Amendment 8 -mechanical.pdf
PDF 6 MB Posted
- Solicitation number
- N4008520R0021
About this file
This solicitation is for design-build construction services for the P-381 Multi-Mission Dry Dock #1 project located at Portsmouth Naval Shipyard in Kittery, Maine. The scope of work includes constructing two new dry dock bays labeled DD1N and DD1W of sufficient size and depth to support maintenance and overhaul of Virginia Class submarines. Additional requirements are concrete floors, walls and a center wall separating the bays; new pump well systems and a pump station building; portal crane rails; mooring hardware; mechanical and electrical utilities; utility tunnels; and all other appurtenances to ensure operational dry docks. Modifications will also be made to the existing dry dock basin closure wall, Berths 1 and 11 to prevent undermining and allow fully dewatered conditions. The existing DD1 pump well will be connected to the new system and interior modified. The solicitation is issued by the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files
Show 40 more
Latest 50 of 123 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVD 88 Level 0.0
EL 0.00
UTILITY BUILDING
TUNNEL
EL -8.28
B3 M-316
A5 M-317
10"x16" SA
3/4" COND
EL: -10.97
14"ø SA
EL: -14.21
10"x16" SA
AHU-2
AHU-1
3/4" NI
4" WHCFSP
TYPICAL
4" WH
EL: 3.31
3/4" NI
EL: 3.46 1 1/4" CA
1" REF(V)
3/4" REF(L)
EL: 2.67
3/4" COND
EL: -15.41
EL: 3.43
1 1/4" CA
1" HPS
1" HPS8" ASWS
EL: 3.15
EL: 1.33
EL: 0.93
8" FW
FIRE
HYDRANT
EL: 1.25
SECTION GENERAL NOTES
1. PROVIDE LOW POINT DRAINS AND HIGH POINT
VENTS FOR ALL PIPING SYSTEMS. CONTRACTOR
MUST PROVIDE LOCATION OF ALL LOWER POINT
DRAINS AND HIGH POINT VENTS ON SHOP
DRAWINGS FOR REVIEW.
2. FINAL PIPE ELEVATIONS MUST BE DETERMINED BY
INSTALLATION CONTRACTOR AND MUST BE
PROVIDED ON AS-BUILT DRAWINGS AFTER FIELD
INSTALLATION.
NAVD 88 Level 0.0
EL 0.00
UTILITY BUILDING
TUNNEL
EL -8.28
C2 M-314
A3 M-317
16"ø SA
EL: -14.29
20"ø SA
EL: 1.08
4" WH
6" FW
3" CR
8" ASWR
2" PW
AHU-1
3/4" COND18"x20" RA 22"ø SA
20" X 18" RA 14"ø SA
EL: 3.87
EL: 2.45
1" HPA
3/4" NI8" ASWS
3/4" NI
1" HPA
8" HPS
3" CR
6" CA
TO DD1E TUNNEL
TO DD1E TUNNEL
6" FW
EL: -2.12
EL: 1.55
EL: 1.96
EL: 2.69
KI
TT
ER
Y, M
AI
N E
PO
R
TS
M
O U
TH
N
AV
AL
S H
IP
YA
R D
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
SHEET
NAVFAC DRAWING NO.
OF
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G C
O M
M
AN
D
CA
PI
TA
L I
MP
RO
VE
ME
NT
C
OR
E
NA
VA
L S
TA
TI
ON
N
OR
FO
LK
, V
IR
GI
NI
A
P-
M
U
LT
I-M
IS
SI
O
N D
R Y
D O
C K
#1
DRAWFORM REVISION: 07 AUG 2018
UNCLASSIFIED
U N C
LA
SS
IF
IE
D
UNCLASSIFIED
LBT/LBL
NBJ
EJA
DSN
SCALE: AS SHOWN
CHKDRWDES
CONSTR. CONTR. NO.
EPROJECT NO.: 1604959
Richard Powers, C980 10/15/20
C
U s er s\ Pu b l ic
\D oc u m en ts \L oc a l_ Re v i t_
Fil es
\D
RY
D S
W T R
-1
5 9
-M _d a rn ol d
.rv t
/3
0/
2 :
:0
PM
D D
1E P
U M
P W
EL
L
SE
C
TI
O
N S
- S H
EE
T
O
F
M-317
TJE DFA VAK
12823848 885 1029
SCALE: 1/4" = 1'-0" A3SECTION THRU PUMP WELL - LOOKING WEST
SCALE: 1/4" = 1'-0" A5
SECTION THRU SOUTHWEST CORNER OF PUMP
WELL - LOOKING SOUTH
AM
E N D
M
EN
T
/1 6/
VM
G
A4 M-301
C2 M-301
B2 M-301
DD1N TUNNEL
OUTLINE
IN TUNNEL
ROUTED
THROUGH
PUMP WELL
EXISTING
PUMP WELL
BELOW GRADE
IN TUNNELCENTER WALL
TUNNEL OUTLINE
C2 M-308
A2 M-308
6" FW
8" FW
8" FW
6" FW
6" FW
3" FW
M F1
M
F1
6" FW6" FW
REFER TO M-401
PUMPWELL
PARTIAL PLANS
6" FW
EXISTING
EXISTING 6" FW
REFER TO V-105
FOR
CONTINUATION
B2 M-303
B5 M-303
A2 M-313
C2 M-313
A5 M-313
6" FW
6" FW
10" FRESH WATER
FROM SITE - REFER
TO DWG CF102 FOR
CONTINUATION
C2 M-314
A4 M-314
A5 M-312
A2 M-3149
6" FW
A5 M-314
DD1N FW UTILITY
SERVICE CONNECTION 5
DD1N FW
UTILITY SERVICE
CONNECTION 6
DD1W FW
UTILITY SERVICE
CONNECTION 6
EXISTING DD1E FW
UTILITY SERVICE
CONNECTION 2
IN TUNNEL
ISOLATION
VALVES
ISOLATION
VALVES
ISOLATION
VALVE
ISOLATION
VALVE
ISOLATION
VALVE
ISOLATION
VALVE
B4 M-308
A4 M-308
M-405 A4
6" FW
UTILITY ENCLOSURE
REFER TO ASSOCIATED PLANS
HB-2
HB-1
HB-1
8" FW
ISOLATION
VALVE
6" FW
6" FW
KEY PLAN KI
TT
ER
Y, M
AI
N E
PO
R
TS
M
O U
TH
N
AV
AL
S H
IP
YA
R D
CHECK GRAPHIC SCALE BEFORE USING
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
SHEET
NAVFAC DRAWING NO.
