The submittal register is a comprehensive document for the Repair BEQ (Bachelor Enlisted Quarters) AS4212 project at Camp Lejeune, issued by the Department of the Navy Naval Facilities Engineering Command. The 74-page register details numerous required technical submittals across multiple construction disciplines, including preconstruction documents, shop drawings, product data, test reports, certificates, samples, design data, manufacturer's instructions, and operation and maintenance documentation.
The submittal register covers extensive technical sections ranging from site preparation and demolition (Sections 02) through architectural and structural elements (Sections 03-06), mechanical and electrical systems (Sections 21-33), telecommunications (Sections 27-33), and other critical infrastructure components. Each section specifies detailed submittal requirements with specific paragraph references, classification codes, and approval processes, indicating a complex renovation project with rigorous documentation and quality control standards. The register suggests a comprehensive renovation of bachelor enlisted quarters with multiple system upgrades and replacements.
View the file
Other files
Show 40 more
Latest 50 of 61 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 74 PAGES
REPAIR BEQ AS4212
01 14 00 SD-01 Preconstruction Submittals
1.3.1.1List of Contact Personnel
01 20 00 SD-01 Preconstruction Submittals
1.3Schedule of Prices
01 30 00 SD-01 Preconstruction Submittals
1.3View Location Map
1.4Progress and Completion
Pictures
01 31 23.13 20 SD-01 Preconstruction Submittals
1.4.2 GList of Contractor's Personnel
01 31 50 SD-11 Closeout Submittals
1.2Interim DD-1354, Transfer &
Acceptance of Military Real
Property
01 32 16.00 20 SD-01 Preconstruction Submittals
1.2 GBaseline Construction Schedule
SD-07 Certificates
1.4Monthly Updates
01 33 00 SD-11 Closeout Submittals
1.4.1Submittal register
1.6.1Complete Submittal Package
01 33 29 SD-01 Preconstruction Submittals
1.4.1 GSustainability Action Plan
1.5.2.2 GPreliminary Sustainability
eNotebook
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 74 PAGES
01 33 29 1.5.2.2 GFinal Sustainability eNotebook
1.5.2.2 GAmended Final Sustainability
eNotebook
01 35 26 SD-01 Preconstruction Submittals
1.8.1 GAPP - Construction
1.17 GDive Operations Plan
1.8 GAccident Prevention Plan (APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.13Notifications and Reports
1.13.2 GAccident Reports
1.13.3LHE Inspection Reports
SD-07 Certificates
1.5Contractor Safety Self-Evaluation
Checklist
1.7.1.5Crane Operators/Riggers
1.8.3.2 GStandard Lift Plan
1.8.3.3 GCritical Lift Plan
1.8.3.4 GNaval Architecture Analysis
1.9Activity Hazard Analysis (AHA)
1.10.1Confined Space Entry Permit
1.10.1Hot Work Permit
1.13.4Certificate of Compliance
1.13.5Third Party Certification of
Floating Cranes and
Barge-Mounted Mobile Cranes
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 74 PAGES
01 35 26 1.15License Certificates
1.15.1 GRadiography Operation Planning
Work Sheet
1.15.1 GPortable Gauge Operations
Planning Worksheet
01 45 00 SD-01 Preconstruction Submittals
1.5.2 GContractor Quality Control (CQC)
Plan
SD-06 Test Reports
1.12.3Verification Statement
SD-07 Certificates
1.6.4.1 GCertificate Of Readiness
01 50 00 SD-01 Preconstruction Submittals
3.4.1Traffic Control Plan
SD-03 Product Data
1.3 GBackflow Preventers
SD-06 Test Reports
3.5Backflow Preventer Tests
SD-07 Certificates
1.3.1Backflow Tester
1.3Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals
1.6.1Environmental Protection Plan
SD-06 Test Reports
3.7.1Abrasive blasting
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 74 PAGES
01 57 19 1.4.1Solid waste disposal permit
1.4.2Disposal permit for hazardous waste
1.2Environmental training documentation
1.4.3Permit to transport hazardous waste
