About this file
This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a repair project at MCB Camp Lejeune, North Carolina. Amendment 0012 updates the specification and pricing sheet for Solicitation No. N40085-25-R-2620 (Project No. 23-0035) for repairing BEQ AS4212. The amendment maintains the original proposal receipt deadline of 1400 hours on 14 August 2025 and includes a revised pricing sheet with eight Exhibit Line Item Numbers (ELINs) covering various construction and remediation tasks.
The ELINs detail specific scopes of work including repair of BEQ AS4212, demolition of HP455 and SHP456, lightning protection installation, parking lot milling and striping, soil replacement, and provisions for unforeseen asbestos-containing material and lead removal. The pricing sheet requires contractors to provide unit prices for each line item, with quantities ranging from 200 cubic yards to 1,000 square feet. Offers must be submitted on all line items, and the government will evaluate proposals by adding the prices for ELINs 0001 through 0008, with the understanding that evaluation does not obligate the government to exercise all options.
View the file
Other files
Show 40 more
Latest 50 of 61 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N40085-25-R-2620 Amendment 0011
CONTINUATION SHEET
1. Revised specification provided for the response to question one on amendment 0011.
2. Use updated pricing sheet (attached) with your proposal.
3. All other terms and conditions remain unchanged.
Repair BEQ AS4212 Solicitation No. N40085-25-R-2620 MCB Camp Lejeune, North Carolina Project No. 23-0035
PRICING SHEET
Under the line items furnished, the offers shall state prices for each Exhibit Line Item Number (ELIN) given hereinafter:
ELIN 0001
Price includes completing all work associated with BEQ AS4212 in accordance with the drawings provided and specifications, but excluding work described in ELIN 0002-0008. The price for this line item should include all applicable costs, overhead and profit for this work.
ELIN 0002
Price includes completing all work associated with the demolition of HP455 and SHP456 in accordance with the provided drawings and specifications, but excluding work described in ELIN 0001, and 0003-0008. The price for this line item should include all applicable costs, overhead and profit for this work.
ELIN 0003
Price includes completing all work associated with installation of lightning protection in accordance with the provided drawings and specifications, but excluding work described in ELIN 0001-0002, and 0004-0008. The price for this line item should include all applicable costs, overhead and profit for this work.
ELIN 0004
Price includes completing all work associated with milling, overlaying, and striping of the parking lot at BEQ BB250 but excluding work described in ELIN 0001-0003, and 0005-0008.
The price for this line item should include all applicable costs, overhead and profit for this work.
ELIN 0005
Price includes completing all work associated with removal, disposal, and replacement of unsuitable soil but excluding work described in ELIN 0001-0004, 0006-0008. The price for this line item should include all applicable costs, overhead and profit for this work.
Quantity Unit Price Total
200 CY $_________ $___________________________________
ELIN 0006
Price includes completing all work associated with unforeseen asbestos containing material (ACM) (piping, pipe insulation, HVAC insulation, etc.). This includes identification, removal, wetting/handling, proper packaging, and disposal of ACM in accordance with all state/federal asbestos handling laws. This excludes work described in ELIN 0001-0005, 0007-0008. The price for this line item should include all applicable costs, overhead and profit for this work.
Quantity Unit Price Total
200 LF $_________ $___________________________________
ELIN 0007
Price includes completing all work associated with unforeseen asbestos containing material (ACM) (Adhesives, vinyl floor tiles, wall and ceiling insulation, roofing, etc.). This includes identification, removal, wetting/handling, proper packaging, and disposal of ACM in accordance with all state/federal asbestos handling laws. This excludes work described in ELIN 0001-0006 and 0008. The price for this line item should include all applicable costs, overhead and profit for this work.
Quantity Unit Price Total
1,000 SF $_________ $___________________________________
ELIN 0008
Price includes completing all work associated with unforeseen lead removal. This includes identification, scraping/removal, encapsulation, handling, proper packaging, and disposal of lead based material per local requirements of North Carolina. This excludes work described in ELIN 0001-0007. The price for this line item should include all applicable costs, overhead and profit for this work.
Quantity Unit Price Total
200 CY $_________ $___________________________________
TOTAL ELIN 0001 - 0008: $___________________________________
Notes A. Offers must be submitted on all line items. Failure to propose on all line items may result in the offer being rejected as non-responsive.
B. ELINs shall include all markups (overhead, labor burden, and profit).
C. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206(b) Evaluation not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for ELINs 0001 through 0008. In accordance with FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the Option(s).