OF
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
GRAPHIC SCALE
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G C
O M
M
AN
D
CA
PI
TA
L I
MP
RO
VE
ME
NT
C
OR
E
NA
VA
L S
TA
TI
ON
N
OR
FO
LK
, V
IR
GI
NI
A
P-
M
U
LT
I-M
IS
SI
O
N D
R Y
D O
C K
#1
DRAWFORM REVISION: 07 AUG 2018
UNCLASSIFIED
U N C
LA
SS
IF
IE
D
UNCLASSIFIED
LBT/LBL
NBJ
EJA
DSN
SCALE: AS SHOWN
CHKDRWDES
CONSTR. CONTR. NO.
EPROJECT NO.: 1604959
Richard Powers, C980 10/15/20
C
U s er s\ Pu b l ic
\D oc u m en ts \L oc a l_ Re v i t_
Fil es
\D
RY
D S
W T R
-1
5 9
-M _d a rn ol d
.rv t
/3
0/
2 :
:4
PM
FR
ES
H W
AT
ER
P
LA
N
D D
1N A
N D
C
EN
TE
R
W
AL
L
- E
AS
T
MF102
TJE DFA VAK
12823746 783 1029
PLAN NORTH
SCALE: 1/16" = 1'-0"
FRESH WATER PLAN - DD1N AND CENTER WALL - EAST 4' 0' 8' 16' 32' 64'
4' 12' 1/16" = 1'-0"
KEYNOTES
PROVIDE 6" FRESH WATER SERVICE WITH 6" AND 2-1/2"
CONNECTIONS. SEE DETAIL ON M-504.
PROVIDE 3" FW SERVICE WITH 2-1/2" AND 1-1/2"
CONNECTIONS. SEE DETAIL ON M-505.
TIE INTO EXISTING 6" FW WITHIN UTILITY TUNNEL WITH 6"
FW LINE. PROVIDE VALVE AT TIE IN. ROUTE MAIN THROUGH
PUMP WELL TO SERVE AS A CROSS CONNECTION BETWEEN
WITH THE UTILITY ENCLOSURE, CENTER WALL AND NORTH
SIDE OF DD1N.
ROUTE 8" FRESH WATER LINE FROM UTILITY ENCLOSURE.
REFER TO UTILITY ENCLOSURE DRAWINGS. THIS 8" LINE IS
INTENDED TO PROVIDE THE FW SERVICE TO THE CENTER
WALL FROM A 10" FW MAIN BELOW THE UTILITY ENCLOSURE.
PROVIDE 6" BYPASS AND VALVE BETWEEN 6" RPZs FOR
REDUNDANCY.
PROVIDE 6" REDUCED PRESSURE ZONE BACKFLOW
PREVENTER, FOR FW SERVICE CONNECTIONS. COORDINATE
MOUNTING OF BACKFLOW PREVENTER WITH
MANUFACTURER'S RECOMMENDATIONS AND LOCAL CODE
REQUIREMENTS. ROUTE DISCHARGE OF RPZ DIRECTLY
OVER THE NEAREST GUTTER DRAIN PIPE CONNECTION.
6" EXISTING FRESH WATER LINE UNDER WHARF STRUCTURE.
CORE DRILL THROUGH CONCRETE TO TRAVERSE 6" FW PIPE
MAIN FROM THE EXISTING DD1E TUNNEL INTO THE EXISTING
PUMPWELL. PROVIDE DOUBLE LINK SEAL AT ENTRY AND
EXIT WITHIN THE CONCRETE.
PROVIDE ISOLATION VALVE WITHIN TUNNEL FOR FRESH
WATER SERVICE CONNECTION IN HOT BOX. PROVIDE 3/4"
LOW POINT DRAIN AFTER VALVE.
PROVIDE 3/4" LOW POINT DRAIN AFTER RPZ IN TUNNEL.
CAP FRESH WATER PIPING AT VALVE WITHIN MANHOLE.
PROVIDE HYDRANT REFER TO CIVIL DRAWING CF102 FOR
MORE INFORMATION.