1.4.4Hazardous waste certification
1.6.3Environmental Plan Review
2.1Annual Report of Products
Containing Recovered Materials
01 74 19 SD-01 Preconstruction Submittals
1.7 GConstruction Waste Management
Plan
SD-11 Closeout Submittals
1.9 SFinal Construction Waste
Diversion Report
01 78 00 SD-03 Product Data
1.6.1Warranty Management Plan
1.6.4Warranty Tags
3.4Final Cleaning
1.5Spare Parts Data
SD-08 Manufacturer’s Instructions
1.6.1Instructions
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 74 PAGES
01 78 00 3.3 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.2 GRecord Drawings
1.6.1As-Built Record of Equipment and Materials
3.6Final Approved Shop Drawings
2.1 GCertification of EPA Designated
Items
2.2 GCertification Of USDA Designated
Items
3.5 GInterim DD FORM 1354
3.5 GChecklist for DD FORM 1354
3.5 GHigh Performance and
Sustainable Building (HPSB)
Checklist
01 78 23 SD-10 Operation and Maintenance
Data
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
01 78 24.00 20 SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 74 PAGES
01 78 24.00 20 1.4.1 GeOMSI, Progress Submittal
1.4.2 GeOMSI, Prefinal Submittal
1.4.3 GeOMSI, Final Submittal
01 78 30.00 22 SD-11 Closeout Submittals
1.3.9 GGIS Data Deliverables
01 91 00.15 20 SD-06 Test Reports
3.1 GDesign Review Report
3.5 GInterim Construction Phase
Commissioning Plan
3.5 GFinal Construction Phase
Commissioning Plan
3.9 GInitial Commissioning Report
1.11 GIssues Log
3.6 GCompleted Pre-Functional
Checklists
SD-07 Certificates
1.9 GCommissioning Firm
1.12 GCertificate Of Readiness
SD-11 Closeout Submittals
3.9 GFinal Commissioning Report
3.10 GUpdated Final Commissioning
Report
02 41 00 SD-01 Preconstruction Submittals
1.2.2 GDemolition Plan
1.9Existing Conditions
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 74 PAGES
02 41 00 1.6 GNotification
SD-11 Closeout Submittals
3.3.2Receipts
02 41 01 SD-01 Preconstruction Submittals
1.2.2 GDeconstruction Plan
1.8Existing Conditions
SD-07 Certificates
1.6 GNotification
02 83 00 SD-01 Preconstruction Submittals
1.5.1.1 GCompetent Person
1.5.1.2 GTraining Certification
1.5.2.3 GOccupational and Environmental
Assessment Data Report
1.5.2.4 GMedical Examinations
1.5.2.8 GLead Waste Management Plan
1.5.3 GLicenses, Permits and
Notifications
1.5.4 GOccupant Protection Plan
1.5.2.2 GLead Compliance Plan
3.1.1.6 GLead Compliance Plan
3.4.1.1Initial Sample Results
3.5.2.1 GWritten Evidence of TSD
Approval
SD-03 Product Data
1.6.1Respirators
1.6.4Vacuum Filters
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 74 PAGES
02 83 00 1.6.7Negative Air Pressure System
2.1Materials and Equipment
2.1.1Expendable Supplies
3.1.1.5Local Exhaust Equipment
3.1.1.5 GPressure Differential Automatic
Recording Instrument
3.1.1.6Pressure Differential Log
SD-06 Test Reports
1.5.2.3 GOccupational and Environmental
Assessment Data Report
1.5.2.3Sampling Results
SD-07 Certificates
1.5.1.3 GTesting Laboratory
1.5.1.4 GThird Party Consultant
Qualifications
3.1.1.1 GOccupant Notification
3.1.1.1Notification of the
Commencement of Lead
Containing Paint Hazard
Abatement
3.5.1.1Clearance Certification
SD-11 Closeout Submittals
3.5.2.1 GHazardous Waste Manifest
03 30 00 SD-01 Preconstruction Submittals
1.6.5 GQuality Control Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 74 PAGES
03 30 00 1.6.6 GQuality Control Personnel
Certifications
1.6.6Quality Control Organizational
Chart
1.6.8 GLaboratory Accreditation
3.3.10Maturity Method Data
SD-02 Shop Drawings
1.6.2.1 GReinforcing Steel
SD-03 Product Data
2.4.5Joint Sealants
2.4.4Joint Filler
2.1Formwork Materials
2.3.3.2Recycled Aggregate Materials
2.3.1Cementitious Materials
2.4.6Vapor Retarder
2.4.1Concrete Curing Materials
2.6Reinforcement
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.3.4Admixtures
2.6.2Mechanical Reinforcing Bar
Connectors
