This document is an Amendment to a Solicitation for Repair of Bachelor Enlisted Quarters (BEQ) AS4212 at MCB Camp Lejeune, North Carolina, issued by NAVFAC Mid-Atlantic. Amendment 0021 revises the pricing sheet and maintains the proposal submission deadline of 1400 on 23 October 2025. The solicitation includes nine Exhibit Line Item Numbers (ELINs) covering various construction and renovation tasks, such as general BEQ repairs, demolition of specific structures, lightning protection installation, parking lot work, partnering, soil replacement, and provisions for unforeseen asbestos and lead removal. Bidders must submit prices for all line items, with each ELIN including specific work scopes, and the total evaluation will be based on summing the prices for ELINs 0001 through 0009. The project number is 23-0035 and the solicitation number is N40085-25-R-2620.

View the file

Other files

File Type Posted
Amend 0020.pdf PDF
Amend 0019.pdf PDF
Amend 0018.pdf PDF
Amend 0017.pdf PDF
Amend 0016.pdf PDF
Amend 0015.pdf PDF
Amend 0013.pdf PDF
Amend 0014.pdf PDF
60040177.pdf PDF
60040178.pdf PDF
60040167.pdf PDF
Updated SUBMITTAL REGISTER.pdf PDF
60040172.pdf PDF
60040137.pdf PDF
Updated List of Drawings.pdf PDF
60040262.pdf PDF
60040179.pdf PDF
60040268.pdf PDF
Updated PROJECT TABLE OF CONTENTS.pdf PDF
60040164.pdf PDF
11 81 00.pdf PDF
60040186.pdf PDF
60040187.pdf PDF
60040189.pdf PDF
60040299.pdf PDF
07 60 00.pdf PDF
07 61 15.00 20.pdf PDF
60040174A.pdf PDF
60040250.pdf PDF
60040188.pdf PDF
05 51 33.pdf PDF
Amend 12 and spec combined.pdf PDF
Amend 0012.pdf PDF
Amend 0011.pdf PDF
Amend 0010.pdf PDF
Amend 0009.pdf PDF
60040202_PPI.pdf PDF
60040196_PPI.pdf PDF
60040201_PPI.pdf PDF
PROJECT.pdf PDF
60040198_PPI.pdf PDF
60040197_PPI.pdf PDF
SECTION 33 61 14.pdf PDF
60040199_PPI.pdf PDF
60040210_PPI.pdf PDF
Amend and cont sheet combined.pdf PDF
60040195_PPI.pdf PDF
60040290_PPI.pdf PDF
REGISTER.pdf PDF
60040194_PPI.pdf PDF
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

1 4

AMENDMENT NO. 0021 10/20/25 23-0035

N40085

NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1107A Birch Street Camp Lejeune, NC 28547-2521

See Item 6

✘ N40085-25-R-2620

2/21/25

23-0035, Repair BEQ AS4212 Amendment 0021, Revise Pricing Sheet

Use the attached revised pricing sheet with your proposal.

The time and date for receipt of proposals remains 1400 on 23 October 2025.

This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.

Repair BEQ AS4212 Solicitation No. N40085-25-R-2620 MCB Camp Lejeune, North Carolina Project No. 23-0035

PRICING SHEET

Under the line items furnished, the offers shall state prices for each Exhibit Line Item Number (ELIN) given hereinafter:

ELIN 0001

Price includes completing all work associated with BEQ AS4212 in accordance with the drawings provided and specifications, but excluding work described in ELIN 0002-0009. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0002

Price includes completing all work associated with the demolition of HP455 and SHP456 in accordance with the provided drawings and specifications, but excluding work described in ELIN 0001, and 0003-0009. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0003

Price includes completing all work associated with installation of lightning protection in accordance with the provided drawings and specifications, but excluding work described in ELIN 0001-0002, and 0004-0009. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0004

Price includes completing all work associated with milling, overlaying, and striping of the parking lot at BEQ AS4212 but excluding work described in ELIN 0001-0003, and 0005-0009.

The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0005

Price includes completing all work associated with formal partnering for BEQ AS4212 but excluding work described in ELIN 0001-0004, and 0006-0009. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0006

Price includes completing all work associated with removal, disposal, and replacement of unsuitable soil but excluding work described in ELIN 0001-0005, 0007-0009. The price for this line item should include all applicable costs, overhead and profit for this work.

Quantity Unit Price Total

200 CY $_________ $___________________________________

ELIN 0007

Price includes completing all work associated with unforeseen asbestos containing material (ACM) (piping, pipe insulation, HVAC insulation, etc.). This includes identification, removal, wetting/handling, proper packaging, and disposal of ACM in accordance with all state/federal asbestos handling laws. This excludes work described in ELIN 0001-0006, 0008-0009. The price for this line item should include all applicable costs, overhead and profit for this work.

Quantity Unit Price Total

200 LF $_________ $___________________________________

ELIN 0008

Price includes completing all work associated with unforeseen asbestos containing material (ACM) (Adhesives, vinyl floor tiles, wall and ceiling insulation, roofing, etc.). This includes identification, removal, wetting/handling, proper packaging, and disposal of ACM in accordance with all state/federal asbestos handling laws. This excludes work described in ELIN 0001-0007 and 0009. The price for this line item should include all applicable costs, overhead and profit for this work.

Quantity Unit Price Total

1,000 SF $_________ $___________________________________

ELIN 0009

Price includes completing all work associated with unforeseen lead removal. This includes identification, scraping/removal, encapsulation, handling, proper packaging, and disposal of lead based material per local requirements of North Carolina. This excludes work described in ELIN 0001-0008. The price for this line item should include all applicable costs, overhead and profit for this work.

Quantity Unit Price Total

200 CY $_________ $___________________________________

TOTAL ELIN 0001 - 0009: $___________________________________

Notes A. Offers must be submitted on all line items. Failure to propose on all line items may result in the offer being rejected as non-responsive.

B. ELINs shall include all markups (overhead, labor burden, and profit).

C. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206(b) Evaluation not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for ELINs 0001 through 0009. In accordance with FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the Option(s).

File details come from the government source that posted it. Updated .