AM
E N D
M
EN
T
/1 6/
FE
M
FT
AO
BAS
BERTH 2
SHORE CONNECTIONS
EXISTING
DRY DOCK 1N
DRY DOCK 1W DRY DOCK 1E
6"-FW
8"-FW
6"-FW
8"-FW
BERTH 11C
SHORE CONNECTIONS
8"-FW
FROM SITE
6"x2-1/2"
8"x2-1/2"
6"-FW
12"-FW
8"x6"
6"-FW
8"x2-1/2" 8"x2-1/2"8"x4"
4" ASW
CONNECTION
6"x2-1/2" 6"x2-1/2"
12"x8"
12"x6"12"x8"
"-F
W
8" -F
W
6" -F
W
8"-FW
6" RPZ4" RPZ
8"x6"
6" RPZ
8"x6" 8"x6"
8"x6"
6" RPZ
8"x4" 8"x6"
6" RPZ
8"x3"
2-1/2"x3"
RPZ
8"x3"
2-1/2"x3"
RPZ
wHYD #36 w
8" -F
W
TO BERTH 12
FROM
SITE
FROM SITE
TO SITE
6"x3"
RPZ
2- 1/
2"
1- 1/
2"
6"x4"
RPZ
6"x3"
RPZ
DRY DOCK 1N
UTILITY SERVICE
CONNECTION 1
DRY DOCK 1N
UTILITY SERVICE
CONNECTION 2
DRY DOCK 1N
UTILITY SERVICE
CONNECTION 4
DRY DOCK 1N
UTILITY SERVICE
CONNECTION 5
DRY DOCK 1N
UTILITY SERVICE
CONNECTION 6
DRY DOCK 1W
UTILITY SERVICE
CONNECTION 2
DRY DOCK 1W
UTILITY SERVICE
CONNECTION 4
DRY DOCK 1W
UTILITY SERVICE
CONNECTION 6
DRY DOCK 1E
SERVICE GALLERY 1
EXISTING
DRY DOCK 1E
SERVICE GALLERY 3
EXISTING
DRY DOCK 1W
UTILITY SERVICE
CONNECTION 3
DRY DOCK 1W
UTILITY SERVICE
CONNECTION 5
DRY DOCK 1E
SERVICE GALLERY 4
EXISTING
DRY DOCK 1E
SERVICE GALLERY 5
EXISTING
DRY DOCK 1E
SERVICE GALLERY 6
EXISTING
DRY DOCK 1W
UTILITY SERVICE
CONNECTION 1
DRY DOCK 1E
SERVICE GALLERY 2
EXISTING
6"x3"
RPZ
8"x6"
8"-FW
6" -F
W
2- 1/
2"
8"x6"
8"-FW
6"x3"
RPZ
6"x3"
RPZ
6"x3"
RPZ
8"x6"
6"x3"
RPZ
6"x4"
RPZ
6"x3"
RPZ
BERTH 11B SHORE
CONNECTION
10" FW
SERVICE
10"-FW
4"
UM710
UE FRESH WATER SCHEMATIC
TO UTILITY ENCLOSURE
8"x6"
2- 1/
2"
1- 1/
2"
2- 1/
2"
1- 1/
2"
2- 1/
2"
2- 1/
2" 4"
1- 1/
2"
2- 1/
2"
2- 1/
2"
10"x12"
2- 1/
2"
1- 1/
2"
2- 1/
2"
1- 1/
2"
4" 2- 1/
2"
1- 1/
2"
6"6"
3"x8"
6"
6" FW FOR
ASW BACKUP
6" FW FOR
ASW BACKUP
6" FW FOR
ASW BACKUP
6"
6" FW FOR
ASW BACKUP 4" FW FOR
GENERATOR
TESTING
4" FW FOR
GENERATOR
TESTING
3"x2"
2" RPZ
TO PUMP
STATION
SEE PM102
10"x8"
4" RPZ
DRY DOCK 1N
UTILITY SERVICE
CONNECTION 3
4" 1- 1/
2"
2- 1/
2"
6"x4"
6"x4"
NC
6" -F
W
PUMP STATION
BOUNDARY
UTILITY
ENCLOSURE
BOUNDARY
HYDRANT
10"x8"
8" -F
W
6"
NC
6"
GENERAL NOTES
1. REFER TO M-001 FOR SYMBOLS AND ABBREVIATIONS.
2. NOT ALL COMPONENTS ARE SHOWN. REFER TO DETAILS
AND SPECIFICATIONS FOR FURTHER REQUIREMENTS.
KI
TT
ER
Y, M
AI
N E
PO
R
TS
M
O U
TH
N
AV
AL
S H
IP
YA
R D
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
SHEET
NAVFAC DRAWING NO.
OF
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G C
O M
M
AN
D
CA
PI
TA
L I
MP
RO
VE
ME
NT
C
OR
E
NA
VA
L S
TA
TI
ON
N
OR
FO
LK
, V
IR
GI
NI
A
P-
M
U
LT
I-M
IS
SI
O
N D
R Y
D O
C K
#1
DRAWFORM REVISION: 07 AUG 2018
UNCLASSIFIED
U N C
LA
SS
IF
IE
D
UNCLASSIFIED
LBT/LBL
NBJ
EJA
DSN
SCALE: AS SHOWN
CHKDRWDES
CONSTR. CONTR. NO.
EPROJECT NO.: 1604959
Richard Powers, C980 10/15/20
C
U s er s\ Pu b l ic
\D oc u m en ts \L oc a l_ Re v i t_
Fil es
\D
RY
D S
W T R
-1
5 9
-M _d a rn ol d
.rv t
/3
0/
2 :
:3
PM
FR
ES
H W
AT
ER
S C
H
EM
AT
IC
MF701
TJE DFA VAK
12823751 788 1029
N.T.S.
