This architectural demolition plan drawing depicts the existing third floor and roof demolition for a Barracks Equipment (BEQ) repair project at Marine Corps Base Camp Lejeune in North Carolina. The document, sheet AD102, shows detailed plans for comprehensive demolition work including:

Third Floor Demolition: Complete removal of existing interior elements such as walls, doors, frames, millwork, and equipment across multiple room spaces (numbered 301-343). Specific demolition notes include removing fire extinguishers, wall brackets, interior finishes like ceramic tile and carpet, and preparing surfaces for new installations. Roof Demolition: Extensive removal of the existing standing seam roof system down to the roof deck, including underlayment and damaged sheathing (approximately 640 square feet). Additional roof demolition tasks include removing gutters, downspouts, parapet coping, and preparing for new roof access hatch installation. The project is part of Naval Facilities Engineering Systems Command contract N40085-23-B-0035, with a documented amendment date of 07/25/2025.

View the file

Other files

File Type Posted
Amend 0021.pdf PDF
Amend 0020.pdf PDF
Amend 0019.pdf PDF
Amend 0018.pdf PDF
Amend 0017.pdf PDF
Amend 0016.pdf PDF
Amend 0015.pdf PDF
Amend 0013.pdf PDF
Amend 0014.pdf PDF
60040177.pdf PDF
60040178.pdf PDF
60040167.pdf PDF
Updated SUBMITTAL REGISTER.pdf PDF
60040172.pdf PDF
60040137.pdf PDF
Updated List of Drawings.pdf PDF
60040262.pdf PDF
60040179.pdf PDF
60040268.pdf PDF
Updated PROJECT TABLE OF CONTENTS.pdf PDF
11 81 00.pdf PDF
60040186.pdf PDF
60040187.pdf PDF
60040189.pdf PDF
60040299.pdf PDF
07 60 00.pdf PDF
07 61 15.00 20.pdf PDF
60040174A.pdf PDF
60040250.pdf PDF
60040188.pdf PDF
05 51 33.pdf PDF
Amend 12 and spec combined.pdf PDF
Amend 0012.pdf PDF
Amend 0011.pdf PDF
Amend 0010.pdf PDF
Amend 0009.pdf PDF
60040202_PPI.pdf PDF
60040196_PPI.pdf PDF
60040201_PPI.pdf PDF
PROJECT.pdf PDF
60040198_PPI.pdf PDF
60040197_PPI.pdf PDF
SECTION 33 61 14.pdf PDF
60040199_PPI.pdf PDF
60040210_PPI.pdf PDF
Amend and cont sheet combined.pdf PDF
60040195_PPI.pdf PDF
60040290_PPI.pdf PDF
REGISTER.pdf PDF
60040194_PPI.pdf PDF
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AD402

B2

AD201

D2

AD201

C3

AD201

A2

AD201

D4

11'-4" 5'-4" 55'-2" 16'-0" 57'-8" 42'-0" 57'-8" 16'-0" 55'-2" 5'-4" 11'-4"

5' -4

'-6

'-0

'-6

5' -4

JANITOR

ELEV

LAUNDRY

301 303 305 307

308306304302

312 314

313 315

316 318

317 319

320 322

321 327

328 330

329 331

332 334

333 337

338 340

339 341

342 344

MECH

MECH

STAIR #1

STAIR #3STAIR #2

4 4

5' -4

'-6

'-0

'-6

5' -4

333'-0"

58'-6" 9'-4" 87'-2" 8'-4" 10'-6" 58'-0" 9'-4" 58'-6"

TYP

AD402

B4

AD402

B5

1 1 77

1. REFERENCE SHEET A-001 FOR SYMBOL LEGEND

2. SEE ENLARGED DEMOLITION PLANS AS NOTED TO SPECIFIC DEMOLITION

SCOPE OF WORK AT INDICATED AREAS

3. ASBESTOS MATERIAL AND LEAD-BASED PAINT TESTING HAS BEEN

PERFORMED ON EXISTING AREAS OF WORK. SEE THE SPECIFICATION

FOR ASBESTOS MATERIAL AND LEAD-BASED PAINT REPORT RESULTS.