2.2.2Waterstops
2.2.3Biodegradable Form Release
Agent
2.4.2Nonshrink Grout
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 74 PAGES
03 30 00 SD-05 Design Data
1.6.1.1 GConcrete Mix Design
SD-06 Test Reports
1.6.1.1 GConcrete Mix Design
1.6.3.1Fly Ash
1.6.3.1Pozzolan
1.6.3.2Slag Cement
1.6.3.3Aggregates
3.10.2.1Tolerance Report
3.14.3.3 GCompressive Strength Tests
3.14.3.5Unit Weight of Structural
Concrete
3.14.3.4Air Content
3.14.3.1Slump Tests
2.3.2Water
SD-07 Certificates
2.6.1Reinforcing Bars
1.8Welder Qualifications
1.6.6.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
2.4.5Joint Sealants
2.4.1Curing Compound
03 30 53 SD-03 Product Data
2.2.3.1Air-Entraining Admixture
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 74 PAGES
03 30 53 2.2.3.2Water-Reducing or Retarding
Admixture
2.2.10Curing Materials
2.2.6Expansion Joint Filler Strips, Premolded
3.2Conveying and Placing Concrete
2.2.7Formwork
2.3 GMix Design Data
2.3Ready-Mix Concrete
2.2.5Mechanical Reinforcing Bar
Connectors
SD-06 Test Reports
2.2.2Aggregates
2.1.3 GConcrete Mixture Proportions
3.8.3 GCompressive Strength Testing
3.8.3 GSlump
3.8.3Air Content
2.2.4Water
SD-07 Certificates
2.2.1Cementitious Materials
2.2.1.2Pozzolan
2.2.2Aggregates
2.3Delivery Tickets
04 20 00 SD-02 Shop Drawings
3.4.1.1 GDetail Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 74 PAGES
04 20 00 1.5.1 GHot Weather Procedures
1.5.2 GCold Weather Procedures
2.2.2 GClay or Shale Brick
2.6.7 GInsulation
SD-04 Samples
1.3.1.1 GMock-Up Panel
2.2.2 GClay or Shale Brick
2.6.5 GClay Masonry Expansion-Joint
Materials
SD-05 Design Data
2.1.2 GMasonry Compressive Strength
3.2.4 GBracing Calculations
SD-06 Test Reports
2.2.2.1.4Efflorescence Test
2.2.3.3Fire-Rated Concrete Masonry
Units
3.6.1.1Field Testing of Mortar
3.6.1.2Field Testing of Grout
3.6.1.4Prism Tests
SD-07 Certificates
2.2.2Clay or Shale Brick
2.2.3.2Concrete Masonry Units (CMU)
2.4.1.1Cementitious Materials
2.4.1.4Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 74 PAGES
04 20 00 2.6.2Anchors, Ties, and Bar
Positioners
2.6.3Joint Reinforcement
2.6.7Insulation
SD-08 Manufacturer’s Instructions
2.4.1.4Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
SD-10 Operation and Maintenance
Data
3.8Take-Back Program
SD-11 Closeout Submittals
2.2.2.1.3 SClay Units
2.2.3.2.1 SRecycled Content
05 30 00 SD-02 Shop Drawings
1.3.5 GFabrication Drawings
SD-03 Product Data
2.2Accessories
2.1Deck Units
2.2.15Mechanical Fasteners
2.1.3Touch-Up Paint
1.3.3Welding Equipment
1.3.3Welding Rods and Accessories
2.1 SRecycled Content of Steel
Products
SD-04 Samples
2.2.4Flexible Closure Strips
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 74 PAGES
05 30 00 SD-05 Design Data
2.1 GDeck Units
SD-07 Certificates
1.3.2Powder-Actuated Tool Operator
1.3.3Welder Qualifications
1.3.3Welding Procedures
1.3.4.1Fire Safety
1.3.4.2Wind Storm Resistance
1.3.1Manufacturer's Certificate
2.2.10Stud Manufacture's Certification
2.2.10Stud Manufacture's Test Reports
05 40 00 SD-02 Shop Drawings
1.5.1 GFraming Components
SD-03 Product Data
2.1Studs, Joists
2.1Recycled Content of Steel
Products
SD-05 Design Data
1.5.2 GMetal Framing Calculations
SD-07 Certificates
3.2.1Welds
05 50 13 SD-02 Shop Drawings
2.4 GExpansion Joint Covers
2.5 GBollards/Pipe Guards
2.8 GRetrofit Treads
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 74 PAGES
05 50 13 2.4 GExpansion Joint Covers
2.8 GRetrofit Treads
2.6 GDownspouts
2.1 SRecycled Content
SD-04 Samples
2.4Expansion Joint Covers
05 51 33 SD-02 Shop Drawings
2.3Ladders
SD-03 Product Data
2.3Ladders
SD-07 Certificates
1.3Fabricator Certification for Ladder
Assembly
05 52 00 SD-02 Shop Drawings
3.2 GHardware
3.2 GShapes, Plates, Bars and Strips
2.2.1 GConcrete Inserts
2.2.2 GMasonry Anchorage Devices
2.1.2 GProtective Coating
2.2.4 GAluminum Railings and Handrails