A4FRESH WATER SCHEMATIC
AM
E N D
M
EN
T
/1 6/
1 2
4"ø
6"ø
4"ø
/1
15 15
8' - 0"
7' - 3"
13 13
16 4"ø 4"ø
7' - 3"
4"ø
10 10 1011
16SCALE: 3/8" = 1'-0" MH101 C3
1 - UTILITY TUNNEL SECTION
SCALE: 3/4" = 1'-0" A2
2 - PLAN VIEW OF HOSE MANIFOLD
DETAIL
SEE DETAIL A2 BELOW
SCALE: 1/2" = 1'-0" A3
3 - ELEVATION VIEW OF HOSE
MANIFOLD
KEYNOTES
FINISHED FLOOR OF
UTILITY TUNNEL
GRADE OF CENTERWALL
GRADE OF
CENTERWALL
CEILING OF UTILITY TUNNEL
EDGE OF CENTERWALL
8 - INCH DRYDOCK NORTH MANIFOLD MAIN
8 - INCH DRYDOCK WEST MANIFOLD MAIN
HEATED ENCLOSURE. REFER TO THE SCHEDULE ON THIS
DRAWING AND MECHANICAL DRAWINGS FOR FURTHER
INFORMATION.
PROVIDE 2-INCH SCHEDULE 40 BLACK STEEL PIPING FROM
FP-HTX OUTLET TO 4-INCH BY 2-INCH TEE DOWNSTREAM
OF FIRST BRANCH CHECK VALVE. REFER TO MH701 FOR
CONNECTION ORDER.
PROVIDE 2-INCH SCHEDULE 40 BLACK STEEL PIPING TO
FP-HTX PUMP INLET FROM 4-INCH BY 2-INCH REDUCER OR
TEE DOWNSTREAM OF LAST CHECK VALVE. REFER TO
MH701 FOR CONNECTION ORDER.
SPRINKLER PIPING. SEE SHEET MH100 FOR PIPE
CONTINUATION.
4 - INCH CHECK VALVE
6 - INCH CHECK VALVE
FIRE PROTECTION FREEZE PROTECTION HEAT
EXCHANGER, FP-HTX. REFER TO MECHANICAL DRAWINGS
FOR MORE DETAILS.
BUTTERFLY VALVE
2.5 - INCH FIRE HOSE CONNECTION
4 - INCH TEMPORARY FIRE MAIN CONNECTION
PROVIDE DRAIN VALVE. PIPE TO NEAREST TUNNEL FLOOR
DRAIN, SEE SHEET MR102 FOR FLOOR DRAIN LOCATIONS.
2 - INCH CHECK VALVE
PROVIDE LOW POINT DRAIN. SEE SHEET MR102 FOR
FLOOR DRAIN LOCATIONS.
PROVIDE MANUAL AIR VENT AT SYSTEM HIGH POINT
PROVIDE PIPE
SUPPORT WITH
STEEL SADDLE
AND STEEL CLAMP
TYPICAL
12823756
793 1056
THESE ARROWS
INDICATE FLOW DIRECTION
ALL PENETRATIONS SEALS
TO HAVE LINK SEAL
ALL PENETRATION SEALS TO
HAVE LINK SEAL
HOT BOX ENCLOSURE SCHEDULE
HOT BOX IDENTIFICATION LOCATION SYSTEM CONNECTIONS (NUMBER AND SIZE) BOX INTERNAL DIMENSIONS INSULATION ACCESS PANELS UNIT HEATERS HOSE MANIFOLD HOT BOX A-D CENTERWALL (1) 2 1/2" (2) 4" 7'-0"(L) 3'-0"(W) 5'-1"(H) 1.5" (2) 33" x 56" H (2)1900W 120V 1PH HOSE MANIFOLD HOT BOX E-F CENTERWALL (1) 2 1/2" (3) 4" 7'-0"(L) 3'-0"(W) 5'-1"(H) 1.5" (2) 22" x 56" H (2)1900W 120V 1PH
PROVIDE PIPE
SUPPORT WITH
STEEL SADDLE
AND STEEL CLAMP
TYPICAL
PROVIDE PIPE
SUPPORT WITH
STEEL SADDLE
AND STEEL CLAMP
TYPICAL
1/4" FILLET WELD ALL AROUND
4" DIAMETER SCHEDULE 40
PIPE GALVANIZED
GALVANIZED
PLATE 8"X8"X1/2"
WITH (4) 3/4"
DIAMETER
EXPANSION
ANCHORS. 4"
MINIMUM
EMBEDMENT
KEY
K
IT
T E
R Y
M
A
IN
E P
O R
T S
M O
U T
H N
A V
A L S
H
IP
Y A
R D
CHECK GRAPHIC SCALE BEFORE
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
M
ID
-A
T L A
N T
IC
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E
INFO
S Y
M D
E S
C R
IP
T
IO
N
D A
T A
P P
SHEE
NAVFAC DRAWING NO.
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
GRAPHIC
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G C
O M
M A
N D
C A
P
IT
A L I
M P
R O
V E
M E
N T
C O
R E
N A
V A
L S
T A
T
IO
N N
O R
F O
L K
V
IR
G
IN
IA
P -3
M
U L T
I- M
IS
S
IO
N
D R
Y D
O C
K
DRAWFORM REVISION: 07 AUG 2018
UNCLASSIFIED
U N C L A S S
IF
IE
D
UNCLASSIFIED
EJA
DSN
NBJ
LBT/LBL
1604959
DES DRW CHK
CONSTR. CONTR. NO.
