 GFittings

2.3.4 GValves

2.8.5 GRelief Valves

2.7 GSprinklers

2.3.3 GPipe Hangers and Supports

2.4.1 GSprinkler Alarm Switch

2.4.2 GValve Supervisory (Tamper)

Switch

2.6 GFire Department Connection

2.5 GBackflow Prevention Assembly

2.8.6 GAir Vent

2.5.1 GHose Valve

2.1.2 GNameplates

SD-05 Design Data

1.2.1.2 GHydraulic Calculations

SD-06 Test Reports

3.7.1 GTest Procedures

SD-07 Certificates

3.7.2.1 GVerification of Compliant

Installation

3.7.2.2 GRequest for Government Final

Test

SD-10 Operation and Maintenance

Data

3.9 GOperating and Maintenance

(O&M) Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 74 PAGES

21 13 13 1.6 GSpare Parts

SD-11 Closeout Submittals

3.9As-built drawings

22 00 00 SD-03 Product Data

3.8.1.1 GBackflow Prevention Assemblies

2.6.2 GShower Faucets

2.4Fixtures

2.4.1Flush Valve Water Closets

2.4.2Wall Hung Lavatories

2.4.3Countertop Lavatories

2.4.4Service Sinks

2.4.5 GDrinking-Water Coolers

2.6.2 SWaterSense Label for

Showerhead

2.9 GWater Heaters

2.10 GPumps

SD-06 Test Reports

3.8Tests, Flushing and Disinfection

3.8.1.1 GTest of Backflow Prevention

Assemblies

SD-07 Certificates

1.3Materials and Equipment

SD-10 Operation and Maintenance

Data

3.8.1 GPlumbing System

23 05 48.19 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 74 PAGES

23 05 48.19 3.1Coupling and Bracing

3.3Flexible Couplings or Joints

2.2Equipment Restraint

1.2.4 GContractor Designed Bracing

SD-03 Product Data

3.1 GCoupling and Bracing

3.3 GFlexible Couplings Or Joints

2.2 GEquipment Restraint

1.2.4 GContractor Designed Bracing

2.6Snubbers

3.9Anchor Bolts

2.2.2Vibration Isolators

SD-05 Design Data

1.2.4Design Calculations

SD-06 Test Reports

3.9 GAnchor Bolts

23 05 93 SD-01 Preconstruction Submittals

1.3.3 GRecords of Existing Conditions

1.5.1 GIndependent TAB Agency and

Personnel Qualifications

1.5.3.1 GTAB Design Review Report

SD-02 Shop Drawings

1.3.3 GTAB Schematic Drawings and

Report Forms

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 44 OF 74 PAGES

23 05 93 1.3 GEquipment and Performance

Data

1.5.1.3 GTAB Related HVAC Submittals

SD-06 Test Reports

3.3.5 GCompleted Pre-Final DALT

Report

3.3.8 GCertified Final DALT Report

1.5.3.2 GPrerequisite HVAC Work

Checkout List

1.5.3.2 GPrerequisite HVAC Work

Checkout List

1.5.3.2 GPrerequisite HVAC Work

Checkout List

3.4.5.1 GProportional Balancing

3.7 GProportional Balancing

3.4.5.2 GSeason 1

3.7 GSeason 1

3.4.5.2 GSeason 2

3.7 GSeason 2

SD-07 Certificates

1.5.1 GIndependent TAB Agency and

Personnel Qualifications

1.5.3.1 GDALT and TAB Submittal and

Work Schedule

1.5.3.2 GTAB Pre-Field Engineering

Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .