This document is an Amendment of Solicitation/Modification of Contract for the Repair BEQ AS4212 project, issued by NAVFAC Mid-Atlantic. Amendment No. 0017, with the contract ID N40085-25-R-2620, is effective 08/21/25 and pertains to Project No. 23-0035. The amendment maintains the original receipt of proposals deadline of 1400 on 26 August 2025.
The amendment includes a detailed question and answer regarding the parking lot work scope. Specifically, it clarifies that ELIN 0004 will be applied to the remaining existing asphalt parking lot section and driveway plan left of the base bid work identified on CD101 and CS101 plan sheets. The document emphasizes that failure to acknowledge the amendment may constitute grounds for proposal rejection, and all other terms and conditions remain unchanged.
View the file
Other files
Show 40 more
Latest 50 of 61 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N40085-25-R-2620 Amendment 0017
CONTINUATION SHEET
1. QUESTION: Regarding the Repair BEQ AS4212 project and Amendment 0015, ELIN 0004 that was corrected to address the parking lot identified in the AS4212 plans, this ELIN states that pricing must be provided to Mill, Overlay, and Re-stripe the associated parking lot. However, on plan sheet C-002 and CD101 Work item number 2 states “remove existing asphalt pavement and stone base to extents shown” This note covers the entire parking lot. Then on C-002 and CS101 work item number 5 states “asphalt pavement”, this item also covers the entire parking lot. Is this to be priced as a base bid item and then provide a separate price for ELIN 0004 to mill, overlay and re-stripe the parking lot that is already part of the base bid?
ANSWER: ELIN 0004 will be applied to the remaining existing asphalt parking lot section and driveway plan left of the of the base bid work identified on CD101 and CS101.
2. All other terms and conditions remain unchanged.