SCALE: AS SHOWN
Richard Powers, C980 10/15/20
Y
S h a re d
Le g a c y
U S
W K
F D
P ro j\
J e n s e n H u g h e s\ K u rt
R u c h a la
K A
R
.0
P
N S Y
P -3
D ry
D o c k
D ra w in g s\
R e v it
D R
Y D
S W
TR
-1
-F
- 1
-2
.r v t
/6 /2
:2
:2
A
M
F
IR
E P
R O
T E
C T
IO
N
S E
C T
IO
N
S A
N D
D E
T A
IL
S
MH301
MRD MRD KAR
D a te
/1
/2
V M
G
1KAR00083.000
Am en dm en t 0
GROUND LEVEL
EL 12.00
UTILITY BUILDING
TUNNEL
EL -8.28
4" VENT UP
THROUGH
UTILITY
ENCLOSURE
ROOF
8" ASWS
8" ASWR
B3 M-316
UE-CRU-1
4" SS
10" FW
2 1/2" VENT
8"x8" SA
8"x8" SA
1/2" HPS
UE-PRV-02
1 1/2" HPS
1 1/2" HPS
1 1/2" CR
3/4" HPC
2" LPC
4" VENT
1 1/2" CR
10"x10" SA
6" FW
1 1/2" CR
2" HPS
3" CR
2" PW
3" DR
6" CA
ACCU-2
4" SS
4" VENT
8" HPS
3" CR
8" ASWS
FP8"ø
6" SS
4" SS
SECTION GENERAL NOTES
1. PROVIDE LOW POINT DRAINS AND HIGH POINT
VENTS FOR ALL PIPING SYSTEMS. CONTRACTOR
MUST PROVIDE LOCATION OF ALL LOWER POINT
DRAINS AND HIGH POINT VENTS ON SHOP
DRAWINGS FOR REVIEW.
2. FINAL PIPE ELEVATIONS MUST BE DETERMINED BY
INSTALLATION CONTRACTOR AND MUST BE
PROVIDED ON AS-BUILT DRAWINGS AFTER FIELD
INSTALLATION.
KI
TT
ER
Y, M
AI
N E
PO
R
TS
M
O U
TH
N
AV
AL
S H
IP
YA
R D
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
SHEET
NAVFAC DRAWING NO.
OF
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G C
O M
M
AN
D
CA
PI
TA
L I
MP
RO
VE
ME
NT
C
OR
E
NA
VA
L S
TA
TI
ON
N
OR
FO
LK
, V
IR
GI
NI
A
P-
M
U
LT
I-M
IS
SI
O
N D
R Y
D O
C K
#1
DRAWFORM REVISION: 07 AUG 2018
UNCLASSIFIED
U N C
LA
SS
IF
IE
D
UNCLASSIFIED
LBT/LBL
NBJ
EJA
DSN
SCALE: AS SHOWN
CHKDRWDES
CONSTR. CONTR. NO.
EPROJECT NO.: 1604959
Richard Powers, C980 10/15/20
C
U s er s\ Pu b l ic
\D oc u m en ts \L oc a l_ Re v i t_
Fil es
\D
RY
D S
W T R
-1
5 9
-M _d a rn ol d
.rv t
/3
0/
2 :
:5
PM
U
TI
LI
TY
E N
C
LO
SU
R
E
- S
EC
TI
O N
SH
EE
T
O
F
UM304
TJE DFA VAK
12823622 659 1029
SCALE: 3/8" = 1'-0" A3
UTILITY ENCLOSURE - TUNNEL SECTION
LOOKING EAST
KEYNOTES
REFER TO DRAWING M-501 FOR ADDITIONAL INFORMATION
REGARDING PIPE PENETRATION THROUGH WALL.
AM
EN
D
M
EN
T
/1 6/
PI
PI
FE
FT
PI
TCV
ZC
PI
M
M
ST
ST
UM711
LPS SCHEMATIC
SAFETY SHOWER/
EYEWASH
MV-1
UE-WH-1
MS703
ASW SCHEMATIC DD1W
MF701
FRESH WATER SCHEMATIC
10" FW MAKE
UP TO FP
ASSEMBLY
10" FW
" F
W
10" FW
10"x4"
4" FW
4"x2"
RPZ-1
4" RPZ FOR
MECHANICAL
MAKE UP
RPZ-2
2" RPZ FOR
DOMESTIC NON-
POTABLE WATER
UTILITY ENCLOSURE
THIRD FLOOR
UTILITY ENCLOSURE
SECOND FLOOR
UTILITY ENCLOSURE
GROUND FLOOR
UTILITY ENCLOSURE
TUNNEL
UE-SK-1
3/4" LPC
UM711
LPS SCHEMATIC
4" F
W
4" F
W
2 1/2" LPS
PLATE AND
FRAME HEAT
EXCHANGER
2" F
W
2" F
W
3/4" FW 1/2" FW
1/ 2"
F W
UE-ESS-1
PLATE AND FRAME HEAT EXCHANGER SKID - UE-HEX-1
INTEGRAL
MIXING VALVE
1/ 2"
F W
2" F
W
1" FW
1-1/2" FW
CONTROL
PANEL
1/ 2"
F W
1" F
W
1-1/4" FW
1" FW
3/4" FW 3/4" FW
UE-TP-1
UE-FS-1UE-FS-1
1/2" FW
UE-TP-1
1/2" FW
UE-FS-1UE-FS-1
3/4" FW
1" FW
UE-TP-1
1/2" FW
UE-FS-1UE-FS-1
3/4" FW
UE-TP-1
1/2" FW
UE-FS-1
3/4" FW
UE-TP-1
1/2" FW
UE-FS-1
3/4" FW
UM712
PW GENERATION SCHEMATIC
1 1
GENERAL NOTES
1. REFER TO UM003 FOR SYMBOLS AND
ABBREVIATIONS.