SD-07 Certificates
1.3.1 GWelding Procedures
1.3.2 GWelder Qualification
06 10 00 SD-06 Test Reports
1.4.2Preservative-treated
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 74 PAGES
06 10 00 1.9.1Certificates of Grade
06 41 16.00 10 SD-02 Shop Drawings
2.7Shop Drawings
3.1Installation
SD-03 Product Data
2.1Wood Materials
2.7.7.3Finish Schedule
SD-04 Samples
2.2Plastic Laminates
2.4Cabinet Hardware
SD-07 Certificates
1.5Quality Assurance
3.1Laminate Clad Casework
1.5.2Certification
06 61 16 SD-02 Shop Drawings
1.4.2 GDetail Drawings
3.1 GInstallation
SD-03 Product Data
2.1Solid Polymer Material
1.4.1Qualifications
2.3Fabrications
2.2.4 SIndoor air quality for solid surface
seam and sealant products
SD-04 Samples
2.1 GMaterial
2.3.5 GCounter and Vanity Tops
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 74 PAGES
06 61 16 SD-06 Test Reports
2.1Solid Polymer Material
SD-07 Certificates
2.3Fabrications
1.4.1Qualifications
2.1 SIndoor Air Quality for solid
surface fabrication products
SD-10 Operation and Maintenance
Data
3.2Clean-up
07 19 00 SD-03 Product Data
2.2Water Repellents
SD-06 Test Reports
1.3.2Water Absorption
2.3.1Accelerated Weathering
2.3.1Resistance to Chloride Ion
Penetration
1.3.2Moisture Vapor Transmission
2.3.1Moisture Vapor Transmission
2.3.1Scaling Resistance
1.3.2Water Penetration and Leakage
SD-07 Certificates
1.3.1Manufacturer's Qualifications
1.3.1Applicator's Qualifications
1.3.3Evidence of Acceptable Variation
1.12Warranty
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 74 PAGES
07 19 00 SD-08 Manufacturer’s Instructions
3.4Application
1.7.1Safety Data Sheets
07 27 19.01 SD-01 Preconstruction Submittals
1.7.1 GQualifications of Manufacturer
1.7.2 GQualifications of Installer
SD-02 Shop Drawings
1.4 GSelf-adhering Air Barrier
SD-03 Product Data
1.4 GSelf-adhering Air Barrier
2.2 GPrimers, Adhesives, and Mastics
1.4.2 GSafety Data Sheets
SD-06 Test Reports
1.6 GField Peel Adhesion Test
1.4.3 GFlame Propagation of Wall
Assemblies
1.4.3 GFlame Spread and Smoke
Developed Index Ratings
3.4.1 GSite Inspections and Testing
SD-07 Certificates
1.4 GSelf-adhering Air Barrier
SD-08 Manufacturer’s Instructions
1.4 GSelf-adhering Air Barrier
2.2 GPrimers, Adhesives, and Mastics
07 27 26 SD-01 Preconstruction Submittals
1.8.1 GQualifications of Manufacturer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 74 PAGES
07 27 26 SD-02 Shop Drawings
1.4 GFluid-Applied Membrane Air
Barrier
SD-03 Product Data
1.4 GFluid-Applied Membrane Air
Barrier
2.3 GTransition Membrane
2.2 GPrimers, Adhesives, and Mastics
2.6 GReinforcement
1.4.2 GSafety Data Sheets
SD-06 Test Reports
1.6 GCapillary Moisture Test
1.4.3 GField Peel Adhesion Test
1.4.3 GFlame Propagation of Wall
Assemblies
1.4.3 GFlame Spread and Smoke
Developed Index Ratings
3.4.1 GSite Inspections
SD-07 Certificates
1.4 GFluid-Applied Membrane Air
Barrier
2.3 GTransition Membrane
SD-08 Manufacturer’s Instructions
1.4 GFluid-Applied Membrane Air
Barrier
2.3 GTransition Membrane
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 74 PAGES
07 27 26 2.2 GPrimers, Adhesives, and Mastics
07 27 36 SD-01 Preconstruction Submittals
1.10 GQuality Control Plan
1.10 GSafety Plan
1.8.1 GFire Prevention Plan
1.8.2 GRespirator Plan
SD-02 Shop Drawings
1.5Spray Foam Air Barrier
1.10 GFoam Air Barrier System
1.5.1 GFire-Rated Assemblies
SD-03 Product Data
2.1.2 GClosed Cell
2.2 GTransition Membrane
2.3 GPrimers, Adhesives, and Mastics
2.5 GSealants
1.5.2 GSafety Data Sheets
2.1.1 GIgnition Barrier Coatings
2.1.1 GAccessories
2.1.2 SRecycled Content for Closed Cell
Spray Foam Air Barrier
2.1.5Blowing Agent
SD-06 Test Reports
1.5.3 GField Peel Adhesion Test
3.4.5.1 GThermographic Test
1.5.3 GFire-Ratings Of Ignition Barrier
Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 74 PAGES
07 27 36 1.5.3 GFlame Spread And Smoke