CONTRACTOR TO BE RESPONSIBLE FOR THE APPROPRIATE STANDARD

OF CARE REGARDING THE HANDLING OF ANY MATERIALS FOUND TO BE

HAZARDOUS AND THE PROTECTION OF PERSONS FROM EXPOSURE.

4. WHERE DUCTWORK, PIPING, CONDUITS OR WIRING IS REMOVED, PATCH

ALL HOLES IN WALLS, FLOORS, AND CEILINGS WITH LIKE MATERIAL. SEE

LIFE SAFETY CODE COMPLIANCE SUMMARY AND LIFE SAFETY PLAN FOR

LOCATIONS AND HOURLY RATINGS OF FIRE RATED WALLS.

5. CLEAN AND PREPARE ALL EXISTING PREVIOUSLY PAINTED INTERIOR AND

EXTERIOR SURFACES FOR NEW PAINT FINISHES. SEE PAINTS AND

COATINGS SPECIFICATION FOR ADDITIONAL INFORMATION.

6. EXISTING INTERIOR WALLS ARE PAINTED CONCRETE MASONRY UNLESS

NOTED OTHERWISE.

7. REMOVE EXISTING FIRE EXTINGUISHERS AND EXISTING WALL BRACKET ±

6 PER FLOOR, AND RETURN TO GOVERNMENT. PATCH HOLES IN

EXISTING CONCRETE MASONRY AND BRICK WALLS WHERE BRACKETS

HAVE BEEN REMOVED.

8. WHERE EXISTING LOAD BEARING ELEMENTS ARE TO BE REMOVED

CONTRACTOR MUST PROVIDE TEMPORARY SHORING AND BRACING OF

EXISTING STRUCTURE UNTIL NEW LOAD BEARING ELEMENT IS IN PLACE

9. SEE INTERIOR DESIGN PLANS FOR FF&E REMOVAL / TREATMENT &

PROCESSING PROTOCOL.

10. REFERENCE THE LIFE SAFETY DRAWINGS FOR LOCATIONS OF RATED

WALLS AND SMOKE PARTITIONS

11. SEE ENLARGED DEMOLITION PLANS FOR EXTENT OF INTERIOR

DEMOLITION/REMOVAL

12. ALL EXISTING INTERIOR AND EXTERIOR DOORS AND FRAMES TO BE

DEMOLISHED. CLEAN AND PREPARE OPENING FOR INSTALLATION OF

NEW HOLLOW METAL DOOR AND FRAME

13. ALL INTERIOR CERAMIC TILE, RESILIENT TILE, AND CARPET FLOOR

FINISHES TO BE DEMOLISHED. CLEAN AND PREP CONCRETE SURFACE

FOR INSTALLATION OF NEW FINISHES.

EXISTING WALLS, DOORS, FRAMES, MILLWORK AND

EQUIPMENT TO REMAIN

WALLS, DOORS, FRAMES, MILLWORK AND EQUIPMENT

TO BE REMOVED

LIMITS OF FLOOR SLAB DEMOLITION

AD201

D2

AD201

C3

AD201

A2

AD201

D4

5:125:125:12 5:12

:1

:1

5:12 5:12

5:12 5:12

5:12 5:12

5:125:12

:1

:1

TYP

B

B6

A-503

TYP

TYP

TYP

:1

:1

:1

:1

5:125:12

REMOVE EXISTING DOOR AND FRAME, INCLUDING TRANSOM OR

LOUVER ABOVE, AS APPLICABLE, IN PREPARATION FOR

INSTALLATION OF NEW DOOR AND FRAME. SEE CONSTRUCTION

PLAN AND DOOR SCHEDULE.

REMOVE EXISTING STAIR HANDRAIL/GUARDRAIL SYSTEMS SHOWN

DASHED. CLEAN AND PREPARE EXISTING CONCRETE FOR

INSTALLATION OF NEW HANDRAIL SYSTEM. SEE STRUCTURAL FOR

ADDITIONAL INFORMATION.