2. REFER TO UM103 FOR BID OPTION REQUIREMENTS.
KI
TT
ER
Y, M
AI
N E
PO
R
TS
M
O U
TH
N
AV
AL
S H
IP
YA
R D
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
SHEET
NAVFAC DRAWING NO.
OF
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G C
O M
M
AN
D
CA
PI
TA
L I
MP
RO
VE
ME
NT
C
OR
E
NA
VA
L S
TA
TI
ON
N
OR
FO
LK
, V
IR
GI
NI
A
P-
M
U
LT
I-M
IS
SI
O
N D
R Y
D O
C K
#1
DRAWFORM REVISION: 07 AUG 2018
UNCLASSIFIED
U N C
LA
SS
IF
IE
D
UNCLASSIFIED
LBT/LBL
NBJ
EJA
DSN
SCALE: AS SHOWN
CHKDRWDES
CONSTR. CONTR. NO.
EPROJECT NO.: 1604959
Richard Powers, C980 10/15/20
C
U s er s\ Pu b l ic
\D oc u m en ts \L oc a l_ Re v i t_
Fil es
\D
RY
D S
W T R
-1
5 9
-M _d a rn ol d
.rv t
/3
0/
2 :
:4
PM
U
TI
LI
TY
E N
C
LO
SU
R
E
- F
R
ES
H W
AT
ER
S C
H
EM
AT
IC
UM710
TJE DFA VAK
12823644 681 1029
N.T.S.
A4
UTILITY ENCLOSURE FRESH WATER
SCHEMATIC
UM710 CONTROL POINTS LIST
ABBREVIATION NUMBER POINT DESCRIPTION ASSOCIATED EQUIPMENT P&ID NUMBER SIGNAL TYPE
SOFTWARE POINTS
COMMENT
SALARM TREND
SCADA
MONITORING
FT 01 UE FRESH WATER METER UE FRESH WATER METER UM710 AI No Yes No ZC 01 LPS VALVE POSITION CONTROL UE WATER HEATER HEAT EXCHANGER UM710 AO No Yes Yes
AM
EN
D
M
EN
T
/1 6/
D
D.4 E F
5.3
A2
UM303
A3
UM304
6"Ø SS TO
SITE/CIVIL
CONNECTION
C
A3 M-317
4"Ø PUMPED
SS TO
SITE/CIVIL
CONNECTION
CO
CO
6"Ø SS FROM
LEVEL ABOVE
4" SS
4"Ø SS FROM
LEVEL ABOVE
UE-CRU-1
8" FW
4" SS
8" FW
3" DR
6" SS
6"Ø ST FROM
LEVEL ABOVE
6"Ø ST TO
SITE/CIVIL
CONNECTION
3" DR
3" DR
UE-FD-1
B4 M-308
A4 M-308
M-401
3" DR
8" FW
BOP: 13' - 9"
BOP: 13' - 9"
SLOPE AT MINIMUM OF 1%
BOP: 13' - 9"
4" SS
10" FW
BOP: 7' - 8"
BOP: 12' - 11"
BOP: -2' - 8"
BOP: 12' - 2"
BOP: 12' - 1"
BOP: 14' - 0"
BOP: 14' - 3"
BOP: 7' - 0"
BOP: 9' - 6"BOP: 12' - 11"
BOP: 8' - 6"
BOP: 8' - 6"
BOP: 7' - 11"
BOP: 11' - 11"
ISOLATION
VALVE
ISOLATION
VALVE
GENERAL NOTES
1. BOD AND BOP ELEVATIONS ARE
RELATIVE TO THE ASSOCIATED
FLOOR ELEVATION.
KEY PLAN KI
TT
ER
Y, M
AI
N E
PO
R
TS
M
O U
TH
N
AV
AL
S H
IP
YA
R D
CHECK GRAPHIC SCALE BEFORE USING
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
SHEET
NAVFAC DRAWING NO.
OF
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
GRAPHIC SCALE
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G C
O M
M
AN
D
CA
PI
TA
L I
MP
RO
VE
ME
NT
C
OR
E
NA
VA
L S
TA
TI
ON
N
OR
FO
LK
, V
IR
GI
NI
A
P-
M
U
LT
I-M
IS
SI
O
N D
R Y
D O
C K
#1
DRAWFORM REVISION: 07 AUG 2018
UNCLASSIFIED
U N C
LA
SS
IF
IE
D
UNCLASSIFIED
LBT/LBL
NBJ
EJA
DSN
SCALE: AS SHOWN
CHKDRWDES
CONSTR. CONTR. NO.
EPROJECT NO.: 1604959
Richard Powers, C980 10/15/20
C
U s er s\ Pu b l ic
\D oc u m en ts \L oc a l_ Re v i t_
Fil es
\D
RY
D S
W T R
-1
5 9
-M _d a rn ol d
.rv t
/3
0/
2 :
:5
PM
U
TI
LI
TY
E N
C
LO
SU
R
E
- T
U N
N
EL
P
LU
M
BI
N G
P
LA
N
UP101
TJE DFA VAK
12823655 692 1029
PLAN NORTH
SCALE: 1/4" = 1'-0"
UTILITY ENCLOSURE - TUNNEL PLUMBING PLAN
KEYNOTES
10"Ø FW UP
3"Ø PIPING RUNNING BELOW SLAB.