Developed Index Ratings Of SPF
Products
1.5.3 GFlame Propagation Of Wall
Assemblies
3.4.1 GSite Inspections
SD-07 Certificates
2.1.2 GClosed cell
2.2 GTransition Membrane
2.1.5 SIndoor Air Quality for Spray Foam
Air Barrier
SD-08 Manufacturer’s Instructions
1.6.1 GSPF Handling, Storage, and
Spray Procedures
3.2.1 GSubstrate Preparation
1.5.1 GIgnition Barrier
2.2 GTransition Membrane
2.3 GPrimers, Adhesives, and Mastics
SD-09 Manufacturer’s Field
Reports
1.10Core Samples
3.3.4Daily Work Record
3.4.5Visual Inspection and Thermal
Scanning
07 60 00 SD-02 Shop Drawings
2.2.1 GExposed Sheet Metal
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 74 PAGES
07 60 00 3.1.12 GGutters
3.1.13 GDownspouts
3.1.15 GCopings
2.1 SRecycled Content
SD-04 Samples
1.4.2 GFinish Samples
SD-08 Manufacturer’s Instructions
1.4.3 GInstructions for Installation
3.5 GQuality Control Plan
SD-10 Operation and Maintenance
Data
1.4.3 GCleaning and Maintenance
07 61 15.00 20 SD-02 Shop Drawings
2.1 GRoofing panels
2.3 GGutters
2.3 GDown spouts
SD-03 Product Data
2.1 GRoofing panels
2.2 GAttachment clips
2.3.1Closures
2.3Accessories
2.3.2Fasteners
1.8 Gwarranty
SD-04 Samples
2.1Roofing panels
2.1.2INTERMEDIATE SUPPORT
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 74 PAGES
07 61 15.00 20 2.3Accessories
SD-05 Design Data
1.5 GLoad calculations
SD-06 Test Reports
2.4 GPanel Finish
1.3.2.9Wind Uplift Test Report
3.5 GManufacturer's field inspection
SD-07 Certificates
1.6.2Technical representative
1.6.3Qualification of Installer
2.1.1.5Coil stock
SD-08 Manufacturer’s Instructions
2.3.3Sealant
3.3Installation
SD-11 Closeout Submittals
3.7Information card
07 84 00.00 22 SD-02 Shop Drawings
2.1 GFirestopping System
SD-03 Product Data
2.2 GFirestopping Materials
3.1 GFirestopping Materials
SD-06 Test Reports
3.3.1 GInspection Forms
3.3.2 GInspection Report
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 74 PAGES
07 84 00.00 22 1.5.2Firestopping Inspector
Qualifications
2.2Firestopping Materials
3.1Firestopping Materials
1.5.1Firestopping Installer
Qualifications
07 92 00 SD-03 Product Data
2.1 GSealants
2.2 GPrimers
2.3 GBond Breakers
2.4 GBackstops
3.1 GField Adhesion
SD-07 Certificates
2.1.1 SIndoor Air Quality For Interior
Sealants
2.1.3 SIndoor Air Quality For Interior
Floor Joint Sealants
2.1.4 SIndoor Air Quality For Interior
Acoustical Sealants
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.4 GFrames
2.4 GFrames
2.2Accessories
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 74 PAGES
08 11 13 2.1 GDoors
2.1 SRecycled Content for Steel Door
Product
2.4 GFrames
2.4 SRecycled Content for Steel Frame
Product
2.2Accessories
08 31 00 SD-02 Shop Drawings
1.3 GAccess Doors And Panels
SD-03 Product Data
1.3 GAccess Doors And Panels
1.3.2 GHardware
2.2.8 GAccessories
2.1 SRecycled Content
SD-04 Samples
2.5 GFinishes
SD-06 Test Reports
1.3.1 GFire-rating(s) of Assemblies
08 33 23 SD-02 Shop Drawings
2.2.1 GOverhead Coiling Doors
2.2.3 GCounterbalancing Mechanism
2.2.1.3Bottom Bars
2.1.1.1 GGuides
2.2.3.1 GMounting Brackets
2.2.2.2 GHood
2.1.1.1 GInstallation Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 74 PAGES
08 33 23 SD-03 Product Data
2.2.1 GOverhead Coiling Doors
2.2.2 GHardware
2.2.3 GCounterbalancing Mechanism
SD-05 Design Data
2.2.1 GOverhead Coiling Doors
2.2.2 GHardware
2.2.3 GCounterbalancing Mechanism
SD-10 Operation and Maintenance
Data
1.3.2 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
1.3.1 GWarranty
08 51 13 SD-02 Shop Drawings
2.1 GWindows
1.6Fabrication Drawings
SD-03 Product Data
2.1 GWindows
2.1 SRecycled Content of Aluminum
Windows
2.2.8.1 GHardware
2.2.3 GFasteners
1.7 GWindow Performance
2.3 GThermal-Barrier Windows
2.4 GMullions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 74 PAGES
08 51 13 2.2.10 GScreens
2.1.4 GWeatherstripping
2.2.8 GAccessories