REMOVE EXISTING ELEVATOR IN ITS ENTIRETY INCLUDING BUT NOT

LIMITED TO CAR, CONTROLS, DRIVE UNIT, HOISTWAY, COUNTER

WEIGHT, GUARDRAILS, DOOR, AND ALL CORRESPONDING

EQUIPMENT AND HARDWARE. PREPARE EXISTING MACHINE ROOM

AND ELEVATOR SHAFT FOR INSTALLATION OF NEW ELEVATOR.

CLEAN AND INSPECT GUARDRAIL SYSTEM IN ITS ENTIRETY.

REMOVE ALL DAMAGED GUARDRAIL SECTIONS AND/OR PANELS

AND PREPARE GUARDRAIL FOR INSTALLATION OF NEW

GUARDRAILS SECTIONS/PANELS TO BE REPAIRED OR REPLACED.

REMOVE EXISTING BIKE RACK AND PREPARE FOR INSTALLATION

OF NEW BIKE RACK

REMOVE EXISTING GUTTERS AND DOWNSPOUTS FROM GUTTERS

ABOVE TO UNDERGROUND DISCHARGE. PREPARE EAVES FOR

INSTALLATION OF NEW GUTTERS PREPARE UNDERGROUND

DISCHARGE FOR INSTALLATION OF NEW DOWNSPOUTS.

REMOVE EXISTING THROUGH-WALL LOUVER AND PREPARE

OPENING FOR INSTALLATION OF NEW LOUVER.

DEMOLISH EXISTING STANDING SEAM ROOF SYSTEM DOWN TO

ROOF DECK, INCLUDING UNDERLAYMENT AND DAMAGED

SHEATHING. ASSUME 640 SQUARE FEET OF SHEATHING AND 150

LINEAL FOOT OF 2x6 DIMENSIONAL LUMBER TO BE REPLACED

REMOVE EXISTING PARAPET COPING AND PREPARE TOP OF WALL

FOR INSTALLATION OF NEW SHEET METAL COPING

REMOVE EXISTING ROOF SHEATHING AND PREPARE OPENING FOR

INSTALLATION OF NEW 30" x 54" ROOF ACCESS HATCH

F ile

P ri n t

SYM. DESCRIPTION DATE APP.

REVISIONS

T

T C

E

TI

HCRAD

R E

G I S

ERE

A N

I

L

ORA

N O

R

T H

C

N

D A

R

N

DE

.J UE

ER

III

C

N

NRB E

E W

M

A

P.

STCETIHCRA

FB

BERN N.C

.NEW

CERT. NO.

UTCETIHCRA

DERET

SI

G E R

N

OI

TA

RO

PR

OC

LAR

CAROLINANORTH

50679

DR.

DES.

CHK.

SUBMITTED BY:

DESIGN DIR.

APPROVED: PWO OR OICC

SATISFACTORY TO:

DATE

DATE

DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

CAMP LEJEUNE, NORTH CAROLINA

MARINE CORPS BASE

SIZE CODE IDENT. NO. NAVFAC DRAWING NO.

E1 80091

CONSTR. CONTR. NO.

AS NOTEDSCALE SHEET

M B

F A

N O

SPEC.

S p ro je c ts

\2

\2

C

L R e p a ir B

E Q

A S

\2

D e s ig n \2

D w g s \2

A

R C

H

.r v t

/2

/2

:2

:0

A

M

AD102

JAS

DJE,III

JENNI REED

JAS

REPAIR BEQ AS4212

THIRD FLOOR AND ROOF PLANS - EXISTING/DEMOLITON

60040164 N40085-23-B-0035

11 JUNE 2024

SCALE: 3/32" = 1'-0"

D3

THIRD FLOOR - EXISTING / DEMOLITION

GRAPHIC SCALE: 3/32"=1'-0"

8' 0 8' 16' 24'

N

GENERAL DEMOLITION NOTES

DEMOLITION LEGEND - PLANS

SCALE: 3/32" = 1'-0"

B3

ROOF- EXISTING / DEMOLITION

N

DEMOLITION KEYNOTES

4 ROOFING AMENDMENT 07/25/2025