PIPING CONTINUATION TO TUNNEL. REFER TO M-801.
6"Ø FW UP TO HYDRANT AT GRADE. REFER CIVIL DRAWING,
CF102 FOR MORE INFORMATION.
PROVIDE GEAR OPERATED BUTTERFLY VALVE. VALVE
SHALL BE PREWIRED WITH A TAMPER SWITCH FOR FIRE
ALARM MONITORING. VALVE MUST BE FM APPROVED AND
RATED FOR POTABLE WATER SERVICE. REFER TO FIRE
PUMP ROOM RISER DIAGRAM ON UR701 FOR FURTHER
INFORMATION.
4' 0' 4' 8' 1/4" = 1'-0"
AM
EN
D
M
EN
T
/1 6/
A3
UM301
D
D.4 E F
3.3
5.3
WHEELER
4"Ø ST TO
DAY LIGHT
6"Ø ST TO
DAY LIGHT
6"Ø ST UP
AND DOWN
3"Ø ST TO DAY LIGHT
3" ST
6" ST
C
C4
UM303
A4
UM303
2"Ø SS FROM
LEVEL ABOVE
UE-FD-1
4" SS
4"Ø SS DOWN,
3"Ø SS VENT
UP
6"Ø SS
DOWN
6"Ø SS FROM
LEVEL ABOVE
6" SS
6" SS4" SS
2" SS
4" SS
4" SS
3" SS
3"Ø ST FROM
LEVEL ABOVE
3"Ø SS
VENT UP CO
3" SS
3" SS
CO
10"Ø FW TO FIRE PUMP.
SEE DRAWING UF301
FOR CONTINUATION
4"Ø FW UP
2"Ø FW
UP
4"Ø FW
VALVE AND
CAP FOR
FUTURE
6"Ø ST FROM
LEVEL ABOVE
CO
4"Ø ST FROM
LEVEL ABOVE
4"Ø SS PIPING
RUN IN SLAB
UE-FD-1
CO
GENERAL NOTES
1. BOD AND BOP ELEVATIONS ARE
RELATIVE TO THE ASSOCIATED
FLOOR ELEVATION.
KEY PLAN KI
TT
ER
Y, M
AI
N E
PO
R
TS
M
O U
TH
N
AV
AL
S H
IP
YA
R D
CHECK GRAPHIC SCALE BEFORE USING
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
SATISFACTORY TO
APPROVED
ACTIVITY
DATE
FOR COMMANDER NAVFAC
SEAL
A/E INFO
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
SHEET
NAVFAC DRAWING NO.
OF
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
GRAPHIC SCALE
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G C
O M
M
AN
D
CA
PI
TA
L I
MP
RO
VE
ME
NT
C
OR
E
NA
VA
L S
TA
TI
ON
N
OR
FO
LK
, V
IR
GI
NI
A
P-
M
U
LT
I-M
IS
SI
O
N D
R Y
D O
C K
#1
DRAWFORM REVISION: 07 AUG 2018
UNCLASSIFIED
U N C
LA
SS
IF
IE
D
UNCLASSIFIED
LBT/LBL
NBJ
EJA
DSN
SCALE: AS SHOWN
CHKDRWDES
CONSTR. CONTR. NO.
EPROJECT NO.: 1604959
Richard Powers, C980 10/15/20
C
U s er s\ Pu b l ic
\D oc u m en ts \L oc a l_ Re v i t_
Fil es
\D
RY
D S
W T R
-1
5 9
-M _d a rn ol d
.rv t
/3
0/
2 :
:0
PM
U
TI
LI
TY
E N
C
LO
SU
R
E
- G
R O
U N
D F
LO
O
R P
LU
M
BI
N
G P
LA
N
UP102
TJE DFA VAK
12823656 693 1029
PLAN NORTH
SCALE: 1/4" = 1'-0"
UTILITY ENCLOSURE - GROUND FLOOR PLUMBING PLAN
KEYNOTES
3"Ø SS FROM UE-FD-1 ON LEVEL ABOVE.
6"Ø SS FROM UE-FS-1 ON LEVEL ABOVE.
ULTRASONIC FLOW METER.
PROVIDE 4" GEAR OPERATED BUTTERFLY VALVE IN THE
VERTICAL FOR BUILDING ISOLATION.