2.2.4Adhesives
1.7.4 GThermal Performance
SD-04 Samples
1.3.4.1Finish Sample
1.3.4.2Window Sample
SD-05 Design Data
2.1 GStructural Calculations for
Deflection
1.3.5 GDesign Analysis
SD-06 Test Reports
1.3.6Minimum Condensation
Resistance Factor
SD-07 Certificates
1.3.5Engineer's Qualifications
SD-10 Operation and Maintenance
Data
2.1 GWindows
08 71 00 SD-02 Shop Drawings
1.3 GManufacturer's Detail Drawings
1.3 GVerification of Existing Conditions
1.5 GHardware Schedule
2.3.5 GKeying System
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 74 PAGES
08 71 00 2.3 GHardware Items
2.3.2.3 GLodging RFID Electronic Lock
Systems
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.5 GHardware Schedule
SD-11 Closeout Submittals
1.6.1Key Bitting
08 81 00 SD-03 Product Data
2.3 GInsulating Glass
1.3Glazing Accessories
2.4.1.1Sealants
2.4.2Joint Backer
SD-04 Samples
2.3 GInsulating Glass
2.4.4Tape
2.4.4Sealing Tapes
SD-08 Manufacturer’s Instructions
2.4Setting and Sealing Materials
3.2Glass Setting
SD-11 Closeout Submittals
1.7.1Insulated Glass Units
08 91 00 SD-02 Shop Drawings
1.4Wall Louvers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 74 PAGES
08 91 00 SD-03 Product Data
2.2Metal Wall Louvers
SD-04 Samples
1.5 GWall Louver Samples
09 03 00 SD-02 Shop Drawings
1.3Work Plan
SD-03 Product Data
2.1Cleaning Solution
09 22 00 SD-03 Product Data
2.1Metal Support Systems
2.1 SRecycled Content for Metal
Support Systems
09 29 00 SD-03 Product Data
2.1.2Abuse Resistant Gypsum Board
2.1.5Accessories
2.1.1Gypsum Board
2.1.1 SRecycled Content for Gypsum
Board
2.1.1 SRecycled Content for Paper
Facing and Gypsum Cores
2.1.3 SVOC Content of Joint Compound
SD-07 Certificates
2.1Asbestos Free Materials
2.1.1 SIndoor Air Quality for Gypsum
Board
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 74 PAGES
09 29 00 2.1Safety Data Sheets
SD-10 Operation and Maintenance
Data
2.1Manufacturer Maintenance
Instructions
09 30 10 SD-02 Shop Drawings
3.2 GDetail Drawings
SD-03 Product Data
2.1.1 GPorcelain Tile
2.2 GSetting-Bed
2.4 GMortar, Grout, and Adhesive
SD-04 Samples
2.1 GTile
2.1 GAccessories
2.1 GTransition Strips
2.5 GTransition Strips
2.4 GGrout
SD-07 Certificates
2.4 SIndoor Air Quality for Adhesives
2.4.4 SIndoor Air Quality for Sealants
SD-08 Manufacturer’s Instructions
3.7Maintenance Instructions
SD-10 Operation and Maintenance
Data
3.2 GInstallation
09 51 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 74 PAGES
09 51 00 2.1Approved Detail Drawings
SD-03 Product Data
2.2.1.1 SRecycled Content for Type IV
Ceiling Tiles
2.3 SRecycled Content for Suspension
Systems
2.1.1Acoustical Performance
SD-04 Samples
2.2Acoustical Units
SD-07 Certificates
2.2.1.1 SIndoor Air Quality for Type IV
Ceiling Tiles
09 65 00 SD-02 Shop Drawings
2.7 GResilient Flooring and
Accessories
SD-03 Product Data
2.7 GResilient Flooring and
Accessories
2.3Adhesives
2.1Luxury Vinyl Tile
2.1.1Wall Base
SD-04 Samples
2.7 GResilient Flooring and
Accessories
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 74 PAGES
09 65 00 3.3 GMoisture, Alkalinity and Bond
Tests
SD-07 Certificates
2.1.1Indoor Air Quality for Wall Base
2.3Indoor Air Quality for Adhesives
SD-08 Manufacturer’s Instructions
3.2 GSurface Preparation
3.1 GInstallation
SD-10 Operation and Maintenance
Data
2.7 GResilient Flooring and
Accessories
09 67 23.13 SD-03 Product Data
1.2.1 GManufacturer's Catalog Data
SD-04 Samples
1.5.2 GHardboard Mounted Epoxy
Flooring
SD-05 Design Data
1.2.2 GDesign Mix Data
SD-07 Certificates
1.5.1 GListing of Product Installations
1.5 GReferenced Standards
Certificates
SD-11 Closeout Submittals
1.6 GWarranty
09 72 00 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 74 PAGES
09 72 00 2.1 GWallcoverings and Accessories
2.3Primer and Adhesive
2.2Recycled Content for vinyl wallcovering
SD-04 Samples
2.1 GWallcoverings and Accessories
