60040167.pdf
PDF 2 MB Posted
- Attached to
- BEQ Repair AS4212
- Solicitation number
- N4008525R2620
About this file
This document is a demolition and exterior elevation drawing for a Repair BEQ (Bachelor Enlisted Quarters) project at Marine Corps Base Camp Lejeune, North Carolina. The architectural drawing (Sheet AD201) details comprehensive demolition requirements for an existing multi-story building, including specific removal and preparation tasks such as demolishing window assemblies, hollow metal doors and frames, existing roof systems, gutters, downspouts, and stair handrail/guardrail systems. The drawing covers four exterior elevations (East, West, North, and South) and provides a detailed demolition legend with nine specific keynotes outlining the scope of deconstruction work. The project is associated with Naval Facilities Engineering Systems Command, with a construction contract number of N40085-23-B-0035 and a project number of 2316, dated 11 June 2024.
View the file
Other files
Show 40 more
Latest 50 of 61 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEMOLISH EXISTING SLEEPING UNIT WINDOW ASSEMBLY. PREPARE
OPENING FOR WINDOW.
NOT USED
DEMOLISH EXISTING HOLLOW METAL DOOR AND FRAME. PREPARE
OPENING FOR NEW DOOR AND FRAME.
DEMOLISH PORTION OF WALL BELOW EXISTING WINDOW FOR
INSTALLATION OF NEW 16"H x 42"W HVAC UNIT. SEE DETAILS AND
MECHANICAL PLANS FOR ADDITIONAL INFORMATION. (NOTE: NOT
SHOWN FOR CLARITY BEHIND 2ND AND 3RD FLOOR GUARDRAILS.)
REMOVE EXISTING PREFINISHED METAL GUTTERS AND DOWNSPOUTS
IN THEIR ENTIRETY. PREPARE FOR INSTALLATION OF NEW GUTTERS
AND DOWNSPOUTS.
REMOVE EXISTING STAIR HANDRAIL/GUARDRAIL SYSTEM SHOWN
DASHED. PREPARE STAIR FOR INSTALLATION OF NEW
HANDRAIL/GUARDRAIL SYSTEM.
CLEAN AND INSPECT GUARDRAIL SYSTEM IN ITS ENTIRETY. REMOVE
ALL DAMAGED GUARDRAIL SECTIONS AND/OR PANELS AND PREPARE
GUARDRAIL FOR INSTALLATION OF NEW GUARDRAILS
SECTIONS/PANELS TO BE REPAIRED OR REPLACED.
DEMOLISH EXISTING STANDING SEAM ROOF SYSTEM DOWN TO ROOF
DECK, INCLUDING UNDERLAYMENT ENCOUNTERED. PREPARE ROOF
FOR REPLACEMENT OF DAMAGED SHEATHING AND INSTALLATION OF
NEW STANDING SEAM METAL ROOF
REMOVE EXISTING PARAPET COPING AND PREPARE TOP OF WALL
FOR INSTALLATION OF NEW SHEET METAL COPING
EXISTING WALLS, DOORS, FRAMES,
MILLWORK AND EQUIPMENT TO REMAIN
WALLS, DOORS, FRAMES, MILLWORK AND
EQUIPMENT TO BE REMOVED
1ST FLOOR
0"
2ND FLOOR
10'-8"
3RD FLOOR
21'-4"
ATTIC DECK
31'-10"
TYP
1ST FLOOR
0"
2ND FLOOR
10'-8"
3RD FLOOR
21'-4"
ATTIC DECK
31'-10"
TYP.
TYP.
TYP.
888 8
TYP
1ST FLOOR
0"
2ND FLOOR
10'-8"
3RD FLOOR
21'-4"
ATTIC DECK
31'-10"
TYP.
TYP.
TYP.
A4
A-310
888 8
TYP
1ST FLOOR
0"
2ND FLOOR
10'-8"
3RD FLOOR
21'-4"
ATTIC DECK
31'-10"
TYP
F ile
P ri n t
SYM. DESCRIPTION DATE APP.
REVISIONS
T
T C
E
TI
HCRAD
R E
G I S
ERE
A N
I
L
ORA
N O
R
T H
C
N
D A
R
N
DE
.J UE
ER
III
C
N
NRB E
E W
M
A
P.
STCETIHCRA
FB
BERN N.C
.NEW
CERT. NO.
UTCETIHCRA
DERET
SI
G E R
N
OI
TA
RO
PR
OC
LAR
CAROLINANORTH
50679
DR.
DES.
CHK.
SUBMITTED BY:
DESIGN DIR.
APPROVED: PWO OR OICC
SATISFACTORY TO:
DATE
DATE
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND
CAMP LEJEUNE, NORTH CAROLINA
MARINE CORPS BASE
SIZE CODE IDENT. NO. NAVFAC DRAWING NO.
E1 80091
CONSTR. CONTR. NO.
AS NOTEDSCALE SHEET
M B
F A
N O
SPEC.
S p ro je c ts
\2
\2
C
L R e p a ir B
E Q
A S
\2
D e s ig n \2
D w g s \2
A
R C
H
.r v t
/2
/2
:2
:0
A
M
AD201
JAS
DJE,III
JENNI REED
JAS
REPAIR BEQ AS4212
EXTERIOR ELEVATIONS - EXISTING/DEMOLITON
60040167 N40085-23-B-0035
11 JUNE 2024
DEMOLITION KEYNOTES
DEMOLITION LEGEND - ELEVATIONS
SCALE: 3/32" = 1'-0"
D2
EAST EXTERIOR ELEVATION - EXISTING / DEMOLITION
SCALE: 3/32" = 1'-0"
C3
NORTH EXTERIOR ELEVATION - EXISTING / DEMOLITION
SCALE: 3/32" = 1'-0"
A2
SOUTH EXTERIOR ELEVATION - EXISTING / DEMOLITION
SCALE: 3/32" = 1'-0"
D4
WEST EXTERIOR ELEVATION - EXISTING / DEMOLITION
GRAPHIC SCALE: 3/32"=1'-0"
8' 0 8' 16' 24'
4 ROOFING AMENDMENT 07/25/2025
File details come from the government source that posted it. Updated .