4' 0' 4' 8' 1/4" = 1'-0"
AM
EN
D
M
EN
T
/1 6/
| M-317 - DD1E PUMP WELL SECTIONS - SHEET 2 OF 2 |
| Sheets |
| G-144 - ENLARGED DECK PLAN - UTILITY ENCLOSURE AREA |
| M-317 - DD1E PUMP WELL SECTIONS - SHEET 2 OF 2 |
| MF102 - FRESH WATER PLAN - DD1N AND CENTER WALL - EAST |
| MF701 - FRESH WATER SCHEMATIC |
| UM304 - UTILITY ENCLOSURE - SECTION - SHEET 4 OF 4 |
| UM710 - UTILITY ENCLOSURE - FRESH WATER SCHEMATIC |
| UP101 - UTILITY ENCLOSURE - TUNNEL PLUMBING PLAN |
| UP102 - UTILITY ENCLOSURE - GROUND FLOOR PLUMBING PLAN |
| MF102 - FRESH WATER PLAN - DD1N AND CENTER WALL - EAST |
| Sheets |
| G-144 - ENLARGED DECK PLAN - UTILITY ENCLOSURE AREA |
| M-317 - DD1E PUMP WELL SECTIONS - SHEET 2 OF 2 |
| MF102 - FRESH WATER PLAN - DD1N AND CENTER WALL - EAST |
| MF701 - FRESH WATER SCHEMATIC |
| UM304 - UTILITY ENCLOSURE - SECTION - SHEET 4 OF 4 |
| UM710 - UTILITY ENCLOSURE - FRESH WATER SCHEMATIC |
| UP101 - UTILITY ENCLOSURE - TUNNEL PLUMBING PLAN |
| UP102 - UTILITY ENCLOSURE - GROUND FLOOR PLUMBING PLAN |
| MF701 - FRESH WATER SCHEMATIC |
| Sheets |
| G-144 - ENLARGED DECK PLAN - UTILITY ENCLOSURE AREA |
| M-317 - DD1E PUMP WELL SECTIONS - SHEET 2 OF 2 |
| MF102 - FRESH WATER PLAN - DD1N AND CENTER WALL - EAST |
| MF701 - FRESH WATER SCHEMATIC |
| UM304 - UTILITY ENCLOSURE - SECTION - SHEET 4 OF 4 |
| UM710 - UTILITY ENCLOSURE - FRESH WATER SCHEMATIC |
| UP101 - UTILITY ENCLOSURE - TUNNEL PLUMBING PLAN |
| UP102 - UTILITY ENCLOSURE - GROUND FLOOR PLUMBING PLAN |
| MH301 - FIRE PROTECTION SECTIONS AND DETAILS |
| Sheets |
| MH301 - FIRE PROTECTION SECTIONS AND DETAILS |
| UM304 - UTILITY ENCLOSURE - SECTION - SHEET 4 OF 4 |
| Sheets |
| G-144 - ENLARGED DECK PLAN - UTILITY ENCLOSURE AREA |
| M-317 - DD1E PUMP WELL SECTIONS - SHEET 2 OF 2 |
| MF102 - FRESH WATER PLAN - DD1N AND CENTER WALL - EAST |
| MF701 - FRESH WATER SCHEMATIC |
| UM304 - UTILITY ENCLOSURE - SECTION - SHEET 4 OF 4 |
| UM710 - UTILITY ENCLOSURE - FRESH WATER SCHEMATIC |
| UP101 - UTILITY ENCLOSURE - TUNNEL PLUMBING PLAN |
| UP102 - UTILITY ENCLOSURE - GROUND FLOOR PLUMBING PLAN |
| UM710 - UTILITY ENCLOSURE - FRESH WATER SCHEMATIC |
| Sheets |
| G-144 - ENLARGED DECK PLAN - UTILITY ENCLOSURE AREA |
| M-317 - DD1E PUMP WELL SECTIONS - SHEET 2 OF 2 |
| MF102 - FRESH WATER PLAN - DD1N AND CENTER WALL - EAST |
| MF701 - FRESH WATER SCHEMATIC |
| UM304 - UTILITY ENCLOSURE - SECTION - SHEET 4 OF 4 |
| UM710 - UTILITY ENCLOSURE - FRESH WATER SCHEMATIC |
| UP101 - UTILITY ENCLOSURE - TUNNEL PLUMBING PLAN |
| UP102 - UTILITY ENCLOSURE - GROUND FLOOR PLUMBING PLAN |
| UP101 - UTILITY ENCLOSURE - TUNNEL PLUMBING PLAN |
| Sheets |
| G-144 - ENLARGED DECK PLAN - UTILITY ENCLOSURE AREA |
| M-317 - DD1E PUMP WELL SECTIONS - SHEET 2 OF 2 |
| MF102 - FRESH WATER PLAN - DD1N AND CENTER WALL - EAST |
| MF701 - FRESH WATER SCHEMATIC |
| UM304 - UTILITY ENCLOSURE - SECTION - SHEET 4 OF 4 |
| UM710 - UTILITY ENCLOSURE - FRESH WATER SCHEMATIC |
| UP101 - UTILITY ENCLOSURE - TUNNEL PLUMBING PLAN |
| UP102 - UTILITY ENCLOSURE - GROUND FLOOR PLUMBING PLAN |
| UP102 - UTILITY ENCLOSURE - GROUND FLOOR PLUMBING PLAN |
| Sheets |
| G-144 - ENLARGED DECK PLAN - UTILITY ENCLOSURE AREA |
| M-317 - DD1E PUMP WELL SECTIONS - SHEET 2 OF 2 |
| MF102 - FRESH WATER PLAN - DD1N AND CENTER WALL - EAST |
| MF701 - FRESH WATER SCHEMATIC |
| UM304 - UTILITY ENCLOSURE - SECTION - SHEET 4 OF 4 |
| UM710 - UTILITY ENCLOSURE - FRESH WATER SCHEMATIC |
| UP101 - UTILITY ENCLOSURE - TUNNEL PLUMBING PLAN |
| UP102 - UTILITY ENCLOSURE - GROUND FLOOR PLUMBING PLAN |
| 2020-12-07T13:19:56-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-12-07T13:20:46-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-12-07T13:21:12-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-12-07T13:21:38-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-12-07T13:22:03-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-12-07T13:22:27-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-12-07T13:23:12-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-12-07T13:23:38-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-12-07T13:24:34-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-12-07T13:24:52-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-12-07T13:24:55-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-12-07T13:24:58-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-12-07T13:25:01-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-12-07T13:25:04-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-12-07T13:25:07-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2020-12-07T13:25:10-0500 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
File details come from the government source that posted it. Updated .