The document is a Project Table of Contents for repairs to a Bachelor Enlisted Quarters (BEQ) facility, AS4212, located at MCB Camp Lejeune, NC, with a project number 23-0035 and roof amendment dated 25 July 2025. The comprehensive table of contents spans four pages and is organized into 33 divisions covering a wide range of construction and renovation activities, including general requirements, existing conditions, concrete, masonry, metals, wood, thermal and moisture protection, openings, finishes, specialties, equipment, furnishings, conveying equipment, fire suppression, plumbing, HVAC, integrated automation, electrical, communications, electronic safety and security, earthwork, exterior improvements, and utilities.

Key technical areas include demolition, lead remediation, concrete work, masonry, metal fabrications, roofing, air barriers, doors and windows, interior finishes, fire protection systems, electrical distribution, telecommunications cabling, HVAC systems, site improvements, and utility infrastructure. The document is part of a Naval Facilities Engineering Command solicitation (N4008525R2620) specifically targeting general MACC (Multiple Award Construction Contract) contractors for renovation work at the Marine Corps Base Camp Lejeune facility, with a focus on comprehensive building system repairs and upgrades across multiple technical disciplines.

View the file

Other files

File Type Posted
Amend 0021.pdf PDF
Amend 0020.pdf PDF
Amend 0019.pdf PDF
Amend 0018.pdf PDF
Amend 0017.pdf PDF
Amend 0016.pdf PDF
Amend 0015.pdf PDF
Amend 0013.pdf PDF
Amend 0014.pdf PDF
60040177.pdf PDF
60040178.pdf PDF
60040167.pdf PDF
Updated SUBMITTAL REGISTER.pdf PDF
60040172.pdf PDF
60040137.pdf PDF
Updated List of Drawings.pdf PDF
60040262.pdf PDF
60040179.pdf PDF
60040268.pdf PDF
60040164.pdf PDF
11 81 00.pdf PDF
60040186.pdf PDF
60040187.pdf PDF
60040189.pdf PDF
60040299.pdf PDF
07 60 00.pdf PDF
07 61 15.00 20.pdf PDF
60040174A.pdf PDF
60040250.pdf PDF
60040188.pdf PDF
05 51 33.pdf PDF
Amend 12 and spec combined.pdf PDF
Amend 0012.pdf PDF
Amend 0011.pdf PDF
Amend 0010.pdf PDF
Amend 0009.pdf PDF
60040202_PPI.pdf PDF
60040196_PPI.pdf PDF
60040201_PPI.pdf PDF
PROJECT.pdf PDF
60040198_PPI.pdf PDF
60040197_PPI.pdf PDF
SECTION 33 61 14.pdf PDF
60040199_PPI.pdf PDF
60040210_PPI.pdf PDF
Amend and cont sheet combined.pdf PDF
60040195_PPI.pdf PDF
60040290_PPI.pdf PDF
REGISTER.pdf PDF
60040194_PPI.pdf PDF
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repairs BEQ AS4212 Project No. 23-0035 MCB Camp Lejeune, NC Roof Amendement - 25 July 2025

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 04/22 SUMMARY OF WORK

01 14 00 04/22 WORK RESTRICTIONS (MCBL)

01 20 00 04/22 PRICE AND PAYMENT PROCEDURES (MCBCL)

01 30 00 01/23 ADMINISTRATIVE REQUIREMENTS

01 31 23.13 20 05/17, CHG 7: 11/21 ELECTRONIC CONSTRUCTION AND FACILITY

SUPPORT CONTRACT MANAGEMENT SYSTEM

01 31 50 04/22 TRANSFER AND ACCEPTANCE OF MILITARY

REAL PROPERTY

01 32 16.00 20 08/18, CHG 1: 08/20 SMALL PROJECT CONSTRUCTION PROGRESS

SCHEDULES

01 33 00 04/22 SUBMITTAL PROCEDURES

01 33 29 02/21 SUSTAINABILITY REQUIREMENTS AND

REPORTING

01 35 26 11/20, CHG 3: 02/22 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 08/23 QUALITY CONTROL

01 50 00 12/21 TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

01 57 19 05/12 TEMPORARY ENVIRONMENTAL CONTROLS

01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

01 78 00 04/22 CLOSEOUT SUBMITTALS

01 78 23 04/22 OPERATION AND MAINTENANCE DATA

01 78 24.00 20 03/23 FACILITY ELECTRONIC OPERATION AND

MAINTENANCE SUPPORT INFORMATION (eOMSI)

01 78 30.00 22 5/22 GIS DATA DELIVERABLES

01 91 00.15 20 02/21, CHG 1: 05/21 TOTAL BUILDING COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 08/22 DEMOLITION

02 41 01 08/22 BUILDING DECONSTRUCTION

02 83 00 11/18 LEAD REMEDIATION

DIVISION 03 - CONCRETE

03 30 00 02/19, CHG 4: 08/22 CAST-IN-PLACE CONCRETE

03 30 53 05/14 MISCELLANEOUS CAST-IN-PLACE CONCRETE

(SIDEWALKS)

DIVISION 04 - MASONRY

04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY

DIVISION 05 - METALS

05 30 00 05/15, CHG 2: 08/18 STEEL DECKS

05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING

05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS

05 51 33 02/16, CHG 2: 02/18 METAL LADDERS

05 52 00 02/18, CHG 1: 02/20 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY

