This document is an Amendment of Solicitation/Modification of Contract for the Repair BEQ AS4212 project at MCB Camp Lejeune, North Carolina. Amendment No. 0011 provides updates to the solicitation N40085-25-R-2620, specifically addressing piping specifications and including a pricing sheet for contractors to complete. The amendment clarifies that Type K copper piping should be used for underground carrier piping per Camp Lejeune preference.

The pricing sheet outlines three Exhibit Line-Item Numbers (ELINs): ELIN 0001 covers work associated with BEQ AS4212, ELIN 0002 involves demolition of HP455 and SHP456, and ELIN 0003 includes the addition of Furniture, Fixtures, and Equipment (FF&E) and interior design efforts. Contractors must submit prices for all line items, with the total price to be evaluated for award purposes. The amendment maintains the original solicitation date of 14 August 2025 for receipt of proposals and notes that failure to acknowledge the amendment may result in proposal rejection.

View the file

Other files

File Type Posted
Amend 0021.pdf PDF
Amend 0020.pdf PDF
Amend 0019.pdf PDF
Amend 0018.pdf PDF
Amend 0017.pdf PDF
Amend 0016.pdf PDF
Amend 0015.pdf PDF
Amend 0013.pdf PDF
Amend 0014.pdf PDF
60040177.pdf PDF
60040178.pdf PDF
60040167.pdf PDF
Updated SUBMITTAL REGISTER.pdf PDF
60040172.pdf PDF
60040137.pdf PDF
Updated List of Drawings.pdf PDF
60040262.pdf PDF
60040179.pdf PDF
60040268.pdf PDF
Updated PROJECT TABLE OF CONTENTS.pdf PDF
60040164.pdf PDF
11 81 00.pdf PDF
60040186.pdf PDF
60040187.pdf PDF
60040189.pdf PDF
60040299.pdf PDF
07 60 00.pdf PDF
07 61 15.00 20.pdf PDF
60040174A.pdf PDF
60040250.pdf PDF
60040188.pdf PDF
05 51 33.pdf PDF
Amend 12 and spec combined.pdf PDF
Amend 0012.pdf PDF
Amend 0010.pdf PDF
Amend 0009.pdf PDF
60040202_PPI.pdf PDF
60040196_PPI.pdf PDF
60040201_PPI.pdf PDF
PROJECT.pdf PDF
60040198_PPI.pdf PDF
60040197_PPI.pdf PDF
SECTION 33 61 14.pdf PDF
60040199_PPI.pdf PDF
60040210_PPI.pdf PDF
Amend and cont sheet combined.pdf PDF
60040195_PPI.pdf PDF
60040290_PPI.pdf PDF
REGISTER.pdf PDF
60040194_PPI.pdf PDF
Show 40 more

Latest 50 of 61 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N40085-25-R-2620 Amendment 0011

CONTINUATION SHEET

1. QUESTION: Historically, the carrier piping on the pre-insulated pipe systems, we have had to provide Per Amendment 8 piping regardless of size for chilled water and heating hot water, Plastic Reinforced Thermosetting Resing (RTR) Piping for any system, and Plastic PVC Piping for chilled water systems. Are we to follow the specifications or provide what has historically been provided at Camp Lejeune?

ANSWER: Type K copper piping should be provided for underground carrier piping per CL preference.

Revised spec provided.

2. All other terms and conditions remain unchanged.

Repair BEQ AS4212 Solicitation No. N40085-25-R-2620 MCB Camp Lejeune, North Carolina Project No. 23-0035

PRICING SHEET

Under the line items furnished, the offers shall state prices for each Exhibit Line-Item Number (ELIN) given hereinafter:

ELIN 0001

Price includes completing all work associated with BEQ AS4212 in accordance with the provided drawings and specifications, but excluding work described in ELIN 0002 and 0003.

The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0002

Price includes completing all work associated with the demolition of HP455 and SHP456 in accordance with the provided drawings and specifications, but excluding work described in ELIN 0001 and 0003. The price for this line item should include all applicable costs, overhead and profit for this work.

ELIN 0003

Price includes addition of FF&E for BEQ AS4212 and associated interior design effort but excluding work described in ELIN 0001 and 0002. The price for this line item should include all applicable costs, overhead and profit for this work.

TOTAL ELIN 0001 - 0003: $______________________________________

Notes A. Offers must be submitted on all line items. Failure to propose on all line items may result in the offer being rejected as non-responsive.

B. ELINs shall include all markups (overhead, labor burden, and profit).

C. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206(b) Evaluation not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for ELINs 0001 through

Repair BEQ AS4212 Solicitation No. N40085-25-R-2620 MCB Camp Lejeune, North Carolina Project No. 23-0035

0003. In accordance with FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the Option(s).

File details come from the government source that posted it. Updated .