SD-07 Certificates
1.3.1Indoor Air Quality
SD-08 Manufacturer’s Instructions
2.1Wallcoverings and Accessories
SD-10 Operation and Maintenance
Data
2.1 GWallcoverings and Accessories
09 90 00 SD-03 Product Data
2.1 GCoating
2.1Product Data Sheets
SD-04 Samples
2.2 GColor
SD-07 Certificates
1.6.4Indoor Air Quality for Paints and
Primers
SD-08 Manufacturer’s Instructions
2.1Mixing
1.8.1Manufacturer's Safety Data
Sheets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 74 PAGES
09 90 00 SD-10 Operation and Maintenance
Data
2.1 GCoatings
09 96 60 SD-03 Product Data
2.4Corner Bead
2.3High Performance Filling
Compound
SD-04 Samples
2.1 GTextured Acrylic Coating
2.3High Performance Filling
Compound
SD-07 Certificates
2.4Corner Bead
SD-08 Manufacturer’s Instructions
2.1Textured Acrylic Coating
2.3High Performance Filling
Compound
09 97 11 SD-03 Product Data
2.1 GCOATINGS
SD-04 Samples
2.1 GCOATINGS
SD-10 Operation and Maintenance
Data
3.2 GMaintenance
10 14 00.20 SD-02 Shop Drawings
1.4.2 GDetail Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 74 PAGES
10 14 00.20 SD-03 Product Data
3.1 GInstallation
1.6 GWarranty
SD-04 Samples
1.4.1 GInterior Signage
1.3 GSoftware
SD-10 Operation and Maintenance
Data
3.1 GApproved Manufacturer's
Instructions
3.1.2 GProtection and Cleaning
10 26 00 SD-02 Shop Drawings
2.2 GCorner Guards
SD-03 Product Data
2.2 GCorner Guards
SD-04 Samples
2.4 GFinish
SD-06 Test Reports
2.2Corner Guards
SD-07 Certificates
2.2Corner Guards
2.5 SIndoor air quality for adhesives
10 28 13 SD-02 Shop Drawings
2.1Product Schedule
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 74 PAGES
10 28 13 2.1Recycled content for stainless steel toilet accessories
2.1.3 GSanitary Napkin Disposal (SND)
2.1.4 GShelf, Mop and Broom Holder
(MHS)
2.1.5 GShower Curtain Rod (SCR)
2.1.6 GToilet Tissue Dispenser (TTD)
2.1.7 GMirror (WM1)
2.1.8 GFoam Soap Dispenser (SD)
2.1.9 GTowel Bar (TB)
2.1.10 GAnti Ligature Robe Hook
SD-10 Operation and Maintenance
Data
2.1.4 GShelf, Mop and Broom Holder
(MHS)
2.1.5 GShower Curtain Rod (SCR)
2.1.6 GToilet Tissue Dispenser (TTD)
2.1.7 GMirror (WM1)
2.1.8 GFoam Soap Dispenser (SD)
2.1.9 GTowel Bar (TB)
2.1.10 GAnti Ligature Robe Hook
10 44 16 SD-02 Shop Drawings
2.1.1 GWall Brackets
SD-03 Product Data
2.1.1 GWall Brackets
3.2.1 GReplacement Parts List
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 74 PAGES
10 44 16 SD-04 Samples
1.2.1 GEquipment Samples
11 81 00 SD-02 Shop Drawings
3.1 GDELEGATED DESIGN
SD-03 Product Data
2.1 GROOF RAIL ASSEMBLIES
2.2 GROOF ANCHOR POSTS
2.3 GHARNESSES, LANYARDS AND
CABLES
1.6WARRANTY
SD-04 Samples
2.3.1 GComponents
SD-05 Design Data
3.1 GDELEGATED DESIGN
SD-10 Operation and Maintenance
Data
1.4Maintenance Practices
3.5 GFall Protection Assemblies
3.5Maintenance
12 00 01.00 20 SD-01 Preconstruction Submittals
3.1.1.3 GFF&E Schedule and Schedule
Updates
3.1.1.1 GContractor's Interior Designer's
Qualifications
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 74 PAGES
12 00 01.00 20 3.1.2.11 GInterior Finish Construction
Submittals
3.2.3 GPost Option Award FF&E Finish
Submittals
SD-05 Design Data
3.1.2.2.2 GFF&E Basis of Design Package
3.1.2.5 GFF&E BVD Request for Quotation
(RFQ) Package
3.1.2.6 GBVD Package
3.1.2.8 GPre-Final FF&E Package 'Over
the Shoulder'
3.1.2.9 GPre-Final FF&E Package
3.1.2.10 GFinal FF&E Package
SD-10 Operation and Maintenance
Data
3.5.1 GWarranty and Maintenance
Information
SD-11 Closeout Submittals
3.3.2 GPunch List(s) Submittal
3.5.2 GInterior Photography
12 24 13 SD-02 Shop Drawings
3.2 GInstallation
SD-03 Product Data
2.1 GWindow Shades
2.1Recycled Content for various fiber components
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 74 PAGES
12 24 13 SD-04 Samples
2.1 GWindow Shades
SD-06 Test Reports
2.1Window Shades
SD-07 Certificates