PROJECT TABLE OF CONTENTS Page 1

06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL

CABINETS

06 61 16 08/20 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 19 00 05/11, CHG 1: 08/17 WATER REPELLENTS

07 27 19.01 05/17, CHG 2: 08/20 SELF-ADHERING AIR BARRIERS

07 27 26 05/17, CHG 2: 08/20 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 27 36 05/17, CHG 3: 02/23 SPRAY FOAM AIR BARRIERS

07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL

07 61 15.00 20 08 March 2021 CL ALUMINUM STANDING SEAM ROOFING

07 84 00.00 22 09/23 FIRESTOPPING

07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 08/20 STEEL DOORS AND FRAMES

08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS

08 33 23 08/20, CHG 1: 02/22 OVERHEAD COILING DOORS

08 51 13 05/19 ALUMINUM WINDOWS

08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE

08 81 00 05/19 GLAZING

08 91 00 08/20 METAL LOUVERS

DIVISION 09 - FINISHES

09 03 00 03/22 LOW PRESSUE BUILDING CLEANING

09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD

09 30 10 08/20 CERAMIC TILING

09 51 00 08/20 ACOUSTICAL CEILINGS

09 65 00 08/10, CHG 3: 08/18, RESILIENT FLOORING

09 67 23.13 27SEP2018 STANDARD RESINOUS FLOORING

09 72 00 08/17, CHG 1: 08/18 WALLCOVERINGS

09 90 00 02/21 PAINTS AND COATINGS

09 96 60 LOW-PROFILE TEXTURED ACRYLIC WALL

COATING

09 97 11 05/24 EPOXY COATINGS

DIVISION 10 - SPECIALTIES

10 14 00.20 08/20 INTERIOR SIGNAGE

10 26 00 08/20 WALL AND DOOR PROTECTION

10 28 13 08/20 TOILET ACCESSORIES

10 44 16 11/19 FIRE EXTINGUISHERS

DIVISION 11 - EQUIPMENT

11 81 00 05/25 FALL PROTECTION

DIVISION 12 - FURNISHINGS

12 00 01.00 20 02/23 FURNITURE, FIXTURES AND EQUIPMENT

(FF&E) PACKAGE

12 24 13 08/20 ROLLER WINDOW SHADES

DIVISION 14 - CONVEYING EQUIPMENT

PROJECT TABLE OF CONTENTS Page 2

14 24 13 05/16 HYDRAULIC FREIGHT ELEVATORS

DIVISION 21 - FIRE SUPPRESSION

21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE

PROTECTION

DIVISION 22 - PLUMBING

22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS

23 05 48.19 05/18 SEISMIC BRACING FOR HVAC

23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR

HVAC

23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL

SYSTEMS

23 09 23.13 09/22 BACnet DIRECT DIGITAL CONTROL SYSTEMS

FOR HVAC

23 11 20 05/20 FACILITY GAS PIPING

23 21 13.00 20 04/06, CHG 2: 11/19 LOW TEMPERATURE WATER (LTW) HEATING

SYSTEM

23 23 00 08/21 REFRIGERANT PIPING

23 25 00 05/21 CHEMICAL TREATMENT OF WATER FOR

MECHANICAL SYSTEMS

23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION

23 52 43.00 20 05/15 LOW PRESSURE WATER HEATING BOILERS

(UNDER 800,000 BTU/HR OUTPUT)

23 64 10 11/16 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 08/09, CHG 5: 11/19 CHILLED WATER PIPING SYSTEMS

23 81 00 05/18 DECENTRALIZED UNITARY HVAC EQUIPMENT

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11.00 09/22 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS - ISOLATED SYSTEMS

DIVISION 26 - ELECTRICAL

26 08 00 11/21 APPARATUS INSPECTION AND TESTING

26 12 19.10 05/19, CHG 1: 11/19 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED

TRANSFORMERS

26 20 00 08/19, CHG 3: 11/21 INTERIOR DISTRIBUTION SYSTEM

26 24 13 08/21 SWITCHBOARDS

26 27 14.00 20 02/21, CHG 1: 05/21 ELECTRICITY METERING

26 28 01.00 10 08/21 COORDINATED POWER SYSTEM PROTECTION

26 41 00 11/13 LIGHTNING PROTECTION SYSTEM

26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING

26 56 00 08/21 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 01/24 BUILDING TELECOMMUNICATIONS CABLING

SYSTEM (MCBCL)

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

PROJECT TABLE OF CONTENTS Page 3

28 31 76 08/20 INTERIOR FIRE ALARM AND MASS

NOTIFICATION SYSTEM, ADDRESSABLE

DIVISION 31 - EARTHWORK

31 00 00 08/23 EARTHWORK

31 11 00 11/18 CLEARING AND GRUBBING

31 31 16.13 08/22 CHEMICAL TERMITE CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 11 23 05/22 AGGREGATE BASE COURSE

32 11 26 05/20 HOT-MIX BITUMINOUS BASE COURSE FOR

ROADS AND STREETS

32 31 13.53 11/21 HIGH-SECURITY FENCES (ORNAMENTAL) AND

GATES

32 92 23 04/06, CHG 1: 08/21 SODDING

DIVISION 33 - UTILITIES

33 11 00 02/18, CHG 2: 11/23 WATER UTILITY DISTRIBUTION PIPING

33 30 00 05/18 SANITARY SEWERAGE

33 40 00 11/21 STORMWATER UTILITIES

33 61 14 02/10 EXTERIOR BURIED PREINSULATED WATER

PIPING

33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 08/22 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)