2.1Indoor Air Quality for roller window shades
SD-08 Manufacturer’s Instructions
2.1Window Shades
SD-10 Operation and Maintenance
Data
2.1Window Shades
SD-11 Closeout Submittals
1.7 GWarranty
14 24 13 SD-02 Shop Drawings
2.1 GElevator
1.2.2 GElevator Components
1.2.3 GElevator Components
1.2.2 GElevator Machine
1.2.2 GElevator Controller
1.3.4 GWiring Diagrams
SD-03 Product Data
2.1 GElevator
1.2.2 GElevator Components
1.2.3 GElevator Components
1.2.3 GData Sheets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 74 PAGES
14 24 13 2.5.2 GElevator Microprocessor
Controller
SD-05 Design Data
1.2.4.2Heat Loads
1.2.4.1Reaction Loads
SD-07 Certificates
1.3.2 Gprice lists
1.4Warranty
1.3.1.1Endorsement Letter
1.2.5Welders' Qualifications
2.5.2.3 GElevator Controller Certification
SD-10 Operation and Maintenance
Data
2.1 GElevator
1.2.6 GMaintenance Control Program
(MCP)
2.5.2.2 GSoftware and Documentation
21 13 13 SD-01 Preconstruction Submittals
1.2.3 GQualified Fire Protection Engineer
(QFPE)
1.4.2.1 GSprinkler System Designer
1.4.2.2 GSprinkler System Installer
SD-02 Shop Drawings
1.2.1.1 GShop Drawing
SD-03 Product Data
2.2.1 GPipe
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 74 PAGES
21 13 13 2.3.1.2 GFittings
2.3.4 GValves
2.8.5 GRelief Valves
2.7 GSprinklers
2.3.3 GPipe Hangers and Supports
2.4.1 GSprinkler Alarm Switch
2.4.2 GValve Supervisory (Tamper)
Switch
2.6 GFire Department Connection
2.5 GBackflow Prevention Assembly
2.8.6 GAir Vent
2.5.1 GHose Valve
2.1.2 GNameplates
SD-05 Design Data
1.2.1.2 GHydraulic Calculations
SD-06 Test Reports
3.7.1 GTest Procedures
SD-07 Certificates
3.7.2.1 GVerification of Compliant
Installation
3.7.2.2 GRequest for Government Final
Test
SD-10 Operation and Maintenance
Data
3.9 GOperating and Maintenance
(O&M) Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 74 PAGES
21 13 13 1.6 GSpare Parts
SD-11 Closeout Submittals
3.9As-built drawings
22 00 00 SD-03 Product Data
3.8.1.1 GBackflow Prevention Assemblies
2.6.2 GShower Faucets
2.4Fixtures
2.4.1Flush Valve Water Closets
2.4.2Wall Hung Lavatories
2.4.3Countertop Lavatories
2.4.4Service Sinks
2.4.5 GDrinking-Water Coolers
2.6.2 SWaterSense Label for
Showerhead
2.9 GWater Heaters
2.10 GPumps
SD-06 Test Reports
3.8Tests, Flushing and Disinfection
3.8.1.1 GTest of Backflow Prevention
Assemblies
SD-07 Certificates
1.3Materials and Equipment
SD-10 Operation and Maintenance
Data
3.8.1 GPlumbing System
23 05 48.19 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 74 PAGES
23 05 48.19 3.1Coupling and Bracing
3.3Flexible Couplings or Joints
2.2Equipment Restraint
1.2.4 GContractor Designed Bracing
SD-03 Product Data
3.1 GCoupling and Bracing
3.3 GFlexible Couplings Or Joints
2.2 GEquipment Restraint
1.2.4 GContractor Designed Bracing
2.6Snubbers
3.9Anchor Bolts
2.2.2Vibration Isolators
SD-05 Design Data
1.2.4Design Calculations
SD-06 Test Reports
3.9 GAnchor Bolts
23 05 93 SD-01 Preconstruction Submittals
1.3.3 GRecords of Existing Conditions
1.5.1 GIndependent TAB Agency and
Personnel Qualifications
1.5.3.1 GTAB Design Review Report
SD-02 Shop Drawings
1.3.3 GTAB Schematic Drawings and
Report Forms
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 44 OF 74 PAGES
23 05 93 1.3 GEquipment and Performance
Data
1.5.1.3 GTAB Related HVAC Submittals
SD-06 Test Reports
3.3.5 GCompleted Pre-Final DALT
Report
3.3.8 GCertified Final DALT Report
1.5.3.2 GPrerequisite HVAC Work
Checkout List
1.5.3.2 GPrerequisite HVAC Work
Checkout List
1.5.3.2 GPrerequisite HVAC Work
Checkout List
3.4.5.1 GProportional Balancing
3.7 GProportional Balancing
3.4.5.2 GSeason 1
3.7 GSeason 1
3.4.5.2 GSeason 2
3.7 GSeason 2
SD-07 Certificates
1.5.1 GIndependent TAB Agency and
Personnel Qualifications
1.5.3.1 GDALT and TAB Submittal and
Work Schedule
1.5.3.2 GTAB Pre-Field Engineering
Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .